To see the other types of publications on this topic, follow the link: BIM models.

Dissertations / Theses on the topic 'BIM models'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 dissertations / theses for your research on the topic 'BIM models.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Levante, Riccardo. "Data Management and Virtual Reality Applications of BIM models." Thesis, KTH, Byggnadsteknik, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-233189.

Full text
Abstract:
Nowadays new digital technologies play an important role in the AEC sector, which are goingthrough a significantly changing period. In this process BIM represent the main character,revolutionizing the traditional way of working in the main operative phases: Design,Construction and Maintenance. However, having all these aspects under a uniquemethodology can brings several problems without a strong framework to regulate the wholeprocedure. The huge quantity of information, as well as the high number of involved people,are the main weak points, that can become the main strong points when Facility Managementis involved in the process. In this scenario this work will analyse a real project located inGenova (Italy), seeing as a complex structure as an hospital can be regulated through the BIMmethodology.The thesis will focus on two fundamental aspects of the new construction methodology: DataManagement and Virtual Reality. The first part aims to analyse correlation between BIM andits information, focusing also on the study case, proposing operative solution through the BIMsoftware Revit and the visual programming toll Dynamo. The second part will showadvantage integrating virtual reality technologies in the AEC sector, showing how build aninteractive virtual simulation using the game engine software Unity based on our study case.Through this work we have seen the importance of new technologies for the future ofConstruction Industry, showing how important is the sharing information involving alwaysmore people into the process, particularly for complex structures.
APA, Harvard, Vancouver, ISO, and other styles
2

Tauscher, Helga. "Configurable nD-visualization for complex Building Information Models." Doctoral thesis, Saechsische Landesbibliothek- Staats- und Universitaetsbibliothek Dresden, 2017. http://nbn-resolving.de/urn:nbn:de:bsz:14-qucosa-228894.

Full text
Abstract:
With the ongoing development of building information modelling (BIM) towards a comprehensive coverage of all construction project information in a semantically explicit way, visual representations became decoupled from the building information models. While traditional construction drawings implicitly contained the visual representation besides the information, nowadays they are generated on the fly, hard-coded in software applications dedicated to other tasks such as analysis, simulation, structural design or communication. Due to the abstract nature of information models and the increasing amount of digital information captured during construction projects, visual representations are essential for humans in order to access the information, to understand it, and to engage with it. At the same time digital media open up the new field of interactive visualizations. The full potential of BIM can only be unlocked with customized task-specific visualizations, with engineers and architects actively involved in the design and development process of these visualizations. The visualizations must be reusable and reliably reproducible during communication processes. Further, to support creative problem solving, it must be possible to modify and refine them. This thesis aims at reconnecting building information models and their visual representations: on a theoretic level, on the level of methods and in terms of tool support. First, the research seeks to improve the knowledge about visualization generation in conjunction with current BIM developments such as the multimodel. The approach is based on the reference model of the visualization pipeline and addresses structural as well as quantitative aspects of the visualization generation. Second, based on the theoretic foundation, a method is derived to construct visual representations from given visualization specifications. To this end, the idea of a domain-specific language (DSL) is employed. Finally, a software prototype proofs the concept. Using the visualization framework, visual representations can be generated from a specific building information model and a specific visualization description<br>Mit der fortschreitenden Entwicklung des Building Information Modelling (BIM) hin zu einer umfassenden Erfassung aller Bauprojektinformationen in einer semantisch expliziten Weise werden Visualisierungen von den Gebäudeinformationen entkoppelt. Während traditionelle Architektur- und Bauzeichnungen die visuellen Reprä̈sentationen implizit als Träger der Informationen enthalten, werden sie heute on-the-fly generiert. Die Details ihrer Generierung sind festgeschrieben in Softwareanwendungen, welche eigentlich für andere Aufgaben wie Analyse, Simulation, Entwurf oder Kommunikation ausgelegt sind. Angesichts der abstrakten Natur von Informationsmodellen und der steigenden Menge digitaler Informationen, die im Verlauf von Bauprojekten erfasst werden, sind visuelle Repräsentationen essentiell, um sich die Information erschließen, sie verstehen, durchdringen und mit ihnen arbeiten zu können. Gleichzeitig entwickelt sich durch die digitalen Medien eine neues Feld der interaktiven Visualisierungen. Das volle Potential von BIM kann nur mit angepassten aufgabenspezifischen Visualisierungen erschlossen werden, bei denen Ingenieur*innen und Architekt*innen aktiv in den Entwurf und die Entwicklung dieser Visualisierungen einbezogen werden. Die Visualisierungen müssen wiederverwendbar sein und in Kommunikationsprozessen zuverlässig reproduziert werden können. Außerdem muss es möglich sein, Visualisierungen zu modifizieren und neu zu definieren, um das kreative Problemlösen zu unterstützen. Die vorliegende Arbeit zielt darauf ab, Gebäudemodelle und ihre visuellen Repräsentationen wieder zu verbinden: auf der theoretischen Ebene, auf der Ebene der Methoden und hinsichtlich der unterstützenden Werkzeuge. Auf der theoretischen Ebene trägt die Arbeit zunächst dazu bei, das Wissen um die Erstellung von Visualisierungen im Kontext von Bauprojekten zu erweitern. Der verfolgte Ansatz basiert auf dem Referenzmodell der Visualisierungspipeline und geht dabei sowohl auf strukturelle als auch auf quantitative Aspekte des Visualisierungsprozesses ein. Zweitens wird eine Methode entwickelt, die visuelle Repräsentationen auf Basis gegebener Visualisierungsspezifikationen generieren kann. Schließlich belegt ein Softwareprototyp die Realisierbarkeit des Konzepts. Mit dem entwickelten Framework können visuelle Repräsentationen aus jeweils einem spezifischen Gebäudemodell und einer spezifischen Visualisierungsbeschreibung generiert werden
APA, Harvard, Vancouver, ISO, and other styles
3

Åskregn, Peter. "BIM i medelstora byggentreprenadföretag : BIM in medium sized building construction companies." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-26416.

Full text
Abstract:
Rapporten har ett fokus på Byggnads Informations Modeller (BIM), ett IT-tekniskt verktyg och arbetssätt som har vuxit fram i byggbranschen alltmer under de senaste åren. Hur detta IT-verktyg används hos medelstora byggentreprenadföretag redovisas i denna rapport.Syftet med rapporten är att verka positivt på utvecklingen mot effektivare och resurssnålare arbetsprocesser inom byggbranschen genom att bidra med kunskap om hur användandet av BIM ser ut bland dessa företag, varför det ser ut som det gör, ifall BIM behövs och vad som kan förändra läget i någon riktning.Metodarbetet har bestått av litteraturstudier och intervjuundersökningar.Arbetet inleddes med studier av rapporter och texter relaterade till BIM och intervjuer med representanter för ledande branschföretag inom bygg samt ett par branschorganisationer med inriktning på BIM. Därefter följde ytterligare litteraturstudier med inriktning på förändring och förändringsarbete och enkät och intervjuteknik. Arbetet ledde fram till olika grundteser och förklaringsmodeller som låg till grund för och utformade de intervjufrågor som ställdes vid huvudintervjuerna med elva medelstora byggentreprenadföretag.Huvudintervjuerna gav ett resultat som visade att företagen generellt sett såg på BIM som något positivt, med fördelar såsom lättare kommunikation och som ett hjälpmedel att minska fel i produktionen. Resultatet visade även att det fanns utmaningar såsom mjukvarukompabilitet och en beroendeproblematik mellan projektets involverade parter som innebar att för att tekniken ska kunna ge fördelar måste alla parter använda tekniken.Förklaringarna till det låga användandet bland medelstora byggentreprenadföretag var flera, vanligast var brist på krav från beställarna. Förklaringarna var också avsaknad av behov, kostsamma investeringar, konkurrerande målsättningar, kompabilitetsproblem med mjukvaror och avsaknad av kunskap om BIM.För att gynna en större användning föreslås att tekniska hinder elimineras genom standardisering och utveckling av arbetssättet och mjukvaran rörande BIM, det föreslås också att konkurrerande målsättningar elimineras genom kunskapsspridning om BIM i branschen, både hos entreprenörerna, -för att främja god utbildning så att personalen vill arbeta med tekniken, och hos beställare, -så att de börjar efterfråga BIM och därigenom ger tekniken konkurrensfördelar.<br>The report has a focus on Building Information Models (BIM), an IT-technical tool- and workmethod that have emerged increasingly in the construction industry in recent years. How this IT tool is used in medium-sized building construction companies is presented in this report.The purpose of the report is to promote positive development towards more efficient and resource-efficient work processes in the construction industry by providing knowledge on how the use of BIM exists among these companies, why it is the way it is, if BIM is needed and what can change the current status in any direction.The work-method has consisted of literature studies and interview surveys.The work began with studies of reports and texts related to BIM and interviews with representatives of leading construction industry companies and a couple of industry organizations with focus on BIM. This was followed by continued literary studies focused on change and change management, survey and interview techniques. This work led to various basic theories and explanatory models as the basis for and the design of the interview questions asked at the main interviews.The main interviews was conducted with eleven medium-sized building construction companies and gave a result that showed that companies generally looked at BIM as something positive with advantages such as easier communication and as a means to reduce errors in production. The result also brought some light to the fact that there existed challenges like software compatibility and dependency between the parties involved in the project, which means that for the technology to be able to provide wanted benefits all parties involved have to use the workmethod.The reasons for the low usage among medium sized construction contractors was several, the most common was the lack of demands of the clients. The reasons were also the absence of need, costly investments, competing objectives, compatibility issues with software and lack of knowledge of BIM.In order to promote a greater usage of BIM it is proposed that the technical obstacles are eliminated through standardization and development of the processing method and software, it is also proposed that the competing objectives are eliminated by spreading and increasing knowledge of BIM in the industry, both amongst entrepreneurs, -to promote good staff training so that the staff will want to work with the technology, and amongst construction clients, -so that they start asking for BIM and thereby provide the technology with a competitive edge.
APA, Harvard, Vancouver, ISO, and other styles
4

Fard, Ali Ataei. "Room Function Program and Technical Description : Interaction with BIM Models." Thesis, Mittuniversitetet, Avdelningen för informations- och kommunikationssystem, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:miun:diva-29969.

Full text
Abstract:
The move from two dimensional drawings (2D) to three dimensional (3D) models is underway in the architectural, engineering and construction industry. The three dimensional models may also be full of information which more exactly defines the different elements of a building, such models are called Building Information Modelling (BIM). Normally within a construction project, Computer-Aided Design (CAD) tools, experts add information to models and the feedback from the rest of the stakeholders are done during common meetings. The important part of information management of construction projects is the briefing process, collecting and defining the client's requirements throughout the construction project. The thesis project aims at defining and developing such tools which communicates with BIM models. Specifically, the main focus of this thesis is on creating interactive tools for Room Function Program (RFP) and Technical Description. An RFP describes the content and functionality of one or several rooms of a building that is designed at the early stage of a building construction. A Technical Description defines and describes all specifications of products which should be in a building. Current available and commonly used processes and products for RFP will be examined within this thesis as the industry has room for improvements with these particular concepts. The thesis project is conducted through research, case studies and interviews, respectively. First, the research and case studies analyzed the use and benefits of BIM. Then, the interview examined the gap between BIM, RFP and Technical Description and it is included in Appendix A. Subsequently, the RFP and Technical Description tools will be integrated with the BIM viewer successfully and desired visual feedback is given by filtering and highlighting the object in the model.
APA, Harvard, Vancouver, ISO, and other styles
5

Porter, Stuart Ross. "Breaking into BIM physical security simulation utilising building information models." Thesis, Curtin University, 2014. http://hdl.handle.net/20.500.11937/963.

Full text
Abstract:
Unlike traditional modelling, Building Information Models (BIMs) are a developing standard which has the capacity to support various value add opportunities like utility and environmental simulations. We will demonstrate a system that utilises BIMs to generate an edge and node graph. This graph will utilise knowledge from the physical security domain to highlight weaknesses in a facilities design. We intend for this system to aid designers from an early stage, allowing for a more accessible application of security knowledge.
APA, Harvard, Vancouver, ISO, and other styles
6

Utiome, Erezi Ame Emmanuel. "Extending building information models to construction specifications." Thesis, Queensland University of Technology, 2015. https://eprints.qut.edu.au/84929/1/Erezi_Utiome_Thesis.pdf.

Full text
Abstract:
This project examined the role that written specifications play in the building procurement process and the relationship that specifications should have with respect to the use of BIM within the construction industry. A three-part approach was developed to integrate specifications, product libraries and BIM. Typically handled by different disciplines within project teams, these provide the basis for a holistic approach to the development of building descriptions through the design process and into construction.
APA, Harvard, Vancouver, ISO, and other styles
7

Fuller, Pierre (Pierre Henri). "A simplified software architecture for self-updating Building Information Models (BIM)." Thesis, Massachusetts Institute of Technology, 2009. http://hdl.handle.net/1721.1/55155.

Full text
Abstract:
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 2009.<br>Cataloged from PDF version of thesis.<br>Includes bibliographical references (p. 61-63).<br>Building Information Modeling (BIM) is an emerging software technology that is revolutionizing the architecture, engineering, and construction (A/E/C) industry. BIM technology employs "object-based 3D models-containing the physical and functional characteristics of a facility-that serve as a repository for lifecycle information in an open, interoperable format" [1]. The major difference between BIM and Computer-Aided Design/Drafting (CADD) is that the former includes geometry and a plethora of building information while the latter includes only geometry. BIM utilization in the AEC industry has increased due to 1) BIM tools increasing productivity in design tasks; 2) the increasing number of private and government agencies that have instituted BIM requirements; 3) the pervasive use of computer analysis and simulations models; 4) the benefits of BIM as lifecycle management tool. Current literature shows trends of a transition from a "passive"-static model-based-approach to an "active"-dynamic model-based-approach. The active approach requires the integration of BIM with sensors to create "self-updating" building models. Previous research introduces the concept of a self-updating building model ([2], [31, [41). These systems involve complex software architecture and may perpetuate the problem of software interoperability. This thesis explores the following question: May a similar system be created to synthesize dynamic sensor data while improving upon previous research and simplifying the software architecture? The author describes a prototype system, called LiveBuild, which integrates commercial BIM software with other off-the-shelf software components to create a self-updating building model. LiveBuild is the first self-updating building model that operates as an extension to existing commercial BIM software. Therefore, the transition from static to active building models is as simple as installing a plug-in. LiveBuild may serve as the basis for future research in self-updating building by providing simplified system that is well integrated with state-of-the art commercial design software. Likewise, the prototype is applicable for professional practice by allowing firms to use their existing BIM software to perform "pilot projects" with self-updating technology. The current prototype supports an interface with single commercial BIM software (Autodesk Revit 2009) product however future prototypes may extend both the functions and interfaces for other BIM software.<br>by Pierre Fuller.<br>S.M.
APA, Harvard, Vancouver, ISO, and other styles
8

Akinade, Olugbenga Olawale. "BIM-based software for construction waste analytics using artificial intelligence hybrid models." Thesis, University of the West of England, Bristol, 2017. http://eprints.uwe.ac.uk/31762/.

Full text
Abstract:
The Construction industry generates about 30% of the total waste in the UK. Current high landfill cost and severe environmental impact of waste reveals the need to reduce waste generated from construction activities. Although literature reveals that the best approach to Construction Waste (CW) management is minimization at the design stage, current tools are not robust enough to support architects and design engineers. Review of extant literature reveals that the key limitations of existing CW management tools are that they are not integrated with the design process and that they lack Building Information Modelling (BIM) compliance. This is because the tools are external to design BIM tools used by architects and design engineers. This study therefore investigates BIM-based strategies for CW management and develops Artificial Intelligent (AI) hybrid models to predict CW at the design stage. The model was then integrated into Autodesk Revit as an add-in (BIMWaste) to provide CW analytics. Based on a critical realism paradigm, the study adopts exploratory sequential mixed methods, which combines both qualitative and quantitative methods into a single study. The study starts with the review of extant literature and (FGIs) with industry practitioners. The transcripts of the FGIs were subjected to thematic analysis to identify prevalent themes from the quotations. The factors from literature review and FGIs were then combined and put together in a questionnaire survey and distributed to industry practitioners. The questionnaire responses were subjected to rigorous statistical process to identify key strategies for BIM-based approach to waste efficient design coordination. Results of factor analysis revealed five groups of BIM strategies for CW management, which are: (i) improved collaboration for waste management, (ii) waste-driven design process and solutions, (iii) lifecycle waste analytics, (iv) Innovative technologies for waste intelligence and analytics, and (v) improved documentation for waste management. The results improve the understanding of BIM functionalities and how they could improve the effectiveness of existing CW management tools. Thereafter, the key strategies were developed into a holistic BIM framework for CW management. This was done to incorporate industrial and technological requirements for BIM enabled waste management into an integrated system. The framework guided the development of AI hybrid models and BIM based tool for CW management. Adaptive Neuro-Fuzzy Inference System (ANFIS) model was developed for CW prediction and mathematical models were developed for CW minimisation. Based on historical Construction Waste Record (CWR) from 117 building projects, the model development reveals that two key predictors of CW are “GFA” and “Construction Type”. The final models were then incorporated into Autodesk Revit to enable the prediction of CW from building designs. The performance of the final tool was tested using a test plan and two test cases. The results show that the tool performs well and that it predicts CW according to waste types, element types, and building levels. The study generated several implications that would be of interest to several stakeholders in the construction industry. Particularly, the study provides a clear direction on how CW management strategies could be integrated into BIM platform to streamline the CW analytics.
APA, Harvard, Vancouver, ISO, and other styles
9

Wisén, André. "Integrating IFC Models and Virtual Reality for Indoor Lighting Design." Thesis, KTH, Fastigheter och byggande, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-254834.

Full text
Abstract:
Previous research has studied the use of Building Performance Simulations (BPS) tools withBuilding Information Modeling (BIM). BPS can be used to visualize and evaluate the designof buildings. Virtual Reality (VR) can be used as a BPS tool for designing indoor lighting.The problem is that previous research still has difficulties with data interoperability. That isthe integration of VR with BIM. Many studies suggest using the file format IFC to mitigatethis problem.The aim of this study is to investigate how to increase data interoperability by using a fileformat IFC. A prototype system will be developed to test this. The research question is if openBIM formats can improve the quality of design solutions? The study will try to answer howVR can be integrated with BIM and how VR can be used for indoor lighting design.The result from this thesis is in part a prototype system called FooBar. FooBar shows how VRcan be integrated with BIM. However, the file format IFC was not used throughout the wholedesign process. Instead, IFC is only used at the beginning and the end of the process. Thisstudy shows how VR can be used as an alternative BPS tool. Users can manipulate lights inthe building model. These changes are then updated in the original BIM model.This means that VR can be used to improve the quality of design solutions. In other words,FooBar can help to cope with multidisciplinary design processes. Users can immersethemselves into the virtual environment and see different design alternatives for themselves.Different design alternatives can easily be rendered in VR. With a system like FooBar, userscan easily define, propose, and analyze different design ideas to reach design goals.<br>Tidigare forskning har studerat hur simuleringsverktyg (Building Performance Simulations,BPS) kan användas med byggnadsinformationsmodellering (Building Information Modeling,BIM).Simuleringsverktyg kan dels användas för att visualisera design och användas somdesignutvärdering. Virtual Reality (VR), eller virtuell verklighet, kan användas som ettsimuleringsverktyg för design av inomhusbelysning. Problemet är att tidigare forskning harproblem med datakompatibilitet, d.v.s. integrationen av VR med BIM. Många studier föreslåratt filformatet IFC används för att lösa detta problem.Syftet med denna studie är att undersöka hur man ökar datakompatibiliteten genom attanvända ett IFC. Ett prototypsystem kommer att utvecklas för att testa detta. Forskningsfråganhandlar om huruvida öppna BIM-format kan förbättra kvaliteten på designlösningarna.Studien ska även försöka svara på hur VR kan integreras med BIM och hur VR kan användasför inomhusbelysningsdesign.Resultatet av detta arbete är en del av ett prototypsystem kallat FooBar. FooBar visar hur VRkan integreras med BIM. Filformatet IFC användes emellertid inte under heladesignprocessen. Istället används IFC endast i början och slutet av processen. Det andraresultatet är att denna studie visar hur VR kan användas som ett alternativ till andrasimuleringsverktyg. Med FooBar kan användare flytta, rotera och skala om ljus ibyggnadsmodellen. Dessa ändringar uppdateras sedan i den ursprungliga BIM-modellen.Det betyder att VR kan användas för att förbättra kvaliteten på designlösningarna. FooBar kanmed andra ord bidra till att underlätta multidisciplinära designprocesser. Användare kan självakliva in i den virtuella miljön (i VR) och se olika designalternativ framför sig. Således kanolika designalternativ enkelt göras i VR. Med ett system som FooBar kan användarna enkeltdefiniera, föreslå och analysera olika designidéer för att nå de designmål som finns i projektet.
APA, Harvard, Vancouver, ISO, and other styles
10

Karlapudi, Janakiram. "A methodology to determine and classify data sharing requirements between OpenBIM models and energy simulation models." Universitätsverlag der TU Berlin, 2019. https://tud.qucosa.de/id/qucosa%3A73548.

Full text
Abstract:
Energy analysis at different stages of a building’s life-cycle allows designers and engineers to make proper design decisions, which will enhance the efficiency and energy saving measures. However, energy analysis of a building using traditional methods at every stage of the project is time-consuming and more labor intensive. Thus, energy simulations of buildings are rarely introduced in all design stages of the project. This study focuses on data transfer process from BIM model (Revit) to energy simulation model (IES<VE>) using OpenBIM meta-data model - Industry Foundation Classes (IFC) as an exchangeable file format. This data sharing process simplifies the complexity in energy modeling and allows to investigate different design alternatives in each phase of the building’s life-cycle. To investigate the efficiency and completeness of this data transfer process, a demonstration of data sharing is carried. By evaluating the results from the demonstration, efficiency gaps are identified in the data transferred process. A detailed investigation on the cause of efficiency gaps in data sharing is carried out and incorporated in this paper.:Abstract 1. Introduction 2. Building Energy Simulation 2.1. Categorization of Energy Simulation Models 3. Data Sharing Requirements - IFC 4. Data Sharing Demonstration 4.1. BIM model 4.2. Data investigation with model viewer 4.3. Data quality verification in energy simulation model 4.3.1. Evaluation of Results 5. Conclusion References
APA, Harvard, Vancouver, ISO, and other styles
11

Costin, Aaron M. "Integration of passive RFID location tracking for real-time visualization in building information models (BIM)." Thesis, Georgia Institute of Technology, 2013. http://hdl.handle.net/1853/50395.

Full text
Abstract:
Navigation through large and unfamiliar facilities with labyrinths of corridors and rooms is difficult and often results in a person being lost. Additionally, locating a specific utility within a facility is often a tough task. The hypothesis tested in this research is that integrating real-time automated sensing technology and a Building Information Model will provide real time visualization that can assist in localization and navigation of a facility. The scope of this research is facility maintenance management during the Operation and Maintenance (O&M) phase of a facility. The thesis demonstrates how the integration of passive Radio Frequency Identification (RFID) tracking technology and Building Information Modeling (BIM) can assist in facilities maintenance management. The objectives of this research included 1) developing a framework that utilizes the integration of commercially-available RFID and a BIM model; 2) evaluating the framework for real-time resource location tracking within an indoor environment; and 3) developing an algorithm for real-time localization and visualization in a BIM model. A prototype application has been developed that simultaneously connects the RFID readers, a database, and a BIM model. The goal of this system is to have a real-time localization accuracy of 3 meters at 95% confidence. Testing was conducted in laboratory conditions, and the results show that the system error was within the 3 meters goal.
APA, Harvard, Vancouver, ISO, and other styles
12

Patel, Parvati, and Nahian Hussain. "Digital environmental certification process by using BIM – models : A study on visualization of environmental parameters." Thesis, KTH, Byggteknik och design, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-300095.

Full text
Abstract:
The ability to enter in information about the building’s function in an open buildingmodel is admittedly not an innovative technology but in regards to those aspects ofwhich this project concerns - that is the building’s environmental performance interms of energy, indoor climate, and daylight— has knowingly not been explored. This thesis explores developing work processes as well as methods for working in acoordinated digital model with buildings environmental certification aspects. Thework emphasizes on the aspects of the environmental certification systems that arenormally examined using simulation tools, that being those aspects which pertain tothe building’s function, and whose calculated results are a determining factor for thebuilding’s design. A demonstration is presented to interviewees where threeindicators from Miljöbyggnad is visualized to identify the pros and cons with thenewly proposed method of working. The study shows that BIM is an interesting tool to use during the design phase. Thefact that the technology is advancing is nothing new, but the development of a moredigitalized environmental certification process should be considered. A visualpresentation provides a broader understanding of the working group and externalactors and is a favorable method to use during the project's workflow. The results from the interviews show that none of the companies use BIM as acomplement to the technical reports during the environmental certification process.The knowledge about BIM among designers and environmental coordinators is verysmall, however, there is great interest in the new proposed way of working. This study brings attention to the digitization of the environmental certificationprocess in a more efficient way, as well as a demonstration of the software Solibriand Revit that generate BIM during the environmental certification process. Theresults have shown that a visual presentation is a useful complement to the technicalreports but not good enough to replace them. The conclusion is that the new proposed working method cannot be implementedwithout the BIM-Link program. BIM - Link is a link that connects the results fromthe building simulation to the object-based model and the review tool. This programis not available as a test variant and this requires the purchase of a license.<br>Förmågan att skriva in information om byggnadens funktion i en öppenbyggnadsmodell är visserligen inte en ny teknik, men med avseende på de aspektersom detta projekt berör, dvs byggnadens miljöprestanda i termer av energi,inneklimat och dagsljus, har detta veterligen inte utforskats. Detta examensarbete behandlar arbetsprocesser samt metoder för att arbeta medbyggnaders miljöcertifieringsaspekter i en samordnad digital modell.En visuell demonstration presenterades för intervjukandidater där tre indikatorer frånMiljöbyggnad – solvärmelast, dagsljusfaktor och termiskt klimat (PPD) –visualiseras för att upptäcka för och nackdelar med det nya förslagna arbetssättet. Enfallstudie genomfördes på ett nyproducerat bostadshus för att kontrollera omresultatet från byggnadssimuleringen går att implementera både i den objektbaserademodellen och granskningsverktyget. Resultatet från intervjuerna visar att ingen av företagen utnyttjar BIM i störreutsträckning men att en visuellpresentation skulle kunna användas som ettkomplement till de tekniska rapporterna under miljöcertifieringsprocessen.Kunskapen om BIM hos projektörer är stor men väldigt liten hos miljösamordnaredäremot finns ett stort intresse för det nya förslagna arbetssättet. Studien visar att BIM är ett intressant verktyg att använda sig av underprojekteringsskedet. Att tekniken går fort fram är inget nytt, men utvecklingen av ettmer digitaliserat miljöcertifieringsprocess bör tas i under olika byggskeden. Envisuell presentation ger en bredare förståelse för arbetsgruppen samt utomståendeaktörer och är en gynnsam metod att använda sig utav under projektets arbetsgång.Slutsatsen är att det nya förslagna arbetssättet går att implementera både i denobjektbaserade modellen och granskningsverktyget. Denna studie medför även uppmärksamhet kring digitalisering avmiljöcertifieringsprocess på ett mer effektivt sätt, samt en demonstration avmiljöparametrar med hjälp av BIM under miljöcertifieringprocessen. Resultatet harpåvisat att en visuell presentation är ett nyttigt komplement till de tekniskarapporterna men inte tillräckligt bra för att ersätta dessa.
APA, Harvard, Vancouver, ISO, and other styles
13

Sun, Jing. "The Integration of 3D Geodata and BIM Data in 3D City Models and 3D Cadastre." Licentiate thesis, KTH, Geodesi och satellitpositionering, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-262845.

Full text
Abstract:
The initial geographic information system (GIS) and building information modelling (BIM) are designed and developed independently in order to serve different purposes and use. Within the prolific increase and growing maturity of three-dimensional (3D) technology, both 3D geodata and BIM data can specify semantic data and model 3D buildings that are prominent for the 3D city models and 3D cadastre. 3D geodata can be collected from geodetic surveying methods such as total station, laser scanning and photogrammetry and generate 3D building models by CityGML format for macro analysis on city scale. BIM data has significant advantages in planning, designing, modelling and managing building information, which contains rich details of building elements. Additionally, BIM helps and supports to exchange and share complex information through life-cycle project. Because there are some overlaps between them, the integration of BIM and 3D city models is mutually beneficial for representing comprehensive 3D building models. This thesis is a summary and compilation of two papers, where one is a review paper published in Journal of Spatial Science, and the other is a research paper currently under review in ISPRS International Journal of Geo-Information. The first paper designed and implemented a methodology to formalize the integration of BIM data into city models (CityGML models) that were generated from BIM data and from ALS/footprint data based on the proposed common modelling guidelines. The geometric results of the CityGML models were compared and evaluated visually and quantitatively. The second paper proposed a general framework for sharing and integrating cadastral information with BIM and 3D GIS together with general requirements. Based on the requirements and framework, the case study focused on how to represent and visualize 3D cadastral boundaries legally and technically by integrating BIM at building level and CityGML at city level. Both the Industry Foundation Classes (IFC) model and the CityGML model were connected to Land Administration Domain Model (LADM) at the conceptual level using Unified Modeling Language (UML) models and on database level. The findings of the first paper include investigation of BIM data as a qualified source on the geometric aspects in order to satisfy the need for a more rapid update process of 3D city models, and the second paper shows that the proposed framework and requirements perform well for generating 3D cadastral model in the real-world case study.<br>Det ursprungliga geografiska informationssystemet (GIS) och byggnadsinformationsmodellering (BIM) är utformade och utvecklade oberoende av varandra för att tjäna olika syften och användning. Inom 3D-teknik kan både 3D geodata och BIM-data specificera semantiska data och modellera 3D-byggnader som är framträdande för 3D stadsmodeller och 3D fastighetsregister. 3D-geodata kan samlas in från geodetiska mätningsmetoder som totalstation, laserskanning och fotogrammetri och de kan generera 3D modeller av byggnader i CityGML för makroanalys av städer. BIM-data har betydande fördelar i planering, design, modellering och hantering av byggnadsinformation eftersom det innehåller detaljerade uppgifter om byggelement. Dessutom gör BIM det möjligt att förmedla och analysera komplex information över byggnaders livscykel. Integrationen av BIM- och 3D-stadsmodeller är viktigt för att kunna analysera både byggnader och stad, exempelvis i stadsplanering, byggnadskonstruktion och hållbarhetsanalys.Denna avhandling är en sammanfattning och sammanställning av två artiklar, varav den ena är publicerad i Journal of Spatial Science, och den andra är under granskning i ISPRS International Journal of Geo-Information. Den första artikeln utformade och implementerade en metod för att formalisera integrationen av BIM-data i stadsmodeller (CityGML-modeller) som genererades från BIM-data och flygburen laserskanning/fotavtryck baserat på gemensamma modelleringsriktlinjerna. De geometriska resultaten av CityGML modellerna jämfördes och utvärderades visuellt och kvantitativt. Den andra artikeln föreslog en allmän ram för att dela och integrera fastighets information med BIM och 3D GIS tillsammans med allmänna krav. Baserat på kraven och ramverket så visade en fallstudie på hur man kan representera och visualisera 3D fastighetsgränser juridiskt och tekniskt genom att integrera BIM på byggnadsnivå och CityGML på stadsnivå. Både IFC-modellen och CityGML-modellen kopplades till LADM på konceptuell nivå med hjälp av UML-modeller och på databasnivå.Slutsatserna från den första artikeln inkluderar undersökning av BIM data som en kvalificerad källa på de geometriska aspekterna för att uppfylla behovet av en snabbare uppdateringsprocess av 3D-stadsmodeller, och den andra uppsatsen visar att det föreslagna ramverket och kraven presterar väl för att generera 3D fastighets modeller i den verkliga världen.<br><p>QC 20191023</p>
APA, Harvard, Vancouver, ISO, and other styles
14

Bengtsson, Jonas, and Mikael Grönkvist. "Performing Geographic Information System Analyses on Building Information Management Models." Thesis, KTH, Geodesi och satellitpositionering, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-208922.

Full text
Abstract:
As the usage of both BIM (Building Information Modelling) and 3D-GIS (Three-Dimensional Geographic Information Systems) has increased within the field of urban development and construction, so has the interest in connecting these two tools.  One possibility of integration is the potential of visualising BIM models together with other spatial data in 3D. Another is to be able to perform spatial 3D analyses on the models. Both of these can be achieved through use of GIS software. This study explores how integration of BIM and GIS could look. The goal was to perform typical GIS analyses in 3D on BIM models. Previous research points towards some success within the field through use of the indicated standard format for each tool – IFC (Industry Foundation Classes) for BIM and CityGML (City Geographic Markup Language) for GIS. Transformation between the formats took place through use of the BIM software Revit, the transformation tool FME and the GIS software ArcGIS. A couple of reviewed applications of GIS analyses were chosen for testing on the converted models – indoor network analysis, visibility analysis and spatial analysis for 3D buildings. The input data in the study was several BIM models, both models created for real-life usage and others that only function as sample data within the different software. From the results of the practical work it can be concluded that a simple, automated and full-scale integration does not seem to be within reach quite yet. Most transformations between IFC and CityGML failed to some extent, especially the more detailed and complex ones. In some test cases, the file could not be imported into ArcGIS and in others geometries were missing or existing even though they should not. There were also examples where geometries had been moved during the process. As a consequence of these problems, most analyses failed or did not give meaningful results. A few of the original analyses did give positive results. Combining (flawed) CityGML models with other spatial data for visualisation purposes worked rather well. Both the shadow volume and sightline analyses did also get reasonable results which indicates that there might be a future for those applications. The obstacles for a full-scale integration identified during the work were divided into four different categories. The first is BIM usage and routines where created models need to be of high quality if the final results are to be correct. The second are problems concerning the level of detail, especially the lack of common definitions for the amount of details and information. The third category concerns the connection between local and global coordinate systems where a solution in form of updates to IFC might already be in place. The fourth, and largest, category contains those surrounding the different formats and software used. Here, focus should lie on the transformation between IFC and CityGML. There are plenty of possible, future, work concerning these different problems. There is also potential in developing own tools for integration or performing different analyses than those chosen for this thesis.<br>I takt med den ökade användningen av både BIM och 3D-GIS inom samhällsbyggnadsprocessen har även intresset för att sammanföra de två verktygen blivit större. En möjlighet med integration är potentialen att visualisera BIM-modeller tillsammans med andra geografiska data i 3D. En annan är att kunna genomföra rumsliga 3D-analyser på modellerna. Båda dessa går att utföra med hjälp av GIS-programvara. Denna studie utforskar hur en integration mellan BIM och GIS kan se ut. Målet är att genomföra typiska GIS-analyser i 3D på BIM-modeller. Tidigare forskning pekar mot vissa framgångar inom området genom att arbeta med det utpekade standardformatet för respektive verktyg – IFC för BIM och CityGML för GIS. Transformation mellan formaten skedde med hjälp av programvarorna Revit, FME och ArcGIS. Ett par framhållna tillämpningar av GIS-analyser valdes ut för tester på de konverterade modellerna – nätverksanalyser inomhus, siktanalyser och rumsliga analyser för 3D-byggnader. Som indata användes flera olika BIM-modeller, både sådana som tillverkats för faktisk användning och modeller som skapats för att användas som exempeldata inom programvarorna. Utifrån resultaten från det praktiska arbetet kan konstateras att en enkel, automatiserad och fullskalig integration mellan verktygen verkar ligga en bit in i framtiden. De flesta transformationerna mellan IFC och CityGML misslyckades i någon aspekt, speciellt de mer detaljerade och komplexa. I vissa testfall kunde filen inte importeras i ArcGIS, i andra saknas eller existerar oväntade geometrier även om importen lyckats. Det finns också exempel där geometrier förflyttats. Som en konsekvens av dessa problem kunde de flesta 3D-analyser inte genomföras alls eller lyckades inte ge betydelsefulla resultat. Ett fåtal av de ursprungliga analyserna gav dock positiv utdelning. Att kombinera (felaktiga) CityGML-modeller med annan rumslig data fungerade förhållandevis väl ur ett visualiseringssyfte. Både skuggvolymsanalysen och framtagandet av siktlinjer från byggnaderna gav någorlunda korrekta resultat vilket indikerar att det kan finnas en framtid gällande de tillämpningarna. Hindren för en fullskalig integration som identifierades genom arbetet delades upp i fyra olika kategorier. Den första är BIM-användning där hög kvalitet på de skapade modellerna är viktigt för korrekta slutresultat. Den andra är detaljeringsgraden där avsaknaden av gemensamma definitioner för detaljeringsgraderna ställer till problem. Den tredje kategorin är koordinat- och referenssystem där en lösning på kopplingen mellan lokala och globala system redan kan finnas på plats i en av de senare utgåvorna av IFC-formatet. Den sista och största kategorin är problematiken kring just format och programvaror där mer arbete på översättningen mellan IFC och CityGML kommer att krävas. I framtiden finns det gott om arbete att göra med dessa olika problem. Det finns också potential att utveckla egna verktyg för integrationen eller att ägna sig åt att göra andra analyser än de som valdes ut i den här studien.
APA, Harvard, Vancouver, ISO, and other styles
15

Thomson, C. P. H. "From point cloud to building information model : capturing and processing survey data towards automation for high quality 3D models to aid a BIM process." Thesis, University College London (University of London), 2016. http://discovery.ucl.ac.uk/1485847/.

Full text
Abstract:
Building Information Modelling has, more than any previous initiative, established itself as the process by which operational change can occur, driven by a desire to eradicate the inefficiencies in time and value and requiring a change of approach to the whole lifecycle of construction from design through construction to operation and eventual demolition. BIM should provide a common digital platform which allows different stakeholders to supply and retrieve information thereby reducing waste through enhanced decision making. Through the provision of measurement and representative digital geometry for construction and management purposes, surveying is very much a part of BIM. Given that all professions that are involved with construction have to consider the way in which they handle data to fit with the BIM process, it stands to reason that Geomatic or Land Surveyors play a key part. This is further encouraged by the fact that 3D laser scanning has been adopted as the primary measurement technique for geometry capture for BIM. Also it is supported by a laser scanning work stream from the UK Government backed BIM Task Group. Against this backdrop, the research in this thesis investigates the 3D modelling aspects of BIM, from initial geometry capture in the real world, to the generation and storage of the virtual world model, while keeping the workflow and outputs compatible with the BIM process. The focus will be made on a key part of the workflow for capturing as-built conditions: the geometry creation from point clouds. This area is considered a bottleneck in the BIM process for existing assets not helped by their often poor or non-existent documentation. Automated modelling is seen as desirable commercially with the goal of reducing time, and therefore cost, and making laser scanning a more viable proposition for a range of tasks in the lifecycle.
APA, Harvard, Vancouver, ISO, and other styles
16

Nezamaldin, Darwn. "Parametric design with Visual programming in Dynamo with Revit : The conversion from CAD models to BIM and the design of analytical applications." Thesis, KTH, Byggvetenskap, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-241167.

Full text
Abstract:
Nowadays, there is a big strive to achieve faster and more accurate results of designing buildings in construction companies. Construction companies that work with the design part are continuously searching for methods to increase efficiency in the working process. Autodesk have introduced a software that uses parametric design to provide input to Revit models and to retrieve and manipulate the outcomes of Revit models. The Dynamo software uses visual programming and is connected directly to Revit where the user can gain access to Revit’s data structure where parameters can be controlled and manipulated. This research consists of two parts. The first part shows how 2D Autocad drawing can be converted into 3D Revit models. This is done by using the 2D geometry as reference lines for placing BIM objects. The second part shows how the BIM model can then be used to analyze different elements with Dynamo. The calculations of element cost, weight and thermal transmission losses of floors, walls and roofs are used to illustrate this possibility. All the main goals were achieved and are presented in the report for engineers to utilize. The report illustrates the basics of Dynamo, shows examples of how to it can be used while sharing the scripts that were used for this research. The report also encourages other competent students to continue where this thesis ended. Even though several tasks were achieved in this thesis, there are still much more to learn about parametric design and visual programming.
APA, Harvard, Vancouver, ISO, and other styles
17

Lyckeborn, Sofia, and Esra Raof. "Implementering av VDC i produktionen." Thesis, Örebro universitet, Institutionen för naturvetenskap och teknik, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:oru:diva-74944.

Full text
Abstract:
Byggsektorn har brottats med flertal problem såsom låg produktivitet, kvalitetsbrister och höga byggkostnader. På senare tid har företag börjat satsat på nya arbetssätt som med hjälp av tekniken gör det möjligt att minska dessa problem. Ett arbetssätt som ska minska dessa problem är VDC, Virtual Design and Construction. Syftet med denna studie är att undersöka ifall VDC gynnar produktionen samt vilka hinder man kan stöta på inom VDC. Undersökningen kommer utföras med hjälp av litteraturstudier och via intervjuer med personer av relevant utbildning eller som är arbetsförande på marknaden. För att undvika fall av fel information kommer undersökningen att kompletteras med litteraturstudier av böcker, artiklar, rapporter samt företagssidor. VDC är ett arbetssätt som bland annat går ut på att alla parter arbetar ständigt med varandra under byggprocessen. VDC i produktionen förbättrar bland annat kommunikationen, slutprodukten och arbetsplatsen i form av bättre kvalite och arbetsmiljö. Hinder som kan förekomma i produktionen är att den äldre generationen inte är redo för en sådan avancerad teknik. Med en kortare utbildning och uppmuntran så bör alla yrkesarbetare kunna hantera en 3D-modell. Undersökningar visar att impementering av VDC i produktionen skulle ge positiva framgångar. Yrkesarbetarna skulle bli mer delaktiga och få en större förståelse för projektet, vilket ger bland annat en förbättrad slutprodukt.<br>The construction sector has struggled with some problems such as low productivity, lack of quality and high construction costs. Recently, companies have started investing in new ways of working, that with the help of the technology and make it possible to reduce these problems. One way to reduce these problems is through VDC, Virtual Design and Construction. The purpose of this study is to investigate whether VDC support production in a positive way and what type of blocks you can bump into using VDC. Literature studies and interview studies will be conducted with experts in order to answer the purpose of this study. This report is limited to production. In order for the information not to be incorrect, we have chosen to do literature studies on books, articles, reports and company pages. VDC is a working method where all the parties work continuosly with each other during the process. VDC in production improves communication, workplace, end product and more. Obstacles that may occur in production are that the older generation is not ready for such advanced technology. With a shorter education and encouragement, all workers should be able to handle a 3D model. Studies show that VDC impregnation in production would produce positive results. The skilled workers would be more involved and gain a greater understanding of the project, which among other things provides an improved end product.
APA, Harvard, Vancouver, ISO, and other styles
18

Avila, Mary-Alice. "Programming and Conceptual Design Using Building Information Modeling." DigitalCommons@CalPoly, 2009. https://digitalcommons.calpoly.edu/theses/38.

Full text
Abstract:
This thesis explores the benefits of using Building Information Modeling (BIM) during the programming and conceptual design phase of a project. The research was based on a case study undertaken dealing with the decisions and assumptions made during the design phases of the Center for Science at Cal Poly San Luis Obispo. The project team used a traditional approach to project plan development. The finding of this study was that the project process would have greatly benefited utilizing BIM tools and a collaborative team approach in the programming and conceptual design phase. Because decisions made early in the project have enormous implications to aesthetics and cost, the increase in analysis of design options afforded by the use of BIM tools would have minimized inaccurate, incomplete and unreliable information, and allowed the design team to work in a more efficient, collaborative manner transmitting through all phases of the project.
APA, Harvard, Vancouver, ISO, and other styles
19

Haugsbakk, Frida. "Evaluations of how carbon dioxide calculations can be integrated into 3D models at an early design stage for more efficient Life Cycle Assessments on buildings." Thesis, KTH, Skolan för elektroteknik och datavetenskap (EECS), 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-230168.

Full text
Abstract:
Life Cycle Assessments on buildings and various environmental certificates are starting to become customary for newbuilding projects in Sweden. Building materials play a big part in a building’s environmental impact. Earlier research indicates that Life Cycle Assessments is not a routine in today’s construction process and it may depend on uncertainties in the methods of quantifying carbon dioxide emissions. This master thesis focuses on how equivalent carbon dioxides, a standard unit to quantify greenhouse gas emissions, of building materials can be integrated with Building Information Modelling. Through meetings with experts in the field, data has been collected. A 3D model of a house was built in order to evaluate both an integration with a cost calculation tool and directly with the 3D model. The results showed how the cost calculation tool works for calculations of equivalent carbon dioxides, early in the pre-construction phase. Difficulties in finding corresponding materials in their database were found and issues with summarizing carbon dioxide data. The integration directly into the 3D model, with visual programming, proved an insert for each materials’ carbon dioxide emissions worked. This allows further updates throughout the building process. It was also possible to import material information to a carbon dioxide calculation tool. This evaluation opened up a possibility to change and update carbon dioxide emissions at an early design stage of a building process with Building Information Modelling along with a need of organizational change due to today's traditional building processes.<br>Livscykelanalyser på byggnader och olika typer av miljöbyggnads-certifieringar blir allt vanligare för nya byggprojekt i Sverige. Materialet i en byggnad spelar en stor roll av hela byggnadens miljöpåverkan. Tidigare forskning indikerar att livscykelanalyser inte är en rutin i dagens byggprocesser vilket kan bero på att osäkerheter i de olika metoderna bakom koldioxidberäkningar. Den här artikeln fokuserar på hur koldioxidekvivalenter av byggnadsmaterial kan bli integrerade med Byggnadsinformationsmodellering. Genom möten med experter i området har datainsamling gjorts för det ändamålet. För att undersöka integreringen byggdes en 3D-modell upp och som senare användes för beräkningar av koldioxidutsläpp i ett kostnads-kalkyleringsverktyg samt undersöka hur en införing av koldioxidekvivalenter direkt i 3D-modellen kunde göras. Resultaten visade hur kostnads-beräkningsverktyget fungerar för beräkningar av koldioxidekvivalenter, tidigt i byggprocessen. Svårigheter i att hitta motsvarande material i kalkyleringsverktygets databas upptäcktes under utvärderingen samt en sammanfattande rapport för beräkningarna. Integrationen direkt i 3D-modellen med visuell programmering visade att en inmatning av koldioxidutsläpp för varje material fungerade vilket möjliggör uppdateringar under hela byggprocessen. Det var också möjligt att importera materialinformation till ett koldioxidberäkningsverktyg. Det öppnar upp möjligheter att ändra och uppdatera koldioxidutsläpp för material tidigt i byggprocessen med hjälp av Byggnadsinformationsmodellering och visar behov av organisationsförändringar på grund av dagens traditionella byggprocess.
APA, Harvard, Vancouver, ISO, and other styles
20

Viljoen, Dewald. "Dynamic building model integration." Thesis, Stellenbosch : Stellenbosch University, 2012. http://hdl.handle.net/10019.1/20257.

Full text
Abstract:
Thesis (MScEng)--Stellenbosch University, 2012.<br>ENGLISH ABSTRACT: The amount and complexity of software applications for the building industry is increasing constantly. It has been a long term goal of the software industry to support integration of the various models and applications. This is a difficult task due to the complexity of the models and the diversity of the fields that they model. As a result, only large software houses have the ability to provide integrated solutions on the basis of a common information model. Such a model can more easily be established since the different software is developed within the same group. Other software suppliers usually have to revert to importing and exporting of data to establish some form of integration. Even large software houses still sometimes make use of this technique between their different packages. In order to obtain a fully integrated solution, clients have to acquire complex and expensive software, even if only a small percentage of the functionality of this software is actually required. A different approach to integration is proposed here, based on providing an integration framework that links different existing software models. The framework must be customisable for each individual's unique requirements as well as for the software already used by the individual. In order for the framework to be customisable, it must either encompass the information requirements of all existing software models from the outset, or be flexible and adaptable for each user. Developing an encompassing software model is difficult and expensive and thus the latter approach is followed here. The result is a model that is less general than BIM-style models, but more focussed and less complex. The elements of this flexible model do not have predetermined properties, but properties can instead be added and removed at runtime. Furthermore, derived properties are not stored as values, but rather as methods by which their values are obtained. These can also be added, removed and modified at runtime. These two concepts allow the structure and the functionality of the model to be changed at runtime. An added advantage is that a knowledgeable user can do this himself. Changes to the models can easily be incorporated in the integration framework, so their future development is not limited. This has the advantage that the information content of the various applications does not have to be pre-determined. It is acknowledged that a specific solution is required for each integration model; however the user still has full control to expand his model to the complexity of BIM-type models. Furthermore, if new software models are developed to incorporate the proposed structures, even more seamless and flexible integration will be possible. The proposed framework is demonstrated by linking a CAD application to a cost-estimation application for buildings. A prototype implementation demonstrates full integration by synchronising selection between the different applications.<br>AFRIKAANSE OPSOMMING: Die hoeveelheid en kompleksiteit van sagteware programme vir die bou industrie is konstant aan die vermeerder. Dit was nog altyd 'n lang termyn doelwit van die sagteware industrie om integrasie van die verskeie modelle en programme te ondersteun. Hierdie is 'n moeilike taak as gevolg van die kompleksiteit van die modelle, en die diversiteit van die velde wat hierdie programme modelleer. Die gevolg is dat net groot sagteware huise die vermoë het om geïntegreerde oplossings te bied op die basis van 'n gemeenskaplike inligting model. So 'n tipe model kan makliker bymekaargestel word siende dat al die verskillende sagteware binne dieselfde groep ontwikkel word. Ander sagteware verskaffers moet gewoonlik gebruik maak van sogenaamde uitvoer/invoer tegnieke om 'n mate van integrasie te verkry. Selfs groot sagteware huise maak ook gebruik van hierdie tegnieke tussen hulle verskeie pakkette, in plaas van om die programme direk met mekaar te koppel. Om 'n vol geïntegreerde oplossing te verkry, moet kliënte komplekse en duur sagteware aanskaf, selfs al word net 'n klein gedeelte van die funksionaliteit van hierdie sagteware gebruik. 'n Verskillende benadering word hier gevolg, gebaseer op 'n integrasie raamwerk wat verskillende bestaande sagteware modelle met mekaar koppel. Die raamwerk moet aanpasbaar wees vir elke individu se unieke opset. Vir die raamwerk om aanpasbaar te wees, moet dit óf alle bou industrie inligting inkorporeer van die staanspoor af, óf dit moet buigbaar en aanpasbaar wees vir elke gebruiker. Om 'n model te ontwikkel wat alle bestaande inligting inkorporeer van die staanspoor af is moeilik en duur, dus word die tweede benadering gevolg. Die eindresultaat is 'n model wat minder omvattend is as BIM-tipe modelle, maar eerder gefokus en minder kompleks. Die elemente van hierdie buigbare model het nie voorafbepaalde eienskappe nie, eienskappe kan bygevoeg en weggevat word terwyl die program hardloop. Verder word afgeleide eienskappe nie gestoor as waardes nie, maar eerder as metodes wat gebruik word om hulle waardes mee af te lei. Hierdie konsepte laat toe dat die struktuur en funksionaliteit van die model verander kan word terwyl die program hardloop. 'n Verdere voordeel is dat 'n kundige verbruiker die veranderinge self kan doen. Veranderinge in die modelle kan maklik ingesluit word in die integrasie model, so toekomstige ontwikkeling word nie beperk nie. Dit beteken dat die inhoud van die modelle nie vooraf bepaal hoef te word nie. Al het die raamwerk 'n gespesialiseerde oplossing vir elke gebruiker tot gevolg, het die gebruiker nogtans volle beheer om sy model uit te brei tot die omvattendheid van BIM-tipe modelle. Indien nuwe sagteware modelle ontwikkel word met die integrasie raamwerk in gedagte, kan nog gladder en buigbare integrasie moontlik wees. In hierdie tesis word 'n tekenprogram met 'n kosteberaming program gekoppel om die voorgestelde raamwerk te demonstreer. 'n Prototipe implementering demonstreer volle integrasie deur seleksie binne die programme te sinchroniseer.
APA, Harvard, Vancouver, ISO, and other styles
21

Razionale, Agnese. "Validation criteria and interoperability check in the BIM management for renovations and interventions on the Nuova Sede del commissariato della Polizia di Stato in Cesena." Master's thesis, Alma Mater Studiorum - Università di Bologna, 2022.

Find full text
Abstract:
The research developed in this thesis is focused on the development of a validation method for BIM-based digital models for the disciplines of the Construction sector, in order to satisfy the interoperability requirements established by the Italian Codes and Regulations, to allow archiving and to make digital models suitable for future interventions. The Validation method involves a deep analysis, using specialized software, of the Architectural, Structural and Systems Design, embedded into BIM digital models as it can be expressed through Levels of Detail (LoD) in the open and neutral Industry Foundation Classes (IFC) format. A reliability scale to evaluate how information can be properly organized in IFC models was proposed in this thesis. If the percentage of reliability obtained from the analysis is less than an imposed threshold, the model is considered unreliable and it has to be fixed by designers. Otherwise, following the Employer Information Requirements as it is requested by Italian laws, the model is explored in more detail to check if all project requirements are met. If this final check is successful, the model is valid and usable for the purposes of the design process. The validation method proposed was tested on a real case study, the “Nuova sede del commissariato della Polizia di Stato in Cesena”, actually prepared for real public procurement. The study was provided by Provveditorato Interregionale per le Opere Pubbliche Lombardia – Emilia-Romagna. The results of the analysis proved how most of the errors found in models were due to bad management of the IFC format. In the case study, the requirements of the Employer Information Requirements were all present, allowing to follow all the steps proposed in the validation method developed. In conclusion, the study presented in this thesis contributes to bring novel criteria in the validation of BIM models, which can be extended to all needs expressed by public and private construction sector.
APA, Harvard, Vancouver, ISO, and other styles
22

Österblom, Fredrik, and Andreas Thunell. "BIM: KOMMUNIKATION MELLAN PROJEKTERING OCH PRODUKTION : - Hur BIM effektiviserar informationsflödet." Thesis, KTH, Byggteknik och design, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-192687.

Full text
Abstract:
Denna rapport syftar till att bistå projekterings- och produktionspersonal med effektiviserande verktyg och metoder för att med BIM som bas öka och förenkla informationsutbytet. NCC använder idag BIM-metoder för projektering av projekt, däremot nyttjas inte BIM-metodernas fulla potential för samarbetet mellan disciplinerna i projekten.   För att undersöka behovet inom produktionen hölls intervjuer med personal från ett brett spektrum av åldrar och befattningar. Intervjuerna låg sedan till grund för kriterier till utvärdering av BIM-verktyg. Intervjuerna hölls även med personal med befattningar som projekteringsledare, modellsamordnare och konstruktör, för att med deras kunskaper utvärdera BIM-verktyg.   För att på ett verklighetsförankrat vis utvärdera digitala verktyg i form av BIM-verktyg modellerades ett hus i Tekla Structures 21.1 och Revit 2015. Även A- och K-modellerna för NCCs projekt Trollhättan 33, T33 fanns att tillgå för tester.   Från utvärderingarna utkristalliserades två program som författarna anser vara bäst i respektive stadium av byggprocessen i det studerade projektet, T33. Solibri Model Checker, SMC anses som bäst lämpat verktyg i projekteringsskedet och Trimble Connect anses bäst under produktionsskedet. Solibri Model Checker har bäst möjligheter för validering och kvalitetskontroller och Trimble Connect är ett verktyg där modeller och handlingar kan lagras för enkel kommunikation och samarbete i projektgrupper. Verktyget har även möjlighet att visuellt presentera modeller och handlingar på en dator, surfplatta eller mobiltelefon. De BIM-verktyg som utvärderades var: Solibri Model Checker v9.6 Autodesk Navisworks Manage 2016 Autodesk BIM 360 Glue Trimble Tekla BIMsight Trimble Connect<br>The purpose of this report is to enable project management and construction personnel to use BIM tools and methods more efficiently. Although NCC is currently using some functionality of such digital tools, NCC is not using the full tool suite to better manage their projects, specifically to leverage the cross discipline collaboration capabilities.   In order to gather a comprehensive view of construction personnel requirements, interviews were conducted across a varied and wide range of age, seniority, and job position. These interviews formed the basis for the evaluation criteria of the BIM tools. Additional interviews were held with other staff, including project leads, model coordinators and construction engineers to ensure their knowledge was incorporated into the evaluation.   To compliment the interviews, and further evaluate the digital tools for cross collaboration capabilities a house was modeled in Tekla Structures and Revit. Also the architectural and construction models of NCC project Trollhättan 33, T33, was available for testing.   Two programs emerged as ‘best in class’ post the assessment, differentiated primarily by which phase of the construction lifecycle they were used for. Solibri Model Checker, SMC was considered most suitable tool in the project management phase and Trimble Connect considered best during the construction phase. SMC is suited for validation and quality control and Trimble Connect is a tool, in which models and documents can be stored for easy collaboration in project teams as well as visualizing models, which are easily shared via computer, tablet or mobile phone. The following BIM tools were tested: Solibri Model Checker v9.6 Navisworks Manage 2016 Autodesk BIM 360 Glue Trimble Tekla BIMsight Trimble Connect
APA, Harvard, Vancouver, ISO, and other styles
23

Lindén, Anna, and Peter Dehlin. "BIM i planeringsarbetet : Effective planning by using BIM." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-19131.

Full text
Abstract:
Abstract The importance of good construction planning affects the final costs of the production and the timing of the project. Planning for building projects has been studied with the aim of identifying how three week planning appears in the construction industry today. A case study has been conducted in Navisworks Simulate to assess whether the software is suitable to connect the task schedule with the BIM model to create a 4D model. 4D models are used for performing 4D construction simulation to visualize the project. In order to use the benefits of the model, investment in equipment and software is required. This means higher costs for the companies. Therefore inexpensive software is needed so that it will be profitable to use 4D models even in the production of small projects. The survey which aims to identify planning in the construction industry shows that planning varies between the different sectors, but also that planning technique depends on the knowledge of those who actually carry out the planning. The conclusion is that education in planning techniques and computer aided planning tools is needed to implement BIM in the planning process. With a detailed schedule and a BIM model which is adjusted to the construction of the building, Navisworks Simulate is a suitable program to use in the creation of Building Information Models. When using Navisworks Simulate to create a 4D model, the natural choice would be Navisworks Freedom software for visualization of the project in the production. This is because the Navisworks creates its own file format, which can only be opened in software created by Autodesk. This study was aimed to improve three week planning and increase the use of assimilating feedback by using BIM in the construction industry. The conclusion is that the choice of software for the creation of a 4D model affects the application that later can be used for visualization.<br>Sammanfattning Vikten av god produktionsplanering ligger till grund för dels den ekonomiska produktionskostnaden, dels tidsaspekten i projektet. Som bakgrund till rapporten har planering i byggproduktionen studerats med syftet att kartlägga hur treveckorsplaneringen ser ut inom bygg- och anläggningsbranschen i dagsläget. En fallstudie har genomförts i Navisworks Simulate för att undersöka om programvaran lämpar sig att sammankoppla treveckorsplanering med BIM-modell för att skapa en 4D-modell. 4D-modellen används för att på ett tydligt vis visualisera arbetet i projektet. För att utnyttja modellen krävs investeringar i utrustning och programvaror vilket innebär dyra kostnader för företagen. För visualisering av projektet eftersträvas därför en programvara till låg kostnad så att det ska bli lönsamt att använda 4D-modellen i produktionen även på mindre projekt. Den utredning som genomförts med syftet att kartlägga planeringsarbetet inom bygg- och anläggningsbranschen visar att planeringsarbetet varierar dels mellan bygg- och anläggningsprojekt men även att planeringsteknik beror på kunskapssnivå hos den som ska genomföra planeringsarbetet. Slutsatsen är att utbildning i planeringsteknik och datorstödda planeringsverktyg behövs för att kunna implementera BIM i planeringsarbetet. Med en detaljerad tidsplanering och produktionsanpassad projektering är Navisworks Simulate ett utmärkt program att använda vid skapandet av BIM-modeller. Vid användandet av Navisworks Simulate för skapande av 4D-modellen är Navisworks Freedom det naturliga valet av program för visualisering ute på arbetsplatsen i produktionen. Detta beror på att Navisworks skapar sitt eget filformat, vilket endast går att öppna i programvaror från Autodesk. Slutsatsen blir att valet av programvara för skapandet av en 4D-modell påverkar vilka program som senare kan användas för visualisering. Examensrapporten syftar till att förbättra treveckorsplaneringen, samt att öka utnyttjandet av erfarenhetsåterföringen inom produktionen genom användande av CAD-samordning och BIM.
APA, Harvard, Vancouver, ISO, and other styles
24

Sjödin, Magnus, and Tobias Rasping. "Analys av BIM-processen i ombyggnadsprojekt." Thesis, KTH, Byggvetenskap, 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-92567.

Full text
Abstract:
Idag används BIM, byggnadsinformationsmodellering, i fler och fler nybyggnadsprojekt och det finns mängder med information att inhämta om detta både i tryckta tidskrifter och på internet. En obesvarad fråga är dock hur arbetsgången ser ut när BIM ska användas i ombyggnadsprojekt. Informationen som går att finna om detta är begränsad trots att ombyggnadsprojekt utgör en betydande del av byggverksamheten, såväl i Sverige som internationellt. Målet med denna rapport är därför att undersöka hur ombyggnadsprojekt i dagsläget utförs med BIM som arbetssätt. Processen att arbeta med BIM har undersökts i detalj för att klargöra hur den ser ut idag och för att identifiera den problematik som just ombyggnationer medför. Denna undersökning har genomförts i två pågående projekt enligt en gemensam analysmodell för att klargöra skillnader och likheter. För att klargöra arbetsprocessen så har ett flertal intervjuer med inblandade i projekten genomförts. Genom ett enkätutskick till båda projekten så har ett jämförbart underlag även tagits fram. Projektens modeller har också undersökts för att klargöra deras detaljeringsnivå. Den stora problematik som identifierats med ombyggnadsprojekt är att eftersom arbetet sker mot befintliga byggnadsdelar måste dessa kontrolleras och hanteras. Av denna anledning behöver därför många gånger en inmätning av dessa göras för att kontrollera och komplettera det underlag som finns tillgängligt eller för att skapa ett helt nytt. Detta är en tidig del i processen och något som måste göras innan ett vidare arbete med att upprätta en modell kan utföras. Gemensamt för båda projekten har varit att använda sig av modellen för att samgranska olika discipliners material med syftet att upptäcka och på så sätt minimera antalet kollisioner i produktionen. Analysen har visat på ganska stora skillnader i arbetssätt beroende på projektens förutsättningar. Den största skillnaden är att det i ett av projekten finns ett intresse ifrån beställaren att en modell ska levereras, för att senare kunna användas i förvaltningen. Beställarens intresse har resulterat i att BIM har använts i större utsträckning i det projektet med bland annat kostnader kopplade till modellen. Något som har framkommit är också att arbetssättet BIM måste standardiseras, möjligtvis genom att företaget tar fram en BIM-manual som kan användas i alla projekt som ska använda sig av BIM. Erfarenhetsåterföring efter genomförda projekt måste även ske för att denna manual ska vara aktuell.<br>Currently BIM (Building Information Modeling) is used to a higher extent in new construction projects and there is a lot of information to gather about this both in magazines and online. An unanswered question is how the workflow looks like when BIM is used in reconstruction projects. The information that can be found about this is limited despite the fact that reconstruction projects represent a significant proportion of the construction business, both in Sweden and internationally. The aim of this report is to examine how reconstruction projects currently is carried out with BIM. The BIM process has been studied in detail to clarify the current situation and to identify the problems that reconstruction adds. The study was conducted on two ongoing projects in accordance to a common analytical model to clarify the similarities and differences between them. In order to clarify the work process several interviews has been conducted with the project personnel. Through a questionnaire, a survey of both projects has been performed. Project models have also been studied to clarify their level of detail. The major problem that has been identified with reconstruction projects is that the work is carried out on existing building elements that have to be verified. For this reason a detail survey often must be done to verify and add to existing drawing and documentations. The survey is an early part of the process and something that must be done before any further work to establish a model can be done. Common to both projects is the use of the model to coordinate the various disciplines content in order to minimize the number of collisions in the production. The analysis has shown quite significant differences in methods depending on project conditions. The main difference is that in one of the projects the client wants to use the model in the property management and therefore a model must be delivered. The client’s interest led to a wider use of BIM in the project, including costs connected to the objects in the model. Something that has become clear is that BIM as a work tool must be standardized, possibly through a BIM manual drafted by the company, which can be used in all projects that will make use of BIM. Feedback with lessons learned must be added to the manual for it to stay updated.
APA, Harvard, Vancouver, ISO, and other styles
25

AL-Hindi, Rafah, and Yousef Yousef. "BIM Byggnadsinformationsmodellering BIM-användning hos de olika aktörerna." Thesis, Örebro universitet, Institutionen för naturvetenskap och teknik, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:oru:diva-61162.

Full text
Abstract:
Clarus arkitekter som projekteringsföretag får ofta beställningar från entreprenörer och beställare där de efterfrågar en BIM-modell. I de flesta fallen så används inte BIM modellen helt utan man tar fram 3D-ritningar eller 2D-ritningar. Då ställs frågan “Har beställaren/entreprenören rätt uppfattning om vad BIM är?” Olika aktörer har olika riktlinjer och krav som projektören ska följa. Frågan som arbetet kommer svara på är “hur ska konsulten göra för att på bästa sätt kunna erbjuda rätt tjänst samt mot vilka mål ska konsulten jobba.” Syftet med den här fallstudien är att ta reda på hur BIM användningen skulle kunna underlätta arbetet samt kommunikationen mellan de olika aktörerna som är inblandade i ett byggprojekt. Att undersöka hur kompetensnivån ligger till hos Beställare, Entreprenör och projektörer/arkitekter och svara på frågan “Vad ligger bakom kompetensskillnaden som finns?” Arbetet inleddes med litteraturstudier för insamling och sammanställning av information. Frågor kommer att ställas upp för att senare kunna användas under intervjuerna med olika personer från olika företag. Intervjuerna kommer att ske med bland annat med individer från konsult-, entreprenör- och beställare företag. Intresset att använda BIM är stort i branschen men tyvärr så finns det stor kompetensbrist. Beställare och entreprenörer har planer att börja använda sig av BIM mer vilket kommer att ske de kommande åren, men i nuläget så vill man inte ta nya risker och föredrar att använda sig av traditionella metoder som är mer säkra. För att man skulle kunna tillämpa BIM mer i byggbranschen så behövs det mer kunskap.<br>Clarus Arkitekter as design companies often receive orders from contractors and clients asking for a BIM model. In most cases, the BIM model is not fully used, but 3D drawings or 2D drawings are available. Then asks the question "Does the client / contractor have the correct understanding of what BIM is?" Different players have different guidelines and requirements that the projector should follow, which can be perceived as defective by the projector just to know what is demanded from each client. The question the thesis will answer is "How should the consultant do the best to offer the right service and what goals the consultant will do. The purpose of this master thesis is to find out how BIM usage could facilitate the work as well as the communication between the various actors who is involved in a construction project. To investigate how the level of competence lies with the Client, Entrepreneur and Projectors / Architects and answerthe question "what is behind the skill difference that exists?". The work began with literature studies for the collection and compilation of information. Questions will be set up to later use them during interviews with different people from different companies. The interviews will take place with individuals from consultancy, contractor and client company. The interest in using BIM is high in the industry, but unfortunately there is a great deal of skills shortage. Customers and entrepreneurs plan to start using BIM more, which will happen in the coming years, but now, they do not want to take new risks and prefer to use traditional methods that are more secure. To be able to apply BIM more in the construction industry, more knowledge is needed.
APA, Harvard, Vancouver, ISO, and other styles
26

Jansson, Simon, and Markus Strok. "Virtuellt byggande." Thesis, Linköping University, Department of Science and Technology, 2008. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-11915.

Full text
Abstract:
<p>Kostnaderna att bygga blir allt högre, man tror att byggkostnaderna väntas öka med 25 procent inom de närmaste tre åren. Mest stiger byggherrekostnaden och kostnaderna för byggmaterial och inget tyder på att detta kommer mattas av. Därför ligger det på byggföretagen att effektivisera och optimera projekteringen för att sänka kostnaderna. För att sänka produktions- och projekteringskostnaderna vill byggbranschen gå från hanteringen av traditionella 2D-ritningar till intelligenta 3D-modeller, BIM – Byggnads Informations Modell.</p><p>BIM är en metod för att lagra komplett information om en byggnad i en datormodell. Modellen integrerar all geometrisk modellinformation, de funktionella kraven och möjligheterna samt uppförandeinformationen i en enda beskrivning av ett byggnadsprojekt sett över dess livscykel.</p><p>Vid arbete med ett BIM-projekt använder man en delad projektmodell som alla inblandade parter kan ta del av och jobba med. Med hjälp av denna BIM-baserade arbetsmetod arbetar bland annat byggnadskonstruktörer, vvskonstruktörer, elkonstruktörer och fastighetsförvaltare med samma modell som arkitekten.</p><p>En av de största fördelarna med att använda BIM vid projekteringen är enkelheten att ändra objekt och dess egenskaper. Eftersom alla i projekteringen jobbar med samma modell av byggnaden ser respektive projektör ändringen. Det man strävar efter är att alla inblandade parter skall jobba med modellen från en gemensam server, för att kunna optimera projekteringen med avseende på tid, åtkomst av ritningar och förenklad korrespondens.</p><p>Syftet med vårt examensarbete är att skaffa fördjupad kunskap om BIM, både teoretiskt och praktiskt. Den praktiska delen bestod i att konstruera en BIM-modell av en byggnad. De tillämpningar vi gjort på modellen är en mängdberäkning som vi utfört i ArchiCAD, och en energiberäkning i tilläggsprogrammet Vipweb.</p><br><p>The costs to build is steadily increasing, one believes that the construction costs will increase with 25 percents within the next three years. The cost that will increase the most is proprietor cost and the costs for construction materials, and nothing indicates that this will weak of. Therefore it lies on the construction companies to become more effective and to optimize the project planning in order to lower their costs. To be able to lower the cost for production and project planning the construction industry have to go from the handling of traditional 2D-drawings to intelligent 3D-models, BIM - Building Information Model.</p><p>BIM is a method in order to store complete information about a building in a computer model. The computer model integrates all geometric model information, the functional requirements and possibilities and the behavior information, in only one description of a building project seen over its life cycle.</p><p>While working with a BIM-project one uses a divided project model that all involved parties can take part of and work with. With the aid of this BIM-based work method construction engineers, electrical engineers, heating- ventilation- and sanitation engineers and real estate managers are able work with the same model as the architect.</p><p>One of the biggest advantages with using BIM at project planning is the simplicity to change items and its properties. Since everyone in the project planning is working with same model of the building they can all see the changes that have been made. What one strives for is that all involved parties will work with the model from a common server, in order to optimize the project planning with the focus on time, accessibility of drawings and simplified correspondence.</p><p>The aim with this degree project is to get deepened knowledge about BIM, both theoretical and practical. The practical part consisted in designing a BIM-model of a building. We have used the model to do an amount calculation on the models building parts. This we carried out in ArchiCAD. We also made an energy calculation in the add-on program Vipweb.</p>
APA, Harvard, Vancouver, ISO, and other styles
27

Hamoud, Bassam, and Subeyr Yassin. "Användning av BIM-modeller vid kommunikation mellan olika parter." Thesis, KTH, Byggteknik och design, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-123772.

Full text
Abstract:
Trafikverket vill ta reda på hur de skaimplementera BIM (Building information modeling) som ett arbetssätt i sinorganisation vid projektering, byggande och förvaltning. Syftet med det härexamensarbetet är att ta reda på hur Trafikverket kommunicerar med BIM-modelleridag och hur man kan utvecklas. Det är få människor i anläggningsbranschen som idag har erfarenhet av att arbeta med BIM. Även i de projekt som jobbar med BIM idag så behövs det alltid en BIM-samordnare som håller i trådarna. För att få ett bra slutresultat så måste kommunikationen i ett projekt fungera bra. En förutsättning för detta är att alla inblandade parter har samma mål med projektet, t.ex. att hålla tidplanen bättre. De som saknar erfarenhet av arbete med BIM-modeller måste ges en chans att förstå sig på det för att de ska kunna dela med sig av sina erfarenheter och kunskap. Kunskapsnivån måste höjas och det kommer ta sin tid. Det är viktigt att man inte fokuserar allt för mycket på tekniken eftersom BIM handlar om mer än bara teknik. Först och främst måste man vara tydliga med vilket mål det är som man har av arbete med BIM. Utifrån detta kan man sedan definiera en process och sist bestämma sig för vilken teknik som passar bäst för detta ändamål.<br>The Transportadministration wants to find out how to implement BIM (Building informationmodeling) as a way of working in their organization during design, constructionand management. The purpose of this study is to find out how BIM-models areused in communication today and how it can be developed.   There are a few people today in the construction industry who have experience of working with BIM. Even in projects who work with BIM there is always a need for a BIM-coordinator who holds the strings. To get a good end result the communication within the project must be good. A condition for this is that all the involved parties have the same goals with the project, such as keeping the schedule better. Those who lack experience of working with BIM-models must be given a chance to understand it in order to be able to share their experience and knowledge with others. Knowledge must be enhanced and it will take time. It is important that there is not too much focus too much on technology because BIM is about more than just technology. First and foremost one must be clear about the ones goals of working with BIM. From this one can then define a process and ultimately decide which technology is best suited for this process.
APA, Harvard, Vancouver, ISO, and other styles
28

Ericson, Robert, and Henriikka Ruuti. "BIM: Revit-content : Modellering och hantering." Thesis, KTH, Byggteknik och design, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-102011.

Full text
Abstract:
I och med införandet av BIM-metodiken inom byggbranschen, har flera frågor fötts kring reformationen av arbetsmetodiken inom projekteringsprocessen. En av dessa är frågan om content; grafik - och informationsinnehållet i en BIM-modell.  Rapportens syfte har varit att, via analys av befintliga contenthanteringstrategier, frambringa rekommendationer för utformande av konsekventa arbetsmetodiker inom Revit-projekt. Mål- sättningen har varit att rekommendationerna skall bidra till förstärkning och vidareutveckling av ett företags hantering av Revit-content.  Arbetet inleddes med en serie intervjuer på arkitektföretaget Tengboms Stockholmskontor. Intervjuerna utfördes med representanter för olika Revit-baserade projekt. Av dessa valdes fyra projekt ut till mer detaljerade fallstudier, där syftet var att kartlägga vilka strategier Tengbom tillämpat i sina Revit-projekt. Parallellt med intervjuerna, utfördes en litteraturstudie där information om befintliga contenthanteringsstrategier inom övriga företag och organisationer, kunde förvärvas och analyseras. Resultatet av fallstudierna på Tengbom jämfördes med de teorier som framkommit via litteraturstudien. För- och nackdelar med olika strategier inom contenthantering analyserades med utgångspunkt i olika aspekter gällande utbildning inom Revit-projektering, samt modellering och hantering av content. Slutsatsen blev att Tengbom haft den i särklass mest hållbara strategin inom den inledande fasen av företagets BIM-implementering. Flera fördelar kunde även identifieras i de övriga contenthanteringsstrategierna som analyserats. Dessa kom att utgöra en gedigen grund för de vidare rekommendationer som arbetet resulterade i.<br>The introduction of the BIM-methodology in the building industry has awoken several questions regarding the reformation of work methods in the project planning process. One is the question about content; graphics and information inside a Building Information Model. The purpose of this report has been to analyze existing content managing strategies, in order to create recommendations for the forming of consequent work methods in Revit projects. The goal has been to adjust the recommendations for companies willing to further develop internal work methods in the field, particularly concerning the management of Revit content. Several interviews with representatives from different Revit projects at the architectural firm Tengbom in Stockholm were conducted. Four of the Revit projects, were chosen for a more detailed case study, in order to acquire information about the company’s strategies concerning content management. Simultaneously, a literary study was executed, through which information about existing content management strategies in other companies and organizations could be obtained and analyzed. The results of the case studies at Tengbom were compared with theories acquired from the existing strategies in content management. Benefits and disadvantages were analyzed, based on different aspects concerning modeling and management of Revit content and also the education of Revit use. The report concludes that Tengbom has applied the most sustainable strategies in the initial part of the company’s BIM implementation process. Several benefits were also found in the existing strategies, analyzed in the literary study. Together, the conclusions formed a solid base for further recommendations, made as a result of the study in this report.
APA, Harvard, Vancouver, ISO, and other styles
29

Camargo, André Pierro de. "Modelos de regressão sobre dados composicionais." Universidade de São Paulo, 2011. http://www.teses.usp.br/teses/disponiveis/45/45132/tde-21052012-170807/.

Full text
Abstract:
Dados composicionais são constituídos por vetores cujas componentes representam as proporções de algum montante, isto é: vetores com entradas positivas cuja soma é igual a 1. Em diversas áreas do conhecimento, o problema de estimar as partes $y_1, y_2, \\dots, y_D$ correspondentes aos setores $SE_1, SE_2, \\dots, SE_D$, de uma certa quantidade $Q$, aparece com frequência. As porcentagens $y_1, y_2, \\dots, y_D$ de intenção de votos correspondentes aos candidatos $Ca_1, Ca_2, \\dots, Ca_D$ em eleições governamentais ou as parcelas de mercado correspondentes a industrias concorrentes formam exemplos típicos. Naturalmente, é de grande interesse analisar como variam tais proporções em função de certas mudanças contextuais, por exemplo, a localização geográfica ou o tempo. Em qualquer ambiente competitivo, informações sobre esse comportamento são de grande auxílio para a elaboração das estratégias dos concorrentes. Neste trabalho, apresentamos e discutimos algumas abordagens propostas na literatura para regressão sobre dados composicionais, assim como alguns métodos de seleção de modelos baseados em inferência bayesiana. \\\\<br>Compositional data consist of vectors whose components are the proportions of some whole. The problem of estimating the portions $y_1, y_2, \\dots, y_D$ corresponding to the pieces $SE_1, SE_2, \\dots, SE_D$ of some whole $Q$ is often required in several domains of knowledge. The percentages $y_1, y_2, \\dots, y_D$ of votes corresponding to the competitors $Ca_1, Ca_2, \\dots, Ca_D$ in governmental elections or market share problems are typical examples. Of course, it is of great interest to study the behavior of such proportions according to some contextual transitions. In any competitive environmet, additional information of such behavior can be very helpful for the strategists to make proper decisions. In this work we present and discuss some approaches proposed by different authors for compositional data regression as well as some model selection methods based on bayesian inference.\\\\
APA, Harvard, Vancouver, ISO, and other styles
30

Elander, Sofia, and Elin Bolmstad. "Byggnadsmodellers anpassning inför 3D-utskift & dess användning." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-30502.

Full text
Abstract:
Syfte: Att utreda hur digitala 3D-modeller bör anpassas inför utskrift i en 3D-skrivare samt undersöka hur en sådan modell kan användas i byggprocessens olika skeden. Metod: En fallstudie genomförs med en befintlig digital 3D-modell som utgångspunkt där intervjuer och action research används som datainsamlingsmetoder. Empirin jämförs och analyseras med det teoretiska ramverket som tagits fram genom litteraturstudier. Resultat: En fysisk 3D-modell skulle kunna användas i flera skeden i byggprocessen, huvudsakligen i idéskedet, produktionsskedet och genomgående processen som ett kommunikationsverktyg och vid reklam/försäljning/presentation för ökad förstående. Inför utskrift bör alla byggnadsdelar vara solida, detaljer bör raderas beroende på skala och komponenter bör bestå av samma material. Konsekvenser: Då intervjuerna utförs med personer med varierande kunskap och erfarenhet är det viktigt att beakta det faktum att förslag på användningsområden eventuellt inte är genomförbara i praktiken då dessa är önskemål. Trots detta kan användning av fysiska 3D-modeller rekommenderas i flera av byggprocessens skeden för ökad förståelse och bättre kommunikation, vilket även styrks av det teoretiska ramverket. Gällande anpassningar av en digital modell krävs en digital 3D-model som utgångspunkt och viss vana av 3D-projektering. Begränsningar: Då denna studie är en fallstudie utförd på ett specifikt fall, kan kunskap och rekommendationer inte generaliseras statistiskt på andra typer av byggnader. Dock kan resultatet i denna studie implementeras på liknande projekt om små justeringar tillämpas. På grund av det faktum att studien är kvalitativ med ett begränsat antal respondenter finns möjlighet till ett annat resultat om utförandet skett med andra förutsättningar. Nyckelord: BIM-modell, fysisk byggnadsmodell, 3D-modell, 3D-skrivare, 3D- utskrift<br>Purpose: To investigate how digital 3D models should be adapted to enable 3D printing for use in the construction process in its various stages. Method: A case study is conducted with an existing digital 3D-model where interviews and action research is used as a data collection method. The empirical data are compared and analyzed with the theoretical framework developed through literature studies. Findings: A physical 3D model can be used at several stages in the construction process, mainly in idea development stages, the production stage and throughout the process as a communication tool and for advertising/sales/presentation for increased understanding. Prior to printing, all parts of the building should be solid, details should be erased depending on the scale used and components should consist of the same material. Implications: Based on interviews with people with varying knowledge and experience within the subject, it is important to take into consideration the fact that the proposals on the fields of use may not be enforceable in reality since they are requests. Despite this, the use of physical 3D models can be recommended in several construction phases of the process for greater understanding and better communication, which is corroborated by the theoretical framework. Adaptions of a digital model require a digital 3D model as a prerequisite and a certain experience of 3D design. Limitations: Since this study is a case study conducted in a specific case, knowledge and recommendations cannot be generalized statistically to other types of buildings. However, with small adjustments, this study can be implemented in similar projects. Due to the fact that the study is qualitative with a limited number of interviewees, there is a possibility of a different result if the execution occurred with other conditions. Keywords: BIM model, physical building model, 3D model, 3D printer, 3D printing
APA, Harvard, Vancouver, ISO, and other styles
31

Pejchal, Mojmír. "Přepracování dokumentace stavby do modelu pro BIM." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2021. http://www.nusl.cz/ntk/nusl-444255.

Full text
Abstract:
The motive of the diploma thesis is the redesign of the original project documentation of an block of flats into an information model for administration and maintenance. The first part deals with modeling the building according to the drawing part of the documentation in the Autodesk Revit. The second is about the outputs of the information model and its use in building management. It also includes an evaluation of the effectiveness of redesign in relation to the detail of the model and its link to the original drawing documentation.
APA, Harvard, Vancouver, ISO, and other styles
32

Håkansson, Lisa, and Julia Dannfors. "BIM i produktion : En undersökning om hur BIM kan implementeras i produktion." Thesis, Uppsala universitet, Byggteknik, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-389669.

Full text
Abstract:
The object of this report is to investigate how to implement BIM into the production part of the construction industry. How NCC should act to make the transformation as smooth and easy as possible. BIM, Building Information Modelling, is a way of working where you gather all information in one place. All disciplines work in a 3Dmodel and have information about their component in that model. For example, you can create a specific wall with its different layers, that will make it easier to calculate offers from subcontractors and also make the daily work with other orders easier if you know what the wall is build of. You can also use the model for collision controles. This make everything more efficient and make it easier to collaborate between different disciplines.By interviewing people from the industry, mainly from the production, we found that there already are softwares on the market that NCC are using that is easy to use even if you haven't worked a lot with digital tools before. The problem is how to spread the information about these softwares so that more projects can use them. Another difficulty is how to get the craftsmen to use these softwares. The people we interviewed thought that the lack of interest for digital tools, and the older generation, is the main reason why the implementation will be challenging. Our conclusion is that NCC need to find a systematic way to educate their employees in the digital tools that they are using. They need to get better to spread the word about those digital tools within the company so that their employees understand how much they can help and will start to use them. The craftsmen should use the tools to help visualize what they are building and the on-site manager should have a software with more features.<br>Syftet med arbetet är att undersöka hur BIM kan implementeras i byggbranschen på ett bra och smidigt sätt ute i produktion. Detta ger NCC ett underlag för hur de ska gå tillväga för att denna process ska gå så lätt och smidigt som möjligt men också för att minska risken att fokus hamnar på fel ställe och att implementeringen utförs på ett sådant sätt att personalen blir mer negativa mot digitala hjälpmedel i produktionen.  Då yrkesarbetarna är de som hittills jobbat minst med digitala hjälpmedel har störst vikt lagts vid att undersöka hur implementeringen kommer att påverka dem och hur man ska göra för att få med dem i denna förändring.   BIM, Building Information Modeling, är egentligen byggbranschens digitalisering. Det bygger på att projekteringen utförs i 3D och sedan byggs modellen på med information som gör att arbetet kan effektiviseras och göras smidigare. Det går till exempel att rita upp hur väggarna är uppbyggda i skikt för att underlätta för kalkylatorn vid upphandlingar med underentreprenörer men också i produktion vid beställning av material. Detta minimerar dubbeljobb och effektiviserar produktionen. I projekteringen används det bland annat vid kollisionskontroller där olika discipliners modeller läggs ihop för att se om installationerna krockar någonstans. I förvaltning kan det användas genom att produkterna som använts läggs in i modellen, till exempel vilken armatur, för att sedan lätt kunna hitta den informationen när armaturen senare behöver bytas ut.   Det pratas ofta om att BIM är dyrt och det stämmer att det blir en högre kostnad i början av projekten. Däremot sparas tid och pengar i produktion och förvaltning. Fel som tidigare har upptäckts i produktion och har behövt lösas på plats så gott som försvinner.  Genom att intervjua personer som börjat använda sig av BIM i produktion har upptäckten gjorts att det finns bra och lätthanterliga program som underlättar och effektiviserar vissa delar av produktionen. Två av dessa program som används på NCC idag är Bluebeam och Dalux. Bluebeam används som dokumenthantering där länkar mellan olika ritningar gör att det går snabbt och enkelt att hoppa mellan ritningar. Dalux är ett lättanvändligt program där du kan se projektet i 2D och 3D samtidigt vilket ger en lättare förståelse för vad som ska byggas genom att du kan gå omkring i projektet i 3D. Dalux har även en gratis app som alla yrkesarbetare skulle kunna använda för att öka förståelsen av vad dom bygger vilket skulle kunna göra att frågorna till arbetsledningen skulle minska. Ett problem är då hur man ska lösa det med mobiler och surfplattor till alla, om man inte får använda sin egen eller äger någon privat. Ett annat problem med digitaliseringen är att hårdvarorna är väldigt ömtåliga och ska användas i en hård miljö samt så har internet en tendens att krascha med jämna mellanrum vilket gör att man alltid måste ha en backup av de aktuella ritningarna och modellerna.  En annan fråga är hur man ska få alla att använda sig av de digitala verktygen. Här är de som intervjuats överens om att det med största sannolikhet handlar om hur intresserad man är av teknik och att det är en generationsfråga. De menar att det med generationsskiftet kommer bli lättare att implementera BIM i yrkesarbetarnas arbete.   För att implementera BIM i produktion på ett så bra och smidigt sätt som möjligt bör ordentliga utbildningar av platsledning och yrkesarbetarna genomföras för att sprida kunskapen om vilka möjligheter som finns inom företaget men också för att ge personalen en bra grund så att de känner sig säkra i programmen när de ska börja användas. Det kan öka intresset även hos de som varit negativt inställda från början. Yrkesarbetarna bör använda programmen som visuell hjälp genom att gå omkring i 3D modellen och för att snabbare kunna navigera sig mellan olika ritningar genom länkar. Arbetsledarna kan ha en högre svårighetsgrad med fler funktioner, bland annat olika lager och möjligheten att uppdatera ritningar och modeller.
APA, Harvard, Vancouver, ISO, and other styles
33

Govan, Ivan, and Burim Berisha. "BIM Building Information Model : Hinder & Drivkraft." Thesis, Högskolan i Skövde, Institutionen för teknik och samhälle, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:his:diva-6587.

Full text
Abstract:
The  construction  industry  is  a  costly  business  such  in  respect  of  capital  for  most construction defects which then require rework, tear down and rebuild again. This study is  meaningful  awareness  of  tools  that  can  reduce  this  best  through  communication  and information sharing between the parties.  The  construction  industry  is  known  as  temporary  projects  organizations,  where  the construction  project  consists  of  several  actors  who  have  to  communicate  and  share information  between  them  to  avoid  mistakes  later  in  the  build  time.  These  actors  are bounded together thus for the duration of the project, then broken when the project has reached its end. The challenge here is for these actors to apply a tool that can help and simplify communications, information sharing, and perhaps the most important aspect is to  create  a  routine  for  the  association  and  the  shattering  of  these  actors.  To  implement such  behavior  using  a  tool  such  as  BIM  in  the  industry  whose  size  perhaps  is indescribable may be a very hard task.  BIM (Building Information Model) could be seen as the solution to this problem because it  acts  as  a  portal  where  the  actors  involved  must  sign  in  and  communicate,  share information, and eventually create a behavior, a routine for this association and division of  the  actors  following  the  end  of  the  project.  The  technology  could  help  the  involved from  the  beginning  of  the  project,  already  in  the  model  stage,  break  down  and  prevent any construction barriers when the building has been placed in the works.  In the current situation used paper models, 2D models and three-dimensional models, 3D, where  the  last  one  is  a  part  of  the  BIM.  BIM  makes  it  also  possible  to  implement  4D, price  calculation  for  the  construction  from  beginning  to  end  and  5D  ie  construction details such as what kind of wood the door is made of, what kind of concrete it is, and even the amount of cable for the construction for example.  BIM  is  seen  as  a  information  technology  used  primarily  in  construction,  where  to encounter  several  obstacles  during  the  implementation  and  use  of  such  technology  is expensive  to  implement  in  a  small  operation,  but  it  creates  many  drivers,  many  agents that  have  implemented  BIM,  which  ultimately  pays  according  to  those  who  can  afford and in the current situation using it
APA, Harvard, Vancouver, ISO, and other styles
34

Karlapudi, Janakiram. "Analysis on automatic generation of BEPS model from BIM model." Verlag der Technischen Universität Graz, 2020. https://tud.qucosa.de/id/qucosa%3A73547.

Full text
Abstract:
The interlinking of enriched BIM data to Building Energy Performance Simulation (BEPS) models facilitates the data flow throughout the building life cycle. This seamless data transfer from BIM to BEPS models increases design efficiency. To investigate the interoperability between these models, this paper analyses different data transfer methodologies along with input data requirements for the simulation process. Based on the analysed knowledge, a methodology is adopted and demonstrated to identify the quality of the data transfer process. Furthermore, discussions are provided on identified efficiency gaps and future work.:Abstract Introduction and background Methodology Methodology demonstration Creation and export of BIM data Verification of OpenBIM meta-data BEPS model generation and validation Import statics Model Geometry and Orientation Construction details Thermal Profile Results and discussion Summary and future work References
APA, Harvard, Vancouver, ISO, and other styles
35

Coe-Björsell, Emily Marie <1989&gt. "Business Models for Sustainability: A System Dynamics study of the Sufficiency Driven Business Model." Master's Degree Thesis, Università Ca' Foscari Venezia, 2019. http://hdl.handle.net/10579/15835.

Full text
Abstract:
Current consumption patterns are not sustainable. As a means of combatting this, some businesses are opting for sustainable business models. One example of this is the Sufficiency-Driven Business Model, in which demand is attempted to be curbed. In this study, an existing example of a business following a model similar to the sufficiency-driven business model is simulated using System Dynamics. Two aspects of the business model are altered in order to see the effects on total sales volume. It is found that one of the aspects has an impact on total sales volume while the other does not have an impact.
APA, Harvard, Vancouver, ISO, and other styles
36

Kjaergaard, Karl, and Wilmer Molin. "Byggnadsinformationsmodelleringgenom byggprocessen." Thesis, KTH, Byggteknik och design, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-301174.

Full text
Abstract:
Bakgrund: Byggbranschen i Sverige är kluven. Behovet av bostadsbygge är stort men produktionen räcker inte till. Många faktorer påverkar produktionen av nya fastigheter. En av de mest väsentliga faktorerna till byggbranschens otillräckliga produktionsmöjligheter är branschens egna utveckling. Branschens utveckling har i stort sett varit stagnant i flera årtionden. Detta fram tills detta årtusende då digitaliseringen även har gjort entré inom byggsektorn. Flera digitala verktyg och arbetsmetoder har utvecklats för att effektivisera branschen. Bland de mest prominenta verktyg som gjort intåg på marknaden är BIM, building information modeling, byggnadsinformationsmodellering. Från att ha arbetat med fysiska ritningar har nu aktörer som projektörer och projektledare tillgång till digitala bygghandlingar. Bygghandlingar som innehåller betydligt mycket mer information som geometrisk och mängd baserad information kopplad till olika byggnadsdelar. BIM-modeller är i allra högsta grad en kraftigt bidragande faktor till både ökad effektivisering och digitalisering av branschen. Syfte: Med detta examensarbete önskar vi identifiera konkreta användningsområden för BIM-modeller samt hur de används i branschen idag. Vi ämnar även identifiera förbättringsmöjligheter för användningen och implementeringen av BIM-modeller samt få svar på vilka utmaningar implementeringen och nyttjande av BIM-modeller i byggproduktionen står inför. Metod: Till denna studie har djupintervjuer, egna observationer samt insamling av tidigare publicerad empiriska data utgjort grunden för metodval. De djupintervjuer som genomförts harv arit med för arbetet högaktuella personer inom arbetslivet. Dessa djupintervjuer har gett oss en högaktuell nulägesbild av användandet av BIM-modeller. Slutsatser: Digitaliseringen av byggbranschen medför stora förändringar i byggprocessen. Implementeringen av digitala verktyg och program har varit enorma steg för branschens utveckling. Arbetsmetoderna för varje steg i byggprocessen har utvecklats betydligt, och metoderna optimeras och effektiviseras konstant. BIMs inflytande på hur ett projekt genomförs, från start till slut, har otvivelaktigt förbättrat byggindustrin och möjligheterna med BIM innebär en fortsatt vidareutveckling.<br>Background: The construction industry in Sweden is divided. The need for housing construction is great, but the current production is insufficient. Many factors are affecting the production of new properties, both commercial and private. One of the most significant factors in the construction industry's insufficient production opportunities is the industry's own development. The development of the industry has largely been stagnant for several decades. This has been ongoing until this millenium, when digitalisation has also made an entrance in the construction sector. Several digital tools and working methods have been developed to streamline the industry. Among the most prominent tools that have entered the market are BIM, building information modeling. From having worked with physical blueprints and drawings, actors such as planners and project managers now have access to digital construction documents. Construction documents that contain much more information such as geometric and quantity of based information linked to different building parts. BIM models are to a very high degree a major contributing factor to both increased efficiency and digitalisation of the industry. Purpose: With this thesis, we want to identify concrete areas of use for BIM models and how they are used in the industry today. We also intend to identify opportunities to improve the use and implementation of BIM models and get answers to what challenges the implementation and practice of BIM models the production faces. Method: For this study, in-depth interviews, own observations and gathering of previously published empirical data have formed the basis for method choices. The in-depth interviews that have been conducted have involved highly relevant people who use BIM in their working life. These in-depth interviews have given us a highly up-to-date picture of what the use of BIM models mean and look like. Conclusion: The digitalisation of the construction industry entails major changes in the construction process. The implementation of digital tools and programs has been a huge step in the industry's development. The working methods for each step in the construction process have developed significantly, and the methods are constantly optimized and streamlined. BIM's influence on how a project is carried out, from start to finish, has undoubtedly improved the construction industry and the possibilities with BIM undoubtedly mean a further development.
APA, Harvard, Vancouver, ISO, and other styles
37

Homolová, Tereza. "Využití informačního modelu budovy (BIM) v realitním inženýrství." Master's thesis, Vysoké učení technické v Brně. Ústav soudního inženýrství, 2020. http://www.nusl.cz/ntk/nusl-413829.

Full text
Abstract:
The diploma thesis deals with Building Information Modeling (BIM) and its application in real estate engineering. The document is divided into three main parts. The first part introduces the Building Information Modeling mentioning historical development, basic principles, software tools and advantages of using BIM in particular parts of building life-cycle. At the end of the first chapter, there are presented the pros and cons of BIM method. The second part is focused on the analysis of the current status of BIM implementation in the Czech Republic as well as in foreign countries. The last part deals with possibilities of using BIM in real estate engineering; specifically, the main focus is on: facility management and property maintenance, real estate market and real estate agencies and real estate appraisal. The possibilities of practical using are showed on examples. The conclusion is based on the discussion and summarization of possible usage of BIM method in real estate engineering.
APA, Harvard, Vancouver, ISO, and other styles
38

Ris, Johannes. "Informationsutbyte från BIM-modeller : Från BIM-modell till format hanterbara av förvaltning- och GIS-system." Thesis, Uppsala universitet, Byggteknik, 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-232957.

Full text
Abstract:
BIM has been a trend in recent years when it comes to design and construction of new buildings. However, there has been less talk about what happens to BIM models after the construction phase. This issue has been raised at the Forsmark construction documentation department. This thesis aims to look at how the information in a BIM model can be transferred to facility management and GIS systems and thus add value, even after the construction phase. Questions raises how such an exchange might look like and whether it is reliable. How should a claim be brought to planners for such an exchange to work. This thesis tested some of the most common methods for this kind of exchange of information from BIM models to facility management and GIS. It was formats like IFC, Fi2xml and a database connectivity that was analyzed by a computer simulation of a model provided by Forsmark. The model consisted of an existing office building at Forsmark, modeled in Autodesk Revit. The results indicate that the formats tested require a precise plotting of the models. The loss of information that came to light in the simulation could be attributed to failure modeling in Revit. Even such things as naming of areas must be consistent. To achieve more efficient naming process, test where carried out to deal with parameters outside the Revit environment. However, it did not work optimally. Support for some parameters was lost and the information that was built up in the database was too extensive.
APA, Harvard, Vancouver, ISO, and other styles
39

Rådeström, Sarah, and Viktor Tell. "Är BIM lönsamt vid projektering av ett småhus?" Thesis, KTH, Byggvetenskap, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-102413.

Full text
Abstract:
This report brings up the question - ”Is BIM profitable when planning a single-family home?”. The methodology for finding the answer to this question is firstly to state the definitions of BIM and the company that is projecting by using the BIM-model. The answer is then obtained by analyses of the factors of profitability with respect to: time, opportunity of revision, problem visualization, preference adjustments and energy. A BIM-model has been made simultaneously as the writing has proceeded to get a perception of how a BIM-model really matters for the analysis. The analysis shows that the answer for the question depends on further factors. The factors that are mostly discussed are the company’s intentions and the complexity of the house. However, the answer to the question is no for most types of single-family homes.
APA, Harvard, Vancouver, ISO, and other styles
40

Södergren, Henrik. "BIM på Trafikverket : Förslag till en utvidgad investeringsprocess." Thesis, Karlstads universitet, Fakulteten för samhälls- och livsvetenskaper, 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:kau:diva-33003.

Full text
Abstract:
2013 a decision was made that all projects at the Swedish Transport Administration shoulduse BIM (Building Information Modeling) to some extent from 2015. BIM is an approachthat allows for streamlining of projects by the use of a 3D-model created in an early stage ofthe project. The 3D-model can carry information about the facility throughout its life cyclefrom planning to management. The use of a 3D-model can help the project to detect errors inearly stages of the project when it is easy and cheap to fix the error instead of finding theerror in the construction phase when it is costly and time consuming to fix it. 3D-models alsolead to improved communication both within the project groups and with the public. To takeadvantage of the improvements that BIM offers it has to be implemented in the SwedishTransport Administrations current processes and practices, including the investment process.This report aims to identify the parts of the investment process that is in need forsupplementation to reach the full potential of BIM and what these supplements consist of.If the Swedish Transport Administration implements BIM successfully in their processes, thisreport shows that The Swedish Transport Administration, among other things will haveimproved time management and produce facilities with higher quality at a lower price.
APA, Harvard, Vancouver, ISO, and other styles
41

Gustafsson, Sofie, and Ted Mårtensson. "BIM - Förvaltarens Framtid." Thesis, Halmstad University, School of Business and Engineering (SET), 2010. http://urn.kb.se/resolve?urn=urn:nbn:se:hh:diva-5014.

Full text
Abstract:
<p>For nearly twenty years people have been talking about Product models, but given that the building industry is so conservative, it is hard to implement new working methods. Product models are these days known as Building Information Modeling, BIM. People often say they work with BIM but they often forget the most important part, the information. A 3D model should be linked with characteristics and information. Information that can be invaluable for the facility manager.</p><p>We have a vision that in the best of worlds the facility manager would be able to "walk" into the model and see what kind of installations are inside the wall or in the roof. You should be able to point at an object and gain complete information about operation and maintenance off the installation. You should also be able to gain information such as the name of the product and article number if you have to buy a new one. That’s why in our thesis we want to highlight the possibilities for the facility manager.</p><p>In order to have high achievements with BIM, coordination is highly needed. All participants in the construction process have to work together at an early stage; they must have the possibility to affect the stage of inquiry. By having the facility manager connected to the process at an early stage, other members have the opportunity to understand what’s expected from them. In the same way the facility manager will understand if any of the requirements are unreasonable or difficult to solve. Planning must be allowed to cost money. A well planned project can later save a lot of money due to less problems at the building worksite. In a well planned project there will be less changes and less additional work. The key words are Coordination and review.</p><p>During the facility management stage there are great opportunities to save money with BIM. The benefits of BIM have been shown and larger facility companies demand a model that work in the facility management stage. The greatest advantages are gained by the visual model that gives a greater understanding and a better base for decisions. There are also great advantages in more effective processes, better quality and better documentation for maintenance, operation, future rebuilding and future sale.</p><p>To be able to get a good image of BIM, how it is used today and what expectations there are, we have interviewed facility managers, system manager and BIM experts. We have also researched information in reports and articles.</p><br><p>I snart 20 år har man pratat om Produktmodeller men i byggbranschen är det svårt att införa nya arbetsmetoder. Produktmodeller har senare fått namnet Building Information Modeling eller Byggnadsinformationsmodeller på svenska, fortsättningsvis kallat BIM. Många säger idag att de BIM:ar när de gör 3D modeller men de glömmer ofta den viktigaste delen, informationen. Till 3D modellen kan egenskaper och information kopplas till varje objekt. Information som sedan kan vara ovärderlig för förvaltaren.</p><p>Vi har en vision av att i de bästa av världar skall förvaltaren kunna ”gå” in i modellen och se vad för installationer som finns i t.ex. väggar och ovanför takplattor. Dessutom ska man bara kunna peka på  ett don och få all information om det vad gäller drift och underhåll samt produktnamn och artikelnummer för att köpa ett nytt. Därför försöker vi i examensarbetet lyfta fram förvaltaren och fördelarna för denne.</p><p>För att få ut det bästa med BIM krävs samordning. De olika aktörerna i processen måste börja arbeta tillsammans i ett tidigt stadium, d.v.s. vara med och påverka redan i utredningsstadiet. Kan man ha med förvaltningen redan i utredningen får övriga aktörer en bättre förståelse för vad som förväntas av dem. Samtidigt kan förvaltningen tidigt få veta om några krav är orimliga eller svårlösta.Projektering måste få kosta. Ett väl projekterat projekt kan senare spara massor med pengar på att inga problem behöver lösas på byggarbetsplatsen. I väl projekterade projekt minskar ÄTA-arbeten och kollisioner. Nyckelorden för detta är Samordning och Samgranskning.</p><p>I förvaltningsskedet finns det stora utsikter att spara kostnader med hjälp av BIM, fördelarna har börjat visa sig och en del större förvaltare har börjat ställa krav på en produktmodell som går vidare in i förvaltningsskedet. De största fördelarna är bl.a. visualiseringen som ger en bättre förståelse och ett bättre underlag för beslut, effektiviseringen som spar både tid och material, kvalitetshöjning och bättre dokumentation för underhåll, drift, uthyrning, framtida ombyggnad och framtida försäljning.</p><p>För att skapa oss en bild om BIM, hur det används idag och vilka förväntningar som finns branschen, har vi intervjuat förvaltare, systemansvariga och BIM-experter. Vi har även sökt information i rapporter och tidsskrifter.</p>
APA, Harvard, Vancouver, ISO, and other styles
42

Barikan, Mohammed, and Siavash Ehsanzamir. "Från modellering till dimensionering : Att modifiera produktionsmodeller till analysmodeller." Thesis, KTH, Byggteknik och design, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-142362.

Full text
Abstract:
Allt fler aktörer inom byggbranschen övergår från att använda gamla och traditionella verktyg i sin projektering till mer avancerade och moderna BIM-verktyg. Däremot sker denna utveckling långsamt på grund av skeptisk och konservativt inställning i byggbranschen. Idag finns analysprogram som har förmågan att beräkna och analysera komplexa strukturer, men trots detta är det väldigt vanligt med handberäkningar. I branschen börjar modellering av produktionsmodeller i moderna 3D BIM-verktyg få fotfäste. Det är praktiskt möjligt att modifiera en produktionsmodell till en analysmodell för att sedan beräknas i ett analysverktyg och det är detta som kommer bland annat undersökas. I denna rapport utreds även skillnaderna mellan handberäkningar och beräkningar i analysverktyg samt undersöks lönsamheten i en arbetsmetod där produktionsmodell och analysmodell integreras. Målet med denna rapport var att skapa ett tillvägagångssätt för en  fungerande överföring mellan produktionsmodell och analysmodell. Vilket enligt denna undersökning resulterar i en effektivare och lönsammare projektering.<br>Many businesses operating in the construction industry are nowadays substituting traditional tools in their project designing process with more modern and advanced BIM tools. However, this transition is taking place at a rather languid pace due to a skeptical and conservative attitude in the construction industry. Today, analysis software that has the ability to calculate and analyze complex structures is available. Yet, despite of this fact, manual calculations are still very common. The use of modern 3D-BIM tools has just started to gain a foothold, and a slight increase in both use and popularity in the construction branch. It is virtually possible to modify a production model into an analysis model using this technology, and that is one of the many aspects that will be investigated in this report. The differences between manual calculation and calculations made with analysis tools will be outlined, as well as the profitability of working with a production model where an analysis model has been integrated. The main objective of the following study was to provide a functioning approach for the effective transfer from a production model to an analysis model, which this investigation have eventuated to a more efficient and profitable project.
APA, Harvard, Vancouver, ISO, and other styles
43

Eriksson, Michael. "BIM i förvaltningsskedet." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-19875.

Full text
Abstract:
Syftet med den här studien är att förbättra informationsflödet från projektering och produktion in i förvaltningen. Detta för att väcka ett intresse hos förvaltare och för att visa att det finns pengar att spara genom att ta hand om informationen från projekteringen och produktionen. Tidigare studier inom området BIM visar att stor fokus läggs på projektering och produktion men det är ett väldigt litet fokus på förvaltningen när man talar om BIM. Målet är att konkret kunna visa vad informationen är värd och att visa vilken information förvaltare använder och var den finns i byggprocessens skeden före förvaltningen. Rapporten bygger på en litteraturstudie, intervjuer och beräkningar. Förvaltare har blivit tillfrågade vilken information de använder i förvaltningen och sedan har projektör och entreprenör blivit tillfrågad ifall denna information finns att tillgå i projekteringen och produktionen. Värderingen av informationen har sedan gått till på två sätt. Det ena sättet är att bedöma kostnaden av att uppdatera information mot kostnaden att ta fram information på nytt. Det andra sättet är att med hjälp av nyckeltal (kronor per kvadratmeter) och den lista med typ av information som förvaltare använder, som sammanställts från intervjuerna, ta reda på vad information är värd. Det första sättet att värdera visar att det kostar lika mycket att hålla relationsritningar (A) uppdaterade i som minst 18år och i som mest 50år som att ta fram informationen helt på nytt. Nästan samma gäller för BIM-modell med avseende på relationsritningar (A). Fast där är kostnaden för framtagning på nytt lika stor som att hålla den uppdaterad i som minst 22år och i som mest 58år. Det andra sättet att värdera visar att mindre än 25% av den information man kan finna i projekteringen och eller i produktionen är värd cirka 10% av projekteringskostnaden.<br>The purpose of this study is to improve the flow of information from the design and construction phase into the facility management. This in order to make the facility managers see the advantages with BIM and to show that there is money to be saved by retrieving the information from the design and the construction phase. Earlier studies show that there actually has been quite little research done within BIM in the facility management and that the main focus has been at the design and the construction phase. The aim with the study is to specify the value of the information and to show which information facility managers use and where it can be retrieved from within the earlier phases of the construction process. The report is based on a literature study, interviews and calculations. A number of facility managers have been asked which types of information they use and designers and entrepreneurs have then been asked if these types of information can be found in the design and the construction phase. The information has been valued in two different ways. In one way the information was valued by comparing the cost between updating existing information or recreate the same type of information. The other way of valuing the information was to find out the worth of information by using key figures (SEK per square meter) and the list of information that facility managers use, which was made up from the interviews. The first way of valuing shows that the cost of producing as built drawings (A) in the facility management cost as much as keeping the same type of information updated for at least 18years and as most 50years. Almost the same goes for a BIM-model. Only there the difference is that the cost of producing a BIM-model focused on as built drawings (A) in the facility management cost as much as keeping the same type of information updated for at least 22years and as most 58years. The other way that the information was valued shows that less than 25% of the information that can be found in the design and/or construction phase is worth circa 10% of the projecting fee.
APA, Harvard, Vancouver, ISO, and other styles
44

Engdahl, Jenny, and Madeleine Hedlund. "BIM för Hållbart Byggande." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-22514.

Full text
Abstract:
The purpose of this study is to facilitate sustainable building by the use of BIM. The goal is to determine which aspects of sustainable building, which can be analyzed mainly with BIM tools, but also other aids. The study is based on literature studies and interviews. The literature review examines aspects important for sustainable building by studying environmental certification systems applicable in Sweden, as well as the BIM tools available on the market to analyze these aspects. The literature also includes the concepts of BIM and sustainability in order to provide a clearer view of its meaning. The interviews have brought the study's overall understanding of the industry and guidance on the subject. The results are presented in a table, where the aspects relevant to sustainable building are listed. It can also be read which aspect the certification systems raise. Overall, the study shows 132 aspects distributed across seven areas: Site, Water and Wastewater, Energy and Pollution, Materials and Waste, Indoor and Wellbeing, City Design and finally Implementation and Management. The table also suggests BIM tools and other aids, which can be used in the analysis of a specific aspect. The study shows a slight majority of the aspects, 55 percent, are possible to analyze with BIM tools. The Site is the area with most aspects, which can be analyzed with BIM tools, 95 percent. And Materials and Waste resulted in least aspects with only ten percent. Overall, the study examined 35 different BIM tools. The aspects that require other means of analysis often generates important information about the project, from a sustainability point of view, and in many cases the information can be integrated in the BIM model manually. In the end, the project gets a packed BIM model with useful information, which follows the project all the way into management and later demolition and recycling. The study shows that sustainable building demands a holistic approach where several aspects should be considered in order to achieve sustainability. To analyze the aspects of sustainability requires that relevant and accurate information about the project be collected. Various proposals can be drawn and compared to generate the most sustainable option. A tool for this is BIM. BIM is defined partly as a method of work, building information modeling, but also as a virtual model, building information model. BIM facilitates the coordination of information gathering, both as a working method and a technical tool. This will contribute BIM to achieve the purpose sustainable building.<br>Syftet med den här studien är att underlätta hållbart byggande genom användandet av BIM. Målet är att utreda vilka aspekter inom hållbart byggande som kan analyseras med fokus på i huvudsak BIM-verktyg, men också andra hjälpmedel. Studien bygger på litteraturstudier och intervjuer. I litteraturstudien undersöks aspekter som är betydelsefulla vid hållbart byggande genom att studera miljöcertifieringssystem som är tillämpningsbara i Sverige, samt vilka BIM-verktyg som finns att tillgå på marknaden för att analysera dessa aspekter. Litteraturstudien innefattar även begrepp rörande BIM och hållbarhet för att ge en klarare bild av dess innebörd. Intervjuerna har tillfört studien övergripande förståelse för branschen och vägledning i ämnet. Resultatet redovisas i en tabell, där de aspekter som är relevanta för hållbart byggande är listade. I tabellen går det även att utläsa vilka aspekter certifieringssystemen tar upp. Totalt visar studien på 132 aspekter fördelade inom sju delområden; Platsen, Vatten och Avlopp, Energi och Föroreningar, Material och Avfall, Inomhusklimat och Välmående, Stadens Gestaltning samt Genomförande och Förvaltning. I tabellen redovisas dessutom förslag på BIM-verktyg samt andra hjälpmedel som används vid analys av en specifik aspekt. Studien visar att en knapp majoritet av aspekterna, 55 procent, är möjliga att analysera med BIM-verktyg. Platsen är det delområde som visar flest aspekter som går att analysera med BIM-verktyg, 95 procent. Material och avfall resulterade i minst aspekter med endast tio procent. Sammantaget har studien undersökt 35 stycken olika BIM-verktyg. De aspekter som kräver andra hjälpmedel för analys genererar ofta information viktig för projektet ur hållbarhetssynpunkt, och går i många fall att integrera i BIM-modellen manuellt. Sammantaget medför det att projektet får en fullmatad BIM-modell med användbar information som följer projektet ända in i förvaltning och sedermera rivning och återvinning. Studien visar att hållbart byggande handlar om att ha en helhetssyn där flertalet aspekter ska beaktas för att uppnå hållbarhet. Det räcker således inte att bara se till exempelvis energihushållning för att anse att ett projekt är hållbart. För att analysera aspekter rörande hållbarhet krävs att relevant och riktig information om projektet insamlas. Då kan olika förslag utarbetas och jämföras för att ta fram det mest hållbara alternativet. Ett redskap för detta är BIM. BIM är definierat dels som en arbetsmetod, byggnadsinformationsmodellering, men också som en virtuell modell, byggnadsinformationsmodell. BIM underlättar samordningen av den insamlande informationen, både som arbetsmetod och som tekniskt verktyg. På så vis bidrar BIM till att uppnå syftet hållbart byggande.
APA, Harvard, Vancouver, ISO, and other styles
45

Schenk, Judith A. "Criteria for Evaluating Model Deficiency for Groundwater Models and the Effects of Eliminating Deficient Models on Multi Model Analysis Using AICc, KIC, AIC, and BIC." Thesis, Colorado School of Mines, 2017. http://pqdtopen.proquest.com/#viewpdf?dispub=10266759.

Full text
Abstract:
<p> Multi-model analysis (MMA) considers multiple model interpretations of a system. MMA provides a more realistic assessment of uncertainty associated with model predictions because both uncertainty of individual models and uncertainty associated with different model structures are considered. Models are evaluated for the strength of evidence that they represent an unknown system using different Information Criteria (IC) equations. IC equations are designed to assess the likelihood that a model in a set of models represents the true but unknown system. IC equations do not include a component which identifies a deficient model. Therefore, inclusion of deficient models in the set of models leads to poor model-averaged results. Evaluation of models to assess whether available observation data sufficiently support the model structure is an important step in MMA. Measures for evaluating models include: 1) failure to reach proper convergence during non-linear regression; 2) unreasonable parameter estimates; 3) unreasonable confidence intervals on parameters or a coefficient of variation greater than ten for one or more parameters; 4) high correlations between parameters; 5) determinant of the correlation matrix less than 1x10<sup> -12</sup>; 6) condition number of the Jacobian matrix greater than 2000; and 7) unreasonable confidence intervals on predictions.</p><p> Experiments presented herein are designed to evaluate how components of AIC, AICc, BIC, and KIC rank models and assign model probabilities, and to demonstrate how removing deficient models improves MMA results. Synthetic models are used to represent true but unknown systems in contrast to experimental models that are created to simulate a simplified version of the unknown system based on observation data taken from the synthetic models. AIC, AICc, BIC, and KIC generally assign high probability to deficient models. AICc generally assigns high probability to deficient models if 1) there are many observation data or 2) there are few observation data and the model fits the data well. KIC generally assigns high probability to deficient models because these models have low Fisher Information. AIC and BIC are influenced by the goodness-of-fit and are more likely to assign high probability to more complex models because these models are generally over-fitted. Removing deficient models results in improved MMA results using AIC, AICc, BIC and KIC.</p><p>
APA, Harvard, Vancouver, ISO, and other styles
46

Bertze, Anna. "Från BIM-modell till logistik : Möjligheten att digitalisera materialflödet." Thesis, Uppsala universitet, Byggteknik, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-302078.

Full text
Abstract:
When all the information for smart building materials orders can be extract from aBIM model it is possible for correct material to be delivered at the right time at theright place. If a flow of material is well planned it leads to a more efficient work on theconstruction site and reduced waste.Overall, the relationship between material supplier and contractor has receivedsurprisingly little attention in research. Especially considering the amount ofcontractor-supplier-relationship there is in each building project. In this bachelorthesis the possibility of using information from a BIM model to a digital material orderis investigated. Furthermore, the need and problems in the digitizing process of thematerial flow and its operators is studied. The results show that a digitalcommunication is possible but requiring a major change in the process of materialflow.
APA, Harvard, Vancouver, ISO, and other styles
47

Haglund, Petter, and Rickard Kallin. "Informationsbehov ur en BIM-modell för användning i fastighetsförvaltning." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik och belysningsvetenskap, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-37100.

Full text
Abstract:
Purpose: As buildings become more complex, property management becomes increasingly complex. New demands are made on buildings environmental performance, risk management and new technology is introduced, which changes the property management industry. Problems with current property management methods are that the information for an efficient maintenance is difficult for the trustee, and the lack of interoperability between architects, constructor, client and trustee. The digital divide between trustees and other actors helps the trustee to reject the idea that BIM can be used in management. The aim for this rapport is to determine what information is to be required from a BIM-model to be to any use in the management process. Method: This work has been done through interviews and document analyses to answer the goal. Findings: There is a drive from trustees to switch to BIM, but the main obstacles are the lack of knowledge and influence at the start of construction projects, which means that the right requirements regarding the development and detailing of a BIM model can’t be set properly. Trustees know what information they need, but not how to set the right requirements without a specific standard. Implications: A lack of competence and knowledge about BIM at the trustees implies the need for a standard on the BIM-models level of detail and development for at all stages in the project, and all actors and researchers involved in the work. However, the trustees is aware of the information they need in their management system, which should be taken into account when a standard is being made. Limitations: The interview respondents came from different types of management companies, such as profit-making and non-profit-making, smaller and larger management companies, as well as trustees of residential, office, hall buildings and campus properties. Interviews with clients had helped make the work more relevant as it appeared from interviews conducted that the client plays a major role when demanding a BIM-model in a construction project.
APA, Harvard, Vancouver, ISO, and other styles
48

Claesson, Cecilia, and Charlotte Kjellkvist. "Implementera BIM i produktionen : Vilka produktionsparamterar krävs i en BIM-modell för att produktionsledare ska kunna tillämpa BIM som verktyg till sina arbetsuppgifter?" Thesis, KTH, Byggteknik och design, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-123792.

Full text
Abstract:
Detta examensarbete syftar till att exemplifiera vilka informationsparametrar som är nödvändiga för att Building Information Management på ett bättre sätt ska kunna implementeras i produktionsfasen. För att uppnå detta mål har vi analyserat utvecklingen och nyttjandet av Building Information Management genom tre olika datainsamlingsmetoder; litteraturstudie, observationer och intervjuer.   I detta examensarbete har vi fördjupat oss i för- och nackdelar samt hur Skanska Sverige AB kan tillämpa Building Information Management som hjälpmedel i arbetsberedningar. Denna fördjupning har lett till att vi kan analysera vilka produktionsanpassade informationsparametrar som en produktionsledare behöver i sin tjänsteroll för att dra nytta av Building Information Management. Vi anser att användandet av en BIM-modell kompletterar produktionsledarens ledaregenskaper, vilket gör det lättare för denne att nå fram med informationen till yrkesarbetarna, då visualiseringen underlättar förståelsen inför aktiviteten. I denna rapport kan läsaren ta del av de slutsatser vi kommit fram till.<br>This thesis aims to exemplify the information parameters necessary for Building Information Management in a better way will be able to implemented in the production phase. To achieve this goal, we have analyzed the development and use of Building Information Management through three different data collection methods; literature, observations and interviews. In this thesis we have extended us in the pros and cons and how Skanska Sweden AB may apply Building Information Management as a work tool in work briefings. This invasive treatment has led us to analyze the production custom information parameters as a production manager needs in its employment to take advantage of Building Information Management. We believe that the use of a BIM model complements the production manager's leadership skills, which makes it easier for him/her to convey information to skilled workers, then the visualization facilitates understanding of the task. More about the conclusions we have reached, the reader can take part of this thesis.
APA, Harvard, Vancouver, ISO, and other styles
49

Granath, Emil, and Sergen Pervance. "Modellering av BIM-objektsfamiljer - en arbetsgång för leverantörer." Thesis, Högskolan i Halmstad, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:hh:diva-43054.

Full text
Abstract:
Under de senaste 10-20 åren har användandet av BIM-modellering i byggbranschen ökat. En BIMmodellbyggs upp med hjälp av BIM-objekt. Dessa BIM-objekt kan skapas av projektören men dekan också skapas av leverantören av den produkt som BIM-objektet representerar. En samling avBIM-objekt med liknande egenskaper eller utseende kallas för en objektfamilj. En objektfamilj kant.ex. vara en dörr eller ett fönster. En fördel med objektfamiljer generellt är att de endast behövermodelleras en gång, men kan sedan användas i många olika projekt.Syftet med denna studie är att underlätta leverantörens arbete med utvecklingen av deras BIMfamiljer.Studien är utförd i Autodesks BIM-plattform Revit.Arbetet inleddes med en litteraturstudie som utgjorde grunden för arbetet. Att undersöka ochutforska befintliga objektfamiljer var även det en stor del av förarbetet. Detta gjorde att vi skaffadeoss goda kunskaper om objektfamiljer som vi sedan utvecklade genom att vi själva modelleradeobjektfamiljer. Modelleringen gjorde att vi fick en bättre förståelse om det vi tidigare endast lästom.Resultatet blev en generell arbetsgång som kan användas vid skapandet av många olika typer avBIM-objekt. Arbetsgången förutsätter att man förstår de olika delarna som en familj är uppbyggdav, vilket beskrivs i rapporten.En slutsats är att modellering av objektfamiljer kan göras på flera olika sätt och att det är viktigt attfortlöpande testa sin modell. Vidare bör inte objektfamiljerna innehålla mer information ännödvändigt, eftersom det kan göra familjerna onödigt komplicerade och mindre användarvänliga.Objektfamiljer med mindre mängd information föredras därför framför stora och detaljrikaobjektfamiljer. Därmed undviks också onödig belastning på den programvara som används.Studien genomfördes i samarbete med Preconal som har för avsikt att ta fram Revitfamiljer försina produkter. Vi använde oss av deras produkter som underlag till modelleringen<br>Within the last 10-20 years, the usage of BIM-modeling in the construction sector has increased.BIM-modeling is used daily in different stages of the design process in Sweden. During the designprocess BIM-objects is used which is created by either the manufacturers or the planner. Theseobjects are created by a real product and is made to represent that in the program. The increase ofBIM usage has led to more disciplines that didn’t work with BIM has to adapt and start with that.The purpose of this study is to increase the understanding about the creation of object families formanufacturers. Besides the literature study about the subject we also describe the whole modellingprocess in Revit step by step. This because to give an example how it could be made.The result became a general workflow that is usable for most kinds of objects. The workflowrequires the reader to understand the different parts of an object family which we describe in thethesis.A conclusion is that a family could be built in different ways and it’s important to regularly testyour model. Furthermore, it should not contain more information than what is necessary. BIMobjectswith less information is often preferred over heavy and detailed BIM-objects. This will alsoprevent unnecessary load on the software.
APA, Harvard, Vancouver, ISO, and other styles
50

Holm, Daniel, and Josefine Wallgren. "Kvalitets- och kollisionskontroller i BIM-projekt : En analytisk jämförelse mellan programvarorna Autodesk Navisworks Manage, Solibri Model Checker och Tekla BIMsight." Thesis, KTH, Byggteknik och design, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-127033.

Full text
Abstract:
I ett BIM-projekt skapas ett flertal intelligenta 3D-modeller innehållande geometrier och information. Respektive fackområde skapar modeller innehållande sina byggdelar och installationskomponenter. Genom att samordna modellerna från alla områden skapas en BIM-modell över hela projektet. En förutsättning för att projekteringen ska effektiviseras är att modellerna håller god kvalitet. Då allt fler byggnader projekteras i 3D-miljö finns det idag goda möjligheter att underlätta arbetet med kvalitetssäkring. Det finns ett flertal programvaror där det är möjligt att sammanfoga och granska modeller. Förutom att upptäcka kollisioner och kvalitetsfel, innehåller programmen flera andra funktioner som kan effektivisera projekt. En egenskap är möjligheten att virtuellt gå omkring i en byggnad innan den uppförs. Det finns även möjlighet att mäta avstånd, rita och göra noteringar i modellen och dess vyer, vilket är till hjälp när den ska granskas av de olika disciplinerna. Bakgrunden till det här examensarbetet är att konsultföretaget Byggteknik AB vill veta vilken programvara för samordning som uppfyller deras behov bäst. Genom implementering av programvaran vill de kunna ta på sig samordningsansvaret i framtida BIM-projekt. Frågeställningen är: Vilken programvara lämpar sig bäst för konsultföretaget Byggteknik AB? Den besvarades genom att en fallstudie genomfördes. I fallstudien jämfördes tre olika programvaror för kvalitets- och kollisionskontroller; Autodesk Navisworks Manage, Solibri Model Checker och Tekla BIMsight. Svaret på frågeställningen, som presenteras i rapporten, är att Autodesk Navisworks Manage är den programvara som i dagsläget lämpar sig bäst för Byggteknik AB.<br>In a BIM-project several intelligent 3D-models is being created. The 3D-models contain both geometries and information. Each discipline creates models containing their building and installation components. By coordinating the models from all the disciplines, a BIM-model of the entire project is being created. A prerequisite for the design to be effective is that the models have a good quality. Today there are good opportunities to facilitate the work of quality assurance, since more and more buildings are designed in 3D. There are several softwares for merging and checking models. In addition to detecting collisions and quality defects, the software can do several tasks to make projects more effective. One feature is the ability to virtually walk around in the building before it is constructed. It is also possible to measure distances, draw and make notes in the model and its views, which is helpful when it will be reviewed by the various disciplines. The background to this thesis is that the consultancy Byggteknik AB would like to know what software for coordination that meets their needs best. By implementing the software, they want to be able to assume responsibility for coordination in future BIM-projects. The question for this thesis is: What software is best suited for the consultancy Byggteknik AB? To answer the question a case study was conducted. In the case study three different softwares for quality and collision checks was being compared. The softwares being compared were Autodesk Navisworks Manage, Solibri Model Checker and Tekla BIMsight. The answer to the question, presented in this report, is that Autodesk Navisworks Manage in the current situation is best suited for Byggteknik AB.
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!

To the bibliography