Contents
Academic literature on the topic 'Betongstomme'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Betongstomme.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Dissertations / Theses on the topic "Betongstomme"
Mohammad, Jan, and Marten Youssef. "Prefabriceringens utveckling av trä och betongstomme." Thesis, KTH, Byggteknik och design, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-102108.
Full textIndustrialized building laid the foundation of modern building techniques and has developed into a prefabricated building. With better knowledge of materials and working methods, engineers have learned tolerance, fit, and dimensions that are most important parameters for assembling prefabricated elements. In this study, we treat the development of prefabricated building during the 21st century and what needs to be improved, how we create an efficient construction industry that can contribute to increased Swedish growth and productivity. From the result we can determine if prefabricated houses are the future of construction method. Houses in wood are by far the largest in the prefabricated construction and are now 90% of new building. As expansion develops technology and now we build eight-story multi-family homes in wood. The prefabricated building has moved most of the work to the factory where, in a controlled environment produce finished elements which are produced in optimum conditions. This means that construction moisture in the materials no longer exists and all operations can be performed covered. The development has also led to significantly shorter construction times and under right conditions up to 80% of the time can be saved. Above all, the construction method requires less storage and is ideal in densely populated areas but requiring major demands for logistics and deliveries.
Olsson, Simon, and Mattias Blom. "Jämförelse mellan radhus med trä- eller betongstomme : Ekonomiska och tidsmässiga skillnader för prefabricerad trästomme, prefabricerad betongstomme och platsbyggd träregelstomme." Thesis, Karlstads universitet, Fakulteten för hälsa, natur- och teknikvetenskap (from 2013), 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:kau:diva-68973.
Full textThe aim of this study is to compare cost and time differences between four different designed wall constructions. The different wall constructions that are compared are a site-built wooden wall, a prefabricated concrete wall, a prefabricated sandwich wall (further referred to as prefabricated concrete wall SW) and a prefabricated CLT (Cross Laminated Timber) wall. These four different walls have been designed to be equivalent from an energy perspective in order to make a fair comparison. The U-values of the walls were selected to indicate how equal they are. Moisture safety has also been assessed for the various constructions. The question posed is, which of the three different prefabricated wall frames get the lowest total cost for the construction of the wall structure, based on construction time and material costs? And how does the total cost and construction time of the site-based timber wall compare to the total cost and construction time of the prefabricated walls? To answer these questions, cost and time calculations have been made for all wall constructions. This has been done by comparing the building cost of the different walls and the building times layer by layer, as well as the total construction time and construction cost for each individual wall per square meter. Input has been retrieved from Wilkells sektionsfakta® and from contact with experts in the industry. The result shows that the prefabricated concrete wall SW has the lowest total construction time of 241 working hours and a total construction cost of just over 570,000 SEK, making it the prefabricated wall with the shortest total construction time and total construction cost. This at the same time as the site-built wooden wall has a total construction time of 484 hours and a total construction cost of just over 435,000 SEK. Based on the results of the different wall constructions, it was chosen to focus on the prefabricated concrete wall SW and the site-built wooden wall, as these two proved to be most relevant from the study's questions. In the comparison between these two wall constructions, it is the total construction cost and the total construction time that become decisive. The total construction time of the prefabricated concrete wall SW is approximately 50% of the total construction time of the site-built wooden wall. This at the same time as the total construction cost of the prefabricated concrete wall SW is 31% higher than for the site-built wooden wall. The conclusion drawn was that, based on the questions posed, the prefabricated concrete wall SW is the wall structure that is considered the most advantageous as the construction time reduction is considered to be justified by the additional building cost that is added compared with the site-built wooden wall. From a sustainability aspect, the prefabricated concrete wall SW may not be chosen as the environmental benefit offered by the site-based wooden wall outweighs the difference in construction time between the prefabricated concrete wall SW and the site-built wooden wall. This would mean that the site-based wooden wall is the most advantageous based on total construction time and total construction cost.
Olsson, Sebastian. "Prefabricerade stomsystem: massivträ- eller betongstomme för flervåningshus : En teknisk jämförelseanalys." Thesis, Mittuniversitetet, Avdelningen för ekoteknik och hållbart byggande, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:miun:diva-40192.
Full textBerggren, Jakob. "Logistic evaluation of internationally purchased concrete frames : Logistisk utvärdering av internationellt köpt betongstomme." Thesis, Linköpings universitet, Institutionen för teknik och naturvetenskap, 2009. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-94415.
Full textThis thesis is made on behalf of NCC as a logistical evaluation, focused on the delivery and assembling of the concrete structure to expansion of Hageby Centrum in Norrköping. The special feature of the project in Hageby Centrum is that NCC turned to a foreign supplier of concrete frame instead of a domestic supplier. This has major logistical implications because the big volume of precast concrete products, and to plan further 900 trucks from Latvia to Sweden is impossible. Instead, they have chosen the relatively untested option to ship the concrete elements by boat. Also this poses a problem when the concrete elements cannot be delivered directly because of lack of space at the building site, which means that they must first be held in Norrköping port until it is time for assembly. The result of the report declares what the emerging problems of the project depends on. The report can also be helpful for future projects as it may be necessary to once again turn to a foreign supplier. The financial aspects such as the price for the structure and assembly are not included in the report, but instead it is the logistics part is in focus.
Töttrup, Hampus, and Gunnar Renström. "Möjligheter med KL-trä : Hur en betongstomme kan omformas till en KL-trästomme." Thesis, KTH, Byggteknik och design, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-231871.
Full textPersson, Moa, and Hanna Sjölander. "Kommunikationsproblem mellan arkitekter och konstruktörer vid projektering av flervåningshus av trä- och betongstomme." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-36617.
Full textRautio, Kirsi, and Ida Johansson. "En jämförelsestudie av koldioxidsläpp för en byggnad med trä- respektive betongstomme ur ett livscykelperspektiv." Thesis, University of Gävle, Department of Building, Energy and Environmental Engineering, 2010. http://urn.kb.se/resolve?urn=urn:nbn:se:hig:diva-7659.
Full textThe goal with this examination thesis is to investigate the difference in carbon dioxide emissions between a building with a wooden versus concrete carcassing from a life cycle perspective. The huge amounts of carbon dioxide released into air from human activities must be reduced to prevent serious consequences. A way to limit this issue is through performing a comparative study where the result shows which of two products with the same function has the lowest emission of carbon dioxide, whereof the product with the lowest carbon dioxide pollution can be chosen.
To be able to perform a study like this an object has been chosen and studies about life cycle analyses have been done. The rental square meter, the thermal conductivity value, the energy requirements and the placement of the building has been set equal in both framework types. There were solely dissimilarities of the two buildings taken into account when this comparison study was performed.
The result of the study is that a building constructed with a wooden carcassing has the lowest amount of carbon dioxide emissions. The difference in carbon dioxide pollution is 22 ton which connotes a difference in 15 percent.
Detta examensarbete har som mål att undersöka hur stora skillnader i koldioxidutsläpp som uppstår om man har en trä- respektive betongstomme ur ett livscykelperspektiv. De stora mängder koldioxid som släpps ut till luften på grund av människans aktiviteter måste försöka begränsas då en förstärkt växthuseffekt kan leda till allvarliga konsekvenser. Ett sätt att göra detta på är att studera vilken av två produkter med samma funktion som har lägst koldioxidutsläpp. Därav kan produkten med lägst koldioxidutsläpp väljas.
För att kunna genomföra denna studie har ett objekt bestämts och en studie kring livscykelanalyser gjorts. Byggnaden som används har en fastställd uthyrbar yta, lika u-värde i ytterväggar, samma energibehov och samma placering i båda fallen. I denna jämförelsestudie utförs beräkningarna bara på olikheter mellan de två byggnaderna.
Resultatet av studien gav ett lägre koldioxidutsläpp för objektet med trästomme. Skillnaden mellan de två objekten är 22 ton i koldioxidutsläpp vilket innebär en skillnad på 15 procent.
Chouhan, Nimesh, and Ibrahim Jound. "Jämförelse mellan prefab och platsgjuten betongstomme för kv.Kleopatra : Arbetsmiljö, kvalitet, tidplanering- kostnader och miljö." Thesis, Mälardalen University, School of Sustainable Development of Society and Technology, 2009. http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-6040.
Full textThis diploma work is about the comparison between the prefabricated and on-site mixed concrete frames for Cleopatra that is a multi-residential building in Västerås, Sweden. Prefabricated and on-site mixed concrete structures are two methods used in the construction of new buildings.
Due to lack of time after procurement of project contractors usually do not have time to make a detailed study for the selection of frames. In such cases they select a frame that has been chosen for previous projects with the lowest price that takes into account the client's budget for the project. The comparison is made between the prefabricated structure and the current structure which is on-site mixed with concrete and prefabricated concrete columns and concrete stairs for kv. Kleopatra. It is very time-efficient in the current situation to make use of prefabricated pillars and cement stairs. Pillars and beams are chosen to be made on-site moulded because there is a very few and due to that it is more expensive to buy these as prefabricated. The extra cost will be when the prefabricated factory use specific forms for those parts which are then discarded and the cost of these forms is then allocated on number of pillars and beams. On-site moulded structures are being built at the workplace and in need of reinforcement, forming, stamping, bending back, ready-mix concrete, crane, equipment for drying, calendaring, glazing and conservation. Prefab structures are built at the factory and transported to the construction site, and then they have a need for the crane, ready-mix concrete, reinforcement for floor plate and calendaring, glazing for these. The choice between the prefabricated and on-site mixed frame for kv. Kleopatra affects the environment, working environment, quality and timing and costs differently. These points are investigated and compared for the quarter. Kleopatra and the results we have arrived at through various methods, including interviews, surveys, literature studies and further research we have done. We have come to different conclusions for the work environment, quality, environment,timeschedule and costs.
Lindholm, Erik, and Robin Malmqvist. "Förbättring av bärighet vid brand : Utvärdering av befintlig betongstomme i hus 08 Falu lasarett." Thesis, Mälardalens högskola, Akademin för ekonomi, samhälle och teknik, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-55440.
Full textTengelin, Fredrik, Kristian Roos, and Johan Axelsson. "En jämförelse av stomval till skolan i Hagfors." Thesis, Karlstad University, Faculty of Technology and Science, 2008. http://urn.kb.se/resolve?urn=urn:nbn:se:kau:diva-1820.
Full textSammanfattning
Detta arbete baseras på nybyggnationen och ombyggnationen av skolan i Hagfors som NCC gör för Hagfors kommun. Uppgiften är att göra en jämförelse av olika stomalternativ; platsgjuten betong, prefabricerad betong och stålstomme på nybyggnationen med hänsyn till tid, ekonomi och miljöpåverkan. Den nybyggda delen kommer att bli ca 7000 m2 fördelat på tre plan och stommen utgörs i dagsläget till största del av prefabricerad betong.
De frågeställningarna som behandlas i arbetet är
• Vilket material är mest fördelaktigt utifrån ett tidsperspektiv?
• Vilket material/stomlösning är ur ett ekonomiskt perspektiv att föredra?
• Hur påverkas miljön av de olika stomsystemen?
Målet med examensarbetet är att välja den mest lämpliga stomlösningen för nybyggnationen av Visa Bildningscentrum i Hagfors på uppdrag av NCC, ur ett ekonomiskt och tidsmässigt perspektiv. De alternativ som ska undersökas och jämföras är stålstomme, prefabricerad betongstomme och platsgjuten stomme.
Syftet med arbetet är att kunna få en inblick i hur olika stomsystem utformas, vilka byggmetoder som används, samt göra en jämförelse av stomsystemen som kan generera en relevant slutsats. Vi ska studera ett objekt där stommen redan är vald för att på så sätt få en mer verklighetsanknuten förståelse för problematiken vid val av stomme.
Problemlösningen baseras på laster, pelardimensioner, balkdimensioner, antal pelare och balkar. Dessa har tillhandahållits av NCC. Beräkningar genomfördes för att specificera armeringsmängd i betongstommarna och för att dimensionera stålstommen. För att se vad de olika stomalternativen kostade användes BidCon för att få fram en kalkyl på stommen, inklusive material och arbetskostnader. Resultatet av detta blev att den platsgjutna betongstommen kostar 4 104 000 kr, stålstommen kostar 5 835 000 kr och den prefabricerade betongstommen kostar 4 558 000 kr.
Om man ska se till tiden är det den prefabricerade betongstommen som tar kortast tid vid förutsättningen att leveranser och samordning sker planenligt. Den platsgjutna stommen är den mest tidskrävande bland annat beroende på långa uttorkningstider och faktumet att platsgjuten betong är mycket väderberoende.
Sett utifrån ett miljöperspektiv föll valet på att använda betong på grund av lägre energiförbrukning och utsläpp vid tillverkning, jämfört med stål, samt att en byggnad i betong har en stor värmetröghet vilket skapar förutsättningar för ett lägre och jämnare energibehov i den färdiga byggnaden. Transporter till byggplatsen har även betydelse på grund av att de prefabricerade betongelementen i detta fall tillverkas i och levereras från Tyskland.
Vid tillverkning av prefabricerade element minimeras de flesta problem som väder orsakar vid användning av platsgjuten betong. All produktion sker inomhus i fabriker och förutom att problem på grund av väderförhållanden försvinner så minskas även olycksrisken. Prefabricerat byggande har dock nackdelen att det är mycket störningskänsligt på grund av att det förlitar sig helt på att logistiken fungerar utan några förseningar. Problem med arbetsmiljö, exempelvis belastningsskador och olycksrisker, kan man flytta från byggarbetsplatsen till en fabrik där arbetsmiljön kan kontrolleras på ett bättre sätt genom att välja en prefabricerad stomme, även om man inte helt kan undvika dem.
I rapporten finns exempel på hur beräkningar genomförts, kalkyler på stålstommen och den platsgjutna betongstommen och ritningar på nybyggnationen.
Arbetet utförs på uppdrag av NCC med Bo Rom och Thomas Boman som externa handledare. Handledare på universitetet är Carina Rehnström.