Contents
Academic literature on the topic 'Betongkonstruktion'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Betongkonstruktion.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Dissertations / Theses on the topic "Betongkonstruktion"
Lundgren, Pär. "Icke-linjära modelleringsteknikerav förspänd betongkonstruktion : Reaktorinneslutningen på Forsmark 3." Thesis, Uppsala universitet, Tillämpad mekanik, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-174125.
Full textEvaldsson, Filip. "Energieffektiv uttorkning av betongkonstruktioner." Thesis, Umeå universitet, Institutionen för tillämpad fysik och elektronik, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-139476.
Full textVid platsgjutning av tjocka betongkonstruktioner är dess förmåga att torka ur essentiell. Tidplaner hos byggnadsentreprenörer måste till stor del anpassas efter denna. Anledningen är att de flesta material som appliceras på betongen inte är fukttåliga vilket rimmar dåligt med ett material som till stor del består av vatten. En minskad mängd vatten – och en ökad mängd cement ger upphov till en snabbare hydrationsutveckling vilket innebär att en stor del av betongens vatten binds till cementpartiklarna och således minskas den relativa fuktigheten i betongen drastiskt efter gjutningen. Ett annat alternativ vid användandet av betong med en mer balanserad kvot av vatten och cement (över 0,45) är att styra det klimat som betongen torkas i. Detta kan göras med hjälp av exempelvis värmefläktar som sänker den relativa fuktigheten i den omgivande luften samtidigt som den också värms vilket stimulerar fukttransporten i betongen. I detta examensarbete har de två alternativen som presenterats ovan jämförts. Jämförelsen beaktade metodernas effektivitet, kostnad och miljöpåverkan för ett typfall i Umeå där en tjock betongkonstruktion skulle gjutas. Resultatet var övervägande så att självuttorkande betong är lämpligast att använda ur samtliga betraktade synvinklar. Användandet av dieselvärmare visade sig vara det sämsta alternativet då dess miljöpåverkan och kostnad var överlägset störst.
Andersson, Emelie. "Jämförande studie avseende svenska byggregler och den europeiska standarden eurokoder : Inriktning husbyggnad och betongkonstruktion." Thesis, Örebro universitet, Akademin för naturvetenskap och teknik, 2009. http://urn.kb.se/resolve?urn=urn:nbn:se:oru:diva-7309.
Full textAlexandersson, Anders, and Sven Gynne. "Ekonomisk utvärdering av betonggjutformar." Thesis, Jönköping University, JTH, Civil Engineering, 2007. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-1029.
Full textThis report will try to evaluate the use of rented concrete casting moulds, which are used to build walls and system of joists. The evaluation is only examining the economical aspects.
The cost of using concrete casting moulds is a big part of the total production expenses. Therefore it is important that the calculated price not exceeds the final costs of the casting moulds. The calculated price is the price used in the process of making an offer.
The evaluation consists of a comparison of the calculated price and the final costs for three building projects. It also evaluates the exploitation of the concrete casting moulds for each project.
The report is made by Sven Gynne and Anders Alexandersson at School of Engineering, Jonkoping University, in cooperation with PEAB Jonkoping. The evaluation is strictly based on the calculated price and final cost of rented concrete casting moulds, only the moulds themselves, not the labour costs.
Educational visits have been made to the three projects gathering facts. The conclusions we have drawn are that the difference between the calculated price and the final costs are considerable, especially one project have a greater difference than the others. The reasons for that are among other things tight building ground and a complicated building construction.
Udroiu, Cristina. "Lean Construction applicerat på betongkonstruktion : The Last Planner och visuell metodik för reducering av produktionstidsvariationer." Thesis, KTH, Industriell ekonomi och organisation (Avd.), 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-34880.
Full textThe background to this thesis is the construction companies’ challenges to engage in construction projects where new and unique objects are to be constructed, with many new conditions and quite often even with a new composition of the workforce. A common need for these construction projects is the need to effectively manage a variety of new and different variations. Oden anläggningsentreprenad AB presented a problem regarding unwanted variations in production times in the construction of concrete monoliths, which include highly repetitive tasks. The purpose of the thesis was to answer the following questions: Which are the factors that affect fluctuations in production time during the construction of concrete monoliths? Which are the solutions to reducing the factors that negatively affect production time? How should the new solutions be implemented? A study has been made of theories in lean production, lean construction, organizational change and concrete structures. The empirical data has been gathered by participating in the daily production, and by maintaining a field diary of daily problems that the production staff brought to the authors attention. Another part of the empirical data has been gathered from a workshop where the production staff identified processes and activities and placed them in their most optimal order. A mapping of responsibilities for the activities was also made at this workshop. The problems from the field diary have been categorized and the four largest categories were planning, communication, material handling and logistics, and responsibilities. After an analysis of the problems, and with the support of lean construction theory, some solutions have been proposed which is to introduce new routines before the start of production in new projects and to use the planning method called The Last Planner supplemented by visual aids. With the purpose of implementing the new solutions a proposal is provided with aspects on change agents and management of resistance to changes. The conclusions of this thesis are that the empirical evidence has identified the factors that create unwanted variations in production times. The solutions that are proposed are based on the empirical evidence and the support of lean construction theories. Therefore it provides the opportunities needed to reduce the variations in production times for concrete monoliths.
Landin, Johan. "Renovering av betongkonstruktioner i vattenverk." Thesis, Malmö universitet, Fakulteten för teknik och samhälle (TS), 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:mau:diva-20312.
Full textAround 1970 many water treatment plants were built and renovated in Sweden. Thesewas calculated to have a service life of between 50-60 years, which in most cases nowhave passed.The aim is to investigate which renovation methods exist and compile and evaluate these.The goal is to present which guidelines should be followed when renovating concretestructures in water treatment plants.The work gives answers to what damage is common in water treatment plants and whatthey depend on, which renovation methods are best suited, which materials can be usedand which requirements are set on the result.Problems in water treatment plants are mainly cracks, leaching, mechanical erosion,corrosion damage, chemical attack, biodegradation and frost damage. These damages arepreferably renovated by removing the damaged concrete and replacing it with new, basedon the exposure class that applies to the object in question.The conclusion is that today there is no general and exact renovation method for concretestructures in water treatment plants. Many different factors are involved.However, it would fill a gap of knowledge and facilitate future renovations if the watertreatment plants made a joint compilation of their experiences and lessons learned. It isalso a great value to educate the personnel.
Arnsten, Emma, and Ellen Öhman. "Användbarheten av Tekla i Betongkonstruktioner : En jämförelsestudie mellan två modelleringsprogram." Thesis, Uppsala universitet, Byggteknik, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-257560.
Full textDetta examensarbete har granskat modelleringsprogrammet Tekla Structures och besvarat frågan om huruvida det kan fungera som ett lämpligt modelleringsprogram för konstruktionsavdelningen på Bjerking AB i Uppsala. Metoden som har använts i arbetet är en fallstudie av ett tidigare genomfört projekt med befintliga underlag att utgå ifrån. Avgränsningen i studien har varit att endast undersöka användbarheten i grundkonstruktioner av platsgjuten betong. Arbetet undersökte tre huvudområden inom projekteringsprocessen. Det första var att modellera betongelement sedan att modellera armering och till sist framtagning av ritningar. Eftersom Autodesk Revit var det befintliga modelleringsprogrammet på avdelningen genomfördes utvärderingen som en jämförelse mellan de två olika programmen. Förutsättningen var att alla tre hvududelarna skulle göras i ett och samma program. Resultatet visade att Tekla Structures har stor potential inom området betongmodellering, och det är ett lämlpligt modelleringsprogram att använda för projekt som innefattar grundkonstruktioner i platsgjuten betong. Studien har även visat programmets fördelar med att 3D-modellera armeringen inom dessa typer av projekt.
Bäckman, Lisa, and Elin Englundh. "Bedömning av tekniska möjligheter och begränsningar med termografering vid inspektion av betongkonstruktioner : En studie med tillämpning på nedströmssidan av betongdammars frontplatta." Thesis, Uppsala universitet, Byggteknik och byggd miljö, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-415720.
Full textSyftet med detta examensarbete är att undersöka hur väl skador på betongkonstruktioner kan upptäckas med hjälp av termografering, med tillämpning på nedsströmsidan av betongdammars frontplatta. Examensarbetet har utförts i samarbete med Vattenfall AB, som uttryckt en önskan om att undersöka alternativa metoder vid inspektion av vattenkraftsdammar. De metoder som används i arbetet är inspektion i fält, undersökning i laboratorium samt simulering av en dammkonstruktion i Therm 7.7. Inspektion i fält samt undersökning i laboratorium genomfördes för att jämföra verkliga förhållanden med de förhållanden som krävs för att termografering ska kunna utföras på önskvärt sätt. Simulering användes som ett verktyg för att se om kondens på konstruktionens yta uppstår, för att på så sätt avgöra huruvida termografering är lämpligt eller inte. Resultatet av detta examensarbete visar att det fanns svårigheter med att lokalisera sprickor i fält, då det inte fanns tillräckligt stora temperaturskillnader på konstruktionens yta. Undersökningen i laboratorium visar att sprickor går att identifiera när fuktpåslaget är koncentrerat till sprickbildningen, den omkringliggande ytan är torrare än sprickan och temperaturskillnaderna på provets yta är större än cirka 1 °C.
Karlsson, Margarita. "Jämförelse mellan halvlätt trä och tung betongkonstruktion i projektet Anläggaren 3 : Koldioxidutsläpp, kostnad och inverkan av geografisk position på energiåtgång." Thesis, Luleå tekniska universitet, Institutionen för teknikvetenskap och matematik, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-78901.
Full textHuset Anläggaren 3 undersöktes utifrån energiåtgången, koldioxidutsläppen ochinvesteringskostnaden genom att ställa upp projektet som två konstruktionstyper. Den första varianten var halvlätt konstruktion där ytterväggarna, mellanbjälklagen och taket varav trä medan i den andra varianten var en tung konstruktion där tidigare nämnda delarbestod av betong.Metodiken var att se över energibehoven genom flera uträkningar med programmet IDAICE. Klimatpåverkan undersöktes med statistik från SMHI och flera energisimuleringar med IDA ICE. Investeringskostnaden togs fram med programmet Bidcon. Mer detaljerade dataför de två konstruktionernas byggnadsdelar användes i energiberäkningsprogrammet. Den halvlätta träkonstruktionen för Anläggaren 3 krävde mindre mängd material än betongkonstruktionen för att uppnå nästintill likadana U-värden. De två konstruktionsalternativen påverkades knappt av geografiska lägesskillnader ochklimatändringar men energikonsumtionen hade en jämnare profil för de sydliga städernaän de nordliga. En investering i den halvlätta träkonstruktionen är att föredra i Skellefteå då det är billigare, tar mindre tid och släpper ut mindre koldioxid än den tungabetongkonstruktionen. Betong är i sitt ursprungliga skick bättre ur mögel och brandsäkerhetssynpunkt, tål ofta mer påfrestning och kan formas i vissa lägen lättare änträ.
Bohlin, Pelle, and Olle Lindroth. "Moderna trä- och betongstommar i flerbostadshus : En teknisk jämförelse av ett fyravåningshus med två stomalternativ." Thesis, KTH, Byggteknik och design, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-102025.
Full textThe goal with thisdegree project was to highlight the differences between an apartment building with a timber frame and partly prefabricated concrete frame from a technical point of view to determine which alternative that is preferable. Highlighted factors were: Thicknesses of load-bearing parts The maximum length of floor structures Assembly of installations Assembly of the frame-parts Sound-insulating ability Moisture problems Dimension of fire-protection Project-complexity Construction documents from an existing apartment building with a timber frame were obtained and analyzed, and a concrete frame house with similar abilities was projected. The half-prefabricated concrete construction was designed with current eurocodes and details were designed according to laws, regulations and recognized industry standards. From the technical perspective that has been discussed in this report, the advantages with concrete frames are greater than the timber alternative, despite the fact that they in some aspects are very similar. The concrete option provides significant benefits in terms of fire and sound abilities and it is also easier to design, while the timber option has its advantages in assembly and foundation. Choosing a frame of timber to an apartment building also seems to have advantages in the environmental and work environmental aspects. To fulfill the sound, fire and moisture requirements which are needed in a timber house it requires advanced building system that involves complexity of the design which requires close cooperation between the constructional engineer and the manufacturer.