To see the other types of publications on this topic, follow the link: 3D BIM.

Dissertations / Theses on the topic '3D BIM'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 dissertations / theses for your research on the topic '3D BIM.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Wikström, David, and Tobias Karlemi. "Varför BIM?" Thesis, Jönköping University, JTH, Civil Engineering, 2008. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-1370.

Full text
Abstract:
<p>Is the new technology always the best? This final project tries to determine if BIM is the melody of today, or if traditional 2D drawing is recommended. Perhaps a compromise is necessary, utilizing both methods.</p><p>In order to answer this question, different views from the industry have been retrieved through reports, producers of software and users. The approach has consisted in building a 3D model of the school Råslättsskolan, house 01, along with interviews with people involved in the building process.</p><p>When working in 2D it is hard to include the third dimension, mistakes are done and collisions happen that must be corrected, in most cases at the construction site. BIM is an incredible help since the model allows you to detect collisions and correct them. Another time when models are preferred is when you need production plans, for example, different steel details that will be joined together at the work shop before shipping to the construction site.</p><p>Skanska and NCC, in densely developed urban areas, already require BIM today, something that most likely will be customary within the nearest future. It is not hard to understand that more and more clients require BIM when you realize its advantages. With the correct method, these 3D models can minimize risks of errors, optimize the production and save money.When it comes to introducing BIM today at BGK the students can’t do anything but make a recommendation. The improved quality, the future prospect and that the advantages of BIM is not depending by project size will make it attractive for BGK to begin a transition already today. BIM is the melody of the future, not the only song being sung, but clearly the strongest one.</p>
APA, Harvard, Vancouver, ISO, and other styles
2

Andersson, Johannes. "Effektivisering av 3d-projektering." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-31432.

Full text
Abstract:
Purpose: Sweden's construction industry is facing great challenges in form of increased housing with the increasing demands on the environment and economy, this combined with the current low unemployment today and many upcoming retirements. To meet these challenges, it requires development and changes which BIM is considered to handle if it is correct performed. 3d planning is an important part of BIM, where it lays the ground for further step in the building process following two steps, production and management. Method: Selected methods of this thesis is a literature review, semi-structured interviews and document analysis. In the literature review writings about, or related to, 3d planning was studied. The interview method gave more detailed information about the problems that planners experience in reality. The document analysis created a deeper understanding of how 3d design work. Findings: The results show that with simple means it is possible to avoid common problems. Which leads to streamline of 3d design and the entire construction process. This in the form of aspects including economy, the environment and sustainable construction. Implications: Development and improvements in 3d design leads to more effective planning which in contributing to more effective construction. Increase of efficiency can now be justified by the savings in the economy and the environment. But visions of development potential in the further step exists today. One step further, for example, be monitoring the working environment in the planning phase. More education in BIM at all levels of the construction industry should create a better understanding of each other and alleviate the communication gaps that currently prevails. Limitations: This thesis is limited to the design phase of the building process conducted with 3d modeling.<br>Syfte: Sveriges byggbransch står idag inför stora utmaningar i form av ökat bostadsbyggande med allt högre krav på miljö och ekonomi. Detta i kombination med rådande låg arbetslöshet redan idag och många kommande pensionsavgångar. För att möta dessa utmaningar krävs utveckling och förändring, vilket BIM anses klara om det utförs korrekt. 3d projektering utgör en viktig byggsten inom BIM, där den lägger grunden för vidare arbete i byggprocessens följande två steg som är produktion och förvaltning. Metod: Valda metoder för detta examensarbete är litteraturstudie, semistrukturerad intervju och dokumentanalys. I litteraturstudien studerades litteratur som handlar om eller är relaterade till 3d projektering. Intervjumetoden gav djupare information om problematiken som projektörer upplever i verkligheten. Dokumentanalysen skapade en djupare förståelse hur 3d projektering fungerar. Resultat: Studiens resultat visar att det med hjälp av enkla medel går att undvika vanligt förekommande problem inom 3d projektering för att effektiviseras. Dessa enkla medel är främst förbättrad kommunikation, kompetens och förståelse för varandra. Effektivisering av 3d projektering leder till att öka effektiviteten i hela byggprocessen. Detta med besparingar på bland annat ekonomi, miljö, arbetssäkerhet och hållbart byggande. Konsekvenser: Utveckling och förbättringar inom 3d projektering leder till effektivare projektering som i sin bidrar till effektivare byggprocess. Ökning av effektiviteten kan idag motiveras med besparingar inom ekonomi och miljö. Men visioner om utvecklingspotential i vidare steg finns idag. Ett steg längre kan exempelvis vara kontroll av arbetsmiljön redan i projektering. Mer utbildning inom BIM i alla nivåer för byggbranschen bör skapa en bättre förståelse för varandra och mildra de kommunikationsbrister som idag råder. Begränsningar: Detta examensarbete begränsar sig till projekteringsfasen inom byggprocessen som utförs med 3d modellering.
APA, Harvard, Vancouver, ISO, and other styles
3

AL-Hindi, Rafah, and Yousef Yousef. "BIM Byggnadsinformationsmodellering BIM-användning hos de olika aktörerna." Thesis, Örebro universitet, Institutionen för naturvetenskap och teknik, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:oru:diva-61162.

Full text
Abstract:
Clarus arkitekter som projekteringsföretag får ofta beställningar från entreprenörer och beställare där de efterfrågar en BIM-modell. I de flesta fallen så används inte BIM modellen helt utan man tar fram 3D-ritningar eller 2D-ritningar. Då ställs frågan “Har beställaren/entreprenören rätt uppfattning om vad BIM är?” Olika aktörer har olika riktlinjer och krav som projektören ska följa. Frågan som arbetet kommer svara på är “hur ska konsulten göra för att på bästa sätt kunna erbjuda rätt tjänst samt mot vilka mål ska konsulten jobba.” Syftet med den här fallstudien är att ta reda på hur BIM användningen skulle kunna underlätta arbetet samt kommunikationen mellan de olika aktörerna som är inblandade i ett byggprojekt. Att undersöka hur kompetensnivån ligger till hos Beställare, Entreprenör och projektörer/arkitekter och svara på frågan “Vad ligger bakom kompetensskillnaden som finns?” Arbetet inleddes med litteraturstudier för insamling och sammanställning av information. Frågor kommer att ställas upp för att senare kunna användas under intervjuerna med olika personer från olika företag. Intervjuerna kommer att ske med bland annat med individer från konsult-, entreprenör- och beställare företag. Intresset att använda BIM är stort i branschen men tyvärr så finns det stor kompetensbrist. Beställare och entreprenörer har planer att börja använda sig av BIM mer vilket kommer att ske de kommande åren, men i nuläget så vill man inte ta nya risker och föredrar att använda sig av traditionella metoder som är mer säkra. För att man skulle kunna tillämpa BIM mer i byggbranschen så behövs det mer kunskap.<br>Clarus Arkitekter as design companies often receive orders from contractors and clients asking for a BIM model. In most cases, the BIM model is not fully used, but 3D drawings or 2D drawings are available. Then asks the question "Does the client / contractor have the correct understanding of what BIM is?" Different players have different guidelines and requirements that the projector should follow, which can be perceived as defective by the projector just to know what is demanded from each client. The question the thesis will answer is "How should the consultant do the best to offer the right service and what goals the consultant will do. The purpose of this master thesis is to find out how BIM usage could facilitate the work as well as the communication between the various actors who is involved in a construction project. To investigate how the level of competence lies with the Client, Entrepreneur and Projectors / Architects and answerthe question "what is behind the skill difference that exists?". The work began with literature studies for the collection and compilation of information. Questions will be set up to later use them during interviews with different people from different companies. The interviews will take place with individuals from consultancy, contractor and client company. The interest in using BIM is high in the industry, but unfortunately there is a great deal of skills shortage. Customers and entrepreneurs plan to start using BIM more, which will happen in the coming years, but now, they do not want to take new risks and prefer to use traditional methods that are more secure. To be able to apply BIM more in the construction industry, more knowledge is needed.
APA, Harvard, Vancouver, ISO, and other styles
4

Sun, Jing. "The Integration of 3D Geodata and BIM Data in 3D City Models and 3D Cadastre." Licentiate thesis, KTH, Geodesi och satellitpositionering, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-262845.

Full text
Abstract:
The initial geographic information system (GIS) and building information modelling (BIM) are designed and developed independently in order to serve different purposes and use. Within the prolific increase and growing maturity of three-dimensional (3D) technology, both 3D geodata and BIM data can specify semantic data and model 3D buildings that are prominent for the 3D city models and 3D cadastre. 3D geodata can be collected from geodetic surveying methods such as total station, laser scanning and photogrammetry and generate 3D building models by CityGML format for macro analysis on city scale. BIM data has significant advantages in planning, designing, modelling and managing building information, which contains rich details of building elements. Additionally, BIM helps and supports to exchange and share complex information through life-cycle project. Because there are some overlaps between them, the integration of BIM and 3D city models is mutually beneficial for representing comprehensive 3D building models. This thesis is a summary and compilation of two papers, where one is a review paper published in Journal of Spatial Science, and the other is a research paper currently under review in ISPRS International Journal of Geo-Information. The first paper designed and implemented a methodology to formalize the integration of BIM data into city models (CityGML models) that were generated from BIM data and from ALS/footprint data based on the proposed common modelling guidelines. The geometric results of the CityGML models were compared and evaluated visually and quantitatively. The second paper proposed a general framework for sharing and integrating cadastral information with BIM and 3D GIS together with general requirements. Based on the requirements and framework, the case study focused on how to represent and visualize 3D cadastral boundaries legally and technically by integrating BIM at building level and CityGML at city level. Both the Industry Foundation Classes (IFC) model and the CityGML model were connected to Land Administration Domain Model (LADM) at the conceptual level using Unified Modeling Language (UML) models and on database level. The findings of the first paper include investigation of BIM data as a qualified source on the geometric aspects in order to satisfy the need for a more rapid update process of 3D city models, and the second paper shows that the proposed framework and requirements perform well for generating 3D cadastral model in the real-world case study.<br>Det ursprungliga geografiska informationssystemet (GIS) och byggnadsinformationsmodellering (BIM) är utformade och utvecklade oberoende av varandra för att tjäna olika syften och användning. Inom 3D-teknik kan både 3D geodata och BIM-data specificera semantiska data och modellera 3D-byggnader som är framträdande för 3D stadsmodeller och 3D fastighetsregister. 3D-geodata kan samlas in från geodetiska mätningsmetoder som totalstation, laserskanning och fotogrammetri och de kan generera 3D modeller av byggnader i CityGML för makroanalys av städer. BIM-data har betydande fördelar i planering, design, modellering och hantering av byggnadsinformation eftersom det innehåller detaljerade uppgifter om byggelement. Dessutom gör BIM det möjligt att förmedla och analysera komplex information över byggnaders livscykel. Integrationen av BIM- och 3D-stadsmodeller är viktigt för att kunna analysera både byggnader och stad, exempelvis i stadsplanering, byggnadskonstruktion och hållbarhetsanalys.Denna avhandling är en sammanfattning och sammanställning av två artiklar, varav den ena är publicerad i Journal of Spatial Science, och den andra är under granskning i ISPRS International Journal of Geo-Information. Den första artikeln utformade och implementerade en metod för att formalisera integrationen av BIM-data i stadsmodeller (CityGML-modeller) som genererades från BIM-data och flygburen laserskanning/fotavtryck baserat på gemensamma modelleringsriktlinjerna. De geometriska resultaten av CityGML modellerna jämfördes och utvärderades visuellt och kvantitativt. Den andra artikeln föreslog en allmän ram för att dela och integrera fastighets information med BIM och 3D GIS tillsammans med allmänna krav. Baserat på kraven och ramverket så visade en fallstudie på hur man kan representera och visualisera 3D fastighetsgränser juridiskt och tekniskt genom att integrera BIM på byggnadsnivå och CityGML på stadsnivå. Både IFC-modellen och CityGML-modellen kopplades till LADM på konceptuell nivå med hjälp av UML-modeller och på databasnivå.Slutsatserna från den första artikeln inkluderar undersökning av BIM data som en kvalificerad källa på de geometriska aspekterna för att uppfylla behovet av en snabbare uppdateringsprocess av 3D-stadsmodeller, och den andra uppsatsen visar att det föreslagna ramverket och kraven presterar väl för att generera 3D fastighets modeller i den verkliga världen.<br><p>QC 20191023</p>
APA, Harvard, Vancouver, ISO, and other styles
5

Гордюк, Іван Васильович, та Ivan Vasilyevich Gordyuk. "Можливості наповнення BIM моделі додатковою інформацією за допомогою 3D сканування". Thesis, Національний авіаційний університет, 2018. http://er.nau.edu.ua/handle/NAU/37930.

Full text
Abstract:
Можливості наповнення BIM моделі додатковою інформацією за допомогою 3D сканування в оцифруванні архітектурних об'єктів дає великі переваги: скорочення часу отримання просторових даних, немає потреби в спеціальних умовах для сканування, немає залежності від зовнішнього освітлення, велика мобільність за рахунок невеликих габаритів 3D скануючого устаткування. Іншою важливою перевагою є універсальність формату вихідних даних, які підтримуються сучасними CAD-програми, такі як Autodesk AutoCAD, Revit, Trimble RealWorks. Результати тривимірної точкової хмари дозволяють виміряти об'єкт за один раз, без будь-яких додаткових вимірювань, після чого у вас буде повна модель з усіма розмірами, а також з інформацією про матеріали та кольори.
APA, Harvard, Vancouver, ISO, and other styles
6

Ohlsson, Sandra. "Utvärdering av inköpsprocessen vid 3D- och BIM- projektering." Thesis, KTH, Bro- och stålbyggnad, 2009. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-36945.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Sjödin, Magnus, and Tobias Rasping. "Analys av BIM-processen i ombyggnadsprojekt." Thesis, KTH, Byggvetenskap, 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-92567.

Full text
Abstract:
Idag används BIM, byggnadsinformationsmodellering, i fler och fler nybyggnadsprojekt och det finns mängder med information att inhämta om detta både i tryckta tidskrifter och på internet. En obesvarad fråga är dock hur arbetsgången ser ut när BIM ska användas i ombyggnadsprojekt. Informationen som går att finna om detta är begränsad trots att ombyggnadsprojekt utgör en betydande del av byggverksamheten, såväl i Sverige som internationellt. Målet med denna rapport är därför att undersöka hur ombyggnadsprojekt i dagsläget utförs med BIM som arbetssätt. Processen att arbeta med BIM har undersökts i detalj för att klargöra hur den ser ut idag och för att identifiera den problematik som just ombyggnationer medför. Denna undersökning har genomförts i två pågående projekt enligt en gemensam analysmodell för att klargöra skillnader och likheter. För att klargöra arbetsprocessen så har ett flertal intervjuer med inblandade i projekten genomförts. Genom ett enkätutskick till båda projekten så har ett jämförbart underlag även tagits fram. Projektens modeller har också undersökts för att klargöra deras detaljeringsnivå. Den stora problematik som identifierats med ombyggnadsprojekt är att eftersom arbetet sker mot befintliga byggnadsdelar måste dessa kontrolleras och hanteras. Av denna anledning behöver därför många gånger en inmätning av dessa göras för att kontrollera och komplettera det underlag som finns tillgängligt eller för att skapa ett helt nytt. Detta är en tidig del i processen och något som måste göras innan ett vidare arbete med att upprätta en modell kan utföras. Gemensamt för båda projekten har varit att använda sig av modellen för att samgranska olika discipliners material med syftet att upptäcka och på så sätt minimera antalet kollisioner i produktionen. Analysen har visat på ganska stora skillnader i arbetssätt beroende på projektens förutsättningar. Den största skillnaden är att det i ett av projekten finns ett intresse ifrån beställaren att en modell ska levereras, för att senare kunna användas i förvaltningen. Beställarens intresse har resulterat i att BIM har använts i större utsträckning i det projektet med bland annat kostnader kopplade till modellen. Något som har framkommit är också att arbetssättet BIM måste standardiseras, möjligtvis genom att företaget tar fram en BIM-manual som kan användas i alla projekt som ska använda sig av BIM. Erfarenhetsåterföring efter genomförda projekt måste även ske för att denna manual ska vara aktuell.<br>Currently BIM (Building Information Modeling) is used to a higher extent in new construction projects and there is a lot of information to gather about this both in magazines and online. An unanswered question is how the workflow looks like when BIM is used in reconstruction projects. The information that can be found about this is limited despite the fact that reconstruction projects represent a significant proportion of the construction business, both in Sweden and internationally. The aim of this report is to examine how reconstruction projects currently is carried out with BIM. The BIM process has been studied in detail to clarify the current situation and to identify the problems that reconstruction adds. The study was conducted on two ongoing projects in accordance to a common analytical model to clarify the similarities and differences between them. In order to clarify the work process several interviews has been conducted with the project personnel. Through a questionnaire, a survey of both projects has been performed. Project models have also been studied to clarify their level of detail. The major problem that has been identified with reconstruction projects is that the work is carried out on existing building elements that have to be verified. For this reason a detail survey often must be done to verify and add to existing drawing and documentations. The survey is an early part of the process and something that must be done before any further work to establish a model can be done. Common to both projects is the use of the model to coordinate the various disciplines content in order to minimize the number of collisions in the production. The analysis has shown quite significant differences in methods depending on project conditions. The main difference is that in one of the projects the client wants to use the model in the property management and therefore a model must be delivered. The client’s interest led to a wider use of BIM in the project, including costs connected to the objects in the model. Something that has become clear is that BIM as a work tool must be standardized, possibly through a BIM manual drafted by the company, which can be used in all projects that will make use of BIM. Feedback with lessons learned must be added to the manual for it to stay updated.
APA, Harvard, Vancouver, ISO, and other styles
8

Campana, Ivan. "Prehistoric house and 3D reconstruction: towards a BIM archaeology." Doctoral thesis, Universitat Autònoma de Barcelona, 2018. http://hdl.handle.net/10803/666054.

Full text
Abstract:
La tesis doctoral titulada “La Casa Prehistórica y La Reconstrucción 3D: Hacia una Arqueología en Entorno BIM”, presenta los esfuerzos para construir y validar un modelo multidimensional de un palafito del sito del Neolítico Temprano de La Draga (Girona, España), explícitamente construido para explicar los restos arqueológicos y para entender la lógica del espacio construido antiguo. Una innovadora metodología basada en el BIM (Building Information Module) ha sido utilizada para creare el modelo y expandir su potencial explicativo. El texto incluye una descripción de la base teórica de esta investigación centrándose sobre la génesis de la Arqueología Virtual y sus ramificaciones incluyendo propósitos, problemas y ventajas de este nuevo aproche a la arqueología. La descripción incluye también Análisis Funcional e Ingeniería Inversa explorando las relaciones con la Arqueología Virtual. Finalmente una se presenta un resumen de la “nueva entrada” en arqueología, el BIM. También se describe la relación entre Etnografía y Arqueología, la evolución de la Etnoarqueología y como similitudes etnográficas y arquitectónicas, cuando los datos arqueológicos carecen o son poco claros, pueden ser utilizadas para deducir o especular formas y técnicas de los antiguos palafitos. Asimismo se presenta una reseña de los diferentes tipos de casa Neolíticas alrededor del planeta para mostrar la gran diversidad de arquitecturas en estos tiempos remotos. Este estudio también incluye una descripción de las fuerzas físicas que afectan los palafitos y los diferentes tipos de degradación de la madera que podrían afectar a un palafito. El núcleo de la investigación describe la metodología reconstructiva a partir de la “disección” de la casa, utilizando una ontología innovadora basada en la moderna definición arquitectónica le las partes de la casa, hasta la reconstrucción de sus elementos. Las relaciones entre los diferentes elementos y partes de la casa han sido examinadas para demonstrar cómo funcionan y cómo interactúan entre ellos. La tesis incluye la descripción de como se ha realizado cada etapa del proceso reconstructivo utilizando los datos a nuestra disposición. Se describe además el proceso creativo emprendido para crear un proceso BIM funcional que pueda aplicarse no solamente al sitio de La Draga sino también a todos los sitios arqueológicos en general. Se describe también como hemos implementado el modelo conceptual de la casa prehistórica de madera en un Building Information Model (BIM) para expandir el modelo explicativo y generalizar nuestros resultados iniciales. Finalmente se describe el desarrollo de la teoría de “Los tres cerditos”. Esta teoría ha sido pensada para demonstrar que edificios con formas, dimensiones etc. similares no solo pueden tener significados y funciones muy diferentes sino también diferentes reacciones a las mismas fuerzas físicas, y por eso deberían evitarse comparaciones basadas singularmente sobre “similitudes en las formas”.<br>The PhD thesis titled “Prehistoric House and 3D Reconstruction: Towards A BIM Archaeology”, illustrates the efforts to build and validate a high-dimensional visual model of the pile dwelling from the Early Neolithic site of La Draga (Girona, Spain), explicitly built to explain archaeological remains and to understand the logic of built spaces in a remote past. An innovative methodology based on BIM (Building Information Module) has been used to create the model and expand its explicative capability. The dissertation includes a description of the theoretical background of this research focusing on the genesis of Virtual Archaeology and its ramifications including purposes, problems and advantages of this new approach to Archaeology. The description take also into account Functional Analysis and Reverse Engineering exploring the relationship with Virtual Archaeology. Finally an overview of the “new entry” in Archaeology, the BIM is given. The relationship between Ethnography and Archaeology, the evolution of Ethnoarchaeology and how ethnographical and architectonical similarities, when the archaeological data is scarce or unclear, could be used to deduce or speculate the form and technique of the ancient pile dwelling are also described. A general vision about different kinds of Neolithic houses around the globe is also given, in order to display the great diversity of architectonics at these early times. The research also includes a description of those physic forces that affect a pile dwelling and the different kind of wooden degradation that could affect a pile dwelling. The core of the research is meant to describes the reconstruction methodology from “dissecting” the house, using an innovative ontology based on modern architectural definition of house parts, to the reconstruction of its elements. The relationships between the different elements and parts of the house have been examined in order to show how they work and how they interact with each others. The dissertation includes a description of how each reconstructive steps has been undertaken using all the data at our disposal. The creative process undertaken in order to create a functional BIM process that would fit not only with the site of La Draga but also with all the archaeological sites in general, it is also described. The thesis includes the description of how we have implemented the conceptual model of the prehistoric timber house into a Building Information Model (BIM) for expanding the explanatory model and generalize our initial findings. Finally, the development of the “Three little pigs theory”, is presented. This theory has been designed to demonstrate how buildings having similar shapes, dimension etc. may not only have very different meanings and functions but also different responses to the same physic forces, which is why comparisons based uniquely on “similarities in shapes” should be avoided.
APA, Harvard, Vancouver, ISO, and other styles
9

Hansen, Fredrik, and Jesper Palmquist. "Från CAD till BIM inom småhusindustrin." Thesis, Linnéuniversitetet, Institutionen för byggteknik (BY), 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-48267.

Full text
Abstract:
BIM står för Building Information Modeling. Det är en ny teknik för att konstruera en virtuell modell av en byggnad i digitalt format. De stora fördelarna med BIM är att alla komponenter som läggs till i modellen innehåller information. Av informationen genereras automatiskt de handlingar och listor som behövs. Dessutom fås presentationsmaterial i form av 3D-modeller utan något extra arbete. Undersökningen behandlar ett företag och varför de inte genomfört en övergång från 2D-CAD till BIM och syftet är därför att visa dem vilka effektiviseringsmöjligheter som finns.
APA, Harvard, Vancouver, ISO, and other styles
10

Atto, Andreas. "Byggprocessen i förändring - Visionen om BIM." Thesis, Linköpings universitet, Institutionen för teknik och naturvetenskap, 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-69576.

Full text
Abstract:
Det primära syftet med detta examensarbete kan sägas vara att skapa en uppfattning hos Skanska Väg &amp; Anläggning Sydost, som är initiativtagare till detta examensarbete, om vad BIM (Building Information Model) är och hur det lättast kan implementeras i deras arbetsprocesser. Det skulle vara omöjligt att täcka in alla aspekter av BIM under den korta tid som funnits till förfogande och inom ramen för detta examensarbete, därför har de aspekter som ansetts vara viktiga för företaget samt författaren lyfts upp för utredning. För att kunna nå dit har examensarbetet till uppgift att kartlägga och synliggöra de skillnader som finns mellan dagens byggprocess och BIM (Building Information Model) och utifrån det föreslå möjliga sätt att implementera denna arbetsmetod hos Skanska Väg &amp; Anläggning Sydost. I examensarbetets första kapitel ges en kort introduktion och bakgrund till hur byggprocessen förändrats under tidens gång. Ett syfte och en frågeställning formuleras och en avgränsning för examensarbetets omfattning görs. I examensarbetets andra kapitel ges den teoretiska bakgrunden till dagens byggprocess. Viktiga aspekter av dagens byggprocess lyfts fram och förklaras. Därefter följer en presentation av begreppet BIM och vad det innebär. Därefter görs en kort genomgång för hur arbetet med BIM ser ut hos Skanska Sverige AB och generellt i byggbranschen. I examensarbetets tredje kapitel presenteras hur BIM används idag på vägprojekt utanför Katrineholm i ett projekt kallat för Förbifart Katrineholm där BIM tillämpats i viss utsträckning. Skillnaderna som finns mellan dagens byggprocess och BIM samt de för- och nackdelar som kan konstateras hos BIM i relation till dagens byggprocess presenteras. I examensarbetes fjärde kapitel besvaras frågeställningarna och resultatet analyseras samt diskuteras ur viktiga aspekter för byggande, för att i det femte kapitlet komma med konkreta förslag på hur en implementering av BIM i Skanska Väg &amp; Anläggning Sydosts arbetsprocesser kan se ut.<br>The primary purpose of this thesis can be said to be to create a perception at Skanska Civil Southeast, which is the initiator of this thesis, on what BIM (Building Information Model) is and how it can most easily be implemented in their work processes. It would be impossible to cover all aspects of BIM in the short amount of time that has been available and in the context of this thesis, therefore, the aspects that were deemed important to the company and to the author has been picked up for investigation. To achieve this, the task of the thesis is to identify and highlight the differences between today's construction process, and BIM (Building Information Model) and from that suggest possible ways to implement this way of working to Skanska Civil Southeast. The thesis first chapter provides a brief introduction and background to the construction process and how it has changed over time. A purpose and questions on which the thesis is being based on are formulated and a boundary for the thesis is done. The thesis second chapter provides the theoretical background to today's construction process. Key aspects of today's construction process are highlighted and explained. This is followed by a presentation of the concept of BIM and what it means. After that, a brief review of how the work with BIM looks at Skanska Sweden AB and in the construction industry generally. The thesis third chapter presents how BIM is currently used on a road project just outside of Katrineholm in a project called Förbifart Katrineholm where BIM is being applied to some extent. The differences that exist between today’s construction process and the BIM and the pros and con that can be observed in BIM relative to today's construction process is presented. In the thesis fourth chapter answers the questions and the results are analyzed and discussed on important aspects of construction, to, in the fifth chapter make concrete proposals on how an implementation of BIM in Skanska Civil Southeast work processes may look like.
APA, Harvard, Vancouver, ISO, and other styles
11

Rådeström, Sarah, and Viktor Tell. "Är BIM lönsamt vid projektering av ett småhus?" Thesis, KTH, Byggvetenskap, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-102413.

Full text
Abstract:
This report brings up the question - ”Is BIM profitable when planning a single-family home?”. The methodology for finding the answer to this question is firstly to state the definitions of BIM and the company that is projecting by using the BIM-model. The answer is then obtained by analyses of the factors of profitability with respect to: time, opportunity of revision, problem visualization, preference adjustments and energy. A BIM-model has been made simultaneously as the writing has proceeded to get a perception of how a BIM-model really matters for the analysis. The analysis shows that the answer for the question depends on further factors. The factors that are mostly discussed are the company’s intentions and the complexity of the house. However, the answer to the question is no for most types of single-family homes.
APA, Harvard, Vancouver, ISO, and other styles
12

Södergren, Henrik. "BIM på Trafikverket : Förslag till en utvidgad investeringsprocess." Thesis, Karlstads universitet, Fakulteten för samhälls- och livsvetenskaper, 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:kau:diva-33003.

Full text
Abstract:
2013 a decision was made that all projects at the Swedish Transport Administration shoulduse BIM (Building Information Modeling) to some extent from 2015. BIM is an approachthat allows for streamlining of projects by the use of a 3D-model created in an early stage ofthe project. The 3D-model can carry information about the facility throughout its life cyclefrom planning to management. The use of a 3D-model can help the project to detect errors inearly stages of the project when it is easy and cheap to fix the error instead of finding theerror in the construction phase when it is costly and time consuming to fix it. 3D-models alsolead to improved communication both within the project groups and with the public. To takeadvantage of the improvements that BIM offers it has to be implemented in the SwedishTransport Administrations current processes and practices, including the investment process.This report aims to identify the parts of the investment process that is in need forsupplementation to reach the full potential of BIM and what these supplements consist of.If the Swedish Transport Administration implements BIM successfully in their processes, thisreport shows that The Swedish Transport Administration, among other things will haveimproved time management and produce facilities with higher quality at a lower price.
APA, Harvard, Vancouver, ISO, and other styles
13

Regnstrand, Rasmus. "3D-projektering : Framtiden i vägbyggnadssektorn." Thesis, KTH, Transportvetenskap, 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-45982.

Full text
Abstract:
Vägbyggnadssektorn står inför ett stort steg i och med övergången till att projektera i 3D. Idag finns programvara för 3Dprojektering från flera leverantörer och stora mervärden finns att erhålla för alla parter i byggprocessen. Studien har genomfört med hjälp av en litteraturstudie men inventering av programvara, en fallstudie av ett vägbyggnadsprojekt samt en enkätundersökning med aktiva vägprojektörer. För att övergå till ett ökat användande av 3D-modeller krävs att intresset och kunskapen ökar genom hela byggprocessens aktörer. Detta bör ske genom en utbildning hos projektörer som sedan visar de mervärden som en 3Dprojektering ger för entreprenör och beställare.
APA, Harvard, Vancouver, ISO, and other styles
14

Fernández, Ramos Leandro, Rugel Renzo Ríos, and Aguilar John Marreros. "Más allá de la tecnología: BIM como una nueva filosofía." Civilizate, 2017. http://repositorio.pucp.edu.pe/index/handle/123456789/114559.

Full text
Abstract:
BIM (Building Information Modeling, por sus siglas en inglés) es una metodología de trabajo multidisciplinario basado en modelos interoperables que mejora la comunicación y el flujo de la información de los stakeholders durante todo el ciclo de vida del proyecto. Esta metodología busca reemplazar a las herramientas tradicionales en el proceso de desarrollo de un proyecto y fomentar la industrialización dentro del sector de la construcción en cada una de sus fases. En este artículo, se brindará un resumen de los beneficios de emplear BIM en cada una de sus dimensiones (BIM-3D, BIM-4D, BIM-5D, BIM-6D y BIM-7D).
APA, Harvard, Vancouver, ISO, and other styles
15

Elander, Sofia, and Elin Bolmstad. "Byggnadsmodellers anpassning inför 3D-utskift & dess användning." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-30502.

Full text
Abstract:
Syfte: Att utreda hur digitala 3D-modeller bör anpassas inför utskrift i en 3D-skrivare samt undersöka hur en sådan modell kan användas i byggprocessens olika skeden. Metod: En fallstudie genomförs med en befintlig digital 3D-modell som utgångspunkt där intervjuer och action research används som datainsamlingsmetoder. Empirin jämförs och analyseras med det teoretiska ramverket som tagits fram genom litteraturstudier. Resultat: En fysisk 3D-modell skulle kunna användas i flera skeden i byggprocessen, huvudsakligen i idéskedet, produktionsskedet och genomgående processen som ett kommunikationsverktyg och vid reklam/försäljning/presentation för ökad förstående. Inför utskrift bör alla byggnadsdelar vara solida, detaljer bör raderas beroende på skala och komponenter bör bestå av samma material. Konsekvenser: Då intervjuerna utförs med personer med varierande kunskap och erfarenhet är det viktigt att beakta det faktum att förslag på användningsområden eventuellt inte är genomförbara i praktiken då dessa är önskemål. Trots detta kan användning av fysiska 3D-modeller rekommenderas i flera av byggprocessens skeden för ökad förståelse och bättre kommunikation, vilket även styrks av det teoretiska ramverket. Gällande anpassningar av en digital modell krävs en digital 3D-model som utgångspunkt och viss vana av 3D-projektering. Begränsningar: Då denna studie är en fallstudie utförd på ett specifikt fall, kan kunskap och rekommendationer inte generaliseras statistiskt på andra typer av byggnader. Dock kan resultatet i denna studie implementeras på liknande projekt om små justeringar tillämpas. På grund av det faktum att studien är kvalitativ med ett begränsat antal respondenter finns möjlighet till ett annat resultat om utförandet skett med andra förutsättningar. Nyckelord: BIM-modell, fysisk byggnadsmodell, 3D-modell, 3D-skrivare, 3D- utskrift<br>Purpose: To investigate how digital 3D models should be adapted to enable 3D printing for use in the construction process in its various stages. Method: A case study is conducted with an existing digital 3D-model where interviews and action research is used as a data collection method. The empirical data are compared and analyzed with the theoretical framework developed through literature studies. Findings: A physical 3D model can be used at several stages in the construction process, mainly in idea development stages, the production stage and throughout the process as a communication tool and for advertising/sales/presentation for increased understanding. Prior to printing, all parts of the building should be solid, details should be erased depending on the scale used and components should consist of the same material. Implications: Based on interviews with people with varying knowledge and experience within the subject, it is important to take into consideration the fact that the proposals on the fields of use may not be enforceable in reality since they are requests. Despite this, the use of physical 3D models can be recommended in several construction phases of the process for greater understanding and better communication, which is corroborated by the theoretical framework. Adaptions of a digital model require a digital 3D model as a prerequisite and a certain experience of 3D design. Limitations: Since this study is a case study conducted in a specific case, knowledge and recommendations cannot be generalized statistically to other types of buildings. However, with small adjustments, this study can be implemented in similar projects. Due to the fact that the study is qualitative with a limited number of interviewees, there is a possibility of a different result if the execution occurred with other conditions. Keywords: BIM model, physical building model, 3D model, 3D printer, 3D printing
APA, Harvard, Vancouver, ISO, and other styles
16

Green, Pettersson Karoline. "Ytmodellering i Civil 3D : Interoperabilitet och begränsningar." Thesis, Uppsala universitet, Byggteknik, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-300913.

Full text
Abstract:
In order to create a complete BIM-model of a whole project, it is common thatseveral programs and software-suites are used. It is beneficial if the models producedin these programs are compatible with each other, in order to improve theeffectiveness of the construction process as a whole. If a model created in oneprogram has to be altered in order to be compatible with another the result is excesswork.Designers, utilizing Civil 3D, more often than not have to alter constructions whichare to be part of a surface-model. This creates a situation where the construction hasto be modelled twice as Civil 3D cannot use the original model. The purpose of thisessay is to research the problems pertaining to surface creation in Civil 3D and theconsequences they have for designers.To better understand the process of surface creation of an object containing verticalparts a practical study of the subject has been carried out in Civil 3D. A simpleconstruction was created in Revit and imported to Civil 3D as to create a surface ofthe highest parts of the construction.The methods used by designers working in Civil 3D were researched as a qualitativestudy by means of surveys and interviews. The result of the study makes it clear thatthe respondents are dependent on models from different fields involved in the sameproject. As the models do not automatically adapt to the software used by thedesigners in question a considerable amount of manual reconstruction of models areneeded. Fundamentally, the issue is two-fold. Firstly, designers depend upon 3Dmodels and objects created by others. Secondly, Civil 3D cannot render verticalsurfaces or overhangs while creating surfaces. Knowledge about the way Civil 3Dworks and utilizing methods avoiding future problems before they occur has thepotential to improve workflow. Sufficient communication between parties involvedalso results in a more effective process.
APA, Harvard, Vancouver, ISO, and other styles
17

Magyari, Mark, Oyebanji Ebire, and Jonas Lot. "Implementering av BIM i ett projektledningsföretag inom byggindustrin : Implementation of BIM in a project management company within construction industry." Thesis, Linnéuniversitetet, Institutionen för teknik, TEK, 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-12599.

Full text
Abstract:
Syftet med rapporten är att skapa en förståelse om vad BIM är och undersöka vad BIM för med sig i projekteringen. Det som kommer behandlas är BIM-samordnarens uppgifter, de olika negativa aspekter som påträffats vid användandet av BIM samt en presentation av olika program så kallade verktyg som används vid BIM-projektering.<br>Our main aim of this report is to create a foundation for understanding the meaning of BIM and explore the major contributions of BIM to construction design. One of the topics that we will be laying emphases on is the role and duties of a BIM-coordinator and different negative aspects that could be encountered when using BIM. So also presentation of different programmes (tools) used in the process of BIM-design.
APA, Harvard, Vancouver, ISO, and other styles
18

wang, menglin. "Building Information Modeling (BIM): Site-Building Interoperability Methods." Digital WPI, 2011. https://digitalcommons.wpi.edu/etd-theses/1026.

Full text
Abstract:
"Nowadays, many companies in the Architecture/Engineering/Construction (AEC) industry are using Building Information Modeling (BIM) in achieving a faster, sustainable and more economic project. Among the new developed concepts and BIM applications, two of the concepts most frequently used with the support of BIM technology in the planning, organization and scheduling of projects are 4D and 5D in which a 3D model is tied to its time execution (4D) at any point in time and its corresponding cost (5D). However, most of these applications concentrate on modeling the building but it does not include a corresponding modeling of the site in which the building is located. To date, there are few studies and systematic implementation of the site and the building integrated into one BIM model. This site-building integrated model can also be conceptualized as ¡°6D BIM¡± model. The benefit of integrating the site and building together into one model is that the building is no longer treated in isolation of its surround site but incorporates extremely helpful short-term and long-term information for the owner, designer, and builder regarding site topography, landscaping, access roads, ground conditions and the location of site utilities. Major existing research and technology issues that are preventing this site-building integration deal with functionality and interoperability of the BIM software, different orientation and coordination of building model and site model. The objectives of this thesis are to explore current organizational and technological issues preventing this integration, to investigate a feasible method to create a site-linked BIM model, and to discuss the benefits and limitations of bringing BIM concept to the site conditions. The research has been conducted by an extensive review on the literature related to the topic of interest published primarily by AEC. A review on current applications of Geographic Information Systems (GIS) has also been included because of the wider context provided by this technology to the specific topic of this research. Related BIM software developed by three different vendors ¡ªhas been discussed and compared to determine the level of feasibility and operational features of technological support necessary to implement the site-linked BIM model. A case study based on the design and construction of the WPI Recreational & Sports Center, currently under construction, was developed to explore and understand the details that are involved in creating a new site model and to link it with the existing 3D building model. What has been learned from the analysis of this case study is presented, discussed and analyzed in terms of benefits and limitations. Recommendations for future extensions from both the research aspect and the technology support aspect finally presented. These include the creation of 3D BIM Campus Map, which is one site model with several building models placed on it to facilitate future planning of new building and/or maintenance and operation of the current buildings and campus infrastructure.   "
APA, Harvard, Vancouver, ISO, and other styles
19

Sandin, Daniel, and Ahmed Farah. "3D-Detaljplaner : En kartläggning kring 3D-detaljplaner utifrån ett företags-, kommuns- samt civilt perspektiv." Thesis, Högskolan i Halmstad, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:hh:diva-41234.

Full text
Abstract:
Behovet av att skapa en digital detaljplan anses bland aktörer som ett måste i framtiden. Detaljplanen bör utvecklas för att kunna visualisera och förklara detaljplanens bestämmelser på ett tydligare sätt än vad det görs idag. Tidigare studier belyser att BIM och GIS kan tillämpas i detaljplanen, detta gör då att detaljplanen kan tillhandahålla nya funktioner och förbättra visualiseringen som idag ses som ett stort behov. Genom att förstå vad som gör detaljplanen svårtolkad och svår att visualisera skapar det ett underlag att ta fram en digital detaljplan som besvarar framlagda problem. Detta kan då skapa möjligheter till flera förbättringar, så som detaljplaneprocessen, bygglovshanteringar samt att kommunikation mellan aktörer förbättras. Syftet i den här studien är att kartlägga vad berörda aktörer har för problem med dagens detaljplan. Även hur en 3D-detaljplan ska tillämpas, samt vad den kan innehålla för ytterligare information eller nya funktioner. Studien genomförs med en kvalitativ metod. Genom litterära studier undersöks vad för möjligheter en 3D-detaljplan kan erbjuda. Vidare utförs semistrukturerade intervjuer med aktörer som är direkt berörda av detaljplanen, så som företag, kommun, arkitekter samt medborgare för att undersöka vad de ser för möjligheter med en 3D-detaljplan och vad de ser för problem med dagens detaljplan. Analysen och diskussionen resulterar i vilka möjligheter en 3D-detaljplan har vid ett utförande och vad som krävs för att det skall bli en verklighet. En övergripande slutsats är att en 3D-detaljplan idag ses som svår att utföra, under studien kom det fram flertalet bidragande faktorer. De viktigaste faktorer som krävs att undersöka är att se till att en gemensam standard mellan företag, kommun och arkitekter över hela landet måste sättas. Utan detta fastställt kommer det skapa en rad problem mellan aktörer att ta emot och skicka olika slags information som kan leda till att viktig information missas. Författarna kom även fram till att detaljplanen inte ska visualiseras utan att ett nytt visualiserings-system ska skapas för att stötta detaljplanen med att visualisera och lättare tolka den.<br>The zoning plan is considered difficult to interpret and there is a great need to digitize it. Previous studies highlight that BIM and GIS can be applied in the zoning plan, this means that the zoning plan can provide new functions and improve visualization. An implementation can create opportunities for several improvements, such as the zoning plan process, building permit management and communication between actors can be improved. The purpose of this study is to map out what problems the relevant users have with today's zoning plan. Also, how a 3D-zoning plan should be applied, and what it can contain further for information and new functions. The study is conducted with a qualitative method. By studying literary studies, what possibilities a 3D-zoning plan can offer is examined. In the study, semi-structured interviews are conducted with municipalities, construction companies, architects and private individuals to understand what needs to be developed, and how it should be conducted. Analyzing and discussing results in what opportunities a 3D-zoning plan has for an implementation and what it takes to make it a reality. An overall conclusion is that a 3D-zoning plan is difficult to implement today. During the study several factors contributing to this conclusion. Common standards between companies, municipalities and architects must be determined. The authors' conclusion is that the zoning plan should not be visualized, instead a new visualization system should be created to support the zoning plan.
APA, Harvard, Vancouver, ISO, and other styles
20

Radtke, Oliver, and Markus Kellgren. "3D-visualisering i mark- och anläggningsprojekt. : En studie utifrån Veidekkes förutsättningar att implementera 3D-modeller i produktion." Thesis, Högskolan i Halmstad, Akademin för ekonomi, teknik och naturvetenskap, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:hh:diva-40451.

Full text
Abstract:
Samhällsdigitaliseringen har lett till att byggbranschen mer och mer strävar efter att digitalisera verktyg och arbetssätt. Att presentera projekt i 3D har därför blivit ett hett ämne där flera aktörer strävar efter att både projektera och nyttja 3D ute i produktionen. Tidigare forskning inom ämnet har till största del valt att lägga fokus på byggskedet och belyser de fördelar som går att utvinna genom nyttjandet av så kallade VDC- eller BIM verktyg. Samtidigt belyser andra vetenskapliga rapporter mark och anläggning som ett betydelsefullt skede inom hela byggprocessen. Ett flertal menar också att mark- och anläggningsskedet spelar en huvudroll i huruvida ett byggprojekt når framgång eller inte. Med detta i åtanke upplever författarna att 3D-modeller i mark- och anläggningsprojekt inte utforskats till den grad som känns nödvändig för att belysa fördelarna, men även de olika hinder som står i vägen för en lyckad implementeringsprocess. Det råder inte heller några tvivel om att byggskedet kommit längre i digitala utvecklingsaspekter, så som att visualisera projekt i 3D, vid en jämförelse med mark och anläggning. I denna studie belyser därför författarna de fördelar som går att utvinna genom att visualisera mark- och anläggningsprojekt i 3D. Studien visar upp bevis på varför verktyget bör implementeras och vad aktörer bör tänka på vid en eventuell implementering av 3Dvisualisering i projekt. Syftet med studien är därav att utreda hur det undersökta fallföretaget kan integrera 3D-modeller i mark- och anläggningsprojekt, samt belysa vilka krav fallföretagets anställda ställer på en 3D-modell för att främja utvecklingen av ett verktyg som passar och leder till en hög nyttjandegrad ute i produktionen. Vidare sker en identifiering av vilka förutsättningar ute i mark och anläggningsprojekt som spelar en nyckelroll i huruvida en implementerad 3D-modell skall kunna figurera och verka så som det är tänkt. Studien utförs med en kvalitativ metod där granskning av befintlig litteratur lyfter fram de problemområden som författarna identifierat. Vidare utförs semistrukturerade intervjuer med tjänstemän och yrkesarbetare på fallföretaget Veidekke Entreprenad AB. Intervjuerna genomförs i syfte att identifiera aktuella problem ute i produktionen, undersöka respondenternas syn på 3D-modeller samt belysa verktygets potentiella inverkan på deras vardagliga arbete.  En tydligt övergripande slutsats är att 3D-modeller i allra högsta grad behövs ute i produktionen på mark- och anläggningsprojekt. Mycket pekar på att verktyget bland annat skulle bidra med en ökad förståelse kring utförandet av projekten, men också förbättra kommunikation och produktionsledande. Verktyget kan också enligt studien minimera problemområden gällande tekniska lösningar, förbättra planering, samt genom att digitalisera moment även tillfredsställa arbetsglädjen för produktionsteamet.<br>Due to the digitalization the construction business is increasingly striving against more digitized tools and working methods. Presenting projects in 3D has therefore become a hot topic where several actors are trying to implement 3D not only in the design phase but also in the production phase. Earlier research dealing with the subject largely chooses to focus on the building construction process and highlights the advantages that can be extracted using so called VDC- or BIM tools. Some of the scientific reports reviewed during this study on the other hand, highlights the importance of the infrastructure and earthworks stages as a part of the entire construction process. Many also believe that the infrastructure and earthworks stage play a key role in whether a construction project achieve success or not. With that in mind, the authors feel that 3D-models for infrastructure and earthworks, have not yet been explored to the extent that feels necessary, meaning that the advantages and the various obstacles that stand in the way of a successful implementation process needs to be investigated. There is no doubt that building construction has come further in a digital development aspect of visualizing projects in 3D, compared to infrastructure and earthworks. In this study the authors have highlighted the benefits that can be gained by visualizing infrastructure and earthworks projects in 3D. The study also shows evidence of why the application of such should take place and what companies should be considering when implementing 3D visualization into such projects. The purpose of the study is therefore to investigate how the company researched by the authors can integrate 3D models into their infrastructure and earthworks projects. This in addition to identifying the requirements that the employees have on a 3D model to facilitate development of a tool that fulfils these requirements and is usable in production. In addition, the conditions and requirements that play a main role in infrastructure and earthworks projects have been investigated to identify the most suitable conditions to allow the model to work in the most efficient way as possible. The study is conducted with a qualitative method including an examination of existing literature that highlights the problem areas identified by the authors. In addition, semi structured interviews are carried out with employees from the work-site leadership and the skilled workers at the company Veidekke Entreprenad AB. This to identify the current problem areas in the production of infrastructure and earthworks projects and to examine employees’ view about how 3D models would impact on their everyday work. A clear overall conclusion is that 3D-models are truly needed in infrastructure and earthworks projects out in production. A lot of factors indicate that the tool would, among other things, contribute to an increased understanding of the scope of projects and thus contribute to an improved communication and production process leading. Such a tool can according to this study, also minimize problem areas regarding technical solutions, contribute to a better planning, and by digitizing processes, increase job satisfaction for the site team.
APA, Harvard, Vancouver, ISO, and other styles
21

Halajová, Andrea. "Analýza únikových tras v 3D modelu budovy." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-390171.

Full text
Abstract:
This diploma thesis is dealing about the Analysis of escape routes in 3D Building model. At first 3D BIM model, in format IFC, is extracted into the GIS software ArcGiS. From the model is created topology network, which representes the rooms and their connections. Based on this model is created the network analysis for building's escape routes. Results are 5 graphical representation of networks, web visualization and time required to exit from each room of the building.
APA, Harvard, Vancouver, ISO, and other styles
22

Ezzidin, Jin. "PROJEKTERING MED TVÅDIMENSIONELLA ELLER TREDIMENSIONELLA RITNINGAR : En jämförelse baserad på konsulters erfarenhet." Thesis, Mälardalens högskola, Akademin för ekonomi, samhälle och teknik, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-31497.

Full text
Abstract:
More and more companies within the building sector are using BIM (Building Information Model). This degree project has the increased use of BIM as a background, but the work is mainly focused on possibilities and limitations specifically for the work with 3D (three-dimensional drawings). The purpose of this study is to compare the work and costs in practice when working with drawings in 2D or 3D. In addition to a literature study, drawings from a particular building are compared, where the original 2D drawings are converted into 3D. Investigations using interviews and questionnaires have been made including several different companies where the respondents have different professions. The answers were really useful, and the results are mainly based on these answers. Conducting all investigations and compiling all the answers gave a balanced picture mainly regarding the work with 3D in practice. One important result is that one should distinguish between BIM and 3D, where BIM is equivalent to a work approach that is recommended primarily for larger projects where you have the possibility to save large sums of money. The advantages and disadvantages between 2D and 3D drawings depends on how you are as a person and how much experience you have with the different software. Moreover, there is no exact figure that explains the economic gain or loss specifically by using 2D or 3D. Results and experiences of this work, however, suggests that in the fairly near future only 3D will be used.
APA, Harvard, Vancouver, ISO, and other styles
23

Kjaergaard, Karl, and Wilmer Molin. "Byggnadsinformationsmodelleringgenom byggprocessen." Thesis, KTH, Byggteknik och design, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-301174.

Full text
Abstract:
Bakgrund: Byggbranschen i Sverige är kluven. Behovet av bostadsbygge är stort men produktionen räcker inte till. Många faktorer påverkar produktionen av nya fastigheter. En av de mest väsentliga faktorerna till byggbranschens otillräckliga produktionsmöjligheter är branschens egna utveckling. Branschens utveckling har i stort sett varit stagnant i flera årtionden. Detta fram tills detta årtusende då digitaliseringen även har gjort entré inom byggsektorn. Flera digitala verktyg och arbetsmetoder har utvecklats för att effektivisera branschen. Bland de mest prominenta verktyg som gjort intåg på marknaden är BIM, building information modeling, byggnadsinformationsmodellering. Från att ha arbetat med fysiska ritningar har nu aktörer som projektörer och projektledare tillgång till digitala bygghandlingar. Bygghandlingar som innehåller betydligt mycket mer information som geometrisk och mängd baserad information kopplad till olika byggnadsdelar. BIM-modeller är i allra högsta grad en kraftigt bidragande faktor till både ökad effektivisering och digitalisering av branschen. Syfte: Med detta examensarbete önskar vi identifiera konkreta användningsområden för BIM-modeller samt hur de används i branschen idag. Vi ämnar även identifiera förbättringsmöjligheter för användningen och implementeringen av BIM-modeller samt få svar på vilka utmaningar implementeringen och nyttjande av BIM-modeller i byggproduktionen står inför. Metod: Till denna studie har djupintervjuer, egna observationer samt insamling av tidigare publicerad empiriska data utgjort grunden för metodval. De djupintervjuer som genomförts harv arit med för arbetet högaktuella personer inom arbetslivet. Dessa djupintervjuer har gett oss en högaktuell nulägesbild av användandet av BIM-modeller. Slutsatser: Digitaliseringen av byggbranschen medför stora förändringar i byggprocessen. Implementeringen av digitala verktyg och program har varit enorma steg för branschens utveckling. Arbetsmetoderna för varje steg i byggprocessen har utvecklats betydligt, och metoderna optimeras och effektiviseras konstant. BIMs inflytande på hur ett projekt genomförs, från start till slut, har otvivelaktigt förbättrat byggindustrin och möjligheterna med BIM innebär en fortsatt vidareutveckling.<br>Background: The construction industry in Sweden is divided. The need for housing construction is great, but the current production is insufficient. Many factors are affecting the production of new properties, both commercial and private. One of the most significant factors in the construction industry's insufficient production opportunities is the industry's own development. The development of the industry has largely been stagnant for several decades. This has been ongoing until this millenium, when digitalisation has also made an entrance in the construction sector. Several digital tools and working methods have been developed to streamline the industry. Among the most prominent tools that have entered the market are BIM, building information modeling. From having worked with physical blueprints and drawings, actors such as planners and project managers now have access to digital construction documents. Construction documents that contain much more information such as geometric and quantity of based information linked to different building parts. BIM models are to a very high degree a major contributing factor to both increased efficiency and digitalisation of the industry. Purpose: With this thesis, we want to identify concrete areas of use for BIM models and how they are used in the industry today. We also intend to identify opportunities to improve the use and implementation of BIM models and get answers to what challenges the implementation and practice of BIM models the production faces. Method: For this study, in-depth interviews, own observations and gathering of previously published empirical data have formed the basis for method choices. The in-depth interviews that have been conducted have involved highly relevant people who use BIM in their working life. These in-depth interviews have given us a highly up-to-date picture of what the use of BIM models mean and look like. Conclusion: The digitalisation of the construction industry entails major changes in the construction process. The implementation of digital tools and programs has been a huge step in the industry's development. The working methods for each step in the construction process have developed significantly, and the methods are constantly optimized and streamlined. BIM's influence on how a project is carried out, from start to finish, has undoubtedly improved the construction industry and the possibilities with BIM undoubtedly mean a further development.
APA, Harvard, Vancouver, ISO, and other styles
24

Pinto, Dias dos Santos Hewan Nayoli. "Byggnadsinformationsmodellering (BIM) i praktiken : En studie av BIM i praktiken hos Peab Bygg Öst 1." Thesis, Mälardalens högskola, Akademin för ekonomi, samhälle och teknik, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-39739.

Full text
Abstract:
Detta examensarbete skrevs under höstterminen 2014 i samarbete med Peab region Bygg Öst 1 i Stockholm och syftar till att utreda hur dem arbetar med BIM i praktiken. Examensarbetaren fördjupar sig i ämnesområdet BIM och hur användningen av den 3D tekniken kan se ut i praktiken i arbetslivet. För att avgränsa arbetet skrevs det om byggnadsinformationsmodellering  BIM, vid tre skeden i byggprocessen, anbud- och kalkylskede, projektering, produktion samt visualisering som sker vid olika tillfällen under hela byggprocessen. Arbetet innehåller även en redogörelse för investering av 3D skrivare hos Peab Bygg Öst 1, syftet med investeringen är bland annat för att utveckla ett arbetssätt med 3D teknik och visualiseringar framöver. Anledningen till att arbetet behandlar olika skeden är för att erhålla bred inblick och förståelse om ämnesområdet. Rapporten behandlar frågeställningar som syftar till att identifiera BIM som teknik och arbetssätt, hur Bygg Öst 1 arbetar med BIM i praktiken samt hur man vill arbeta med det framöver. Arbetet innehåller även redovisning av ett internt projekt som examensarbetaren utförde hos företaget. Interna projektet syftar till att utveckla anbud och kalkylskedet med BIM. Arbetet är baserat på studier i ämnet samt platsbesök på projekt inom Bygg Öst 1. Resultaten som erhölls från intervjustudierna visar hur man arbetar med BIM vid de olika pågående projekten för bland annat kollisionshantering, arbetsberedningar samt olika typer av visualiseringar med mera. Sammanfattningsvis syftar BIM till att effektivisera, såsom att reducera eventuellt uppkommande fel och säkerställa moment i byggprocessen. En jämförelse av litteratur- och intervjustudierna medförde förståelse för ämnesområdets användningsområden och omfattning. BIM är ett brett ämnesområde och det praktiska tillvägagångssättet med 3D tekniken kan tillämpas på olika sätt hos ett företag, vilket kan vara beroende av ambition och arbetssätt hos företaget. När man implementerar BIM i arbetssättet medför det inte direkta lösningar eller strategier att tillämpa i ett företag, utan implementeringen av BIM i arbetssättet kommer med utmaningar. På grund av ämnesområdets omfattning kan det vara viktigt att man har specifika mål och en tydlig bild om vad som vill uppnås med resultatet av implementeringen i arbetssättet. Det är även viktigt att veta hur mycket inverkan resultatet kommer ha på tids- eller ekonomiska besparingar. På så sätt är det möjligt att erhålla förståelse om hur implementeringen av tekniken kan ske och vilka vinningar som kan erhållas.<br>This thesis was written during the autumn term 2014 in cooperation with Peab region Bygg Öst 1 in Stockholm. The writing aims to investigate how they work with Building Information Modeling, BIM, in practice and increase understanding in how you can use the 3D technology in the professional working life. In order to define the thesis it has been written about three stages in the construction process: offer- and costing stage (construction bidding), projecting (preconstruction phase) and production (construction execution). Besides that the thesis also includes how BIM is used for visualization of the project and a report containing an investment of 3D printer has also been fulfilled. Additionally, the thesis also contains a description of an internal project that the writer has performed in the company. The internal project aims to develop the offer- and costing stage with BIM. The writing is based on studies on the subject and visits to some of Bygg Öst 1 ongoing projects. Results from the interview studies indicate that Peab Bygg Öst 1 in Stockholm is working with BIM for example collision handlings, preparation for big parts in the production, different types of visualizations and more. In short, the technology is used for ensuring the occasions in the construction process to improve the efficiency. The comparing of the literature and the interview study led to an understanding of the field of the subject and how wide it is. BIM is a broad topic and this 3D technology can be applied in work methods in different ways. The technique does not provide ready-made solutions or strategies to implement in a company, it has been learned that the implementation comes with some challenges. Because the technique is broad it may be beneficial that there are specific goals about what should be achieved in the result of the implementation of BIM in the construction process in order to ensure what achievements obtained with the help of the technology.
APA, Harvard, Vancouver, ISO, and other styles
25

Brage, Carl. "Synchronizing 3D data between software : Driving 3D collaboration forward using direct links." Thesis, Linköpings universitet, Institutionen för datavetenskap, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-175165.

Full text
Abstract:
In the area of 3D visualization there are often several stages in the design process. These stages can involve creating a model, applying a texture to the model and creating a rendered image from the model. Some software can handle all stages of the process while some are focused on a single stage to try to perfect and narrow down the service provided. In this case there needs to be a way to transfer 3D data between software in an efficient way where the user experience isn’t lacking. This thesis explores the area of 3D data synchronization by first getting foundation from the prestudy and literature study. The findings from these studies are used in a shared file-based implementation and a design of a network-based system. The work presented in this thesis forms a comprehensive overview which can be used for future work.
APA, Harvard, Vancouver, ISO, and other styles
26

Martin, Hugo. "Maquette numérique 3D pour la construction : visualiser les connaissances métier et interagir avec des dispositifs immersifs." Thesis, Université Paris-Saclay (ComUE), 2016. http://www.theses.fr/2016SACLV125/document.

Full text
Abstract:
La construction montre un retard de productivité par rapport à l’industrie. Pour y remédier, le monde de la construction met en place le processus BIM (Building Information Modeling). Celui-ci repose sur l’utilisation d’une maquette numérique 3D, reproduction du bâtiment, contenant toutes les informations nécessaires à sa réalisation. Cependant, les ingénieurs ont remonté des difficultés dans l’utilisation du BIM. La maquette contient énormément d’éléments provenant de plusieurs intervenants. Le côté collaboratif de la réalisation d’un bâtiment n’est pas pris en considération, les éléments ne sont pas classés par corps de métier, tous les corps de métier travaillent sur la même maquette. Le processus BIM propose la même méthode de travail aux différents types de métiers de la construction. Cette thèse propose une méthodologie d’interaction adaptée aux maquettes numériques de bâtiments. Le but est d’offrir un environnement adapté à tout type de métier du bâtiment tout en respectant des procédés de conception actuelle. Ce travail propose une étude sur la visualisation des connaissances métiers ainsi qu’une interaction avec des dispositifs immersifs pour la construction. Dans un premier temps, ce manuscrit propose d’étudier la classification des divers éléments d’une maquette BIM en utilisant l’apprentissage automatique, assister la visualisation des données en utilisant les modèles de saillance et une interface reposant sur la collaboration. Dans un second temps, deux salles de réalité virtuelle dédiées à la construction seront décrites. Plusieurs applications immersives développées seront présentées<br>The construction show a lack of efficiency to compare to other industries. This is explained by the insufficiency to computerize the design of building. In answer, the world of architecture set up a new process called BIM (Building Information Modeling). This process is based on a3D virtual mock up containing every information needed for the construction. During the implementation of this process, difficulties of interaction has been noted by the BIM users.BIM models are hard to observe and manage, explained by the fact that these models contain a large amount of information. Moreover, the collaborative idea of the BIM is not considered in the actual method. BIM process proposes the same scheme for all the construction profile. This thesis proposes an adapted methodology of interaction for the inspection of architectural projects, using artificial intelligence tools or more particularly virtual reality technologies. The purpose is to offer an adapted environment, considering the profile of each BIM user, while keeping the actual design method. Firstly, this document describes the creation of virtual reality rooms dedicated to the construction. Secondly, it deals with the development of algorithms allowing the classification of components from BIM model, an adaptive system of visualization and a process to handle the model. These development are based on the consideration of the profile of the user, the trade of the user
APA, Harvard, Vancouver, ISO, and other styles
27

Johansson, Christian. "Länkade 3D-modeller för ökad förståelse mellan konstruktörer och byggnadsarbetare." Thesis, Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-80935.

Full text
Abstract:
Det kommer hela tiden ut nya verktyg och arbetssätt till byggbranschen, men det är inte alltid säkert att dessa behövs eller är gynnsamma att använda. Användandet av 3D-modeller och BIM i byggbranschen har undersökts relativt mycket, men relativt få studier har gjorts för nya alternativa användningsområden av branschens befintliga 3D-verktyg. Detta examensarbete går ut på att undersöka om 3D-modeller för specifika områden i ett projekt kan vara ett intressant komplement till traditionella 2D-ritningar för att öka förståelse för den som läser ritningen. Tekniken som användes var Tech Soft 3D:s applikation 3D PDF Reader som gör det möjligt att läsa 3D-PDF:er direkt i en mobil eller surfplatta, men modellerna går också att nyttja på en dator om man vill det. De yrkesgrupper som studeras är byggnadsarbetare och konstruktörer samt kommunikationen däremellan.   För att utreda 3D-PDF:ernas användningsområde gjordes en kvalitativ studie med semistrukturerade intervjuer. Det fördes intervjuer med tre byggnadsarbetare och tre konstruktörer. Under intervjuerna fick deltagarna testa tekniken med tre olika 3D-modeller för att skapa en uppfattning om hur tekniken skulle kunna användas i olika projekt. En litteraturstudie gjordes också för att samla in kunskap att jämföra och analysera med resultatet från intervjuerna.   Respondenterna tyckte att 3D-modellerna vara lättare att förstå och smidiga att använda. Vid hög komplexitet kan det t.o.m. vara lättare att redovisa med 3D-modeller än med 2D-ritningar. Dock ansåg konstruktörerna att det kan finnas en risk att dessa 3D-PDF:er glöms bort att uppdateras, eftersom de är fristående. Dessa 3D-PDF:erna anses ha potential att bidra till en mer effektiv process för de som anammar verktyget, men med hänsyn till den bl a juridiska risken kommer de mest troligt inte användas som en handling, utan som ett komplement till 2D-ritninngarna för att enklare skapa en uppfattning om situationen i fråga.
APA, Harvard, Vancouver, ISO, and other styles
28

Longo, Rosario Alessandro. "Dalla generazione di modelli 3D densi mediante TLS e fotogrammetria alla modellazione BIM." Master's thesis, Alma Mater Studiorum - Università di Bologna, 2017. http://amslaurea.unibo.it/13284/.

Full text
Abstract:
La tesi tratta la ricerca di procedure che permettano di rilevare oggetti utilizzando il maggior numero di informazioni geometriche ottenibili da una nuvola di punti densa generata da un rilievo fotogrammetrico o da TLS realizzando un modello 3D importabile in ambiente FEM. Il primo test si è eseguito su una piccola struttura, 1.2x0.5x0.2m, in modo da definire delle procedure di analisi ripetibili; la prima consente di passare dalla nuvola di punti “Cloud” all’oggetto solido “Solid” al modello agli elementi finiti “Fem” e per questo motivo è stata chiamata “metodo CSF”, mentre la seconda, che prevede di realizzare il modello della struttura con un software BIM è stata chiamata semplicemente “metodo BIM”. Una volta dimostrata la fattibilità della procedura la si è validata adottando come oggetto di studio un monumento storico di grandi dimensioni, l’Arco di Augusto di Rimini, confrontando i risultati ottenuti con quelli di altre tesi sulla medesima struttura, in particolare si è fatto riferimento a modelli FEM 2D e a modelli ottenuti da una nuvola di punti con i metodi CAD e con un software scientifico sviluppato al DICAM Cloud2FEM. Sull’arco sono state eseguite due tipi di analisi, una lineare sotto peso proprio e una modale ottenendo risultati compatibili tra i vari metodi sia dal punto di vista degli spostamenti, 0.1-0.2mm, che delle frequenze naturali ma si osserva che le frequenze naturali del modello BIM sono più simili a quelle dei modelli generati da cloud rispetto al modello CAD. Il quarto modo di vibrare invece presenta differenze maggiori. Il confronto con le frequenze naturali del modello FEM ha restituito differenze percentuali maggiori dovute alla natura 2D del modello e all’assenza della muratura limitrofa. Si sono confrontate le tensioni normali dei modelli CSF e BIM con quelle ottenute dal modello FEM ottenendo differenze inferiori a 1.28 kg/cm2 per le tensioni normali verticali e sull’ordine 10-2 kg/cm2 per quelle orizzontali.
APA, Harvard, Vancouver, ISO, and other styles
29

Simey, Oscar. "Improving Production Phase Performance in Bridge Construction Through the Use of 3D BIM." Thesis, KTH, Bro- och stålbyggnad, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-125347.

Full text
Abstract:
The effectiveness of Building Information Modelling, or BIM, in the construction industry has become a hot topic of debate. Used in the AEC (Architecture, Engineering and Construction) industry for over a decade now, its effectiveness to certain aspects and sectors of the industry is under constant review. Its implementation into the Swedish bridge construction sector is relatively new, especially when used during the production phase of a projects delivery. This paper aims to investigate how using a 3D BIM during the production phase can improve the performance of production, whilst exploring ways in which to improve the handling of 3D BIM for future projects. This is achieved by following the production phase of the Roforsbron project in Arboga, Sweden. The first of its kind to utilise 3D BIM tools throughout its entire production phase. The theoretical framework focuses on the concepts of constructability, lean construction and productivity as well as reviewing a variety of literature on the benefits and drawbacks of BIM. The empirical data has been gathered through personal involvement of the Röforsbron project, where structured and semi-structured interviews with the workforce make up the bulk of the findings. Empirical observation and practical participation of activities on-site complement the opinions of the personnel. The interviews focus on individuals’ experiences using 3D BIM and their opinions on its effect of the production of the Röforsbron. The problems affecting current production performance often stem from a lack of detailed design and planning that affect constructability. Designing with a larger consideration on how to build and addressing constructability issues early is the means in which production can improve. The Röforsbron project was successful where no rework was performed and attributed many of its savings to the use of 3D BIM. Extra resources and experienced personnel were also a factor in the success of the project. 3D BIM is shown to have the most beneficial effect on the reinforcement works, but also offers a broad range of tangible and intangible benefits to widespread aspects of a bridge project. It is concluded that 3D BIM provides an effective tool in which to improve constructability through facilitating a more detailed design and effective means of understanding through visualisation and communication.
APA, Harvard, Vancouver, ISO, and other styles
30

Granath, Emil, and Sergen Pervance. "Modellering av BIM-objektsfamiljer - en arbetsgång för leverantörer." Thesis, Högskolan i Halmstad, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:hh:diva-43054.

Full text
Abstract:
Under de senaste 10-20 åren har användandet av BIM-modellering i byggbranschen ökat. En BIMmodellbyggs upp med hjälp av BIM-objekt. Dessa BIM-objekt kan skapas av projektören men dekan också skapas av leverantören av den produkt som BIM-objektet representerar. En samling avBIM-objekt med liknande egenskaper eller utseende kallas för en objektfamilj. En objektfamilj kant.ex. vara en dörr eller ett fönster. En fördel med objektfamiljer generellt är att de endast behövermodelleras en gång, men kan sedan användas i många olika projekt.Syftet med denna studie är att underlätta leverantörens arbete med utvecklingen av deras BIMfamiljer.Studien är utförd i Autodesks BIM-plattform Revit.Arbetet inleddes med en litteraturstudie som utgjorde grunden för arbetet. Att undersöka ochutforska befintliga objektfamiljer var även det en stor del av förarbetet. Detta gjorde att vi skaffadeoss goda kunskaper om objektfamiljer som vi sedan utvecklade genom att vi själva modelleradeobjektfamiljer. Modelleringen gjorde att vi fick en bättre förståelse om det vi tidigare endast lästom.Resultatet blev en generell arbetsgång som kan användas vid skapandet av många olika typer avBIM-objekt. Arbetsgången förutsätter att man förstår de olika delarna som en familj är uppbyggdav, vilket beskrivs i rapporten.En slutsats är att modellering av objektfamiljer kan göras på flera olika sätt och att det är viktigt attfortlöpande testa sin modell. Vidare bör inte objektfamiljerna innehålla mer information ännödvändigt, eftersom det kan göra familjerna onödigt komplicerade och mindre användarvänliga.Objektfamiljer med mindre mängd information föredras därför framför stora och detaljrikaobjektfamiljer. Därmed undviks också onödig belastning på den programvara som används.Studien genomfördes i samarbete med Preconal som har för avsikt att ta fram Revitfamiljer försina produkter. Vi använde oss av deras produkter som underlag till modelleringen<br>Within the last 10-20 years, the usage of BIM-modeling in the construction sector has increased.BIM-modeling is used daily in different stages of the design process in Sweden. During the designprocess BIM-objects is used which is created by either the manufacturers or the planner. Theseobjects are created by a real product and is made to represent that in the program. The increase ofBIM usage has led to more disciplines that didn’t work with BIM has to adapt and start with that.The purpose of this study is to increase the understanding about the creation of object families formanufacturers. Besides the literature study about the subject we also describe the whole modellingprocess in Revit step by step. This because to give an example how it could be made.The result became a general workflow that is usable for most kinds of objects. The workflowrequires the reader to understand the different parts of an object family which we describe in thethesis.A conclusion is that a family could be built in different ways and it’s important to regularly testyour model. Furthermore, it should not contain more information than what is necessary. BIMobjectswith less information is often preferred over heavy and detailed BIM-objects. This will alsoprevent unnecessary load on the software.
APA, Harvard, Vancouver, ISO, and other styles
31

Fält, Pernilla. "Från 2D till BIM i ett trähusföretag : Transition from 2D-CAD to BIM in a timber frame home company." Thesis, Växjö University, School of Technology and Design, 2009. http://urn.kb.se/resolve?urn=urn:nbn:se:vxu:diva-5675.

Full text
Abstract:
<p>A prefabricated timber frame house previously built by Villafabriken AB has been modeled in Autodesk Revit Architectural, a 3D-program based on BIM-technology. This has been done tosee if it’s possible to produce the publications that Villafabriken demands from the designengineer’s work, and examine which possible extra values that may arise compared to traditional 2D-CAD drawing.BIM is short for Building Information Modeling. Everything is stored in a single database and a change in the project file is automatically updated across the project. BIM provides more than just drawings since information from the model can be retrieved in various ways such as lists and quantity schedules.It was possible to produce the publications that Villafabriken demanded using Revit, but BIM doesn’t only mean a new way of drawing, it also require a change in the company’s process were the information from the model is being used.</p>
APA, Harvard, Vancouver, ISO, and other styles
32

Shakir, Anmar, and Romeo Eileia. "Informationshantering med VDC." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-29629.

Full text
APA, Harvard, Vancouver, ISO, and other styles
33

Holmgren, Per, and Adam Ström. "Digitalt anläggningsbeslut som en 3D-informationsmodell : Möjligheter, hinder och åtgärder." Thesis, Högskolan i Gävle, Samhällsbyggnad, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:hig:diva-32817.

Full text
Abstract:
Detta examensarbete på Högskolan i Gävle berör både den tekniska och den ekonomiska/juridiska inriktningen på Lantmätarprogrammet. Studien är baserad på behovet av effektivisering och automatisering i förrättningsprocessen. Möjligheten att representera tredimensionella objekt som informationsbaserade 3D-modeller finns idag. Examensarbetet undersöker möjligheten att anpassa anläggningsbeslut till informationsbaserade 3D-modeller. Sådana modeller ska baseras på anläggningslagen samt relevanta standarder i form av en 3D-modell. Studien begränsas till gemensamhetsanläggningar. I dagsläget utgörs anläggningsbeslut för inrättande av gemensamhetsanläggning av protokoll, kartor och verbala beskrivningar. Problemställningen i denna studie är huruvida det är tekniskt och juridiskt möjligt att ersätta de beskrivande handlingarna med modellbaserade beslutshandlingar baserade på gällande standarder och lagstiftning. De frågeställningar som upprättades utifrån syftet är: · Vilka möjligheter inom samhällsbyggnadsprocessen ger ett digitalt anläggningsbeslut för gemensamhetsanläggning som en 3D-informationsmodell? · Vilka tekniska och juridiska hinder finns för att kunna skapa ett digitalt anläggningsbeslut för gemensamhetsanläggning som en 3D-informationsmodell? · Vilka tekniska och juridiska utmaningar kommer att uppstå vid hanteringen av ett digitalt anläggningsbeslut för gemensamhetsanläggning som en 3D-informationsmodell, och vilka åtgärder krävs för att samhällsbyggnadsbranschen ska kunna hantera ett sådant beslut? För att besvara frågeställningen tillämpas ett metodval i form av semistrukturerade intervjuer med sakkunniga aktörer inom området. En väsentlig slutsats från denna studie är att för att möjliggöra ett digitalt anläggningsbeslut som 3D-informationsmodell för gemensamhetsanläggning krävs det en tydlig branschstandard som också är sanktionerad av lantmäterimyndigheten.<br>This thesis project at the University of Gävle covers both the technical and economical/legal fields of the Land Surveying Program. The study originates from the needs for increased efficiency and automation in cadastral processes. The possibility to represent three dimensional objects as information based 3D-models exists today. The thesis will explore possibilities, constraints and measures of adapting joint facility decisions information-based 3D-models. Such models should be based on relevant standards. The study is limited to joint facilities. Today facility decisions consists of protocols, maps and verbal descriptions. In order to answer the research question semi-structured interviews were conducted with experts representing different actors in the domain. The research questions in this study are: · What opportunities in the civil process does a digital facility order decision for joint facilities provide as a 3D-information model? · What are the technical and legal barriers for creating a digital facility order decision for a joint facility as a 3D-information model? · What technical and legal challenges will arise when dealing with a digital facility decision for a joint facility as a 3D-information model, and what measures are needed to enable the civil process industry to handle such a decision? To answer the research questions, the method applied is in the form of semi-structured interviews with experts in the field. A conclusion from this study is that in order to enable a digital facility decision for a joint facility as a 3D-information model a clear industry standard from the Swedish mapping, cadastral and land registration authority.
APA, Harvard, Vancouver, ISO, and other styles
34

Johansson, Simon, and Viktor Gälldin. "Möjligheter med Byggnadsinformationsmodellering inom förvaltning." Thesis, Linnéuniversitetet, Institutionen för teknik, TEK, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-19487.

Full text
Abstract:
Examensarbetet är en studie om möjligheter med Byggnadsinformationsmodellering (BIM) inom fastighetsförvaltning. Olika fastighetsförvaltare och mjukvarutillverkare presenteras och ger sin syn på BIM. Begreppet BIM förklaras och dessutom ges några exempel på hur mjukvaror hanterar BIM-modeller. Viktiga slutsatser från arbetet är att mjukvarorna behöver förändras och anpassas till de olika kategorier av förvaltare som är aktuella, det kommer också krävas utbildning och information till dessa. Anledningen till det är att kunskapen om BIM idag är låg bland de flesta förvaltare.
APA, Harvard, Vancouver, ISO, and other styles
35

Govan, Ivan, and Burim Berisha. "BIM Building Information Model : Hinder & Drivkraft." Thesis, Högskolan i Skövde, Institutionen för teknik och samhälle, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:his:diva-6587.

Full text
Abstract:
The  construction  industry  is  a  costly  business  such  in  respect  of  capital  for  most construction defects which then require rework, tear down and rebuild again. This study is  meaningful  awareness  of  tools  that  can  reduce  this  best  through  communication  and information sharing between the parties.  The  construction  industry  is  known  as  temporary  projects  organizations,  where  the construction  project  consists  of  several  actors  who  have  to  communicate  and  share information  between  them  to  avoid  mistakes  later  in  the  build  time.  These  actors  are bounded together thus for the duration of the project, then broken when the project has reached its end. The challenge here is for these actors to apply a tool that can help and simplify communications, information sharing, and perhaps the most important aspect is to  create  a  routine  for  the  association  and  the  shattering  of  these  actors.  To  implement such  behavior  using  a  tool  such  as  BIM  in  the  industry  whose  size  perhaps  is indescribable may be a very hard task.  BIM (Building Information Model) could be seen as the solution to this problem because it  acts  as  a  portal  where  the  actors  involved  must  sign  in  and  communicate,  share information, and eventually create a behavior, a routine for this association and division of  the  actors  following  the  end  of  the  project.  The  technology  could  help  the  involved from  the  beginning  of  the  project,  already  in  the  model  stage,  break  down  and  prevent any construction barriers when the building has been placed in the works.  In the current situation used paper models, 2D models and three-dimensional models, 3D, where  the  last  one  is  a  part  of  the  BIM.  BIM  makes  it  also  possible  to  implement  4D, price  calculation  for  the  construction  from  beginning  to  end  and  5D  ie  construction details such as what kind of wood the door is made of, what kind of concrete it is, and even the amount of cable for the construction for example.  BIM  is  seen  as  a  information  technology  used  primarily  in  construction,  where  to encounter  several  obstacles  during  the  implementation  and  use  of  such  technology  is expensive  to  implement  in  a  small  operation,  but  it  creates  many  drivers,  many  agents that  have  implemented  BIM,  which  ultimately  pays  according  to  those  who  can  afford and in the current situation using it
APA, Harvard, Vancouver, ISO, and other styles
36

Asklund, Andersson Mathias. "En konservativ bransch i utveckling - Är BIM lösningen?" Thesis, Linköpings universitet, Kommunikations- och transportsystem, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-160501.

Full text
Abstract:
Syftet med denna studie har varit att undersöka hur ett företag tillämpar BIM vid projektering. Detta för att analysera hur företaget har implementerat BIM samt att identifiera fördelar, utmaningar och möjligheter med BIM. För att förse denna studie med kunskap har en fallstudie utförts hos en ingenjörsbyrå. Resultatet av studien visar att företaget arbetar med 3D-modellering samt att implementeringen av BIM i organisationen huvudsakligen har genomförts med fortlöpande utbildning och arbete inom BIM. Studien har identifierat möjligheter och utmaningar som uppkommer när företaget arbetar med BIM. Studiens slutsatser uppmärksammar att det råder brist på kunskap och medvetenhet inom BIM både inom organisationen och inom byggbranschen för att tillgodose se möjligheter som BIM-projektering medför. Studien praktiska implikationer rekommenderar företaget att utveckla en målsättning, införa en grundläggande kunskapsnivå samt att utveckla BIM leveransen.
APA, Harvard, Vancouver, ISO, and other styles
37

Härdstedt, Linus, and Joel Snäll. "Underlagshantering i projekteringsprocessen : En studie om datasamordning från underlag till BIM-modell." Thesis, Tekniska Högskolan, Jönköping University, JTH, Byggnadsteknik och belysningsvetenskap, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-49525.

Full text
Abstract:
Purpose: The purpose of this paper is to examine how material, vital for the designprocess (supporting documents) is handled throughout the entire process. From obtaining the material from the document-administer until the material is transformed and applicable in a BIM-software in the design-process. Method: The first method is a case study that contains semi-structured interviews with one large as well as one small design-firm in Sweden, but also the biggest client regarding infrastructure in Sweden. Secondly, the other part of this thesis work is to perform an experiment containing two parts where the first one is to examine supporting material of an ongoing infrastructure-project and evaluate the quality, as well as constructing conversion rules to evaluate how supporting documents can be implemented. Findings: All the respondents in the conducted survey reported that supporting material regarding electric-, telecommunication- and fibre-optic cables were supporting material with the lowest degree of accuracy. Furthermore, the most used file-format is DWG, but file-formats like PDF, JPG, XML and LAS are also file-formats that is used according to the respondents. All the respondents suggest that a standardised way of using supporting documents would be an efficient way of standardising the process. The findings from the experiment concluded that the most used file-format used as supporting material is DWG (79%), followed by PDF (21 %). The quality varied between different providers. Supporting material provided straight from the contractor in DWG had great or excellent quality. Material as PDF/JPG needed to be processed in order to be used in a BIM-software. The implementing of conversion rules resulted in way of implementing these. In order to use this, the supporting document needs to be digital, in this case as DWG-files. Well established ways of using colours, layers and names in the CAD-software is vital. Implications: In order to make the way of handling the supporting material more efficient, a standardised way of handling these need to be used, as well as standardised file-formats. By making the supporting material digital, this will make the material more accessible, thus is the quality of e.g. PDF and JPG “not sufficient” because a BIMuser must convert these files manually, which provide one source of error. Therefore, these files lack interoperability. Regarding the material provided by the contractor, the design-firm need to have direct communication with the provider of the supporting material to take advantage of DWG-files and use the same file-formats, layers etc., to reduce the time it takes to convert the supporting documents manually. Limitations: A limitation is that only one large and one small design-firm is analysed. One part of a complete BIM-software is used, so the external validity is low, because the result may only be used in another small design-firm with the same project configurations and programmes. The experiment, where Conversion Rules were examined did only embrace wells (water-systems).<br>Syfte: Syftet med detta examensarbete är att ta reda på hur underlagshanteringen ser ut igenom hela processen från tillhandahållning av underlaget till implementering i projekteringsprocessen. Metod: Den första är en fallstudie som består av kvalitativa semi-strukturerade intervjuer med en stor och en liten konsultfirma inom projekteringsprocessen, såväl som den största beställaren av infrastrukturprojekt i Sverige. Den andra delen är ett experiment som är uppdelat i två delar där den första är att ta reda på hur underlag ser ut och bedöma dessa i ett pågående infrastrukturprojekt. Den andra delen är att upprätta så kallade konverteringsregler för att importera underlag i en BIM-mjukvara. Resultat: Samtliga respondenter i intervjuerna svarade att underlag gällande el-, teleoch fiberoptikkablar är underlag med lägst grad av träffsäkerhet/noggrannhet. Vidare svarade respondenterna att DWG är filformatet som oftast används. Andra filformat som PDF, JPG, XML och LAS är även det filformat som används. Samtliga respondenter redogjorde även för vissa åtgärder som kan vidtas för att standardisera underlagshantering i branschen. Däribland efterfrågas en standardisering av underlagshantering gällande lagernamn, färger, filformat osv. I experimentet visade det sig att underlag i DWG-format svarar för (79 %) av underlagen, följt av PDF (21 %). Kvaliteten varierade mellan olika källor, där underlag tillhandahållna direkt av entreprenören i DWG hade bra eller utomordentlig kvalitet. Underlag i from av PDF/JPG måste omvandlas för hand för att kunna används i en BIM-mjukvara. Implementeringen av konverteringsregler resulterade i en arbetsgång för att implementera konverteringsregler i projekteringsprocessen. För att göra detta krävs underlag i DWG-format. Konsekvenser: För att göra underlagshanteringsprocessen mer effektiv, behövs ett standardiserat sätt att använda dessa, såväl som filformat. Genom att digitalisera underlag bidrar detta till att höja antagningsgraden i CAD- och BIM-mjukvaror. Således är kvalitén av exempelvis PDF och JPG ”inte tillräckligt” på grund av att en person manuellt måste omvandla dessa filer, som bidrar till en felkälla. Därav är interoperabiliteten bristfällig. Gällande material tillhandahållen av entreprenören, så måste en god kommunikation upprättas mellan de båda parterna för att dra nytta av underlag i DWG, och använda samma filformat, lager etcetera, för att reducera tidsåtgången i att konvertera exempelvis PDF-filer manuellt. Begränsningar: Endast en stor och en lite konsultfirma analyseras. Endast en del av en komplett BIM-mjukvara används, därav låg extern validitet, då resultatet endast kan appliceras i en annan liten konsultfirma med samma projekt-konfigurationer och program. I experimentet där konverteringsregler utreddes inkluderades endast brunnar (VA).
APA, Harvard, Vancouver, ISO, and other styles
38

Bengtsson, Jonas, and Mikael Grönkvist. "Performing Geographic Information System Analyses on Building Information Management Models." Thesis, KTH, Geodesi och satellitpositionering, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-208922.

Full text
Abstract:
As the usage of both BIM (Building Information Modelling) and 3D-GIS (Three-Dimensional Geographic Information Systems) has increased within the field of urban development and construction, so has the interest in connecting these two tools.  One possibility of integration is the potential of visualising BIM models together with other spatial data in 3D. Another is to be able to perform spatial 3D analyses on the models. Both of these can be achieved through use of GIS software. This study explores how integration of BIM and GIS could look. The goal was to perform typical GIS analyses in 3D on BIM models. Previous research points towards some success within the field through use of the indicated standard format for each tool – IFC (Industry Foundation Classes) for BIM and CityGML (City Geographic Markup Language) for GIS. Transformation between the formats took place through use of the BIM software Revit, the transformation tool FME and the GIS software ArcGIS. A couple of reviewed applications of GIS analyses were chosen for testing on the converted models – indoor network analysis, visibility analysis and spatial analysis for 3D buildings. The input data in the study was several BIM models, both models created for real-life usage and others that only function as sample data within the different software. From the results of the practical work it can be concluded that a simple, automated and full-scale integration does not seem to be within reach quite yet. Most transformations between IFC and CityGML failed to some extent, especially the more detailed and complex ones. In some test cases, the file could not be imported into ArcGIS and in others geometries were missing or existing even though they should not. There were also examples where geometries had been moved during the process. As a consequence of these problems, most analyses failed or did not give meaningful results. A few of the original analyses did give positive results. Combining (flawed) CityGML models with other spatial data for visualisation purposes worked rather well. Both the shadow volume and sightline analyses did also get reasonable results which indicates that there might be a future for those applications. The obstacles for a full-scale integration identified during the work were divided into four different categories. The first is BIM usage and routines where created models need to be of high quality if the final results are to be correct. The second are problems concerning the level of detail, especially the lack of common definitions for the amount of details and information. The third category concerns the connection between local and global coordinate systems where a solution in form of updates to IFC might already be in place. The fourth, and largest, category contains those surrounding the different formats and software used. Here, focus should lie on the transformation between IFC and CityGML. There are plenty of possible, future, work concerning these different problems. There is also potential in developing own tools for integration or performing different analyses than those chosen for this thesis.<br>I takt med den ökade användningen av både BIM och 3D-GIS inom samhällsbyggnadsprocessen har även intresset för att sammanföra de två verktygen blivit större. En möjlighet med integration är potentialen att visualisera BIM-modeller tillsammans med andra geografiska data i 3D. En annan är att kunna genomföra rumsliga 3D-analyser på modellerna. Båda dessa går att utföra med hjälp av GIS-programvara. Denna studie utforskar hur en integration mellan BIM och GIS kan se ut. Målet är att genomföra typiska GIS-analyser i 3D på BIM-modeller. Tidigare forskning pekar mot vissa framgångar inom området genom att arbeta med det utpekade standardformatet för respektive verktyg – IFC för BIM och CityGML för GIS. Transformation mellan formaten skedde med hjälp av programvarorna Revit, FME och ArcGIS. Ett par framhållna tillämpningar av GIS-analyser valdes ut för tester på de konverterade modellerna – nätverksanalyser inomhus, siktanalyser och rumsliga analyser för 3D-byggnader. Som indata användes flera olika BIM-modeller, både sådana som tillverkats för faktisk användning och modeller som skapats för att användas som exempeldata inom programvarorna. Utifrån resultaten från det praktiska arbetet kan konstateras att en enkel, automatiserad och fullskalig integration mellan verktygen verkar ligga en bit in i framtiden. De flesta transformationerna mellan IFC och CityGML misslyckades i någon aspekt, speciellt de mer detaljerade och komplexa. I vissa testfall kunde filen inte importeras i ArcGIS, i andra saknas eller existerar oväntade geometrier även om importen lyckats. Det finns också exempel där geometrier förflyttats. Som en konsekvens av dessa problem kunde de flesta 3D-analyser inte genomföras alls eller lyckades inte ge betydelsefulla resultat. Ett fåtal av de ursprungliga analyserna gav dock positiv utdelning. Att kombinera (felaktiga) CityGML-modeller med annan rumslig data fungerade förhållandevis väl ur ett visualiseringssyfte. Både skuggvolymsanalysen och framtagandet av siktlinjer från byggnaderna gav någorlunda korrekta resultat vilket indikerar att det kan finnas en framtid gällande de tillämpningarna. Hindren för en fullskalig integration som identifierades genom arbetet delades upp i fyra olika kategorier. Den första är BIM-användning där hög kvalitet på de skapade modellerna är viktigt för korrekta slutresultat. Den andra är detaljeringsgraden där avsaknaden av gemensamma definitioner för detaljeringsgraderna ställer till problem. Den tredje kategorin är koordinat- och referenssystem där en lösning på kopplingen mellan lokala och globala system redan kan finnas på plats i en av de senare utgåvorna av IFC-formatet. Den sista och största kategorin är problematiken kring just format och programvaror där mer arbete på översättningen mellan IFC och CityGML kommer att krävas. I framtiden finns det gott om arbete att göra med dessa olika problem. Det finns också potential att utveckla egna verktyg för integrationen eller att ägna sig åt att göra andra analyser än de som valdes ut i den här studien.
APA, Harvard, Vancouver, ISO, and other styles
39

El-Mekawy, Mohamed. "Integrating BIM and GIS for 3D City Modelling : The Case of IFC and CityGML." Licentiate thesis, KTH, Geoinformatik, 2010. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-28899.

Full text
Abstract:
3D geoinformation has become a base for an increasing number of today’s applications. Examples of these applications are: city and urban planning, real estate management, environmental simulation, crisis and disaster management, telecommunication, facility management and others. 3D city models are presently scattered over different public and private sectors in different systems, different conceptual models, different data formats, different data schemas, different levels of detail and different quality. In addition, the potential of 3D models goes beyond visualisation of 3D objects of virtual scenes to real 3D city models. In such an environment, integration of different sources of data for building real 3D city models becomes more difficult.   3D city models are of two types, design and real world models. Design models are usually used for building industry purposes and to fulfil the requirements of maximum level of detail in the architecture, engineering and construction (AEC) industry. Real world models are geospatial information systems that represent spatial objects around us and are largely represented in GIS applications. Research efforts in the AEC industry resulted in Building Information Modelling (BIM), a process that supports information management throughout buildings’ lifecycle and is increasingly widely used in the AEC industry. Results of different integration efforts of BIM and geospatial models show that only 3D geometric information does not fulfil the integration purpose and may lead to geometrical inconsistency. Further complex semantic information is required. Therefore, this thesis focuses on the integration of the two most prominent semantic models for the representation of BIM and geospatial objects, Industry Foundation Classes (IFC) and City Geography Markup Language (CityGML), respectively.   In the integration of IFC and CityGML building models, substantial difficulties may arise in translating information from one to the other. Professionals from both domains have made significant attempts to integrate CityGML and IFC models to produce useful common applications. Most of these attempts, however, use a unidirectional method (mostly from IFC to CityGML) for the conversion process. A bidirectional method can lead to development of unified applications in the areas of urban planning, building construction analysis, homeland security, etc. The benefits of these unified applications clearly appear at the operational level (e.g. cost reduction, unified data-view), and at the strategic level (e.g. crisis management and increased analysis capabilities).   For a bidirectional method, a formal mapping between both domains is required. Researchers have suggested that harmonising semantics is currently the best approach for integration of IFC and CityGML. In this thesis, the focus is therefore on semantic integration of IFC and CityGML building models for bidirectional conversion. IFC and CityGML use different terminologies to describe the same domain and there is a great heterogeneity in their semantics. Following a design research method, the thesis proposes a more expressive reference ontology between IFC and CityGML semantic models. Furthermore, an intermediate unified building model (UBM) is proposed between IFC and CityGML that facilitates the transfer of spatial information from IFC to CityGML and vice versa. A unified model in the current study is defined as a superset model that is extended to contain all the features and objects from both IFC and CityGML building models. The conversion is a two-steps process in which a model is first converted to the unified model and then to the target model.   The result of the thesis contributes, through the reference ontology, towards a formal mapping between IFC and CityGML ontologies that allows bidirectional conversion between them. Future development of the reference ontology may be seen as the design of a meta-standard for 3D city modelling that can support applications in both domains. Furthermore, the thesis also provides an approach towards a complete integration of CityGML and IFC through the development of the UBM. The latter contribution demonstrates how different classes, attributes and relations have been considered from IFC and CityGML in the building of the UBM.   To illustrate the applicability of the proposed approach, a hospital building located in Norrtälje City, north of Stockholm, Sweden, is used as a case study. The purpose of the case study is to show how different building elements at different levels of detail can be constructed. Considering future research possibilities, the integration approach in the thesis is seen as a starting-point for developing a common database that formulates a UBM’s platform. With such a platform, data from IFC and CityGML can be automatically integrated and processed in different analyses. Other formats can also be included in further steps. Finally, the proposed approach is believed to need future research beyond the building models alone and on an implementation process for testing and verification.<br>QC 20110127
APA, Harvard, Vancouver, ISO, and other styles
40

PAPADOPOULOS, NICOLAS ALEXANDROS. "ASSESSMENT OF THE BIM METHODOLOGY THROUGH THE 3D PARAMETRIC MODELING OF A CONVENTIONAL PROJECT." PONTIFÍCIA UNIVERSIDADE CATÓLICA DO RIO DE JANEIRO, 2014. http://www.maxwell.vrac.puc-rio.br/Busca_etds.php?strSecao=resultado&nrSeq=23675@1.

Full text
Abstract:
PONTIFÍCIA UNIVERSIDADE CATÓLICA DO RIO DE JANEIRO<br>Atualmente o processo que envolve a construção de um empreendimento é baseado em documentos impressos e desconexos. Há uma tendência global de que um mesmo projeto seja elaborado por diversas empresas e diferentes equipes, porém, as ferramentas computacionais que são utilizadas ainda são as mesmas de décadas atrás. Devido a essa mudança de paradigma, a metodologia conhecida como modelagem da informação da construção, BIM, vem aos poucos ganhando aceitação na área de AEC (Arquitetura, Engenharia e Construção). Motivada por esse processo de transição, essa dissertação tem como objetivo estudar e avaliar algumas das ferramentas computacionais disponíveis no mercado que são utilizadas na implementação da metodologia BIM. Essa avaliação é feita a partir do projeto de um empreendimento real que foi feito utilizando a metodologia tradicional, isto é, documentos 2D independentes. O projeto é modelado em 3D com uma base de dados integrada de acordo com a metodologia BIM. O projeto baseado no modelo 3D é então comparado com o projeto original. Ao término desse estudo são obtidos exemplos reais dos benefícios da modelagem 3D parametrizada. Uma série de deficiências são detectadas nos documentos 2D originais, o que não teria acontecido caso a metodologia BIM fosse usada desde o início do projeto. Além disso, é avaliada a integração entre uma ferramenta de modelagem 3D estrutural (Autodesk Revit Structure 2012) e um software de análise estrutural (Autodesk Robot 2012). Estratégias de integração são testadas e as melhores práticas são descritas em detalhe. Os resultados obtidos sugerem que o uso da metodologia é promissor e sua implementação deve ser seriamente considerada no Brasil.<br>Currently the process involved in the construction of a facility remains fragmented and dependent on paper-based communication modes. There is a global trend where a single project may be developed by different companies and may involve several teams of specialists. However, the computational tools that are still in use are the same as the ones being used for decades. Due to this paradigm shift, a methodology known as Building Information Modeling, BIM, has been gaining acceptance in the AEC (Architecture, Engineering and Construction) area. Motivated by this process of transition, this thesis aims to study and evaluate some of the computational tools available in the market that are used to implement the BIM methodology. This assessment is made using the design of an actual facility, which is done using the traditional 2D design methodology, i.e., disjoint 2D documents. The project is modeled in 3D with using integrated database according to the BIM methodology. The resulting project is then compared to the original project. At the end of this study, real examples of the benefits of parameterized 3D modeling are obtained. Several inconsistencies in the original design documents are observed, which would not have occurred if the BIM methodology had been used from the beginning of the project. In addition, the integration between a 3D structural modeling tool (Autodesk Revit Structure 2012) and a structural analysis tool (Autodesk Robot 2012) is evaluated. Integration strategies are tested and the best practices are described in detail. The findings of this work suggest the use of the BIM methodology is promising and support its use in Brazil.
APA, Harvard, Vancouver, ISO, and other styles
41

Leon, Perlasca José Arturo. "Automated climate calculations and 3D value-based visualizations : An Integration of BIM and LCA." Thesis, KTH, Hållbar utveckling, miljövetenskap och teknik, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-261659.

Full text
Abstract:
The Swedish Government has set a goal to reach net zero emissions of greenhouse gases by 2045, which together with the commissioning to the Swedish Housing Agency to prepare requirements for a climate declaration that shall reduce the climate impact from buildings, has enforce the AEC industry to provide solutions that help reach these targets. The introduction of the integration of BIM technologies, together with the LCA methodology has been suggested as a key solution to solve this problem. To achieve the results for this study, two main objectives were stablished. The first objective was to develop a BIM model in SMC able to produce automated climate calculations. The second objective was to perform interviews with relevant actors about this tool. The integration of those objectives helped to answer the research questions of this study. This study provides a way of performing automated climate calculations for construction projects using classification of materials in SMC and calculations in Excel. It also has the ability to perform data visualization of the carbon footprints of the complements in the 3D models of the project using the GWP of the chosen materials. It can be said that it is a great tool to introduce to decision-makers an easy way to identify the hotspots of carbon emissions and choose more sustainable alternatives.<br>Den Svenska Regeringen har fastställt ett mål att nå utsläppen av växthusgaser netto noll till 2045, som tillsammans med uppdraget till Boverket att förbereda krav på en klimatdeklaration som ska minska klimatpåverkan från byggnader har tvingat AEC-industrin att tillhandahålla lösningar som hjälper till att nå dessa mål. Införandet av integrationen av BIM-teknologier tillsammans med LCA-metoden har föreslagits som en nyckellösning för att lösa detta problem. För att uppnå resultaten för denna studie fastställdes två huvudmål. Det första målet var att utveckla en BIM-modell i SMC som kunde producera automatiserade klimatberäkningar. Det andra målet var att genomföra intervjuer med relevanta aktörer om detta verktyg. Integrationen av dessa mål hjälpte till att besvara forskningsfrågorna i denna studie. Denna studie ger ett sätt att utföra automatiserade klimatberäkningar för byggprojekt med klassificering av material i SMC och beräkningar i Excel. Det har också förmågan att utföra datavisualisering av kolavtryck av komplementen i projektets 3D-modeller med GWP för de valda materialen. Det kan sägas att det är ett bra verktyg att introducera för beslutsfattare ett enkelt sätt att identifiera de hotspots som koldioxidutsläpp och välja mer hållbara alternativ.
APA, Harvard, Vancouver, ISO, and other styles
42

Siwani, Zahra, and Bahar Tunc. "Mängdavtagning i Vico Office : Jämförelse ur tids- och kostnadsperspektiv mellan Vico Office och manuell mängdavtagning." Thesis, KTH, Byggvetenskap, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-174126.

Full text
Abstract:
BIM som står för Building Information Modeling har lett till stora förändringar inom byggbranschen, men trots detta tillämpas inte tekniken fullt ut. Detta beror bland annat på att vissa aktörer känner sig tryggare vid det manuella arbetssättet. Tekniken som är tillgänglig kan bland annat tillämpas vid utförandet av mängdavtagningar. I dagsläget väljer vissa kalkylingenjörer att utföra mängdavtagningar manuellt utifrån PDF-ritningar i utskriftsformat med hjälp av SpeedyCalc, penna och skalstock. Detta kan istället genomföras i mängdavtagningsprogrammet Vico Office med hjälp av en 3D-modell.   Syftet med examensarbete är att jämföra två mängdavtagningsmetoder ur tids- och kostnadsperspektiv. Metoderna som jämfördes i studien var manuell mängdavtagning och mängdavtagning i programmet Vico Office. Studiens syfte var även att jämföra felen som kan uppstå vid utförandet av dessa två metoder.   För studiens ändamål utfördes ett antal intervjuer där viktig information samlades in. Författarna deltog även i två kurser för att få kunskapen som behövdes för att underlätta utförandet av studien. Dessa kurser handlade om modelleringsprogrammet ArchiCAD och mängdavtagningsprogrammet Vico Office. Författarna samlade även in information genom att studera tidigare forskningar inom berörda området.   Mängdavtagningen i studien utfördes på projektet Strandpromenaden, som tilldelades av Peab. Projektet är ett flerbostadshus som består av fem huskroppar med fyra till sex våningar. Studien avgränsades till tre huskroppar och även de större byggnadsdelarna som bland annat väggar, dörrar och fönster. Studien påvisade att implementering av BIM i anbudsskedet medför en kortare tid och lägre kostnad vid mängdavtagning. När de olika mängdavtagningsmetoderna ställdes gentemotvarandra, var differensen av mängden på exempelvis en fläktrumsvägg 100 %, vilket innebar att fläktrumsväggen blev utebliven vid den manuella mängdavtagningen.<br>BIM stands for Building Information Modeling and has led to major changes in the construction industry, but despite this, the technology is not used fully. This is partly because some players feel more comfortable in the manual methods. The technology that is available can be particularly applied in the performance of amount calculation. In the current situation, some calculus engineers choose to perform amount calculation manually based on PDF drawings in print format using the program SpeedyCalc and also with pen and shell stock. This may instead be implemented in calculation program Vico Office with the help of a 3D model. The aim of the thesis is to compare two methods used for the amount calculation in time and cost perspective. The methods that were compared in this study was manual calculation and calculation program Vico Office. The study's purpose was also to compare the errors that may arise in the performance of these two methods. For study purposes, the authors conducted a number of interviews in which important information was collected. The authors also participated in two courses to gain the knowledge needed to facilitate the study. These courses focused on modeling program ArchiCAD and Vico Office. The authors also collected information by studying previous research in the area concerned. The amount calculation in this study was carried out on the project “Promenade”, which the authors reserved by Peab. The project is a multi-family apparment which consists of five buildings with four to six floors. The study was limited to three buildings and the major structural elements including for instance walls, doors and windows. The study demonstrated that the implementation of BIM in the tender stage results in a shorter time and at lower cost in amount calculation. When the different amount calculation methods prepared against each other, the difference in the amount of, for example a fan room wall was 100%, meaning that the fan room wall was missed during manual amount calculation.
APA, Harvard, Vancouver, ISO, and other styles
43

Bashay, Natnael, and Roubin Nawfal. "Installationskrockar i ett ROT-Projekt." Thesis, KTH, Byggteknik och design, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-213419.

Full text
Abstract:
Att utföra installationer i ett ROT-projekt är mer komplicerat än vid nyproduktion. I ROT-projekt möter installatören gamla svårlästa handlingar som oftast inte stämmer med verkligheten. Vanligaste problemet är att det kan uppstå krockar mellan installationerna och mellan installationerna och stommen vilket leder till kostnader och tidsförluster. I vår rapport har vi studerat möjligheten att i ett tidigt skede få fram handlingar som stämmer med verkligheten vilket skulle underlätta planering och byggande i ett ROT-projekt. Metoden förväntas lösa problemet med krockar som kan uppstå vid utförandet av arbetet samt kunna nå installationerna på ett smidigt sätt utan något hinder vid tillsyn, skötsel och underhåll. Resultatet i denna rapport baseras på mätningar som vi har genomfört, i form av inskanning av ett rum med hjälp av en handlasermätare och en 3D-laser för att skapa en 3D-modell. För att kunna hitta ett lämpligt utrymme i byggnaden och säkerställa installationer utan någon typ av krock krävs noggrann projektering. För att komplettera studien intervjuades flera personer med erfarenhet inom detta område. Vår slutsats är att genom en kombination av BIM tillsammans med en väl fungerande installationssamordning och skanning med 3D-laser kan noggrannheten i projekteringen öka, risken för kollisioner minska vilket leder till ökad lönsamhet i ett ROT-projekt.<br>Performing an installation process under a Renovation, Conversion and Extension (ROT) project is more complicated than in a new production. In a ROT projects, the installer meets old and hard-to- read documents that usually do not match the reality. The most common problem is that clashes may occur between the installations and building elements, which results in costs and time losses. In our report we have studied the opportunity to produce documents that correspond to reality at an early stage, which would facilitate planning and construction in a ROT project. The method is expected to solve the collision problem that may arise in the performance of the work, as well as being able to reach the installations in a smooth manner without any barriers to supervision and maintenance. The results of this report are based on the measurements we performed, in particular by using measurement methods using a handheld meter and a 3D-laser scanning technique that creates a 3Dmodeling . In order to be able to find a suitable space in the building and to ensure installations without any type of collision, careful design is required. To complete the study, several people were interviewed with experience in this area. Our conclusion is that through a combination of BIM, together with a wellfunctioning installation coordination and 3D-laser scanning, design accuracy can be increased, the risk of collisions reduced, leading to increased profitability in a ROT project.
APA, Harvard, Vancouver, ISO, and other styles
44

Klang, Rasmus. "KARTLÄGGNING OCH ANALYS AV MÄNGDNINGSARBETET HOS EN BYGGENTREPRENÖR : ANVÄNDNING AV 3D-MODELLER FÖR MÄNGDAVTAGNING." Thesis, Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-70087.

Full text
Abstract:
Byggbranschen halkar efter i digitalisering om den jämförs med andra tillverkande industrier.Byggkostnaderna är höga och effektiviseringen går bakåt samtidigt som det blir mer och meratt göra. Vad går det att göra för att branschen ska följa med i den digitala utvecklingen ochvart står den idag?I skolan är arbetet i datorprogram vanligtvis det självklara valet för en mer digital arbetsprocess,men på byggföretagen ser det annorlunda ut. Alltifrån att mäta med skalstock från ritningaroch summera i Excel till att mängda från 3D-modeller.Det finns tidigare rapporter som påvisar att arbetet med BIM i företag ger positiva effekteroch att det egentligen bara är att börja arbeta med det direkt för att se resultat. Men varför börjarinte fler med BIM och vilken kvalitet håller modellerna idag? De arbeten som studerats gerresultatet av att mängdavtagning från en 3D-modell stämmer mellan metoderna traditionelloch modellbaserad mängdavtagning. I de fall där det undersökts mellan utfallen har det vanligtvisgjorts en avgränsning att bara kolla på en del av byggdelarna i en byggnad och intehela kalkylen. Ett första steg i implementeringen av BIM är enligt författaren att en mängdavtagninggår att utföra på modellen för ett projekt. Vilka mängder går det att exportera ur en3D-modell som stämmer överens med mängder från en traditionell mängdavtagning? Går detatt göra en korrekt mängdavtagning med modeller?För att detta examensarbete ska bidra med ny kunskap har steg ett varit att kartlägga hurbyggföretaget arbetar idag. Steg två har varit att utvärdera 3D-modeller från sex projekt ochjämföra med kalkylatorns kalkyl från anbuds- och projekteringsskedet. I arbetet har hela kalkylenoch 3D-modellen använts, inga komponenter eller byggdelar har avgränsats bort. Ettsista steg har varit att utifrån kravspecifikationer mot arkitekt utvärderat hur de framtagna kravenfrån SBUF projektet Detaljeringsnivå i BIM fungerar i de sex projekten som utvärderat idetta arbete. Målet är att ge en rekommendation kring kravställning för 3D-modeler och förslagpå hur företag kan bli mer digitala.Resultatet från kartläggningen över hur de arbetar med 3D-modeller för mängdavtagning idagvisar att det inte används. Det som används idag är skalstock med utskrivna ritningar, Excel,Bluebeam och kalkyleringsprogrammet Bidcon. Av de anställda i företaget är de flesta intresseradeav BIM men att ta steget till att implementera det är individuellt och det finns några individersom hade uppskattat att arbeta med det. I framtiden tror författaren att en implementeringav krav på konsulter och att modulen Bidcon BIM är en bra start på en mer digital arbetsplats.Utvärderingen av 3D-modellerna gav tre summerade resultat. Mängderna från den modellbaseradmängdavtagningen har jämförts mot kalkylatorns kalkyl. Skillnaden mellan utfallenvalde författaren till att högst få vara 10 procent för att anses vara ett godkänt resultat. Detsom låg innanför marginalen och som gick att hitta i modellen och stämde överens med kalkylatornsmängd är 47 procent. Det som inte gick att identifiera i 3D-modellen är 33 procent.Det som gick att identifiera men där skillnaden var större än 10 procent är 21 procent.När det kommer till kravställningen på konsulterna utifrån SBUF-projektet är det en bra startmen det går att göra lite mindre revideringar för att få den mer lättjobbad. Det beror på hur företagetarbetar idag. Ett exempel är att ta bort kravet gällande BSAB-koder och istället läggavikt på konsekvent namngivning av familj och typ av byggdelarna.
APA, Harvard, Vancouver, ISO, and other styles
45

Skålberg, Johan, and Markus Höijer. "Optimering av modelleringsteknik i BIM : I samarbete med Peab Sverige AB." Thesis, Karlstads universitet, Fakulteten för hälsa, natur- och teknikvetenskap (from 2013), 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:kau:diva-36706.

Full text
Abstract:
Building Information Modelling, ByggnadsInformationsModellering på svenska eller mer känt som förkortning BIM är en arbetsmetod som kan tillämpas inom byggbranschen. Denna moderna digitala metod tar projektering till en helt ny nivå. Genom informationsutbyte av relevant information för projektet utifrån en avancerad BIM-modell kan projektet effektiviseras. För att få en korrekt BIM-modell, eller en objektsbaserad modell som det också kan kallas, är det viktigt att de olika disciplinerna samarbetar i framtagningen. En BIM-modell har enligt många studier och rapporter stora fördelar för de inblandade aktörerna; reducering av kvalitetsfels- och produktionskostnader samt samordning och kollisionskontroller för att nämna några. Men för att kunna ta del av dessa fördelar måste det vara tydligt i hur beställaren av en modell ställer sina krav. Peab Sverige AB har i dagsläget ett stort intresse inom BIM och tillämpar det till viss grad. De ser stora fördelar med metoden och håller ständigt på att förbättra arbetsprocessen. Karlstadskontoret har önskan om att kunna använda BIM-modellerna i deras kalkyleringsarbete, och sättet som många konsulter modellerar på i dag fyller inte den önskade funktionen Peab eftersträvar. Modellerna är inte produktionsanpassade. Syftet med arbetet är att underlätta samarbetet mellan entreprenören Peab och dess externa konsulter i modelleringsdelen i framtagandet av en BIM-modell, för att undvika merarbete senare i kalkyleringsskedet. Detta ska uppfyllas genom att ta fram ett underlag för hur konsulter skall modellera så att entreprenören kan använda sig av modellen fullt ut. Arbetet ligger även till grund för ett kompendium som konsulterna kan använda sig utav där objektsindelningen blir produktionsanpassad och på så sätt tillfredsställer Peabs kalkylatorer. Med hjälp av en byggd teoretisk grund, intervjuer av berörda partner och granskning av Peabs BIM program blev en objektsindelning av 2D-detaljsektioner enligt SBEF:s byggdelstabell aktuell. Tankar och åsikter hämtades från Peabs BIM-samordnare, kalkyl Peab samt tre externa konsultfirmor Tengbom, Mondo Arkitekter och Integra för att skapa ett modelleringstekniskt underlag.   Resultatet av arbetet slutade i ett kompendium där ritande konsult får en visuell hjälp om hur Peab vill ha sin BIM-modell modellerad. Detta blir en hjälp för att överbygga det glapp som råder mellan ritande instans och entreprenören. Detta kompendium blir en bilaga till den rådande BIM-manual som Peab skickar ut till samtliga deltagande aktörer i deras BIM-projekt. Mötena med konsulterna resulterade i vetskapen om att en modellering på det önskade sättet var möjligt, men att det skulle ta längre tid att uppföra en sådan modell vilket i sin tur betyder en ökad kostnad för beställaren. För att det ska bli standardiserat att göra på det här sättet innebär att Peab måste se vinning i att lägga ner mer pengar på projektörerna, något som blir svårt att motivera då det kan vara svårt att mäta de vinster en korrekt BIM-modell medför. En sådan utredning skulle väga tungt och en önskvärd effekt är en implementering av BIM i hela byggbranschen.<br>Building Information Modeling, or more known as BIM, is one of the most up-to-date working process within the construction industry. This advanced digital high end model brings projection to a whole new level. By the exchange of information which is stored within the model, every involved participant has easy access to relevant information needed for the project. To get an accurate BIM-model, or an object-based model which it also could be called, every participant has to strive against a common goal for a successful result. The BIM-method has, according to a lot of different studies, a very positive impact on the whole project such as being able to minimize errors as a result of miscommunication, early identification of potential clashes and detection of collisions. To receive these benefits the requirements from the requested model has to be clearly presented.  Peab Sweden AB, one of the biggest companies in the construction industry in Sweden, has a huge interest in this method and uses BIM to manage some of their projects. The office in Karlstad, Sweden, has the desire to be able to use BIM-models in their calculation work. Today’s modeling by the consultants is not filling the desired function Peab aspire because the models aren’t adapted to production. The purpose of this study is to facilitate the cooperation between the contractor Peab and its external consultants in the development of a BIM-model to avoid additional work in the calculation stage. In order to close the gap this study will create an illustration of how the consultants should model. The study will also provide the basis to create a compendium which the external consultants can use where object classification is adapted to production and will satisfy Peab’s calculators. With the help of a built theoretical foundation, interviews with relevant partners and understanding of Peab's BIM-programs, an object classification according to SBEF's building component table became the best option. Thoughts and opinions were taken from BIM-Coordinator and calculators from Peab and three external consulting firms Tengbom, Mondo Architects and Integra to understand different modeling techniques and getting knowledge of what’s possible to model by different CAD-programs. The result of the study ended up in a compendium to give the consultant a visual aid how Peab wants their models. This guideline will help close the existing gap between the drawing consultants and contractor. The compendium will be used as an attachment to Peab’s current BIM-manual which is sent out to every participant when BIM-project is appropriate. The meetings with the consultants verified that a modeling based on the compendium was possible, but it would take longer to build such a model, which also means an increased cost. In order to standardized this model-based method Peab has to see the benefits in putting down more money on project planners, which will be difficult to justify when it may be difficult to measure the profits.
APA, Harvard, Vancouver, ISO, and other styles
46

Sardi, Johanna, and Angelica Svärd. "Drivande och bromsande faktorer vid implementering av BIM i produktion." Thesis, KTH, Byggteknik och design, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-204641.

Full text
APA, Harvard, Vancouver, ISO, and other styles
47

Johansson, Anton, and Lopez Maxim Simonov. "Limträstomme till hallbyggnader : Utformning och dimensionering av momentstyva ramhörn och 3D-modell framtagning." Thesis, KTH, Byggteknik och design, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-101845.

Full text
Abstract:
Industrial buildings are increasing all over Sweden. Farmers are building new modern facilities and the government chooses to build new halls to invest i youth sports. Glulam is the most common framework but there are limitations because of the transport. Therefore, there is a need to develop new solutions to increase the use of glulam. The maximum torque in the eaves was found in the frame with a roof pitch of 18 degrees and a wingspan of 25 meters. Using hand calculations according to Eurocode and comparison with the computer software StatCon, the maximum torque, shear force and utilization rate is calculated. Based on the maximum torque, of 973,86 kNm (calculated as 1000 kNm), the maximum compressive force is found in the eaves storage. The area is determined to 0.116m2 and the eaves are formed with 7 lamellae glued to the inside of the frame to relocate the support surface so that cutting of the laminated timber should be as simple as possible. The relocation of the storage is also needed for the required number of WR-T screws to fit on top of the frame. The screws are dimensioned according to previously calculated traction force in the eaves and to the transmission between the screws and the glulam. The transmission forces were found in a product brochure by SFS intec. Two different screw sizes is tested and deployed by distance according to Eurocode. -          WR-T-9x400                  Number: 332 pieces/frame   Cost: 15 897 skr/frame -          WR-T-13x700               Number: 136 pieces/frame   Cost: 22 927 skr/frame Calculations on the new attachment method show that it is possible to construct moment resisting eaves. In an economic comparison between the screws, it appears that WR-T-9x400 was the cheapest regardless of the length or span on the chosen building. The design of the glulam frame system in 3D is based on the calculations and definitions. The models are developed in the software Revit in stages according to the desired dimensions and local conditions in order to show the client at the tender negotiations.<br>Byggandet av hallbyggnader ökar runt om i Sverige. Lantbruk bygger nya moderna anläggningar och staten väljer att bygga nya hallar för att satsa på ungdomsidrotten. Limträ är ett mycket vanligt stommaterial men det finns begräsningar av limträmöjligheterna som styrs av transporten. Därför finns det behov av att utreda nya lösningar för att kunna öka användandet av limträ. Av de undersökta ramarna beräknades det maximala momentet i ramhörnet där taklutningen var 18 grader och spännvidden 25 meter. Med hjälp av handberäkningar enligt Eurocode och jämförelser med dataprogrammet StatCon togs maximalt moment, tvärkrafter, normalkrafter och utnyttjandegrader ut. Utifrån det maximala momentet, 973,86 kNm (räknas som 1000 kNm) beräknas tryckkraften vid ramhörnsupplaget som dimensionerar upplagsarean. Arean bestämdes till 0.116m2 och ramhörnet utformas med 7 pålimmade lameller på insidan av rambenet samt på undersidan av överramen för att förskjuta upplagsytan så att sågningen av limträet ska vara så enkelt och ekonomiskt som möjligt. Förskjutningen krävs även för att erfordrat antal WR-T skruvar ska få plats på ovansidan av rambenet. Skruvarna dimensioneras efter tidigare beräknad dragkraft i ramhörnet och skruvarnas kraftöverföring till limträet bestäms enligt underlag från SFS intec. Två olika skruvdimensioner testas och placeras ut efter avstånd enligt Eurocode:  - WR-T-9x400 Antal: 332 st/ram Kostnad: 15 897 kr/ram - WR-T-13x700 Antal: 136 st/ram Kostnad: 22 927 kr/ram  Beräkningar på den nya infästningsmetoden visar att det är möjligt att konstruera momentstyva ramhörn som kan monteras på plats med skruvmontage. Vid en ekonomisk jämförelse mellan skruvarna visar det sig att WR-T-9x400 skruven blir billigast oavsett vilken längd eller spännvidd man väljer på byggnaden. Utifrån beräkningar och avgränsningar utformas 3D-modeller av limträstomsystemet i dataprogrammet Revit. Modellerna tas fram stegvis efter önskade dimensioner och lokala förutsättningar för att kunna visa beställaren vid offerförhandlingarna.
APA, Harvard, Vancouver, ISO, and other styles
48

Wallin, Eric. "BIM som en effektivisering av processindustrin : en fallstudie på COWI Management AB." Thesis, Högskolan i Borås, Institutionen Ingenjörshögskolan, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:hb:diva-16933.

Full text
Abstract:
Building Information Modeling eller byggnadsinformationsmodellering används idag inom byggbranschen för att effektivisera projekteringsprocessen. Denna metod är fortfarande relativt ny inom branschen men är på väg att bli en branschstandard. Indikationer som visar på detta är att på universitetsutbildningarna Byggnadsingenjör och Affärsutveckling och entreprenörskap inom byggsektorn vid Chalmers tekniska högskola läggs stor vikt på utbildning om BIM. Många branschtidningar behandlar även detta ämne. På teknikkonsultföretaget COWI Management AB finns intresset av att se vilka möjligheter BIM-metoden kan medföra och om metoden går att överföra på processindustrin.Syftet med examensarbetet är att tydliggöra innebörden av BIM-metoden. Examensarbetet ska ge relevant information och kunskap om BIM och ge ett förslag på mjukvaruprogram som kan användas tillsammans med 3D-programet Aveva PDMS och planeringsverktyget Oracle Primavera P6. Målet med examensarbetet är att visa på nyttan med BIM och 3D-visualisering. COWI Management AB ska kunna använda sig av detta examensarbete för implementeringen av BIM hos sina uppdragsgivare.BIM bygger på att alla berörda aktörer och discipliner kan ta del av den information som ett projekt tillhandahåller. För att underlätta informationsöverföringen mellan berörda aktörer och discipliner föreslås i denna studie en modellsamordnare för att underlätta för informationshanteringen. Om BIM integreras i hela företagsstrukturen kan det skapa en hållbar utveckling för företaget genom övergripande helhetsperspektiv i processerna.Slutsatser som har dragits av detta examensarbete är att kommunikationssvårigheter existerar både mellan inblandade aktörer men även mellan de IT-verktyg som används. Författaren menar att BIM kan möjliggöra en bättre kommunikation mellan de olika disciplinerna. På COWI Management AB förlitar man sig i dagsläget till stor utsträckning på muntlig kommunikation. Genom bättre kommunikationsmöjligheter kan processer effektiviseras.Ytterliggare slutsats som dragits i detta examensarbete är att BIM-modellen som plattform för Lean-modellen kan göra Lean ännu mer effektiv.<br>Program: Industriell ekonomi - arbetsorganisation och ledarskap
APA, Harvard, Vancouver, ISO, and other styles
49

Jensen, Marie. "Implementering av byggnadsinformationsmodellering i byggproduktionen." Thesis, Linnéuniversitetet, Institutionen för teknik, TEK, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-19504.

Full text
Abstract:
De större företagen i Sverige använder alltmer byggnadsinformationsmodellering (BIM) i sina byggprojekt. Examensarbetets syfte är att kartlägga i vilken utsträckning BIM påverkar effektiviteten i produktionsfasen på två byggarbetsplatser, Fortnox Arena och Myresjöhus Arena, båda i Växjö. Rapporten belyser BIM, med dess möjligheter respektive svårigheter samt hur det kan användas i produktionsskedet. Utgångspunkten för analysen är intervjuer av olika entreprenörer som medverkade i något av de två nämnda byggprojekten. Intervjuerna visade att BIM tillämpas till viss del på arbetsplatsen och BIM anses bidra till tidsbesparing i projekten. Med hjälp av intervjuerna och teori har analys och diskussion förts kring hur BIM kan användas i produktionen i större utsträckning för att uppnå en ökad effektivitet.
APA, Harvard, Vancouver, ISO, and other styles
50

Marcus, Strandmer. "Using 3-D blueprints at a construction site." Thesis, Linköpings universitet, Medie- och Informationsteknik, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-98680.

Full text
Abstract:
Building information modeling, eller BIM som det kallas, har länge varit utsett till framtiden inom byggindustri. BIM är ett samlingsnamn för en arbetsprocess där en gemensam informationsbaserad 3D-modell utnyttjas. Denna modell nås av alla aktörer i projektet. BIM skiljer sig mot vanlig 3D-CAD då objekten innehåller digital information i form av beskrivningar, mängder, klassificeringar med mera. Modellen granskas med hjälp av ett visningsprogram, antingen för dator eller mobil enhet i form av surfplatta eller mobiltelefon. I visningsprogrammet ges fri manövrering och möjlighet till lagerhantering och analyser. Åhlin &amp; Ekeroth i Linköping Byggnads AB är stor lokal entreprenör i Östergötland. På denna lokala nivå konkurrerar de med det stora rikstäckande byggbolagen. I ett steg att följa utvecklingen är de initiativtagarna till detta examensarbete som undersöker deras möjlighet till att utnyttja BIM i deras producerande skeden. Det finns enormt många områden under ett byggprojekt där BIM kan underlätta, kvalitetssäkra och avlasta arbetet. Åhlin &amp; Ekeroth i Linköping Byggnads AB står inför sitt första BIM-projekt och de kommer använda visningsprogrammet Autodesk Navisworks Freedom för att samgranska den gemensamma 3D-modellen. Erfarenheterna efter det första projektet under hösten 2012 kommer avgöra Åhlin &amp; Ekeroths framtida satsning på BIM.
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!

To the bibliography