Academic literature on the topic 'ÄTA-arbeten'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'ÄTA-arbeten.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Dissertations / Theses on the topic "ÄTA-arbeten"

1

Magnusson, Carl. "ÄTA-arbeten på Trafikverket." Thesis, Umeå universitet, Institutionen för tillämpad fysik och elektronik, 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-90363.

Full text
Abstract:
“ÄTA-work” (Changes, Supplementary and Retiring works) is more or less common in all construction projects whether it is about houses, roads or railways, in the planning stage, or in the construction stage. For the Swedish Transport Administration, which is the largest purchaser of infrastructure in Sweden, ÄTA-work is a hotter topic than ever.Economists and managers want to draw conclusions on the projects share ÄTA-work, while the project manager is concerned about whether it is possible to draw any conclusions at all as each project is unique in itself and has its own merits. There is a big variation in the amount of ÄTA-work in different geographic districts in the Swedish Transport Administration.This study shows that the Swedish Transport Administration does not have a unanimous approach regarding the management of “ÄTA-work”. Forms and systems is not fully used and “ÄTA-works” are accounted wrong in many projects, sometimes because of the project managers’ hesitation about how to handle it.<br>ÄTA-arbeten(Ändrings-, Tilläggs- och Avgående arbeten) är mer eller mindre vanligt förekommande i alla byggprojekt vare sig det gäller hus, väg eller järnväg, i projekteringsskede, eller i byggskede. För Trafikverket, som är Sveriges största beställare av infrastruktur är ÄTA-arbeten ett hetare diskussionsämne än någonsin då andelen ÄTA-arbeten ökar.Ekonomer och chefer vill dra slutsatser på projekts andel ÄTA-arbeten, medan projektledare ställer sig frågande till om det går att dra några slutsatser överhuvudtaget då varje projekt är unikt i sig och har sina egna förutsättningar. Samtidigt har olika distrikt relativt skilda andelar ÄTA-arbeten vid uppsummeringar på distriktsnivå.Detta arbete visar att Trafikverket inte har ett enhälligt arbetssätt kring hanteringen av ÄTA-arbeten. Blanketter och system används inte fullt ut och ÄTA-arbeten konteras fel i många projekt, ibland på grund av att projektledare har svårt att veta hur de ska hantera ÄTA-arbeten.
APA, Harvard, Vancouver, ISO, and other styles
2

Nyfors, Axel. "ÄTA-arbeten - särskilt om entreprenörens rätt till tidsförlängning till följd av ÄTA-arbeten." Thesis, Umeå universitet, Juridiska institutionen, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-173354.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Heinefeldt, Moa. "ÄTA-arbeten : - En otillåten direktupphandling?" Thesis, Linköpings universitet, Affärsrätt, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-127534.

Full text
Abstract:
Huvudregeln när staten, landstinget eller kommunen vill få ett arbete utfört för deras räkning är att arbetet ska upphandlas i konkurrens mellan ett antal entreprenörer i enlighet med LOU:s regelverk. LOU och det nya upphandlingsdirektivet har dock vissa undantagsregler som medger att en direktupphandling av kompletterande byggentreprenader är tillåten under förutsättning att de i bestämmelserna stadgade rekvisiten är uppfyllda. Om ett tillkommande arbete som beställs av den upphandlande myndigheten inte faller in under dessa undantagsbestämmelser kan myndigheten gjort sig skyldig till en otillåten direktupphandling. Ett ÄTA-arbete är ett entreprenadrättsligt begrepp som dels ger entreprenören en rätt och skyldighet att utföra tillkommande arbeten, dels ger beställaren en vid ändringsbefogenhet i den bemärkelsen att denne kan göra ändringar från de ursprungliga kontraktshandlingarna. Just möjligheten att kunna göra ändringar från det ursprungliga kontraktet är en av de mest särskiljande egenskaperna hos entreprenadavtalet.    Det går följaktligen att urskilja att det å ena sidan föreligger ett regelverk, LOU, som verkar för att samtliga arbeten ska upphandlas och att ändringar av redan upphandlade byggentreprenader i största möjliga mån ska motverkas. Det föreligger å andra sidan ett annat regelverk, AB 04, enligt vilket det anses nödvändigt för parterna att kunna göra ändringar från redan ingånget avtalet varför BKK föreskrivit detta som en rättighet och skyldighet som är skadeståndssanktionerad. I den fortsatta framställningen redogörs närmare för innebörden av begreppen ÄTA-arbete och kompletterande byggentreprenader, vilka ändringar som åsyftas med regelverken samt hur kompatibla regelverken de facto är. Det kommer efter den företagna redogörelsen och analysen påvisas att det finns fler aspekter som visar att LOU:s undantagsregler om direktupphandling tar sikte på andra ändringar än ÄTA-arbeten. Det kommer också visa sig att om LOU är tillämplig i fråga om ÄTA-arbeten medför detta en rad olägenheter för parterna i entreprenadavtalet som kan leda till att entreprenaden aldrig färdigställs.
APA, Harvard, Vancouver, ISO, and other styles
4

Hakansson, Amanda, and Philippa Kampe. "ÄTA-arbeten – Om ofullständighet i entreprenadavtal." Thesis, Malmö universitet, Fakulteten för kultur och samhälle (KS), 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:mau:diva-23837.

Full text
Abstract:
Varje entreprenad är unik på så sätt att den i något eller i några avseenden skiljer sig från andra entreprenader. Det kan handla om att uppföra en byggnad snarlik en annan, det som skiljer entreprenaderna åt är att inblandade parter, avtal, utförande av arbetsuppdraget samt tillkommande ÄTA-arbeten kommer att, på ett eller annat sätt skilja sig åt mellan varandra. Då entreprenadrätten inte är lagstadgad i Sverige ges möjligheter att under ett kontrakterat arbete föreskriva förändringar i det ursprungliga avtalet, för att ett så tillfredsställande slutresultat som möjligt ska kunna uppnås. I nästan alla entreprenader uppkommer ÄTA-arbeten, som kan beskrivas som arbeten som utförs i anknytning till och är av samma natur som det ursprungliga kontrakterade arbetet. ÄTA-systematiken regleras i AB 04, som i allmänhet tolkas som branschpraxis och utges av byggandets kontraktskommitté. ÄTA-arbeten står för ändrings-, tilläggs- och avgående arbeten och utgör således en för beställaren, ändringsbefogenhet där rätten att beställa nödvändiga tilläggsarbeten, eller avbeställa ännu inte utförda kontraktsarbeten föreligger. Entreprenören blir med hänsyn till detta, både bunden och berättigad att utföra de ÄTA-arbeten som uppfyller formaliteterna. För att ett beställt ÄTA-arbete ska föreligga krävs en skrivelse angående detta av beställaren, samt att arbetet är av samma natur som det kontrakterade arbetet. Likställda ÄTA-arbeten har inget skriftlighetskrav, men då svårigheter att bevisa muntliga avtal föreligger borde entreprenören för att säkra rätten till betalning, ändå vänta med att påbörja ett likställt ÄTA-arbete till dess att en skrivelse om arbetet finns att tillgå. Denna utredning har visat att ändringsbefogenheten är anledningen till att tvister uppstår i entreprenadförhållanden och att tvister kan undvikas genom att precisera kontraktshandlingarna. Ett ÄTA-arbete berättigar till betalning om kraven för vad som utgör ett ÄTA-arbete är uppfyllda samt om arbetet har ett direkt samband med och är av samma natur som kontraktsarbetena. Formaliteterna för ett ÄTA-arbete måste vara uppfyllda för att ersättning ska utgå. Undantag från formaliteterna kan dock göras gällande, dessa är oskälighetsbedömningen och dolusregeln, vilket innebär att ersättning kan utgå även om formaliteterna inte är uppfyllda. Entreprenören kan bli berättigad till ersättning för faktisk mängd och inte det som föreskrivits i mängdregleringen om det finns bevis att faktisk mängd föreligger. Det är alltid entreprenörens skyldighet att bevisa att ett ÄTA-arbete föreligger för att ersättning skall utgå.<br>Each contract is unique because each project is different from other projects. What distinguishes the contracts is that the parties involved, agreements, execution of the work assignment and additional work will differ between each other. Since the contract law is not constitutional in Sweden, opportunities are given during a contracted work to prescribe changes to the original agreement, in order to achieve the best result as possible. In almost all contracts, additional work will arise. Additional work can be described as a work that are carried out in connection with and are of the same nature as the original contracted work. The additional work-system is regulated in AB 04, which is generally accepted as industry practice and is issued by the contract's contract committee. Additional work stands for changes-, additional- and resigning work. This constitutes a power of change for the purchaser where the right to order necessary additional work, or cancellation of contract work not yet performed. With this in mind, the contractor becomes both bound and entitled to carry out the additional work that meets the formalities. For an ordered additional work to exist, a written order is required by the purchaser, and the additional work needs to be of the same nature as the contracted work. Equal additional work has no written requirement, but when difficulties in proving verbal agreements exist, the contractor should, in order to secure the right to payment, still wait to start an equal additional work until received order in writing. This investigation has shown that the power of amendment is the reason why disputes arise in contractual relations and that disputes can be avoided by specifying the contract documents. An additional work entitles to payment if the requirements for what constitutes an additional work are fulfilled and that the work is directly related to and is of the same nature as the contract work. The formalities for an additional work must also be fulfilled for compensation to be paid. Exceptions to the formalities can, however, be made valid, these are the innocence assessment and the dolus rule, which means that compensation can be paid even if the formalities are not fulfilled. The contractor may be entitled to compensation for the actual quantity and not the amount prescribed in the quantity regulation, if there is evidence that the actual quantity exists. It is always the contractor's obligation to prove that an additional work exists for compensation to be paid.
APA, Harvard, Vancouver, ISO, and other styles
5

Sager, Wisam. "Hantering av ÄTA-arbeten enligt standardavtalet AB 04." Thesis, Högskolan i Gävle, Avdelningen för bygg- energi- och miljöteknik, 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:hig:diva-16754.

Full text
Abstract:
Att det förekommer ändringar vid utförandet av ett byggprojekt är inte något nytt i byggbranschen, utan snarare något som alltid har funnits och förmodligen alltid kommer att finnas. Ändringar som uppstår vid utförandet av ett byggprojekt kan orsakas av en mängd olika anledningar. Men det ändringarna har gemensamt, är att de i regel resulterar i något som inom byggbranschen brukar benämnas ÄTA-arbeten. Begreppet ÄTA-arbeten står för Ändringsarbeten, Tilläggsarbeten samt Avgående arbeten och är ett resultat av ändringar i ett ursprungligt kontrakt.I utförandeentreprenader gäller i regel standardavtalet AB 04, vilket är ett avtal som innefattar bestämmelser som reglerar både beställares och entreprenörers förpliktelser gentemot varandra. Standardavtalet AB 04 reglerar i den meningen även hur ÄTA-arbeten ska hanteras, för att en entreprenör ska kunna erhålla ersättning för arbeten som inte omfattas av det ursprungliga kontraktet.Den här studien inleds med att beskriva hur ÄTA-arbeten ska hanteras enligt standardavtalet AB 04. För att i ett senare skede kunna avgöra vilka vardagliga hanteringssätt som strider mot bestämmelserna och av den anledningen medför rättsliga påföljder.För att kunna ta reda på hur ÄTA-arbeten hanteras i dagsläget, utfördes ett antal intervjuer med verksamma personer inom anläggningsbranschen. Intervjuerna resulterade i en slutsats som tyder att det vardagligt förekommer hanteringssätt som strider mot bestämmelserna i AB 04, vilket i sin tur är anledningen till att entreprenörer i en relativt vid utsträckning går miste om ersättning för utförda ÄTA-arbeten. Studien ger även förslag på hur parterna kan förbättra hanteringen av dessa arbeten samtidigt som samhällsnyttiga perspektiv tas i beaktande.<br>The fact that changes occur at the performance of a construction project is not a new phenomenon in the construction industry, it´s rather something that has always existed and will likely do so in the future. Changes that occur during the performance of a construction project can be caused by a variety of reasons, but what those changes have in common is that they in general result in amendments of the original contract.In Swedish performance contracts the standard agreement AB 04 is regularly used, which is an agreement that includes the both parties’ obligations in relation to each other. The standard agreement AB 04 regulates in that sense even the way in how the changes shall be dealt with, in order to let the contractor be able to obtain compensation for those additional implementations. This study begins by describing how changes should be handled according to the standard agreement AB 04, in order to determine which daily doings by the contractor is inconsistent with the provisions in AB 04 and consequently leads to legal sanctions.To find out how changes are handled in current construction projects, the study conducts a number of interviews with persons that are active in the construction industry.The study resulted in a finding that puts forward that it´s fairly common that changes are handled in a manner that is inconsistent with the provisions of AB 04.The study provides also a number of suggestions on how the parties can improve the management of these changes that also takes socially useful perspective into account.
APA, Harvard, Vancouver, ISO, and other styles
6

Wallgren, Anna. "Väsentlig ändring av offentliga byggentreprenadkontrakt och ÄTA-arbeten." Thesis, Stockholms universitet, Juridiska institutionen, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:su:diva-127903.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Stridsberg, Christine. "Avtalade formkrav i entreprenadförhållanden : entreprenörens rätt till ersättning för ÄTA-arbeten." Thesis, Stockholms universitet, Juridiska institutionen, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:su:diva-95961.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Axelsson, Alice, and Elinor Johansson. "UTREDNING AV UPPHANDLINGSDOKUMENT VID OFFENTLIG UPPHANDLING MED FOKUS PÅ ÄTA-ARBETEN." Thesis, Tekniska Högskolan, JTH, Byggnadsteknik och belysningsvetenskap, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-50985.

Full text
Abstract:
Purpose: Today two of the biggest problems within the construction industry in Sweden is the exceeding of budgets and that the projects do not finish in time. One of the reasons is the use of alterations, supplementary- and withdrawn work that occurs during the project. The purpose is therefore to study the variations that can be related to the documents that are used during public procurement as well as provide some suggestions on how the procurement documents can be improved for future projects. Hence trying to decrease the use of variations in projects. Method: The study consists of a multiple case study with three similar projects. The methods that are used are a literature study that provides the base of the intended study. A study of documents is also a crucial element to be able to draw the connections between the procurement documents and the alterations, supplementary- and withdrawn work. There will also be semi structured interviews that will strengthen the case study and increase the knowledge within the area. Findings: the study shows that 60 percent of the alterations, supplementary- and withdrawn work can be connected to the procurement documents. There are a few causes that leads to the use of alterations, supplementary- and withdrawn work in a project for example coordination between the different technical areas within the projects that can lead to contradictions in the documents. Too much material in the procurement documents can leads to conflicting information which leads to the use of alterations, supplementary- and withdrawn work. With greater accuracy and greater coordination between the different technical areas, drawings, and other documents. Coordination between the areas would also improve if it is implemented in the early stages of design. It is important to be clear in the technical description which work is expected from the project which would lead to fewer the alterations, supplementaryand withdrawn work. Implications: the overall problem is in this study is how you can reduce the use off alterations, supplementary- and withdrawn work connected to the procurement documents. Most of the alterations, supplementary- and withdrawn work in a project can be connected to these documents. To be able to reduce the cost there should be a system implemented regarding the review and coordination of the procurement documents. Limitations: This study is limited to three different projects from different municipalities, to secure a more certain result there should be more equivalent projects included in the study. The interviews are limited to the project managers that where responsible for the specific projects in this study. Keywords: alterations, supplementary- and withdrawn work, procurement documents, public procurement, specifications, regulations, technical specifications
APA, Harvard, Vancouver, ISO, and other styles
9

Johansson, Pontus, and Pontus Olander. "BIM-Projektering som metod för att minska antalet ÄTA-arbeten inom anläggningsproduktion." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-31009.

Full text
Abstract:
Purpose: BIM has the potential to reduce the number of design errors in construction projects. Possibilities to change parts at a later stage, as well as better opportunities to which the designer himself can detect if anything wrong has been done. The possibility to discover faults easier and with better opportunities for changes should lead to the defects related to design errors in production decreases. The introduction of BIM in a firm may be costly and clear evidence that the design errors decreased by BIM has not been found. The goal of the work is to find out whether the introduction of BIM in the design stage in construction has led to fewer defects related to design errors in the production stage. Method: In order to achieve the target set has interviews with designers at two consulting companies been implemented. This is to find out how the methods of the designing has become more BIM-based. A document analysis has been carried out on the lists of defects and changes from eleven different engineering projects of varying size. These documents come from two large contractors in Sweden. Findings: The deisgners interviewed describe the methods for designing roads and facilities have gone on to become more BIM-based. Having previously designed in 2D CAD it has gone over more to the 3D models. In the 3D software it is also possible to add different models to the same file and check for any errors between them. To check itself has also become easier than when the designing was done in 2D CAD. The lists of changes and defects also shows that the amount of the defects related to design errors was reduced significantly compared to how it looked in a study conducted in 1999 and mentioned in a study from 2014. Implications: The introduction of BIM in the design has led to the defects related to design errors out in production has fallen. This would be of interest to companies thinking of introducing BIM in their organization but have not yet seen the benefits that BIM brings. Limitations: The thesis is relevant to both designers and contractors in civil engineering. This is when the work has been focused more towards the road and facility than designing of houses. Designers and entrepreneurs from different companies in different parts of Sweden have contributed to the collection of data, which means that the results can be assumed to be general. Contact with more companies from more places in Sweden had definitely been able to make the results even more generally. Keywords: BIM, design, changes, design errors<br>Syfte: BIM har potentialen att minska antalet projekteringsfel i anläggningsprojekt. Möjligheter att ändra delar i ett senare skede samt bättre möjligheter att som projektör själv upptäcka eventuella fel man gjort. Upptäcks fel enklare och med bättre möjligheter för ändringar bör därför leda till att ÄTA-arbetena i produktionen minskar. Att införa BIM på ett företag kan dock vara kostsamt och tydliga bevis på att projekteringsfelen minskat med BIM har inte kunnat hittas. Målet med arbetet var att ta reda på om införandet av BIM i projekteringsskedet vid anläggningsarbeten har lett till färre ÄTA- arbeten relaterade till projekteringsfel ute i produktionsskedet. Metod: För att uppnå det mål som satts har intervjuer med projektörer på två konsultföretag genomförts. Detta för att ta reda på hur metoderna för att projektera blivit mer BIM-baserade. En dokumentanalys har sedan genomförts på ÄTA-listor från elva olika anläggningsprojekt i varierande storlek. Dessa dokument kommer från två större entreprenadföretag i Sverige. Resultat: De projektörer som intervjuats beskriver att metoderna för att projektera vägar och anläggningar har gått mot att bli mer BIM-baserat. Från att tidigare ha projekterat i 2D-CAD har man gått över mer till 3D-modeller. I programmen med 3D finns även möjligheter att lägga in olika modeller i samma fil och kontrollera eventuella fel. Att kontrollera sig själv har även det blivit enklare jämfört med när projektering genomfördes i 2D-CAD. ÄTA-listorna visar även de att mängden ÄTA-arbeten relaterade till projekteringsfel minskat betydligt jämfört med hur det såg ut i en studie genomförd 1999 som även nämns i en studie genomförd 2014. Konsekvenser: Införandet av BIM i projekteringen har lett till att ÄTA-arbetena ute i produktionen har minskat. Detta skulle kunna intressera företag som funderat på att införa BIM i sin organisation men som ännu inte sett nyttan och de fördelar som BIM för med sig. Begränsningar: Examensarbetet är relevant för både projektörer och entreprenörer inom anläggningsbranschen. Detta då arbetet har koncentrerats mer mot väg och anläggning än mot hus. Projektörer och entreprenörer från olika företag i olika delar av Sverige har bidragit till datainsamlingen vilket gör att resultatet kan antas vara generellt. Kontakt med fler företag från fler platser i Sverige hade definitivt kunnat göra resultatet än mer generellt. Nyckelord: BIM, projektering, ÄTA-arbeten, projekteringsfel.
APA, Harvard, Vancouver, ISO, and other styles
10

Berglund, Amanda. "Bristfälliga bygghandlingar, ÄTA-arbeten och dess medföljande ekonomiska konsekvenser : Husbyggnadsprojekt och utförandeentreprenader." Thesis, Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-81893.

Full text
Abstract:
In recent years, deficiencies in construction documents has become a common problem in the construction industry. In most cases this leads to financial consequences, both for clients and building contractors. The risk of financial consequences can be minimized if the deficiencies and errors are eliminated before the construction phase or if it’s detected in an early stage of a project. Within Peab Skellefteå, a lot of time, energy and money are spent to investigate the deficiencies and errors in construction documents. This mostly occur in the construction phase, since that is where the deficiencies and errors usually are discovered. Previous studies concerning the same area indicate that financial consequences is a result of inadequate construction documents and alteration and additional works, but none of the studies includes further investigation concerning how it practically appears in projects and in what way it affects the client’s and building contractor’s economy. Based on this, the purpose of the report has been formulated: The purpose of the master thesis is to investigate and understand how inadequate construction documents affects individual construction projects in terms of economy. Based on the results from the interviews, recommendations will be proposed regarding how the risk of financial consequences can be reduced to help entrepreneurs avoid these types of situations. The content of this report is essentially based on interviews with nine participants, either site managers, construction engineers or purchasers from Peab Skellefteå. Theory from previous studies is also used and the report is limited to traditional contracts. The results of the interview study revealed that both the building contractor and the client have been negatively affected in terms of economy in project 1–6. It is hard to report accurate numbers, since inadequate construction documents might affect the next work stage, contract rate, time that should have been spent doing something else and the time spent to investigate deficiencies and errors, which can be difficult to prove. Some costs could be deduced to the discovered deficiencies and errors, see Table 1. Generally, it’s stated that deficiencies in construction documents entails financial consequences for both entrepreneurs and clients. The respondents explain that the drawings are the most problematic construction document and that’s where most errors are discovered. The parts of the drawings that’s usually inadequate is piercings, fittings, inner walls, details, attachments and contradictory information. Deficiencies typically connected to financial consequences for the building contractor is piercings, reinforcement, fire sealing and time spent investigating the deficiencies. For the client, typical deficiencies connected to financial consequences are lack of foundation- and ground investigation, quantifying errors, when incorrect dying times leads to extra costs and additional work. The respondents’ suggestions for improvement in collaboration with the author’s own thoughts is the basis of the given recommendation. The main potential improvements for designers are to review construction documents more accurate, increase their knowledge about production and materials, work with BIM-coordination and be receptive to feedback. Clients should check the coordination, increase their knowledge about work steps and materials and have consistent solutions through the project. Building contractors should have coordination meetings with designers, clients and installers, make an appropriate number of tender calculations, provide feedback to designers and clients, use the question/answer-method, design a useful contract administration and increase the review of contract documents for the often-deficient parts.
APA, Harvard, Vancouver, ISO, and other styles
More sources
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!

To the bibliography