To see the other types of publications on this topic, follow the link: Building Construction Management and Project Planning.

Dissertations / Theses on the topic 'Building Construction Management and Project Planning'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 dissertations / theses for your research on the topic 'Building Construction Management and Project Planning.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Parks, Clare A. "Improving building function : an analysis of design management processes and operational planning in the development of hospital food service systems." Thesis, Robert Gordon University, 2000. http://hdl.handle.net/10059/597.

Full text
Abstract:
The complexity of future societies will be reflected not only in the buildings that are created but also in the processes that evolve such buildings. Within the construction industry, and specifically in relation to large, complex multi-user buildings, operational planning and design processes will assume greater importance than ever before. Given that increasing complexity is likely to lead to increasing specialism and differentiation amongst the main contributing parties in a construction procurement project, it is also likely that there will be more disruption of the communication and organ
APA, Harvard, Vancouver, ISO, and other styles
2

Walrath, Bryan James. "A Project Planning Guide for Healthcare Facility Owners." Thesis, Georgia Institute of Technology, 2007. http://hdl.handle.net/1853/14557.

Full text
Abstract:
According to a recent study, about 30 percent of U.S. real estate projects are canceled midstream, while more than half run up to 190 percent over budget and 220 percent over the initial time estimate. The reasons for this are manifold but poor decisions during the initiation and early planning of the project can be pointed to as main causes. Most poor decisions stem from lack of information, bad judgment, and lack of communication and transparency between what the client expects and what the project team can deliver. Proper project planning procedures and methods will lead to proper conting
APA, Harvard, Vancouver, ISO, and other styles
3

Alnasseri, Nasser. "Managing and controlling airport construction projects : a strategic management framework for operators." Thesis, Northumbria University, 2015. http://nrl.northumbria.ac.uk/32542/.

Full text
Abstract:
During the last few decades, strategic management and strategic human resource management theories have received a great deal of attention in many industrial sectors. The complex and constantly changing business environment has driven large construction companies more than ever before to reflect on the interplay between their organisational strategies and their strategic management processes, tools and techniques. This is despite the great value of human capital for an organisation’s strategic flexibility within different sets of environmental evolutions. This includes people in various positi
APA, Harvard, Vancouver, ISO, and other styles
4

Lau, Chak-Kei Jacky, and 劉澤基. "A critical analysis of integrated project organisations in meeting client's objectives." Thesis, The University of Hong Kong (Pokfulam, Hong Kong), 1994. http://hub.hku.hk/bib/B31251286.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Wanyona, Githae. "Risk management in the cost planning and control of building projects : the case of the quantity surveying profession in Kenya." Doctoral thesis, University of Cape Town, 2005. http://hdl.handle.net/11427/5063.

Full text
Abstract:
Includes bibliographical references (leaves 295-305).<br>This thesis examines financial risk management in the cost planning and cost control of building projects in Kenya. The quantity surveying professional in Kenya is faced with poor access to the recorded cost data needed for preparing final building cost estimates and for budget prediction. This shortcoming is exacerbated by the passive role played by the professional building cost consultant during design development. Passive professional building cost consultants are unlikely to implement risk management strategies as part of the cost p
APA, Harvard, Vancouver, ISO, and other styles
6

Ningappa, Geetanjali Ningappa. "Use of lean and building information modeling (bim) in the construction process; does bim make it leaner?" Thesis, Georgia Institute of Technology, 2011. http://hdl.handle.net/1853/39594.

Full text
Abstract:
Construction productivity lags behind most industries. In general, the process of construction is carried out in several smaller processes. For the overall construction process to be successful, continuity between these smaller processes must be achieved. This has been the persistent goal of construction productivity improvement for decades now. Waste is generated between the continuing activities by the unpredicted release of work and the arrival of resources. However, in recent decades the construction industry has a great need to improve its productivity, quality and incorporate new techn
APA, Harvard, Vancouver, ISO, and other styles
7

Yiu, Yee-ming, and 姚怡明. "Design and build as an alternative method of procuring major publicly funded hospital projects in Hong Kong: a casestudy." Thesis, The University of Hong Kong (Pokfulam, Hong Kong), 1998. http://hub.hku.hk/bib/B31251547.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Holmstjerna, Elin, and Erika Haraldsson. "Ett gestaltningsförslag på ett flerbostadshus i trå : Stubben i Rosenlundsparken." Thesis, KTH, Byggteknik och design, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-259979.

Full text
Abstract:
Examensarbetet behandlar trä som byggnadsmaterial. I arbetet ingår en rapport med förklarande illustrationer samt framtagning av programhandlingar för ett bostadsprojekt. Byggbranschen står idag för en hög miljöbelastning där den största bidragande faktorn är materialproduktionen. Trots att trä är det enda koldioxidneutrala konstruktionsmaterialet byggs få flerbostadshus med trä som bärande stomme. Det råder brist på kunskap och erfarenhet inom träbyggnadsteknik av anledningen att en tidigare lagstiftning förbjöd byggnader över två våningar med trästomme. Studien har fördjupat sig i möjlighete
APA, Harvard, Vancouver, ISO, and other styles
9

Lim, Bobby Ting Chuan. "Causal modelling construction project performance." Thesis, Heriot-Watt University, 1987. http://hdl.handle.net/10399/1011.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Grossmann, Jiří. "Podnikatelský záměr stavebního podniku se zaměřením na dřevostavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225436.

Full text
Abstract:
The thesis includes business intention of construction company in the form of a feasibility study. Planned company deals with the realization of timber-framed buildings that are built by hand directly on the construction site. The introductory part describes basic knowledge of the investment projects planning. One subchapter shortly describes the timber construction system. Parts of the business intention are oriented on corporate strategy, marketing, production technology, manpower, economic a financial analysis and risk management. In conclusion is an overall assessment of the project feasib
APA, Harvard, Vancouver, ISO, and other styles
11

Kaehkoenen, Kalle Esa Eelis. "Modelling activity dependencies for building construction project scheduling." Thesis, University of Reading, 1993. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.336061.

Full text
APA, Harvard, Vancouver, ISO, and other styles
12

Chan, Po-keung, and 陳保強. "Project management of building services engineering work in Hong Kong building construction industry." Thesis, The University of Hong Kong (Pokfulam, Hong Kong), 1989. http://hub.hku.hk/bib/B31251171.

Full text
APA, Harvard, Vancouver, ISO, and other styles
13

Lin, Chun-ming. "Managerial use of quantitative techniques in building project management : contractors perspectives /." Hong Kong : University of Hong Kong, 2000. http://sunzi.lib.hku.hk/hkuto/record.jsp?B25949275.

Full text
APA, Harvard, Vancouver, ISO, and other styles
14

Saluja, Chitwan Messner John I. "A process mapping procedure for planning Building Information Modeling (BIM) execution on a building construction project." [University Park, Pa.] : Pennsylvania State University, 2009. http://etda.libraries.psu.edu/theses/approved/WorldWideIndex/ETD-4242/index.html.

Full text
APA, Harvard, Vancouver, ISO, and other styles
15

Wong, Wai-keung. "Project management of building services engineering in Hong Kong /." Hong Kong : University of Hong Kong, 2001. http://sunzi.lib.hku.hk/hkuto/record.jsp?B25950071.

Full text
APA, Harvard, Vancouver, ISO, and other styles
16

Ha, Pui-hing Susanna, and 夏佩卿. "Project planning and control in the construction industry of HongKong." Thesis, The University of Hong Kong (Pokfulam, Hong Kong), 1987. http://hub.hku.hk/bib/B31263768.

Full text
APA, Harvard, Vancouver, ISO, and other styles
17

Ferre, Jose L. "Construction management : a viable solution to traditional project delivery problems." Thesis, Georgia Institute of Technology, 1986. http://hdl.handle.net/1853/22378.

Full text
APA, Harvard, Vancouver, ISO, and other styles
18

Guiney, Andrew, and aguiney@smsmt com. "Information Technology Project Management Team Building for Project Success." RMIT University. Graduate School of Business, 2009. http://adt.lib.rmit.edu.au/adt/public/adt-VIT20100122.121228.

Full text
Abstract:
More than ninety per cent of projects are run by project teams and the stronger the team the more likely the project will succeed. Team building activities are performed to both increase team performance and to enhance the likelihood of project success. For the purpose of this study, information technology (IT) business projects were chosen as IT is a major driving force in business today and there is widespread dissatisfaction with the performance of IT business projects. In analysing the causes of dissatisfaction, increasingly researchers are recognising that technology is a secondary issue
APA, Harvard, Vancouver, ISO, and other styles
19

Lin, Chun-ming, and 連振明. "Managerial use of quantitative techniques in building project management: contractors perspectives." Thesis, The University of Hong Kong (Pokfulam, Hong Kong), 2000. http://hub.hku.hk/bib/B31251602.

Full text
APA, Harvard, Vancouver, ISO, and other styles
20

Wu, Shuwei. "The impact of collaborative working on construction project performance." Thesis, Northumbria University, 2010. http://nrl.northumbria.ac.uk/2/.

Full text
Abstract:
In the construction industry, the relationship between clients and contractors has been usually characterized by uncertainty and adversarial behaviour. More recently, their relationship is said to be changing from a traditional and arms-length basis to more collaborative forms, e.g. partnering. There is evidence that such collaborative forms can have a substantial impact on project performance, not only with regard to time, cost and quality objectives, but also with regard to more general outcomes, e.g. greater innovation and improved user satisfaction. However, such benefits are less well und
APA, Harvard, Vancouver, ISO, and other styles
21

Kruger, I. J. "Project management delays : project management delays with specific reference to the building and construction industry of the Western Cape." Thesis, Stellenbosch : Stellenbosch University, 2000. http://hdl.handle.net/10019.1/51888.

Full text
Abstract:
Thesis (MBA)--Stellenbosch University, 2000.<br>ENGLISH ABSTRACT: The purpose of this study is to investigate reasons for delays and disruptions in project management, with specific reference to the building and construction industries of the Western Cape. The reason for the study can be posed in the form of a question, "Why, even though the construction and building industry possess the skills of highly competent people do a substantial percentage of projects still experience significant delays and disruptions often leading to financial and program difficulties?" The study can point
APA, Harvard, Vancouver, ISO, and other styles
22

Wong, Wai-keung, and 汪偉強. "Project management of building services engineering in Hong Kong." Thesis, The University of Hong Kong (Pokfulam, Hong Kong), 2001. http://hub.hku.hk/bib/B31251742.

Full text
APA, Harvard, Vancouver, ISO, and other styles
23

Akinyede, Imisioluseyi Julius. "Framework for effective management of cost constraint on building project delivery in South Africa." Thesis, Cape Peninsula University of Technology, 2014. http://hdl.handle.net/20.500.11838/1063.

Full text
Abstract:
Thesis submitted in fulfilment of the requirement for the degree Master of Technology (Construction Management) In the Faculty of Engineering 2014<br>According to findings presented in literature, construction projects are restrained within budgeted cost. Hence, the operational system is challenged within prohibitive cost limits to deliver projects at a stipulated time and at a satisfactory quality. This has prompted the intention of establishing effective management of cost constraint on building project delivery in South Africa. Data for the main study were collected through observations,
APA, Harvard, Vancouver, ISO, and other styles
24

Rahmat, Ismail Bin. "The planning and control process of refurbishment projects." Thesis, University College London (University of London), 1997. http://discovery.ucl.ac.uk/1317640/.

Full text
Abstract:
This study examines the planning and control process of refurbishment projects. The methods of achieving integration in the process is the main focus of this study. The integrative mechanisms employed by refurbishment project organisations and their influence on planning performance were analysed. The integrative mechanisms include the involvement of the key participants in decision-making, lateral relations, planning and control procedures, communication skills and knowledge and information technology. This study also highlights the influence of the complexity and uncertainty of the refurbish
APA, Harvard, Vancouver, ISO, and other styles
25

Lau, Chak-Kei Jacky. "A critical analysis of integrated project organisations in meeting client's objectives /." Hong Kong : University of Hong Kong, 1994. http://sunzi.lib.hku.hk/hkuto/record.jsp?B25947217.

Full text
APA, Harvard, Vancouver, ISO, and other styles
26

Chen, Qian. "An Object Model Framework for Interface Management in Building Information Models." Diss., Virginia Tech, 2007. http://hdl.handle.net/10919/28410.

Full text
Abstract:
The construction industry's overall project performance is significantly reduced by numerous interface issues that also hinder its industrialization. Interface Management (IM) is becoming critical to the success of multidisciplinary construction projects. This research deals with three challenging problems associated with IM: 1) how to build a holistic understanding of interface issues for developing all-around IM solutions; 2) how to define and present interface information in a unified, accurate, and efficient way to improve information sharing, coordination, and implementation; and 3) how t
APA, Harvard, Vancouver, ISO, and other styles
27

Albishri, Abdulaziz Ali M. "Mega-project engineering-management processes: pre-planning phase evaluation for construction and mining." Thesis, Curtin University, 2015. http://hdl.handle.net/20.500.11937/1350.

Full text
Abstract:
Mega-projects internationally continue to experience time and cost overruns. Addressing the pre-planning phase has been assessed as a key requirement. This research-project presents two KSA mega-project resources case-studies towards an evaluation of the management-processes applied at the preplanning, design, construction and design phases to clarify procedure and recommend improvement. Findings note the impact of Stage-Gate Process, Gate-keeper approval, and scope-change processes. Recommendations for a best practice stakeholder guide are developed towards best practice.
APA, Harvard, Vancouver, ISO, and other styles
28

Carlsson, Linnea. "Visual Planning in construction : a study of its use in construction projects." Thesis, KTH, Fastigheter och byggande, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-96390.

Full text
Abstract:
Abstract The purpose of this master thesis is to investigate of what use the method Visual Planning can be in the construction industry in general and in the design phase of construction projects in particular.   The investigation and empirical part of the thesis has been based on semi-structured interviews with process developers, design managers and designers from Swedish companies where Visual Planning is used. The interviews have been the base for a comparative case study with the aim of providing an overview of how the method is currently used, interpreted, experienced and perceived in th
APA, Harvard, Vancouver, ISO, and other styles
29

Adebowale, Oluseyi Julius. "Framework for effective management of the construction workforce towards enhancement of labour efficiency during the building production process in South Africa." Thesis, Cape Peninsula University of Technology, 2014. http://hdl.handle.net/20.500.11838/1065.

Full text
Abstract:
Thesis submitted in fulfilment of the requirements for the degree Master of Technology: Construction Management in the Faculty of Engineering at the Cape Peninsula University of Technology 2014<br>The study investigates the predominant factors that adversely affect the efficiency of construction labour in the South African construction industry. There is a significant number of studies on construction labour efficiency and productivity. Nonetheless, construction labour efficiency in developed and developing nations is widely reported to be inadequate, and thus adversely impacts the deliver
APA, Harvard, Vancouver, ISO, and other styles
30

George, Marcus G. "The implementation of project management in the building construction field in the United Arab Emirates." Thesis, University of South Wales, 2003. https://pure.southwales.ac.uk/en/studentthesis/the-implementation-of-project-management-in-the-building-construction-field-in-the-united-arab-emirates(765f1852-fcb3-44db-8b35-a5ac99c0a75d).html.

Full text
Abstract:
This thesis is concerned with the application of project management techniques and systems implemented in the United Arab Emirates. Areas of current weakness in the application of project management in the Gulf area were identified, examined and analyzed. Three case studies regarding the implementation of project management, in the UAE were used as a basis for detailed examination. The author's extensive field experience, together with research into current practices in project management both in the U.A.E. and internationally, was combined to critically appraise the particular case studies. F
APA, Harvard, Vancouver, ISO, and other styles
31

Alharbi, Meshal Abdulaziz B. "Factors influencing project team effectiveness to achieve quality of building projects in the kingdom of Saudi Arabia." Thesis, Queensland University of Technology, 2022. https://eprints.qut.edu.au/227840/1/Meshal%20Abdulaziz%20B_Alharbi_Thesis.pdf.

Full text
Abstract:
This thesis investigated the organisational and project levels factors influencing team effectiveness to achieve quality of building projects in the KSA. Team effectiveness outcomes were also investigated. The research employed two data collection stages for quantitative and qualitative analysis. The survey was validated for evaluating perceived team effectiveness factors to achieve quality through the interviews. The principal component analysis and Thematic analysis were utilised. Relationships among team effectiveness factors were explored in the developed conceptual framework. The conceptu
APA, Harvard, Vancouver, ISO, and other styles
32

Aggor, Kenneth Kwame. "Relationship Between Budget and Project Success Factors in the Ghanaian Building Construction Sector." ScholarWorks, 2017. https://scholarworks.waldenu.edu/dissertations/4345.

Full text
Abstract:
In developing countries, 60% of project management professionals appear to lack knowledge that timely completion, budget fidelity, and high quality are critical success factors for completion of construction initiatives. Based on the theories of iron triangle, accident causation, scientific management, and strategic management, the purpose of this correlational study was to examine the relationship between project budget and the independent variables of time, quality, safety, environmental impact, and site disputes in the Greater Accra Region of Ghana. One hundred and sixteen project managers,
APA, Harvard, Vancouver, ISO, and other styles
33

Yunus, Riduan. "Decision making guidelines for sustainable construction of industrialised building systems." Thesis, Queensland University of Technology, 2012. https://eprints.qut.edu.au/63646/1/Riduan_Yunus_Thesis.pdf.

Full text
Abstract:
The construction industry has an obligation to respond to sustainability expectations of our society. Solutions that integrate innovative, intelligent and sustainability deliverables are vital for us to meet new and emerging challenges. Industrialised Building Systems (IBS), or known otherwise as prefabrication, employs a combination of ready-made components in the construction of buildings. They promote quality of production, enhance simplification of construction processes and minimise waste. The unique characteristics of this construction method respond well to sustainability. Despite the p
APA, Harvard, Vancouver, ISO, and other styles
34

Mbanjwa, Siyabonga. "The use and effectiveness of construction management as a building procurement system in the South African construction industry." Thesis, University of Pretoria, 2003. http://hdl.handle.net/2263/27570.

Full text
Abstract:
Project objectives are no longer being determined in terms of time, cost and quality only. Other factors such as employment creation, transfer of skills, use of small medium and micro enterprises (SMMEs) and community empowerment now play a role in determining project objectives and success. Is project management, applied with the traditional building procurement system the best method to achieve these unique project objectives ? Some have argued that construction management, as a building procurement system, could be the most suitable method to use in the South African situation considering t
APA, Harvard, Vancouver, ISO, and other styles
35

Mabanjwa, Siyabonga. "The use and effectiveness of construction management as a building procurement system in the South African construction industry." Pretoria : [s.n.], 2003. http://upetd.up.ac.za/thesis/available/etd-08272003-104103/.

Full text
APA, Harvard, Vancouver, ISO, and other styles
36

Elsayah, Othoman S. "A framework for improvement of contractor selection procedures on major construction project in Libya." Thesis, Edinburgh Napier University, 2016. http://researchrepository.napier.ac.uk/Output/453191.

Full text
Abstract:
The construction sector constitutes one of the most important sectors in the economy of any country. Contractor selection is a critical decision that is undertaken by client organisations and is central to the success of any construction project. For major construction projects, final contractor selection often follows the contractor selection stage. Contractor selection is a process which involves investigating, screening and determining whether candidate contractors have the technical and financial capability to be accepted to formally tender for construction work. The process should be cond
APA, Harvard, Vancouver, ISO, and other styles
37

Pretorius, Albertus Johannes Hendrik. "Business problems facing potential emerging contractors in CIDB grades 5 to 7." Thesis, Nelson Mandela Metropolitan University, 2016. http://hdl.handle.net/10948/3459.

Full text
Abstract:
Considering the vital part which the construction industry plays in the economy of South Africa, as well as the objectives of the reconstruction and development thereof, the failure of contractors, despite all the interventions to identify and eradicate the root of the problem, is a matter of great concern. In November 2000, the Construction Industry Development Board Act (2000) was promulgated which led to the inception of the cidb with a mandate to implement an integrated strategy for the reconstruction, growth and development of the construction industry. The matter of contractor developmen
APA, Harvard, Vancouver, ISO, and other styles
38

Guo, Qiu Ling. "Development of risk analysis models for decision-making in project management." Thesis, Edinburgh Napier University, 2001. http://researchrepository.napier.ac.uk/Output/2745.

Full text
Abstract:
Risks and uncertainties are inherent in construction projects and if neglected these risks often lead to project cost and time overruns. Traditional methods of forecasting risks rely upon intuition and 'feel' which has proved inadequate for the needs of investors in modern construction projects. To cope with these recognised risks, a risk management framework, which consists four components (risk identification, risk classification, risk analysis and risk response), has been developed. The present research focuses on financial risks in construction management, and in particular, the developmen
APA, Harvard, Vancouver, ISO, and other styles
39

Goedhart, Michael H. "The Du Toitskloof Tunnel project : the construction of the (south) soft ground tunnel, Western Cape, South Africa." Master's thesis, Faculty of Engineering and the Built Environment, 1986. https://hdl.handle.net/11427/31890.

Full text
Abstract:
The four kilometre twin-bore Du Toitskloof Tunnel is situated in the Klein Drakenstein mountain range, approximately 60 kilometres from Cape Town, near the town of Paarl. The tunnel will form part of the new National road system, upgraded to a freeway standard, linking Johannesburg and Cape Town. The subject of this report is the construction of the Du Toitskloof tunnel, with emphasis on the excavation and construction of the soft ground tunnel, by means of artificial ground freezing for ground support and stabilisation. The soft ground section of the tunnel being situated at the Western porta
APA, Harvard, Vancouver, ISO, and other styles
40

Chan, Chung-kwong. "The adaptation of building consultancy firms in Hong Kong for handling PRC projects /." Hong Kong : University of Hong Kong, 1996. http://sunzi.lib.hku.hk/hkuto/record.jsp?B25947710.

Full text
APA, Harvard, Vancouver, ISO, and other styles
41

Unterhitzenberger, C. "Organizational justice and its impact on project performance : an explanatory framework in the context of the construction industry." Thesis, Liverpool John Moores University, 2017. http://researchonline.ljmu.ac.uk/5376/.

Full text
Abstract:
Despite the constant improvement of project management tools and methodologies the performance of projects is decreasing. Considering the forecast that the volume of projects undertaken will roughly double by 2025 this is a considerable issue for the profession. Therefore this work focuses on the psycho-social relationships in projects, in particular organisational justice (climate) and their impact on performance in order to present an alternative approach to increase project performance and to highlight this under-researched area. Three studies were conducted for the purpose of this work: fi
APA, Harvard, Vancouver, ISO, and other styles
42

Pérez, José Luis. "Building functional and affordable schools in California." CSUSB ScholarWorks, 1994. https://scholarworks.lib.csusb.edu/etd-project/929.

Full text
APA, Harvard, Vancouver, ISO, and other styles
43

Yau, Pak-hang Andy. "An analysis of the effectiveness of the project management process and organisation structure employed by government in new town development /." Hong Kong : University of Hong Kong, 1989. http://sunzi.lib.hku.hk/hkuto/record.jsp?B25947175.

Full text
APA, Harvard, Vancouver, ISO, and other styles
44

Adams, Russell John. "Quantitative Modelling Methods for the Incorporation of Uncertainty into Construction Project Estimates." Thesis, Link to the online version, 2007. http://hdl.handle.net/10019/952.

Full text
APA, Harvard, Vancouver, ISO, and other styles
45

Verheij, Johan Michiel. "Process-mediated Planning of AEC Projects through Structured Dialogues." Diss., Georgia Institute of Technology, 2005. http://hdl.handle.net/1853/7980.

Full text
Abstract:
Project planning in the Architecture, Engineering and Construction (AEC) industry at present relies heavily on individual skills, experience and improvisation. In an attempt to increase predictability and efficiency, and to improve knowledge retention across projects, this thesis proposes a more systematic approach to project planning. It does so by introducing the notion of a meta-process model that embodies and cultivates the logic and intelligence of incremental and collaborative planning activities in a given domain. Planning tasks are encoded and enforced as a set of structured dialogues
APA, Harvard, Vancouver, ISO, and other styles
46

Al-Saqer, Khalid Mohammed. "An investigation into the development processes and project management practices of government construction projects in Saudi Arabia." Thesis, University of Birmingham, 2001. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.369155.

Full text
APA, Harvard, Vancouver, ISO, and other styles
47

Damström, Matilda. "Digitalization and construction project management : What consequences the use of ICT-tools has had on the project manager role in the construction industry." Thesis, KTH, Ledning och organisering i byggande och förvaltning, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-277051.

Full text
Abstract:
Digitalization is a hot topic in the construction industry today, with more and more ICT-tools being used. Web-based project platforms, digital meetings and BIM have all existed for quite a while, however the progress in using them and exploring the potential takes time. ICT-tools are usually aimed to make the information flow and communication more efficient, which directly relates to the project manager in a construction project. Therefore, the aim of this thesis is to understand how digital tools has affected the role of the client’s construction project manager over the last 5 years. The p
APA, Harvard, Vancouver, ISO, and other styles
48

Serhan, Ahmad, and Asen Draganov. "Project managers’ communication skills and stakeholder engagement in sustainable construction projects." Thesis, Malmö högskola, Fakulteten för kultur och samhälle (KS), 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:mau:diva-22559.

Full text
APA, Harvard, Vancouver, ISO, and other styles
49

Pakgohar, Alireza. "Hierarchical multi-project planning and supply chain management : an integrated framework." Thesis, University of Exeter, 2014. http://hdl.handle.net/10871/15720.

Full text
Abstract:
This work focuses on the need for new knowledge to allow hierarchical multi-project management to be conducted in the construction industry, which is characterised by high uncertainty, fragmentation, complex decisions, dynamic changes and long-distance communication. A dynamic integrated project management approach is required at strategic, tactical and operational levels in order to achieve adaptability. The work sees the multi-project planning and control problem in the context of supply chain management at main contractor companies. A portfolio manager must select and prioritise the project
APA, Harvard, Vancouver, ISO, and other styles
50

Al, Sanad Shaikha Abdulattef. "The promotion of sustainable construction practices in Kuwait." Thesis, University of Manchester, 2014. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.603228.

Full text
Abstract:
The construction industry has a significant impact on the environment. It is responsible for a large proportion of global CO2 emissions, as well as the use of both natural resources and energy reserves. Green building practices are becoming increasingly recognised as a way of mitigating CO2 emissions and energy consumption, with economic, environmental, social and financial benefits accruing. The aim of the research reported here is to investigate the opportunities to promote sustainable construction practices in Kuwait. This entails identifying the current status of green construction practic
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!