To see the other types of publications on this topic, follow the link: Construction and Owner.

Journal articles on the topic 'Construction and Owner'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 journal articles for your research on the topic 'Construction and Owner.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.

1

Che, Andrews Anzagira, Badu Edward, and Owusu-Manu De-Graft. "PERCEPTION OF BARRIERS TO SUCCESSION PLANNING IN FAMILY-OWNED CONSTRUCTION FIRMS IN GHANA." International Journal of Recent Research in Commerce Economics and Management (IJRRCEM) 9, no. 3 (2022): 58–72. https://doi.org/10.5281/zenodo.6992378.

Full text
Abstract:
<strong>Abstract:</strong> Purpose &ndash; This paper examines the barriers to undertaking succession planning in family-owned construction firms. This would unearth the reasons why family-owned construction firms are unable to undertake succession planning which is identified as the leading panacea to unsurvivability of family-owned construction firms beyond the owner-manager. Design/methodology/approach &ndash; The research explored these barriers to undertaking succession planning in family-owned construction firms using a survey approach within a cross-sectional design to collect data from
APA, Harvard, Vancouver, ISO, and other styles
2

Yin, Yi Lin, Zhi Chao Xu, and Qing Song Zou. "Research on Bias of Owner's Decision-Making in Risk-Sharing in Construction Project - A Perspective of Bounded Rationality." Applied Mechanics and Materials 357-360 (August 2013): 2164–70. http://dx.doi.org/10.4028/www.scientific.net/amm.357-360.2164.

Full text
Abstract:
Bounded rationality has an important impact on owners decision-making of risk-sharing in the project. Based on the hypothesis of bounded rationality, the paper established a risk-sharing game model concerning owners reference dependency and loss aversion, as well as conducted the quantitative analysis. The finding shows that comparing with the hypothesis of rationality, if taking the ex-post transaction cost as reference, when owner considers that the cost of risk management is smaller, the bounded rationality would make the owner prefer the proper risk-sharing; when owner considers that the c
APA, Harvard, Vancouver, ISO, and other styles
3

Pratama, Firman Yudi, Achfas Zacoeb, and Ming Narto Wijaya. "Identification of Dam Construction Risks to Job Owners (Dam Construction in East Java)." Journal of Mechanical, Civil and Industrial Engineering 4, no. 2 (2023): 25–33. http://dx.doi.org/10.32996/jmcie.2023.4.2.4.

Full text
Abstract:
Approach to risk management, knowing the potential risks in realizing the construction of dam construction on the side of the work owner in the East Java area. In constructing a dam, construction on the job owner can affect the project's success. A practical risk management approach is carried out to achieve schedule, cost, quality, and service. This research aims to identify risks and provide a priority order of risks for the owner of the dam construction project in East Java that are most likely to occur to minimize the consequences arising from these risks. The identified risks will then be
APA, Harvard, Vancouver, ISO, and other styles
4

Luo, Qin. "Difficulties and Countermeasures on Restricting the Development of Project Management." Applied Mechanics and Materials 438-439 (October 2013): 1808–11. http://dx.doi.org/10.4028/www.scientific.net/amm.438-439.1808.

Full text
Abstract:
Difficulties of engineering supervision are mainly in the complex beneficial relationship among the owner, supervision and contractor. Owners lack of knowledge on the need of supervision and uneven quality of supervision personnel bring about disjunction in the stage of decision making, design and construction during the project operating process. The measures can be used to introduce a new mechanism to eliminate the economic dependence between the supervision unit and the owner, enhance the construction of laws and regulations in supervision, improve the three main competitive consciousnesses
APA, Harvard, Vancouver, ISO, and other styles
5

Zhou, Wen Fang. "Research on the Legal Claim in Large-Scale Mechanical and Electrical Engineering in Construction Project." Applied Mechanics and Materials 416-417 (September 2013): 1818–21. http://dx.doi.org/10.4028/www.scientific.net/amm.416-417.1818.

Full text
Abstract:
Research on the claim is based on the contractor's claims for compensation to the owner, however, the legal status of the owner and contractor are equal in the construction project. The contractor has the right of claim to the owner. The owners also claim for compensation to the contractor. However, the owner's claim is not a simple matter. In this paper, from the legal basis for claims, by studying the theories about contract and claim, combined with the characteristics of large mechanical and electrical engineering project, the author preliminarily discusses the theoretical system of the own
APA, Harvard, Vancouver, ISO, and other styles
6

Zhang, Yao, Shuangliang Tai, and Kunhui Ye. "Contractor Recommendation Model Using Credit Networking and Collaborative Filtering." Buildings 12, no. 12 (2022): 2049. http://dx.doi.org/10.3390/buildings12122049.

Full text
Abstract:
The credit of contractors in the construction market directly affects the cooperative intentions of owners. Although previous scholars have attempted to use credit to select appropriate contractors, they have rarely considered the trust relationship between decision-making and former owners. This work introduces and verifies a credit network recommendation model based on a collaborative filtering algorithm. The contractor’s credit established based on this model serves as a viable method for owners to select efficient contractors. The application of the model includes relevant information coll
APA, Harvard, Vancouver, ISO, and other styles
7

Guo, Lei, Huimin Li, Peng Li, and Chengyi Zhang. "Transaction costs in construction projects under uncertainty." Kybernetes 45, no. 6 (2016): 866–83. http://dx.doi.org/10.1108/k-10-2014-0206.

Full text
Abstract:
Purpose – The purpose of this paper is to find how those uncertainty factors influence transaction costs generated and to identify ways to minimize the transaction costs borne by the construction owner. Design/methodology/approach – The literature indicates that there is no consensus on a standard definition of transaction costs in the construction industry. A detailed literature review of research work on transaction costs in construction is conducted in order to identify the determinants of transaction costs in construction projects. A structural equation model is tested on data collected by
APA, Harvard, Vancouver, ISO, and other styles
8

Indrayana, D. V., K. S. Pribadi, P. F. Marzuki, and H. Iridiastadi. "Factors affecting safety leadership of construction project owners in Indonesia." IOP Conference Series: Earth and Environmental Science 1065, no. 1 (2022): 012003. http://dx.doi.org/10.1088/1755-1315/1065/1/012003.

Full text
Abstract:
Abstract Construction is an industry with a high possibility of risk. The construction industry accounts for the highest number of work accidents globally, with more than 60,000 fatal accidents per year. A construction safety culture through mature safety leadership can be the fundamental factor to improve safety performance. Safety leadership is the process of interaction between leaders and followers to achieve organizational safety goals. In many cases of work accidents in construction projects in Indonesia, the leadership of the project owner is rarely discussed. It is more often determine
APA, Harvard, Vancouver, ISO, and other styles
9

Wang, Fangliang, Min Cheng, and Xiaotong Cheng. "Exploring the Project-Based Collaborative Networks between Owners and Contractors in the Construction Industry: Empirical Study in China." Buildings 13, no. 3 (2023): 732. http://dx.doi.org/10.3390/buildings13030732.

Full text
Abstract:
In the project-based construction industry, organizations build collaborative relationships through specific projects. The owners and contractors who are the key project stakeholders have gradually formed a complex project-based industry-level collaborative network in many different projects, closely related to knowledge exchange and industry development. Based on the data set of the National Quality Engineering Award (NQEA) projects in China from 2013 to 2021, we empirically analyze the characteristics and evolution of project-based collaborative networks between owners and contractors in the
APA, Harvard, Vancouver, ISO, and other styles
10

Li, Huimin, David Arditi, and Zhuofu Wang. "Transaction costs incurred by construction owners." Engineering, Construction and Architectural Management 21, no. 4 (2014): 444–58. http://dx.doi.org/10.1108/ecam-07-2013-0064.

Full text
Abstract:
Purpose – Transaction costs arise from economic exchange rather than production activities. However, the term “transaction cost” is not consistently defined in the construction industry because the concept of transaction cost is not universally accepted by all stakeholders in construction projects. As a result, empirical studies are few and conflicting because accessing data on transaction costs is problematic, and the interpretation of the data is difficult. The purpose of this paper is to analyze the transaction costs borne by the owner in a construction project from the perspective of trans
APA, Harvard, Vancouver, ISO, and other styles
11

Xuan, Vu Ngoc. "Determinants of business performance of the firms: A case of the construction listed enterprises in Vietnam Stock Market." Accounting 7, no. 7 (2021): 1741–50. http://dx.doi.org/10.5267/j.ac.2021.4.023.

Full text
Abstract:
This research aims to investigate the determinants of business performance in Vietnam small and medium sized firms. The study employs a sample of 100 construction-listed enterprises in the Vietnam Stock Market. The author collects data on time series of October 2020 based on the financial statement and annual reports of the Vietnam construction listed companies. The survey data are collected by email and internet sources. This study also identifies the factors that affect the business performance enterprises in Vietnam. The author processed data via STATA 14.0 and SPSS 20.0 software. The resea
APA, Harvard, Vancouver, ISO, and other styles
12

Sirait, Gunther Hercules, Felix Taihuttu, and Fauzan A. Sangadji. "ANALISIS TINGKAT KEPUASAN PEMILIK PROYEK TERHADAP KINERJA KONTRAKTOR PADA PEKERJAAN KONSTRUKSI DI KOTA AMBON." Kokoh 21, no. 2 (2023): 81–96. http://dx.doi.org/10.17509/k.v21i2.61197.

Full text
Abstract:
The contractor is a construction company that is key in implementing construction projects in the city of Ambon. The problem that occurs is the performance of contractor services in the city of Ambon is not optimal, so construction services with low quality and product quality are not in accordance with the expectations of the project owner. This study aims to determine the level of satisfaction of project owners on the quality of contractor performance in Ambon City and to evaluate this performance. Data analysis used the CSI (Customer Satisfaction Index) and IPA (Importance Performance Analy
APA, Harvard, Vancouver, ISO, and other styles
13

Muhaemin, Aris, and Agus Suroso. "Analysis of the Influence of Project Communication Management on Owner Decision to Improve Implementation Time Performance in High-Rise Building Construction Projects." ASTONJADRO 14, no. 2 (2025): 595–605. https://doi.org/10.32832/astonjadro.v14i2.17646.

Full text
Abstract:
Building high-rises is one example of a property business sector construction project involving various interested parties. The issue that high-rise building construction projects frequently encounter at PT X as the property developer prevented the intended completion date from being met. In high-rise building construction projects, this study examines how owner decisions affect implementation time performance based on project communication management. This study used multiple regression analysis with SPSS and SemPLS, and the sample size consisted of 80 respondents. According to the research f
APA, Harvard, Vancouver, ISO, and other styles
14

GIMENEZ, FERNANDO A. P., CLEUFE PELISSON, EUGÊNIO G. S. KRÜGER, and PAULO HAYASHI. "SMALL FIRMS' OWNER-MANAGERS CONSTRUCTION OF COMPETITION." Journal of Enterprising Culture 08, no. 04 (2000): 361–79. http://dx.doi.org/10.1142/s021849580000019x.

Full text
Abstract:
This study explores how small firms' owner-managers view competition in their business environment and how this view may be associated with specific strategic choices leading to a competitive position in their markets. Its main research question deals with why different small firms' owner-managers choose different competitive strategies in a given industry setting. One of its main contentions is that in examining this phenomenon it was necessary first to explore the mental categorisations that guide the entrepreneurs' understanding of their competitive environment. Competition is a core concep
APA, Harvard, Vancouver, ISO, and other styles
15

Ahmadu, Hassan Adaviriku, Yahaya Makarfi Ibrahim, Ahmed Doko Ibrahim, and Muhammed Abdullahi. "Modelling building construction durations." Journal of Financial Management of Property and Construction 20, no. 1 (2015): 65–84. http://dx.doi.org/10.1108/jfmpc-02-2014-0004.

Full text
Abstract:
Purpose – This paper aims to develop a multivariate model that will be applicable to the Nigeria construction industry. Design/methodology/approach – A self-administered questionnaire survey was used to source information on project scope factors and qualitative factors considered in the study. Principal component regression was used for data analysis and model development, using SPSS 16.0 for windows, while T-test was used for model testing and validation. Findings – The study found that delay in progress payment by owner, lateness in revising and approving design document by owner, delay in
APA, Harvard, Vancouver, ISO, and other styles
16

Feuer, Matt, Scott Glick, and Caroline M. Clevenger. "Benefits of owner mandated CM/GC contract amendment templates." Journal of Facilities Management 13, no. 3 (2015): 282–96. http://dx.doi.org/10.1108/jfm-03-2014-0009.

Full text
Abstract:
Purpose – The purpose of this paper is to explore how implementing a standardized/owner-mandated template for Construction Manager/General Contractor (CM/GC) contract amendments can minimize errors. The focus is on public owners who manage multiple CM/GC projects at any one time. Design/methodology/approach – A case study format was used to compare contract amendments errors using a baseline project, transition project and best practices project. Six metrics were identified, including factual recital errors, summary formatting errors, schedule of values errors, construction services fee errors
APA, Harvard, Vancouver, ISO, and other styles
17

Shesterniak, Mariia. "Efficiency of distributing results of collaborative efforts in construction." Herald of Ternopil National Economic University, no. 2(84) (May 31, 2017): 98–108. http://dx.doi.org/10.35774/visnyk2017.02.098.

Full text
Abstract:
The article clarifies that results of collaborative efforts in construction, which are received without establishing a legal entity, are presented by constructed buildings that belong to owners as a jointly-owned property. It is revealed that a completed real estate object is put into operation by the operator of collaborative activities. It is pointed out that results of collaborative efforts are distributed according to percentage rates of co-owners and in accordance with the purpose of the joint project. The procedure of completing documents on jointly constructed building which is based on
APA, Harvard, Vancouver, ISO, and other styles
18

Krajangsri, Thanachon, and Jakrapong Pongpeng. "The role of infrastructure sustainability and success of construction projects on owner benefits." MATEC Web of Conferences 192 (2018): 02026. http://dx.doi.org/10.1051/matecconf/201819202026.

Full text
Abstract:
The infrastructure sustainability and success of construction projects likely influence owner benefits. However, these influences have rarely been examined. Thus, the research aimed to examine such influences and intervening behavior of the success of construction projects between the sustainability of infrastructure and owner benefits using structural equation modeling (SEM). The study finds that there are a direct influence of the sustainability of infrastructure on owner benefits (regression weight: 0.63) and an indirect direct influence of that (regression weight: 0.22) through the interve
APA, Harvard, Vancouver, ISO, and other styles
19

Zaigham Ali, Dr. Ammar Hussain, and Mehfooz Ullah. "Practitioners’ Perception on the Critical Determinant of Uncertainty Factors that Influence Transaction Cost in Highway Construction Projects." sjesr 4, no. 1 (2021): 528–38. http://dx.doi.org/10.36902/sjesr-vol4-iss1-2021(528-538).

Full text
Abstract:
The purpose of this paper is to ascertain practitioners’ perception of the critical determinants of uncertainty factors on the transaction cost (TC) in highway construction projects. A survey questionnaire is used to collect data from the 230 practitioners of public-sector construction organizations in Pakistan to identify those factors. The partial least square structural equation modeling (PLS-SEM) is tested on the collected data. This research investigates that TC borne by the owner can be reduced when the owner minimizes inherent uncertainties. To reduce uncertainty, the owner needs to ens
APA, Harvard, Vancouver, ISO, and other styles
20

Wijaya, Joshua, Paulus Nugraha, and Jani Rahardjo. "Identification of Extreme Risk Factors for Construction Time and Cost Performance in Surabaya Housing." Dimensi Utama Teknik Sipil 7, no. 1 (2020): 23–32. http://dx.doi.org/10.9744/duts.7.1.23-32.

Full text
Abstract:
The importance level of risk throughout the construction progress is apparently inherit tendermous impact on the ultimate project performance and client satisfaction. Such determination level of risk in terms of frequency, time risk as well as cost effect to be perceived from two perspectives, owner and contractor, is inventably crucial to be researched, primarily for housing construction in Surabaya. This study was conducted by applying a survey through some questionnaires to observe 30 risks that have been identified from the previous literature. Total respondents involved were 69 respondent
APA, Harvard, Vancouver, ISO, and other styles
21

Dua Lembang, Anastasia Reski, Christanto Puji R, and Muhammad Zamroni. "Konstruksi Pemberitaan Anggaran Janggal Rancangan APBD DKI Jakarta 2020 Pada Program MetroTVNewsRoom dan Mata Najwa TRANS7 (Analisis Framing Robert Entman)." ROLLING 5, no. 2 (2022): 84. http://dx.doi.org/10.19184/rolling.v5i2.18540.

Full text
Abstract:
The present study discusses the reporting construction of two talk show programs, MetroTVNewsRoom and Mata Najwa The present study aims to find out the reporting construction of MetroTVNewsRoom and Mata Najwa TRANS7 in reporting. Unusual 2020 regional budget plan of DKI Jakarta case These media possess different backgrounds. Employing descriptive qualitative study, this study spells out in detail the problem of the study. The data were analyzed using Robert N. Entman’s framing model analysis. The present study employed the theory of reality construction, ideology, and media ownership. The resu
APA, Harvard, Vancouver, ISO, and other styles
22

Guo, Zhang Lin, and Rui Hong Jia. "The Risk Management of the Owner in the Bidding Process under the 2013 Edition of the Valuation Mode of Bill of Engineering Quantity." Applied Mechanics and Materials 687-691 (November 2014): 4670–73. http://dx.doi.org/10.4028/www.scientific.net/amm.687-691.4670.

Full text
Abstract:
Taking the perspective of the owners,we analyze the major valuation risk which is based on the theory of the project risk management under the version of 2013 code of valuation with bill quantity of construction works when the owner want to bid to identify the possible risk factors. And in this article we propose some specific measures of the risk control about the imperfect of construction drawing design,the quatity problems of tender documents,unbalanced quote of the bidders,the price changing of the building materials and equipments and various rates of change in order to achieve active con
APA, Harvard, Vancouver, ISO, and other styles
23

Medić, Duško. "Construction on Somebody Else’s Property // Građenje na tuđem zemljištu." Годишњак факултета правних наука - АПЕИРОН 7, no. 7 (2017): 19. http://dx.doi.org/10.7251/gfp1707019m.

Full text
Abstract:
Construction on somebody else’s property is a legal way of aquiring property rights. That is the case of an artificial growth of immovable property which is in existence when someone builds a construction project with his own material and work and locate it on somebody else’s land, and in addition to that there is not any contractual or other relations regulating that matter between the owner and the constructor. This institute is being under a reformation by the Proprietary law of Republika Srpska.General determination is to protect the owner of the land. Principle superficies solo credit is
APA, Harvard, Vancouver, ISO, and other styles
24

Ahmad, Hesham S., Maha D. Ayoush, and Majed S. Al-Alwan. "Causes of delay to public infrastructure projects according to engineers representing different contract parties." Built Environment Project and Asset Management 10, no. 1 (2019): 153–79. http://dx.doi.org/10.1108/bepam-03-2019-0026.

Full text
Abstract:
Purpose The purpose of this paper is to investigate the main causes of delay in public construction projects. This is motivated by feedback from public construction experts concerning substantive delays during the last decade. The study thus seeks to help decision makers in Jordan and elsewhere identify problems and develop mitigating strategies. Design/methodology/approach Causes of delay were identified from previous related studies and then augmented after consultation with experts. This resulted in 56 delay factors classified into eight groups. The sampling frame for the study was defined
APA, Harvard, Vancouver, ISO, and other styles
25

Banobi, Edwin Thomas, and Wooyong Jung. "Causes and Mitigation Strategies of Delay in Power Construction Projects: Gaps between Owners and Contractors in Successful and Unsuccessful Projects." Sustainability 11, no. 21 (2019): 5973. http://dx.doi.org/10.3390/su11215973.

Full text
Abstract:
Few studies have verified the different causes of project delays between the owner and contractor perspectives. This article’s goal is to find what the causes of delay are and how to mitigate this delay depending on project performance. Thus, this study investigated 82 owner-side experts and 106 contractor-side experts in Tanzanian power construction projects. In successful projects (less than 10% time delay), the owners and contractors weighted similar causes such as vandalism and permits from authorities. They suggested similar mitigation strategies such as close project supervision, capacit
APA, Harvard, Vancouver, ISO, and other styles
26

Ilkiv, Oleh. "Civil law consequences of object construction on a land provided for construction (superficies)." Legal Ukraine 3, no. 3 (2021): 11–19. http://dx.doi.org/10.37749/2308-9636-2021-3(219)-2.

Full text
Abstract:
The article is devoted to the analysis of civil consequences of superfidence as a legal category of the Institute of Rights in Ukraine. The right to build a foreign land should be considered as a legally secured opportunity and ability of a person to carry out all kinds of urban planning activities on a land plot or acquired for such purposes. For construction, the person must have an appropriate legal title (superficies agreement) on the basis of which state registration and determine the boundaries of the area in nature in the terrain. Superficies rights to the land should be recorded in lic
APA, Harvard, Vancouver, ISO, and other styles
27

Peng, Jun Long. "Risk Prevention and Control Measures in Highway Design and Construction Turnkey Project." Advanced Materials Research 446-449 (January 2012): 3814–19. http://dx.doi.org/10.4028/www.scientific.net/amr.446-449.3814.

Full text
Abstract:
In order to ensure the highway design and construction turnkey project smooth implementation, it is necessary to proactively consider risks produced by highway design and construction turnkey model, and to input specific risk prevention and corresponding risk control measures. This paper firstly discusses risk control measures for highway design and construction turnkey model. Then, risk is reasonably contributed both the owners and general contractors. The risk range has also be defined between the owner and general contractor. In the ending of this article, there are some recommendations abo
APA, Harvard, Vancouver, ISO, and other styles
28

Bubshait, Abdulaziz A., and Abdulaziz A. Al‐Musaid. "Owner Involvement in Construction Projects in Saudi Arabia." Journal of Management in Engineering 8, no. 2 (1992): 176–85. http://dx.doi.org/10.1061/(asce)9742-597x(1992)8:2(176).

Full text
APA, Harvard, Vancouver, ISO, and other styles
29

Sun, Jide, and Peiliang Zhang. "Owner organization design for mega industrial construction projects." International Journal of Project Management 29, no. 7 (2011): 828–33. http://dx.doi.org/10.1016/j.ijproman.2011.04.005.

Full text
APA, Harvard, Vancouver, ISO, and other styles
30

Westgarth, Carri, Robert M. Christley, Garry Marvin, and Elizabeth Perkins. "The Responsible Dog Owner: The Construction of Responsibility." Anthrozoös 32, no. 5 (2019): 631–46. http://dx.doi.org/10.1080/08927936.2019.1645506.

Full text
APA, Harvard, Vancouver, ISO, and other styles
31

Shided, M. .S, Rashid I. Abdel, Monayeri O.D EL, and M. A. ELSayad. "Using ANP to Evaluate Factors Affecting Construction Project's Performance." International Journal of Innovative Technology and Exploring Engineering (IJITEE) 10, no. 3 (2021): 120–24. https://doi.org/10.35940/ijitee.C8414.0110321.

Full text
Abstract:
The Analytic Network Process (ANP) approach was applied to evaluate the overall project performance. The interdependencies between the performance factors in sanitation infrastructure projects have been modeled, and their cumulative influences were simulated and quantified. This model focuses on the planning and construction phase of projects under unit price contracts and is intended for use by owners, supervision consulting firms (Owner&rsquo;s representative) and/or contractors as well. The proposed model assist both owners, consultants and contractors in controlling projects during the dif
APA, Harvard, Vancouver, ISO, and other styles
32

Feng, Qun, Kun Wang, Yulong Feng, Xuejun Shi, Yilin Rao, and Jia Wei. "Incentives for Promoting Safety in the Chinese Construction Industry." Buildings 13, no. 6 (2023): 1446. http://dx.doi.org/10.3390/buildings13061446.

Full text
Abstract:
Construction accidents occur frequently in China because the supervision of safety standards mandated by the government has not had its intended effect. In this paper, the authors propose a model to incentivize the management of safety during construction that involves the government as well as the owners and contractors in the industry. This study analyzes the principal–agent relationship involving each participant to determine their utility function and the minimum constraints on their participation, and uses this to obtain the optimal parameters to incentivize the management of safety durin
APA, Harvard, Vancouver, ISO, and other styles
33

Elnaz Asadian, Robert Leicht, Renee Cheng, and Claudia Neuhauser. "Project Owner Satisfaction Forecasting through Longitudinal Monitoring of Project Team Attributes." Engineering Project Organization Journal 11, no. 1 (2024): 32. https://doi.org/10.25219/epoj.v11i1.20142.

Full text
Abstract:
Applying project team success to forecast a building project’s outcomes is challenging due to the presence of a large number of variables in building’s owner goals, program types, and project team composition. However, studying the dynamic interactions of team integration with the project outcomes, which can be represented by owner satisfaction, provides evidence of a meaningful relationship between the success of a project with regard to budget, quality, and schedule. Herein, the association of team integration and group cohesion with the success of project outcomes in terms of owner satisfac
APA, Harvard, Vancouver, ISO, and other styles
34

Tahmasebinia, Faham, and Vicheth Song. "Significant Factors Causing Delay in the Cambodian Construction Industry." Sustainability 14, no. 6 (2022): 3521. http://dx.doi.org/10.3390/su14063521.

Full text
Abstract:
The construction sector is one of the essential sectors in the world; it aids in developing all the countries in the world because it is the foundation of other industries. However, delays in construction projects are a common issue that has been found in all global construction projects. This research aims to understand the issues that lead to construction project delay, ranking the ten most significant causes of construction delay and providing instructive recommendations to overcome the discussed issue in the construction sector. The first ten substantial delay factors are poor planning and
APA, Harvard, Vancouver, ISO, and other styles
35

Pyatkov, D. V. "THE RIGHT OF COMMON SHARED OWNERSHIP: THE ESSENCE AND PROBLEMS OF PROTECTION." Russian-Asian Legal Journal, no. 3 (November 10, 2021): 18–22. http://dx.doi.org/10.14258/ralj(2021)3.4.

Full text
Abstract:
The article attempts to rethink the phenomenon of shared ownership, taking into account the conceptof multiple ownership rights to one thing at the same time existing in civil law. The widespread view ofthe right of shared ownership as one right to the same thing belonging to several persons at the same timeis critically evaluated. It is concluded that each co-owner has his own property right, which is limited bythe same rights of other co-owners. The construction of shared ownership is considered in the contextof possession protection proposed in the Concept of the Development of Civil Legisl
APA, Harvard, Vancouver, ISO, and other styles
36

Muhsen, Hassan kamal, and Sedqi Esmaeel Rezouki. "The Causes Influencing the Occurrence of Variation Orders in the Construction of Buildings." Journal of Engineering 28, no. 8 (2022): 34–53. http://dx.doi.org/10.31026/j.eng.2022.08.03.

Full text
Abstract:
In the construction of buildings usually, problems occur because of the causes of change orders. The main causer of change orders is the owners, consultants, and contractors. These changes lead to conflicts among them which result in influencing building projects. Therefore, it is necessary to analyze the causes of change orders to reduce them and facilitate management. This paper determines the most critical factors that cause change orders from a different point of view, a consulting owner and a contractor, and a study of the reality of the management of change orders when constructing publi
APA, Harvard, Vancouver, ISO, and other styles
37

Alashari, Mishal Ahmad. "Accelerated Bridge Construction (ABC), A Better Approach to Bridge Construction?" International Journal for Innovation Education and Research 4, no. 8 (2016): 42–71. http://dx.doi.org/10.31686/ijier.vol4.iss8.577.

Full text
Abstract:
Accelerated Bridge Construction (ABC) is a common term given to the combination of different procedures that help reduce the construction period of a project. Utilizing these different procedures on bridge replacement/rehabilitation projects presents several benefits, including reduced traffic congestion and improved on-site safety. The purpose of this paper is to recognize the difference between Accelerated Bridge Construction and Conventional Bridge Construction, and the process of deciding which approach is more suitable for a particular project. Specifically, this paper explores the desira
APA, Harvard, Vancouver, ISO, and other styles
38

Kang, Sang-Chan, and Myunghoun Jang. "Case Analysis of Construction Management in Small Projects in Jeju, Korea." E3S Web of Conferences 65 (2018): 03007. http://dx.doi.org/10.1051/e3sconf/20186503007.

Full text
Abstract:
It is difficult to build small houses in a urban or rural region because an owner meets lots of risks from planning, feasible study, estimation, and design to construction. Conflicts or disputes owing to the improper communication between stakeholders like the owner, designer, contractor, sub-contractor, and manufacturer may cause the construction project to delay or stop. Thus, construction management can be a key success factor to the small construction projects. Many construction projects are built in Jeju. The middle and large projects have competent management personnels, but the small pr
APA, Harvard, Vancouver, ISO, and other styles
39

Ding, Xiang, Zhaohan Sheng, Jianguo Du, and Qian Li. "Computational Experiment Study on Selection Mechanism of Project Delivery Method Based on Complex Factors." Mathematical Problems in Engineering 2014 (2014): 1–8. http://dx.doi.org/10.1155/2014/701652.

Full text
Abstract:
Project delivery planning is a key stage used by the project owner (or project investor) for organizing design, construction, and other operations in a construction project. The main task in this stage is to select an appropriate project delivery method. In order to analyze different factors affecting the PDM selection, this paper establishes a multiagent model mainly to show how project complexity, governance strength, and market environment affect the project owner’s decision on PDM. Experiment results show that project owner usually choose Design-Build method when the project is very comple
APA, Harvard, Vancouver, ISO, and other styles
40

Horton, Donald F. "DESIGN AND CONSTRUCTION OF GROINS." Coastal Engineering Proceedings 1, no. 1 (2010): 27. http://dx.doi.org/10.9753/icce.v1.27.

Full text
Abstract:
Groins are frequently used for shore protection and improvement. Not infrequently the owner of shore property who has had groins built to protect or improve his property is disappointed with the results. More often than not this unhappy situation must be attributed to the fact that too much was expected by the owner. The owner in such a case is not properly to be criticized, because a great deal remains to be learned about groins; their effects, their proper design and construction. In the present state of the art of shore protection and improvement it is not possible to design and build groin
APA, Harvard, Vancouver, ISO, and other styles
41

Ma, Yan Ting, and Chun Jie Ma. "Analysis on Construction Delay of Suburban Roads." Applied Mechanics and Materials 333-335 (July 2013): 2167–70. http://dx.doi.org/10.4028/www.scientific.net/amm.333-335.2167.

Full text
Abstract:
As one of large engineering projects, suburban roads plays an important role in urban construction, however, there exists a great many risks in the entire constructing process, which restrict the course of the project in varying degrees. It may cause the construction delay, property loss, and even leave serious quality problems if handled improperly. This paper analyzes the reason of suburban roads construction delay from three aspects which are owner, construction and supervision units, and give some corresponding countermeasures for reference.
APA, Harvard, Vancouver, ISO, and other styles
42

Hatmoko, Jati Utomo Dwi, Raden Arya Pratistha, and Arif Hidayat. "Project Delays Caused by the Owner: Evaluation of Causal Factors and Contractor Claims." MEDIA KOMUNIKASI TEKNIK SIPIL 28, no. 2 (2023): 212–18. http://dx.doi.org/10.14710/mkts.v28i2.45875.

Full text
Abstract:
Delays in construction projects are generally understood to be the sole responsibility of the contractor. In fact, these delays can also be caused by factors that actually are the responsibility of the owner, resulting in project completion exceeding the contract target date. As a result, the contractors can be affected and suffer losses due to delays that are not actually their responsibility. This study intends to evaluate project delays caused by the owner and the delay claims submitted by the contractor. This research is exploratory and uses a mixed method of quantitative and qualitative a
APA, Harvard, Vancouver, ISO, and other styles
43

Zhang, Jin Hui, and Xiao Ying Song. "Discussion about the Efficient Management and Control of Construction Projects′ Cost." Advanced Materials Research 591-593 (November 2012): 2437–40. http://dx.doi.org/10.4028/www.scientific.net/amr.591-593.2437.

Full text
Abstract:
The management and control of the construction project’ cost is throughout the course of construction projects. The owner should exercise economic supervision and control over whole process from decision-making, designing, inviting bits, constructing to completing. Based on the status, this article has carried on detailed analysis of the whole process management and control of the construction projects’ cost, and put forward improving the levels of cost management and control by the information technology.
APA, Harvard, Vancouver, ISO, and other styles
44

Ali, Noori Sadeq, and Khalil Ismail Wali. "Evaluation of Construction Delay of Public Projects in Erbil Governorate." Cihan University-Erbil Scientific Journal 3, no. 1 (2019): 18–26. http://dx.doi.org/10.24086/cuesj.v3n1y2019.pp18-26.

Full text
Abstract:
Delay is one of the greatest challenges facing the implementation of construction projects. The completion project time is considered one of the measure indicators for assessing the success of any project. Delays usually have negative impacts of financial and social to all parties involved in the projects. The aim of the study is to find the most important causes of delay by evaluating the common causes of delays in terms of frequency, severity, and important indices in implementation of public construction projects in Erbil Governorate related to owners, contractors, consultants, and external
APA, Harvard, Vancouver, ISO, and other styles
45

Ejem, E. A.*1 Dike D. N2 Njoku L. C.3 Onwuka U.4 Igboanusi C. C.5 and Moneke U. N.6. "ANALYSIS OF FACTORS OF DELAY IN ROAD CONSTRUCTIONAND OTHERPROJECTS IN IMO STATE." INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY 6, no. 12 (2017): 454–60. https://doi.org/10.5281/zenodo.1116805.

Full text
Abstract:
This paper is aimed at identifying various factors responsible for road construction delays. From literature 165 common factors causing delays were identified. A survey were carried out amongst selected experienced personnel for expert opinion to identify the significant factors causing road construction and other projects delays in Imo State, Nigeria. 436 responses were collected from each of the respondents groups including client, consultant and contractor covering the Senatorial zones of Imo State. The questionnaire responses were analyzed by exploratory factor analysis method, which resul
APA, Harvard, Vancouver, ISO, and other styles
46

Leu, Wen Hao, and Andrew S. Chang. "Status and Psychology of DBB and BOT Construction Project Participants." Applied Mechanics and Materials 71-78 (July 2011): 160–66. http://dx.doi.org/10.4028/www.scientific.net/amm.71-78.160.

Full text
Abstract:
Adopting the BOT (build-operate-transfer) delivery method for construction projects has brought opportunities for desired performance. Studies have investigated many issues of BOT projects such as concessionaire selection criteria or risk factors, but the soft issue of the status and psychology change of project participants from traditional DBB (design-bid-build) method is not investigated. This research explored the status and psychology of DBB and BOT project participants and drew implication for performance. By using the case study method, this study selected ten projects in which five fro
APA, Harvard, Vancouver, ISO, and other styles
47

Boldyrev, Vladimir. "Civil-law construction of a legal entity non-owner." News of higher educational institutions. Jurisprudence, no. 313 (June 30, 2014): 128–36. https://doi.org/10.5281/zenodo.15544235.

Full text
Abstract:
The article proves that the construction of a legal entity - non-owner determines the following characteristics of the corresponding right-holders: 1) lack of ability to hold an ownership title; 2) the ability to possess property on specific titles, not typical for other legal entities, natural persons and public institutions; 3) special legal capacity the peculiarity of which is the prohibition to enter the definite contractual relations expressly stipulated by the law; 4) the possibility to perform the most important legal actions with the consent of another right-holder (an owner).
APA, Harvard, Vancouver, ISO, and other styles
48

Sunidhi, Kabra* Vivek Mishra Kshitiz Kesharwani Shivaanshu Nagarkar. "IMPLEMENTATION PAPER ON REAL ESTATE MONITORING SYSTEM." INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY 5, no. 12 (2016): 104–8. https://doi.org/10.5281/zenodo.191615.

Full text
Abstract:
With the enhancements in the Internet and computer technology, we are now able to do most of our work automatically, for example, e-wallet, online payments, etc. As a whole, Internet has made our lives simpler. Making use of modern day Internet and computer technologies, we have come up with an online system useful in the field of construction. Our concept, Real Estate Monitoring System, enables any individual constructor to automate the manual logs maintained at a construction site. By this automation, the owner will be able to keep an eye on the daily consumption of different material, vario
APA, Harvard, Vancouver, ISO, and other styles
49

Zhu, Ji-Wei, Li-Nan Zhou, Liang Li, and Wajhat Ali. "Decision Simulation of Construction Project Delivery System under the Sustainable Construction Project Management." Sustainability 12, no. 6 (2020): 2202. http://dx.doi.org/10.3390/su12062202.

Full text
Abstract:
Choosing an appropriate project delivery system (PDS) directly affects the achievement of performance goals, and at the same time it is of great significance for sustainable construction project management (SCPM). This paper took the PDS of construction engineering as the research object, took the Design-Build (DB) and the Design-Bid-Build (DBB) as examples, and established the indicator system for determinants of the PDS decision. Based on Multi-Agent Systems (MAS), a decision-making simulation model of the PDS decision was constructed, and this paper analyzed the influence of the project att
APA, Harvard, Vancouver, ISO, and other styles
50

Plebankiewicz, Edyta. "MODELLING DECISION-MAKING PROCESSES IN BIDDING PROCEDURES WITH THE USE OF THE FUZZY SETS THEORY." International Journal of Strategic Property Management 18, no. 3 (2014): 307–16. http://dx.doi.org/10.3846/1648715x.2014.943332.

Full text
Abstract:
In the bidding procedure not only the contractor but also the construction owner make a number of vital decisions, the consequences of which are significant. The contractor has to decide whether to take part in a given bid and, having been accepted, he/she has to prepare a bidding offer. Its essential element is the mark-up introduced to the calculation of the bidding price. On the other hand, the investing construction owner has to decide which contractors are the closest to his/her requirements. The article presents mathematical models concerning the decisions made by the contractor and cons
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!