Dissertations / Theses on the topic 'Building Information Model (BIM)'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the top 50 dissertations / theses for your research on the topic 'Building Information Model (BIM).'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.
Govan, Ivan, and Burim Berisha. "BIM Building Information Model : Hinder & Drivkraft." Thesis, Högskolan i Skövde, Institutionen för teknik och samhälle, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:his:diva-6587.
Full textJaffery, Syed Raza Ali. "Envisioning a building information model (BIM) integrated building performance visualization (iPViz) interface." Thesis, University of British Columbia, 2016. http://hdl.handle.net/2429/58925.
Full textApplied Science, Faculty of
Civil Engineering, Department of
Graduate
Utiome, Erezi Ame Emmanuel. "Extending building information models to construction specifications." Thesis, Queensland University of Technology, 2015. https://eprints.qut.edu.au/84929/1/Erezi_Utiome_Thesis.pdf.
Full textEngdahl, Jenny, and Madeleine Hedlund. "BIM för Hållbart Byggande." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-22514.
Full textSyftet med den här studien är att underlätta hållbart byggande genom användandet av BIM. Målet är att utreda vilka aspekter inom hållbart byggande som kan analyseras med fokus på i huvudsak BIM-verktyg, men också andra hjälpmedel. Studien bygger på litteraturstudier och intervjuer. I litteraturstudien undersöks aspekter som är betydelsefulla vid hållbart byggande genom att studera miljöcertifieringssystem som är tillämpningsbara i Sverige, samt vilka BIM-verktyg som finns att tillgå på marknaden för att analysera dessa aspekter. Litteraturstudien innefattar även begrepp rörande BIM och hållbarhet för att ge en klarare bild av dess innebörd. Intervjuerna har tillfört studien övergripande förståelse för branschen och vägledning i ämnet. Resultatet redovisas i en tabell, där de aspekter som är relevanta för hållbart byggande är listade. I tabellen går det även att utläsa vilka aspekter certifieringssystemen tar upp. Totalt visar studien på 132 aspekter fördelade inom sju delområden; Platsen, Vatten och Avlopp, Energi och Föroreningar, Material och Avfall, Inomhusklimat och Välmående, Stadens Gestaltning samt Genomförande och Förvaltning. I tabellen redovisas dessutom förslag på BIM-verktyg samt andra hjälpmedel som används vid analys av en specifik aspekt. Studien visar att en knapp majoritet av aspekterna, 55 procent, är möjliga att analysera med BIM-verktyg. Platsen är det delområde som visar flest aspekter som går att analysera med BIM-verktyg, 95 procent. Material och avfall resulterade i minst aspekter med endast tio procent. Sammantaget har studien undersökt 35 stycken olika BIM-verktyg. De aspekter som kräver andra hjälpmedel för analys genererar ofta information viktig för projektet ur hållbarhetssynpunkt, och går i många fall att integrera i BIM-modellen manuellt. Sammantaget medför det att projektet får en fullmatad BIM-modell med användbar information som följer projektet ända in i förvaltning och sedermera rivning och återvinning. Studien visar att hållbart byggande handlar om att ha en helhetssyn där flertalet aspekter ska beaktas för att uppnå hållbarhet. Det räcker således inte att bara se till exempelvis energihushållning för att anse att ett projekt är hållbart. För att analysera aspekter rörande hållbarhet krävs att relevant och riktig information om projektet insamlas. Då kan olika förslag utarbetas och jämföras för att ta fram det mest hållbara alternativet. Ett redskap för detta är BIM. BIM är definierat dels som en arbetsmetod, byggnadsinformationsmodellering, men också som en virtuell modell, byggnadsinformationsmodell. BIM underlättar samordningen av den insamlande informationen, både som arbetsmetod och som tekniskt verktyg. På så vis bidrar BIM till att uppnå syftet hållbart byggande.
Mendez, Ronald Osiris. "The building information model in facilities management." Link to electronic thesis, 2006. http://www.wpi.edu/Pubs/ETD/Available/etd-050406-153423/.
Full textTauscher, Helga. "Configurable nD-visualization for complex Building Information Models." Doctoral thesis, Saechsische Landesbibliothek- Staats- und Universitaetsbibliothek Dresden, 2017. http://nbn-resolving.de/urn:nbn:de:bsz:14-qucosa-228894.
Full textMit der fortschreitenden Entwicklung des Building Information Modelling (BIM) hin zu einer umfassenden Erfassung aller Bauprojektinformationen in einer semantisch expliziten Weise werden Visualisierungen von den Gebäudeinformationen entkoppelt. Während traditionelle Architektur- und Bauzeichnungen die visuellen Reprä̈sentationen implizit als Träger der Informationen enthalten, werden sie heute on-the-fly generiert. Die Details ihrer Generierung sind festgeschrieben in Softwareanwendungen, welche eigentlich für andere Aufgaben wie Analyse, Simulation, Entwurf oder Kommunikation ausgelegt sind. Angesichts der abstrakten Natur von Informationsmodellen und der steigenden Menge digitaler Informationen, die im Verlauf von Bauprojekten erfasst werden, sind visuelle Repräsentationen essentiell, um sich die Information erschließen, sie verstehen, durchdringen und mit ihnen arbeiten zu können. Gleichzeitig entwickelt sich durch die digitalen Medien eine neues Feld der interaktiven Visualisierungen. Das volle Potential von BIM kann nur mit angepassten aufgabenspezifischen Visualisierungen erschlossen werden, bei denen Ingenieur*innen und Architekt*innen aktiv in den Entwurf und die Entwicklung dieser Visualisierungen einbezogen werden. Die Visualisierungen müssen wiederverwendbar sein und in Kommunikationsprozessen zuverlässig reproduziert werden können. Außerdem muss es möglich sein, Visualisierungen zu modifizieren und neu zu definieren, um das kreative Problemlösen zu unterstützen. Die vorliegende Arbeit zielt darauf ab, Gebäudemodelle und ihre visuellen Repräsentationen wieder zu verbinden: auf der theoretischen Ebene, auf der Ebene der Methoden und hinsichtlich der unterstützenden Werkzeuge. Auf der theoretischen Ebene trägt die Arbeit zunächst dazu bei, das Wissen um die Erstellung von Visualisierungen im Kontext von Bauprojekten zu erweitern. Der verfolgte Ansatz basiert auf dem Referenzmodell der Visualisierungspipeline und geht dabei sowohl auf strukturelle als auch auf quantitative Aspekte des Visualisierungsprozesses ein. Zweitens wird eine Methode entwickelt, die visuelle Repräsentationen auf Basis gegebener Visualisierungsspezifikationen generieren kann. Schließlich belegt ein Softwareprototyp die Realisierbarkeit des Konzepts. Mit dem entwickelten Framework können visuelle Repräsentationen aus jeweils einem spezifischen Gebäudemodell und einer spezifischen Visualisierungsbeschreibung generiert werden
Eriksson, Michael. "BIM i förvaltningsskedet." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-19875.
Full textThe purpose of this study is to improve the flow of information from the design and construction phase into the facility management. This in order to make the facility managers see the advantages with BIM and to show that there is money to be saved by retrieving the information from the design and the construction phase. Earlier studies show that there actually has been quite little research done within BIM in the facility management and that the main focus has been at the design and the construction phase. The aim with the study is to specify the value of the information and to show which information facility managers use and where it can be retrieved from within the earlier phases of the construction process. The report is based on a literature study, interviews and calculations. A number of facility managers have been asked which types of information they use and designers and entrepreneurs have then been asked if these types of information can be found in the design and the construction phase. The information has been valued in two different ways. In one way the information was valued by comparing the cost between updating existing information or recreate the same type of information. The other way of valuing the information was to find out the worth of information by using key figures (SEK per square meter) and the list of information that facility managers use, which was made up from the interviews. The first way of valuing shows that the cost of producing as built drawings (A) in the facility management cost as much as keeping the same type of information updated for at least 18years and as most 50years. Almost the same goes for a BIM-model. Only there the difference is that the cost of producing a BIM-model focused on as built drawings (A) in the facility management cost as much as keeping the same type of information updated for at least 22years and as most 58years. The other way that the information was valued shows that less than 25% of the information that can be found in the design and/or construction phase is worth circa 10% of the projecting fee.
Sjödin, Magnus, and Tobias Rasping. "Analys av BIM-processen i ombyggnadsprojekt." Thesis, KTH, Byggvetenskap, 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-92567.
Full textCurrently BIM (Building Information Modeling) is used to a higher extent in new construction projects and there is a lot of information to gather about this both in magazines and online. An unanswered question is how the workflow looks like when BIM is used in reconstruction projects. The information that can be found about this is limited despite the fact that reconstruction projects represent a significant proportion of the construction business, both in Sweden and internationally. The aim of this report is to examine how reconstruction projects currently is carried out with BIM. The BIM process has been studied in detail to clarify the current situation and to identify the problems that reconstruction adds. The study was conducted on two ongoing projects in accordance to a common analytical model to clarify the similarities and differences between them. In order to clarify the work process several interviews has been conducted with the project personnel. Through a questionnaire, a survey of both projects has been performed. Project models have also been studied to clarify their level of detail. The major problem that has been identified with reconstruction projects is that the work is carried out on existing building elements that have to be verified. For this reason a detail survey often must be done to verify and add to existing drawing and documentations. The survey is an early part of the process and something that must be done before any further work to establish a model can be done. Common to both projects is the use of the model to coordinate the various disciplines content in order to minimize the number of collisions in the production. The analysis has shown quite significant differences in methods depending on project conditions. The main difference is that in one of the projects the client wants to use the model in the property management and therefore a model must be delivered. The client’s interest led to a wider use of BIM in the project, including costs connected to the objects in the model. Something that has become clear is that BIM as a work tool must be standardized, possibly through a BIM manual drafted by the company, which can be used in all projects that will make use of BIM. Feedback with lessons learned must be added to the manual for it to stay updated.
Ignjatovic, Jelena. "Utredning av projekteringsverktygets ROL utvecklingsbehov : En anpassning för norsk marknad." Thesis, Högskolan Väst, Avdelningen för maskinteknik och naturvetenskap, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:hv:diva-9445.
Full textRail Overhead Line (ROL) är ett projekteringsverktyg, vilket ägs av företaget Bentley Systems AB och används av kontaktledningsprojektörer på Sweco Rail. Projekteringsverktyget används för att projektera kontaktledningsanläggningar. Sweco Rail AB har för avsikt att etablera sig på den norska marknaden tillsammans med systerbolaget Sweco A/S. Inför etableringen på den nya marknaden erfordras en utveckling av ROL för att verktyget skall kunna nyttjas vid projektering i Norge. Syftet med arbetet har varit att identifiera de krav och utvecklingsbehov som krävs i avsikt att anpassa ROL för den norska marknaden.Det blir allt mer vanligt att förvaltningarna Jernbaneverket och Trafikverket, vilka är stora kunder till Sweco, ställer krav på att arbetssättet Building Information Model (BIM) skall användas i projekt. Målet med användningen av BIM är att få en effektivare förvaltning samt reducera risken för att information försvinner mellan olika skeden i projekten och processer. Inför etableringen på den norska marknaden behöver därför Sweco och Bentley Systems anpassa ROL för att bland annat kunna leverera 3D-modeller vilka uppfyller de krav norska Jernbaneverket ställer på användningen av BIM i projekt.För att identifiera utvecklingsbehoven, vilka krävs för en norsk anpassning av ROL, genomfördes intervjuer, observationer samt en studie av styrdokument. Kundbehov identifierades och översattes till krav, vilka även låg till grund för de identifierade utvecklingsbehoven.Resultatet av arbetet visade att det finns 56 stycken utvecklingsbehov, vilka behöver uppfyllas för att ROL skall kunna användas vid projektering för den norska marknaden. Av de identifierade utvecklingsbehoven återfinns även åtgärder av verktyget vilka skulle kunna gynna projekteringen på den svenska marknaden. 22 stycken av de 56 utvecklingsbehoven kan Sweco åtgärda med hjälp av sina resurser på företaget. För de resterande 34 utvecklingsbehoven behöver ägarna av ROL, Bentley Systems, ta ansvar för de lösningar som krävs för att behoven skall tillfredsställas.
Håkansson, Lisa, and Julia Dannfors. "BIM i produktion : En undersökning om hur BIM kan implementeras i produktion." Thesis, Uppsala universitet, Byggteknik, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-389669.
Full textSyftet med arbetet är att undersöka hur BIM kan implementeras i byggbranschen på ett bra och smidigt sätt ute i produktion. Detta ger NCC ett underlag för hur de ska gå tillväga för att denna process ska gå så lätt och smidigt som möjligt men också för att minska risken att fokus hamnar på fel ställe och att implementeringen utförs på ett sådant sätt att personalen blir mer negativa mot digitala hjälpmedel i produktionen. Då yrkesarbetarna är de som hittills jobbat minst med digitala hjälpmedel har störst vikt lagts vid att undersöka hur implementeringen kommer att påverka dem och hur man ska göra för att få med dem i denna förändring. BIM, Building Information Modeling, är egentligen byggbranschens digitalisering. Det bygger på att projekteringen utförs i 3D och sedan byggs modellen på med information som gör att arbetet kan effektiviseras och göras smidigare. Det går till exempel att rita upp hur väggarna är uppbyggda i skikt för att underlätta för kalkylatorn vid upphandlingar med underentreprenörer men också i produktion vid beställning av material. Detta minimerar dubbeljobb och effektiviserar produktionen. I projekteringen används det bland annat vid kollisionskontroller där olika discipliners modeller läggs ihop för att se om installationerna krockar någonstans. I förvaltning kan det användas genom att produkterna som använts läggs in i modellen, till exempel vilken armatur, för att sedan lätt kunna hitta den informationen när armaturen senare behöver bytas ut. Det pratas ofta om att BIM är dyrt och det stämmer att det blir en högre kostnad i början av projekten. Däremot sparas tid och pengar i produktion och förvaltning. Fel som tidigare har upptäckts i produktion och har behövt lösas på plats så gott som försvinner. Genom att intervjua personer som börjat använda sig av BIM i produktion har upptäckten gjorts att det finns bra och lätthanterliga program som underlättar och effektiviserar vissa delar av produktionen. Två av dessa program som används på NCC idag är Bluebeam och Dalux. Bluebeam används som dokumenthantering där länkar mellan olika ritningar gör att det går snabbt och enkelt att hoppa mellan ritningar. Dalux är ett lättanvändligt program där du kan se projektet i 2D och 3D samtidigt vilket ger en lättare förståelse för vad som ska byggas genom att du kan gå omkring i projektet i 3D. Dalux har även en gratis app som alla yrkesarbetare skulle kunna använda för att öka förståelsen av vad dom bygger vilket skulle kunna göra att frågorna till arbetsledningen skulle minska. Ett problem är då hur man ska lösa det med mobiler och surfplattor till alla, om man inte får använda sin egen eller äger någon privat. Ett annat problem med digitaliseringen är att hårdvarorna är väldigt ömtåliga och ska användas i en hård miljö samt så har internet en tendens att krascha med jämna mellanrum vilket gör att man alltid måste ha en backup av de aktuella ritningarna och modellerna. En annan fråga är hur man ska få alla att använda sig av de digitala verktygen. Här är de som intervjuats överens om att det med största sannolikhet handlar om hur intresserad man är av teknik och att det är en generationsfråga. De menar att det med generationsskiftet kommer bli lättare att implementera BIM i yrkesarbetarnas arbete. För att implementera BIM i produktion på ett så bra och smidigt sätt som möjligt bör ordentliga utbildningar av platsledning och yrkesarbetarna genomföras för att sprida kunskapen om vilka möjligheter som finns inom företaget men också för att ge personalen en bra grund så att de känner sig säkra i programmen när de ska börja användas. Det kan öka intresset även hos de som varit negativt inställda från början. Yrkesarbetarna bör använda programmen som visuell hjälp genom att gå omkring i 3D modellen och för att snabbare kunna navigera sig mellan olika ritningar genom länkar. Arbetsledarna kan ha en högre svårighetsgrad med fler funktioner, bland annat olika lager och möjligheten att uppdatera ritningar och modeller.
Ericson, Robert, and Henriikka Ruuti. "BIM: Revit-content : Modellering och hantering." Thesis, KTH, Byggteknik och design, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-102011.
Full textThe introduction of the BIM-methodology in the building industry has awoken several questions regarding the reformation of work methods in the project planning process. One is the question about content; graphics and information inside a Building Information Model. The purpose of this report has been to analyze existing content managing strategies, in order to create recommendations for the forming of consequent work methods in Revit projects. The goal has been to adjust the recommendations for companies willing to further develop internal work methods in the field, particularly concerning the management of Revit content. Several interviews with representatives from different Revit projects at the architectural firm Tengbom in Stockholm were conducted. Four of the Revit projects, were chosen for a more detailed case study, in order to acquire information about the company’s strategies concerning content management. Simultaneously, a literary study was executed, through which information about existing content management strategies in other companies and organizations could be obtained and analyzed. The results of the case studies at Tengbom were compared with theories acquired from the existing strategies in content management. Benefits and disadvantages were analyzed, based on different aspects concerning modeling and management of Revit content and also the education of Revit use. The report concludes that Tengbom has applied the most sustainable strategies in the initial part of the company’s BIM implementation process. Several benefits were also found in the existing strategies, analyzed in the literary study. Together, the conclusions formed a solid base for further recommendations, made as a result of the study in this report.
Viljoen, Dewald. "Dynamic building model integration." Thesis, Stellenbosch : Stellenbosch University, 2012. http://hdl.handle.net/10019.1/20257.
Full textENGLISH ABSTRACT: The amount and complexity of software applications for the building industry is increasing constantly. It has been a long term goal of the software industry to support integration of the various models and applications. This is a difficult task due to the complexity of the models and the diversity of the fields that they model. As a result, only large software houses have the ability to provide integrated solutions on the basis of a common information model. Such a model can more easily be established since the different software is developed within the same group. Other software suppliers usually have to revert to importing and exporting of data to establish some form of integration. Even large software houses still sometimes make use of this technique between their different packages. In order to obtain a fully integrated solution, clients have to acquire complex and expensive software, even if only a small percentage of the functionality of this software is actually required. A different approach to integration is proposed here, based on providing an integration framework that links different existing software models. The framework must be customisable for each individual's unique requirements as well as for the software already used by the individual. In order for the framework to be customisable, it must either encompass the information requirements of all existing software models from the outset, or be flexible and adaptable for each user. Developing an encompassing software model is difficult and expensive and thus the latter approach is followed here. The result is a model that is less general than BIM-style models, but more focussed and less complex. The elements of this flexible model do not have predetermined properties, but properties can instead be added and removed at runtime. Furthermore, derived properties are not stored as values, but rather as methods by which their values are obtained. These can also be added, removed and modified at runtime. These two concepts allow the structure and the functionality of the model to be changed at runtime. An added advantage is that a knowledgeable user can do this himself. Changes to the models can easily be incorporated in the integration framework, so their future development is not limited. This has the advantage that the information content of the various applications does not have to be pre-determined. It is acknowledged that a specific solution is required for each integration model; however the user still has full control to expand his model to the complexity of BIM-type models. Furthermore, if new software models are developed to incorporate the proposed structures, even more seamless and flexible integration will be possible. The proposed framework is demonstrated by linking a CAD application to a cost-estimation application for buildings. A prototype implementation demonstrates full integration by synchronising selection between the different applications.
AFRIKAANSE OPSOMMING: Die hoeveelheid en kompleksiteit van sagteware programme vir die bou industrie is konstant aan die vermeerder. Dit was nog altyd 'n lang termyn doelwit van die sagteware industrie om integrasie van die verskeie modelle en programme te ondersteun. Hierdie is 'n moeilike taak as gevolg van die kompleksiteit van die modelle, en die diversiteit van die velde wat hierdie programme modelleer. Die gevolg is dat net groot sagteware huise die vermoë het om geïntegreerde oplossings te bied op die basis van 'n gemeenskaplike inligting model. So 'n tipe model kan makliker bymekaargestel word siende dat al die verskillende sagteware binne dieselfde groep ontwikkel word. Ander sagteware verskaffers moet gewoonlik gebruik maak van sogenaamde uitvoer/invoer tegnieke om 'n mate van integrasie te verkry. Selfs groot sagteware huise maak ook gebruik van hierdie tegnieke tussen hulle verskeie pakkette, in plaas van om die programme direk met mekaar te koppel. Om 'n vol geïntegreerde oplossing te verkry, moet kliënte komplekse en duur sagteware aanskaf, selfs al word net 'n klein gedeelte van die funksionaliteit van hierdie sagteware gebruik. 'n Verskillende benadering word hier gevolg, gebaseer op 'n integrasie raamwerk wat verskillende bestaande sagteware modelle met mekaar koppel. Die raamwerk moet aanpasbaar wees vir elke individu se unieke opset. Vir die raamwerk om aanpasbaar te wees, moet dit óf alle bou industrie inligting inkorporeer van die staanspoor af, óf dit moet buigbaar en aanpasbaar wees vir elke gebruiker. Om 'n model te ontwikkel wat alle bestaande inligting inkorporeer van die staanspoor af is moeilik en duur, dus word die tweede benadering gevolg. Die eindresultaat is 'n model wat minder omvattend is as BIM-tipe modelle, maar eerder gefokus en minder kompleks. Die elemente van hierdie buigbare model het nie voorafbepaalde eienskappe nie, eienskappe kan bygevoeg en weggevat word terwyl die program hardloop. Verder word afgeleide eienskappe nie gestoor as waardes nie, maar eerder as metodes wat gebruik word om hulle waardes mee af te lei. Hierdie konsepte laat toe dat die struktuur en funksionaliteit van die model verander kan word terwyl die program hardloop. 'n Verdere voordeel is dat 'n kundige verbruiker die veranderinge self kan doen. Veranderinge in die modelle kan maklik ingesluit word in die integrasie model, so toekomstige ontwikkeling word nie beperk nie. Dit beteken dat die inhoud van die modelle nie vooraf bepaal hoef te word nie. Al het die raamwerk 'n gespesialiseerde oplossing vir elke gebruiker tot gevolg, het die gebruiker nogtans volle beheer om sy model uit te brei tot die omvattendheid van BIM-tipe modelle. Indien nuwe sagteware modelle ontwikkel word met die integrasie raamwerk in gedagte, kan nog gladder en buigbare integrasie moontlik wees. In hierdie tesis word 'n tekenprogram met 'n kosteberaming program gekoppel om die voorgestelde raamwerk te demonstreer. 'n Prototipe implementering demonstreer volle integrasie deur seleksie binne die programme te sinchroniseer.
Jansson, Simon, and Markus Strok. "Virtuellt byggande." Thesis, Linköping University, Department of Science and Technology, 2008. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-11915.
Full textKostnaderna att bygga blir allt högre, man tror att byggkostnaderna väntas öka med 25 procent inom de närmaste tre åren. Mest stiger byggherrekostnaden och kostnaderna för byggmaterial och inget tyder på att detta kommer mattas av. Därför ligger det på byggföretagen att effektivisera och optimera projekteringen för att sänka kostnaderna. För att sänka produktions- och projekteringskostnaderna vill byggbranschen gå från hanteringen av traditionella 2D-ritningar till intelligenta 3D-modeller, BIM – Byggnads Informations Modell.
BIM är en metod för att lagra komplett information om en byggnad i en datormodell. Modellen integrerar all geometrisk modellinformation, de funktionella kraven och möjligheterna samt uppförandeinformationen i en enda beskrivning av ett byggnadsprojekt sett över dess livscykel.
Vid arbete med ett BIM-projekt använder man en delad projektmodell som alla inblandade parter kan ta del av och jobba med. Med hjälp av denna BIM-baserade arbetsmetod arbetar bland annat byggnadskonstruktörer, vvskonstruktörer, elkonstruktörer och fastighetsförvaltare med samma modell som arkitekten.
En av de största fördelarna med att använda BIM vid projekteringen är enkelheten att ändra objekt och dess egenskaper. Eftersom alla i projekteringen jobbar med samma modell av byggnaden ser respektive projektör ändringen. Det man strävar efter är att alla inblandade parter skall jobba med modellen från en gemensam server, för att kunna optimera projekteringen med avseende på tid, åtkomst av ritningar och förenklad korrespondens.
Syftet med vårt examensarbete är att skaffa fördjupad kunskap om BIM, både teoretiskt och praktiskt. Den praktiska delen bestod i att konstruera en BIM-modell av en byggnad. De tillämpningar vi gjort på modellen är en mängdberäkning som vi utfört i ArchiCAD, och en energiberäkning i tilläggsprogrammet Vipweb.
The costs to build is steadily increasing, one believes that the construction costs will increase with 25 percents within the next three years. The cost that will increase the most is proprietor cost and the costs for construction materials, and nothing indicates that this will weak of. Therefore it lies on the construction companies to become more effective and to optimize the project planning in order to lower their costs. To be able to lower the cost for production and project planning the construction industry have to go from the handling of traditional 2D-drawings to intelligent 3D-models, BIM - Building Information Model.
BIM is a method in order to store complete information about a building in a computer model. The computer model integrates all geometric model information, the functional requirements and possibilities and the behavior information, in only one description of a building project seen over its life cycle.
While working with a BIM-project one uses a divided project model that all involved parties can take part of and work with. With the aid of this BIM-based work method construction engineers, electrical engineers, heating- ventilation- and sanitation engineers and real estate managers are able work with the same model as the architect.
One of the biggest advantages with using BIM at project planning is the simplicity to change items and its properties. Since everyone in the project planning is working with same model of the building they can all see the changes that have been made. What one strives for is that all involved parties will work with the model from a common server, in order to optimize the project planning with the focus on time, accessibility of drawings and simplified correspondence.
The aim with this degree project is to get deepened knowledge about BIM, both theoretical and practical. The practical part consisted in designing a BIM-model of a building. We have used the model to do an amount calculation on the models building parts. This we carried out in ArchiCAD. We also made an energy calculation in the add-on program Vipweb.
Bengtsson, Jonas, and Mikael Grönkvist. "Performing Geographic Information System Analyses on Building Information Management Models." Thesis, KTH, Geodesi och satellitpositionering, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-208922.
Full textI takt med den ökade användningen av både BIM och 3D-GIS inom samhällsbyggnadsprocessen har även intresset för att sammanföra de två verktygen blivit större. En möjlighet med integration är potentialen att visualisera BIM-modeller tillsammans med andra geografiska data i 3D. En annan är att kunna genomföra rumsliga 3D-analyser på modellerna. Båda dessa går att utföra med hjälp av GIS-programvara. Denna studie utforskar hur en integration mellan BIM och GIS kan se ut. Målet är att genomföra typiska GIS-analyser i 3D på BIM-modeller. Tidigare forskning pekar mot vissa framgångar inom området genom att arbeta med det utpekade standardformatet för respektive verktyg – IFC för BIM och CityGML för GIS. Transformation mellan formaten skedde med hjälp av programvarorna Revit, FME och ArcGIS. Ett par framhållna tillämpningar av GIS-analyser valdes ut för tester på de konverterade modellerna – nätverksanalyser inomhus, siktanalyser och rumsliga analyser för 3D-byggnader. Som indata användes flera olika BIM-modeller, både sådana som tillverkats för faktisk användning och modeller som skapats för att användas som exempeldata inom programvarorna. Utifrån resultaten från det praktiska arbetet kan konstateras att en enkel, automatiserad och fullskalig integration mellan verktygen verkar ligga en bit in i framtiden. De flesta transformationerna mellan IFC och CityGML misslyckades i någon aspekt, speciellt de mer detaljerade och komplexa. I vissa testfall kunde filen inte importeras i ArcGIS, i andra saknas eller existerar oväntade geometrier även om importen lyckats. Det finns också exempel där geometrier förflyttats. Som en konsekvens av dessa problem kunde de flesta 3D-analyser inte genomföras alls eller lyckades inte ge betydelsefulla resultat. Ett fåtal av de ursprungliga analyserna gav dock positiv utdelning. Att kombinera (felaktiga) CityGML-modeller med annan rumslig data fungerade förhållandevis väl ur ett visualiseringssyfte. Både skuggvolymsanalysen och framtagandet av siktlinjer från byggnaderna gav någorlunda korrekta resultat vilket indikerar att det kan finnas en framtid gällande de tillämpningarna. Hindren för en fullskalig integration som identifierades genom arbetet delades upp i fyra olika kategorier. Den första är BIM-användning där hög kvalitet på de skapade modellerna är viktigt för korrekta slutresultat. Den andra är detaljeringsgraden där avsaknaden av gemensamma definitioner för detaljeringsgraderna ställer till problem. Den tredje kategorin är koordinat- och referenssystem där en lösning på kopplingen mellan lokala och globala system redan kan finnas på plats i en av de senare utgåvorna av IFC-formatet. Den sista och största kategorin är problematiken kring just format och programvaror där mer arbete på översättningen mellan IFC och CityGML kommer att krävas. I framtiden finns det gott om arbete att göra med dessa olika problem. Det finns också potential att utveckla egna verktyg för integrationen eller att ägna sig åt att göra andra analyser än de som valdes ut i den här studien.
Ruokamo, S. (Simo). "Single shared model approach for building information modelling." Doctoral thesis, Oulun yliopisto, 2019. http://urn.fi/urn:isbn:9789526223704.
Full textTiivistelmä Rakentamisen tietomallinnuksen (BIM) nykyisenä tiedonjakamisen käytäntönä on hajautettu tietojärjestelmä, joka perustuu konversioihin. Konversiot ovat ongelmallisia tiedon häviämisen, ristiriitojen ja päällekkäisyyksien vuoksi. Tämän tutkimuksen hypoteesit olivat: i) konversiovapaa tiedonjakaminen on mahdollista, ii) etuja on saavutettavissa ilman konversioita tapahtuvassa tiedonsiirrossa ja iii) laajemmalle teolliselle käytölle ei ole periaatteellisia esteitä. Konversiovapaa tiedon jakaminen edellyttää yhden dataformaatin käyttöä. Alati kasvavien tietomallien koko vaatii tiedon järjestämismenetelmän, joko mahdollistaa osamallit. Datan ristiriidat ja päällekkäisyydet voidaan estää yhden jaetun mallin menetelmällä. Informaatio on parhaiten kaikkien osapuolien saatavilla, kun jaettu malli sijoitetaan pilvipalveluun. Kun tietomallia käsitellään vain web-palvelun rajapintafunktioilla, tiedon eheys ja kelpoisuus säilyvät. Tietoteknisten ratkaisujen kelpoisuus voidaan viime kädessä osoittaa vain toimivilla ohjelmistoilla. Konversiovapaan menetelmän testausta varten kehitettiin vaadittavat ominaisuudet sisältävä ohjelmistokehityspaketti (SDK), joka on edellytys sovellusten yhteensopivuudelle. Kolme sovellusta eli 3DTrussme, Leonardo ja Viewer ohjelmoitiin SDK:n avulla. Ohjelmointirajapinta sisälsi tarvittavat toiminnallisuudet tiedonjakamiseen, ja se toteutettiin pilvipalveluna. Testiajossa Leonardo-sovelluksella mallinnettiin seinät, 3DTrussmellä suunniteltiin naulalevyristikot ja Viewer-sovelluksella tarkasteltiin mallia. Kaikki kolme sovellusta käyttivät samaa jaettua mallia pilvipalvelussa. Suoritetussa testissä kaikki informaatio jaettiin ilman konversioita ja tallennettiin vain kerran. Ilman konversioita ja päällekkäisyyksiä saavutettiin parempi datan eheys ja integraatio. SDK:n avulla uudet sovellukset pystyivät liittymään yhden jaetun mallin ekosysteemiin ilman teknisiä esteitä. Toisaalta, ilman merkittäviä muutoksia nykyiset BIM sovellukset eivät ole yhteensopivia. Testiajossa suorituskyky oli hyväksyttävä, mutta todellisuudessa mallien koko sekä sovellusten ja käyttäjien lukumäärä ovat paljon suurempia. Tutkimus osoitti, että konversiovapaa yhden jaetun mallin menetelmä voi olla seuraava BIM-kehityssuunta ja vaihtoehto nykyisille tiedonsiirtoratkaisuille, jotka käyttävät erillisiä tiedostoja, konversioita ja linkkejä
Porter, Stuart Ross. "Breaking into BIM physical security simulation utilising building information models." Thesis, Curtin University, 2014. http://hdl.handle.net/20.500.11937/963.
Full textÅskregn, Peter. "BIM i medelstora byggentreprenadföretag : BIM in medium sized building construction companies." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-26416.
Full textThe report has a focus on Building Information Models (BIM), an IT-technical tool- and workmethod that have emerged increasingly in the construction industry in recent years. How this IT tool is used in medium-sized building construction companies is presented in this report.The purpose of the report is to promote positive development towards more efficient and resource-efficient work processes in the construction industry by providing knowledge on how the use of BIM exists among these companies, why it is the way it is, if BIM is needed and what can change the current status in any direction.The work-method has consisted of literature studies and interview surveys.The work began with studies of reports and texts related to BIM and interviews with representatives of leading construction industry companies and a couple of industry organizations with focus on BIM. This was followed by continued literary studies focused on change and change management, survey and interview techniques. This work led to various basic theories and explanatory models as the basis for and the design of the interview questions asked at the main interviews.The main interviews was conducted with eleven medium-sized building construction companies and gave a result that showed that companies generally looked at BIM as something positive with advantages such as easier communication and as a means to reduce errors in production. The result also brought some light to the fact that there existed challenges like software compatibility and dependency between the parties involved in the project, which means that for the technology to be able to provide wanted benefits all parties involved have to use the workmethod.The reasons for the low usage among medium sized construction contractors was several, the most common was the lack of demands of the clients. The reasons were also the absence of need, costly investments, competing objectives, compatibility issues with software and lack of knowledge of BIM.In order to promote a greater usage of BIM it is proposed that the technical obstacles are eliminated through standardization and development of the processing method and software, it is also proposed that the competing objectives are eliminated by spreading and increasing knowledge of BIM in the industry, both amongst entrepreneurs, -to promote good staff training so that the staff will want to work with the technology, and amongst construction clients, -so that they start asking for BIM and thereby provide the technology with a competitive edge.
Linder, Viktor. "BIM - Tillämpning och effekt i byggprocessens olika skeden." Thesis, Umeå universitet, Institutionen för tillämpad fysik och elektronik, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-84204.
Full textThe construction industry is facing major changes in the future, as a result of BIM (Building Information Model/Modelling/Management) that gradually makes its arrival. BIM implies a changed working method that can provide improved possibilities to reduce time and rework in the pre-planning stage and create a more efficient design and production stage with fewer errors. BIM is a relatively new way of conducting projects in the construction industry and implies a change in different sections of the building process, which affects involved parts. The purpose of the study is to find out how Peab in Kiruna in the best possible way can take advantage of the potential of BIM, also describe some of the changes BIM can mean compared to current practices. A theoretical part describes BIM and its advantages and disadvantages in different areas and explains the barriers that exist for the working method. A result based on the theoretical part explains that BIM today primarily should be utilized by Peab in Kiruna in a tender stage where a contract document is converted to a BIM model. While this may help them to see errors in the specifications, they also can perform quantity takeoff and calculation in an easier way. However, this requires that the company has the expertise necessary for creating BIM models and that they pay for licenses for the essential software. Further, it is explained in the report how this can be done, by a practical implementation carried out where an outlining of the potential and benefits of performing quantity takeoff of a BIM model is shown. The quantity takeoff is performed in the CAD software Autodesk Revit, where a building was used as a model. By using suitable functionsin the program, optional utility values can be obtained from optional materials in the building. If Peab can use BIM in this manner in their working method, it will make it easier for them in future projects and could even be a first step for an implementation of BIM in their design and production stage.
Grann, Blane. "A Building Information Model (BIM) Based Lifecycle Assessment of a University Hospital Building Built to Passive House Standards." Thesis, Norges teknisk-naturvitenskapelige universitet, Institutt for energi- og prosessteknikk, 2012. http://urn.kb.se/resolve?urn=urn:nbn:no:ntnu:diva-18849.
Full textFuller, Pierre (Pierre Henri). "A simplified software architecture for self-updating Building Information Models (BIM)." Thesis, Massachusetts Institute of Technology, 2009. http://hdl.handle.net/1721.1/55155.
Full textCataloged from PDF version of thesis.
Includes bibliographical references (p. 61-63).
Building Information Modeling (BIM) is an emerging software technology that is revolutionizing the architecture, engineering, and construction (A/E/C) industry. BIM technology employs "object-based 3D models-containing the physical and functional characteristics of a facility-that serve as a repository for lifecycle information in an open, interoperable format" [1]. The major difference between BIM and Computer-Aided Design/Drafting (CADD) is that the former includes geometry and a plethora of building information while the latter includes only geometry. BIM utilization in the AEC industry has increased due to 1) BIM tools increasing productivity in design tasks; 2) the increasing number of private and government agencies that have instituted BIM requirements; 3) the pervasive use of computer analysis and simulations models; 4) the benefits of BIM as lifecycle management tool. Current literature shows trends of a transition from a "passive"-static model-based-approach to an "active"-dynamic model-based-approach. The active approach requires the integration of BIM with sensors to create "self-updating" building models. Previous research introduces the concept of a self-updating building model ([2], [31, [41). These systems involve complex software architecture and may perpetuate the problem of software interoperability. This thesis explores the following question: May a similar system be created to synthesize dynamic sensor data while improving upon previous research and simplifying the software architecture? The author describes a prototype system, called LiveBuild, which integrates commercial BIM software with other off-the-shelf software components to create a self-updating building model. LiveBuild is the first self-updating building model that operates as an extension to existing commercial BIM software. Therefore, the transition from static to active building models is as simple as installing a plug-in. LiveBuild may serve as the basis for future research in self-updating building by providing simplified system that is well integrated with state-of-the art commercial design software. Likewise, the prototype is applicable for professional practice by allowing firms to use their existing BIM software to perform "pilot projects" with self-updating technology. The current prototype supports an interface with single commercial BIM software (Autodesk Revit 2009) product however future prototypes may extend both the functions and interfaces for other BIM software.
by Pierre Fuller.
S.M.
Curan, Selma, and Jesper Hansen. "SPEGLAR SVERIGES LÅGA GRAD AV DIGITAL UTVECKLING INOM BYGGSEKTORN ANVÄNDANDET AV BIM I PROJEKTERINGSSKEDET? : EN UNDERSÖKNING OM DAGENS ANVÄNDNING AV BIM I PROJEKTERINGSSKEDET." Thesis, Jönköping University, Tekniska Högskolan, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-54063.
Full textSyfte: Det finns tydliga fördelar med BIM i projekteringen men även hinder och utmaningar som begränsar implementering av BIM i projekteringsskedet. I Sverige finns i dagsläget inga krav på BIM vilket skiljer sig från flera internationella länder. Målet med rapporten är att undersöka dagens användning av BIM i projekteringsskedet i Sverige. Studien genomförs i förhoppning om att bidra till en ökad BIM-integrering i projekteringsskedet samt bidra med ökad kunskap om hur utvecklingen av BIM kan drivas framåt. Metod: Forskningsmetoden i denna undersökning är en survey. För att besvara rapportens frågeställningar och uppnå målet sker datainsamling via en enkät som omfattas av både kvantitativa och kvalitativa enkätfrågor i kombination med litteraturstudie. Enkäten har skickats ut till arkitekter, projektörer och konstruktörer på olika ingenjörs- och arkitektföretag runt om i Sverige. Resultat: Användningen av BIM i projekteringsskedet antas vara hög i dagsläget och majoriteten av medverkande i undersökningen känner till fördelarna med arbetssättet och hur det kan effektivisera arbetsgången i projekteringsskedet. Faktorer som hindrar implementering av BIM antas gå hand i hand med faktorer som bidrar till en ökad användning av BIM och behöver därmed beaktas för att användningen av BIM ska öka. Konsekvenser: Sveriges låga grad av digital utveckling inom byggsektorn speglar inte användandet av BIM i projekteringsskedet på arkitekt- och ingenjörsföretag i Sverige i dagsläget. Vanligt förekommande användningsområden med BIM i projekteringsskedet bland arkitekt- och ingenjörsföretag är kollisionskontroller, samgranskning, informationshantering och visualisering. Genom att öka kunskapen om BIM i beställarledet och informera om nyttan med arbetssättet antas användningen av BIM stiga. Vidare rekommendation som antas leda till en ökad användning av BIM är en kravställning på arbetssättet inom offentligt byggande i Sverige. Begränsningar: Rapporten är avgränsad till att undersöka användningen av BIM i projekteringsskedet och undersöker endast arkitekt- och ingenjörsföretag runt om i Sverige. Enkätrespondenterna utgörs av projektörer, arkitekter och konstruktörer. Resultaten är representativa för undersökningen men kan inte tillämpas på alla arkitekt och ingenjörsföretag i Sverige eftersom urvalstekniken inte är generaliserbar.
Abbasnejad, Behzad. "Building information modelling adoption and implementation in construction firms: A multi-stage model." Thesis, Queensland University of Technology, 2018. https://eprints.qut.edu.au/119686/1/Behzad_Abbasnejad_Thesis.pdf.
Full textRuixue, Liu, and Zhong Yicheng. "Analysis of BIM and GIS integration: results from literature review and questionnaire." Thesis, Jönköping University, Tekniska Högskolan, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-53310.
Full textAtto, Andreas. "Byggprocessen i förändring - Visionen om BIM." Thesis, Linköpings universitet, Institutionen för teknik och naturvetenskap, 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-69576.
Full textThe primary purpose of this thesis can be said to be to create a perception at Skanska Civil Southeast, which is the initiator of this thesis, on what BIM (Building Information Model) is and how it can most easily be implemented in their work processes. It would be impossible to cover all aspects of BIM in the short amount of time that has been available and in the context of this thesis, therefore, the aspects that were deemed important to the company and to the author has been picked up for investigation. To achieve this, the task of the thesis is to identify and highlight the differences between today's construction process, and BIM (Building Information Model) and from that suggest possible ways to implement this way of working to Skanska Civil Southeast. The thesis first chapter provides a brief introduction and background to the construction process and how it has changed over time. A purpose and questions on which the thesis is being based on are formulated and a boundary for the thesis is done. The thesis second chapter provides the theoretical background to today's construction process. Key aspects of today's construction process are highlighted and explained. This is followed by a presentation of the concept of BIM and what it means. After that, a brief review of how the work with BIM looks at Skanska Sweden AB and in the construction industry generally. The thesis third chapter presents how BIM is currently used on a road project just outside of Katrineholm in a project called Förbifart Katrineholm where BIM is being applied to some extent. The differences that exist between today’s construction process and the BIM and the pros and con that can be observed in BIM relative to today's construction process is presented. In the thesis fourth chapter answers the questions and the results are analyzed and discussed on important aspects of construction, to, in the fifth chapter make concrete proposals on how an implementation of BIM in Skanska Civil Southeast work processes may look like.
Pejchal, Mojmír. "Přepracování dokumentace stavby do modelu pro BIM." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2021. http://www.nusl.cz/ntk/nusl-444255.
Full textAvila, Mary-Alice. "Programming and Conceptual Design Using Building Information Modeling." DigitalCommons@CalPoly, 2009. https://digitalcommons.calpoly.edu/theses/38.
Full textHahne, Johannes, and Linnea Karlsson. "Vägen mot en integration av BIM och Internet of Things : En modell över fördelar och förutsättningar vid användning av Internet of Things i BIM." Thesis, Uppsala universitet, Byggteknik, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-355791.
Full textOliveira, Marina Rodrigues de. "Modelagem virtual e prototipagem rápida aplicadas em projeto de arquitetura." Universidade de São Paulo, 2011. http://www.teses.usp.br/teses/disponiveis/18/18141/tde-07042011-110243/.
Full textThis master research work studies the employment of tools like virtual modeling and rapid prototyping on architectural designs trough educational institutions and commercial offices case studies from that use Rapid Prototyping Laboratories during the design process. Based on a literature review regarding design process, parametric design, virtual modeling, Building Information Model(ing) and rapid prototyping, connection between academic knowledge and potential design were performed in order to study the potentials, interferences, and future these technologies can offer to architectural design process. Two field studies were employed to investigate how technologies are influencing the design projects. The descriptive work presents the professional practice reality in São Paulo, Brazil, through interviews with five architectural design offices that are using these tools in different ways during the design project. The exploratory study was performed at three schools of excellent: University of Campinas, Brazil, Architectural Association in London, UK and Technical University of Lisbon, Portugal where the methodology employs parametric virtual modeling technology, giving evidence of changes in design teaching using the Digital Fabrication facilities. It concludes that the use of these technologies on design project teaching and practice a hanger the way of design, involving decision-making, simulation, design drawings, documents generation and collaboration between designers. However the academic research groups that use the technology for contemporary design conception and production do not represent the professional practice reality once they are using the BIM software on an isolated way given that complementary design offices don\'t have access to the same technology.
Joblot, Laurent. "Contribution à la mise en œuvre du BIM en rénovation : Proposition d'un Modèle de Maturité BIM spécifique." Thesis, Paris, ENSAM, 2018. http://www.theses.fr/2018ENAM0039/document.
Full textThis research aims to answer two imperatives: 1) promote an economically promising sector, Renovation, that has not been subject to much scientific study; and 2) offer companies in this sector useful tools to help them succeed in their digital transition, a major challenge of the 21st century. When it comes to disseminating an Information System such as BIM, it is essential to use levers that enhance its implementation: the Critical Success Factor, fundamentals of Project Management, drafting BIM Execution Plans, an Integrated Project Delivery approach and Maturity Models. To ensure the right fit between these different levers and the specific needs of the Renovation segment, we conducted a survey with a representative panel of small enterprises, predominant in this sector. This survey confirmed that the sector is still in the early days of digital transition due to the small size of companies and economic situations that often reduce visibility and the ability to make long-term investment decisions. Small renovation firms are not always aware of the need for change (they are generally satisfied with 2D drawings and artisanal processes) and are therefore reluctant to invest in digital solutions such as BIM. In spite of this, most stakeholders are aware that in order to benefit from the transition or risk being left behind, they must find support in tools specific to their uses and practices. To measure their maturity and then realistically define their own development objectives, we therefore developed a "BIM Maturity Model for Renovation" or BiM²FR. The format and ease of implementation should enable small enterprises to identify their situation, emphasize their strengths and weaknesses, and then outline individual action plans suited to their activities. The Critical Success Factors analyzed and presented within BiM²FR should guarantee successful progress as companies implement BIM. In order to broaden the scope of this work, we created a free web interface for companies to make their own BIM maturity diagnosis. The site www.BiM2FR.eu, in addition to helping these companies, offers us, through the data collected and exchanged, a large number of research opportunities
Lee, Yong Cheol. "Rule logic and its validation framework of model view definitions for building information modeling." Diss., Georgia Institute of Technology, 2015. http://hdl.handle.net/1853/54430.
Full textKärnbo, Josua. "Svensk Byggindustri och Critical Success Factors : En lokal diskussion kring kritiska moment vid implementering av BIM." Thesis, Uppsala universitet, Byggteknik, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-383266.
Full textBIM (Building Information Modeling) is an exponentially growing field within the construction industry, with no signs of slowing down. However, as the process continues to spread on both an international and national scale, issues with implementation inevitably arise due to many different factors, in this work identified as CSF (Critical Success Factors). The purpose of this work is therefore to examine these factors, as well as the term CSF itself, with regards to meaning and relevance. Based on previous studies the term CSF, as well as 14 factors, were established. To correlate these internationally described factors to the Swedish market, five interviews featuring people with experience of BIM in Sweden were conducted, after which similarities and patterns could be recognized. The core concepts continually established throughout the work was the value of mutual and shared understanding, as well as the importance of utilizing previously established knowledge within the construction industry. The report concludes that the identified factors as well as the term CSF are both valid and beneficial for future discussions and implementations of BIM
Nilsson, Erik, and Goidaragh Safiyeh Alizadeh. "Kundnyttan av Tekla Structures som verktyg i broprojektering." Thesis, KTH, Byggteknik och design, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-125749.
Full textThe building industry is going trough a transitional stage, from 2D to 3D. BIM, as a working method, and 3D models are becoming more common. In bridge project however, the demand for 3D models is low. At WSP in Stockholm the 3D modelling program Tekla Structures is widely used in several departments. There is a desire to expand the usage of the program also when it comes to bridge planning. To make that possible a bigger request by the customers is required. The purpose of this thesis is to evaluate Tekla Structure as a tool from a customer perspective and to analyse the customer values by using Tekla models. To shed light on this issue interviews have been made with different customers of WSP. The customers’ needs and their reflections on BIM and Tekla Structures in bridge projects are mapped out and analysed. Aspects reached by the customers have served as a basis for analyse of a 3D model, built up in Tekla Structures, as well as two bridges – already modelled in the same program. The analysis shows that there is a big customer value by using Tekla models in bridge projects, but to enable management models great efforts are required. An evaluation of the software also shows both strengths and weaknesses. In the following pages the result is presented.
Quiso, E., J. Rivera, and J. Farje. "Proposal for the application of ICE and BIM sessions to increase productivity in construction." IOP Publishing Ltd, 2021. http://hdl.handle.net/10757/655943.
Full textNováček, Michal. "Pokročilé uplatnění BIM při návrhu stavebních objektů." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392305.
Full textCostin, Aaron M. "Integration of passive RFID location tracking for real-time visualization in building information models (BIM)." Thesis, Georgia Institute of Technology, 2013. http://hdl.handle.net/1853/50395.
Full textLee, Bryan. "Applying systems modeling and case study methodologies to develop building information modeling for masonry construction." Thesis, Georgia Institute of Technology, 2015. http://hdl.handle.net/1853/53602.
Full textVasconcelos, Tiago Miguel Nunes Rolo Ferreira de. "Building information model - avaliação do seu potencial como solução para os principais atrasos e desperdícios na construção portuguesa." Master's thesis, Faculdade de Ciências e Tecnologia, 2010. http://hdl.handle.net/10362/5641.
Full textEstudos anteriores ao sector da construção revelaram a necessidade de investir na melhoria da qualidade dos projectos e na melhoria da gestão dos empreendimentos. A concepção desta dissertação partiu, assim, da ideia de esclarecer as causas para o incumprimento de prazos e de custos, reunindo toda a informação necessária de forma a discutir se a implemenção do BIM – Building Information Modeling – resolveria estas situações. Este estudo concebeu-se através de entrevistas a 10 empresas portuguesas de construção com actividades de investigação e desenvolvimento, sobre os problemas de incumprimento de prazos e de custos nas fases de Concurso, Preparação e Execução, na perspectiva do Empreiteiro. Os potenciais benefícios da metodologia BIM são o aumento do fluxo de informação, o aumento da colaboração, o aumento do controlo do planeamento e do orçamento, a redução das incompatibilidades entre projectos de especialidades, o aumento da qualidade da construção e a diminuição do risco. Assim, o BIM tem a capacidade de eliminar ou atenuar os problemas detectatos nas 3 fases. Pretende-se que este estudo esclareça a indústria da construção relativamente aos problemas existentes e alerte os responsáveis para a implementação de ferramentas de gestão que eliminem desperdícios (tempo e materiais) e diminuam os custos dos empreendimentos.
Farah, Toni E. "Review of current estimating capabilities of the 3d building information model software to support design for production/construction." Link to electronic thesis, 2005. http://www.wpi.edu/Pubs/ETD/Available/etd-082305-165125/.
Full textHjalmarsson, Markus. "BIM i små väg- och anläggningsprojekt : För- och nackdelar med 3D-projektering kontra 2D-projektering." Thesis, Karlstads universitet, Avdelningen för energi-, miljö- och byggteknik, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:kau:diva-68700.
Full textHomolová, Tereza. "Využití informačního modelu budovy (BIM) v realitním inženýrství." Master's thesis, Vysoké učení technické v Brně. Ústav soudního inženýrství, 2020. http://www.nusl.cz/ntk/nusl-413829.
Full textRodriguez, Ewerlöf Ivana. "Användning av byggnadsinformationsmodellering (BIM) för effektivare klimat- och livscykelanalyser av byggnadskonstruktioner." Thesis, Uppsala universitet, Industriell teknik, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-351956.
Full textConstruction processes and the production of building material cause a large part of the emissions of greenhouse gases around the world. To achieve a sustainable development it is of great importance to reduce emissions from construction projects. Doing climate analyses and life cycle assessments of building materials during early design phases could enable more sustainable design and material choices. This thesis focuses on Swedish conditions. During this study it was investigated how Building Information Modeling/Management (BIM) can be used to improve possibilities of doing efficient life cycle assessments (LCA) of buildings and included materials, during the whole design phase. Two 3D building models were transferred to two software tools, Bidcon and One Click LCA, for climate analysis and life cycle assessment of the building components. Quantity take-off from the model objects to the tools worked automatically while the connection between the material descriptions and databases inside the tools had to be done manually. The process requires information about the materials in the model to work. To make the connections more automatic, material descriptions need to be more standardized and connect to entries in the databases. Moreover interviews were held to investigate how the methods of integrating BIM with LCA can be used in construction projects. For consulting firms this depends on the demands from the client and which stages of the project the consultants work in. LCA-methods based on BIM should be combined with interdisciplinary meetings for better results. This together with an expanding demand for LCA could increase the motivation to use these methods, which enables reduction of climate impact from buildings.
Orenäs, Nissas Sebastian, and Nangi Rahimi. "Digitalized Construction Project : To Build after a Legally Binding BIM-model." Thesis, KTH, Fastigheter och byggande, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-279110.
Full textDigitalisering har blivit något av ett modeord inom dagens samhälle och det med all rätt då det medför sina fördelar och möjligheter. Bygg- och fastighetsbranschen har ständigt släpat efter övriga industrier vad gäller förändring och utveckling och ses därefter ofta som konservativ. Starkt associerat med digitalisering inom bygg är koncepten Building Information Modeling (BIM) och Virtual Design and Construction (VDC) som dels innefattar teknologi och modeller för integrerade och modellbaserade arbetssätt. De används exempelvis för att minska fragmentering mellan projektmedlemmar som vanligen enbart fokuserar på sina egna teknikområden. Inom forskningsvärlden sägs det finnas stora vinningar med en lyckad implementering av BIM/VDC i projekt och det är något som många företag inom branschen arbetar med och söker utveckla. Samtidigt anger forskningen också att det finns stora utmaningar och att man ännu inte kommit så långt med digitaliseringen. Syftet med detta examensarbete är bland annat att undersöka hur projektmedlemmar har arbetat och hur arbetssätten har upplevts i ett av få välkända byggprojekt i Sverige där man tagit ett steg längre i att digitalisera byggandet genom att bygga efter en digital modell som juridisk bygghandling istället för de traditionella pappersritningarna. Ämnet utforskas kvalitativt, i form av en fallstudie, där en vetenskaplig litteraturstudie, intervjustudie samt observationer tillsammans utgör grunden för arbetet och som alla agerar underlag för analysdelen. Litteraturstudien täcker tidigare studier på området för att beskriva kunskapsläget samt koncept som är relevanta för att besvara formulerade frågeställningar samt begrepp som dykt upp under intervjustudien som är viktiga att förstå för en kvalitativ diskussion och följaktligen likaså kvalitativa slutsatser. I intervjustudien har 13 respondenter intervjuats i så kallade semi-strukturerade intervjuer och som alla varit inblandade i det undersökta projektet. Resultatet tyder på att BIM-modellen kan bidra till en bättre kommunikation, högre resurseffektivitet, bättre kvalitet och samtidigt till en lägre totalkostnad av projektet. Identifierade upplevelser med att projektera en BIM-modell och att därefter bygga efter modellen istället för 2Dritningar är till övervägande del positiva. Samtidigt som fördelar och möjligheter påvisas med detta arbetssätt så uppkommer nya utmaningar och risker. Det medför juridiska risker, tekniska risker och hanteringsrisker. Det är exempelvis nya typer av fel som uppkommer med en mer detaljerad projektering.
Muminovic, Meliha, and Emira Tandirovic. "Varför används inte BIM?- Vad är det som motverkar implementeringsprocessen?" Thesis, Örebro universitet, Institutionen för naturvetenskap och teknik, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:oru:diva-68451.
Full textMost production sectors in Sweden have had a positive technical development with digitized operations, and thus more efficient processes. The construction industry is the industry that has taken much longer to implement digitized working methods and methods, and is usually described as a conservative industry. However, this development has accelerated in recent years, and BIM (Buliding Information Modeling) has become increasingly known in the construction industry. The purpose of the work was to investigate how much BIM is actually used in the construction industry, and what the prevailing reasons are why it is not used by all actors. The method used in the study consists of a preliminary study in the form of a survey, where different actors have described how BIM is applied in their operations and what the real problems are for the development of BIM. Based on questionnaire responses, a deeper study has been conducted in the form of interviews by different actors. The result shows that it is rather ignorance, user friendliness and inadequate collaboration that counteract the development of the BIM process. To get rid of the conservative, these factors need to be addressed if more efficient processes are to be supplied to the industry.The conclusion about why BIM is not used is deducted from the results above. The process is used to a certain extent, but not to the extent that it is theoretically intended. It does not extend throughout the entire construction process, and is most developed in the design phase. The process is applied to the transition between the different stages, and is due to insufficient demands and cooperation between actors and developer. One solution is to increase BIM knowledge and develop a common platform for all actors at all stages, where the requirement for BIM should be a matter of course in the projects. This through an implemented implementation-model adapted to the responses and wishes that have been found in the study.
Thomson, C. P. H. "From point cloud to building information model : capturing and processing survey data towards automation for high quality 3D models to aid a BIM process." Thesis, University College London (University of London), 2016. http://discovery.ucl.ac.uk/1485847/.
Full textOdeh, Ahmad. "An Integrated BIM Model to Evaluate the Embodied Energy, Carbon Emissions & Environmental Costs of Construction Materials Used in the Design of Buildings." Thesis, Université d'Ottawa / University of Ottawa, 2020. http://hdl.handle.net/10393/41550.
Full textStaufčík, Jakub. "Využití laserového skenování v informačním modelování budov." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-400177.
Full textTaher, Abdo, and Benyamin Ulger. "Tillämpning av BIM i ett byggnadsprojekt : Centrum för idrott och kultur i Knivsta." Thesis, Mälardalens högskola, Akademin för ekonomi, samhälle och teknik, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-55198.
Full textPurpose: The purpose of this study is to describe how the CIK project was executed. Furthermore, it is investigated how the CIK project could have been designed with BIM as a working method and what changes it would entail for the project. Method: This study has consisted of a literature study of BIM and a case study of the CIK project. The case study included an object description as well as documents and interviews were analyzed. In addition, remodeling and observations of the CIK project were performed with BIM tools. Results: The results initially show how the traditional working methods were implemented in the CIK project. The initial lack of requirements created ambiguities. The architects used traditional sketching methods for the design. Calculation and scheduling were handled separately from the 3D model. The 3D models in the CIK project were used for visualizations and coordination. However, the contracted documents for various deliveries were traditional 2D drawings. The architects produced over 300 drawings and over 100 different doors that were presented on different drawings. At the end of the production, selected PDF-documents were re-stamped in consultation with the customers for the administration. Furthermore, the results show how the CIK project with a BIM application could have been carried out. Initially, a BIM manual is created by a BIM strategist to specify the requirements. During design, parametric and generative design are used to find different solutions to meet the requirements. The calculation and schedule must be linked to the BIM model. All information management takes place in cloud services such as BIMeye. Through StreamBIM, the production then retrieves all the necessary information from the BIM model. Additional detailed drawings should be linked to the objects in StreamBIM. During production, the BIM model is updated before the delivery to the customers. Conclusions: The conclusions that can be drawn from this study are that the information management is an important aspect to implement during the construction process. For the CIK project, BIM would mean a completely new way of managing and centralizing the information by linking data to the objects in the model. The point of BIM projects is to constantly turn to the model or database, which is linked to the model to retrieve the necessary information. The result is therefore a release from the information islands and duplication of work that is formed in a traditional design.
Moore, Nigel Jonathan. "A contextual AR model based system on-site construction planning." Thesis, University of Wolverhampton, 2013. http://hdl.handle.net/2436/301614.
Full textBäckner, Caroline, and Tobias Vigert. "Kan kostnadsbedömningar i tidiga skeden byggt på BIM utföras?" Thesis, KTH, Byggteknik och design, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-260323.
Full textToday's society is at the forefront of a paradigm shift in digitization where cost-efficiency, productivity and digitalization interact. The Swedish construction sector has proven to have a low degree of development in digitization. Ottosson has shown that over 80% of all complications in construction projects are due to lack of communication. Svensk byggtjänst declares increasing costs for construction production and management by about SEK 60 billion each year. Basically, it is about how actors in the sector communicate among themselves, but also how information is handled digitally. A known concept in today's construction industry concerning information management and communication is BIM, "Building information model / modeling". The concept is about creating and utilizing precise digital models from construction projects. The aim is to obtain information from the digital model that is significant for the realization of the construction work and which then fulfills the BIM concept. The concept concerns information management, i.e. communication between different actors. ÅF-Infrastructure AB section "Byggekonomi – Rådgivning tidiga skeden" commissioned the authors of this master thesis to examine a specific method for cost assessments using digital models as a basis. The purpose of this thesis is to investigate the suggestion for approaches to cost assessments using digital models in order to develop the company's internal cost assessment tools. With this procedure, the right basis at the right stage within the early stage can contribute to increasing the quality of the adoption of financial decisions. The degree project is based on a qualitative method in the form of literature studies, interviews, participation in subject-specific seminars, observations of meetings and a quantitative method performed in order to simulate multi-dwelling housing projects. The methods have investigated the possibility of the information management systems Level Of Development and CoClass being available with a basis for cost assessment of the three stages in the early stages: the idea- feasibility study- and the program action stage. The study has shown two greater challenges. There is development potential both with regard to the classification system CoClass and the cost assessment tool Calc Frame. Regarding CoClass, it should above all be the classification system that informs the user about what ought to be contained under each level of information. It should not be up to the business community to interpret what information includes in each level in the system, this necessitate should be refined and clarified within the classification system itself. From a cost assessment point of view, it has not been possible to produce generic building complexes in Calc Frame. But since the tool is capable of handling several different construction works, these can thus be combined into specific and unique building works. Theoretically, the development of generic building complexes would be possible if the program were further developed. If this is considered desirable, then our assessment is that it is possible to further develop and apply the methodology on building complexes (with the same principle as the program is designed) to create generic complexes. Our study has shown that an economic evaluation in the early stages of the building process can be done with BIM. Whether ÅF-Infrastructure AB's updating of its internal cost assessment tool is compatible with digital models, the authors consider that the study has shown that the method used to increase the quality of cost assessments is compatible with the new classification system CoClass. The recommendation is therefore to update and develop cost assessment tools against the classification system CoClass.
Bortolini, Rafaela. "Enhancing building performance : a Bayesian network model to support facility management." Doctoral thesis, Universitat Politècnica de Catalunya, 2019. http://hdl.handle.net/10803/666187.
Full textActualmente, el desempeño de los edificios existentes es de gran interés debido a la necesidad de renovar el stock de edificios antiguos, proporcionando así una mejor calidad de vida a los usuarios finales. El estado de conservación de los edificios y las condiciones ambientales interiores se relacionan con el bienestar, la salud y la productividad de los ocupantes. Al mismo tiempo, existe la necesidad de edificios más sostenibles con un menor consumo energético. El desempeño de un edificio se ve afectado por varios factores (p.ej., agentes ambientales, comportamiento de los ocupantes, operación, mantenimiento, etc.). La mayoría de estos aspectos y causas muestran complejas relaciones, y consecuentemente existe una gran incertidumbre para predecirlo. Sin embargo, las investigaciones anteriores no contemplan estas relaciones causales y, a menudo, se basan en modelos lineales. Aunque el desempeño de los edificios se debe abordar teniendo en cuenta los requisitos de las diferentes partes interesadas, pocos estudios se centran en este enfoque. Los estudios anteriores tienden a analizar aspectos particulares del desempeño, ignorando las posibles relaciones que pueden ocurrir entre ellos. Los gestores de edificios deben abordar eficientemente la incertidumbre, gestionar los riesgos e identificar, analizar, evaluar y mitigar sistemáticamente los factores que pueden afectar el desempeño del edificio. Teniendo en cuenta los aspectos comentados anteriormente, el objetivo de esta tesis es desarrollar un modelo de red bayesiana (BN) para gestionar holísticamente el desempeño operativo de los edificios y apoyar su gestión. El modelo propuesto consiste en un enfoque probabilístico para evaluar el desempeño de los edificios existentes, considerando tres categorías: seguridad y funcionalidad, salud y confort, y eficiencia energética. El modelo también proporciona una interpretación de la cadena de causalidad entre los múltiples factores e indicadores relacionados con el desempeño del edificio. El análisis de las relaciones entre los diferentes aspectos del desempeño de los edificios (estado de conservación del edificio, el confort del usuario final y la eficiencia energética del edificio) va a permitir explicar y entender sus factores causales y va a posibilitar mejorar la gestión de estos edificios. La verificación del modelo propuesto se lleva a cabo mediante análisis de sensibilidad y datos de edificios existentes. Las aplicaciones del modelo incluyen: la evaluación del desempeño de edificios de forma integrada; la identificación de factores causales; la predicción del desempeño de los edificios a través de escenarios de renovación y modernización; y la priorización de las acciones de mantenimiento. La implementación del modelo en diversos casos de estudio permite ilustrar su aplicabilidad y validar su uso. Los resultados de esta tesis también incluyen métodos de recogida de datos para las variables del modelo propuesto. De hecho, se propone un sistema de inspección de edificios para evaluar el desempeño técnico de los edificios, se desarrolla un sistema de text mining para analizar las solicitudes de mantenimiento de los usuarios finales y se formula un cuestionario para recoger la satisfacción de los usuarios finales en relación a los espacios de los edificios en los que interactúan. Para concluir, este trabajo propone el uso del Building Information Modeling (BIM) para almacenar y acceder a la información necesaria para el modelo.