Dissertations / Theses on the topic 'Building Cost'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the top 50 dissertations / theses for your research on the topic 'Building Cost.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.
Phaobunjong, Kan. "Parametric cost estimating model for conceptual cost estimating of building construction projects." Thesis, Full text (PDF) from UMI/Dissertation Abstracts International, 2002. http://wwwlib.umi.com/cr/utexas/fullcit?p3086790.
Full textAlabi, Bimpe Omolara. "Effect of building materials cost on housing delivery towards sustainability." Thesis, Cape Peninsula University of Technology, 2017. http://hdl.handle.net/20.500.11838/2635.
Full textThe study investigates the predominant factors responsible for increase in the cost of building materials and the effect of this cost increase on housing delivery in Western Cape, South Africa. Sustainable housing is buildings produced to meet the present housing needs of people without conceding the ability of the future generation to meet their future needs. However, a significant increase in the cost of building materials has been a major constraint to the delivery of sustainable housings, as made evident in the literature, leading to project cost and time overruns or even project abandonment. However, building materials consume up to 65% of the total cost of construction. This factor on cost has, over the years, threatened the ability of the construction industry to deliver projects within budgeted cost, at stipulated time, and at satisfactory quality. This prompted the need to proffer solutions to these factors identified which are causing increases in the cost of building materials towards sustainable housing delivery in Western Cape. Based on this research study, housing is termed to be sustainable when it is available and affordable for the masses timely and at quality expected. The research study adopted a mixed methodological approach, involving the use of semi-structured qualitative interviews and closed-ended quantitative questionnaires administered to construction stakeholders (architects, quantity surveyors, engineers, construction managers, project managers, site supervisors and material suppliers) in the Western Cape Province of South Africa. SPSS version 24 software was used for analysing the quantitative data collected and ‘content analysis’ method was used to analyse the information collected through the qualitative interviews. The findings revealed that the major factors responsible for increasing the cost of building materials are inflation, wastages of building materials by labourers, cost of transportation and distribution of labour, design changes, client contribution to design change and change in government policies and regulation. Moreover, the research showed that fluctuation in the cost of construction and high maintenance costs due to poor workmanship also impact the cost increase of building materials for housing delivery. In addition, research findings affirmed that for optimum materials usage for the enhancement of sustainable construction, the following criteria should be considered in the selection of building materials: maintenance cost, energy consumption and maintainability. The adoption of these findings by construction stakeholders in the South African construction industry would enhance the delivery of affordable housing at reduced cost, at the required time and at the expected quality. Therefore, an adequate implementation of the framework presented in this study will enhance sustainable housing delivery.
Silva, Vera. "Cost-effective Building Constructions – Carbon Fibres Reinforcement." Thesis, KTH, Byggnadsteknik, 2003. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-35085.
Full textWu, Kin-kwong. "A study of the cost management process and estimation techniques for estimating building services installations in the building construction industry /." Hong Kong : University of Hong Kong, 1998. http://sunzi.lib.hku.hk/hkuto/record.jsp?B25949597.
Full textChoi, Ming-hang Edmund. "Evaluation of the cost estimating systems /." Hong Kong : University of Hong Kong, 2001. http://sunzi.lib.hku.hk/hkuto/record.jsp?B25949780.
Full textDoğan, Sevgi Zeynep Günaydın H. Murat. "Using machine learning techniques for early cost prediction of structural systems of buildings/." [s.l.]: [s.n.], 2005. http://library.iyte.edu.tr/tezlerengelli/doktora/mimarlik/T000357.pdf.
Full textKeywords:Artificial neural networks, artificial intelligence, cost estimation, predictive models, construction management. Includes bibliographical references (leaves.111).
Kibar, Mustafa Alptekin. "Building Cost Index Forecasting With Time Series Analysis." Master's thesis, METU, 2007. http://etd.lib.metu.edu.tr/upload/12608686/index.pdf.
Full textmoreover can help investors to evaluate project alternatives adequately.
Tang, Wai-kuen Raymond. "Cost management for building contractors in Hong Kong." Click to view the E-thesis via HKUTO, 2005. http://sunzi.lib.hku.hk/hkuto/record/B31601212.
Full text鄧惠權 and Wai-kuen Raymond Tang. "Cost management for building contractors in Hong Kong." Thesis, The University of Hong Kong (Pokfulam, Hong Kong), 2005. http://hub.hku.hk/bib/B31601212.
Full textAldwaik, Mais M. "Cost Optimization of Reinforced Concrete Highrise Building Structures." The Ohio State University, 2019. http://rave.ohiolink.edu/etdc/view?acc_num=osu1574738135695095.
Full textWehrli, Sara E. "The cost effective redesign of an apartment building using LEED standards." Muncie, IN : Ball State University, 2009. http://cardinalscholar.bsu.edu/690.
Full textSimmons, Brian Spencer. "Lowest cost building technology selection for energy efficient design." Thesis, Georgia Institute of Technology, 2012. http://hdl.handle.net/1853/45941.
Full textJrade, Ahmad. "A conceptual cost estimating computer system for building projects." Thesis, National Library of Canada = Bibliothèque nationale du Canada, 2000. http://www.collectionscanada.ca/obj/s4/f2/dsk1/tape3/PQDD_0018/MQ47815.pdf.
Full textAl-Marwaee, Mohammed Aish. "Tubular daylight guidance systems cost, value and building codes." Thesis, University of Liverpool, 2006. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.433020.
Full textZhang, Dalu. "Project Time and Cost Control Using Building Information Modeling." Thesis, North Dakota State University, 2013. https://hdl.handle.net/10365/26538.
Full textHardcastle, Clifford. "An information model of the construction cost estimating process." Thesis, Heriot-Watt University, 1992. http://hdl.handle.net/10399/1386.
Full textWeeks, Jason A. "Understanding the issues of project cost and time in sustainable construction from a general contractor's perspective: case study." Thesis, Georgia Institute of Technology, 2010. http://hdl.handle.net/1853/33914.
Full textSuttle, Natasha M. "National Green Building Standard multi-family housing : a cost comparison /." Muncie, Ind. : Ball State University, 2009. http://cardinalscholar.bsu.edu/715.
Full textEyers, Kevin. "Belief network analysis of direct cost risk in building construction." Thesis, National Library of Canada = Bibliothèque nationale du Canada, 2001. http://www.collectionscanada.ca/obj/s4/f2/dsk3/ftp04/MQ58766.pdf.
Full textJouni, Mohammad S. M. Massachusetts Institute of Technology. "Reference architecture and cost estimation model for building intelligent platforms." Thesis, Massachusetts Institute of Technology, 2017. http://hdl.handle.net/1721.1/114083.
Full textCataloged from PDF version of thesis.
Includes bibliographical references (pages 101-104).
With the recent resurgence of Machine Learning and Artificial Intelligence as a competitive advantage in product development, technical executives and managers are interested in learning what it would take to build intelligent platforms that can leverage these advances. In addition, they wish to produce cost estimates for developing such platforms. The goal of this thesis is to develop a reference architecture for an intelligent platform and an associated costing model that allows technical managers to understand the components needed to deliver such a platform and estimate the cost of each module, estimate the cost of the overall architecture, and enable what-if analysis to understand the cost tradeoffs. The intent is not to provide the values of the variables in the model, but to develop a cost model that will enable interested parties to plug in their estimated values for each factor and generate a forecast of the build cost.
by Mohammad Jouni.
S.M. in Engineering and Management
Pourghazian, Hanif. "Industrial Construction Methods for Cost-Effective and Sustainable Multi-Storey Buildings." Doctoral thesis, Stockholm : Royal Institute of Technology, 2008. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-9212.
Full textLi, Jinmin. "Integrating Building Information Modelling (BIM), Cost Estimating and Scheduling for Buildings Construction at the Conceptual Design Stage." Thesis, Université d'Ottawa / University of Ottawa, 2016. http://hdl.handle.net/10393/35292.
Full textShi, Xin, and 施歆. "A fuzzy reasoning cost estimation model of sustainable building refurbishment solutions for residential buildings in Hong Kong." Thesis, The University of Hong Kong (Pokfulam, Hong Kong), 2014. http://hdl.handle.net/10722/208599.
Full textpublished_or_final_version
Civil Engineering
Master
Master of Philosophy
Choi, Ming-hang Edmund, and 蔡銘鏗. "Evaluation of the cost estimating systems." Thesis, The University of Hong Kong (Pokfulam, Hong Kong), 2001. http://hub.hku.hk/bib/B31251651.
Full textMarston, V. K. "Interdependence of the functional element costs of buildings." Thesis, University of Portsmouth, 1985. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.380580.
Full textBurnside, Angelica, Jennifer Lee, and Olof Palmquist. "Held & Francke : Cost calculation for building project and the role of cost calculation in achieving competitive advantage." Thesis, Växjö University, School of Management and Economics, 2007. http://urn.kb.se/resolve?urn=urn:nbn:se:vxu:diva-1488.
Full textPurpose: The purpose is to gain a better understanding in how a construction com-pany like Held & Francke calculate the price of an offer for a building project and what role cost calculation, in relation to quality and time, plays in achieving competi-tive advantage.
Method: Since the method of cost calculation only was investigated at one company we found it suitable for us to use a holistic single case study as the research strategy. The method used in this study is a qualitative research method since our empirical data, to a large extent, is based on interviews. Further, because our study is of a quali-tative nature, we have chosen to perform semi-structured interviews.
Conclusions:
After examining Held & Francke we found that they manage very well to use some of the theoretical methods for cost calculations. Their main method of calculation is ABC, where the project is broken down into smaller work steps. Cost calculation plays a large role as a competitive advantage for Held & Francke. Cost is the sole as-pect where Held & Francke has full control and providing competitive project prices therefore becomes imperative in order to generate sales. With the focus on costs the cost calculation becomes an important role in achieving a competitive advantage.
Kisamfu, Rehema Aman. "Investigating Contractual Challenges of Performing Cost Control in Building Construction Projects." Thesis, KTH, Fastigheter och byggande, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-297855.
Full textKvantitetbesiktningsman anses vara de mest kvalificerade kostnadsspecialisterna inom byggbranschen, med sina erfarenheter och färdigheter inom kostnadsstyrning och kontroll samt kontrakthantering. Denna roll är dock inte välkänd i Sverige jämfört med andra länder som Storbritannien där den härstammar från. Och så använder byggbranschen i Sverige andra yrken för de roller som skulle göras av kvantitetsmätare eller kostnadsansvariga. Som ett resultat står de kvantitetsmätare som har trängt igenom den svenska byggbranschen inför utmaningar att utföra sina uppgifter specifikt i detta fall, kostnadskontroll på grund av flera omständigheter. Denna studie har undersökt olika avtalsmässiga utmaningar som möter kvantitetsmätare när de utför kostnadskontroll i byggprojekt. Dessutom har rekommendationer gjorts för att mildra dessa utmaningar och förbättra kostnadskontrollen i projekt. I detta examensarbete har en kvalitativ studie utförts där kvantitetbesiktningsman intervjuades angående kostnadskontroll och de kontraktsmässiga utmaningar som de står inför i byggprojekt. Resultaten analyserades med en teoretisk ram och diskuterades tillsammans med tidigare forskning och kunskap och i denna studie användes princip - agentteori. Resultaten av studien visade att dålig planering, sen involvering av kvantitetsmätarna i projekt, brist på effektiv kommunikation och dålig kontrakthantering är de viktigaste utmaningarna för kvantitetsmätaren när det gäller att utföra kostnadskontroll i byggprojekt. För att övervinna dessa utmaningar föreslår författaren att det finns ett behov av att öka medvetenheten om vikten av att ha kvantitetsmätare och tydligt fastställa sina roller i projekt, ha korrekt kommunikationsplan, korrekt kontrakthantering och förbättra färdigheterna i kvantitetsmätningsprogramvara.
Asele, Massamo Ayele, and Ebrahim Ahmed Awol. "Building Sustainable Earnings : Low Cost Model-Based Air Carriers in Europe." Thesis, Umeå universitet, Handelshögskolan vid Umeå universitet, 2009. http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-36621.
Full textKnight, Karla Grace. "A fuzzy logic model for predicting commercial building design cost overruns." Thesis, National Library of Canada = Bibliothèque nationale du Canada, 2001. http://www.collectionscanada.ca/obj/s4/f2/dsk3/ftp04/MQ60445.pdf.
Full textKim, Han-su. "Value for money in building design : modelling the cost-quality relationships." Thesis, University of Reading, 1998. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.244946.
Full textOey, Marvin. "Effects of selected practices on the cost performance of building projects /." Digital version, 2001. http://wwwlib.umi.com/cr/utexas/fullcit?p3008408.
Full textPark, Moonseo 1967. "Robust control of cost impact on fast-tracking building construction projects." Thesis, Massachusetts Institute of Technology, 1999. http://hdl.handle.net/1721.1/9500.
Full textIncludes bibliographical references (leaves 74-75).
The fast-tracking delivery method has received considerable attention in recent years. Its time saving feature has placed it as an alternative to the sequential method. Effective fast-tracking may shorten delivery time and lower project costs. However, it should be highlighted that fast tracking also inherits a greater potential for an unexpected cost increase due to uncertainty in planning and management. To handle such inherent risks, fast-tracking should be undertaken with proper planning and management in a systematic manner. A closer observation of the design and construction process reveals that all of the cost-increasing factors in fast-tracking are directly or indirectly related to non value-adding or corrective changes. These changes are mainly attributed to uncertainty that is rooted in the interdependency of project tasks. Consequently, reducing this interdependency and managing the undesirable interactions among project tasks hold a key to successful fast-tracking. To meet these challenges, a robust planning and control methodology is developed to provide a systematic solution. The proposed methodology is elaborated based on concurrent engineering and system dynamics. Concurrent engineering is applied to develop an overlapping framework for the construction processes and to enable the interdependency among them to be minimized. The system dynamics modeling approach helps analyze and quantify the effect of dynamic interactions among the design and construction processes. The final result of this research may help ensure that the fast-tracking approach achieves sizable delivery time reductions without driving up costs. The provision of an optimal overlapping strategy, workforce control policy, and schedule adjustments assists in satisfying this goal.
by Moonseo Park.
S.M.
Ford, Teri (Teri Leigh). "The relationship between the Massachusetts' building code and construction cost escalation." Thesis, Massachusetts Institute of Technology, 2018. http://hdl.handle.net/1721.1/120654.
Full textCataloged from PDF version of thesis.
Includes bibliographical references (pages 44-46).
Over the last twenty years in Massachusetts, there has been significant focus on a shrinking labor supply and material cost escalation as they relate to rising construction costs. However, there are other factors attributing to increased construction costs that are often overlooked. In these twenty years, four editions of the Massachusetts building code have been released; Massachusetts is currently governed by the 9 th edition. Since the 6 th edition was released in 1997, the code has expanded to include increased seismic requirements, improved fire prevention, and the energy stretch code. However, code changes are rarely included in the industry discussion when trying to explain rising costs. According to The Greater Boston Housing Report Card from 2015, "... the cost of developing urban projects in the Commonwealth increased by nearly 40 percent more than overall inflation" (Bluestone) since 2011. This suggests there is more at play than simply a high volume of work; and while there is no disputing the cyclic nature of the real estate market and the sheer economics of supply and demand, this conversation needs to be expanded to include regulatory influence - specifically building code. The building code in Massachusetts is reviewed and amended by a qualified, volunteer board of industry professionals called the Board of Building Regulations and Standards ("BBRS"). There is a public review process for code changes and avenues for the average person to request a variance or submit suggested amendments. However, this service is severely underutilized by the commercial industry. The intent of this paper is to analyze the relationship between the development and regulatory industries through the primary filter of cost management. Through this lens, I will look at the role of code ambiguity, the layers of regulatory enforcement, and the distribution of liability and the impact on construction cost. Based on interviews with industry professionals, I have identified the primary inefficiencies in the interactions between the two industries and developed three viable solutions to address some of the criticism. These solutions address the misalignment of interests between parties, the subjective assignment of liability, and the opaque, intimidating processes surrounding code variances and appeals.
by Teri Ford.
S.M. in Real Estate Development
Salam, Md. "Time and cost overruns on high-rise building construction in Bangladesh." Thesis, Abertay University, 2007. https://rke.abertay.ac.uk/en/studentTheses/15bbc393-0b06-4691-a6ec-1e6a6d925179.
Full textVelez, Enrique(Velez Lopez). "Is embedding the reactor building below grade a cost-effective proposition?" Thesis, Massachusetts Institute of Technology, 2020. https://hdl.handle.net/1721.1/129930.
Full textThesis: S.M., Massachusetts Institute of Technology, Department of Nuclear Science and Engineering, February, 2020
Cataloged from student-submitted PDF of thesis.
Includes bibliographical references (pages 103-105).
The construction cost of reactor buildings has escalated substantially over time primarily for three reasons. First, new safety requirements, such as the post-9/11 airplane crash measures, have been imposed. Second, labor rates for construction workers and the cost of raw materials such as steel for rebar and cement for concrete have increased. Third, the deployment of new plant designs, such as AP1000 (Advanced Pressurized 1000 MWe Reactor) and EPR (European Pressurized Reactor), has been plagued by first-of-a-kind challenges and a general loss of construction know-how by the nuclear industry in the U.S and Western Europe. Embedding the reactor building below grade is a potential approach to reducing the construction cost of new plants, be they large LWRs (Light Water Reactors), SMRs (Small Modular Reactors) or Generation-IV designs. There are important trade-offs. Embedment of a reactor building requires a much larger excavation effort than is necessary for above-grade plants. However, embedded buildings have lower loads during an earthquake or an airplane crash, thus requiring a lot less reinforcement. The cost of the building itself can therefore be significantly lower. In this thesis we analyze various modularized, silo-type reactor buildings (i.e., the type used, for example, in GEH's (General Electric Hitachi) BWRX-300 (Boiling Water Reactor X-300) design) for a set of reference seismic loads at sites with both soil and rock stratigraphy. The comparison includes a completely embedded design, a partially-embedded design and an above-ground design. The level of reinforcement required is determined from FEM (Finite Element Method) analysis of the building, and the cost of constructing the buildings is estimated from productivity data, labor rates and materials costs obtained from industry sources. This leads to the finding that there are some building layouts and sites where there is a potential cost reduction in embedment.
by Enrique Velez.
M. Eng.
S.M.
M.Eng. Massachusetts Institute of Technology, Department of Civil and Environmental Engineering
S.M. Massachusetts Institute of Technology, Department of Nuclear Science and Engineering
Sultan, Sahira. "Cost Evaluation of Building Space Heating; District Heating and Heat Pumps." Thesis, Mälardalens högskola, Akademin för ekonomi, samhälle och teknik, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-37137.
Full textWu, Kin-kwong, and 吳健光. "A study of the cost management process and estimation techniques for estimating building services installations in the buildingconstruction industry." Thesis, The University of Hong Kong (Pokfulam, Hong Kong), 1998. http://hub.hku.hk/bib/B31251523.
Full textSun, Minhui. "A study of precast reinforced concrete skeleton for low-cost housing /." Thesis, McGill University, 1991. http://digitool.Library.McGill.CA:80/R/?func=dbin-jump-full&object_id=61221.
Full textThe development of SPCSS traces its origin as the structure of prefabricated houses for the housing shortage after the world war in Europe to its spread to developing countries for low-cost housing.
Design and performance study focuses on its features related to low-cost housing its special considerations and key points in design as a small component system, its acclaimed system performance features.
Case studies surveys 15 typical cases. Each case includes general background of the system, system design, comments following the design consideration and example of its application.
Best, Truman J. "An analysis of building a submarine base in the Arctic." Thesis, Monterey, California. Naval Postgraduate School, 1988. http://hdl.handle.net/10945/22878.
Full textThis analysis addresses the value of a submarine base in the Arctic in relation to the growing Soviet threat in that region and the feasibility of constructing and operating such a submarine base. Location, command and control, force operation, logistic support and appropriate force size are elements of the analysis. Also included is the cost effectiveness of the Arctic submarine base both in peacetime and in wartime situations. Based upon this limited analysis, such a base appears to be only marginally cost effective in peacetime but substantially so in wartime.
http://archive.org/details/analysisofbuildi00best
Lieutenant, United States Navy
Tan, Xiaowei. "A parametric building energy cost optimization tool based on a genetic algorithm." Texas A&M University, 2003. http://hdl.handle.net/1969.1/5744.
Full textEgerud, Rebecca, and Erik Södergren. "Cost differences between Miljöbyggnad Guld and BBR." Thesis, Linköpings universitet, Kommunikations- och transportsystem, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-142880.
Full textMeister, Eric. "Using hard cost data on resource consumption to measure green building performance." [Gainesville, Fla.] : University of Florida, 2005. http://purl.fcla.edu/fcla/etd/UFE0010531.
Full textSoutos, Michail K. "Forecasting Elemental Building cost percentages using regression analysis and neural network techniques." Thesis, University of Manchester, 2006. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.556705.
Full textDeterman, Kelley Victoria. "Sustainability and residential development : a guide to cost-efficient green building technologies." Thesis, Massachusetts Institute of Technology, 2014. http://hdl.handle.net/1721.1/90013.
Full textCataloged from PDF version of thesis.
Includes bibliographical references (pages 39-41).
Given the upward trend of global energy consumption in recent decades, it has become imperative that countries reduce the amount of energy used on an annual basis. In America, the residential sector is one of the primary energy consumers, but many homeowners lack reliable information about how to build sustainable homes. This lack comes from the difficulty found in trying to quantify energy savings and costs of different sustainable technologies. Focusing on the commonwealth of Massachusetts, this thesis has compiled costs and energy savings for four different sustainable technologies- geothermal heating, heat recovery ventilation, triple-pane windows and a range of insulation materials. Considering all of these options, an interactive computer code was designed to take in inputs from the user about their home, calculate the energy needs of the home, and optimize the technologies and materials chosen based on a budget given by the user. The final result is a list of insulation choices for the walls, roof and floor of a home, the heating and ventilation systems, and window types for the highest energy savings within the users budget.
by Kelley Victoria Determan.
M. Eng.
Qiao, Zhi. "Building Reliable and Cost-Effective Storage Systems for High-Performance Computing Datacenters." Thesis, University of North Texas, 2020. https://digital.library.unt.edu/ark:/67531/metadc1707348/.
Full textStutesman, Jonathan Harley. "Identifying the Economic Barriers to CLT Cost Estimation Among Building Construction Professionals." Thesis, Virginia Tech, 2020. http://hdl.handle.net/10919/96712.
Full textMaster of Science
Cross-laminated timbers (CLTs) are strong and lightweight structural building materials that also serve as a method of sequestering carbon rather than emitting carbon like more traditional construction materials. CLT construction is straightforward and quick to assemble, requiring minimal time and labor. CLTs are made from abundant and renewable wood resources and have significant economic potential as a job creator and as a new value-added product for the United States. However, market penetration has been obstructed by product affordability and lack of availability for use. Previous studies and projects have surveyed opinions of designers and contractors about CLT use. However, no previous study has been found that examined the opinions of cost estimators, who serve an essential function in providing economic comparisons of different construction systems for designers and building owners to select in the commercial construction area. CLTs are currently not included in these cost estimates, and this lack of information may be limiting the potential of this construction system. The purpose of this study was to discover if cost estimation is being used to make structural decisions potentially affecting the marketability of CLT use in construction and building design because of the ability to estimate CLTs adequately. Through the use of a survey and discussions with subject matter experts, this study examined the knowledge level of crosslaminated timbers of under-surveyed building construction professions and the relationship between cost estimation and structural material choices. They are demonstrating the need for better cost estimation tools for cross-laminated timbers such as inclusion in the Construction Specifications Institute’s classification systems in order for CLTs to become a more competitive product. Cost estimation is performed early in the design process before the structural material has been chosen. However, making cost estimates of CLT materials early in the design process is not a practical solution at this point due to the lack of cost data available. As an alternative solution, this project developed a design tool that is meant to accelerate the design process and allow companies to approach suppliers for quotes, which require mostly complete designs. While this is not a complete solution, if designs are made faster and more effortless, they should also be a more affordable investment for clients. 5 | Page Building construction professionals perceived CLT construction as too expensive, unavailable to the consumer, or unwanted by the client. It was found that the lack of data, due primarily to the material being new to the US construction industry, was a significant barrier to CLT cost estimation. The custom design of many previous CLT projects, due to the lack of CLT construction in the current building codes, limits the collection of standard CLT construction data. There is also an issue with the discrete sizes of CLT panels limiting their competitiveness. These barriers were identified in this study, and further research is needed to develop complete solutions.
Xu, Weili. "An Energy and Cost Performance Optimization Platform for Commercial Building System Design." Research Showcase @ CMU, 2017. http://repository.cmu.edu/dissertations/956.
Full textNirmal, Deepika. "Environmental and Cost impact Analysis of Materials and Assemblies in Building Construction." FIU Digital Commons, 2012. http://digitalcommons.fiu.edu/etd/643.
Full textAlnestig, Henrik. "On the Feasibility of Low Cost Computer Vision : Building and Testing SimpleEye." Thesis, Mälardalens högskola, Akademin för innovation, design och teknik, 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-29363.
Full textNdlovu, Shweshwe. "Barriers to consumer acceptance of innovative building technologies for low-cost housing." Diss., University of Pretoria, 2021. http://hdl.handle.net/2263/81683.
Full textMini Dissertation (MBA)--University of Pretoria, 2021.
Gordon Institute of Business Science (GIBS)
MBA
Unrestricted