Journal articles on the topic 'BIM Project Execution Plan'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the top 50 journal articles for your research on the topic 'BIM Project Execution Plan.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.
Talaat, Abdelhakim. "PREPARE BIM PROJECT EXECUTION PLAN." Journal of Al-Azhar University Engineering Sector 14, no. 53 (October 1, 2019): 1594–605. http://dx.doi.org/10.21608/auej.2019.64154.
Full textAnderson, Anne, and Shobha Ramalingam. "A socio-technical intervention in BIM projects – an experimental study in global virtual teams." Journal of Information Technology in Construction 26 (July 26, 2021): 489–504. http://dx.doi.org/10.36680/j.itcon.2021.026.
Full textAbu Bakar, Ahmad Ridzuan, Ahmad Tarmizi Haron, and Rahimi A. Rahman. "Building Information Modelling Execution Plan (BEP): A Comparison of Global Practice." International Journal of Engineering Technology and Sciences 7, no. 2 (September 17, 2021): 63–73. http://dx.doi.org/10.15282/ijets.7.2.2020.1005.
Full textTolmer, Charles-Edouard. "Improving the Use of BIM Using System Engineering for Infrastructure Projects." International Journal of 3-D Information Modeling 6, no. 3 (July 2017): 17–32. http://dx.doi.org/10.4018/ij3dim.2017070102.
Full textZanni, Maria-Angeliki, Robby Soetanto, and Kirti Ruikar. "Defining the sustainable building design process: methods for BIM execution planning in the UK." International Journal of Energy Sector Management 8, no. 4 (October 28, 2014): 562–87. http://dx.doi.org/10.1108/ijesm-04-2014-0005.
Full textLucarelli, M., E. Laurini, M. Rotilio, and P. De Berardinis. "BEP & MAPPING PROCESS FOR THE RESTORATION BUILDING SITE." ISPRS - International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences XLII-2/W11 (May 4, 2019): 747–52. http://dx.doi.org/10.5194/isprs-archives-xlii-2-w11-747-2019.
Full textGhimire, Rajarshi, Seungtaek Lee, Jin Ouk Choi, Jin-Yeol Lee, and Yong-Cheol Lee. "Combined Application of 4D BIM Schedule and an Immersive Virtual Reality on a Modular Project: UNLV Solar Decathlon Case." International Journal of Industrialized Construction 2, no. 1 (January 22, 2021): 1–14. http://dx.doi.org/10.29173/ijic236.
Full textRamírez-Sáenz, Juan Antonio, Juan Martín Gómez-Sánchez, Jose Luis Ponz Tienda, Juan Pablo Romero Cortés, and Laura Gutierrez Bucheli. "Requirements for a BIM execution plan (BEP): a proposal for application in Colombia = Requisitos para un plan de ejecución de BIM (BEP): propuesta de aplicación en Colombia." Building & Management 2, no. 2 (September 10, 2018): 5. http://dx.doi.org/10.20868/bma.2018.2.3763.
Full textSackey, Enoch, and Julius Akotia. "Spanning the multilevel boundaries of construction organisations." Construction Innovation 17, no. 3 (July 10, 2017): 273–93. http://dx.doi.org/10.1108/ci-09-2016-0047.
Full textSánchez Barroso, Gonzalo, Jaíme Gónzalez Domínguez, Felix Badilla Murillo, Juan Aunión Villa, Justo García Sanz Salcedo, Juan Pablo Carrasco Amador, and Jose Luis Cañito Lobo. "Implementación del aprendizaje basado en proyectos a través de la tecnología BIM = Implementing Project-Based Learning through BIM Technology." Advances in Building Education 4, no. 2 (November 25, 2020): 34. http://dx.doi.org/10.20868/abe.2020.2.4462.
Full textKhawaja, Ebad Ur Rehman, and Abdelhakim Mustapha. "Mitigating Disputes and Managing Legal Issues in the Era of Building Information Modelling." Journal of Construction in Developing Countries 26, no. 1 (July 30, 2021): 111–30. http://dx.doi.org/10.21315/jcdc2021.26.1.6.
Full textShahruddin, Syafizal. "A SYSTEMATIC REVIEW OF BIM REQUIREMENTS THROUGHOUT A WHOLE LIFE CYCLE OF A PROJECT." Asia Proceedings of Social Sciences 4, no. 1 (April 18, 2019): 164–67. http://dx.doi.org/10.31580/apss.v4i1.682.
Full textCajade Sánchez, Delmiro, and Patricia del Solar Serrano. "Integration of the BIM execution plan with the guide to the project management body of knowledge (PMBOK®) of PMI (Project Management Institute) = Integración del plan de ejecución BIM con la guía para la dirección de proyectos (PMBOK®) de PMI (Project Management Institute)." Building & Management 2, no. 3 (January 10, 2019): 24. http://dx.doi.org/10.20868/bma.2018.3.3839.
Full textPopov, Vladimir, Milena Medineckienė, Tatjana Grigorjeva, and Arūnas Remigijus Zabulėnas. "BUILDING INFORMATION MODELLING: PROCUREMENT PROCEDURE." Journal Business, Management and Economics Engineering 19, no. 01 (June 29, 2021): 180–97. http://dx.doi.org/10.3846/bmee.2021.14653.
Full textLeonovich, S. N., and J. Riachi. "3D-Modeling for Life Cycle of the Structure." Science & Technique 20, no. 1 (February 5, 2021): 5–9. http://dx.doi.org/10.21122/2227-1031-2021-20-1-5-9.
Full textHe, Wei, Wenjing Li, and Wei Wang. "Developing a Resource Allocation Approach for Resource-Constrained Construction Operation under Multi-Objective Operation." Sustainability 13, no. 13 (June 30, 2021): 7318. http://dx.doi.org/10.3390/su13137318.
Full textRam, Jiwat, Numan Khan Afridi, and Khawar Ahmed Khan. "Adoption of Big Data analytics in construction: development of a conceptual model." Built Environment Project and Asset Management 9, no. 4 (September 9, 2019): 564–79. http://dx.doi.org/10.1108/bepam-05-2018-0077.
Full textHrdina, Otmar, and Petr Matějka. "BIM EXECUTION PLAN IN CZECH REPUBLIC." Business & IT VI, no. 2 (2016): 17–23. http://dx.doi.org/10.14311/bit.2016.02.03.
Full textPruskova, Kristyna, and Jiri Kaiser. "Implementation of BIM Technology into the Design Process Using the Scheme of BIM Execution Plan." IOP Conference Series: Materials Science and Engineering 471 (February 23, 2019): 022019. http://dx.doi.org/10.1088/1757-899x/471/2/022019.
Full textLin, Yu-Cheng, Yen-Pei Chen, Wan-Ting Huang, and Chia-Chun Hong. "Development of BIM Execution Plan for BIM Model Management during the Pre-Operation Phase: A Case Study." Buildings 6, no. 1 (February 17, 2016): 8. http://dx.doi.org/10.3390/buildings6010008.
Full textJo, Yong-Hyun, Joo-Sung Lee, Nam-Hyuk Ham, and Jae-Jun Kim. "Bim Strategy Plan through Domestic Construction Companies BIM Project Case Analysis - focused on the BIM USE of the project from 2009 to 2015 -." Journal of KIBIM 6, no. 2 (June 30, 2016): 1–11. http://dx.doi.org/10.13161/kibim.2016.6.2.001.
Full textHuang, Xin Xing, and Zhan She Yang. "Project Executive Ability Research under Lean Construction." Applied Mechanics and Materials 174-177 (May 2012): 2806–10. http://dx.doi.org/10.4028/www.scientific.net/amm.174-177.2806.
Full textJin, Ruoyu, Tong Yang, Poorang Piroozfar, Byung-Gyoo Kang, Dariusz Wanatowski, Craig Matthew Hancock, and Llewellyn Tang. "Project-based pedagogy in interdisciplinary building design adopting BIM." Engineering, Construction and Architectural Management 25, no. 10 (November 19, 2018): 1376–97. http://dx.doi.org/10.1108/ecam-07-2017-0119.
Full textSchranz, Christian, Harald Urban, and Alexander Gerger. "Potentials of Augmented Reality in a BIM based building submission process." Journal of Information Technology in Construction 26 (July 26, 2021): 441–57. http://dx.doi.org/10.36680/j.itcon.2021.024.
Full textUstinovičius, Leonas, Arūnas Puzinas, Jovita Starynina, Mantas Vaišnoras, Oksana Černiavskaja, and Robertas Kontrimovičius. "Challenges of BIM technology application in project planning." Engineering Management in Production and Services 10, no. 2 (June 1, 2018): 15–28. http://dx.doi.org/10.2478/emj-2018-0008.
Full textVereshchagin, V. V., and T. Yu Shemyakina. "Risk Management in the Context of Information Modeling Technologies for Construction Objects: Features and Opportunities." Issues of Risk Analysis 17, no. 3 (June 30, 2020): 56–65. http://dx.doi.org/10.32686/1812-5220-2020-17-3-56-65.
Full textKoseoglu, Ozan, and Elif Tugce Nurtan-Gunes. "Mobile BIM implementation and lean interaction on construction site." Engineering, Construction and Architectural Management 25, no. 10 (November 19, 2018): 1298–321. http://dx.doi.org/10.1108/ecam-08-2017-0188.
Full textSubramani, T., and A. Ammai. "Maturing Construction Management Up The Bim Model & Scheduling Using Primavera." International Journal of Engineering & Technology 7, no. 3.10 (July 15, 2018): 1. http://dx.doi.org/10.14419/ijet.v7i3.10.15617.
Full textCui, Yan, and Yingyu Tai. "Application of BIM technology in the construction of ChangKe 6# building." E3S Web of Conferences 165 (2020): 04028. http://dx.doi.org/10.1051/e3sconf/202016504028.
Full textHaider, Usman, Usama Khan, Asif Nazir, and Muhammad Humayon. "Cost Comparison of a Building Project by Manual and BIM." Civil Engineering Journal 6, no. 1 (January 1, 2020): 34–49. http://dx.doi.org/10.28991/cej-2020-03091451.
Full textHarsritanto, Bangun IR, Gentina Pratama Putra, and Rona Fika Jamila. "BRIEF OF BUILDING INFORMATION MODELLING FOR INDONESIAN ARCHITECTURE." MODUL 19, no. 1 (May 29, 2019): 15. http://dx.doi.org/10.14710/mdl.19.1.2019.15-18.
Full textPatil, Omkar, and Umesh Deshpande. "A Review On Advanced Applications of BIM in Construction Field." International Journal of Research in Engineering, Science and Management 3, no. 10 (October 24, 2020): 127–31. http://dx.doi.org/10.47607/ijresm.2020.350.
Full textKoseoglu, Ozan, Basak Keskin, and Beliz Ozorhon. "Challenges and Enablers in BIM-Enabled Digital Transformation in Mega Projects: The Istanbul New Airport Project Case Study." Buildings 9, no. 5 (May 7, 2019): 115. http://dx.doi.org/10.3390/buildings9050115.
Full textCimitile, A., and G. Visaggio. "Managing Software Projects by Structured Project Planning." International Journal of Software Engineering and Knowledge Engineering 07, no. 04 (December 1997): 553–84. http://dx.doi.org/10.1142/s0218194097000308.
Full textChipman, Nick, and Rob Gray. "Oil and gas investment decision making—what's at risk?" APPEA Journal 52, no. 2 (2012): 679. http://dx.doi.org/10.1071/aj11093.
Full textBelay, Solomon, James Goedert, Asregedew Woldesenbet, Saeed Rokooei, José Matos, and Hélder Sousa. "Key BIM Adoption Drivers to Improve Performance of Infrastructure Projects in the Ethiopian Construction Sector: A Structural Equation Modeling Approach." Advances in Civil Engineering 2021 (September 23, 2021): 1–12. http://dx.doi.org/10.1155/2021/7473176.
Full textHamooni, Morteza, Mojtaba Maghrebi, Javad Majrouhi Sardroud, and Sungjin Kim. "Extending BIM Interoperability for Real-Time Concrete Formwork Process Monitoring." Applied Sciences 10, no. 3 (February 6, 2020): 1085. http://dx.doi.org/10.3390/app10031085.
Full textVincent, Deborah, Samson Ojo, and Hyginus Omeje. "Assessing the Utilization of Building Information Modelling Software for Project Planning in Construction Industries in Ondo State." Journal of Advanced Research in Economics and Administrative Sciences 1, no. 2 (November 8, 2020): 134–40. http://dx.doi.org/10.47631/jareas.v1i2.108.
Full textWhitlock, Kane, Fonbeyin Henry Abanda, Marcelline Blanche Manjia, Chrispin Pettang, and George Elambo Nkeng. "4D BIM for Construction Logistics Management." CivilEng 2, no. 2 (April 16, 2021): 325–48. http://dx.doi.org/10.3390/civileng2020018.
Full textMa, Guofeng, and Xiaoye Liu. "Model and Algorithm for Dependent Activity Schedule Optimization Combining with BIM." Advances in Civil Engineering 2020 (August 30, 2020): 1–14. http://dx.doi.org/10.1155/2020/9727256.
Full textCerezo-Narváez, Alberto, Andrés Pastor-Fernández, Manuel Otero-Mateo, and Pablo Ballesteros-Pérez. "Integration of Cost and Work Breakdown Structures in the Management of Construction Projects." Applied Sciences 10, no. 4 (February 19, 2020): 1386. http://dx.doi.org/10.3390/app10041386.
Full textSbiti, Maroua, Karim Beddiar, Djaoued Beladjine, Romuald Perrault, and Bélahcène Mazari. "Toward BIM and LPS Data Integration for Lean Site Project Management: A State-of-the-Art Review and Recommendations." Buildings 11, no. 5 (May 7, 2021): 196. http://dx.doi.org/10.3390/buildings11050196.
Full textKarampour, Behzad, Sherif Mohamed, Hassan Karampour, and Sonia Lupica Spagnolo. "Formulating a Strategic Plan for BIM Diffusion within the AEC Italian Industry: The Application of Diffusion of Innovation Theory." Journal of Construction in Developing Countries 26, no. 1 (July 30, 2021): 161–84. http://dx.doi.org/10.21315/jcdc2021.26.1.8.
Full textSahare, Janhvi A. "Planning and Scheduling of Nagpur Metro Project using Smart-sheet tool." International Journal for Research in Applied Science and Engineering Technology 9, no. 8 (August 31, 2021): 1032–35. http://dx.doi.org/10.22214/ijraset.2021.37525.
Full textMosley Jr, John C., and Abdulaziz A. Bubshait. "Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia." Engineering, Construction and Architectural Management 24, no. 6 (November 20, 2017): 1004–17. http://dx.doi.org/10.1108/ecam-02-2016-0055.
Full textIbrahim, Mwafaq, and Dhuha Al-kazzaz. "Utilizing BIM 4D in Improving Project Execution Scheduling A Realistic Project for the Mosul Municipality as a Case Study." Al-Rafidain Engineering Journal (AREJ) 26, no. 1 (January 1, 2021): 1–18. http://dx.doi.org/10.33899/rengj.2021.128695.1068.
Full textKonior, J. "Significance Risks Evaluation of Commercial Construction Projects." Archives of Civil Engineering 65, no. 2 (June 1, 2019): 19–33. http://dx.doi.org/10.2478/ace-2019-0016.
Full textKehily, Dermot, Trevor Woods, and Fiacra McDonnell. "Linking Effective Whole Life Cycle Cost Data Requirements to Parametric Building Information Models Using BIM Technologies." International Journal of 3-D Information Modeling 2, no. 4 (October 2013): 1–11. http://dx.doi.org/10.4018/ij3dim.2013100101.
Full textAndújar-Montoya, María Dolores, Antonio Galiano-Garrigós, Víctor Echarri-Iribarren, and Carlos Rizo-Maestre. "BIM-LEAN as a Methodology to Save Execution Costs in Building Construction—An Experience under the Spanish Framework." Applied Sciences 10, no. 6 (March 11, 2020): 1913. http://dx.doi.org/10.3390/app10061913.
Full textTakim, Roshana, Muhammad Hanafi Zulkifli, and Abdul Hadi Nawawi. "The Integration of ASRC System within BIM." Asian Journal of Quality of Life 3, no. 10 (March 18, 2018): 169. http://dx.doi.org/10.21834/ajqol.v3i10.113.
Full text