Academic literature on the topic 'Bergschakt'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Bergschakt.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Journal articles on the topic "Bergschakt"
Mendel, C., W. Scholaut, and F. Pirchner. "Performance of merinolandschaf and bergschaf under an accelerated lambing system." Livestock Production Science 21, no. 2 (February 1989): 131–41. http://dx.doi.org/10.1016/0301-6226(89)90044-4.
Full textDickie, M. B., and A. Holzmann. "Untersuchungen zum Einsatz von Progesteronschnelltests (Serozyme®-Progesteron, Ovucheck®) zur Graviditätsdiagnose beim österreichischen Bergschaf." Journal of Veterinary Medicine Series A 39, no. 1-10 (February 12, 1992): 525–30. http://dx.doi.org/10.1111/j.1439-0442.1992.tb00212.x.
Full textDissertations / Theses on the topic "Bergschakt"
Jenssen, Henrik, and Christoffer Olsson. "Jämförelse mellan trådlösa sensorer med fjärravläsning och konventionell mätning med totalstation." Thesis, Mittuniversitetet, Institutionen för ekoteknik- och hållbart byggande, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:miun:diva-42690.
Full textTo continuously develop, evaluate and implement new technology is animportant part in all trades and all products shall contribute to a moreefficient workflow. Surveying can be deemed as a foundation in construction,infrastructure and field work and is therefore vital for the marketsdevelopment and streamlining. This study treats a comparison between aconventional surveying method and a new form of surveying equipmentwhich allows remote readings. The study was implemented to develop aperception regarding if the new form of technology is a valid form ofsurveying in comparison to the traditional surveying methods. Based on thestudies result the usability is evaluated and an analysis determines if this newtechnology is suitable in this field of work.This study was made at the hydropower plant Kvarnfallet in Rörvattnet,Jämtland, where a mountain shaft, 40 meter deep is opened to allow forservice and inspection related labour. Surveying is performed both with totalstation and these new wireless sensors to determine whether the exposedmountain shaft shows any movement. With help from Mitta AB in Östersundthe study was achieved by comparing different surveying methods used onsite, thereafter the outcome is analyzed. The results show there are clearbenefits with the new surveying method, although the range of use isrestricted compared to the conventional approach. This specific project issuited for the new type of technology since the surveying only requiresmeasuring of static points and retrieves data continuously in a short timespan. In combination with remote analysis through a web monitor enableseconomic, environmental and safety benefits.The new technology is suited for projects in which continuous surveying froma static position is required. It is by contrast crucial to collect the data in closeproximity to the same time of day to minimize the margin of error due tofluctuations in temperature.
Betyg 2021-06-04
Sundelin, Alexander. "Bergschakt 153 kopplad till enbergspänningsmodell i Kiirunavaara gruvan : Ore pass 153 connected to a rock tension model in the mine of Kiirunavaara." Thesis, Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-66762.
Full textWidén, Emil. "Kostnadsberäkning av rörläggning." Thesis, KTH, Byggteknik och design, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-213502.
Full textWater- and waste water systems plays a huge role in today’s management of storm-, waste and drinking water. Part of the water- and waste water systems are pipelines located below ground level whose purpose is to supply homes, schools and companies with water and to drain storm – and waste water. Stockholm Vatten och Avfall manages over 200 Swedish miles of water pipelines and 300 Swedish miles of waste water pipelines in Stockholm. Adding new pipelines to the system and change the existing pipelines requires sustainable investment decisions to be taken at early stages of projects. When estimating the costs of a pipeline construction project, many different costs has to be taken into account, especially the excavation costs and machinery and materials costs. In order to do this, Stockholm Vatten och Avfall has previously been using a calculation tool that estimates the cost of a pipeline construction project in an excavated pipeline trench. This calculation tool is based on prices that are not current for current conditions. In order to make the calculation tool useful with today’s prices, reference projects have been collected and divided into inner city and suburban areas along with inputs and economic facts. Based on these inputs, factors have been calculated which the output from the calculation tool has been multiplied with and then been compared t o the calculation tool after the tool’s prices have been updated. A regression – and correlation analysis was then made to determine which of the methods best describe the reference projects and the largest correlation was found in the calculation tool with updated prices.
Book chapters on the topic "Bergschakt"
"Bergschutt m." In Wörterbuch GeoTechnik/Dictionary Geotechnical Engineering, 133. Berlin, Heidelberg: Springer Berlin Heidelberg, 2013. http://dx.doi.org/10.1007/978-3-642-33335-4_21383.
Full text