To see the other types of publications on this topic, follow the link: Building machines and gadgerty.

Dissertations / Theses on the topic 'Building machines and gadgerty'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 dissertations / theses for your research on the topic 'Building machines and gadgerty.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Kertesz, Vladimír. "Montovaná hala Dunajská Lužná. Stavebně technologické řešení." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225474.

Full text
Abstract:
The thesis deals with realization of a new assembled hall in Dunajska Luzna. This hall has two floors and is based on ferroconctrete foot. Carrying contruction system consist of steel profiles. Siding frontage is designed with sandwich panels. The work deals also with technical and economical part of the building.
APA, Harvard, Vancouver, ISO, and other styles
2

Felton, Samuel M. "Methods for Building Self-Folding Machines." Thesis, Harvard University, 2015. http://nrs.harvard.edu/urn-3:HUL.InstRepos:17467471.

Full text
Abstract:
Origami can turn a sheet of paper into complex three-dimensional shapes, and similar folding techniques can be used to build structures and mechanisms. However, folding by hand can be difficult and time consuming. This has led to the development of self-folding materials that transform themselves from flat sheets into 3D shapes by bending themselves along hinges. A variety of self-folding methods have been demonstrated at a variety of length scales, but they have not yet been used to build complex machines. This dissertation demonstrates that self-folding can produce functional machines with
APA, Harvard, Vancouver, ISO, and other styles
3

Heathcote, Jonathan David. "Building and operating large-scale SpiNNaker machines." Thesis, University of Manchester, 2016. https://www.research.manchester.ac.uk/portal/en/theses/building-and-operating-largescale-spinnaker-machines(6151916a-ed71-42e4-97d2-2993a4caf5f6).html.

Full text
Abstract:
SpiNNaker is an unconventional supercomputer architecture designed to simulate up to one billion biologically realistic neurons in real-time. To achieve this goal, SpiNNaker employs a novel network architecture which poses a number of practical problems in scaling up from desktop prototypes to machine room filling installations. SpiNNaker's hexagonal torus network topology has received mostly theoretical treatment in the literature. This thesis tackles some of the challenges encountered when building `real-world' systems. Firstly, a scheme is devised for physically laying out hexagonal torus t
APA, Harvard, Vancouver, ISO, and other styles
4

Lee, Byungjin. "BUILDING A SECURE NETWORK TEST ENVIRONMENT USING VIRTUAL MACHINES." CSUSB ScholarWorks, 2019. https://scholarworks.lib.csusb.edu/etd/947.

Full text
Abstract:
The objective of this project is to provide an overview of how to create a secure network test environment using virtual machines with Red Hat CentOS 7. Using virtual machines to create a secure network test environment simplify the workflow of testing several servers including network segmentation, network path redundancy, and traffic control using a firewall. This study suggests a set of guidelines for building a secure network test environment that includes a Domain Name Server (DNS), Web Server, File Transfer Protocol (FTP) Server, and a firewall. The documentation provided in this project
APA, Harvard, Vancouver, ISO, and other styles
5

Atchuta, Kaushik. "Slicing of extended finite state machines." Kansas State University, 2014. http://hdl.handle.net/2097/17640.

Full text
Abstract:
Master of Science<br>Department of Computing and Information Sciences<br>Torben Amtoft<br>An EFSM (Extended Finite State Machine) is a tuple (S, T, E, V) where S is a finite set of states, T is a finite set of transitions, E is a finite set of events, and V is a finite set of variables. Every transition t in T has a source state and a target state, both in S. There is a need to develop a GUI which aids in building such machines and simulating them so that a slicing algorithm can be implemented on such graphs. This was the main idea of Dr. Torben Amtoft, who has actually written the slicin
APA, Harvard, Vancouver, ISO, and other styles
6

Shaffer, Marcus. "Rise Tectonic Machines!: The Revitalization of the Relationship Between Architects and Machines as a Means of Restoring Intimacy, Immediacy, and Delight to the Act of Building." Thesis, Virginia Tech, 2008. http://hdl.handle.net/10919/34283.

Full text
Abstract:
Architectural form is both an expression of human desire and built edifice directly related to construction methods. It follows that the responsibilities of the architect seeking new form must extend to the instrumentation of tectonic machines and devices, which are also appropriately new. This thesis proposes a revitalization of the relationship between the architect and machines as a means of restoring intimacy, immediacy, and delight to the act of building. What follows is a presentation of images, photographs, and models related to the design and development of an architecture machine, and
APA, Harvard, Vancouver, ISO, and other styles
7

Riss, yaw Benjamin. "Des Synthons Entrelacés pour la Préparation Efficace de Machines Moléculaires et de Rotaxanes Dénués de Site de Reconnaissance." Thesis, Montpellier, 2018. http://www.theses.fr/2018MONTS143.

Full text
Abstract:
Cette thèse est dédiée à la conception de synthons entrelacés pour la préparation efficace de machines moléculaires pH-sensible de type rotaxane et de rotaxanes dénués de site de reconnaissance. Bien que la stratégie dirigée par l’effet « template » ait été employée très fréquemment et avec succès à ce jour, elle ne mène dans la plupart des cas qu’à des composés entrelacés qui contiennent les sites d’interactions nécessaires à la reconnaissance préalable des éléments moléculaires à assembler. Pour remédier à cette limitation, une nouvelle voie d’accès directe utilisant des synthons entrelacées
APA, Harvard, Vancouver, ISO, and other styles
8

Koc, San Dilek. "Approaches For Automatic Urban Building Extraction And Updating From High Resolution Satellite Imagery." Phd thesis, METU, 2009. http://etd.lib.metu.edu.tr/upload/3/12610501/index.pdf.

Full text
Abstract:
Approaches were developed for building extraction and updating from high resolution satellite imagery. The developed approaches include two main stages: (i) detecting the building patches and (ii) delineating the building boundaries. The building patches are detected from high resolution satellite imagery using the Support Vector Machines (SVM) classification, which is performed for both the building extraction and updating approaches. In the building extraction part of the study, the previously detected building patches are delineated using the Hough transform and boundary tracing based techn
APA, Harvard, Vancouver, ISO, and other styles
9

Štefaňák, Jan. "Stavebně technologický projekt výrobní haly Rokycany." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225511.

Full text
Abstract:
Master´s Thesis describes the realization setup procedure of factory building in Rokycany. Building has precast concrete skeleton based on in-situ concrete piles. Document consists of concept of site accommodation, sizing of building machines, time schedule, technological rules and constraints for the chosen technological processes and plan of workplace safety and health.
APA, Harvard, Vancouver, ISO, and other styles
10

Huková, Martina. "Stavebně technologická příprava prodejny Smart Light v Bratislavě." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392005.

Full text
Abstract:
The main subject of this diploma thesis is elaboration of construction and technological preparation for the main structure of the Smart Light shop in Bratislava. For main structure has been processed time schedule of the construction, single item budget, machine configuration design, drawing of building site, coordination situation of the building with connection to the infrastructure, safety and health protection during work on building site. Part of the thesis is processing study of main construction technological parts. Diploma thesis in technological prescript focuses on implementation of
APA, Harvard, Vancouver, ISO, and other styles
11

Poprová, Barbora. "Stavebně technologická příprava komplexu bytových domů v Liberci." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372082.

Full text
Abstract:
The content of this diploma thesis is construction-technological preparation of complex of apartment buildings. The work includes a technical report, a technology prescription, a control and test plan, a building site design, a main building machines, a budget, a timetable, building instructions, a BOZP plan, a noise study and a change in the use of a part of the building.
APA, Harvard, Vancouver, ISO, and other styles
12

Benák, Dalibor. "Stavebně-technologický projekt polyfunkčního domu v Brně." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-226997.

Full text
Abstract:
This master's thesis focuses on a preparation of a multifunctional building in Brno, on Vídeňská street. It is based on a project that has been realized in 2005. Construction-technological preparation of this project includes the design of securing of time, financial, and human resources, project of construction site layout, a design of construction machines setup, technological manual for construction of monolithic reinforced concrete structure, plan of controls and tests for quality, and a manual for obtaining permission for using public space and protection of historical tree.
APA, Harvard, Vancouver, ISO, and other styles
13

Kudiovský, Filip. "Novostavba základní školy v Bobrové, stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372114.

Full text
Abstract:
The diploma thesis deals with the construction project of the new building of the primary school in Bobrová. The main goal of the thesis is to propose a suitable implementation procedure in relation to the specific place of the site. The thesis deals with the time schedule of the main object, itemized budget, major building machines and mechanisms, project of site equipment, study of the construction realization, material resources plan, technical report, time schedule and financial plan of the main object and also with the situation of the construction. It focuses in detail on the stage of ea
APA, Harvard, Vancouver, ISO, and other styles
14

Vasserbauer, Jiří. "Hasičská stanice Jaroměř - stavebně technologická příprava stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227298.

Full text
Abstract:
The subject of the diploma thesis is building-technology project of new building Fire station Jaroměř. This preparation includes the processing of technological regulation for, design of site equipment, time schedule, itemized budget, design of machinery confuguration, inspection and test plan, environmental plan and work safety plan.
APA, Harvard, Vancouver, ISO, and other styles
15

Kužela, Vlastimil. "Stavebně technologický projekt polyfunkčních domů Zlín-Příluky." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240006.

Full text
Abstract:
This diploma thesis deals with technological project for the construction of complex of two multifunctional buildings in Zlín-Příluky. Thesis includes technical report, technological rules, plan of controls and testing, machines, safety plan, project of construction site equipment, budget and time schedule.
APA, Harvard, Vancouver, ISO, and other styles
16

Blažková, Eva. "Stavebně technologický projekt Trutnovského divadla." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225576.

Full text
APA, Harvard, Vancouver, ISO, and other styles
17

Pospíšilová, Izabela. "Projekt přípravy a realizace polyfunkčního domu ve Velkých Bílovicích." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372125.

Full text
Abstract:
The thesis is focused on construction technology solution for realization of the construction of a polyfunctional building in Velké Bílovice. Part of the thesis is technical report for construction technology project, time and financial evaluation of selected building as well as the whole project. The thesis contains selected technological regulations of carried out activities, control, and test plans, safety and health protection at work, a design of major building machines and mechanisms, a concept of the construction site or instructions for using the building.
APA, Harvard, Vancouver, ISO, and other styles
18

Teplý, Tomáš. "Rezidence na Dlouhé - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372228.

Full text
Abstract:
The subject of this diploma thesis is the building construction project of Residence Dlouha in Olomouc. It is an apartment building with two to four floors and a basement with garages. The diploma thesis contains a time and finance schedule, a site equipment project and technological procedure of a cast-in-place reinforced concrete floor and a green roof including a quality control. Moreover, a set of machines, usage options of a tower crane or a mobile crane and usage options of a mobile pump or a concrete container have been processed for this building. During the building process it is care
APA, Harvard, Vancouver, ISO, and other styles
19

Rylko, Dominik. "Stacionář Ropice- stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2013. http://www.nusl.cz/ntk/nusl-226488.

Full text
Abstract:
The master‘s thesis deals with the constructive – technological project of day care centre in Ropice. The project includes a technical report, time and financial schedule, building site, quality and safety requirement, an operating regulativ for implementation of concrete cailing above the 1-st floor of a main building object. The work is based on the project for implementation.
APA, Harvard, Vancouver, ISO, and other styles
20

Brabec, Josef. "Polyfunkční dům Eastgate, Brno - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-239963.

Full text
Abstract:
The aim of this diploma thesis is the building-technological solutions of gross structure Multifunctional file EASTGATE Brno. This multi-functional file is divided into objects Z and Y. This thesis solves the construction of gross substructure and gross superstructure object Z and gross substructure object Y. It deals with the most optimal propsal of technological procedures, working machines, itemized budget, time schedule, check and test plans, equipment of construction site, assessment of lifting mechanism and last but not least closer transport relations. The thesis is prepared on the basi
APA, Harvard, Vancouver, ISO, and other styles
21

Věrný, Roman. "Vybrané části stavebně technologického projektu - Bytový dům Novostrašnická." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240147.

Full text
Abstract:
This thesis is focused on selected parts of building technological project of apartment house Novostrašnická in Prague. The project contained technical report, coordinating situation with distinguished traffic routes, object-oriented time and financial plan, study of essential technological phases, report of building equipment and drawing of building equipment for different phases, the design of mechanical arrangement, the work schedule for fabric, plan for securing material resources, technological prescript and control trial plan for drilled piles, budget and design of lifting mechanisms.
APA, Harvard, Vancouver, ISO, and other styles
22

Sviták, Roman. "Příprava realizace víceúčelového domu Brno - Klíčova." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-226985.

Full text
Abstract:
The thesis is focused on the preparation of realization the multipurpose building Brno - Klíčova. The content of this the thesis is study of construction technology followed by the construction technology project. The aim of the thesis is to identify the sources of the time, money, workers and materials of the building and then select the appropriate process of realization.
APA, Harvard, Vancouver, ISO, and other styles
23

Kytlík, David. "Stavebně technologický projekt vývojového centra v Jaroměři." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2020. http://www.nusl.cz/ntk/nusl-409971.

Full text
Abstract:
The content of this this diploma thesis is structurally technical project of development center in Jaroměř. The building is situated in a V shape and it consists of two production halls and the projection building. Halls and projection building are conected with a special hall. The building of projection have two floors and halls have one floor. The thesis contains a technical report of the construction-technological project, studies of realization of the main technological stages and report of the building equipment. The thesis also deals with design of the main building machines, report of t
APA, Harvard, Vancouver, ISO, and other styles
24

Říha, Tomáš. "Stavebně technologický projekt výstavby skladu." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372177.

Full text
Abstract:
The aim of the diploma thesis is to elaborate parts of the frozen food warehouse construction project in Dašice in the area of MD logistics as, resulting in the elaboration of a technical report on the building technology project, the coordination situation of the building with the broader relations of the transport routes, the time and financial plan of the construction in the plane of the buildings, implementation of the main technological stages of the main building, drawing of the building site equipment, design of the main building machines, detailed time schedule of the main building, bu
APA, Harvard, Vancouver, ISO, and other styles
25

Stach, Jakub. "Apartmány Farské lúky, Čeladná - příprava a realizace stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2013. http://www.nusl.cz/ntk/nusl-226489.

Full text
Abstract:
The object of the diploma thesis is preparation and realization of the gross superstructure of apartment houses Farske luky in Celadna. Diploma thesis deals with facility of the building site, project of machines, technological rules of monolithic constructions, plans of quality controls, time and financial plan, works contract, schedule and work safety.
APA, Harvard, Vancouver, ISO, and other styles
26

Izsová, Radka. "Design centrum HANÁK NÁBYTEK a.s., Popůvky u Kojetína - příprava a organizace výstavby objektu." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-227002.

Full text
Abstract:
This thesis addresses the Design centrum HANÁK NÁBYTEK a.s., Popůvky u Kojetína - This is a new object had the basement and a second floor. The thesis includes - Technical report on the construction technology of the project , which are described in each chapter building equipment, coordination of building relationships with the wider transport routes , the study of the main technological stages, the design of the main building machines and mechanisms. There is a solution on time and financial plan object , the schedule object SO03 - Rapid technological and construction timetable and plan for
APA, Harvard, Vancouver, ISO, and other styles
27

Drbohlav, Martin. "Realizace rekonstrukce mostu u obce Planá." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392224.

Full text
Abstract:
The part of the construction project "Reconstruction of the realization of the bridge at Planá" is elaborated. These are in particular the following: technical report for the construction tech-nological project, object time schedule of the construction, study of the implementation of the main technological stages of construction, project of the building site and implementation of the reinforced concrete structures.
APA, Harvard, Vancouver, ISO, and other styles
28

Sokola, Jiří. "Administrativní budova v Brně, stavebně technologická příprava stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265247.

Full text
Abstract:
Thesis I worked on a project basis provided the building permit for an office complex of two identical fourth storey buildings which from the first storey intersects the inner atrium. The buildings are located within the CTZone Brno in the street Masna. The buildings are designed so that the ground floor is a garage for cars and retail space for rent and above-ground floors are reserved for office space lease. Objects are based on a floating pile conducted by the CFA, which builds prefabricated concrete skeleton. The cladding is formed by a combined system of aluminum windows, masonry face and
APA, Harvard, Vancouver, ISO, and other styles
29

Volf, Miroslav. "Bytový dům "Za Pivovarem" Lázně Bohdaneč - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-371962.

Full text
Abstract:
The aim of this diploma thesis is to process a building construction project for the apartment building “Za Pivovarem” in Lázně Bohdaneč. The building is designed as a four-floor object which has a flat roof, 24 apartments, 24 cellars, 10 garage stalls, 3 terraces that belong to the apartments on the 1st floor and enclosed balconies or balconies for the apartments in the above floors. The thesis focuses on the organization and preparation of the construction process. It contains a technological project for the cast-in-place reinforced concrete floors, which includes also drawings of formwork,
APA, Harvard, Vancouver, ISO, and other styles
30

Strnadová, Lenka. "Rekonstrukce a přístavba Městského muzea Česká Třebová - příprava realizace a řízení stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-227012.

Full text
Abstract:
Master thesis solves construction and technological project which deals with data processing, documentation and technological processes of building reconstruction and extension realization in Muzeum of Česká Třebová. The work contains technological building study, assessment of relationships to the wider transportation routes, time and financial plan, building-site organization project, design of the main building machines and mechanisms, technological prescriptions for excavation work and micropile injection, occupational safety and health protection management, project calculation budget.
APA, Harvard, Vancouver, ISO, and other styles
31

Koláček, Ivo. "Montovaná hala, areál firmy Bosh Diesel s r.o. - stavebně technologická příprava stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392063.

Full text
Abstract:
The masters thesis prepares the project of a prefabricated hall in the premises of Bosch Diesel s. r.o. The work completely elaborates the technical report, the coordination situation with the relations to the wider transport routes, the study of the main technological stages, the project of the building site, the design of the machines, the schedule of the main building, the material and human resources, the technological regulations, the control and test plan, safety and health protection during work, noise study, budget and building details.
APA, Harvard, Vancouver, ISO, and other styles
32

Mrózek, Jakub. "Stavebně technologické řešení bytového domu Hubertus v Karlově Studánce." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-226993.

Full text
Abstract:
In my master thesis I deal with construction and technological solutions of Residental House Hubertus in Karlova Studánka. Thesis mainly includes technical report of the construction technology project, coordination situation of building with relationships to the wider transportation routes, the implementation study of the main technological stages of the main building structure, technical report of building-site equipment with drawings of building-site equipment, design of the main building machines and mechanisms, project calculation budget, calculation of construction by the building struct
APA, Harvard, Vancouver, ISO, and other styles
33

Hascoët, Nicolas. "Méthodes pour l'interprétation automatique d'images en milieu urbain." Thesis, Evry, Institut national des télécommunications, 2017. http://www.theses.fr/2017TELE0004/document.

Full text
Abstract:
Cette thèse présente une étude pour l'interprétation automatique d'images en milieu urbain. Nous proposons une application permettant de reconnaître différents monuments au sein d'images représentant des scènes complexes. La problématique principale est ici de différencier l'information locale extraite des points d'intérêt du bâtiment recherché parmi tous les points extraits de l'image. En effet, la particularité d'une image en milieu urbain vient de la nature publique de la scène. L'objet que l'on cherche à identifier est au milieu de divers autres objets pouvant interférer avec ce dernier. N
APA, Harvard, Vancouver, ISO, and other styles
34

Slováček, Ondřej. "Stavebně technologický projekt polyfunkčního domu Sokolská 5 v Olomouci." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372119.

Full text
Abstract:
The subject of this diploma thesis is the elaboration of the building project of Polyfunkční dům Sokolská 5. In the course of the diploma thesis is elaborated a summary technical report, report of building site and drawings for individual stages. The implementation of the waterproofing of the base structure and the reinforced concrete monolithic skeleton are subject to technological regulations and control and test plans. In this work the object time and financial plan, the use of machines and mechanisms and health and safety at work are also solved. For the main building objects, an item budg
APA, Harvard, Vancouver, ISO, and other styles
35

Hrubá, Denisa. "Výšková budova AZ Tower - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-227005.

Full text
Abstract:
This master´s thesis is dealing with selected part of the construction technology project of the high-rise building AZ Tower. The main content becomes the realization of supporting gross upper structure. It compiles in detail the most optimal proposal of technological processes, working machines, schedule, control and test plan, occupational safety, environment protection, construction site equipment and last but not least, the coordination of four tower cranes. Apart from the architectural and technically impressive draft of the Czech Republic tallest building it will be interesting to deal w
APA, Harvard, Vancouver, ISO, and other styles
36

Kazda, Jiří. "Realizace novostavby hasičské zbrojnice ve Ždírci nad Doubravou." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2020. http://www.nusl.cz/ntk/nusl-409932.

Full text
Abstract:
The master´s thesis describes the realization of new building of fire station in Ždírec nad Doubravou. The parts of the thesis are time and financial plan for all building objects, assessment of transport routes, design of site equipment and design of main machines. An itimized budget with a bill of quantities and a detailed construction schedule are prepared for the main building. A technological regulativ and quality control plan are prepared for the stage of industrial steelconcrete floor. In the end of the work, there is solved the noise study of construction and the topic of system infilt
APA, Harvard, Vancouver, ISO, and other styles
37

Rusínová, Alena. "Tělocvična Třebíč - vybraná část STP." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225431.

Full text
Abstract:
The tesis is focused on building a new elementary school gym Třebíč, Horka-Domky, Václavské nám. 44/12. In addition to the new building itself is considered a gym and the construction of the connecting neck between the existing elementary school building andnew construction including reconstruction of the gym space newly connected corridor. Solves problems of selected parts of the building and technological project, which are: technical report, coordination situation, the financial plan of the building, site equipment oftechnological stages, a stage of construction schedule and itemized, use m
APA, Harvard, Vancouver, ISO, and other styles
38

Novotný, Zdeněk. "Centrální objekt nemocnice v Uherském Hradišti - stavebně technologická příprava stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227165.

Full text
Abstract:
This diploma thesis deals with construction and technological preparation of the construction of the central hospital building in the town Uherske Hradiste. The work is composed of selected parts of the building and technological project, which is annexed to the diploma thesis. On some selected parts of the building and technological project is also prepared relevant drawings. The aim of the thesis is to choose a suitable and effective implementation process object depending on the circumstances and determine the resources of time, funds, personnel and materials.
APA, Harvard, Vancouver, ISO, and other styles
39

Pupíková, Ingrid. "Přístavba hotelu Tři Věžičky ve Stříteži - příprava realizace stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265509.

Full text
Abstract:
This thesis solves the construction technology project extension at Three Steeples in Střítež, building apartments. Work includes the complete study of the implementation, including timing and the financial plan, assessment of the wider relations of transport routes, the project site equipment, design of the main building machines and mechanisms, technological specifications for masonry, inspection and test quality plan for walling, technological prescription for clay plasters and itemized budget rough construction of the main building.
APA, Harvard, Vancouver, ISO, and other styles
40

Boucník, Jan. "Příprava realizace administrativních objektů Palmovka Park." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-371812.

Full text
Abstract:
The diploma thesis deals with the preparation of the construction of Palmovka Open Park III administrative building. It contains a technological regulation for drilled piles, technological regulation for reinforced concrete monolithic constructions, broader transport routes, study of the implementation of the main technological stages, design of building machines and mechanisms, control and testing plan for drilling piles and reinforced concrete constructions, risk and measures, time and financial plan, calculation according to THU, drawing of site equipment, cycle, timetable, item budget, sel
APA, Harvard, Vancouver, ISO, and other styles
41

Carbol, Štěpán. "Stavebně technologický projekt výrobní haly Massag v Bílovci." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265322.

Full text
Abstract:
This thesis addresses the construction of steel buildings in Bílovec. In this work we are solved structurally technological study of the construction of steel buildings. The work deals with the traffic situation around the building and a landing distance. The thesis focuses on the installation for the steel skeleton and industrial floors of wire reinforced concrete, time and financial plan, project, site equipment, design of main construction machines and mechanisms, timelines, capital construction object, then control plan for the steel skeleton and industrial floor. Moreover, it is processed
APA, Harvard, Vancouver, ISO, and other styles
42

Šmíd, Radim. "Stavebně technologický projekt stanice Integrovaného záchranného systému." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392135.

Full text
Abstract:
The subject of this diploma thesis is construction-technological project of the integrated rescue system station. The building is situated in the village of Týn nad Vltavou and will be used to perform the service of fire protection of the population. The thesis is focused on the design of the construction site equipment, the time and financial plan, the design of the main building machines and mechanisms, the technological specification, the control and test plan, and also the occupational safety and health protection.
APA, Harvard, Vancouver, ISO, and other styles
43

Nováková, Martina. "Stavebně technologický projekt dálničního nadjezdu č. D1 - 150." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392186.

Full text
Abstract:
This diploma thesis deals with demolition of the motorway overpass. The bridge (overpass) is located over the D1 motorway from Prag to Brno at the 115,881 km. On the brigde runs the local comunication II/352 between villages Švábka and Měšín. The bridge demolition is part of the D1 renovation plan. The main reason behind the demolitions si that the bridge no longer meets it´s lenght requierments. During the demolition and construction will be any use of II/352 for public transport over the bulding site forbiden. This diploma thesis include technical report for construction technology project,
APA, Harvard, Vancouver, ISO, and other styles
44

Janíček, Jakub. "Školící středisko Zašová - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-227007.

Full text
Abstract:
The subject of work is building-technology project Training center in Zasova. The study includes a technical report on the construction technological project, technical report of the site equipment project including a drawings, design of the main building machines, technical report of transport relations, itemized budget, the detailed time plan of the construction, technology regulations to of the selected construction processes, inspection and testing plans, occupational safety, environment, contract for construction works, major lifting mechanisms evaluation from an economic perspective.
APA, Harvard, Vancouver, ISO, and other styles
45

Hladký, Dominik. "Obytný areál Ponavia park v Brně, příprava a organizace stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2020. http://www.nusl.cz/ntk/nusl-409926.

Full text
Abstract:
This thesis deals with the construction process of the apartment house Ponavia Park located in Brno. The thesis solves the individual realization phases of the main building phase. Building site equipment is designed for the projected construction process in three different variations. A technical report is also included in the building site. Critical points within the transport of materials and machines are also verified. A financial plan for the whole building is made as an summarizing time schedule for the apartment building. The sources for the financial plan are the figures taken from the
APA, Harvard, Vancouver, ISO, and other styles
46

Lisztwanová, Mariola. "Stavebně technologický projekt stavby Nové byty - Bystřice na Pasekách." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225648.

Full text
Abstract:
The subject of the thesis is the Constructive-Technological Project of building New Flats – Bystrice on Paseky. The building will be realized at the building plot of land within a developed area. The attempt is to leave the calm rural character of the surroundings undisturbed. The bulding is supposed to merge with the surroundings. Concerned are two apartment buildings with grand plans of 18 x 36 meters, disposing of three above-ground floors, no cellar, and a panel roof. In order to make the building merge with the surroundings, a wooden external cladding has been projected. Thus, the buildin
APA, Harvard, Vancouver, ISO, and other styles
47

Lupač, David. "Distribuční sklady v Praze - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265317.

Full text
Abstract:
The subject of this thesis is the construction and technological project for distribution warehouses in Prague. Textual part contains a technical report on construction technology project, wider relations of traffic routes with marked critical points, the study of the main technological stages of the building, principles of organization of construction, design of the main building machines and mechanisms, technological regulations, inspection and test plans, health and safety on the site. In the section with attachments there is a map of the locality, drawings of site facilities, including roa
APA, Harvard, Vancouver, ISO, and other styles
48

Karafiátová, Hana. "Stavebně technologický projekt výstavby penzionu pro seniory." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2013. http://www.nusl.cz/ntk/nusl-226094.

Full text
Abstract:
The purpose of the final thesis is to elaborate selected parts of a technology building project of the Pension for the elderly. The complex includes eleven building objects and the main one is developed in detail. The final thesis includes a technical report about the technology building project, a building schedule, suggestion for realization of the main stages of its construction, a design of mechanical assembly. The final thesis also includes the project of site equipment, technological regulations , an inspection and test plan, an occupational safety and health plan.
APA, Harvard, Vancouver, ISO, and other styles
49

Šrámek, Jiří. "Stavebně technologický projekt výrobní a administrativní haly ATX." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392191.

Full text
Abstract:
The subject of this master’s thesis is a solution of chosen parts of building construction project. The project solves industrial hall that contains productions and administrative space. This thesis includes technological regulations for substructure, study of performing the main technological stages, design of using machines, checking and testing plans. Other phrases parts are time schedules, budget, calculations, design of site equipment including engineering report and report for performing access road. Starting materials, which were used for this thesis, were engineering report also includ
APA, Harvard, Vancouver, ISO, and other styles
50

Malý, Filip. "Stavebně technologický projekt výstavby polyfunkčního domu lokalita Nová Nitra." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225445.

Full text
Abstract:
The content of this thesis is the construction project of technological multifunctional building new locality Nitra the Slovak Republic. Individual points outline the project, which are dealt with in this thesis can be divided into subcategories, depending on the type of information provided. The first category can include items such as a technical report to the STP, which describes the basic information about the objects constructed building including the construction situation, location of the site including links to transport and technical infrastructure and rough timetable for the construc
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!