To see the other types of publications on this topic, follow the link: Theory of schedule.

Journal articles on the topic 'Theory of schedule'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 journal articles for your research on the topic 'Theory of schedule.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.

1

Pérez, Omar D., Michael RF Aitken, Peter Zhukovsky, Fabián A. Soto, Gonzalo P. Urcelay, and Anthony Dickinson. "Human instrumental performance in ratio and interval contingencies: A challenge for associative theory." Quarterly Journal of Experimental Psychology 72, no. 2 (2018): 311–21. http://dx.doi.org/10.1080/17470218.2016.1265996.

Full text
Abstract:
Associative learning theories regard the probability of reinforcement as the critical factor determining responding. However, the role of this factor in instrumental conditioning is not completely clear. In fact, free-operant experiments show that participants respond at a higher rate on variable ratio than on variable interval schedules even though the reinforcement probability is matched between the schedules. This difference has been attributed to the differential reinforcement of long inter-response times (IRTs) by interval schedules, which acts to slow responding. In the present study, we
APA, Harvard, Vancouver, ISO, and other styles
2

Sotskov, Yuri N., Natalja M. Matsveichuk, and Vadzim D. Hatsura. "Two-Machine Job-Shop Scheduling Problem to Minimize the Makespan with Uncertain Job Durations." Algorithms 13, no. 1 (2019): 4. http://dx.doi.org/10.3390/a13010004.

Full text
Abstract:
We study two-machine shop-scheduling problems provided that lower and upper bounds on durations of n jobs are given before scheduling. An exact value of the job duration remains unknown until completing the job. The objective is to minimize the makespan (schedule length). We address the issue of how to best execute a schedule if the job duration may take any real value from the given segment. Scheduling decisions may consist of two phases: an off-line phase and an on-line phase. Using information on the lower and upper bounds for each job duration available at the off-line phase, a scheduler c
APA, Harvard, Vancouver, ISO, and other styles
3

Takahashi, Masaharu. "Schedule segmentation and delay-reduction theory." Behavioural Processes 36, no. 3 (1996): 263–75. http://dx.doi.org/10.1016/0376-6357(95)00066-6.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Sattorov, Samandar, Alexey Kotenko, Shukhrat Saidivaliev, Jamshid Barotov, and Nassim Rustamov. "Development of the fundamentals for organizing the transportation of local goods on the railways of the republic of Uzbekistan." E3S Web of Conferences 460 (2023): 06015. http://dx.doi.org/10.1051/e3sconf/202346006015.

Full text
Abstract:
Target: The article discusses the approach to variant calculations of a phased increase in line capacity, modeling of a traffic management system aimed at meeting transportation needs and finding a balance between schedules of various categories of trains in the train schedule configuration to improve the efficiency of local freight transportation. Methods: The article uses methods from the theory of operational work, development of train schedules, graph theory, methods of system and cluster analysis, mathematical statistics, economic and mathematical modeling. Results: two-level model of tra
APA, Harvard, Vancouver, ISO, and other styles
5

Moloshtan, Dmytro, Serhii Korol, and Kateryna Korol. "Improvement of traffic organization and vehicle operation by means of mathematical and computer modeling." Central Ukrainian Scientific Bulletin. Technical Sciences 2, no. 9(40) (2024): 195–203. http://dx.doi.org/10.32515/2664-262x.2024.9(40).2.195-203.

Full text
Abstract:
The intensive development of road transport requires further improvement of the efficiency of the management apparatus, improvement of its structure, introduction of economic and mathematical methods and automated control systems. The effectiveness of passenger transportation management depends on the information support of managers at each stage of management - planning, dispatching, regulating, accounting and analyzing transportation activities. This axiom of management requires managers of all ranks to implement and use certain information technologies (IT). The bus schedule is the main doc
APA, Harvard, Vancouver, ISO, and other styles
6

Jiang, Yang, Qiulei Ding, Junhu Ruan, and Wenjuan Wang. "Combining prospect theory with fuzzy theory to handle disruption in production scheduling." Filomat 32, no. 5 (2018): 1649–56. http://dx.doi.org/10.2298/fil1805649j.

Full text
Abstract:
This paper focuses on revising a production scheduling that an unpredictable disruption happens after a subset of jobs has been processed. Under these circumstances, continuing with the original schedule will not be optimal. This paper combines prospect theory and fuzzy theory to present a recovery model to handle the disruption. The proposed model is different from most rescheduling approaches in that the difference between the original schedule and the recovery schedule is contained by taking human behavior into consideration. The computational result demonstrates that due to the tradeoff be
APA, Harvard, Vancouver, ISO, and other styles
7

Wicaksono, Pramitha Shafika, and Kartono Kartono. "ANALISIS PENJADWALAN MATA PELAJARAN MENGGUNAKAN ALGORITMA WELCH-POWELL." Prismatika: Jurnal Pendidikan dan Riset Matematika 3, no. 1 (2020): 1–21. http://dx.doi.org/10.33503/prismatika.v3i1.1008.

Full text
Abstract:
At the beginning of each semester, subjects scheduling is always carried out by the curriculum representatives and academic staff. There were several problems that must be avoided in subjects scheduling, these problems were the schedule of teachers who teach one subject at the same time are scheduled in different classes, teachers who teach more than one subject are scheduled in the same class at the same time, teachers who are lack of scheduled for teaching. In the subject of graph theory, there is a concept of graph coloring, one of which is vertex coloring. In vertex coloring, there is a We
APA, Harvard, Vancouver, ISO, and other styles
8

Moro, K., and Y. Sugai. "Evaluation of train schedule by using information theory." International Journal of Transport Development and Integration 1, no. 3 (2017): 460–70. http://dx.doi.org/10.2495/tdi-v1-n3-460-470.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Kariuki,, S., and J. Efstathiou,. "Information Theory as a Measure of Schedule Complexity." Journal for Manufacturing Science and Production 5, no. 1-2 (2003): 37–40. http://dx.doi.org/10.1515/ijmsp.2003.5.1-2.37.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Kossek, Ellen Ernst, Lindsay Mechem Rosokha, and Carrie Leana. "Work Schedule Patching in Health Care: Exploring Implementation Approaches." Work and Occupations 47, no. 2 (2019): 228–61. http://dx.doi.org/10.1177/0730888419841101.

Full text
Abstract:
The authors propose a typology of “work schedule patching,” the ongoing adjustments made to plug scheduling holes after employers post schedules. Patching occurs due to changes in employer work demands, or employee nonwork demands necessitating scheduling adjustments, which are reactive or proactive. Using qualitative data from eight health-care facilities, the authors identified three narratives justifying schedule patching implementation approaches (share-the-pain, work-life-needs, and reverse-status-rotation) with variation in formalization and improvisation. Exploratory analysis showed a s
APA, Harvard, Vancouver, ISO, and other styles
11

Tahir, Fauzia D., Deny Ardika Prasetyo, and Nisky Imansyah Yahya. "IMPELEMENTASI ALGORITMA WELCH-POWELL DALAM PENJADWALAN PIKET JAGA SEKRETARIAT ORGANISASI MAHASISWA PADA HIMPUNAN MAHASISWA JURUSAN MATEMATIKA UNIVERSITAS NEGERI GORONTALO." Amalgamasi: Journal of Mathematics and Applications 4, no. 1 (2025): 30–39. https://doi.org/10.55098/amalgamasi.v4.i1.pp30-39.

Full text
Abstract:
Graph theory is used to represent discrete objects and the relationships between them. One of its applications is scheduling through graph coloring. Scheduling duty shifts for an organizational secretariat often becomes a complex problem due to the varying class schedules of members. This article aims to implement graph coloring to arrange the duty schedule for HIMATIKA UNG using the Welch-Powell algorithm. This algorithm works by assigning different colors to adjacent vertices (representing members from the same class), resulting in a graph coloring with the minimum number of colors. The impl
APA, Harvard, Vancouver, ISO, and other styles
12

Dzendolet, Ernest. "On the Theory of Behavioral Mechanics." Psychological Reports 85, no. 3 (1999): 707–42. http://dx.doi.org/10.2466/pr0.1999.85.3.707.

Full text
Abstract:
The Theory of Behavioral Mechanics is the behavioral analogue of Newton's laws of motion, with the rate of responding in operant conditioning corresponding to physical velocity. In an earlier work, the basic relation between rate of responding and sessions under two FI schedules and over a range of commonly used session values had been shown to be a power function. Using that basic relation, functions for behavioral acceleration, mass, and momentum are derived here. Data from other laboratories also support the applicability of a power function to VI schedules. A particular numerical value is
APA, Harvard, Vancouver, ISO, and other styles
13

Markevich, A. V., and V. G. Sidorenko. "An intelligent system for constructing metro train driver working schedules." Dependability 23, no. 3 (2023): 63–72. http://dx.doi.org/10.21683/1729-2646-2023-23-3-63-72.

Full text
Abstract:
Aim. The paper aims to tests and analyse the results of application of an intelligent system for constructing metro train driver working schedules that is intended for automatically improving the efficiency of utilisation of the working time of metro train drivers. In this case, depending on the task at hand and the chosen criterion, efficiency is understood as a reduction of the number of drivers involved in the implementation of the specified standard train schedule, improved uniformity of alternation of driver work and rest periods, as well as reduction of the duration of down time within w
APA, Harvard, Vancouver, ISO, and other styles
14

Korotkova, Yulia L., and Yury A. Mesentsev. "A risk-based approach to solving the problem of airline schedule operational management." Analysis and data processing systems, no. 4 (December 27, 2021): 19–36. http://dx.doi.org/10.17212/2782-2001-2021-4-19-36.

Full text
Abstract:
The paper discusses the problem of optimal regulation of aircraft assignments for airline flights. Due to the fact that the activities of the airline are subject to changes caused by both external and internal environment, the planned schedule needs continuous management and control. In the event when the actual flight schedule deviates from the planned one, it is necessary to promptly make a decision on adjusting (restoring) the schedule and reassigning aircraft. Operational schedule management involves making adjustments to the current schedule from a depth of several hours to several days.
APA, Harvard, Vancouver, ISO, and other styles
15

Jin, Jun Yan. "Application of the Last Planner System in Schedule Management of Construction Projects." Applied Mechanics and Materials 438-439 (October 2013): 1777–81. http://dx.doi.org/10.4028/www.scientific.net/amm.438-439.1777.

Full text
Abstract:
Schedule control is one of the main tasks of engineering project management, and effective schedule management is an important means of realization of project objectives. The traditional project schedule management is lack of dynamic adjustment and update, and various drawbacks of the method have been appeared. Last planner system (LPS) is a kind of schedule management of project based TFV theory of lean thinking, which transfers the traditional "push" system into "pull" system for schedule management. Based on the master schedule, look-ahead schedule and weekly work plan, schedule management
APA, Harvard, Vancouver, ISO, and other styles
16

Zheng, Xi Jian, Lei Ma, and Yu Fei Zhu. "Analysis of Influence of the Roller Number and Rolling Schedule to Straighten Quality of the Project Steel Bar." Applied Mechanics and Materials 437 (October 2013): 590–96. http://dx.doi.org/10.4028/www.scientific.net/amm.437.590.

Full text
Abstract:
Roll number and rolling schedule are the important parameters affecting the quality of steel bar straightening,when domestic manufacturer design the straightening equipment, these two parameters design basic is by analogy, so it is necessary to study these two parameters. This paper calculated the straightening roller to obtain reasonable roll number; next step quantitative calculate to obtains the theory rolling schedule, in the meantime actual measurement to obtains the practical rolling schedule of the same equipment;then based on rigid-flexible virtual prototype technology to build straigh
APA, Harvard, Vancouver, ISO, and other styles
17

Hammad, Mohammed Wajdi, Alireza Abbasi, and Michael J. Ryan. "Developing a Novel Framework to Manage Schedule Contingency Using Theory of Constraints and Earned Schedule Method." Journal of Construction Engineering and Management 144, no. 4 (2018): 04018011. http://dx.doi.org/10.1061/(asce)co.1943-7862.0001178.

Full text
APA, Harvard, Vancouver, ISO, and other styles
18

Yang, Chunxi, Gengen Li, Guanbin Gao, and Qinghua Shi. "Distributed Consensus Kalman Filter Design with Dual Energy-Saving Strategy: Event-Triggered Schedule and Topological Transformation." Sensors 23, no. 6 (2023): 3261. http://dx.doi.org/10.3390/s23063261.

Full text
Abstract:
In the distributed information fusion of wireless sensor networks (WSNs), the filtering accuracy is commonly negatively correlated with energy consumption. Therefore, a class of distributed consensus Kalman filters was designed to balance the contradiction between them in this paper. Firstly, an event-triggered schedule was designed based on historical data within a timeliness window. Furthermore, considering the relationship between energy consumption and communication distance, a topological transformation schedule with energy-saving is proposed. The energy-saving distributed consensus Kalma
APA, Harvard, Vancouver, ISO, and other styles
19

Zhang, Guo Hai, Guang Hui Zhou, and Xue Qun Su. "A Game Theory Approach for Multiple Design Tasks Schedule." Applied Mechanics and Materials 26-28 (June 2010): 163–66. http://dx.doi.org/10.4028/www.scientific.net/amm.26-28.163.

Full text
Abstract:
This paper presents a new kind of scheduling solution for multiple design tasks in networked developing environments. The main contributions of this study can be focused on three points: The first is to distinguish the concepts and contents of the task scheduling in the networked developing environments. The second is to construct a game-theory mathematical model to deal with this new multiple design tasks scheduling problem. In the presented mathematical model, the players, strategies and payoff are given separately. Therefore, obtaining the optimal scheduling results is determined by the Nas
APA, Harvard, Vancouver, ISO, and other styles
20

Zinchenko, L. V. "ABOUT THE PROBLEMS OF THE SCHEDULE THEORY IN EDUCATION." Innovative Solution in Modern Science 6, no. 33 (2019): 48. http://dx.doi.org/10.26886/2414-634x.6(33)2019.4.

Full text
Abstract:
In the article, a number of statements of the problems of the theory of schedules with accentuation are considered and emphasized for those that reflect the peculiarities of the modern enterprising education of persons who are interested in teachers (mentors), which does not require the presence and analysis of groups and audiences. A classification of such tasks was carried out and a new task of composing schedules from the sphere of education was proposed, it uses such basic parameters as the coefficient of similarity between the mentor and the student, as well as the importance of the subje
APA, Harvard, Vancouver, ISO, and other styles
21

Zhang, Ai Lin, and Ting Ting Geng. "Study on the Schedule Management Methods of Projects Based on Critical Chain Technology." Applied Mechanics and Materials 488-489 (January 2014): 1454–57. http://dx.doi.org/10.4028/www.scientific.net/amm.488-489.1454.

Full text
Abstract:
In view of the deficiency of the traditional schedule management methods in dealing with practical problems, on the basis of Dr. Goldratt s critical chain project management theory, the thesis optimizes his theory so as to build the critical chain schedule management model according to the actual needs of the program.
APA, Harvard, Vancouver, ISO, and other styles
22

Hoshino, Richard, and Ken-ichi Kawarabayashi. "The Linear Distance Traveling Tournament Problem." Proceedings of the AAAI Conference on Artificial Intelligence 26, no. 1 (2021): 1770–78. http://dx.doi.org/10.1609/aaai.v26i1.8358.

Full text
Abstract:
We introduce a linear distance relaxation of the n-team Traveling Tournament Problem (TTP), a simple yet powerful heuristic that temporarily "assumes"' the n teams are located on a straight line, thereby reducing the n(n–1)/2 pairwise distance parameters to just n–1 variables. The modified problem then becomes easier to analyze, from which we determine an approximate solution for the actual instance on n teams. We present combinatorial techniques to solve the Linear Distance TTP (LD-TTP) for n = 4 and n = 6, without any use of computing, generating the complete set of optimal distances regardl
APA, Harvard, Vancouver, ISO, and other styles
23

Martinez, Aja Y., and Robert O. Smith. "Critical Theory, Critical Race Representations." Writers: Craft & Context 4, no. 1 (2023): 52–59. http://dx.doi.org/10.15763/issn.2688-9595.2023.4.1.52-59.

Full text
Abstract:
This is the lead contribution for the series of fourteen student essays that follow. This first contribution offers contextual information about the course as well as suggestions for replicating this course in other contexts. Provided course materials are a course schedule, readings, and assignments.
APA, Harvard, Vancouver, ISO, and other styles
24

Barlow, Sheila. "Drawing up a schedule for observation." Nurse Researcher 2, no. 2 (1994): 22–29. http://dx.doi.org/10.7748/nr.2.2.22.s4.

Full text
APA, Harvard, Vancouver, ISO, and other styles
25

Dobrynin, Alexey Sergeyevich, Stanislav Matveevich Kulakov, and Alexander Sergeyevich Koynov. "BUILDING UP SCHEDULES IN MULTIPROJECT DESIGN MANAGEMENT SYSTEMS." Vestnik of Astrakhan State Technical University. Series: Management, computer science and informatics 2021, no. 3 (2021): 105–14. http://dx.doi.org/10.24143/2072-9502-2021-3-105-114.

Full text
Abstract:
The article focuses on the problem of algorithmizing the process of building schedules in various spheres of human activity by using the modern mathematical apparatus, as well as achievements in the field of systems analysis, game theory, and graph theory. Nowadays, there have been analyzed and determined the boundaries of the effective application of many well-known heuristic and metaheuristic algorithms, which have shown good results in practice. However, despite the achievements in the discrete optimization, scheduling and network planning, the new problems of drawing up so-called coordinat
APA, Harvard, Vancouver, ISO, and other styles
26

Heirman, Ann. "Time Schedule of thekathinaPeriod." Acta Orientalia Academiae Scientiarum Hungaricae 56, no. 2-4 (2003): 309–16. http://dx.doi.org/10.1556/aorient.56.2003.2-4.15.

Full text
APA, Harvard, Vancouver, ISO, and other styles
27

Guo, Yan Yong, Yao Wu, Yao Yu, and Xin Xu. "Development of a Model for Urban Rail Transit Construction Schedule." Applied Mechanics and Materials 361-363 (August 2013): 2075–78. http://dx.doi.org/10.4028/www.scientific.net/amm.361-363.2075.

Full text
Abstract:
This paper developed a model for urban rail transit lines construction schedule based on cumulative prospect theory. Firstly, six typical influencing factors of urban rail transit construction schedule were proposed and analyzed. Secondly, the decision matrix was build and standardized. In addition, the prospect value function was defined based on the cumulative prospect theory and gray correlation analysis, and an optimization model was constructed. Thirdly, the optimal weight vector was solved and the construction schedule was determined. Finally, a case study of Xian rail transit was conduc
APA, Harvard, Vancouver, ISO, and other styles
28

Fitriyani, Aida, Hendarman Lubis, Andy Achmad Hendharsetiawan, and Johanes Andi Lawrence Hutahaean. "SISTEM PENJADWALAN MATA PELAJARAN MENGGUNAKAN ALGORITMA GENETIKA SMK PGRI RAWALUMBU." Jurnal Manajamen Informatika Jayakarta 5, no. 2 (2025): 205. https://doi.org/10.52362/jmijayakarta.v5i2.1881.

Full text
Abstract:
Subject Scheduling System Using the Genetic Algorithm at SMK PGRI Rawalumbu. Bekasi. Faculty of Computer Science. Bhayangkara University, Jakarta Raya. 2024. The aim of this research is to reduce the time required to develop and test schedules. Ensure there are no clashes in the teaching schedule. Utilizing web -based technology for easy and flexible data access. Helps schools compile subject schedules that suit their needs, reduce clashes, and increase the efficiency of automatic schedule creation Research Framework Method or strategy for planning and implementing research that focuses on col
APA, Harvard, Vancouver, ISO, and other styles
29

Liu, Xun, Le Shen, and Kun Zhang. "Estimating the Probability Distribution of Construction Project Completion Times Based on Drum-Buffer-Rope Theory." Applied Sciences 11, no. 15 (2021): 7150. http://dx.doi.org/10.3390/app11157150.

Full text
Abstract:
Various factors affecting the construction progress are regarded as bottlenecks giving rise to the project duration overrun. The contractor should combine the project schedule with the plan in order to reduce the uncertainty of the project activities. The present research describes the method derived from the theory of constraints (TOC) attempts to enhance the relationship among activities, to revise and further reduce the uncertainty of construction activities to improve the reliability of project progress. The elements of drum, buffer and rope (DBR) in TOC are added to PERT network schedule;
APA, Harvard, Vancouver, ISO, and other styles
30

Qu, Haibin, Xudong Wang, Lingpeng Meng, and Chuanfeng Han. "Liner Schedule Design under Port Congestion: A Container Handling Efficiency Selection Mechanism." Journal of Marine Science and Engineering 12, no. 6 (2024): 951. http://dx.doi.org/10.3390/jmse12060951.

Full text
Abstract:
Port congestion significantly impacts the reliability of container ship schedules. However, the existing research often treats vessel time in port as a random variable, failing to systematically consider the complex impact of port congestion on ship schedules. This study addresses the issue of container ship schedule design under port congestion. Vessel waiting times in ports are predicted and quantified by queueing theory, along with information on vessel schedules, cargo handling volumes, and available port operating time windows. We propose a mechanism for selecting container handling effic
APA, Harvard, Vancouver, ISO, and other styles
31

Dow, S. M., and S. E. G. Lea. "Sampling of schedule parameters by pigeons: tests of optimizing theory." Animal Behaviour 35, no. 1 (1987): 102–14. http://dx.doi.org/10.1016/s0003-3472(87)80215-4.

Full text
APA, Harvard, Vancouver, ISO, and other styles
32

Lu, Fuqiang, Hualing Bi, Min Huang, and Shupeng Duan. "Simulated Annealing Genetic Algorithm Based Schedule Risk Management of IT Outsourcing Project." Mathematical Problems in Engineering 2017 (2017): 1–17. http://dx.doi.org/10.1155/2017/6916575.

Full text
Abstract:
IT outsourcing is an effective way to enhance the core competitiveness for many enterprises. But the schedule risk of IT outsourcing project may cause enormous economic loss to enterprise. In this paper, the Distributed Decision Making (DDM) theory and the principal-agent theory are used to build a model for schedule risk management of IT outsourcing project. In addition, a hybrid algorithm combining simulated annealing (SA) and genetic algorithm (GA) is designed, namely, simulated annealing genetic algorithm (SAGA). The effect of the proposed model on the schedule risk management problem is a
APA, Harvard, Vancouver, ISO, and other styles
33

Christensen, Samuel, Yitong Huang, Olivia J. Walch, and Daniel B. Forger. "Optimal adjustment of the human circadian clock in the real world." PLOS Computational Biology 16, no. 12 (2020): e1008445. http://dx.doi.org/10.1371/journal.pcbi.1008445.

Full text
Abstract:
Which suggestions for behavioral modifications, based on mathematical models, are most likely to be followed in the real world? We address this question in the context of human circadian rhythms. Jet lag is a consequence of the misalignment of the body’s internal circadian (~24-hour) clock during an adjustment to a new schedule. Light is the clock’s primary synchronizer. Previous research has used mathematical models to compute light schedules that shift the circadian clock to a new time zone as quickly as possible. How users adjust their behavior when provided with these optimal schedules rem
APA, Harvard, Vancouver, ISO, and other styles
34

Yuan, Huan, Xiao Jie Wang, and Yu Chuan Yan. "Risk Analysis of Rapid Construction Schemes Based on the Fuzzy Theory." Advanced Materials Research 838-841 (November 2013): 259–64. http://dx.doi.org/10.4028/www.scientific.net/amr.838-841.259.

Full text
Abstract:
In the engineering project in Contemporary, Rapid construction is an advanced managing concept which core is fast. On the basis of the fuzzy risk, risk degree and fuzzy probability and risk analysis, this paper analyze the factors affecting rapid construction, and with different construction project factors fuzzy risk evaluation set is established. From the Angle of quantitative the risk analysis of hydraulic engineering in the influencing factors of construction schedule. On the impact of factors on construction schedule to different schemes are obtained quantitative values. We can choose the
APA, Harvard, Vancouver, ISO, and other styles
35

Huang, Jun, and Hai Bo Wang. "A Graph Partition Model for Cross Docking Schedule Problem." Advanced Materials Research 601 (December 2012): 470–75. http://dx.doi.org/10.4028/www.scientific.net/amr.601.470.

Full text
Abstract:
Cross docking has been received a great attention in logistics field. This study uses graph theory to solve cross docking schedule problem. A specific example is given and a node oriented, graph partition model is introduced to exploit a new way in dealing with the cross docking schedule problem.
APA, Harvard, Vancouver, ISO, and other styles
36

Wang, Yangjing, Jinquan Huang, Muxuan Pan, and Wenxiang Zhou. "Game-Theory-Based Mode Switch Control Schedule Design for Variable Cycle Engine." Aerospace 10, no. 2 (2023): 112. http://dx.doi.org/10.3390/aerospace10020112.

Full text
Abstract:
The variable cycle engine selects the appropriate working mode through mode switch to meet the requirements of low specific fuel consumption and high unit thrust. When the variable cycle engine switches between different modes, it should ensure the smooth transition of working modes and obtain the expected performance at the same time. Consequently, a general control schedule design method for mode switch is investigated in this paper. The feasible switching domains of single-bypass working mode and double-bypass working modes are obtained based on multifurcating tree traversal, and the switch
APA, Harvard, Vancouver, ISO, and other styles
37

Lan, Dun Chen. "Research on Canal System Automation Control Based on Adaptive Parameters Fuzzy." Applied Mechanics and Materials 373-375 (August 2013): 1529–32. http://dx.doi.org/10.4028/www.scientific.net/amm.373-375.1529.

Full text
Abstract:
Automated control can improve the canal system to scheduler run levels, improve water efficiency and reduce operating costs schedule. In order to improve the accuracy and reliability of the control, the paper combines fuzzy control theory and PID control technology, Can give full play to the intelligence technology characteristics of the fuzzy control and can effectively improve the limitations of the traditional PID control, realize real-time self-tuning of PID control parameters, This ensures stable operation of drainage systems, can greatly improve the overall control performance of the can
APA, Harvard, Vancouver, ISO, and other styles
38

Tong, Da Wei. "Construction Schedule Real-Time Control Coupling Construction Quality in Large Scale Underground Powerhouse." Applied Mechanics and Materials 256-259 (December 2012): 1320–24. http://dx.doi.org/10.4028/www.scientific.net/amm.256-259.1320.

Full text
Abstract:
Underground powerhouse of hydraulic and hydroelectric engineering is a large cavern group structure. Construction process of underground powerhouse is a complex system, whose construction schedule is associated with construction quality. It is necessary to arrange construction schedule adopting construction simulation method and combining with tunnel stability analysis, which can advance the level of construction organization design. By using real-time control theory and methodology, the real-time control model of construction schedule and quality was established, considering construction proc
APA, Harvard, Vancouver, ISO, and other styles
39

Liberatore, Matthew J. "Project Schedule Uncertainty Analysis using Fuzzy Logic." Project Management Journal 33, no. 4 (2002): 15–22. http://dx.doi.org/10.1177/875697280203300403.

Full text
Abstract:
There is continuing interest by academics and practitioners alike in measuring and coping with project schedule uncertainty. Fuzzy logic has been proposed as an alternate approach to probability theory for quantifying uncertainty related to activity duration. However, the fuzzy logic approach is not widely understood, and generally accepted computational approaches are not available. This paper describes the differences between the probabilistic and fuzzy approaches and the advantages of the latter. The paper also illustrates a straightforward approach for applying fuzzy logic to assess projec
APA, Harvard, Vancouver, ISO, and other styles
40

Brueckner, Jan K., Achim I. Czerny, and Alberto A. Gaggero. "Airline mitigation of propagated delays via schedule buffers: Theory and empirics." Transportation Research Part E: Logistics and Transportation Review 150 (June 2021): 102333. http://dx.doi.org/10.1016/j.tre.2021.102333.

Full text
APA, Harvard, Vancouver, ISO, and other styles
41

Liu, Gehui, Shaokuan Chen, Hua Jin, and Shuang Liu. "Optimum opportunistic maintenance schedule incorporating delay time theory with imperfect maintenance." Reliability Engineering & System Safety 213 (September 2021): 107668. http://dx.doi.org/10.1016/j.ress.2021.107668.

Full text
APA, Harvard, Vancouver, ISO, and other styles
42

Lee, Timothy D., Richard A. Magill, and Daniel J. Weeks. "Influence of Practice Schedule on Testing Schema Theory Predictions in Adults." Journal of Motor Behavior 17, no. 3 (1985): 283–99. http://dx.doi.org/10.1080/00222895.1985.10735350.

Full text
APA, Harvard, Vancouver, ISO, and other styles
43

Cong, DISHI. "The Application of Digital Technology in Improving the Progress Management of Assembly Buildings." Journal of Engineering Research and Reports 26, no. 9 (2024): 254–60. http://dx.doi.org/10.9734/jerr/2024/v26i91277.

Full text
Abstract:
In recent years, guided by the new development concepts and against the backdrop of national economic transformation and upgrading policies, the construction industry has also embarked on modernization and transformation and upgrading. Digital technology plays a significant role in this process. Schedule management, as one of the three major objectives of project management, directly affects construction costs and quality if not properly managed. Starting with the schedule management theory of prefabricated buildings, this paper focuses on analyzing the problems existing in the process of sche
APA, Harvard, Vancouver, ISO, and other styles
44

Qin, Song Xiang, and Yang Lin Li. "Stress Analysis of the Working Device of Multi-Functional Excavator." Advanced Materials Research 314-316 (August 2011): 2499–503. http://dx.doi.org/10.4028/www.scientific.net/amr.314-316.2499.

Full text
Abstract:
According to the working characteristics of working device of WDJ25 multi-functional undercover excavator, the study had calculated and analyzed the mining force of bucket rod oil cylinder and crushing force of bucket oil cylinder of full schedule theory .The force change curve accurately described full schedule working ability of bucket rod and the bucket.
APA, Harvard, Vancouver, ISO, and other styles
45

Kalay, Avner, and Avi Wohl. "Detecting Liquidity Traders." Journal of Financial and Quantitative Analysis 44, no. 1 (2009): 29–54. http://dx.doi.org/10.1017/s0022109009090085.

Full text
Abstract:
AbstractWe develop a measure (based on the relative slopes of the demand and supply schedules) quantifying the asymmetric presence of liquidity traders in the market: a steeper slope of the demand (supply) schedule indicates a concentration of liquidity traders on the demand (supply) side. Using the opening session of the Tel Aviv Stock Exchange, we demonstrate the predictive power of our measure. Consistent with theory, we find that the concentration of liquidity traders on the demand (supply) side is negatively (positively) correlated with future returns. We find that liquidity traders are l
APA, Harvard, Vancouver, ISO, and other styles
46

Xia, Jian Sheng. "Study on Mechanical Processing Workshop Production Information and Management System." Applied Mechanics and Materials 713-715 (January 2015): 2352–55. http://dx.doi.org/10.4028/www.scientific.net/amm.713-715.2352.

Full text
Abstract:
Based on management theory of the manufacture and execution system (MES), a method of mechanical processing workshop production schedule management was discussed. The concrete planning was realized to manage the workshop production schedule by using the bar code technology. The system can increase product assembly query sub module, query information of one or more parts missing in equipment product.
APA, Harvard, Vancouver, ISO, and other styles
47

Han, Yi, Chu Na Wu, and Kang Zhao. "Research on Multi-Thread Schedule Algorithm of the Adjusted Pressure Casting Control System." Advanced Materials Research 462 (February 2012): 246–51. http://dx.doi.org/10.4028/www.scientific.net/amr.462.246.

Full text
Abstract:
Research and analyze the multi-thread schedule methods of the adjusted pressure casting control system deeply. Present an analysis method of related slice graphs based on the code slice and a theory of code subdivision based on the slice granularity and time slice. Then strictly divide the program of control system based on the time slice and obtain the strategies of event driven schedule and time slice schedule by analyzing the casting system. Subsequently, subdivide and recombine the multi-thread program slices based on the priority of the schedule strategies in control system. The control s
APA, Harvard, Vancouver, ISO, and other styles
48

Iyer, K. Chandrashekhar, and Partha S. Banerjee. "Project ambidexterity: case of recovering schedule delay in a brownfield airport project in India." Organization, Technology and Management in Construction: an International Journal 8, no. 1 (2016): 1464–81. http://dx.doi.org/10.1515/otmcj-2016-0012.

Full text
Abstract:
Abstract Planning deficiencies and consequent execution delays are likely to persist in infrastructure development projects. However, recovery of schedule delay is a less researched area. This case research, using a two-stage inquiry modeled on the grounded theory, studied the schedule delay recovery during the execution phase of a brownfield airport construction project. The analyses generated contextual evidence and ambidexterity was found to be the key underlying phenomenon for successful recovery measures. The empirical learning was validated with literature and can be used by practitioner
APA, Harvard, Vancouver, ISO, and other styles
49

Yeh, Yi-Shiung, Ting-Yu Huang, I.-Te Chen, and Shih-Chin Chou. "Analyze SHA-1 in message schedule." Journal of Discrete Mathematical Sciences and Cryptography 10, no. 1 (2007): 1–7. http://dx.doi.org/10.1080/09720529.2007.10698105.

Full text
APA, Harvard, Vancouver, ISO, and other styles
50

Пургина, Марина Владимировна, Алексей Сергеевич Добрынин, and Роман Сергеевич Койнов. "Schedule formation in multi-project developments management systems." Вычислительные технологии, no. 4 (October 6, 2022): 118–26. http://dx.doi.org/10.25743/ict.2022.27.4.010.

Full text
Abstract:
Важный фактор повышения качества планирования - построение расписаний в проектной, производственной и экономической деятельности. Целесообразно использовать автоматизированные процедуры построения расписаний. Следует отметить, что некоторые теоретические и прикладные аспекты их формирования хорошо проработаны и описаны в литературе. Тем не менее в реальной практике деятельности человеческих коллективов очень распространен случай, когда проектные или производственные группы одновременно работают с несколькими проектами. Поэтому задача автоматизированного построения расписаний для мультипроектно
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!