To see the other types of publications on this topic, follow the link: BIM.

Dissertations / Theses on the topic 'BIM'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 dissertations / theses for your research on the topic 'BIM.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Lindén, Anna, and Peter Dehlin. "BIM i planeringsarbetet : Effective planning by using BIM." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-19131.

Full text
Abstract:
Abstract The importance of good construction planning affects the final costs of the production and the timing of the project. Planning for building projects has been studied with the aim of identifying how three week planning appears in the construction industry today. A case study has been conducted in Navisworks Simulate to assess whether the software is suitable to connect the task schedule with the BIM model to create a 4D model. 4D models are used for performing 4D construction simulation to visualize the project. In order to use the benefits of the model, investment in equipment and software is required. This means higher costs for the companies. Therefore inexpensive software is needed so that it will be profitable to use 4D models even in the production of small projects. The survey which aims to identify planning in the construction industry shows that planning varies between the different sectors, but also that planning technique depends on the knowledge of those who actually carry out the planning. The conclusion is that education in planning techniques and computer aided planning tools is needed to implement BIM in the planning process. With a detailed schedule and a BIM model which is adjusted to the construction of the building, Navisworks Simulate is a suitable program to use in the creation of Building Information Models. When using Navisworks Simulate to create a 4D model, the natural choice would be Navisworks Freedom software for visualization of the project in the production. This is because the Navisworks creates its own file format, which can only be opened in software created by Autodesk. This study was aimed to improve three week planning and increase the use of assimilating feedback by using BIM in the construction industry. The conclusion is that the choice of software for the creation of a 4D model affects the application that later can be used for visualization.
Sammanfattning Vikten av god produktionsplanering ligger till grund för dels den ekonomiska produktionskostnaden, dels tidsaspekten i projektet. Som bakgrund till rapporten har planering i byggproduktionen studerats med syftet att kartlägga hur treveckorsplaneringen ser ut inom bygg- och anläggningsbranschen i dagsläget. En fallstudie har genomförts i Navisworks Simulate för att undersöka om programvaran lämpar sig att sammankoppla treveckorsplanering med BIM-modell för att skapa en 4D-modell. 4D-modellen används för att på ett tydligt vis visualisera arbetet i projektet. För att utnyttja modellen krävs investeringar i utrustning och programvaror vilket innebär dyra kostnader för företagen. För visualisering av projektet eftersträvas därför en programvara till låg kostnad så att det ska bli lönsamt att använda 4D-modellen i produktionen även på mindre projekt. Den utredning som genomförts med syftet att kartlägga planeringsarbetet inom bygg- och anläggningsbranschen visar att planeringsarbetet varierar dels mellan bygg- och anläggningsprojekt men även att planeringsteknik beror på kunskapssnivå hos den som ska genomföra planeringsarbetet. Slutsatsen är att utbildning i planeringsteknik och datorstödda planeringsverktyg behövs för att kunna implementera BIM i planeringsarbetet. Med en detaljerad tidsplanering och produktionsanpassad projektering är Navisworks Simulate ett utmärkt program att använda vid skapandet av BIM-modeller. Vid användandet av Navisworks Simulate för skapande av 4D-modellen är Navisworks Freedom det naturliga valet av program för visualisering ute på arbetsplatsen i produktionen. Detta beror på att Navisworks skapar sitt eget filformat, vilket endast går att öppna i programvaror från Autodesk. Slutsatsen blir att valet av programvara för skapandet av en 4D-modell påverkar vilka program som senare kan användas för visualisering. Examensrapporten syftar till att förbättra treveckorsplaneringen, samt att öka utnyttjandet av erfarenhetsåterföringen inom produktionen genom användande av CAD-samordning och BIM.
APA, Harvard, Vancouver, ISO, and other styles
2

AL-Hindi, Rafah, and Yousef Yousef. "BIM Byggnadsinformationsmodellering BIM-användning hos de olika aktörerna." Thesis, Örebro universitet, Institutionen för naturvetenskap och teknik, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:oru:diva-61162.

Full text
Abstract:
Clarus arkitekter som projekteringsföretag får ofta beställningar från entreprenörer och beställare där de efterfrågar en BIM-modell. I de flesta fallen så används inte BIM modellen helt utan man tar fram 3D-ritningar eller 2D-ritningar. Då ställs frågan “Har beställaren/entreprenören rätt uppfattning om vad BIM är?” Olika aktörer har olika riktlinjer och krav som projektören ska följa. Frågan som arbetet kommer svara på är “hur ska konsulten göra för att på bästa sätt kunna erbjuda rätt tjänst samt mot vilka mål ska konsulten jobba.” Syftet med den här fallstudien är att ta reda på hur BIM användningen skulle kunna underlätta arbetet samt kommunikationen mellan de olika aktörerna som är inblandade i ett byggprojekt. Att undersöka hur kompetensnivån ligger till hos Beställare, Entreprenör och projektörer/arkitekter och svara på frågan “Vad ligger bakom kompetensskillnaden som finns?” Arbetet inleddes med litteraturstudier för insamling och sammanställning av information. Frågor kommer att ställas upp för att senare kunna användas under intervjuerna med olika personer från olika företag. Intervjuerna kommer att ske med bland annat med individer från konsult-, entreprenör- och beställare företag. Intresset att använda BIM är stort i branschen men tyvärr så finns det stor kompetensbrist. Beställare och entreprenörer har planer att börja använda sig av BIM mer vilket kommer att ske de kommande åren, men i nuläget så vill man inte ta nya risker och föredrar att använda sig av traditionella metoder som är mer säkra. För att man skulle kunna tillämpa BIM mer i byggbranschen så behövs det mer kunskap.
Clarus Arkitekter as design companies often receive orders from contractors and clients asking for a BIM model. In most cases, the BIM model is not fully used, but 3D drawings or 2D drawings are available. Then asks the question "Does the client / contractor have the correct understanding of what BIM is?" Different players have different guidelines and requirements that the projector should follow, which can be perceived as defective by the projector just to know what is demanded from each client. The question the thesis will answer is "How should the consultant do the best to offer the right service and what goals the consultant will do. The purpose of this master thesis is to find out how BIM usage could facilitate the work as well as the communication between the various actors who is involved in a construction project. To investigate how the level of competence lies with the Client, Entrepreneur and Projectors / Architects and answerthe question "what is behind the skill difference that exists?". The work began with literature studies for the collection and compilation of information. Questions will be set up to later use them during interviews with different people from different companies. The interviews will take place with individuals from consultancy, contractor and client company. The interest in using BIM is high in the industry, but unfortunately there is a great deal of skills shortage. Customers and entrepreneurs plan to start using BIM more, which will happen in the coming years, but now, they do not want to take new risks and prefer to use traditional methods that are more secure. To be able to apply BIM more in the construction industry, more knowledge is needed.
APA, Harvard, Vancouver, ISO, and other styles
3

Wikström, David, and Tobias Karlemi. "Varför BIM?" Thesis, Jönköping University, JTH, Civil Engineering, 2008. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-1370.

Full text
Abstract:

Is the new technology always the best? This final project tries to determine if BIM is the melody of today, or if traditional 2D drawing is recommended. Perhaps a compromise is necessary, utilizing both methods.

In order to answer this question, different views from the industry have been retrieved through reports, producers of software and users. The approach has consisted in building a 3D model of the school Råslättsskolan, house 01, along with interviews with people involved in the building process.

When working in 2D it is hard to include the third dimension, mistakes are done and collisions happen that must be corrected, in most cases at the construction site. BIM is an incredible help since the model allows you to detect collisions and correct them. Another time when models are preferred is when you need production plans, for example, different steel details that will be joined together at the work shop before shipping to the construction site.

Skanska and NCC, in densely developed urban areas, already require BIM today, something that most likely will be customary within the nearest future. It is not hard to understand that more and more clients require BIM when you realize its advantages. With the correct method, these 3D models can minimize risks of errors, optimize the production and save money.When it comes to introducing BIM today at BGK the students can’t do anything but make a recommendation. The improved quality, the future prospect and that the advantages of BIM is not depending by project size will make it attractive for BGK to begin a transition already today. BIM is the melody of the future, not the only song being sung, but clearly the strongest one.

APA, Harvard, Vancouver, ISO, and other styles
4

Knutsen, Erik. "BIM-Koordinering." Thesis, Norges teknisk-naturvitenskapelige universitet, Institutt for bygg, anlegg og transport, 2014. http://urn.kb.se/resolve?urn=urn:nbn:no:ntnu:diva-25557.

Full text
Abstract:
BIM handler om mer enn kun 3D-modeller. Det handler også om mennesker og prosesser. Innføring av BIM endrer prosessene og krever nye kunnskaper av menneskene i prosjektorganisasjonen. Implementering av BIM har ført til nye begreper som BIM-koordinering og BIM-koordinator. Formålet med denne oppgaven er å gå dypere inn i hva BIM-koordinering som funksjon er og hvordan BIM-koordinering håndteres på best mulig måte i prosjekter, samt om det er en sammenheng mellom hvordan BIM-koordinering håndteres og type prosjekt. Oppgaven har sett på hva BIM-koordinering er i administrerende prosesser, hvor BIM-koordinering handler om å koordinere og lage en BIM-plan som definerer målet med BIM, strukturen til modellen og hvem som skal gjøre hva og når. I prosjekteringsprosessen handler det om å koordinere de prosjekterende til å levere etter- og følge BIM-planen med riktig struktur og til riktig tid. Det handler også om å sammenstille modeller, kontrollere dem og koordinere og løse konflikter fra kollisjonskontroller. Siste prosess oppgaven har tatt for seg er produksjonsprosessen. I den prosessen handler BIM-koordinering i stor gran om å tilrettelegge for de utførende slik at de kan ta i bruk BIM. BIM-modellene må også her sammenstiller og kontrolleres, samt koordinering slik at as built modellen blir riktig. På hvilken BIM-koordinering bør håndteres kan grovt sett deles inn i to metoder. Enten opprette en egendefinert BIM-koordinatorrolle til å ivareta BIM-koordinering eller at funksjonen fordeles på de eksisterende rollene hvor prosjektorganisasjonen kan få støtte av en sentral BIM-koordinator i kortere perioder. Oppgaven ser det som mest hensiktsmessig at prosjekteringslederen har hovedansvaret med støtte fra andre roller og en sentral BIM-koordinator da det er mulig og prosjektorganisasjonen har tilstrekkelig kunnskap og kapasiteten. Behov til prosjektorganisasjonens kunnskapsnivå avhenger av målet med modellen med nivå på BIM-anvendelse, nivå på detaljeringsgrad samt størrelse og kompleksitet til prosjektet. Er det et for stort «kunnskapsgap» mellom prosjektorganisasjonen og målet med modellen og type prosjekt, kan det være nødvendig og mest hensiktsmessig å opprette en egendefinert BIM-koordinatorrolle. Fordelen ved å fordele BIM-koordineringsfunksjonen på eksisterende roller er tilsynelatende bedre læring, kompetanseutvikling, implementering/integrering av BIM samt mindre grensesnittproblematikk.
APA, Harvard, Vancouver, ISO, and other styles
5

Prejner, Magnus. "BIM Undersökning : Undersökning av kompetens och erfarenhet för BIM." Thesis, Umeå universitet, Institutionen för tillämpad fysik och elektronik, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-136112.

Full text
Abstract:
BIM är ett steg i rätt riktning för att klara av den höga produktionstakten som krävs för populationsökningen i Sverige samt den rådande bostadsbristen. Det är viktigt att alla små och medelstora byggföretag hänger med på den omfattande digitaliseringen som sker av byggsektorn för att kunna fortsätta vara konkurrenskraftiga i både Sverige och Europa. Increase Competence in Northern Building är ett projekt som startat för att se till att små och medelstora företag i Norden fortsätter att vara konkurrenskraftiga i Europa. ICNB är ett interregnord projekt tillsammans med Norge och Finland.   Building Information Modeling avser processer att hantera information gällande en byggnads hela livscykel eller delar av den. Det finns en mängd fördelar med att använda BIM. Det är även en av de största faktorerna till att det är viktigt att hänga med i digitaliseringen för att fortsätta vara konkurrenskraftiga i Europa. Genom intervjustudie med olika branschorganisationer och ett par företag tillhörande respektive branschgren ska kompetens och erfarenhet för BIM undersökas.   Resultatet visar att företagen är eniga i de positiva aspekterna av BIM-användning. Fokuset på kompetensutbildningar varierar mellan konsultföretagen och NCC, där det huvudsakliga syftet med utbildningarna är den största skillnaden mellan dem. Konsultföretagen och NCC utbildar rent praktiskt men NCC jobbar även med att utveckla tankesättet och förståelsen för BIM.
Building Information Modeling is a step in the right path to be able to handle the production rate that is needed for the increase in population in Sweden and handle the current housing shortage. It is important that the small and medium sized enterprises follow the extensive digitization which is happening to the construction sector, and it is also essential to keep being competitive in both Sweden and Europe. Increase Competence in Northern Building is a project which started to make sure the small and medium sized enterprises from the Nordic countries keep being competitive in Europe. ICNB is an interregional project together with Norway and Finland.   Building Information Modeling refers to the process of handling information regarding a buildings whole life cycle or parts of it. There are plenty of benefits from using BIM, and it is also one of the biggest reasons that it is important to follow this digitization to keep being competitive in Europe. Through interviews with different trade organizations and a couple of companies from each industry branch will competence and experience for BIM be investigated.   The results show that the companies agree on the positive aspects with usage of BIM. It varies a lot between NCC and the consulting companies what focus the educations have, where the main purpose with the educations is the biggest difference between them. The consulting companies educate purely to be able to use the software practically, where NCC also works with developing the mind-set and understanding for BIM.
APA, Harvard, Vancouver, ISO, and other styles
6

A, Taher Ali. "BIM Software Capability and Interoperability Analysis : An analytical approach toward structural usage of BIM software (S-BIM)." Thesis, KTH, Byggnadsteknik, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-184856.

Full text
Abstract:
This study focused on the structuralanalysis of BIM models. Different commercial software (Autodesk products and Rhinoceros)are presented through modelling and analysis of different structures with varying complexity,section properties, geometry, and material. Beside the commercial software, differentarchitectural and different tools for structural analysis are evaluated (dynamo, grasshopper,add-on tool, direct link, indirect link via IFC).
BIM and Structural BIM (S-BIM)
APA, Harvard, Vancouver, ISO, and other styles
7

Herrera, Erik. "Byggnadsinformationsmodellering (BIM) - Användning under byggprocessen : Möjligheter och hinder med BIM." Thesis, Mälardalens högskola, Akademin för ekonomi, samhälle och teknik, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-30924.

Full text
Abstract:
ABSTRACT The construction industry represents one of the largest and most important industries in Sweden with a large throughput per year. Problems often arise in construction projects which lead to unnecessary construction costs, material costs and waste of time. A solution to those problems can be BIM-Building Information Modeling. BIM is a collective concept of how information is created, stored and used in different stages using a BIM 3D-model. The information should contain important data like height, volume, area, pressure etc. and be digital, measurable and available throughout the whole construction process.    The purpose of this study is to explore how BIM can make the construction industry more efficient regarding construction costs and time and to obtain a comprehensive view of BIM concept and functions during the construction process. The theoretical part includes benefits and disadvantages of BIM during the project planning, production and management stages. The implementation part describes the background of several of the interviewed actors and the implementation of a BIM-model in the program Autodesk Revit. The results are mainly based on interviews of different actors from project planning, production and management stages, but also from a BIM-model of a simple component. The interview result is a summary and reports the features and benefits of the use of BIM.  Former research in one residential shows that BIM perhaps give a saving in 5.15% of the costs. In conclusion BIM represents many advantages that will change and improve the construction process including time saving and less costs. BIM will be the leading approach in the construction industry with more education and better adapted software.
APA, Harvard, Vancouver, ISO, and other styles
8

Österblom, Fredrik, and Andreas Thunell. "BIM: KOMMUNIKATION MELLAN PROJEKTERING OCH PRODUKTION : - Hur BIM effektiviserar informationsflödet." Thesis, KTH, Byggteknik och design, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-192687.

Full text
Abstract:
Denna rapport syftar till att bistå projekterings- och produktionspersonal med effektiviserande verktyg och metoder för att med BIM som bas öka och förenkla informationsutbytet. NCC använder idag BIM-metoder för projektering av projekt, däremot nyttjas inte BIM-metodernas fulla potential för samarbetet mellan disciplinerna i projekten.   För att undersöka behovet inom produktionen hölls intervjuer med personal från ett brett spektrum av åldrar och befattningar. Intervjuerna låg sedan till grund för kriterier till utvärdering av BIM-verktyg. Intervjuerna hölls även med personal med befattningar som projekteringsledare, modellsamordnare och konstruktör, för att med deras kunskaper utvärdera BIM-verktyg.   För att på ett verklighetsförankrat vis utvärdera digitala verktyg i form av BIM-verktyg modellerades ett hus i Tekla Structures 21.1 och Revit 2015. Även A- och K-modellerna för NCCs projekt Trollhättan 33, T33 fanns att tillgå för tester.   Från utvärderingarna utkristalliserades två program som författarna anser vara bäst i respektive stadium av byggprocessen i det studerade projektet, T33. Solibri Model Checker, SMC anses som bäst lämpat verktyg i projekteringsskedet och Trimble Connect anses bäst under produktionsskedet. Solibri Model Checker har bäst möjligheter för validering och kvalitetskontroller och Trimble Connect är ett verktyg där modeller och handlingar kan lagras för enkel kommunikation och samarbete i projektgrupper. Verktyget har även möjlighet att visuellt presentera modeller och handlingar på en dator, surfplatta eller mobiltelefon. De BIM-verktyg som utvärderades var: Solibri Model Checker v9.6 Autodesk Navisworks Manage 2016 Autodesk BIM 360 Glue Trimble Tekla BIMsight Trimble Connect
The purpose of this report is to enable project management and construction personnel to use BIM tools and methods more efficiently. Although NCC is currently using some functionality of such digital tools, NCC is not using the full tool suite to better manage their projects, specifically to leverage the cross discipline collaboration capabilities.   In order to gather a comprehensive view of construction personnel requirements, interviews were conducted across a varied and wide range of age, seniority, and job position. These interviews formed the basis for the evaluation criteria of the BIM tools. Additional interviews were held with other staff, including project leads, model coordinators and construction engineers to ensure their knowledge was incorporated into the evaluation.   To compliment the interviews, and further evaluate the digital tools for cross collaboration capabilities a house was modeled in Tekla Structures and Revit. Also the architectural and construction models of NCC project Trollhättan 33, T33, was available for testing.   Two programs emerged as ‘best in class’ post the assessment, differentiated primarily by which phase of the construction lifecycle they were used for. Solibri Model Checker, SMC was considered most suitable tool in the project management phase and Trimble Connect considered best during the construction phase. SMC is suited for validation and quality control and Trimble Connect is a tool, in which models and documents can be stored for easy collaboration in project teams as well as visualizing models, which are easily shared via computer, tablet or mobile phone. The following BIM tools were tested: Solibri Model Checker v9.6 Navisworks Manage 2016 Autodesk BIM 360 Glue Trimble Tekla BIMsight Trimble Connect
APA, Harvard, Vancouver, ISO, and other styles
9

Thunell, Andreas, and Fredrik Österblom. "BIM: KOMMUNIKATION MELLAN PROJEKTERING OCH PRODUKTION : Hur BIM effektiviserar informationsflödet." Thesis, KTH, Byggteknik och design, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-192901.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Gustafsson, Sofie, and Ted Mårtensson. "BIM - Förvaltarens Framtid." Thesis, Halmstad University, School of Business and Engineering (SET), 2010. http://urn.kb.se/resolve?urn=urn:nbn:se:hh:diva-5014.

Full text
Abstract:

For nearly twenty years people have been talking about Product models, but given that the building industry is so conservative, it is hard to implement new working methods. Product models are these days known as Building Information Modeling, BIM. People often say they work with BIM but they often forget the most important part, the information. A 3D model should be linked with characteristics and information. Information that can be invaluable for the facility manager.

We have a vision that in the best of worlds the facility manager would be able to "walk" into the model and see what kind of installations are inside the wall or in the roof. You should be able to point at an object and gain complete information about operation and maintenance off the installation. You should also be able to gain information such as the name of the product and article number if you have to buy a new one. That’s why in our thesis we want to highlight the possibilities for the facility manager.

In order to have high achievements with BIM, coordination is highly needed. All participants in the construction process have to work together at an early stage; they must have the possibility to affect the stage of inquiry. By having the facility manager connected to the process at an early stage, other members have the opportunity to understand what’s expected from them. In the same way the facility manager will understand if any of the requirements are unreasonable or difficult to solve. Planning must be allowed to cost money. A well planned project can later save a lot of money due to less problems at the building worksite. In a well planned project there will be less changes and less additional work. The key words are Coordination and review.

During the facility management stage there are great opportunities to save money with BIM. The benefits of BIM have been shown and larger facility companies demand a model that work in the facility management stage. The greatest advantages are gained by the visual model that gives a greater understanding and a better base for decisions. There are also great advantages in more effective processes, better quality and better documentation for maintenance, operation, future rebuilding and future sale.

To be able to get a good image of BIM, how it is used today and what expectations there are, we have interviewed facility managers, system manager and BIM experts. We have also researched information in reports and articles.


I snart 20 år har man pratat om Produktmodeller men i byggbranschen är det svårt att införa nya arbetsmetoder. Produktmodeller har senare fått namnet Building Information Modeling eller Byggnadsinformationsmodeller på svenska, fortsättningsvis kallat BIM. Många säger idag att de BIM:ar när de gör 3D modeller men de glömmer ofta den viktigaste delen, informationen. Till 3D modellen kan egenskaper och information kopplas till varje objekt. Information som sedan kan vara ovärderlig för förvaltaren.

Vi har en vision av att i de bästa av världar skall förvaltaren kunna ”gå” in i modellen och se vad för installationer som finns i t.ex. väggar och ovanför takplattor. Dessutom ska man bara kunna peka på  ett don och få all information om det vad gäller drift och underhåll samt produktnamn och artikelnummer för att köpa ett nytt. Därför försöker vi i examensarbetet lyfta fram förvaltaren och fördelarna för denne.

För att få ut det bästa med BIM krävs samordning. De olika aktörerna i processen måste börja arbeta tillsammans i ett tidigt stadium, d.v.s. vara med och påverka redan i utredningsstadiet. Kan man ha med förvaltningen redan i utredningen får övriga aktörer en bättre förståelse för vad som förväntas av dem. Samtidigt kan förvaltningen tidigt få veta om några krav är orimliga eller svårlösta.Projektering måste få kosta. Ett väl projekterat projekt kan senare spara massor med pengar på att inga problem behöver lösas på byggarbetsplatsen. I väl projekterade projekt minskar ÄTA-arbeten och kollisioner. Nyckelorden för detta är Samordning och Samgranskning.

I förvaltningsskedet finns det stora utsikter att spara kostnader med hjälp av BIM, fördelarna har börjat visa sig och en del större förvaltare har börjat ställa krav på en produktmodell som går vidare in i förvaltningsskedet. De största fördelarna är bl.a. visualiseringen som ger en bättre förståelse och ett bättre underlag för beslut, effektiviseringen som spar både tid och material, kvalitetshöjning och bättre dokumentation för underhåll, drift, uthyrning, framtida ombyggnad och framtida försäljning.

För att skapa oss en bild om BIM, hur det används idag och vilka förväntningar som finns branschen, har vi intervjuat förvaltare, systemansvariga och BIM-experter. Vi har även sökt information i rapporter och tidsskrifter.

APA, Harvard, Vancouver, ISO, and other styles
11

Louise, Kollberg. "BIM vid installationsprojektering." Thesis, Linköping University, Department of Science and Technology, 2009. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-19379.

Full text
APA, Harvard, Vancouver, ISO, and other styles
12

Shamloo, Ruzbeh, and Bijan Mobaraki. "BIM förändrar produktionen." Thesis, KTH, Byggteknik och design, 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-49196.

Full text
Abstract:
Because society’s demand for quality, efficiency at low cost is constantly increasing, companies are increasingly choosing to invest new methods to achieve these points. Those who manage to find ways to improve their processes are often the companies that have the greatest chance of becoming a winning player in the market. BIM is a new method that can reduce the internal costs while increasing communications between different parties. However there is disagreement about what BIM is and its purpose. BIM is a new concept in the construction industry and is defined as a collection of programs with different devices used in the design, production and finally in the management. That includes object oriented models that contains information about the building during the construction process. The purpose of this work is to find reasons why BIM is used to a limited extent, and explaining what is required for expanded use in the production. The result is based on interviews with different productions companies but also literatures. The conclusion we reached is that BIM improves the work processes in the industry. Like all new technologies and changes BIM is facing resistance for various reasons. Some of them are maybe because of the lack of knowledge, fear of changes and confusion about the technology.
I dagens samhälle ökar kraven på kvalité och effektivitet till en låg kostnad ständigt och alltfler företag väljer att satsa på nya metoder för att uppnå dessa punkter. De företag som lyckas hitta metoder som förbättrar deras processer har oftast störst chans att bli en vinnande aktör på marknaden. BIM är en ny metod som kan sänka de interna kostnaderna samtidigt ökar kommunikationen mellan olika parter. Det råder dock skilda meningar om vad syftet med BIM är, samtidigt som det finns flera olika tolkningar av det. BIM är ett nytt begrepp i byggbranschen och definieras som ett samlingsprogram med olika hjälpmedel som används i projektering, produktion och slutligen i förvaltningen. Det innehåller objektorienterade modeller som ska innehålla information om byggnaden under byggprocessen. Syftet med detta arbete är att hitta orsakerna till varför BIM används i en begränsad utsträckning samt redogöra vad som krävs för en utökad användning inom produktionen. Resultatet är baserad på intervjuer av produktionspersonal från olika företag men även litteraturstudier. Slutsatsen vi kommit fram till är att BIM förbättrar arbetsprocesserna i branschen. Precis som all ny teknik och förändringar möter BIM motstånd av olika anledningar. Dessa kan vara bristande kunskap, rädsla för förändringar och oklarheter kring tekniken.
APA, Harvard, Vancouver, ISO, and other styles
13

Eriksson, Michael. "BIM i förvaltningsskedet." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-19875.

Full text
Abstract:
Syftet med den här studien är att förbättra informationsflödet från projektering och produktion in i förvaltningen. Detta för att väcka ett intresse hos förvaltare och för att visa att det finns pengar att spara genom att ta hand om informationen från projekteringen och produktionen. Tidigare studier inom området BIM visar att stor fokus läggs på projektering och produktion men det är ett väldigt litet fokus på förvaltningen när man talar om BIM. Målet är att konkret kunna visa vad informationen är värd och att visa vilken information förvaltare använder och var den finns i byggprocessens skeden före förvaltningen. Rapporten bygger på en litteraturstudie, intervjuer och beräkningar. Förvaltare har blivit tillfrågade vilken information de använder i förvaltningen och sedan har projektör och entreprenör blivit tillfrågad ifall denna information finns att tillgå i projekteringen och produktionen. Värderingen av informationen har sedan gått till på två sätt. Det ena sättet är att bedöma kostnaden av att uppdatera information mot kostnaden att ta fram information på nytt. Det andra sättet är att med hjälp av nyckeltal (kronor per kvadratmeter) och den lista med typ av information som förvaltare använder, som sammanställts från intervjuerna, ta reda på vad information är värd. Det första sättet att värdera visar att det kostar lika mycket att hålla relationsritningar (A) uppdaterade i som minst 18år och i som mest 50år som att ta fram informationen helt på nytt. Nästan samma gäller för BIM-modell med avseende på relationsritningar (A). Fast där är kostnaden för framtagning på nytt lika stor som att hålla den uppdaterad i som minst 22år och i som mest 58år. Det andra sättet att värdera visar att mindre än 25% av den information man kan finna i projekteringen och eller i produktionen är värd cirka 10% av projekteringskostnaden.
The purpose of this study is to improve the flow of information from the design and construction phase into the facility management. This in order to make the facility managers see the advantages with BIM and to show that there is money to be saved by retrieving the information from the design and the construction phase. Earlier studies show that there actually has been quite little research done within BIM in the facility management and that the main focus has been at the design and the construction phase. The aim with the study is to specify the value of the information and to show which information facility managers use and where it can be retrieved from within the earlier phases of the construction process. The report is based on a literature study, interviews and calculations. A number of facility managers have been asked which types of information they use and designers and entrepreneurs have then been asked if these types of information can be found in the design and the construction phase. The information has been valued in two different ways. In one way the information was valued by comparing the cost between updating existing information or recreate the same type of information. The other way of valuing the information was to find out the worth of information by using key figures (SEK per square meter) and the list of information that facility managers use, which was made up from the interviews. The first way of valuing shows that the cost of producing as built drawings (A) in the facility management cost as much as keeping the same type of information updated for at least 18years and as most 50years. Almost the same goes for a BIM-model. Only there the difference is that the cost of producing a BIM-model focused on as built drawings (A) in the facility management cost as much as keeping the same type of information updated for at least 22years and as most 58years. The other way that the information was valued shows that less than 25% of the information that can be found in the design and/or construction phase is worth circa 10% of the projecting fee.
APA, Harvard, Vancouver, ISO, and other styles
14

Olsson, Lovisa, and Henrik Arnäs-Nielsen. "BIM i produktionsskedet." Thesis, Karlstads universitet, Fakulteten för hälsa, natur- och teknikvetenskap (from 2013), 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:kau:diva-28468.

Full text
Abstract:
This thesis treats Building Information Modeling, BIM, in the production stage. Briefly described BIM is virtual model of a building object where all information about the object is gathered. All the involved operators in the construction project have access to the model and can gather or share information about the project. There are several ways to apply BIM in the production stage. This thesis primarily deals with visualization of the object, preparation and planning, the ability to take amounts from the model and coordination and clash control. The basic issue was highlighted by Byggdialog AB. The company has a vision about how they want to use BIM in all the different stages in a building project. Byggdialog want their partnering entrepreneurs to develop their BIM usage in the production stage in order to fulfill this vision. Goodtech is one of Byggdialogs partnering entrepreneurs and is the company that has been studied during this thesis. The goal with this thesis was to develop proposals as to how the BIM usage in the production stage can improve. The purpose was to make the partnering entrepreneurs understand why it is important and helpful to use BIM. The intention was also that other partnering entrepreneurs should be able to use this thesis while working with BIM in the production stage. The methods to collect information have been visits to construction sites, literature search, and interviews. The interviewees represented different operators that can affect the usage of BIM in the production stage. This thesis resulted in concrete proposals as to how the partnering entrepreneur can improve their BIM usage. Proposals as to how Byggdialog can ensure that their entrepreneurs are using BIM correct have also been developed. Today the partnering entrepreneur uses BIM to visualize the building object. As a suggestion the entrepreneur should also use the BIM model while preparing and planning their work and in order to calculate material amounts . It’s important that the entrepreneur understand how the model can be used and what kind of information it contains in order to enable these applications. It’s also important that the design phase is carefully executed. Proposals as to how this can be achieved is to educate the staff in BIM and how it should be used, that the partnering entrepreneur participates in the coordination meetings and that the partnering entrepreneur place greater demands on their electrical consultant. In order for Byggdialog to ensure that their partnering entrepreneurs are using BIM correct they should offer them education about BIM and how it works, make the BIMmodel more user-friendly and place demands on how they want BIM to be used in the project specifications.
Detta examensarbete handlar om byggnadsinformationsmodellering, BIM, i produktionen. Kort förklarat är BIM en virtuell modell av ett byggobjekt, där all information som rör byggnaden samlas. Alla aktörer i ett byggprojekt har tillgång till denna modell och kan, genom denna, samla in eller dela ut information som rör objektet. Det finns olika tillämpningar av BIM i produktionen, denna studie behandlar främst visualisering, arbetsberedning och planering, mängdavtagning och samordning och kollisionskontroller. Grundproblematiken lyftes fram med hjälp av uppdragsgivaren Byggdialog AB. Företaget har en vision om hur BIM ska användas i byggprocessens olika skeden. Byggdialog upplever att deras partneringentreprenörer, PE, bör utveckla sin BIManvändning i produktionen för att denna vision ska kunna uppfyllas. Goodtech är en av Byggdialogs partneringentreprenörer och är det företag som studerats i detta examensarbete. Målet med arbetet var att, med utgångspunkt från teorier samt Byggdialogs vision, ge förslag till hur partneringentreprenören kan utveckla BIM-användningen i produktionen. Syftet var att få partneringentreprenören att förstå nyttan med att använda BIM i produktionsskedet. Avsikten har också varit att andra partneringentreprenörer ska ha nytta av denna studie vid användning av BIM i produktionen. De metoder som användes var studiebesök, litteraturstudie och intervjustudie. Intervjuobjekten representerade olika yrkeskategorier som alla kan påverka användningen av BIM i produktionen. Detta examensarbete resulterade i konkreta förslag till hur partneringentreprenören kan förbättra BIM användningen. Även förslag till hur Byggdialog kan säkerställa att deras PE använder BIM korrekt togs fram. Idag använder partneringentreprenören BIM främst för att visualisera byggobjektet. Förslagsvis bör de även använda BIM vid arbetsberedning/planering av arbetet. Partneringentreprenören har också förutsättningar för mängdavtagning ur modellen. För att möjliggöra dessa tillämpningar är det viktigt att partneringentreprenören förstår hur 3D - modellen kan användas, samt vilken information som finns i den. Det är även viktigt att modellen är noggrant projekterad. Förslag till hur detta kan uppnås är genom att partneringentreprenören utbildar sig inom BIM och hur det används, att de deltar i BIM-samordningsmötena samt att de ställer högre krav på sin elprojektör. Byggdialog kan säkerställa att deras PE använder BIM korrekt genom att erbjuda utbildningstillfällen, anpassa BIM-modellen efter användaren och ställa krav i förfrågningsunderlaget.
APA, Harvard, Vancouver, ISO, and other styles
15

Grong, Lise Kjerringvåg. "BIM i produksjon." Thesis, Norges teknisk-naturvitenskapelige universitet, Institutt for bygg, anlegg og transport, 2013. http://urn.kb.se/resolve?urn=urn:nbn:no:ntnu:diva-21876.

Full text
Abstract:
BIM benyttes tradisjonelt mest i prosjekteringsfasen, men har også et stort potensial i produksjonsfasen. Det hevdes at BIM, kombinert med VDC og god prosjektledelse, kan mer enn halvere byggeprisen. Til tross for dette brukes BIM i begrenset grad i produksjonsfasen. Oppgaven skal svare på hvilke bruksområder BIM har i produksjonsfasen, og hvilke erfaringer, muligheter og barrierer som finnes. Status på utviklingen globalt skal kartlegges, og drivere som påvirker bruken av BIM i produksjon positivt og negativt skal identifiseres. Oppgaven skrives i samarbeid med Veidekke Entreprenør, og informasjonen presenteres dermed i stor grad fra en entreprenørbedrifts synsvinkel. For å svare på forskningsspørsmålene er det utført et litteraturstudium, kvalitative intervjuer og en kvantitativ spørreundersøkelse blant ansatte i Veidekke.De viktigste funnene i rapporten er at BIM har mange og varierte bruksområder i produksjonsfasen, hvor mengdeuttak er et av de viktigste, sammen med kollisjonskontroll. Mange av bruksområdene krever at modellen har tilstrekkelig detaljnivå, og uten dette er det vanskelig å dra nytte av bruk av BIM. BIM i produksjon har flere fordeler, blant annet oppnår man økt forståelse på tvers av fag, og man kan få bedre kvalitet, samt spare tid og penger.Byggebransjen oppfattes gjerne som konservativ, men for at BIM skal bli bedre utnyttet i produksjonsfasen må bransjen blant annet vise vilje til utvikling og heve kunnskapsnivået.Fremtidsutsiktene til BIM i produksjon er positive, og hele 93 % av respondentene i spørreundersøkelsen tror det vil være viktig eller svært viktig om 5 år. Rapporten gir anbefalinger for det videre arbeidet med BIM i produksjon, og det vil blant annet være viktig å øke kunnskapsnivået i organisasjonen, spesielt om bruksområder, muligheter og fordeler.
APA, Harvard, Vancouver, ISO, and other styles
16

Buszman, Angelica, and Caroline Canel. "Materialdokumentation inom BIM." Thesis, KTH, Byggteknik och design, 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-147311.

Full text
Abstract:
Byggbranschen befinner sig mitt i ett paradigmskifte – detta i samband med att BIM kommer att ersätta de traditionella arbetsmetoderna inom byggprocessen. BIM, även kallat objektsbaserad informationshantering, används idag till 3D-projektering, visualisering och samordning. Dock utnyttjas inte BIM till sin fulla potential. Förändringar sker även beträffande miljöaspekter inom byggsektorn. Miljökrav är inte längre enbart lagstadgade, utan kommer även från fastighetsägarna själva. En anledning är den ökade miljömedvetenheten, och att byggbranschen är en viktig aktör för en hållbar utveckling. Genom en byggnadsmiljöcertifiering styrs byggproduktioner mot att bli mer miljöanpassade. Miljöbyggnad är en av de vanligaste certifieringarna i Sverige då den är anpassad efter svenska byggregler. Ett av bedömningskriterierna för Miljöbyggnad är att dokumentera byggprodukter som byggs in i byggnadsverket i en loggbok. Det är byggnadsentreprenören som uppför denna och bär ansvaret för Miljöbyggnadscertifieringen under produktionen. Detta examensarbete utreder hur loggbokshanteringen för miljöcertifieringen Miljöbyggnad kan effektiviseras och optimeras inom ramen för BIM. Det första skedet av examensarbetet ägnades åt identifikation av problem kring arbetet med loggboken genom enkätundersökningar och kompletterande muntliga samtal.  I det andra skedet intervjuades BIM-sakkunniga med syftet att söka praktiskt genomförbara tillämpningar av BIM inom loggbokshanteringsprocessen. Kartläggningen resulterade i ett flertal problematiska områden inom den nuvarande loggbokshanteringen. Denna kan dock effektiviseras genom att byggföretag etablerar en konsekvent arbetsmetodik, definierar loggboksprocessen samt inför erfarenhetsåterföring. Utförda intervjuer resulterade i förslag på möjliga effektiviseringar av loggboken med hjälp av BIM – både en lösning som är tillämpningsbar idag och tre framtida lösningar. Den lösning som fått namnet ”Excellista med GUID” kan tillämpas idag, och effektiviserar loggboksprocessen genom att utnyttja den BIM-modell som tas fram under projekteringsskedet med hjälp av unika kodsträngar. Automatiska mängdavtagningar för byggprodukter är ett exempel på en effektiviserad loggboksprocess. Tre lösningar är tänkbara för framtida materialdokumentation inom BIM: En applikation, integrerade systemplattformar eller företagsgemensam databas. Framtidslösningarna kan effektivisera avsevärt genom en automatiserad loggboksprocess. Loggboken inom BIM-modellen skapar möjlighet till spårbarhet och visualisering. Den eliminerar kostsamma och tidskrävande moment i jämförelse med dagens hantering. Slutsatsen är att byggföretaget ska satsa på en företagsgemensam databas för företagets alla systemplattformar, men framtiden för materialdokumentation inom BIM ligger i en väl integrerad lösning mellan BIM-modellen och ett PLM-system.
The AEC industry is in the midst of a paradigm shift - this in conjunction with BIM replacing traditional working methods within the construction process. BIM, also called object-oriented information management, is currently used for 3D modeling, visualization and coordination. However BIM is not being utilized to its full potential. There are also occurring changes regarding the environmental aspects of construction. Environmental requirements are not only legal, but are now requested by the clients themselves. One reason for these changes is increased environmental awareness and another is the fact that the construction industry has a vital role in sustainable development. Environmental certification of building projects promotes an environmentally friendly production. ‟Miljöbyggnad” is one of the most common certifications in Sweden because it is adapted to the Swedish building regulations. One of the assessment criteria for ‟Miljöbyggnad” is the logbook documentation of all the building materials used. It is the contractor who is responsible for the logbook and for the environmental building certification during the production.                   This thesis investigates how logbook management for environmental certification can be efficient and optimized in the context of BIM. The first stage of the thesis was devoted to the identification of problems related to logbook management. This was done with the use of surveys and complementary interviews. In the second phase BIM experts were interviewed in order to find practical applications for BIM in the log management process. The survey revealed several areas of concern within current logbook management. However these problems can be resolved if construction companies can establish a consistent work methodology, define the logbook procedures and implement experience feedback. Analysis of the interviews resulted in suggestions for possible streamlining of logbook procedures using BIM –one solution which is possible to implement today and three for future use. The solution which has been named "Excel list with GUID" can be applied today. Here, the BIM model generated during the design stage, is used to streamline the logbook process with the help of unique reference numbers. Automatic quantity take off for construction products is an example of a streamlined logbook process. Three solutions are possible for future material documentation in BIM: An application, integrated computing platforms or a company shared database. In the future results can be considerably improved with an automated logbook process. The logbook within the BIM model creates the opportunity for traceability and visualization. It eliminates costly and time-consuming steps in comparison with todays logbook management. The conclusion is that construction companies should invest in a company-wide database for all computing platforms, but the future of material documentation with BIM exists in an integrated solution with the BIM model and a PLM system.
APA, Harvard, Vancouver, ISO, and other styles
17

Jensen, Lene. "BIM og FDV." Thesis, Norges teknisk-naturvitenskapelige universitet, Institutt for konstruksjonsteknikk, 2013. http://urn.kb.se/resolve?urn=urn:nbn:no:ntnu:diva-27221.

Full text
Abstract:
Tradisjonelle arbeidsformer i dagens byggebransje vier lite oppmerksomhet til forvaltning, drift og vedlkehold (FDV) av bygninger. BIM, bygningsinformasjonsmodellering, kan bidra til en ny digital arbeidsprosess, hvor FDV står i sentrum. Resultatet av en slik prosess er en modell, en database, hvor all informasjon om et bygg ligger lagret.LYDIA er FDV-programvare, utviklet og levert av Lydia AS. De ønsker å videreutvikle LYDIA i retning BIM, og se på hvordan sammenhengen BIM-LYDIA kan utføres i praksis. Lydia AS opplever i dag størst utfordringer ved import av informasjon til LYDIA-databasen. Kundene samler manuelt inn store mengder informasjon til databasen. Erfaringer viser at endel kunder strever med å forstå bruksnytten av LYDIA.Systemarkitekturen presentert i oppgaven løser Lydia AS sine forutsetninger for overgangen BIM-LYDIA. Funksjonaliteten i LYDIA er opprettholdt. buildingSMART sitt standardiserte filformat, IFC, er brukt som utgangspunkt for overføring av informasjon. Løsningen er realiserbar innen andre kvartal 2014. Modellen forenkler dagens importarbeid. Lydia AS sine kunder slipper manuell dataregistrering som øker risikoen for feil. Ved import direkte fra BIM forenkler man prosessen med å hente informasjon til LYDIA-databasen. Modellen bygger likevel ikke oppunder en ny samarbeidsprosess. Digitale arbeidsformer kan endre de tradisjonelle arbeidsformene i byggebransjen. Utgangspunktet for slike arbeidsprosesser er større tillit og mer fokus på samskaping. Lydia AS må selv tenke gjennom hvilken retning de ønsker å ta for fremtidige LYDIA.
APA, Harvard, Vancouver, ISO, and other styles
18

Larsson, Kristoffer. "Planering med BIM." Thesis, Umeå universitet, Institutionen för tillämpad fysik och elektronik, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-126410.

Full text
Abstract:
New technical solutions is popping up all the time. In the construction industry today there is a development to find methods that can take advantage of these modern technological solutions. BIM is a term that stands for this development of information handling and therefore for the streamline and improvement of the construction process. But many in the industry still do not know what the term stands for and therefore not what it means to work with the tools.   A good planning is an important condition for carry out a successful project. Today various techniques is used to establish plans in the construction industry but it is usually traditional methods where the results are presented in a Gantt chart. But there are also other ways and one of those is Flowline. It´s a technique used when the Empire State Building was built. A program that uses Flowline and even claim to fall under the concept of BIM tools are Vico Office. They claim that by planning in their program with Flowline the project period can be shortened by 10-20 %. As previously mentioned many do not know what it means to use this type of tool nor the method Flowline and therefore Skanska wants to investigate it.   The purpose of the study is to provide the reader with the knowledge of what it means to plan with Vico Office and to investigate the flexibility regarding changes in the 3D-model and changes in the planning. The planning was based on a 3D-model of Skanska Project Länsförsäkringar in Umeå. The flexibility in Vico was tested during the construction of the planning. It was tested by upgrading to new versions of the model and by changing the way the building is divided. All this to result in a description of what it has meant to preform out the work.   The description shows that the construction of a planning with a timetable presentation of the Flowline requires a number of different operations. Some of these are control of the model, the creation of calculus, quantity takeoff, creation of a task list, connecting the various parts to each other, location division of the building and creation of Flowline.   The study shows that there are advantages by using this type of technology solutions when planning a construction project. There are benefits such as a flexible location division and a strong visual presentation using Flowline. There are also a number of aspects that needed to be taken into consideration to ensure the success of the method. In addition to the study Vico Office uses many more functions related to planning that can make the program more preferable to use.   The 3D-model that is used as a foundation for the planning needs to be adapt for the purpose and well developed. To avoid work with adapting the planning which in some cases can be extensive the construction projection and modeling need to be far successes in an early stage. A risk with a plan that is mostly performed by retrieving information from a model is that the commitment of those who will carry out the work decreases. It is dangerous because it is one of the key elements of success in planning. Something not to be overlooked is that the experience and knowledge of the planners are very important aspects for the planning to be successful. Because it does not matter how good a time plan is if it is not followed. Therefore it is important to find good work procedures that creates commitment, utilizing experience and uses new technological tools.
Det kommer hela tiden ny teknik. Inom byggbranschen pågår det en utveckling för att hitta arbetssätt som kan utnyttja dessa moderna tekniska lösningar. Begreppet BIM står för denna utveckling av informationshantering och handlar alltså om att effektivisera och förbättra byggprocessen. Många inom byggbranschen vet fortfarande inte vad begreppet står för och därför inte heller vad det innebär att arbeta med verktygen. Att upprätta en bra planering är en viktig förutsättning för kunna utföra ett lyckat projekt. Idag används det olika sätt för att upprätta planeringar inom byggbranschen men det är oftast traditionella metoder där resultatet presenteras i ett Ganttschema. Men det finns andra sätt och ett av dessa är Flowline som användes redan när Empire State Building byggdes. Ett program som använder sig av Flowline och även påstår sig falla under begreppet BIM-verktyg är Vico Office. De påstår att arbetssättet som används i deras program kan effektivisera tidplanen med 10-20 %. Som det tidigare nämns vet många inte vad det innebär att använda denna typ av verktyg och inte heller metoden Flowline och därför vill Skanska utreda den frågan. Syftet med studien är därför att ge läsaren kunskap om vad det innebär att planera med Vico Office samt att undersöka programmets flexibilitet gällande förändringar i 3D- modellen och planering. Planeringen utgick från en 3D-modell för Skanskaprojektet Länsförsäkringar i Umeå. Samtidigt testades programmets flexibilitet genom att uppdatera till nya versioner av modellen och genom att förändra hur byggnaden delas upp vid uppförandet. Allt detta för att resultera i en beskrivning av vad det har inneburit att genomföra arbetet. Beskrivningen visar att ett uppförande av en planering i programmet med en tidsplanspresentation i Flowline kräver att en rad olika moment genomförs. Några av dessa är kontroll av modellen, upprättande av kalkyl, mängdavtagning, upprättning av aktivitetslista, koppling av de olika delarna till varandra, platsindelning av byggnaden och bearbetning av tidplan i Flowline. Studien visar på att det finns fördelar med att använda den här typen av tekniska lösningar vid en planering utav ett byggprojekt. Det är fördelar som exempelvis en smidig platsindelning och en visuellt stark presentation med hjälp av Flowline. Det finns också ett flertal aspekter som det krävs att man tar hänsyn till för att säkerställa metodens framgång. Utöver studien behandlar Vico Office många fler funktioner som har samband med planeringen vilket kan göra att programmet i sin helhet blir mera fördelaktigt att använda. Vid upprättandet krävs det att modellen som används till bas för planeringen är anpassad och väl utvecklad. För att slippa göra om arbetet, som i vissa fall kan vara omfattande, krävs det därför att projekteringen och modellen tidigt är långt framgången. En risk med en planering som till stora delar utförs genom att hämta information från en modell är att engagemanget hos de som ska utföra arbetet minskar. Det är farligt då det är en av de viktigaste framgångsfaktorerna vid planering. Något som inte heller får glömmas är att erfarenhet och kunskap hos planerarna är väldigt viktiga aspekter för att planeringen ska bli lyckad. För det spelar ingen roll hur bra en tidplan är om det inte följs och det gäller därför att hitta bra arbetssätt som både involverar, utnyttjar erfarenheter och nya tekniska hjälpmedel.
APA, Harvard, Vancouver, ISO, and other styles
19

Khochaba, Silvia, and Vinos Koutcho. "BIM inom kalkyl." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-40799.

Full text
Abstract:
Sammanfattning Syfte: Det främsta problemet med implementering av BIM inom kalkyl är brister och felaktigheter i 3D-modeller (tredimensionell modell) som medför att de inte blir pålitliga. Målet med detta arbete är därför att klargöra hur informationskvalitén i en BIM-modell kan förbättras för att därmed öka användningen av BIM inom kalkyl hos byggföretag. Metod: Intervjuer, observationsstudier och litteraturstudier är de metoder som har valts för att besvara frågeställningarna i rapporten. Intervjuer utfördes med företag som har implementerat BIM inom kalkyl, med sådana som inte har infört och med företag som håller på att införa det. Observationsstudier genomfördes med handledarföretaget där kalkylprocessen redovisades tydligt. Litteraturstudier har pågått under hela arbetets gång för att ha en teoretisk grund i det hela. Informationen från dessa tre metoder har sedan jämförts för att därefter dra rimliga slutsatser. Resultat: En vägledning för branschen som lösning till kvalitetsproblem i modeller är att upprätta manualer. Dessa ska användas vid skapandet av modeller vilket troligtvis ska medföra reducering av felaktigheter. Dock krävs det även erfarenhet och kompetens inom personal samt investeringar på kostnad- och tid. Konsekvenser: Skulle implementering av BIM inom kalkyl lyckas medför det att säkrare kalkyler kan utföras vilket stärker företagets konkurrenskraft. Genom att implementera detta så tidigt som möjligt kan företagen utvecklas och undvika att hamna efter i branschen. Detta gynnar både företaget och den nya tekniken samtidigt som stora tids och kostnadsbesparingar erhålls. En implementering som denna kan lyckas vid upprättning av manualer med tydliga kravspecifikationer som tillämpas vid modellskapandet. Detta med hjälp av rätt erfarenheter och kompetenser bland involverad personal. Begränsningar: De begränsningar som finns i resultaten är bland annat att entreprenadformer och ansvarsförhållanden inte inkluderas. Dessutom är det avgränsat till att enbart behandla BIM i tidiga kalkylskeden vilket därmed medför att BIM inom planering, produktion, förvaltning och övriga skeden utesluts. Nyckelord: BIM, 5D, fördelar, kostnader, manualer.
Abstract Purpose: The main problem with implementation of BIM within calculation is the weaknesses and inaccuracies in 3D-models that makes them unreliable. The aim of this work is therefore to clarify how the information quality in a BIM model can be improved to thereby increase the use of BIM within calculation of construction companies. Method: Interviews, observation studies and literature studies are the chosen methods to answer the questions in the report. Interviews were conducted with companies that have implemented BIM within calculation, with those who have not introduced it yet, and with those who are about to implement it. Observation studies were conducted with the supervisor company where the calculation process was clearly reported. Literature studies have been done throughout the course to have a theoretical knowledge of the whole. The information from these three methods has then been compared to therefore make good conclusions. Findings: A guidance to the industry as a solution to quality problems in models is to set up manuals. These will be used during the creation of the models which will probably lead to a reduction of errors. However, it also requires experience and skills in staff as well as investments on cost and time. Implications: If the implementation of BIM within calculation succeeds, it will be possible to make safer calculations that strengthen the company's competitiveness. By implementing this as early as possible, companies can develop and avoid falling behind in the industry. This benefits both the company and the new technology while achieving great time and cost savings. An implementation like this can be successful in establishing manuals with clear requirement specifications which are applied during the creation of a model. This can be done with right experience and skills in the involved staff. Limitations: The limitations in the results are among other things, the fact that construction contracts and allocation of responsibilities are not included. In addition, it is limited to treat BIM in early calculation phases, which means that BIM in planning, production, management and other stages are excluded.  Keywords: BIM, 5D, benefits, costs, manuals.
APA, Harvard, Vancouver, ISO, and other styles
20

Zuhir, Falah Hasan Hasan. "BIM-baserad anbudskalkylering." Thesis, Malmö universitet, Fakulteten för teknik och samhälle (TS), 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:mau:diva-20208.

Full text
Abstract:
Idag finns det många aktörer inom byggsektorn som fortfarande använder sig av traditionellanbudskalkylering, trots möjligheterna och fördelarna som digitaliseringen medbringarbyggprocessens olika skeden. Den traditionella arbetsmetoden anses vara tidskrävande ochosäker. Detta eftersom att det baseras på ritningar och beskrivningar som tillhandhållas med ettförfrågningsunderlag. Det har pågått en utveckling i byggbranschen från att framställa ritningareller digitala 2D-ritningar till att skapa 3D-modeller med tillhörande information om deingående byggkomponenterna. Arbetsprocessen för framställandet av dessa 3D-modeller kallasför Byggnadsinformationsmodellering (BIM). 3D-modellerna med tillhörande information omingående byggkomponenterna kallas för BIM-modeller. Dessa BIM-modeller används blandannat för anbudskalkyleringssyfte med hjälp av kalkyleringsprogram som exempelvis VicoOffice och medbringar många fördelar. Därför är det intressant att det moderna ochdigitaliserade arbetssättet inte används av många aktörerna idag.Med anledning av ovanstående syftar denna studie till att undersöka om BIM kan bidra till enförbättrad anbudskalkylering. Studien syftar även till att identifiera faktorer som förhindrarimplementeringen av BIM i anbudskalkyleringen. Detta uppnås genom att besvara studiensfrågeställningar. Studiens frågeställningar tar upp fördelarna med tillämpningen av BIM ianbudskalkylering och ifall det förekommer skillnader i anbudskalkyleringsresultat vidtillämpning av BIM jämfört med det traditionella arbetssättet. Studiens frågeställningar taräven upp kraven som ställs på en kalkylerbar BIM-modell och faktorerna som förhindrarimplementeringen av BIM i anbudskalkyleringen.Resultatet och slutsatsen av studien är att BIM effektiviserar anbudskalkyleringen med hänsyntill arbetstiden, ökar precisionsgraden i mängdavtagningen och bidrar till en bättre förståelse avdet man räknar ut. BIM underlättar även kommunikationen mellan de olika parterna och germöjlighet att återanvända anbudskalkylen i byggprocessens senare skeden. Kraven som ställspå BIM modellen är objektens namngivning, klassificering och benämning. BIM-modellen skaäven vara korrekt uppbyggd med korrekt detaljeringsgrad, och att de ingående objekten är pårätt ställe och med rätt mängd. Det som förhindrar implementeringen av BIM ianbudskalkyleringen är aktörer som känner sig bekväma med traditionella arbetssättet och harkompetensbrist inom BIM. En annan faktor som förhindrar implementeringen av BIM ianbudskalkyleringen är att det inte finns standardavtal som är anpassade till en BIM-modell.Därför saknas bestämmelser som reglerar ägarskapet och juridiska ansvaret av BIM-modellen.Detta skapar osäkerhet mellan beställare och entreprenör, därför kan tvister som uppstår mellandessa bli svåra att lösa.
Despite the opportunities and benefits that the digitalization brings to the construction processdifferent stages, there are many participants in the construction sector who performs their bidcalculation using a traditional method. The traditional working method is considered timeconsuming and imprecise. There has been a development in the construction industry fromproducing digital 2D drawings to creating 3D models which is associated with informationabout each included building component. These 3D models are called building informationmodels or BIM models and are used for, among other things, bid calculation purposes. BIMmodels entails the bidding calculations great advantages. Therefore, it is Interesting that thismodern and digitized working method are not used by many participants today.This study aims to investigate whether BIM can contribute to an improved bid calculation. Thestudy also aims to identify which factors prevent the implementation of BIM in the bidcalculation. The purpose of the study is achieved by responding to the three questions of thestudy. These three questions handle the advantages of BIM in bid calculation and differencesin the results of calculation by each method. The study's questions also handle the requirementsthat are set on the used BIM model for bid calculation.The result and conclusion of the study is that BIM streamlines the work on bid calculation,increases the precision of the quotation and contributes to a better understanding of what havebeen calculated. BIM also facilitates communication between the participants and provides theopportunity to reuse the bid calculation in the later stages of the construction process. Therequirements set on the BIM model are how detailed the model should be created and thedesignation and classification of the objects. The BIM-model should also be correctly drawn,the included objects are correctly placed and with the right amount. What prevents theimplementation of BIM in the bid calculation are participants who are comfortable with thetraditional working method and have a lack of skills within BIM. Another factor that preventsthe implementation of BIM in the bid calculation is that there are no standard agreementsadapted to a BIM model. Which makes it difficult to resolve any disputes that may arisebetween the entrepreneur and the client.
APA, Harvard, Vancouver, ISO, and other styles
21

Åskregn, Peter. "BIM i medelstora byggentreprenadföretag : BIM in medium sized building construction companies." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-26416.

Full text
Abstract:
Rapporten har ett fokus på Byggnads Informations Modeller (BIM), ett IT-tekniskt verktyg och arbetssätt som har vuxit fram i byggbranschen alltmer under de senaste åren. Hur detta IT-verktyg används hos medelstora byggentreprenadföretag redovisas i denna rapport.Syftet med rapporten är att verka positivt på utvecklingen mot effektivare och resurssnålare arbetsprocesser inom byggbranschen genom att bidra med kunskap om hur användandet av BIM ser ut bland dessa företag, varför det ser ut som det gör, ifall BIM behövs och vad som kan förändra läget i någon riktning.Metodarbetet har bestått av litteraturstudier och intervjuundersökningar.Arbetet inleddes med studier av rapporter och texter relaterade till BIM och intervjuer med representanter för ledande branschföretag inom bygg samt ett par branschorganisationer med inriktning på BIM. Därefter följde ytterligare litteraturstudier med inriktning på förändring och förändringsarbete och enkät och intervjuteknik. Arbetet ledde fram till olika grundteser och förklaringsmodeller som låg till grund för och utformade de intervjufrågor som ställdes vid huvudintervjuerna med elva medelstora byggentreprenadföretag.Huvudintervjuerna gav ett resultat som visade att företagen generellt sett såg på BIM som något positivt, med fördelar såsom lättare kommunikation och som ett hjälpmedel att minska fel i produktionen. Resultatet visade även att det fanns utmaningar såsom mjukvarukompabilitet och en beroendeproblematik mellan projektets involverade parter som innebar att för att tekniken ska kunna ge fördelar måste alla parter använda tekniken.Förklaringarna till det låga användandet bland medelstora byggentreprenadföretag var flera, vanligast var brist på krav från beställarna. Förklaringarna var också avsaknad av behov, kostsamma investeringar, konkurrerande målsättningar, kompabilitetsproblem med mjukvaror och avsaknad av kunskap om BIM.För att gynna en större användning föreslås att tekniska hinder elimineras genom standardisering och utveckling av arbetssättet och mjukvaran rörande BIM, det föreslås också att konkurrerande målsättningar elimineras genom kunskapsspridning om BIM i branschen, både hos entreprenörerna, -för att främja god utbildning så att personalen vill arbeta med tekniken, och hos beställare, -så att de börjar efterfråga BIM och därigenom ger tekniken konkurrensfördelar.
The report has a focus on Building Information Models (BIM), an IT-technical tool- and workmethod that have emerged increasingly in the construction industry in recent years. How this IT tool is used in medium-sized building construction companies is presented in this report.The purpose of the report is to promote positive development towards more efficient and resource-efficient work processes in the construction industry by providing knowledge on how the use of BIM exists among these companies, why it is the way it is, if BIM is needed and what can change the current status in any direction.The work-method has consisted of literature studies and interview surveys.The work began with studies of reports and texts related to BIM and interviews with representatives of leading construction industry companies and a couple of industry organizations with focus on BIM. This was followed by continued literary studies focused on change and change management, survey and interview techniques. This work led to various basic theories and explanatory models as the basis for and the design of the interview questions asked at the main interviews.The main interviews was conducted with eleven medium-sized building construction companies and gave a result that showed that companies generally looked at BIM as something positive with advantages such as easier communication and as a means to reduce errors in production. The result also brought some light to the fact that there existed challenges like software compatibility and dependency between the parties involved in the project, which means that for the technology to be able to provide wanted benefits all parties involved have to use the workmethod.The reasons for the low usage among medium sized construction contractors was several, the most common was the lack of demands of the clients. The reasons were also the absence of need, costly investments, competing objectives, compatibility issues with software and lack of knowledge of BIM.In order to promote a greater usage of BIM it is proposed that the technical obstacles are eliminated through standardization and development of the processing method and software, it is also proposed that the competing objectives are eliminated by spreading and increasing knowledge of BIM in the industry, both amongst entrepreneurs, -to promote good staff training so that the staff will want to work with the technology, and amongst construction clients, -so that they start asking for BIM and thereby provide the technology with a competitive edge.
APA, Harvard, Vancouver, ISO, and other styles
22

Svedin, Alexandra, and Engman Felicia Ylvén. "BIM inom offentlig fastighetsförvaltning : Hur relevant information kan tillhandahållas med BIM." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik och belysningsvetenskap, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-41103.

Full text
Abstract:
Syfte: Bristerna på informationsöverföringen mellan de olika faserna i en byggnads livscykel har en negativ inverkan på förvaltningen. På grund av de komplexa informationsmängderna bör förvaltningen specificera vilken information de vill få levererad från projekteringen. Den negativa inverkan kan minskas med hjälp av BIM, då BIM underlättar samverkan mellan olika discipliner. Därför är målet med denna undersökning att underlätta implementeringen av BIM inom den offentliga tekniska fastighetsförvaltningen på landstingsnivå, och följande frågeställningar ställs: (1) Hur ser processen kring tillsyn och skötsel ut inom teknisk fastighetsförvaltning på landstingsnivå? (2) Vilken information behövs i anknytning till denna process, för att en teknisk fastighetsförvaltning skall kunna genomföras effektivt? (3) Hur kan man med BIM tillhandahålla denna information? (4) Hur bör man gå tillväga för att lyckas med implementeringen av BIM inom fastighetsförvaltning?  Metod: Angreppssättet för undersökningen är en fallstudie, med en teknikavdelning inom en offentlig fastighetsförvaltning i ett landsting, som studerat fall. Samtliga frågeställningar bygger på varandra: datainsamling och analys har skett i växelverkan. Frågeställningarna besvaras till största del av litteraturstudier och semistrukturerade intervjuer, men även observationer och dokumentanalyser har genomförts.  Resultat: Den första frågeställningens resultat visar på att processen tillsyn och skötsel är komplex och innefattar många olika discipliner. Processen innehåller en administrativ del där åtgärder och intervall kopplas till installationer i fastighetsförvaltningssystemet. Vidare innefattar processen att åtgärderna utförs av driftpersonalen, och om problem uppstår skapas beslutspunkter där teknikförvaltare och driftingenjörer konsulteras för att lösa problemet.  Resultatet på frågeställning 2 visar på ett stort behov av informationsmängder. Den information som behövs av flest personer är; placering, installationens komponenter och fabrikat/leverantör. Det är viktigt att poängtera att även om viss information inte behövs av lika många personer, innebär det inte att informationen är av mindre värde.  Vidare visar resultatet på frågeställning 3 att informationsmängderna som framkommit i frågeställning 2 kan tillhandahållas med BIM genom att koppla informationen till objekt via property sets, databaser eller portaler.  Resultatet på frågeställning 4 visar tillvägagångssättet vid implementering av BIM i förvaltning; processkartläggning, informationsanalys och koppling av informationen.  Konsekvenser: Studien visar att det finns goda möjligheter att använda BIM för att tillhandahålla den information som behövs inom en offentlig fastighetsförvaltning. Vid implementering är det viktigt att kartlägga processer och informationsbehov som finns i organisationen. Implementeringen bör ske i anknytning till ny- eller ombyggnation.  Begränsningar: Studien beaktar endast tillsyn och skötsel inom teknisk fastighetsförvaltning och undersöker varken ekonomiska eller tekniska aspekter. Resultatet anses generellt giltigt, men ett än mer komplett resultat kan erhållas vid en större undersökning av förvaltningsorganisationen samt med fler intervjurespondenter.
Purpose: The shortcomings of information transfer between the different building phases has a negative impact on facility management (FM). Because of the complex information needs it is important that the FM specifies which information they want delivered from the design and construction phases. The negative impact can be reduced with BIM because of its ability to ease communication between the disciplines. Therefore, the aim of the thesis is to ease the implementation of BIM within the technical FM of the public sector, and following questions are asked: (1) What does the process of operation and maintenance in a technical department of FM in a public sector look like? (2) Which information is needed in this process, to effectively accomplish the FM activities? (3) How can you, with BIM, provide this information? (4) How should you do to succeed with the implementation of BIM in FM?  Method: The approach of the thesis is a case study, studying the technical department of a public FM. All questions are based on each other, which means that the data collection and the analysis have been done in interaction. Mostly, the questions have been answered by literature studies and interviews, but observations and document analysis has also been done.  Findings: The result of the first question shows that the process of operation and maintenance is complex and includes many different disciplines. The process includes an administrative part where actions and intervals are connected to the installations in the FM system. The process also includes that the maintenance personnel performs the actions, and if problems occur, the technical manager and the operating engineer are being consulted for a solution.  The result of question 2 shows a big need of different information. The information needed by the most people are; placement, the installation’s component and manufacturer/supplier. Although some information might not be needed by a lot of people, it is important to point out that the information does not have lower value.  The result of the third question shows that the information that emerged from question 2 could be provided with BIM by connecting the information to an object through property sets, databases or portals.  The result of the fourth question shows the way to implement BIM in FM; process mapping, information analysis and connect the information.  Implications: The study shows that there are good opportunities to use BIM to provide relevant information needed by the FM. It is important to analyse the processes and information needs within the organisation. The implementation should be done in connection to a new construction or a reconstruction.  Limitations: The study only observes operation and maintenance within the technical department of FM and does not investigate either economical nor technical aspects. The result is considered to be generally valid, however, a more complete result can be achieved with a bigger research of the FM organisation and several interview respondents.
APA, Harvard, Vancouver, ISO, and other styles
23

El-Zouki, Robert. "Producera mängdgrafer genom BIM : Produce quantity take-off graphs using BIM." Thesis, KTH, Byggnadsteknik, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-209563.

Full text
Abstract:
Avvikelser i ett byggprojekt leder till bland annat förseningar. De kan även leda till för tidigt avslutadeaktiviteter. Oavsett blir detta ett problem då kontraktstiden för underentreprenörer är bestämda.Vad detta betyder är att blir en underentreprenör färdig för tidigt kommer det finnas en tidbuffert itidplan mellan färdig- och nästa aktivitet. Detta anses som en kostnad eftersom det inte utförs någotarbete. Blir en underentreprenör sen med färdigställande av en aktivitet blir detta ocksåproblematiskt då detta skjuter fram aktiviteter på den kritiska linjen. Förutsatt att de aktiviteternaligger på den kritiska linjen. Det ska förtydligas att fler former av avvikelser finns. Bland annatfelleverans, försenad transport, oförutsedda hinder under produktion m.m. En metod att åskådliggöra avvikelser tidigt efter initiering är att kontinuerligt under produktion följaupp aktiviteter med hjälp av mängdgrafer. Mängdgrafer är diagram som visar byggd mängd pertidsenhet och kumulativ byggd mängd. De ger en visuell bild över hur produktionen ligger till inuläget och med hjälp av dessa kan beslut fattas om ändringar i produktionen för att projektet skatidsmässigt åter hamna i fas. Mängdgrafer kommer i tre former. Planerade-, aktuella- &prognostiserade mängdgrafer. Syftet med detta examensarbete är att undersöka hur BIM-verktyg under projektering kan stödja ettprojekt under produktion genom att förutse avvikelser. Ifall avvikelser upptäcks tidigt kan resurserjusteras eller arbetstider ändras för att projektet färdigställs enligt tidplan. Studien visar att mängdgraferna kan utvecklas relativt enkelt men det krävs väl genomtänktplanering och struktur på arbetet. Det rekommenderas att samordna en bra arbetsmetod för helaarbetet från början till slut genom att ha en samordnare som styr över modellen men också andratjänstemän som känner till programmet tillräckligt bra för att stötta och avlasta samordnaren vidbehov. Studien visar också att det är viktigt att modellutvecklare levererar modellen med bra ochstrukturerad namnbeteckning för objekten. Detta för att enklare kunna koppla KPI-tal till korrektmängdgraf. CoClass-klassifikationssystem (projektnamn BSAB 2.0) borde ligga till grund förnamngivning av objekt.
Deviations in a construction project lead to delays. They can also lead to prematurely completed activities. In any case, this will be a problem since the contract period for subcontractors is determined. What this means is that if a subcontractor completes its task prematurely, there will be a time buffer in the timetable between completed and next activity. This is considered a cost because no work is being done. If a subcontractor completes an activity late, this is also problematic as it displaces activities on the critical line. If the activities are on the critical line. It should be clarified that more types of deviations exist. Including delivery, delayed transport, unforeseen obstructions during production, etc. One method of avoiding deviations is to continuously monitor production activities using quantity take-off graphs. These graphs are charts showing built-up amount per unit of time and cumulative built-up amount. They give a visual picture of the state of production, and from there, decisions can be made about changes in production so that the project will follow the time schedule again. Quantity take-off charts come in three forms. Planned, actual & forecast quantity take-off graphs. The purpose of this degree project is to investigate how BIM tools during design phase can support a project under production phase by predicting deviations. If deviations are early discovered, resources can be adjusted or working hours changed to complete the project according to time schedule. The study shows that the quantity graphs can be developed relatively easily, but well thought out planning and structure are required. It is recommended to coordinate a good working method for the entire work from start to finish by having a coordinator who controls the model but also other officials who know the program well enough to support and relieve the coordinator if necessary. The study also shows that it is important that model developers deliver the model with a good and structured designation of object. This is easier to connect KPI-numbers to the correct quantity takeoff graph. CoClass classification system (project name BSAB 2.0) should be used as the basis for naming of objects.
APA, Harvard, Vancouver, ISO, and other styles
24

Björendahl, Lisa, and Bergman Nicole Janz. "Mervärden av BIM : En analys av implementering av BIM i byggproduktionen." Thesis, Uppsala universitet, Byggteknik, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-393518.

Full text
Abstract:
The past 60 years, many industries have developed exponentially regarding digitalisation and they have adapted to the technology quickly. However, the construction industry has a linear development and has almost remained unchanged over the past years. It is still common to use printed plans at construction sites and raise buildings based on 2D drawings even if there are detailed 3D models accessible. There are great opportunities for development of the construction industry, but not many companies have succeeded in maximizing the outcomes due to limitations of external factors. The use of Building Information Modeling (BIM) needs to be standardised in the construction industry, in all phases. The thesis aims to investigate the obtained benefits of implementing BIM at construction sites. The thesis presents the topics of the construction process and BIM, and it accounts the results of the study based on a qualitative analysis. The responses from the interviews have been interpreted and summarised into a result, which are also confirmed by a background research. The study resulted in many benefits from the implementation of BIM at construction sites. To summarise, the benefits are: better information management, clearer communication, more efficient planning, reduced costs and increased quality. The study also shows that each benefit, in turn, results in additional benefits. The conclusion is that, in order to gain from the benefits, companies must invest in competence and resources. It is also necessary to demand more from authorities in order to make digitalisation a standard in the construction industry. There are great opportunities for an automatised construction process in the future. Furthermore, it can be speculated whether this will also lead to robotisation of the industry, 3D printing of buildings and using AI to design buildings. The first step for the construction industry is to catch up with the other industries is to standardise the use of BIM throughout the construction process.
De senaste 60 åren har många industrier haft en exponentiell utveckling gällande digitalisering och de har anpassat sig snabbt utifrån teknologins kapacitet. Däremot har byggindustrin haft en linjär, nästan oföränderlig resa genom åren. Det förekommer arkitekter och andra konsulter i branschen som arbetar uteslutande med 2D-ritningar än idag. Det är först under de senaste tio åren som 3D-modeller har börjat användas som metod för att ta fram ritningar, men standarden idag är fortfarande att byggnader produceras utifrån 2D-ritningar. Det finns stora utvecklingsmöjligheter inom byggbranschen, men få har lyckats utnyttja det maximalt eftersom de begränsas av yttre faktorer. Användandet av Building Information Modeling (BIM) behöver standardiseras i byggbranschen. Ett första steg till att ta del av den stora belöning som finns att hämta av digitaliseringen är att implementera BIM i hela byggprocessen. Syftet med examensarbetet är att undersöka vilka mervärden som erhålls när BIM implementeras i byggproduktionen. Examensarbetet redogör för byggprocessen och tillämpningen av BIM, samt redovisar erhållna resultat utifrån en kvalitativ studie där svaren från intervjustudien kan styrkas av litteraturstudien. I intervjustudien har fem respondenter deltagit och deras erfarenheter har tolkats och sammanfattats i ett resultat. Studien visar att det finns många mervärden från implementering av BIM i produktionen. Sammanfattningsvis är dessa: bättre informationshantering, ökad kommunikation, effektivare planering, minskade kostnader och ökad kvalitet. Resultatet av den undersökta frågeställningen visar även att ett erhållet mervärde i sin tur ger upphov till ytterligare mervärden. Slutsatsen är att för att kunna ta del av de mervärden som implementering av BIM i byggproduktionen medför, måste en investering i kompetens och resurser genomföras. Det behöver även ställas högre krav på myndigheter för att en digitalisering i branschen ska bli en standard eftersom det är först då stora förändringar kan börja utföras. Det finns stora möjligheter för byggbranschen att automatiseras i framtiden, och vidare kan det spekuleras i om det även kommer kunna leda till robotisering av branschen, 3D-utskrifter av byggnader och användning av AI för att utforma byggnader. Byggbranschens första steg i den framtida utvecklingen är att standardisera användandet av BIM i hela byggprocessen.
APA, Harvard, Vancouver, ISO, and other styles
25

Forro, Gabriella. "The signalling pathway of Bim L and Bim S, two isoforms of the BH3-only protein Bim, in apoptosis." Doctoral thesis, Humboldt-Universität zu Berlin, Mathematisch-Naturwissenschaftliche Fakultät I, 2010. http://dx.doi.org/10.18452/16105.

Full text
Abstract:
Ziel der vorliegenden Arbeit war es, die Rolle des pro-apoptotischen Proteins Bim am endoplasmatischen Retikulum (ER) und an den Mitochondrien zu untersuchen. Für diese Untersuchungen wurden zwei Isoformen von Bim verwendet, zum einen BimL, welches an den Motor Dynein Komplex gebunden ist, zum anderen BimS, welches im Zytosol lokalisiert ist. Um eine konditionale Expression von Bim zu erreichen, wurde Myc-markierte humane cDNA unter der Kontrolle des Tet-Off Systems in einen adenoviralen Vector kloniert. Eine Überexpression von BimL und BimS induzierte in der Prostatakarzinomzelllinie DU145 Bax- und Bak-abhängigen apoptotischen Zelltod. Eine Überexpression des anti-apoptotischen Proteins Bcl-2 lokalisiert am ER zeigte eine vollständige Hemmung der Bim-induzierten Apoptose, was die Wichtigkeit des ER unterstreicht. Überexpression von Bcl-2 an den Mitochondrien führte eine partielle Hemmung herbei. Bim Expression induzierte Bax- und Bak-abhängig den Zusammenbruch des mitochondrialen Membranpotentials. Dieses wurde ebenso in mit am ER lokalisiertem Bcl-2 Zellen beobachtet. Bcl-2 lokalisiert an den Mitochondrien verminderte dagegen mitochondriale Permeabilisation. Proteinanalysen zeigten eine Hochregulierung von ER-Stress Proteinen nach Bim Überexpression. Zusätzlich wurde Cytochrom c Freisetzung aus den Mitochondrien und Aktivierung von Caspase-9, -3 und -8 beobachtet. Mit einem Breitband-Caspase Hemmer konnte der Bim-induzierte Zelltod vollständig gehemmt werden, was zeigt, dass Caspasen essentiell sind. Zusammenfassend kann gesagt werden, dass Bim, parallel zum mitochondrialen Signalweg, ER-Stress auslöst und, dass Bim eine effektive Apoptose durch die Interaktion des ER und der Mitochondrien induziert.
The aim of this thesis was to investigate the role of the pro-apoptotic BH3-only protein Bim, at the endoplasmic reticulum (ER) and the mitochondria. For this purpose, a full length human myc-tagged Bim cDNA was cloned into an adenoviral vector, which allows for the conditional expression of the transgene under the control of a Tet-Off-system. Two different Bim isoforms were used for these investigations. One was BimL, which is bound to the motor dynein complex of the microtubule and the other one was BimS, which is localized in the cytosol. The enforced expression of each of these two isoforms in the prostate cancer cell line DU145, showed the capability of BimL and BimS to induce apoptosis via either Bak or Bax. Also, Bax- and Bak-dependent breakdown of the mitochondrial membrane potential upon overexpression of either Bim isoforms was measured. This effect was also observed in cells overexpression the anti-apoptotic protein Bcl-2 at the ER. However, targeting Bcl-2 to the mitochondria partially inhibited Bim-induced mitochondrial permeabilization. These findings indicated the execution of the intrinsic apoptotic pathway upon Bim signalling. Nevertheless, expression of Bcl-2 at the mitochondria partially suppressed Bim-induced apoptosis whereas ER-targeted Bcl-2 entirely prevented cell death induction by Bim underlining the importance of the ER. Further, an upregulation of ER stress proteins upon Bim expression was seen. Cytochrome c release form the mitochondria and activation of caspase-9, -3 and -8 was observed. In addition, the complete inhibition of Bim-induced cell death by a pan caspase inhibitor revealed that caspases are crucial. In conclusion, Bim induces the mitochondrial apoptotic pathway and, in parallel, triggers ER stress. It seems that Bim mediates cell death through the interaction of the mitochondria and the ER. The ER-mitochondria cross-talk leads to the amplification of the apoptotic death signal.
APA, Harvard, Vancouver, ISO, and other styles
26

Hasi, Adem, and Tommy Andersén. "BIM i anläggningsproduktion : BIM i anläggningsproduktion - En utredning om BIM-s potential med avseende på platschefens arbete samt dess implementeringsprocess." Thesis, Högskolan i Jönköping, Tekniska Högskolan, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-27991.

Full text
Abstract:
The thesis is a study about the usage of BIM in construction projects in relation to how the software can support the site manager in the building production. The goal is to analyze the barriers and drivers to integrate BIM into the site manager’s work. The compositions of questions which are the basis for the thesis are “What obstacles does the site manager experience in his daily work routine and how can BIM be an option?” And “What mechanisms and factors is needed for BIM to be applied in the activities of site managers in construction projects?” For the answer to the first question, the daily work routine of a site manager has been studied in relation to today’s obstacle that is the basis for the production stoppages and how BIM can be an option. With information from the first matter as basis the study analyzes external and internal forces against the introduction of BIM. The study also clarifies the implementation problem and how it can be eliminated to thereby give rise to a change of the software in a conservative industry. In order to answer the question two scientific methods have been used; literature study and interviews. The Literature study reports the facts that may lead to the development of the construction process in its entirety. The interviews have given a reality perspective on the facts linked to the literature study. The results show that good planning with good coordination between the various disciplines t is the fundamentals for a successful production. The study demonstrates current shortcomings due to the disciplines inadequate coordination and information loss in an industry with high growth potential. With software that allows synchronization between different disciplines at the same time stands as the source for storing relevant information about a project would solve many of the daily obstacles in the production. The conclusion of this work is to BIM as new software minimizes the current barriers in relations to the site manager and production where information storage and synchronization of disciplines is a great advantage towards the elimination of obstacles in the production. To eliminate barriers that lead to minimization of production downtime and good balance in the daily operations there is a demand for change in the view towards new technology and work routines in the industry.
APA, Harvard, Vancouver, ISO, and other styles
27

Alic, Sanel, and Erik Anehov. "Implementering av BIM-Manual – En riktlinje hur BIM-manualen tillämpas i verkligheten." Thesis, Malmö universitet, Fakulteten för teknik och samhälle (TS), 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:mau:diva-20864.

Full text
Abstract:
Ett byggprojekt innehåller fyra skeden, förstudie, projektering, produktion och förvaltning. Projekteringsskedet är hela designprocessen där ritningar och beskrivningar skapas för att sedan kunna bygga och förvalta den tänkta byggnaden. Projekteringsstadiet består av flera olika aktörer och teknik discipliner där samordning och koordinering krävs. Ett verktyg som tillämpas i hela byggprocessen men framförallt i projekteringen är BIM, vilket är en arbetsprocess som effektiviserar informationshantering genom att under byggprojektets gång samla information till en 3D-modell. BIM i projekteringsstadiet består av flera olika teknik discipliner som behöver samordnas och koordineras till gemensamma mål för att inte missförstånd ska ske och att viktig information ska förloras.Denna studie utreder BIM-manualer och dess innehåll samt undersöka om projektörer och arkitekter följer de krav och riktlinjer som formulerats i BIM-manualen. Studien utreder även om de krav och riktlinjer som utformats i BIM-manualer öppnar upp för nytänkande och innovation för projektörerna och arkitekterna, eller om det eventuellt begränsar projektörerna och arkitekterna innovation samt nytänkande. Rapporten grundas på en kvalitativ metod, där information erhålls från semistrukturerade intervjuer, och en litteraturstudie där data och information har hämtats från litteraturer i form av böcker, forskningsrapporter, utredningsrapporter, examensarbeten, dokument och webbsidor. Studien avgränsar sig till projekteringsskedet, där åtta personer har intervjuats och fyra företag har studerats. Personal som har intervjuats är fem BIM-samordnare, en Section Manager inom BIM, en avdelningschef som ansvarar för BIM och slutligen en VVS-projektör.Baserat på resultatet i studien kan man konstatera att BIM-manualer inte följs strikt i verkligheten utan mer översiktligt. Detta beror bland annat på att krav och riktlinjer kan uppdateras under projektets gång. Utifrån studien kan man även konstatera att en BIM-manual innehåller projektspecifika krav och riktlinjer för de planerade BIM-modellerna i syfte för att skapa den organisation och de arbetsprocesser som ett BIM-projekt eftersträvar. Några exempel på krav och riktlinjer som kan formuleras i en BIM-manual är leveransformat på filer, programvaror och specifika krav och redovisningsteknik. Man kan även dra slutsatsen att krav och riktlinjer som definierats i BIM-manualen underlättar samordning och koordinering under projektets gång men att de inte följs rigoröst. En annan slutsats som kan faställas utifrån studien är att BIM-manualen öppnar upp för kreativitet och innovation för projektörerna och arkitekterna eftersom inga tekniska lösningar är definierade i manualen. Avslutningsvis kan man även konstatera att det som kan förbättras med arbetet kring BIM-manualer är att den tydligare kan förklaras till alla involverade aktörer.Efter att ha studerat hur BIM-manualer efterlevs i projekteringsskedet så kan även en liknande studie göras för att se hur BIM-manualen följs i förvaltningsskedet.
A construction project contains four stages, feasibility study, design, production and management. The planning stage is the entire design process where drawings and descriptions are created in order to be able to build and manage the intended building. The design stage consists of several different actors and technology disciplines where coordination and coordination are required. A tool that is used throughout the construction process but above all in the design is BIM, which is a work process that streamlines information management by gathering information into a 3D model during the construction project. BIM at the design stage consists of several different technology disciplines that need to be coordinated and coordinated to common goals so that misunderstandings do not occur and that important information is lost.This study investigates BIM manuals and their contents and analyzes whether projectors and architects follow the requirements and guidelines formulated in the BIM manual. The study also investigates whether the requirements and guidelines formulated in BIM manuals open up new thinking and innovation for the projectors and architects, or whether it may limit the projectors and architects innovation. The report is based on a qualitative method, where information is obtained from semi-structured interviews, and a literature study there data and information has been obtained from literature in the form of books, research reports, investigative reports, degree projects, documents and web pages. The study is limited to the design stage, where eight people have been interviewed and four companies have been studied. Staff interviewed are five BIM coordinators, a Section Manager within BIM, a department manager in charge of BIM and finally a plumbing projector.Based on the results of the study, it can be concluded that BIM manuals are not strictly followed in reality but more comprehensively. This is partly due to the fact that requirements and guidelines can be updated during the course of the project. Based on the study, it can be concluded that a BIM manual contains project-specific requirements and guidelines for the planned BIM models in order to create the organization and work processes that a BIM project seeks. Some examples of requirements and guidelines that can be formulated in a BIM manual are delivery formats for files, software and specific requirements and accounting technology. It can also be concluded that the requirements and guidelines defined in the BIM manual facilitate coordination during the course of the project, but that they are not rigorously followed. Another conclusion that can be determined from the study is that the BIM manual opens up for creativity and innovation for the projectors and architects as no technical solutions are defined in the manual. Finally, it can also be noted that what can be improved with the work on BIM manuals is that it can be more clearly explained to all the actors involved.After studying how BIM manuals are complied with in the design phase, a similar study can also be done to see how the BIM manual is followed in the management phase.
APA, Harvard, Vancouver, ISO, and other styles
28

Håkansson, Lisa, and Julia Dannfors. "BIM i produktion : En undersökning om hur BIM kan implementeras i produktion." Thesis, Uppsala universitet, Byggteknik, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-389669.

Full text
Abstract:
The object of this report is to investigate how to implement BIM into the production part of the construction industry. How NCC should act to make the transformation as smooth and easy as possible. BIM, Building Information Modelling, is a way of working where you gather all information in one place. All disciplines work in a 3Dmodel and have information about their component in that model. For example, you can create a specific wall with its different layers, that will make it easier to calculate offers from subcontractors and also make the daily work with other orders easier if you know what the wall is build of. You can also use the model for collision controles. This make everything more efficient and make it easier to collaborate between different disciplines.By interviewing people from the industry, mainly from the production, we found that there already are softwares on the market that NCC are using that is easy to use even if you haven't worked a lot with digital tools before. The problem is how to spread the information about these softwares so that more projects can use them. Another difficulty is how to get the craftsmen to use these softwares. The people we interviewed thought that the lack of interest for digital tools, and the older generation, is the main reason why the implementation will be challenging. Our conclusion is that NCC need to find a systematic way to educate their employees in the digital tools that they are using. They need to get better to spread the word about those digital tools within the company so that their employees understand how much they can help and will start to use them. The craftsmen should use the tools to help visualize what they are building and the on-site manager should have a software with more features.
Syftet med arbetet är att undersöka hur BIM kan implementeras i byggbranschen på ett bra och smidigt sätt ute i produktion. Detta ger NCC ett underlag för hur de ska gå tillväga för att denna process ska gå så lätt och smidigt som möjligt men också för att minska risken att fokus hamnar på fel ställe och att implementeringen utförs på ett sådant sätt att personalen blir mer negativa mot digitala hjälpmedel i produktionen.  Då yrkesarbetarna är de som hittills jobbat minst med digitala hjälpmedel har störst vikt lagts vid att undersöka hur implementeringen kommer att påverka dem och hur man ska göra för att få med dem i denna förändring.   BIM, Building Information Modeling, är egentligen byggbranschens digitalisering. Det bygger på att projekteringen utförs i 3D och sedan byggs modellen på med information som gör att arbetet kan effektiviseras och göras smidigare. Det går till exempel att rita upp hur väggarna är uppbyggda i skikt för att underlätta för kalkylatorn vid upphandlingar med underentreprenörer men också i produktion vid beställning av material. Detta minimerar dubbeljobb och effektiviserar produktionen. I projekteringen används det bland annat vid kollisionskontroller där olika discipliners modeller läggs ihop för att se om installationerna krockar någonstans. I förvaltning kan det användas genom att produkterna som använts läggs in i modellen, till exempel vilken armatur, för att sedan lätt kunna hitta den informationen när armaturen senare behöver bytas ut.   Det pratas ofta om att BIM är dyrt och det stämmer att det blir en högre kostnad i början av projekten. Däremot sparas tid och pengar i produktion och förvaltning. Fel som tidigare har upptäckts i produktion och har behövt lösas på plats så gott som försvinner.  Genom att intervjua personer som börjat använda sig av BIM i produktion har upptäckten gjorts att det finns bra och lätthanterliga program som underlättar och effektiviserar vissa delar av produktionen. Två av dessa program som används på NCC idag är Bluebeam och Dalux. Bluebeam används som dokumenthantering där länkar mellan olika ritningar gör att det går snabbt och enkelt att hoppa mellan ritningar. Dalux är ett lättanvändligt program där du kan se projektet i 2D och 3D samtidigt vilket ger en lättare förståelse för vad som ska byggas genom att du kan gå omkring i projektet i 3D. Dalux har även en gratis app som alla yrkesarbetare skulle kunna använda för att öka förståelsen av vad dom bygger vilket skulle kunna göra att frågorna till arbetsledningen skulle minska. Ett problem är då hur man ska lösa det med mobiler och surfplattor till alla, om man inte får använda sin egen eller äger någon privat. Ett annat problem med digitaliseringen är att hårdvarorna är väldigt ömtåliga och ska användas i en hård miljö samt så har internet en tendens att krascha med jämna mellanrum vilket gör att man alltid måste ha en backup av de aktuella ritningarna och modellerna.  En annan fråga är hur man ska få alla att använda sig av de digitala verktygen. Här är de som intervjuats överens om att det med största sannolikhet handlar om hur intresserad man är av teknik och att det är en generationsfråga. De menar att det med generationsskiftet kommer bli lättare att implementera BIM i yrkesarbetarnas arbete.   För att implementera BIM i produktion på ett så bra och smidigt sätt som möjligt bör ordentliga utbildningar av platsledning och yrkesarbetarna genomföras för att sprida kunskapen om vilka möjligheter som finns inom företaget men också för att ge personalen en bra grund så att de känner sig säkra i programmen när de ska börja användas. Det kan öka intresset även hos de som varit negativt inställda från början. Yrkesarbetarna bör använda programmen som visuell hjälp genom att gå omkring i 3D modellen och för att snabbare kunna navigera sig mellan olika ritningar genom länkar. Arbetsledarna kan ha en högre svårighetsgrad med fler funktioner, bland annat olika lager och möjligheten att uppdatera ritningar och modeller.
APA, Harvard, Vancouver, ISO, and other styles
29

Dolk, Gustav, and Magnus Ziervogl. "BIM-projektering i praktiken." Thesis, Halmstad University, School of Business and Engineering (SET), 2008. http://urn.kb.se/resolve?urn=urn:nbn:se:hh:diva-2543.

Full text
Abstract:

The use of CAD, within the building industry came strongly, during the 1980’s and the 1990’s. The development has since then rapidly progressed and the using of 3D-models has in addition increased. We are now at the edge of next step of evolution. BIM, Building Information Model(ing), is here. Briefly, BIM is an object oriented 3D-model, which contains information. The information is used in all phases of the building’s lifecycle. BIM simplifies the coordination and enables, among others, a more accurate calculation in an early phase of the process.

The purpose of the report is to present how BIM applies in practice. The report is based on interviews and observations at the projecting of Halmstad Arena.

BIM-technology isn’t completely ready yet, but it is on its way. Today BIM is most suited for complex projects. Once you have learned the work method, BIM will be superior the traditional 2D-projecting and applied to every project. New job types will be established, such as BIM-supervisor and building modeler, whom are specialized towards BIM. Even though the objective for all parts has been to work integrated and towards a common objective, with traditional projecting, we aren’t there yet. BIM doesn’t change the objective, but simplifies the approach.

APA, Harvard, Vancouver, ISO, and other styles
30

Haugsand, Magnus. "Effektivt ingeniørarbeid med BIM." Thesis, Norges teknisk-naturvitenskapelige universitet, Institutt for konstruksjonsteknikk, 2010. http://urn.kb.se/resolve?urn=urn:nbn:no:ntnu:diva-12384.

Full text
Abstract:
Byggebransjen har etter innføringen av datamaskiner hatt liten vekst i lønnsomhet sammenlignet med andre bransjer. BIM — bygningsinformasjonsmodellering — er en teknologi som kan fornye hele bransjen. Men selv om BIM har blitt innført, gjennomføres prosjekteringen fortsatt med tradisjonelle metoder. Denne masteroppgaven ønsker å undersøke hvordan informasjonen i en bygningsinformasjonsmodell kan utnyttes mer effektivt, og hvordan arbeidsmetodene må utformes for å oppnå dette. For å definere hva som er god bruk av BIM, utarbeides det en helhetlig BIM-løsning for fremtiden, som bygger på 7 grunnprinsipper. Løsningen baserer seg på at all informasjon skal være tilgjengelig på sentrale servere, og at modellen er utformet som en database. Masteroppgaven har byggeteknisk prosjektering hos det rådgivende ingeniørfirmaet COWI Trondheim som utgangspunkt. COWI kan oppnå fordeler ved å tilpasse dagens arbeidsmetoder og utnytte de mulighetene dagens BIM-verktøy kan tilby. Men for å få fullt utbytte av BIM, er COWI nødt til å utvikle nye arbeidsmetoder og verktøy. Det fundamentale problemet med dagens BIM-løsninger, er at alle modelleringsverktøy bygger på ulik kodebase med forskjellige objektklassedefinisjoner. IFC som filoverføringsformat er ingen løsning på dette problemet, og en fullverdig løsning som utnytter BIM sitt potensial må bygges opp fra grunnen av. Effektiv prosjektering med BIM forutsetter også bruk av samprosjektering.
APA, Harvard, Vancouver, ISO, and other styles
31

Dahl, Erik. "BIM inom ROT-projekt." Thesis, KTH, Byggvetenskap, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-104493.

Full text
Abstract:
Användingen av virtuellt byggande och byggnadsinformationsmodeller inom byggbranschen ökar ständigt och är ett område som varit föremål för flera studier under de senaste åren. I flertalet av dessa har dock fokus legat på nyproduktion. Men i och med ett ökande renoveringsbehov i stora delar av det svenska bostadsbeståndet ökar även intresset av att använda BIM inom ROT-projekt. Dessutom har ny teknik inom området inmätning, då främst laserscanning, gjort att det idag finns lämpliga verktyg för att skapa byggnadsinformationsmodeller av befintliga byggnader. Målet med denna studie har följaktligen varit att undersöka hur en BIM av en befintlig byggnad kan tas fram och hur denna kan användas inom ett ROT-projekt. Resultaten som redovisas i denna studie bygger dels på en kartläggning av olika metoder för inmätning och dels på en sammanställning av erfarenheter från olika personer som arbetat med antingen inmätning eller arbetat i ROT-projekt där digitala 3D-modeller använts på ett eller annat sätt. Kartläggningen av de olika inmätningsmetoderna genomfördes främst genom en litteraturstudie medan insamlingen av erfarenheter genomfördes i form av en intervjustudie. De slutsatser som har kunnat dras utifrån resultaten visar att det finns en rad olika nyttor med att använda sig av BIM även inom ROT-projekt. Framför allt nyttor rörande kommunikation mellan olika aktörer inom projektet och aktörer som på olika sätt berörs av projektet. Dessa aktörer kan exempelvis vara beställare eller hyresgäster av en fastighet och saknar många gånger kunskap och erfarenhet av att läsa traditionella bygghandlingar i 2D. Användandet av digitala 3D-modeller skulle göra det lättare att kommunicera med dessa aktörer. Dessutom redovisar studien ett förslag på arbetsgång som kan användas då en BIM av en befintlig byggnad ska tas fram. Denna arbetsgång består av åtta steg och går igenom vad en beställare av en 3D-modell bör tänka på för att undvika de fallgropar som denna studie kunnat identifiera.
The usage of Virtual Design and Construction (VDC) and Building Information Models (BIM) in the building industry is steadily increasing and has been the subject of several studies during the last couples of years. The majority of these have focused on the new production of buildings. However, with an increasing need for renovation in large parts of the Swedish housing stock there has been an increasing interest in using VDC and BIM in retrofit projects.  In addition to that, new advances in the field of surveying, mainly through laser scanning, have provided new adequate tools to create building information models of existing buildings. The objective of this study has therefore been to investigate how a BIM of an existing building can be developed and how it can be used in a retrofit project. The results reported in this study are partly based on a survey consisting of various survey methods and partly on a compilation of experiences from individuals who worked as either a surveyor or in retrofit projects where digital 3D models where used in one way or another. The survey consisting of different survey methods was carried out mainly through a literature study, whereas the collection of experiences was carried out in the form of an interview study. The conclusions that could be drawn from these results show that there are a variety of benefits associated with the use of BIM in retrofit projects. The most pronounced benefits relate to the communication between different participants within the project and participants that are affected by the project in various ways. These participants may include the tenants or the users of the property who often lack the knowledge and the experience of reading traditional blueprints in 2D. The implementation of digital 3D models would facilitate communication with these participants. Further to this the study presents a proposal for a method that can be used when creating a BIM for a retrofit project. This method consists of eight steps, carefully explaining what a client interested in a 3D model should consider in order to avoid the pitfalls that this study has been able to identify.
APA, Harvard, Vancouver, ISO, and other styles
32

Kull, Andreas. "Compatibility issues with BIM." Thesis, KTH, Byggvetenskap, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-98791.

Full text
Abstract:
With the growing demand and use of BIM modeling, there’s also a growing number of competitors. Since every provider of BIM software has their own specific functions and file formats, there is no standard common platform and compatibility issues occur when projects are transferred between each other. Focus for this thesis is this gap and what can be done from preventing the gap to expand even more, this will be done by having a look at the most promising solutions that exists today.  If a way to prevent this from happening is discovered, this will be documented in the report and if possible, a program will be developed that can be used by anyone in order for the programs to communicate with each other in a better way.
APA, Harvard, Vancouver, ISO, and other styles
33

Johansen, Jørund. "BIM in Bridge Design." Thesis, Norges teknisk-naturvitenskapelige universitet, Institutt for konstruksjonsteknikk, 2013. http://urn.kb.se/resolve?urn=urn:nbn:no:ntnu:diva-21504.

Full text
Abstract:
Building Information Modeling (BIM) is a relatively new technology and work process.The main idea is to model 3D objects and store the information in a database such that this information can easily be extracted and viewed from these objects.The construction sector has more or less employed full BIM, however, the infrastructure sector has not incorporated the new technology in the same fashion.In this thesis, modeling of a specific bridge structure using the BIM tool Autodesk® Revit™ 2013, and the current bridge design process used at Norconsult were analyzed in order to evaluate the advantages and challenges of using BIM in bridge design.In order for Revit to be applicable it has to be able to accurately design the structure and provide the necessarydocumentation, as well as incorporate the steps leading up to, and following the bridge design, satisfactory.The main conclusions are:- There is a future for BIM in bridge design.- Advantages by utilizing BIM in bridge design have been shown through pilot projects.- The collaboration of the Revit model with road and underlay models (2D models displaying the projection of a structure on the horizontal plane) for reference is satisfactory, however the road geometry has to be appropriate for BIM purposes.- The use of Robot was not studied extensively in this thesis; however, non-standard geometry makes the incorporation of Robot difficult.- Although this thesis does not explicitly investigate the representation of the model created in Revit with other disciplines, there is documentation showing successful interplay in this regard.- The reinforcement tool included in Revit works well when modeling standard objects, but needs improvements in terms of modeling curved objects.- In terms of being able to effectively utilize BIM, the skill level of the user is of major importance; in the most extreme cases it can dictate whether or not a task can be done.
APA, Harvard, Vancouver, ISO, and other styles
34

Engdahl, Jenny, and Madeleine Hedlund. "BIM för Hållbart Byggande." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-22514.

Full text
Abstract:
The purpose of this study is to facilitate sustainable building by the use of BIM. The goal is to determine which aspects of sustainable building, which can be analyzed mainly with BIM tools, but also other aids. The study is based on literature studies and interviews. The literature review examines aspects important for sustainable building by studying environmental certification systems applicable in Sweden, as well as the BIM tools available on the market to analyze these aspects. The literature also includes the concepts of BIM and sustainability in order to provide a clearer view of its meaning. The interviews have brought the study's overall understanding of the industry and guidance on the subject. The results are presented in a table, where the aspects relevant to sustainable building are listed. It can also be read which aspect the certification systems raise. Overall, the study shows 132 aspects distributed across seven areas: Site, Water and Wastewater, Energy and Pollution, Materials and Waste, Indoor and Wellbeing, City Design and finally Implementation and Management. The table also suggests BIM tools and other aids, which can be used in the analysis of a specific aspect. The study shows a slight majority of the aspects, 55 percent, are possible to analyze with BIM tools. The Site is the area with most aspects, which can be analyzed with BIM tools, 95 percent. And Materials and Waste resulted in least aspects with only ten percent. Overall, the study examined 35 different BIM tools. The aspects that require other means of analysis often generates important information about the project, from a sustainability point of view, and in many cases the information can be integrated in the BIM model manually. In the end, the project gets a packed BIM model with useful information, which follows the project all the way into management and later demolition and recycling. The study shows that sustainable building demands a holistic approach where several aspects should be considered in order to achieve sustainability. To analyze the aspects of sustainability requires that relevant and accurate information about the project be collected. Various proposals can be drawn and compared to generate the most sustainable option. A tool for this is BIM. BIM is defined partly as a method of work, building information modeling, but also as a virtual model, building information model. BIM facilitates the coordination of information gathering, both as a working method and a technical tool. This will contribute BIM to achieve the purpose sustainable building.
Syftet med den här studien är att underlätta hållbart byggande genom användandet av BIM. Målet är att utreda vilka aspekter inom hållbart byggande som kan analyseras med fokus på i huvudsak BIM-verktyg, men också andra hjälpmedel. Studien bygger på litteraturstudier och intervjuer. I litteraturstudien undersöks aspekter som är betydelsefulla vid hållbart byggande genom att studera miljöcertifieringssystem som är tillämpningsbara i Sverige, samt vilka BIM-verktyg som finns att tillgå på marknaden för att analysera dessa aspekter. Litteraturstudien innefattar även begrepp rörande BIM och hållbarhet för att ge en klarare bild av dess innebörd. Intervjuerna har tillfört studien övergripande förståelse för branschen och vägledning i ämnet. Resultatet redovisas i en tabell, där de aspekter som är relevanta för hållbart byggande är listade. I tabellen går det även att utläsa vilka aspekter certifieringssystemen tar upp. Totalt visar studien på 132 aspekter fördelade inom sju delområden; Platsen, Vatten och Avlopp, Energi och Föroreningar, Material och Avfall, Inomhusklimat och Välmående, Stadens Gestaltning samt Genomförande och Förvaltning. I tabellen redovisas dessutom förslag på BIM-verktyg samt andra hjälpmedel som används vid analys av en specifik aspekt. Studien visar att en knapp majoritet av aspekterna, 55 procent, är möjliga att analysera med BIM-verktyg. Platsen är det delområde som visar flest aspekter som går att analysera med BIM-verktyg, 95 procent. Material och avfall resulterade i minst aspekter med endast tio procent. Sammantaget har studien undersökt 35 stycken olika BIM-verktyg. De aspekter som kräver andra hjälpmedel för analys genererar ofta information viktig för projektet ur hållbarhetssynpunkt, och går i många fall att integrera i BIM-modellen manuellt. Sammantaget medför det att projektet får en fullmatad BIM-modell med användbar information som följer projektet ända in i förvaltning och sedermera rivning och återvinning. Studien visar att hållbart byggande handlar om att ha en helhetssyn där flertalet aspekter ska beaktas för att uppnå hållbarhet. Det räcker således inte att bara se till exempelvis energihushållning för att anse att ett projekt är hållbart. För att analysera aspekter rörande hållbarhet krävs att relevant och riktig information om projektet insamlas. Då kan olika förslag utarbetas och jämföras för att ta fram det mest hållbara alternativet. Ett redskap för detta är BIM. BIM är definierat dels som en arbetsmetod, byggnadsinformationsmodellering, men också som en virtuell modell, byggnadsinformationsmodell. BIM underlättar samordningen av den insamlande informationen, både som arbetsmetod och som tekniskt verktyg. På så vis bidrar BIM till att uppnå syftet hållbart byggande.
APA, Harvard, Vancouver, ISO, and other styles
35

Strand, Fredrik, and Pontus Lindström. "BIM-PROJEKTERING FÖRFÖRBÄTTRAD LOGISTIK." Thesis, Uppsala universitet, Byggteknik, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-257589.

Full text
Abstract:
The construction industry depends on functioning logistics; if the logistics isn’tworking the construction site will risk to be interrupted due to material shortages orproblems with deliveries. Despite this, the construction industry is battling logisticproblems daily. This problem is very time consuming and costly for the companies.These theses are written for Peab Bostadsproduktion and investigate if it is possibleto focus on logistics earlier in the building planning process to reduce the problemsthat occur. Peab has partnerships with three companies that could be helpful for themin the work of reducing logistic problems. These three companies are Vico, BEAst andBIMobject.The thesis first section gives a general review of logistics, as well as the conceptsrelated to it. A general review of the above named partners is also given. In the firstsection the meaning of BIM is also explained. The core of the thesis consists of asurvey with craftsman from one of Peabs construction sites. The other main part isinterviews with officials from both the production side and from Peabs headquarters.The survey and the interviews have then been collected and analyzed. Based on theresult that was gathered, suggestions and solutions are presented and discussed.The work shows that many of the logistical problems that occur can be reduced orcompletely prevented by implementing these three in all Peabs own managementbuilds.
APA, Harvard, Vancouver, ISO, and other styles
36

Maria, Mônica Mendonça. "Tecnologia BIM na arquitetura." Universidade Presbiteriana Mackenzie, 2009. http://tede.mackenzie.br/jspui/handle/tede/2640.

Full text
Abstract:
Made available in DSpace on 2016-04-18T12:12:29Z (GMT). No. of bitstreams: 4 Monica Mendonca Maria1.pdf: 763444 bytes, checksum: d5fe5f8d60e9e7bd08aecfc0a88b8198 (MD5) Monica Mendonca Maria2.pdf: 1212194 bytes, checksum: b5f0b63d350777866e3955220d604827 (MD5) Monica Mendonca Maria3.pdf: 1656626 bytes, checksum: c2a9d642d2e4d86b7409ce54aabebe89 (MD5) Monica Mendonca Maria4.pdf: 2215429 bytes, checksum: 64893a7cd54a8d0497c2dc13776f74e4 (MD5) Previous issue date: 2009-02-04
This dissertation presents the technology within BIM and its implication in the architectural and engineering design process. Since the 60 s, aerospace and automotive industries have already revolutionized the way of project with the CAD, and manufacture with the assembly lines. In AEC, the CAD became BIM, a new way of project, build and manage, from conception till life cycle building. This brought a project and construction time reduction, cost and environmental impacts decrease foreseen in LEED and merged in BIM.
Este trabalho objetiva apresentar a tecnologia contida no BIM e suas implicações no processo de projeto da arquitetura e engenharia civil. A partir de 1960, as indústrias, aeronáutica e automotiva, já haviam revolucionado a forma de projetar com o CAD, e de fabricar com as linhas de montagem. Na Arquitetura, Engenharia e Construção, o CAD está evoluindo para o BIM (Building Information Modeling), uma forma de projetar, construir e gerenciar, da concepção ao habite-se, aplicável a todo o ciclo de vida da edificação. Dessa forma houve não só uma redução no tempo de projeto e construção, mas também em custos e impactos ambientais previstos em normas internacionais incorporadas ao BIM.
APA, Harvard, Vancouver, ISO, and other styles
37

Hossein, Mohammad Ahmad, and Ahmad Milad Sharif. "Brandskyddsprojektering kopplad till BIM." Thesis, Örebro universitet, Institutionen för naturvetenskap och teknik, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:oru:diva-67303.

Full text
Abstract:
Brandskyddsprojekteringen i olika projekt sker i dagsläget i 2D-CAD där filerna sparas iPDF-format. Detta framgick från de olika intervjuerna som skedde i samband med rapporten.Detta sätt att projektera på kan göra så att det uppstår olika typer av problem i projektet bådeför brandskyddsprojekteringen och de övriga discipliner som är med och projekterar. Närbrandskyddsprojekteringen inte deltar i att använda 3D-BIM i de olika projekten så försvårassamordningen av modellerna som görs av arkitekten eller BIM-samordnaren. De problem somkan uppstå består även av de möjligheter som inte tas till vara på vid BIM-användning avbrandskyddsprojekteringen. Dessa möjligheter och fördelar kan t.ex. vara ökad förståelse förkoncept och färdig byggnad, minskad tidsåtgång i byggskedet, högre produktivitet ochkvalitet m.fl. [1]. Det finns även möjligheter inriktad till brandskyddsprojekteringen där BIMbland annat underlättar framtagningen av brandskyddsritningar ochlivssäkerhetsystemsritningar.Implementering av BIM i brandskyddsprojekteringen kan ske på olika sätt. Efter delitteraturstudier som gjorts har det kommit fram till att BIM kan implementeras på olika sättgenom att t.ex. ta till vara på de olika förutsättningar som finns i dagsläget. Dessaförutsättningar är olika BIM-programvaror och BIM-kurser som gör det lättare attimplementera BIM för brandskyddsprojekteringen. Det går även att vid upphandling av deolika entreprenadformerna ge förslag och ställa krav på att projekteringen ska ske i BIM iförfrågningsunderlag eller i CAD- och BIM-manualen. Krav och regler kan även ställas avregeringen där ett liknande exempel är i Storbritannien där regeringen krävt byggnads- ochinfrastrukturprojekt att jobba med BIM i nivå 2 sedan April 2016 [2, 3].Boverkets byggregler kan också ställa mer strikta krav när det gäller projekteringen utifrånPBL och PBF där de kan ställa krav på att det ska ske i BIM.Utifrån dessa problem, möjligheter och förutsättningar som finns idag med implementering avBIM i brandskyddsprojekteringen kommer övergången inte att vara lätt och kommer inte attske snarast. Men detta borde göras i och med att BIM utvecklas hela tiden och då kommerövergången från 2D-CAD att bli ännu svårare i framtiden. Därmed bordebrandskyddsprojekteringen och de övriga disciplinerna i byggprocessen sträva att jobba i 3DBIMeftersom att detta nyttjar för alla som är delaktiga i projektet.
Fire protection design in various projects is currently done in 2D-CAD where the files aresaved in PDF format. This was evident from the various interviews that took place inconnection with the report. This way of designing can cause various types of problems in theproject that occur for both the fire protection design and the others disciplines involved in thedesigning. When the fire protection design does not participate in using 3D-BIM in theprojects, collaboration of the models made by the architect or the BIM coordinator willcomplicate. The problems that may arise also consist of the possibilities not taken for BIMuse of the fire protection design. These opportunities and benefits can for example be a betterunderstanding of concepts and completed building, reduced time spent in the constructionphase, higher productivity and quality etc. [1]. There are also possibilities for the fireprotection design, where BIM facilitates the production of the fire protection plans and lifesecuritysystem drawings.Implementation of BIM in the fire protection design can be done in different ways. Followingthe literature studies, it has come to conclusion that BIM can be implemented in differentways for example by taking advantage of the various conditions that exist today. Theseconditions include different BIM software and BIM courses that makes it easier to implementBIM for the fire protection design. It is also possible to make proposals for the design of BIMin the specifications or in the CAD- and BIM manuals when procuring the various types ofcontractors. Requirements and rules can also be set by the government where a similarexample where made in the UK where the government demanded construction andinfrastructure projects to work with BIM at level 2 since April 2016 [2, 3].Boverkets byggregler can also make stricter requirements regarding the design by PBL andPBF, where they can demand that it should be done in BIM. Based on these problems,opportunities and conditions that exist today with the implementation of BIM in the fireprotection design, the transition will not be easy and will not be happening soon. But thisshould be done as BIM evolves all the time and then the transition from 2D CAD will be evenmore difficult in the future. Therefore, the fire protection design and the other disciplines inthe construction process should aim to work in 3D-BIM, as this is useful to all those who areinvolved in the project.
APA, Harvard, Vancouver, ISO, and other styles
38

Cominetti, Matteo. "Project validation using BIM." Master's thesis, Alma Mater Studiorum - Università di Bologna, 2013. http://amslaurea.unibo.it/5413/.

Full text
APA, Harvard, Vancouver, ISO, and other styles
39

Mattsson, Martin, and Mathias Rodny. "BIM in Infrastructure : Using BIM to increase efficiency throughthe elimination of wasteful activities." Thesis, KTH, Byggvetenskap, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-127045.

Full text
Abstract:
The construction industry has for decades been suffering from low productivity growth and  production  processes that could be made  more  efficient if the occurrence  of non- value   adding   activities   could   be  reduced.   Building   Information  Modeling,   BIM, provides a new set of tools and new ways of working within the industry that has been attributed to numerous  advantages of different kinds at different stages of construction projects. The  main  purpose  of this  thesis  have  been  to describe  how BIM  applications can  be used to achieve a more efficient construction process through the reduction of wasteful activities in infrastructure projects. Through this we aim to find ways to increase  the level of efficiency in production and to create  incentives  for construction companies  to increase the use of BIM applications in infrastructure projects. The findings presented in this thesis are based on a literature review, observations from a case study  and interviews.  The literature review has been conducted to gain a deeper understanding  for the studied  area  as well as for creating  a theoretical  foundation on which the analysis  is based.  The  case study  bridge  project  has provided  observations from  the planning   and  design  process  as  well as  from  the construction  process.  In addition to this, interviews  have been carried out with people involved in the project as well  as  with  other   experienced   people  at  the  company,   and  all  together  this  has provided  the opportunity to investigate how BIM can be used throughout the project chain, from design to production. In this study we have found several types of non-value  adding activities in construction as  well  as  identified   numerous   obstacles  for  successful  implementation  of  BIM  in infrastructure projects. In addition to this, the results from this study show that there are many  benefits related  to the implementation of BIM that can improve  efficiency in infrastructure   projects.   The   conclusion   derived   from   this   study   is   that  BIM applications  can  be  used  to  support  a  detailed  collaborative  planning   and  design process, which in turn  creates  the prerequisites for a more efficient production process through the elimination of non-value  adding activities.
APA, Harvard, Vancouver, ISO, and other styles
40

Holmgren, Magnus. "Användning av BIM inom förvaltningen för vårdbyggnader : utveckla förvaltningen med hjälp av BIM." Thesis, Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-71403.

Full text
Abstract:
Potentialen att tillhandhålla stora mängder information under hela byggprocessen är något BIM(byggnadsinformationsmodellering på svenska) är mest förknippat med. Dock är den praktiskaanvändningen av BIM i förvaltningen minimal vid jämförelse mot projekteringen.Vårdbyggnader är otroligt viktiga och komplicerade byggnader i samhället som konstant behöverunderhållas och detta arbete tar upp BIM och relationsmodellernas potential att fungera som ettkomplement till dagens och framtidens förvaltningssystem.Studien har fokuserat på att ta reda på hur förvaltningen för vårdbyggnader arbetar idag medBIM och hur de önskar arbeta i framtiden. Detta har gjorts genom intervjuer ochdokumentanalyser där en litteraturstudie ligger till grund över utformningen av de frågeformulärsom tagits fram. Syftet har varit att undersöka vilken information som en BIM-relationsmodell(även kallat förvaltningsmodell) måste innehålla för att vara användbar och till nytta iförvaltningen.Teorin för arbetet beskriver vad BIM är och hur sambandet med BIM och fastighetsförvaltningenser ut. Teorin tar också upp vikten av hållbar information i öppna filformat.Resultatet av insamlade data visar att BIM är väl känt hos fastighetsförvaltningsorganisationernamen används inte i den utsträckning som önskas. Några anledningar till detta är brist på; kunskapinom organisationen, inflytande i byggprocessen och interna arbetsmetoder. Allaintervjurepresentanter är positiva till BIM och ser potentialen i att använda BIM-modeller somderas digitala verktyg att visualisera och hantera information inom förvaltningen. Dock har,framförallt, representanterna med ansvar för CAD/BIM för fastighetsdokumentationen svårt atttydligt påvisa vilken information som de vill ha och ser mer information som bättre.Slutsatsen visar att organisationerna är beroende av att utvärdera sina behov och hitta nyttor medBIM i förvaltningen för att sedan kunna sätta rätt krav på slutleveransen av BIM-modellen somska användas i förvaltningen. Behovet av att på ett konsekvent sätt lägga till, ta ut, uppdatera ochmodifiera information ser alla intervjurepresentanter som en viktig fråga för framtiden.Under diskussionskapitlet tas bland annat problematiken upp med att många som intervjuats seratt ju mer information den levererade BIM-modellen innehåller desto bättre är det. Författarenspersonliga åsikt är att modellen måste anpassas så att rätt information finns.
The potential for supplying large amounts of information throughout the construction process issomething BIM is mostly associated with. However, the practical use of BIM in facilitymanagement is minimal when compared to the project planning phase.Healthcare buildings are incredibly important and complex buildings in the society thatconstantly need to be maintained and this study addresses the potential of BIM and the use of asbuiltmodels to serve as a complement to today's and future facility management systems.This study has focused on finding out how the management of healthcare facilities uses andworks with BIM today and how they wish to work in the future. This has been done throughinterviews and document analyzes where a literature study forms the basis for the formulation ofthe questionnaires produced. The purpose has been to investigate what information a BIM asbuiltmodel (also called facility management model) must contain to be useable and useful in thefacility management.The theory of this study describes what BIM is and how the relationship with BIM and facilitymanagement looks. It also addresses the importance of sustainable information in open fileformats.The result of the collected data from the interviews shows that BIM is well known to facilitymanagement organizations but is not used to the extent desired. A few reasons for this are lackof; knowledge within the organization, influence in the construction process and workingmethods. All interviewees are positive to BIM and see the potential of using BIM models as theirdigital tools to visualize and manage information within the facility management. However have,in particular, the CAD/BIM representatives of the facility documentation difficulty in clearlyidentifying what information they want and thinks a lot of information in the models is better.The conclusion shows that organizations are dependent on evaluating their needs and findingbenefits with BIM in their facility management and then be able to set the right requirements forthe final delivery of the BIM model to be used in the facility management. The need to add,extract, update and modify information consistently, is something all interviewees sees as animportant question for the future.In the discussion chapter the problem arises about the fact that many interviewed thinks that themore information the BIM model contains, the better it is. The author's opinion is that the modelmust be adapted so that the right information is available.
APA, Harvard, Vancouver, ISO, and other styles
41

Fernández, Ramos Leandro, Rugel Renzo Ríos, and Aguilar John Marreros. "Más allá de la tecnología: BIM como una nueva filosofía." Civilizate, 2017. http://repositorio.pucp.edu.pe/index/handle/123456789/114559.

Full text
Abstract:
BIM (Building Information Modeling, por sus siglas en inglés) es una metodología de trabajo multidisciplinario basado en modelos interoperables que mejora la comunicación y el flujo de la información de los stakeholders durante todo el ciclo de vida del proyecto. Esta metodología busca reemplazar a las herramientas tradicionales en el proceso de desarrollo de un proyecto y fomentar la industrialización dentro del sector de la construcción en cada una de sus fases. En este artículo, se brindará un resumen de los beneficios de emplear BIM en cada una de sus dimensiones (BIM-3D, BIM-4D, BIM-5D, BIM-6D y BIM-7D).
APA, Harvard, Vancouver, ISO, and other styles
42

Claesson, Cecilia, and Charlotte Kjellkvist. "Implementera BIM i produktionen : Vilka produktionsparamterar krävs i en BIM-modell för att produktionsledare ska kunna tillämpa BIM som verktyg till sina arbetsuppgifter?" Thesis, KTH, Byggteknik och design, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-123792.

Full text
Abstract:
Detta examensarbete syftar till att exemplifiera vilka informationsparametrar som är nödvändiga för att Building Information Management på ett bättre sätt ska kunna implementeras i produktionsfasen. För att uppnå detta mål har vi analyserat utvecklingen och nyttjandet av Building Information Management genom tre olika datainsamlingsmetoder; litteraturstudie, observationer och intervjuer.   I detta examensarbete har vi fördjupat oss i för- och nackdelar samt hur Skanska Sverige AB kan tillämpa Building Information Management som hjälpmedel i arbetsberedningar. Denna fördjupning har lett till att vi kan analysera vilka produktionsanpassade informationsparametrar som en produktionsledare behöver i sin tjänsteroll för att dra nytta av Building Information Management. Vi anser att användandet av en BIM-modell kompletterar produktionsledarens ledaregenskaper, vilket gör det lättare för denne att nå fram med informationen till yrkesarbetarna, då visualiseringen underlättar förståelsen inför aktiviteten. I denna rapport kan läsaren ta del av de slutsatser vi kommit fram till.
This thesis aims to exemplify the information parameters necessary for Building Information Management in a better way will be able to implemented in the production phase. To achieve this goal, we have analyzed the development and use of Building Information Management through three different data collection methods; literature, observations and interviews. In this thesis we have extended us in the pros and cons and how Skanska Sweden AB may apply Building Information Management as a work tool in work briefings. This invasive treatment has led us to analyze the production custom information parameters as a production manager needs in its employment to take advantage of Building Information Management. We believe that the use of a BIM model complements the production manager's leadership skills, which makes it easier for him/her to convey information to skilled workers, then the visualization facilitates understanding of the task. More about the conclusions we have reached, the reader can take part of this thesis.
APA, Harvard, Vancouver, ISO, and other styles
43

Mondini, Leonardo. "BIM Lifecycle e Facility Management: il caso di studio del BIM per Gio Ponti." Master's thesis, Alma Mater Studiorum - Università di Bologna, 2020.

Find full text
Abstract:
Come contributo all’attuale stato di necessità di adozione del BIM nel nostro Paese, questo elaborato vuole documentare come il Building Information Modeling, grazie alla sua metodologia di natura olistica, non sia in contrasto con i tradizionali metodi di progettazione, costruzione e gestione di un edificio, ma attualizzi invece un portato proprio della tradizione ingegneristica: il rapporto fra atto ideativo e fatto costruttivo. Il passo evolutivo più grosso lo deve fare il Facility, poiché è qui che si concentra il 70% del costo sul totale della spesa nell’arco della vita utile di un edificio. Lo scoglio da superare è sicuramente la gestione dei dati: abbiamo un database efficace (il modello IFC), che ci permette di archiviare una grande quantità di dati (ACdat e ACDoc), ora dobbiamo riuscire a leggerli e decifrarli; l’altro problema da risolvere è la bidirezionalità dell’informazione, che viene letta in un senso (dall’IFC ai programmi di Facility), ma non trova un reale risposta nel passaggio inverso. E’ ora di ottimizzare tutti gli aspetti insiti nel processo costruttivo, attraverso un cambio di approccio al problema, un cambiamento generazionale di pensiero che sta trovando terreno fertile nel settore AEC per sviluppare appieno le sue potenzialità.
APA, Harvard, Vancouver, ISO, and other styles
44

Redander, Robin. "Bättre arbetsberedningar med hjälp av BIM : Hur de kan utformas för implementering av BIM." Thesis, Uppsala universitet, Byggteknik, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-257673.

Full text
Abstract:
During the past years Building Information Modelling (BIM), which is a digital way to work, has begun to spread amongst the parts of the construction process. At the construction phase the larger companies has started using the new way to work. This expansion has not been developed amongst smaller companies leading to the purpose of this report, to investigate in which ways the smaller companies can implement BIM by changing their way to work. The thesis is delimited to work preperations with the objective to define how the work preperations should be structured to enable the implementation of BIM. To achieve the objective of the report, information about the subject has been collected by interviews and literature studies. Among other things the interviews have shown a need of education regarding BIM. By using the computer application Autodesk NavisWorks, application areas have been found within visualization, time management and managing information. Further on the results from interviews and literature studies have been analyzed to identify the areas in which BIM can contribute to a better way of creating the work preperations. The possibility to insert appendices into the template, an elucidation of the BIM-modells application areas and working with multiple operators while creating work preperations have been mentioned.The report has eventually resulted in a suggestion of how the template for work preperations can be structured. Together with the template a document describing in which ways the BIM-modell can be used while working with the template have been made.
APA, Harvard, Vancouver, ISO, and other styles
45

Hamoud, Bassam, and Subeyr Yassin. "Användning av BIM-modeller vid kommunikation mellan olika parter." Thesis, KTH, Byggteknik och design, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-123772.

Full text
Abstract:
Trafikverket vill ta reda på hur de skaimplementera BIM (Building information modeling) som ett arbetssätt i sinorganisation vid projektering, byggande och förvaltning. Syftet med det härexamensarbetet är att ta reda på hur Trafikverket kommunicerar med BIM-modelleridag och hur man kan utvecklas. Det är få människor i anläggningsbranschen som idag har erfarenhet av att arbeta med BIM. Även i de projekt som jobbar med BIM idag så behövs det alltid en BIM-samordnare som håller i trådarna. För att få ett bra slutresultat så måste kommunikationen i ett projekt fungera bra. En förutsättning för detta är att alla inblandade parter har samma mål med projektet, t.ex. att hålla tidplanen bättre. De som saknar erfarenhet av arbete med BIM-modeller måste ges en chans att förstå sig på det för att de ska kunna dela med sig av sina erfarenheter och kunskap. Kunskapsnivån måste höjas och det kommer ta sin tid. Det är viktigt att man inte fokuserar allt för mycket på tekniken eftersom BIM handlar om mer än bara teknik. Först och främst måste man vara tydliga med vilket mål det är som man har av arbete med BIM. Utifrån detta kan man sedan definiera en process och sist bestämma sig för vilken teknik som passar bäst för detta ändamål.
The Transportadministration wants to find out how to implement BIM (Building informationmodeling) as a way of working in their organization during design, constructionand management. The purpose of this study is to find out how BIM-models areused in communication today and how it can be developed.   There are a few people today in the construction industry who have experience of working with BIM. Even in projects who work with BIM there is always a need for a BIM-coordinator who holds the strings. To get a good end result the communication within the project must be good. A condition for this is that all the involved parties have the same goals with the project, such as keeping the schedule better. Those who lack experience of working with BIM-models must be given a chance to understand it in order to be able to share their experience and knowledge with others. Knowledge must be enhanced and it will take time. It is important that there is not too much focus too much on technology because BIM is about more than just technology. First and foremost one must be clear about the ones goals of working with BIM. From this one can then define a process and ultimately decide which technology is best suited for this process.
APA, Harvard, Vancouver, ISO, and other styles
46

Holm, Daniel, and Josefine Wallgren. "Kvalitets- och kollisionskontroller i BIM-projekt : En analytisk jämförelse mellan programvarorna Autodesk Navisworks Manage, Solibri Model Checker och Tekla BIMsight." Thesis, KTH, Byggteknik och design, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-127033.

Full text
Abstract:
I ett BIM-projekt skapas ett flertal intelligenta 3D-modeller innehållande geometrier och information. Respektive fackområde skapar modeller innehållande sina byggdelar och installationskomponenter. Genom att samordna modellerna från alla områden skapas en BIM-modell över hela projektet. En förutsättning för att projekteringen ska effektiviseras är att modellerna håller god kvalitet. Då allt fler byggnader projekteras i 3D-miljö finns det idag goda möjligheter att underlätta arbetet med kvalitetssäkring. Det finns ett flertal programvaror där det är möjligt att sammanfoga och granska modeller. Förutom att upptäcka kollisioner och kvalitetsfel, innehåller programmen flera andra funktioner som kan effektivisera projekt. En egenskap är möjligheten att virtuellt gå omkring i en byggnad innan den uppförs. Det finns även möjlighet att mäta avstånd, rita och göra noteringar i modellen och dess vyer, vilket är till hjälp när den ska granskas av de olika disciplinerna. Bakgrunden till det här examensarbetet är att konsultföretaget Byggteknik AB vill veta vilken programvara för samordning som uppfyller deras behov bäst. Genom implementering av programvaran vill de kunna ta på sig samordningsansvaret i framtida BIM-projekt. Frågeställningen är: Vilken programvara lämpar sig bäst för konsultföretaget Byggteknik AB? Den besvarades genom att en fallstudie genomfördes. I fallstudien jämfördes tre olika programvaror för kvalitets- och kollisionskontroller; Autodesk Navisworks Manage, Solibri Model Checker och Tekla BIMsight. Svaret på frågeställningen, som presenteras i rapporten, är att Autodesk Navisworks Manage är den programvara som i dagsläget lämpar sig bäst för Byggteknik AB.
In a BIM-project several intelligent 3D-models is being created. The 3D-models contain both geometries and information. Each discipline creates models containing their building and installation components. By coordinating the models from all the disciplines, a BIM-model of the entire project is being created. A prerequisite for the design to be effective is that the models have a good quality. Today there are good opportunities to facilitate the work of quality assurance, since more and more buildings are designed in 3D. There are several softwares for merging and checking models. In addition to detecting collisions and quality defects, the software can do several tasks to make projects more effective. One feature is the ability to virtually walk around in the building before it is constructed. It is also possible to measure distances, draw and make notes in the model and its views, which is helpful when it will be reviewed by the various disciplines. The background to this thesis is that the consultancy Byggteknik AB would like to know what software for coordination that meets their needs best. By implementing the software, they want to be able to assume responsibility for coordination in future BIM-projects. The question for this thesis is: What software is best suited for the consultancy Byggteknik AB? To answer the question a case study was conducted. In the case study three different softwares for quality and collision checks was being compared. The softwares being compared were Autodesk Navisworks Manage, Solibri Model Checker and Tekla BIMsight. The answer to the question, presented in this report, is that Autodesk Navisworks Manage in the current situation is best suited for Byggteknik AB.
APA, Harvard, Vancouver, ISO, and other styles
47

Axelsson, Henrik. "BIM : Förvaltning, inventering och användningsområden." Thesis, Mittuniversitetet, Avdelningen för ekoteknik och hållbart byggande, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:miun:diva-25158.

Full text
Abstract:
ByggnadsInformationsModellering, BIM är ett komplext begrepp med varierande innebörd beroende på var i byggprocessen det används. Det finns ingen enkel definition av hur arbetet med BIM tillämpas och innefattar många aktiviteter.   I rapporten har en litteraturstudie samt intervjufrågor legat till grund för resultat och slutsatser, dessa har riktats mot att ta reda på hur digital informationshantering anpassas till en byggnads förvaltningsskede och hur inventering av en befintlig byggnad kan utföras med dagens teknik. Genom att studera vad som tidigare skrivits inom ämnet samt med kontakter via personer som sysslar med konsultuppdrag eller förvaltningsadministration inom byggbranschen har en sammanställning av nuvarande tillämpningar kunnat visas. I grund och botten är BIM ett modernt arbetssätt som kan nyttjas av alla discipliner för att tillge information i ett projekt som även kan fortsätta att uppdateras vidare genom produktion, förvaltning, ombyggnader samt renovering, och slutligen rivning.   Inventering av en äldre byggnad som saknar data kan återskapas med laserskannerteknik och ger en tillförlitlig datainsamling som sedan bearbetas i CAD-program. Forskning har skett för att försöka hitta ett sätt att lokalisera inbyggnadsmaterial utan att göra åverkan på byggnadskonstruktionen.
Building Information Modeling, BIM is a complex idea which has varying meaning depending on where in the building process it is used. There is no simple definition of how the working with BIM is applied and consists of many areas of activity.     This report is based upon the study of available literature and interview questions, which both have set the ground for the result and conclusions presented. These have aimed to investigate how digital information processing can be applied in the facility management for a building and furthermore, how inventory of an already built building can be improved by today’s technology.  By studying what´s already have been written on the subject and contacting people who works in the building consulting business or building facility management, a combination of available techniques is presented. The bottom-line is that BIM (Building Information Modeling) is a modern working method which can be used by all disciplines for applying information to a project, and which also can be used progressively into production, facility management, rebuilding and renovation, and finally deconstruction.   Inventorying of an old building which lacks data can be recreated by the use of laser scanner technique and gives a reliable collection of data, which afterwards is processed in a CAD program. Studies have been made in order to find a way for localizing inbuilt material without making any permanent damage to the building construction.
APA, Harvard, Vancouver, ISO, and other styles
48

Wallin, Dan, and Benny Andersson. "Implementering av BIM i kalkyleringsskedet." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-29353.

Full text
Abstract:
Syfte: Syftet med examensarbetet är att analysera i vilken utsträckning BIM används i kalkyleringsarbetet, och hur hindren kan övervinnas för att öka implementeringen av BIM i kalkyleringsarbetet. Metod: Vi har använt oss av en litteraturanalys och ett antal kvalitativa intervjuer. Resultat: Resultatet av examensarbetet är att det finns ett antal hinder som behöver övervinnas för att öka implementeringen av BIM i kalkyleringsarbetet. Ett av hindren är att i förfrågningsunderlaget från beställaren finns inte BIM-modeller med. Och om de finns med så håller de en bristande kvalité. Ytterligare hinder som är identifierade är de juridiska, tekniska och branschens motstånd mot ny teknik. Även utbildning i BIMverktygen, avsaknad av en gemensam branschstandard och att de inblandade aktörerna måste få en förståelse att BIM är ett verktyg som alla kan dra nytta av. Konsekvenser: BIM i kalkyleringsarbetet har en potential att ge en exaktare, mer tidsbesparande och säkrare kalkyler. Den analys som vi kan dra av vårt examensarbete är att vi upplever att Peab är på rätt väg. De väntar inte på att beställarna ska ge dem en användbar BIM-modell tillsammans med anbudunderlaget. De har istället tagit ett ledningsbeslut att själva börja modellera upp rätta geometriska modeller som är användbara för kalkylingenjören. De har insett vikten av att kalkylingenjören får de digitala verktygen och utbildning på dessa så att de kan dra nytta av de fördelar som BIM kan ge i kalkyleringsarbetet. För att driva implementeringen av BIM framåt så kan det behövas åtgärder i form av nationella regler gällande hur standardiseringar ska utformas. Dessa standardiseringar kan möjliggöra att processen att implementera BIM underlättas och att dessa standardiseringar kan övervinna hinder i informationsutbytet mellan aktörerna. För att öka användandet av BIM så rekommenderas att en BIM-samordnare utses, som tidigt i projekten ställer krav på de olika aktörerna på hur filer och handlingar ska utformas så att informationen går att använda, inte bara vid kalkyleringsskeendet utan också vidare i projektet. För att driva implementeringen av BIM framåt så behöver det juridiska hindret få en lösning. Därför att nu så saknas regler i standardavtalen för att kunna inkludera digital information i handlingarna. Dessa förändringar behöver åtgärdas för att kunna knyta leverantören och mottagarens ansvar och nyttjanderätt av innehållet i leveransen av digital information. Begränsningar: Vi har avgränsat oss till att endast analysera hur BIM används idag och hur det kan komma att användas i kalkyleringsarbetet i framtiden.
Purpose: The purpose with our thesis is to analyze to what extent BIM is used in the calculation work, and how to overcome the obstacles of implementing BIM in the calculation work. Method: We have used literature analysis and a number of qualitative interviews. Findings: The outcome of our thesis is that there are several obstacles to overcome in order to increase the implementation of BIM in the calculation work. One of the obstacles is that BIM structures are missing in the specifications from the clients and if they are included they do not live up to the standard necessary. Further obstacles are the juridical and technical problems alongside with the industry’s resistance towards new techniques. Insufficient education in BIM tools, and the lack of a common industrial standard are problems as well as there’s a need to help the involved operators acquire knowledge that BIM is a tool that everyone can benefit from. Implications: BIM has the potential to give more precise, more timesaving and more accurate calculations in the calculation work. When analyzing our work, we feel that Peab is on the right path. They don’t wait for the clients to give them a useful BIM structure together with the tender documentation. Instead, the management have decided to make geometrically correct structures themselves that are useful to the calculation engineer. They have realized the importance of providing the calculation engineer with the proper digital tools and education of these tools so that they can benefit from the advantages BIM can give in the calculation work. In order to drive the implementation of BIM forward, there might be a need for some workarounds in the form of national rules about standardizations are to be formed. These standardizations can make it possible to ease the process of implementing BIM and that these standardizations can overcome obstacles in the information exchange between the clients. To increase the use of BIM it’s recommended that a BIM coordinator is selected, who can make demands on the various clients about how files and documents should be designed in order to be able to use them, not just in the calculation stage but also further into the project. In order to drive the implementation of BIM forward, a solution to the juridical obstacle are needed. As it is now, rules to include digital information in the acts are missing in the standard documents. Changes need to be done in order to attach the contractor and the client`s responsibility and usufruct of content in the delivery of digital information. Limitations: We have limited ourselves to only analyze how BIM are used today and how it may be used in the calculation work in the future.
APA, Harvard, Vancouver, ISO, and other styles
49

Feole, Ana Inés. "Soluciones BIM para Cambridge Architectural." Bachelor's thesis, Universidad Nacional de Córdoba. Facultad de Ciencias Exactas, Físicas y Naturales, 2014. http://hdl.handle.net/11086/1673.

Full text
Abstract:
Práctica Supervisada (IC)--FCEFN-UNC, 2014
Analiza una nueva forma de llevar a cabo los trabajos relacionados con la ingeniería y arquitectura. Consiste en una herramienta llamada BIM (Building Informatión Modeling) o en castellano, Modelado de información para la Edificación. Conforma el modelo BIM del edificio en cuestión, aplicarlo al producto del cliente, y hallar la solución más eficiente y adecuada para facilitar la instalación de este producto
APA, Harvard, Vancouver, ISO, and other styles
50

Sliška, Andrej. "Využití BIM při oceňování nemovitostí." Master's thesis, Vysoké učení technické v Brně. Ústav soudního inženýrství, 2019. http://www.nusl.cz/ntk/nusl-402601.

Full text
Abstract:
The main objectives of this diploma thesis are to introduce the building information model as an effective tool, helping at work with the buildings throughout their lifecycle and to consider its use for real estate valuation, from the point of view of individual valuation methods, used in Czech Republic. The real estate valuation methods and the functional principles of building information model, as well as its features, are described in the first part of the thesis. In addition, the first part of the thesis also deals with the model implementation conditions in selected countries of the world. The second part of the document contains consideration for model usage in the valuation practice. A practical demonstration of working with the model is also included in this thesis.
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!

To the bibliography