To see the other types of publications on this topic, follow the link: Concrete road bridge.

Dissertations / Theses on the topic 'Concrete road bridge'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 30 dissertations / theses for your research on the topic 'Concrete road bridge.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Mohi, Amal A. "Performance Evaluation of Pavement Markings on Portland Cement Concrete Bridge Decks." University of Akron / OhioLINK, 2009. http://rave.ohiolink.edu/etdc/view?acc_num=akron1238350586.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

García, Segura Tatiana. "Efficient design of post-tensioned concrete box-girder road bridges based on sustainable multi-objective criteria." Doctoral thesis, Universitat Politècnica de València, 2016. http://hdl.handle.net/10251/73147.

Full text
Abstract:
[EN] Bridges, as an important component of infrastructure, are expected to meet all the requirements for a modern society. Traditionally, the primary aim in bridge design has been to achieve the lowest cost while guaranteeing the structural efficiency. However, concerns regarding building a more sustainable future have change the priorities of society. Ecological and durable structures are increasingly demanded. Under these premises, heuristic optimization methods provide an effective alternative to structural designs based on experience. The emergence of new materials, structural designs and
APA, Harvard, Vancouver, ISO, and other styles
3

Topinková, Petra. "Most přes silnici I/44." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372111.

Full text
Abstract:
My master's thesis aims to design a bridge construction spanning road III/443 over road I/44. Three versions were created one of which has been developed further. It is a three span bridge with a total spread of 77.5 meters. Proposal and evaluation of bridge construction is done unassisted. Static analysis is done using Scia Engineer program. Construcion evaluation is done by valid EU norms ČSN EN 1992-1-1. Mechanical drawing, building procedure and visualisation is also included.
APA, Harvard, Vancouver, ISO, and other styles
4

Mendroková, Magda. "Most v obci Návsí přes řeku Olši." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2013. http://www.nusl.cz/ntk/nusl-226070.

Full text
Abstract:
The diploma thesis deals with design and assessment of steel arched bridge with the semi through bridge deck placed on the third-class road. This steel structure is drawn up to bridge water barrier – the river Olše in Návsí. The distance between axes lay on abutments is 48,5 meters. The bridge´s supporting structure consists of two steel arches angled towards each other and fastened to the foundation blocks. The supporting beam of the bridge deck is tied to the arch by tie-rods. The tie-rods are designed to the V-shaped system.
APA, Harvard, Vancouver, ISO, and other styles
5

Lykvist, Peter, and Mathias Blom. "Utmattning av vägbroar i armerad betong enligt eurokoder." Thesis, KTH, Byggteknik och design, 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-49147.

Full text
Abstract:
Since 1 January 2010 it is a requirement to use the European standards, Eurocodes, in Sweden when constructing bridges. One chapter that has caused an extra amount of problems for the engineers is the one about fatigue analysis, which resulted in us doing this thesis. To do this we had to read all of the Eurocodes that direct, or indirect deals with fatigue and calculating of such. We have read the background documents for the Eurocodes and master’s thesis in the subject. We also studied the calculations of bridges constructed by different construction firms. We have chosen to limit the thesis
APA, Harvard, Vancouver, ISO, and other styles
6

Kalců, Martin. "Stavebně technologický projekt realizace Místní komunikace ve Žďáru nad Sázavou." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227843.

Full text
Abstract:
This diploma thesis deals with the development of constructive technology project od local road in Žďár nad Sázavou. Specifically, there is a solution prestressed reinforced concrete construction of the bridge over the Sázava river according to the extent of the diploma work.
APA, Harvard, Vancouver, ISO, and other styles
7

Lindtner, Tomáš. "Most na rychlostní silnici." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227570.

Full text
Abstract:
The subject of Diploma’s thesis is the design of a road bridge on the R1 expressway, at km 1,293 above the road III/51311. The main content is static calculation of supporting structure consisting of four spans. Four studies were processed and the first variant of double-girder monolithic structure was chosen. The range of spans is ranging from 25 m - 30 m. Double-girder consists of two post-tensioned concrete beams and reinforced concrete slab. Static models and load effects are solved in Scia Engineer. Bridge is located in the horizontal curvature, however, compromise was elected (because of
APA, Harvard, Vancouver, ISO, and other styles
8

Vlček, Radek. "Ocelová konstrukce mostu na pozemní komunikaci." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240323.

Full text
Abstract:
The content of the thesis is a proposal of steel load-bearing structure (carrying structure of a steel) bridge of the span of 31+74+31m with the bottom bridge deck taking over the second-class road in the territory of Olomouc city. The bridge deck is created by composite steel-concrete slab with crossbars. The solution was focused on using arched construction in the middle of the bridge with different tilt of arches to the horizontal central axis of the bridge. Under the term of the solution four alternatives have been calculated. The most optimal solution was selected and processed in detail.
APA, Harvard, Vancouver, ISO, and other styles
9

Paleček, Vladimír. "Estakáda na silnici I/57." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392190.

Full text
Abstract:
The aim of the diploma thesis is the design of a continuous bridge construction of five fields in the direction of the town Albrechtice - Opava. The bridge overcame local roads and railway tracks and is part of the bypass of Albrechtice. From the three proposed variants, a pre-stressed two-beam structure was selected for the detailed solution and it is assessed according to the limit states and includes the effects of gradual construction. Further detailed drawings are drawn up.
APA, Harvard, Vancouver, ISO, and other styles
10

Kloda, Petr. "Ocelová konstrukce silničního mostu." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-391963.

Full text
Abstract:
The aim of the master thesis was a design of the steel-concrete composite road bridge for a main road in Ostrava. The part of the design was a variant design of the bridge which has theoretical spans equal to 44 m + 55 m + 44 m. Total span of the bridge is then 143 m. Two variants of the bearing steel structure are compared in the preliminary structural design, in the first one a twin-girder is designed and in the second one a box-girder bridge is assessed. The width of the bridge is 14 m and a launching of the bridge without temporary supports is chosen as the assembly method. The design of t
APA, Harvard, Vancouver, ISO, and other styles
11

Večeřa, Jan. "Most přes místní komunikaci a potok." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240232.

Full text
Abstract:
The Diploma thesis deals with the design of the bridge construction that conveys the road I/11 across the Bystry brook and the local road between Nebory and Oldřichovice. The construction is designed in four options, one of which was selected is the variation of the prestressed onebeam construction of four fields and the lenght of bridging 106,6 m. Calculation of the effects of the load is carried by a computer program Scia Engineer. Assessing the design is done in accordance with applicable European standards EN 1992-1-1. It is also elaborated well arranged drawing documentation, construction
APA, Harvard, Vancouver, ISO, and other styles
12

Kuba, Michal. "Návrh silničního ocelobetonového komorového mostu na obchvatu Bludova." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372194.

Full text
Abstract:
The aim of this work is design and assessment of the box-girder road bridge on by-road of Bludov. Bridge is designed as composite steel concrete bridge with 5 spans with distances between supports of 31,25 m; 40,0 m; 60,0 m; 60,0 m and 40,35 m. Main bearing structure is designed as open steel box-girder with reinforced concrete deck. Box girder is braced with longitudinal and transversal bracings. Main structure is separated for each traffic direction. The bridge crosses river Morava and railway in 2nd and 3rd span, respectively. The category of road I/44 is S 21,5/100. The height of steel box
APA, Harvard, Vancouver, ISO, and other styles
13

Hollý, Tomáš. "SO 217 Most přes řeku Morávku v km 6.205." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225523.

Full text
Abstract:
The subject of the thesis is to design and consider steel superstructure of a composite steel-concrete road bridge. It is a continuous beam with seven spans of 36,0 + 57,0 + 75,0 + 90,0 + 75,0 + 57,0 + 36,0 = 426 meters. The superstructure consists of welded I-beams, which pass into closed box girder. The calculations take into account the construction phase.
APA, Harvard, Vancouver, ISO, and other styles
14

Jedlička, Martin. "Most na silnici I/11." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-239992.

Full text
Abstract:
Aim of this thesis is to design a concrete road bridge over a Neborůvka stream and surrounding valley. This bridge is a part of I/11 road. Three preliminary designs with focus on girder bridge solution were made. As a most suitable variant was chosen two gilder beams variant. For this variant was made a static calculation concerning TDA. This design was made according EC. As a construction method was chosen classic construction with falsework. Design was made in Midas Civil and Dlubal RFEM calculation software. As a next step a drawing documentation was made as well as construction time plan a
APA, Harvard, Vancouver, ISO, and other styles
15

Otevřel, Rostislav. "Most na rampě." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-226748.

Full text
Abstract:
Thesis describes the design and assessment of a plan view of a curved road bridge, which is a part of an elevated crossing transferring directional divided communication and tram line of public transport in Brno. There are four variants of cross sections designed, from which is selected bicameral cross section with arched angled bottom plate, which should be aesthetically pleasant to impress in an urban environment. Static calculation is processed and design is assessed by current European standards. Then clear and detailed drawings, the process of construction and visualization of the bridge
APA, Harvard, Vancouver, ISO, and other styles
16

Škarda, Jan. "Návrh spojité mostní konstrukce." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-391999.

Full text
Abstract:
The subject of this master thesis is the design and analysis of bridge construction on the crossing of relocated road III/11812 over the future extension of the motorway D4. The geometrical road design of the sugested relocation is predetermined. 4 variant solutions are designed, one of which is selected for subsequent detailed solution. The selected variant is designed as a slab-girder continuous 3-span beam bridge with span lenghts 20.00, 34.50, 20.00m. The load-carrying structure is connected to pillars by notched joint and to abutment by pot bearing. Calculation of load effects was made wi
APA, Harvard, Vancouver, ISO, and other styles
17

Majer, David. "Most na silnici I/44." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372226.

Full text
Abstract:
The subject of this thesis is the design and analysis of five-span bridge construction across the railway on the route Zábřeh - Šumperk and the Morava river. There will be made separated bridge for each direction, only right bridge is considered in the thesis. Object is located to 1st class road I/44 on the route between Mohelnice and Jeseník. Three variants were designed - two prestressed chamber girders, one prestressed chamber girder with prefabricated consoles and construction of concrete slab mixed with two steel girders. After these variants were weigh up and the first one, with the leng
APA, Harvard, Vancouver, ISO, and other styles
18

Lerch, David. "Estakáda přes Ostravskou radiálu v Brně." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225497.

Full text
Abstract:
Diploma thesis deals with design pre-stressed road bridge over the radial road from Ostrava, railway ČD and tram in Brno. There are designed 4 studies, from which variation parabolic double-chamber girder with 8 spans is chosen. Thesis solves construction process and static calculation includes time analysis. It is elaborated a detailed structural analysis and bridge is considered a proposal to limit states for temporary and permanent design situations according to European standards - Eurocodes. It is developed drawings and visualization of the bridge.
APA, Harvard, Vancouver, ISO, and other styles
19

Uhl, Milan. "Návrh silničního spřaženého mostu na obchvatu Bytomi." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240415.

Full text
APA, Harvard, Vancouver, ISO, and other styles
20

Smělíková, Petra. "Přemostění řeky Svitavy a tratě ČD v Blansku." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227189.

Full text
Abstract:
The aim of the Diploma Thesis is elaboration of study of bridge crossing over the Svitava river and ČD railway track in Blansko. It concerns a five-pole steel beam road bridge with through-span which carries road of the third category. The static system of the construction is solved as solid-web beam of 1.3 meters height which is in three middle spans reinforced by truss construction with top chord and system of diagonals without verticals. The height of the main beam where reinforced by trusswork is 4.75 meters. The width of spans in the road axis is 18.5 + 30.525 + 44.4 + 30.525 + 18,5 metre
APA, Harvard, Vancouver, ISO, and other styles
21

Hroudná, Denisa. "Mostní konstrukce přes údolí." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-412920.

Full text
Abstract:
The subject of this diploma thesis is the design of post-tensioned road bridge over the valley. Two preliminary studies have been proposed and one of them was selected for more detailed processing. The selected variant is a box girder with a constant height 2,5 m. The construction id divided into five span and its total lenght is 240 m Span length of construction is 18,0 m. The construction was assessed for ultimate and serviceability limit state acording to standarts and regulation. Drawings and vizualizations ard parts of the diploma thesis.
APA, Harvard, Vancouver, ISO, and other styles
22

Kubíček, Ondřej. "Most na silnici II/379." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-371987.

Full text
Abstract:
The master´s thesis deals with a new road bridge on the road II/379. There are three possible variants in preliminary design but only the option of connected girder slab beam of four fields was selected. This variant was assessed by static calculation in accordance with European standards. Other important parts of this thesis are also drawings, construction progress, visualisation and technical report.
APA, Harvard, Vancouver, ISO, and other styles
23

Kratochvíl, Tomáš. "D1 Rekonstrukce mostu D1-212 Ostrovačice, příprava realizace stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372065.

Full text
Abstract:
The diploma thesis deals with preparation and realization of D1 reconstruction of D1-212 bridge in Ostrovačice. It is a motorway bridge that transfers traffic over road II / 386. The reconstruction will demolish the superstructure of bridge with bridge equipment and parts of the abutments and their new construction. The preparation of the project solves the engineering report, the block plan drawing, the financial and time schedule - by objects, the budget SO 201, the study of the implementation of the main construction technologys, the project of the site equipment, the design of the main bui
APA, Harvard, Vancouver, ISO, and other styles
24

Tlamka, Tomáš. "Most na rampě přes dálnici." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265325.

Full text
Abstract:
The proposal is for new construction of a road bridge over the highway.Three options of solutions were proposed but only the option of connected girder slab beam of six fields was selected. This variant was assessed by static calculation. Static calculation is processed in accordance with European standards. Another important part of this thesis is also drawings, visualization, technical report and construction procedure.
APA, Harvard, Vancouver, ISO, and other styles
25

Reilly, James Joseph. "Load Testing Deteriorated Spans of the Hampton Roads Bridge-Tunnel for Load Rating Recommendations." Thesis, Virginia Tech, 2017. http://hdl.handle.net/10919/74302.

Full text
Abstract:
The Hampton Roads Bridge-Tunnel is one of the oldest prestressed concrete structures in the United States. The 3.5 mile long twin structure includes the world's first underwater tunnel between two man-made islands. Throughout its 60 years in service, the harsh environment along the Virginia coast has taken its toll on the main load carrying girders. Concrete spalling has exposed prestressing strands within the girders allowing corrosion to spread. Some of the more damaged girders have prestressing strands that have completely severed due to the extensive corrosion. The deterioration has caused
APA, Harvard, Vancouver, ISO, and other styles
26

Suntharavadivel, Thuraichamy Guganesan. "Behaviour of shear damaged reinforced concrete beams strengthened with external post-tensioning and clamping." University of Southern Queensland, Faculty of Engineering and Surveying, 2008. http://eprints.usq.edu.au/archive/00006254/.

Full text
Abstract:
[Abstract]Over the last few decades, there has been a rapid increase in the volume and weight of heavy vehicles using national road networks. More than half of the bridges around the world are over forty years old. The deterioration of these existing bridges due to increased traffic loading, progressive structural aging, and reinforcement corrosion from severe environmental conditions has become a major problem in most countries. Several techniques have been used to strengthen these structures around the world. External post-tensioning is one of the widely used strengthening techniques in many
APA, Harvard, Vancouver, ISO, and other styles
27

Zemánek, Tomáš. "Spojitá betonová mostní konstrukce." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372029.

Full text
Abstract:
The diploma thesis is focused on solving road bridge situated between Roudno and Razová village over the water basin Slezská Harta. Before the design itself 3 studies were created and compared together. The selected variant is a continuous box girder with inclined walls, post-tensioned by bonded cables. The girder of a total lenght 148,0 m and width 13,6 m is divided into three spans. Height of the girder is 3,3 m. A detailed structural design, including construction limit state assessment, prestress design and time dependent analysis verification is processed. The design and the assessments o
APA, Harvard, Vancouver, ISO, and other styles
28

Silva, Irwing Aguiar Ribeiro da. "Modelagem do comportamento dinâmico e análise de fadiga de pontes rodoviárias mistas (aço-concreto)." Universidade do Estado do Rio de Janeiro, 2014. http://www.bdtd.uerj.br/tde_busca/arquivo.php?codArquivo=9076.

Full text
Abstract:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior<br>Considerando-se os diversos carregamentos que solicitam a estrutura de uma ponte rodoviária, ao longo de sua vida útil, alguns possuem um comportamento essencialmente dinâmico, ou seja, variam com o tempo, diferentemente do que é considerado na prática corrente de projeto desse tipo de obra de arte. Em geral, os projetistas desse tipo de estrutura têm tratado carregamentos como o de vento, tráfego de veículos e de pedestres como ações de natureza estática, ignorando seu perfil cíclico. Tal consideração, em diversas situações de pro
APA, Harvard, Vancouver, ISO, and other styles
29

Fontana, Patricia. "Análise de modelos de distribuição transversal de cargas em superestruturas de viga em seção caixão de pontes e viadutos alargados." Universidade Tecnológica Federal do Paraná, 2015. http://repositorio.utfpr.edu.br/jspui/handle/1/2016.

Full text
Abstract:
O presente trabalho apresenta uma comparação entre resultados da análise estrutural da superestrutura de um viaduto em seção celular obtidos do estudo por métodos teóricos e pelo método dos elementos finitos com uso de software adequado, visando a validação dos métodos empregados para obras em seção celular, observando os critérios de tempo, custo e resultados satisfatórios. Foram analisados os coeficientes de distribuição transversal dos esforços na superestrutura de um viaduto quando da ampliação da obra com uso de seção caixão de dimensões diferentes da original e sem haver simetria, visto
APA, Harvard, Vancouver, ISO, and other styles
30

"Critique of durability specifications for concrete bridges on national roads in South Africa." Thesis, 2011. http://hdl.handle.net/10413/2792.

Full text
Abstract:
Damage to reinforced concrete bridges due to carbonation and chloride induced corrosion is widespread in South Africa and prone in environments where carbon dioxide is at high levels as well as in marine environments where chlorides are present. Performance specifications are therefore essential in order that structural concrete can be designed and constructed to the required standards ensuring that the long term durability can be maintained. This dissertation includes a review of SANRAL‘s current durability specifications. The specifications are critiqued in terms of the testing methodology f
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!