Journal articles on the topic 'The PERT technique'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the top 50 journal articles for your research on the topic 'The PERT technique.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.
Nkoi, Barinyima, Animia Ajor Wordu, and Fortune Worgu. "Project Evaluation Review Technique Model to Dredging Operations in Niger Delta." European Journal of Engineering Research and Science 4, no. 3 (2019): 190–95. http://dx.doi.org/10.24018/ejers.2019.4.3.1115.
Full textNkoi, Barinyima, Animia Ajor Wordu, and Fortune Worgu. "Project Evaluation Review Technique Model to Dredging Operations in Niger Delta." European Journal of Engineering and Technology Research 4, no. 3 (2019): 190–95. http://dx.doi.org/10.24018/ejeng.2019.4.3.1115.
Full textDuc, Nguyen Anh. "Enhancing programevaluation and review technique (PERT) for construction project scheduling with Bayesian updating and appropriate probability distributions." Journal of Science and Technology in Civil Engineering (JSTCE) - HUCE 18, no. 4 (2024): 132–47. https://doi.org/10.31814/stce.huce2024-18(4)-11.
Full textCottrell, Wayne D. "Simplified Program Evaluation and Review Technique (PERT)." Journal of Construction Engineering and Management 125, no. 1 (1999): 16–22. http://dx.doi.org/10.1061/(asce)0733-9364(1999)125:1(16).
Full textAshadi, Reza Ferial, Albert Eddy Husin, and Ireng Guntorojati. "Infrastructure Construction Projects Scheduling Using Manual-Program Evaluation and Review Technique (M-PERT) Method. Case Study: Indonesian Sunda Strait Bridge." Jurnal Teknik Sipil 29, no. 2 (2022): 125–32. http://dx.doi.org/10.5614/jts.2022.29.2.3.
Full textWahyudiono, Sandi, and Rini Pebri Utari. "Analisis Terkait Penggunaan Program Evaluation and Review Technique (PERT) pada Pemeliharaan Gedung (Studi Kasus: GKB 1 UMM Malang)." Jurnal Media Teknik Sipil 20, no. 2 (2022): 53–58. http://dx.doi.org/10.22219/jmts.v20i2.35561.
Full textLiu, Mei. "Program Evaluation and Review Technique (PERT) in Construction Risk Analysis." Applied Mechanics and Materials 357-360 (August 2013): 2334–37. http://dx.doi.org/10.4028/www.scientific.net/amm.357-360.2334.
Full textMasinambow, Jendry. "PENJADWALAN PEMBANGUNAN MENARA ALFA OMEGA DI KOTA TOMOHON DENGAN MENGGUNAKAN METODE PERT (PROGRAM EVALUATION AND REVIEW TECHNIQUE)." Jurnal Ilmiah Realtech 15, no. 2 (2019): 121–28. http://dx.doi.org/10.52159/realtech.v15i2.94.
Full textNovanto, Ferdi, Larashati B'tari Setyaning, and Umar Abdul Aziz. "Penjadwalan Waktu Menggunakan Metode Program Evaluation and Review Technique (PERT)." Surya Beton : Jurnal Ilmu Teknik Sipil 8, no. 1 (2024): 1–7. http://dx.doi.org/10.37729/suryabeton.v8i1.4694.
Full textHusna, Rifa Auliya'ul, Nur Fadilatul Ilmiyah, and Nalsa Cintya Resti. "Implementasi CPM dan PERT dalam Memprediksi Durasi serta Biaya Pembangunan Musala Al-Ikhlas di Kotawaringin Barat." Journal Focus Action of Research Mathematic (Factor M) 5, no. 1 (2022): 97–109. http://dx.doi.org/10.30762/f_m.v5i1.633.
Full textRidwan, Ahmad. "Optimizing Project Time Management Using the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT)." JURNAL APLIKASI PELAYARAN DAN KEPELABUHANAN 15, no. 2 (2025): 354–61. https://doi.org/10.30649/japk.v15i2.160.
Full textNugraha, Farhan Zaidan, and Winarno Winarno. "IMPLEMENTASI PENENTUAN JADWAL DAN BIAYA EFEKTIF MELALUI INTEGRASI METODE CPM (CRITICAL PATH METODE) DAN PERT (PROGRAM EVALUATION AND REVIEW TECHNIQUE)." Journal of Economic, Bussines and Accounting (COSTING) 7, no. 5 (2024): 4616–26. https://doi.org/10.31539/costing.v7i6.13008.
Full textUdoumoh, E. F., and I. A. Iwok. "Estimating Activity Duration in PERT Using the Burr XII Distribution." Asian Research Journal of Mathematics 21, no. 3 (2025): 63–74. https://doi.org/10.9734/arjom/2025/v21i3900.
Full textWahyudiono, Sandi, Faris Rizal Andardi, Yunan Rusdianto, and Rifky Awalludiensyah. "Penerapan Metode Program Evaluation and Review Technique (PERT) Pada Proyek Malang Creative Center (MCC) Berdasarkan Building Information Modelling (BIM)." Jurnal Media Teknik Sipil 21, no. 2 (2023): 66–76. http://dx.doi.org/10.22219/jmts.v21i2.28969.
Full textPratiwi, Mirza Fitria, and Djaelani Djaelani. "ANALISA BIAYA DAN WAKTU DENGAN KOMBINASI METODE PDM DAN PERT PADA PROYEK PEMBANGUNAN SALURAN KANTOR PEMDA – EXIT TOL KEBOMAS GRESIK." Jurnal Teknik Sipil 13, no. 2 (2024): 141–50. http://dx.doi.org/10.36546/tekniksipil.v13i2.1086.
Full textRodriguez, Rene A. Santa Cruz. "Pert using Fuzzy variables and probability distribution function randomly selected." Independent Journal of Management & Production 10, no. 1 (2019): 041. http://dx.doi.org/10.14807/ijmp.v10i1.844.
Full textElfandani, Moh Alviko, and Said Salim Dahda. "Analisis Manajemen Proyek Menggunakan Metode CPM dan PERT pada Proyek Instalasi Pipa di PT. XYZ." Journal of Management and Bussines (JOMB) 7, no. 3 (2025): 200–209. https://doi.org/10.31539/jomb.v7i3.15063.
Full textShabani, Amir, and Reza Farzipoor Saen. "Developing a novel data envelopment analysis model to determine prospective benchmarks of green supply chain in the presence of dual-role factor." Benchmarking: An International Journal 22, no. 4 (2015): 711–30. http://dx.doi.org/10.1108/bij-12-2012-0087.
Full textPang, Chuan Kian, Noor Ajian Mohd-Lair, and Yi Sheng Chua. "Using PERT to Optimise the Completion Time of Air-Conditioning and Mechanical Ventilation (ACMV) Project." Applied Mechanics and Materials 892 (June 2019): 266–73. http://dx.doi.org/10.4028/www.scientific.net/amm.892.266.
Full textAbadiyah, Siti, Muhammad Ali Mu’min, and Teguh Dwi Julianto. "ANALISA PERBANDINGAN WAKTU PENJADWALAN PROYEK DENGAN METODE CPM (CRITICAL PATH METHOD) DAN PERT (PROGRAM EVALUATION AND REVIEW TECHNIQUE)." Structure (Jurnal Sipil) 2, no. 2 (2022): 72. http://dx.doi.org/10.31000/civil.v2i2.7007.
Full textRachmawati, Indah, R. Dimas Endro W, and Edi Haryono. "Network Planning Application for Scheduling of Marine Diesel Engine General Overhaul Activities." IOP Conference Series: Earth and Environmental Science 1265, no. 1 (2023): 012012. http://dx.doi.org/10.1088/1755-1315/1265/1/012012.
Full textAstari, Naura Mutia, Ade Momon Subagyo, and Kusnadi Kusnadi. "PERENCANAAN MANAJEMEN PROYEK DENGAN METODE CPM (CRITICAL PATH METHOD) DAN PERT (PROGRAM EVALUATION AND REVIEW TECHNIQUE)." Konstruksia 13, no. 1 (2022): 164. http://dx.doi.org/10.24853/jk.13.1.164-180.
Full textStrang, Kenneth David, and Robert J. Symonds. "Analyzing Research Activity Duration and Uncertainty in Business Doctorate Degrees." International Journal of Risk and Contingency Management 1, no. 1 (2012): 29–48. http://dx.doi.org/10.4018/ijrcm.2012010103.
Full textFadjar, Adnan, Amar Akbar Ali, and Arief Setiawan. "ESTIMATING HOUSE CONSTRUCTION COMPLETION TIME WITH PROBABILISTIC ACTIVITIES DURATION USING THE PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) METHOD." Jurnal Sains dan Teknologi Tadulako 9, no. 1 (2023): 1–9. http://dx.doi.org/10.22487/jstt.v9i1.449.
Full textLopi, Maria Ferlina Mo, Roswita Angel Semu Lewotobi, Yohana Mude, and Imelda Hendriani Eku Rimo. "Optimasi Penjadwalan Waktu Produksi dan Pemasaran Produk Daun Kelor di Moza Cafe Menggunakan Model PERT." Jurnal Ilmiah Soulmath : Jurnal Edukasi Pendidikan Matematika 13, no. 2 (2025): 121–38. https://doi.org/10.25139/smj.v13i2.10077.
Full textNingtyas, Rena Avinika, M. Bagus Yulistian, M. Rijali Sukur Pelu, et al. "TINJAUAN PENERAPAN CRITICAL PATH METHOD (CPM) DAN PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) DALAM PEMBANGUNAN PROYEK GEDUNG." Construction and Material Journal 7, no. 1 (2025): 65–71. https://doi.org/10.32722/cmj.v7i1.6562.
Full textSuryanto, Kelik, Herry Widhiarto, Michella Beatrix, and Laily Endah Fatmawati. "PENJADWALAN WAKTU PROYEK PEMBANGUNAN GEDUNG TELKOM GROUP SURABAYA DENGAN METODE PERT (PROGRAM EVALUATION AND REVIEW TECHNIQUE)." EXTRAPOLASI 17, no. 1 (2021): 44–51. http://dx.doi.org/10.30996/exp.v17i1.3617.
Full textBERGANTIÑOS, GUSTAVO, and JUAN VIDAL-PUGA. "A VALUE FOR PERT PROBLEMS." International Game Theory Review 11, no. 04 (2009): 419–36. http://dx.doi.org/10.1142/s0219198909002418.
Full textOktrima, Bulan. "Evaluasi Waktu Penyelesaian Proyek dengan Metode PERT (Project Evaluation and Review Technique) di PT.ConcoPhillips Indonesia (Suban Tie In,April 1-2,2006)." Jurnal Saintika Unpam : Jurnal Sains dan Matematika Unpam 1, no. 1 (2018): 98. http://dx.doi.org/10.32493/jsmu.v1i1.1606.
Full textLevner, Eugene, Vladimir Kats, Pengyu Yan, and Ada Che. "Fast Algorithm for High-Throughput Screening Scheduling Based on the PERT/CPM Project Management Technique." Algorithms 17, no. 3 (2024): 127. http://dx.doi.org/10.3390/a17030127.
Full textAL-Seedi, Abdul-Sattar A. K., Jawad K. AL-khafaji, and Hadi M. A. AL-Mosawi. "Comparison and evaluation of diagnostic techniques of mycobacterium tuberculosis in Iraq." Journal of Contemporary Medical Sciences 3, no. 9 (2017): 193–96. https://doi.org/10.22317/jcms.v3i9.137.
Full textMirkovic, Milan. "Triangular distribution and PERT method vs. payoff matrix for decision-making support in risk analysis of construction bidding: A case study." Facta universitatis - series: Architecture and Civil Engineering 18, no. 3 (2020): 287–307. http://dx.doi.org/10.2298/fuace201117020m.
Full textRahmatullah, Rahmatullah, A. Fajryah Ramadhani L, Sofyan Bachmid, Watono Watono, and St Fatmah Arsal. "Perbandingan Critical Path Method (CPM) dengan Program Evaluation and Review Technique (PERT) Terhadap Penjadwalan Waktu Proyek." Jurnal Teknik Sipil MACCA 7, no. 2 (2022): 157–67. http://dx.doi.org/10.33096/jtsm.v7i2.660.
Full textRitonga, Chori Okio, Suliawati Suliawati, Mahrani Arfah, and Anisah Lukman. "Analisis Penjadwalan Proyek Pembangunan Jembatan Rel Kereta Api Bukit Putus - Padang Menggunakan Metode CPM Dan PERT." JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING 7, no. 1 (2023): 109–14. http://dx.doi.org/10.31289/jime.v7i1.9421.
Full textPrakoso, Akas Dwi, Edison H. Manurung, and Abdul Mubarok. "ANALISIS NETWORK PLANNING PADA PROYEK APARTEMEN SAVYAVASA DI JAKARTA SELATAN DENGAN METODE PROGRAM EVALUATION REVIEW AND TECHNIQUE (PERT)." SENTRI: Jurnal Riset Ilmiah 2, no. 10 (2023): 4156–68. http://dx.doi.org/10.55681/sentri.v2i10.1655.
Full textPuspitasari, Dita Puji, Novi Andhi Setyo Purwono, and F. Eddy Poerwodihardjo. "ANALISIS PERBANDINGAN PENJADWALAN PROYEK DENGAN METODE CPM, PERT, KURVA-S (Studi Kasus Peningkatan Jalan Menganti Kesugihan)." Teodolita: Media Komunkasi Ilmiah di Bidang Teknik 23, no. 1 (2022): 77–89. http://dx.doi.org/10.53810/jt.v23i1.441.
Full textGhiffari, Mochamad Haikal, and Nur Budi Mulyono. "Improving Project Time Estimation in Game Development: Rayleigh Distribution and Program Evaluation and Review Technique Approach." Jurnal sosial dan sains 5, no. 1 (2025): 35–46. https://doi.org/10.59188/jurnalsosains.v5i1.31973.
Full textNag, Paulami, Samarpita Dutta, Goutam Saha, and Arindam Das. "Relevance of Project Evaluation and Review Technique (PERT) for Procurement of Equipments in a Government Medical College and Hospital in North-East India." January-March 2023 14, no. 1 (2023): 74–78. http://dx.doi.org/10.51957/healthline_496_2023.
Full textMursyid, Agil Thoriq, Hidayat Hidayat, and Yanuar Pandu Negoro. "Analisis Manajemen Proyek Pada Proyek Instalasi Pipa Dengan Metode CPM Di PT. Cahya Mandiri Gemilang." INTECOMS: Journal of Information Technology and Computer Science 8, no. 2 (2025): 578–85. https://doi.org/10.31539/intecoms.v8i2.15002.
Full textAbadiyah, Siti, Muhammad Ali Mu'min, and Taufik Ismail Rinaldi. "EVALUASI PENJADWALAN WAKTU DAN BIAYA PROYEK JALAN TOL KUNCIRAN-SERPONG PT. WASKITA KARYA (persero) Tbk. DENGAN METODE PERT DAN CPM." Structure (Jurnal Sipil) 1, no. 2 (2022): 39. http://dx.doi.org/10.31000/civil.v1i2.6934.
Full textYudistira, I. Gusti Agung Anom, Rinda Nariswari, Samsul Arifin, Abdul Azis Abdillah, Puguh Wahyu Prasetyo, and Nanang Susyanto. "Program Evaluation and Review Technique (PERT) Analysis to Predict Completion Time and Project Risk Using Discrete Event System Simulation Method." CommIT (Communication and Information Technology) Journal 18, no. 1 (2024): 67–76. http://dx.doi.org/10.21512/commit.v18i1.8495.
Full textS, Radhakrishnan, and Saikeerthana D. "Interval network analysis in project management." Kongunadu Research Journal 7, no. 2 (2020): 99–113. http://dx.doi.org/10.26524/krj.2020.29.
Full textTripathy, Bibhuti Bhusan. "An optimisation technique for crashing PERT network in project management." International Journal of Operational Research 10, no. 3 (2011): 277. http://dx.doi.org/10.1504/ijor.2011.038902.
Full textPontrandolfo, Pierpaolo. "Project duration in stochastic networks by the PERT-path technique." International Journal of Project Management 18, no. 3 (2000): 215–22. http://dx.doi.org/10.1016/s0263-7863(99)00015-0.
Full textMummolo, Giovanni. "PERT-path network technique: a new approach to project planning." International Journal of Project Management 12, no. 2 (1994): 89–99. http://dx.doi.org/10.1016/0263-7863(94)90015-9.
Full textMiller, Robert D., and Roy Riblet. "Improved phenol emulsion DNA reassociation technique (PERT) using thermal cycling." Nucleic Acids Research 23, no. 12 (1995): 2339–40. http://dx.doi.org/10.1093/nar/23.12.2339.
Full textRyan Swastiputro Adinugroho and Sugiyono Madelan. "OPTIMIZATION OF CAFE AND SALON DEVELOPMENT PROJECT MANAGEMENT WITH PERT AND CPM METHODS AT PT DTD." Dinasti International Journal of Management Science 3, no. 1 (2021): 188–201. http://dx.doi.org/10.31933/dijms.v3i1.919.
Full textSyahidir Firdaus, Radja, and Herry Hermawan. "Analysis and Application of Construction Management in The Waled-Ciledug BTS Road Reconstruction Project." Jurnal Syntax Transformation 6, no. 2 (2025): 129–43. https://doi.org/10.46799/jst.v6i2.1065.
Full textSetiawan, A., A. Fadjar, and M. Labombang. "Scheduling The Construction of Low-Income Community Houses in Palu City Using the Probabilistic Duration Method." IOP Conference Series: Earth and Environmental Science 1355, no. 1 (2024): 012013. http://dx.doi.org/10.1088/1755-1315/1355/1/012013.
Full textMorán Montenegro, Alejandra Massiel, Jhonny Alexander Dávila González, and Julio Trujillo González. "OPTIMIZACIÓN DE OPERACIONES EN DISTRIBUIDORA MEDIANTE PERT/CPM PARA DETERMINAR ACTIVIDADES CRÍTICAS." Tecnociencia 26, no. 1 (2024): 151–64. http://dx.doi.org/10.48204/j.tecno.v26n1.a4656.
Full text