Academic literature on the topic 'Construction Contractor'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Construction Contractor.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Journal articles on the topic "Construction Contractor"

1

Zuhri, Zuhri, Muhammad Isya, and Hafnidar A.Rani. "PENGARUH FAKTOR-FAKTOR KUALIFIKASI KONTRAKTOR TERHADAP KUALITAS PROYEK KONSTRUKSI JALAN DI KOTA BANDA ACEH." Jurnal Arsip Rekayasa Sipil dan Perencanaan 1, no. 3 (2018): 113–21. http://dx.doi.org/10.24815/jarsp.v1i3.11775.

Full text
Abstract:
The number of contractor companies, especially in the field of roads every year continues to increase. Based on data obtained from LPJK website (Construction Services Development Agency) Province of Aceh Year 2016, shows that from 2,717 road contractors in Aceh Province, 1% of them are big qualification, 10% middle qualification and 89% small qualification. The problem is from the increasing number of road contractor companies in Aceh Province, it has not been followed by an increase in qualification and performance. These improvements can be seen from the quality of work, the timeliness of co
APA, Harvard, Vancouver, ISO, and other styles
2

Mofokeng, Godfrey. "Mentorship Programmes within the Small and Medium Sized Contractor Development Programme: A Case Study of the Free State Province, South Africa." Journal of Economics and Behavioral Studies 4, no. 12 (2012): 712–22. http://dx.doi.org/10.22610/jebs.v4i12.371.

Full text
Abstract:
The South African government has been implementing various small and medium sized contractor development programmes in an effort to redress the legacy created by apartheid government. The programmes fulfil such an objective through awarding construction projects to the historically disadvantaged Black contractors to enable them develop competent skills, build viable construction firms, create jobs and redistribute wealth. A mentorship programme was put in place to assist the contractors with technical, managerial, contractual and business impediments they might be encountered in the project ex
APA, Harvard, Vancouver, ISO, and other styles
3

Chiang, Fu Yuan, and Pin Luarn. "Contractor Prequalification in Taiwan." Advanced Materials Research 905 (April 2014): 742–47. http://dx.doi.org/10.4028/www.scientific.net/amr.905.742.

Full text
Abstract:
It is very important for the project owner to screen out potential failure contractors from the bidding process. Contractor prequalification has been established as a standard practice in solving this problem. This study uses a prequalification that is a financial ratios model to assess the contractor's financial capability in Taiwan. Do not consider non-quantifiable factor, the model is effective in assessing the financial ability of construction contractors' selection.
APA, Harvard, Vancouver, ISO, and other styles
4

Ayegba, Calistus. "Duties and Required Competencies of a Management Contractor." Journal of Construction Business and Management 2, no. 1 (2018): 1–9. http://dx.doi.org/10.15641/jcbm.2.1.70.

Full text
Abstract:
One of the responses to the critical failings of separation of design and construction processes of traditional procurement system is the development of management contracting (MC) procurement system. Several studies have indicated MC procurement system to be most suitable for large and complex projects, when on-time project delivery is required, and when flexibility during construction is desired. Owing to the involvement of the Management contractor at both design and construction stage of projects, the management contractors play more significant role in the benefits that MC system has show
APA, Harvard, Vancouver, ISO, and other styles
5

Mateș, Dorel, Adriana Marina Puşcaş, and Daniela Pordea. "Accounting and Fiscal Considerations upon Performance Guarantees - Particular Case of Construction Works." Studia Universitatis „Vasile Goldis” Arad – Economics Series 28, no. 4 (2018): 81–96. http://dx.doi.org/10.2478/sues-2018-0022.

Full text
Abstract:
Abstract The performance guarantee represents the contractor's liability to ensure the beneficiary on the fulfillment of the quality conditions for the contracted works, as well as of their execution within the agreed contractual term. In the context of a growth trend in the industrial construction market since 2018, we considered it appropriate to study the impact of the performance guarantees on the financial balance of the contractors operating on this market. Through this research we aim to analyze the methods of guaranteeing the construction works, to assess the financial, accounting and
APA, Harvard, Vancouver, ISO, and other styles
6

Kadhim, Saraa Naseer, and Kadhim Raheim Erzaij. "Examining sensitivity of financial performance at construction projects prequalification stage." Journal of Engineering 26, no. 7 (2020): 175–89. http://dx.doi.org/10.31026/j.eng.2020.07.12.

Full text
Abstract:
Construction projects are complicated in nature and require many considerations in contractor selection. One of the complicated interactions is that between performance with the project size, and contractor financial status, and size of projects contracted. At the prequalification stage, the financial ‎requirements restrict the ‎contractors to meet minimum limits in financial criteria such as net worth, working capital and ‎annual turnover, etc. In construction projects, however, there are cases when contractors meet these requirements but show low performance in practice. The model used in th
APA, Harvard, Vancouver, ISO, and other styles
7

Arslan, Gokhan. "WEB-BASED CONTRACTOR EVALUATION SYSTEM FOR MASS-HOUSING PROJECTS IN TURKEY." Journal of Civil Engineering and Management 18, no. 3 (2012): 323–34. http://dx.doi.org/10.3846/13923730.2012.698892.

Full text
Abstract:
Determining the most appropriate contractor for a construction project is a highly critical issue. Selecting the right contractor for the right job can significantly influence the overall project performance. In the selection process, construction clients have to know all financial, technical and general information about the contractors to determine the most appropriate one for the project. Within this context, clients should consider several criteria that may include quality of production, adequacy of technical staff and financial stability. In this study, a survey was carried out among 52 c
APA, Harvard, Vancouver, ISO, and other styles
8

McCabe, Brenda, Viet Tran, and Joseph Ramani. "Construction prequalification using data envelopment analysis." Canadian Journal of Civil Engineering 32, no. 1 (2005): 183–93. http://dx.doi.org/10.1139/l04-073.

Full text
Abstract:
Contractor prequalification is essential in most construction projects, and the process has been performed by many different methods in practice. Data envelopment analysis (DEA) had been recognized as a useful technique to prequalify contractors by assigning relative efficiency scores. Data envelopment analysis, however, usually requires a large amount of data and has not been fully developed to achieve reliable results. An enhanced contractor prequalification model using DEA was developed together with a methodology for determining a "practical frontier" of best contractors. The established p
APA, Harvard, Vancouver, ISO, and other styles
9

Liu, Xun, Dexin Liu, and Mengyu Xu. "An Extended Theory of Planned Behavior to Explain General Contractors’ Long-Term Cooperation Intentions in Construction Projects: Empirical Evidence from China." Sustainability 15, no. 9 (2023): 7072. http://dx.doi.org/10.3390/su15097072.

Full text
Abstract:
With the continuous development of the construction industry, the current construction production mode is gradually transforming into the contractor, professional subcontractor and labor subcontractor’s “main-sub contractor” cooperative production mode in the market segmentation. Long-term cooperation between contractors and subcontractors is beneficial to both parties, yet only limited research has explored the factors that determine contractors’ willingness to cooperate with subcontractors on a long-term basis. This paper explores the factors that influence contractors’ willingness to cooper
APA, Harvard, Vancouver, ISO, and other styles
10

Moses, Tochukwu, David Heesom, and David Oloke. "Implementing 5D BIM on construction projects: contractor perspectives from the UK construction sector." Journal of Engineering, Design and Technology 18, no. 6 (2020): 1867–88. http://dx.doi.org/10.1108/jedt-01-2020-0007.

Full text
Abstract:
Purpose The purpose of this paper is to report on primary research findings that sought to investigate and analyse salient issues on the implementation of 5D building information modelling (BIM) from the UK contractors’ perspective. Previous research and efforts have predominantly focussed on the use of technologies for cost estimation and quantity takeoff within a more traditional-led procurement, with a paucity of research focussing on how 5D BIM could facilitate costing within contractor-led procurement. This study fills this current knowledge gap and enhances the understanding of the speci
APA, Harvard, Vancouver, ISO, and other styles
More sources

Dissertations / Theses on the topic "Construction Contractor"

1

Pun, I. Chung. "Feasibility study of contractor registration system and contractor grading system in Macau." Thesis, University of Macau, 2012. http://umaclib3.umac.mo/record=b2586271.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Palaneeswaran, Ekambaram. "Contractor selection systems for design-build projects." Thesis, Hong Kong : University of Hong Kong, 2000. http://sunzi.lib.hku.hk/hkuto/record.jsp?B22582150.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Lindblom, Daniel, and Jonathan Isaksson. "Construction Management or Contractor : A client´s choice." Thesis, KTH, Fastigheter och byggande, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-101148.

Full text
Abstract:
Clients within the construction industry have become more aware of benefits that exist and can be reached when going through a major construction project, benefits that invite for efficiency improvements both during construction and its prophases. New methods of execution and their different advantages are evaluated. This change has opened the door for new business models such as Construction Management (CM) but it also demands the contractors to adapt and come up with more client-customized methods. The thesis goes further into the question of when to use which execution method and describes
APA, Harvard, Vancouver, ISO, and other styles
4

Johnson, Conrad C. "Significant Trade Contractor Performance Characteristics as Evaluated by Big-D Construction." Diss., CLICK HERE for online access, 2007. http://contentdm.lib.byu.edu/ETD/image/etd1764.pdf.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Fenn, James Ellis. "The Purposes and Evaluation Methods for State Residential General Contractor Licensing." Diss., CLICK HERE for online access, 2005. http://contentdm.lib.byu.edu/ETD/image/etd708.pdf.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Shum, Chun-pang. "The influence of organizational culture of main contractor to organizational culture of sub-contractor in the construction industry in Hong Kong." Click to view the E-thesis via HKU Scholars Hub, 2004. http://lookup.lib.hku.hk/lookup/bib/B37933140.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Mitra, John Paul, Joseph Shrestha, Jeremy Ross, and Jinseok Hong. "Analysis of Construction Cost Variation of Construction Manager General Contractor (CM/GC) Project." Digital Commons @ East Tennessee State University, 2019. https://dc.etsu.edu/etsu-works/5472.

Full text
Abstract:
Cost overrun is prevalent in the construction industry. Usually, an owner sets a budget at the preliminary phase of a project which changes over time. Past studies are focused on analyzing the cost growth of design-bid-build projects during construction. Limited efforts have been made to analyze details of projects delivered with the Construction Manager General Contractor (CM/GC) method. This study tracks and analyzes the construction cost variation of a project from the conceptual phase to the design completion phase. The analysis is presented with a case study of a new stadium construction
APA, Harvard, Vancouver, ISO, and other styles
8

Rogers, Maile Anne. "Contractor Variability in Construction of Cement Treated Base Layers." Diss., CLICK HERE for online access, 2006. http://contentdm.lib.byu.edu/ETD/image/etd1474.pdf.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Masrom, Md Asrul Nasid. "Developing a predictive contractor satisfaction model (CoSMo) for construction projects." Thesis, Queensland University of Technology, 2012. https://eprints.qut.edu.au/54737/1/Masrom_Md_Thesis.pdf.

Full text
Abstract:
Over the last few decades, construction project performance has been evaluated due to the increase of delays, cost overruns and quality failures. Growing numbers of disputes, inharmonious working environments, conflict, blame cultures, and mismatches of objectives among project teams have been found to be contributory factors to poor project performance. Performance measurement (PM) approaches have been developed to overcome these issues, however, the comprehensiveness of PM as an overall approach is still criticised in terms of the iron triangle; namely time, cost, and quality. PM has primari
APA, Harvard, Vancouver, ISO, and other styles
10

Seaman, R. Anthony (Richard Anthony) 1970. "Multi-organizational project teams and construction innovation : the role of general contractor and construction manager." Thesis, Massachusetts Institute of Technology, 2000. http://hdl.handle.net/1721.1/9013.

Full text
Abstract:
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 2000.<br>Includes bibliographical references (p. 87-89).<br>With the advent of major advances in current information technology, many business leaders and academicians hail the arrival of a new decentralized economy based on globally networked teams. This dispersed "market-oriented" structure is a new reality for many current industrial organizations who must transform from fully-integrated, centralized organizations into loose networks of suppliers and sellers utilizing just-in-time collaborati
APA, Harvard, Vancouver, ISO, and other styles
More sources

Books on the topic "Construction Contractor"

1

1946-, Carter John D., Cushman Robert Frank 1931-, and Palmer William J. 1934-, eds. Construction litigation: Representing the contractor. 2nd ed. Wiley Law Publications, 1992.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
2

1931-, Cushman Robert Frank, ed. Construction disputes: Representing the contractor. 3rd ed. Aspen Law & Business, 2001.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
3

Gransberg, Douglas D. Performance-based construction contractor prequalification. Transportation Research Board, 2009.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
4

1931-, Cushman Robert Frank, Carter John D. 1946-, and Silverman Alan, eds. Construction litigation: Representing the contractor. Wiley Law Publications, 1986.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
5

Hernes, Tor. Construction management programme: Interactive contractor training. I.L.O., 1987.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
6

Hernes, Tor. Construction management programme: Interactive contractor training. I.L.O., 1987.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
7

Hernes, Tor. Construction management programme: Interactive contractor training. I.L.O., 1987.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
8

Gerber, Michael E. The E-Myth Contractor. HarperCollins, 2007.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
9

Somervill, Barbara A. Green general contractor. Cherry Lake Pub., 2011.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
10

Cook, Paul J. Bidding for the general contractor. R.S. Means Co., 1985.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
More sources

Book chapters on the topic "Construction Contractor"

1

Winter, Christoph. "Overview of Construction Procurement Types." In Contractor-Led Procurement. Deutscher Universitätsverlag, 2003. http://dx.doi.org/10.1007/978-3-322-81614-6_3.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Winter, Christoph. "The Construction Industry and its Participants." In Contractor-Led Procurement. Deutscher Universitätsverlag, 2003. http://dx.doi.org/10.1007/978-3-322-81614-6_2.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Powell, Geoff. "Tendering and contractor selection." In Construction Contracts Preparation and Management. Macmillan Education UK, 2016. http://dx.doi.org/10.1057/978-1-137-51116-4_5.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Adriaanse, John. "The Main Obligations of the Contractor." In Construction Contract Law. Macmillan Education UK, 2017. http://dx.doi.org/10.1057/978-1-137-00959-3_6.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Adriaanse, John. "The Main Obligations of the Contractor." In Construction Contract Law. Macmillan Education UK, 2010. http://dx.doi.org/10.1007/978-0-230-36600-8_6.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Hofstadler, Christian, and Markus Kummer. "Worked Examples – Contractor." In Chances and Risks in Construction Management and Economics. Springer International Publishing, 2021. http://dx.doi.org/10.1007/978-3-030-64014-9_10.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Sørensen, Jakob B. "The Contractor." In FIDIC Red Book: A Companion to the 2017 Construction Contract, Revised Edition. Emerald Publishing Limited, 2024. http://dx.doi.org/10.1680/978-1-83608-174-620241008.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Duncan, William. "Make Progress Payments to Contractor." In Substantial Rehabilitation & New Construction. Springer US, 1991. http://dx.doi.org/10.1007/978-1-4684-6539-6_56.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Solimene, Fabio. "Claims against the contractor." In The Law and Practice of Complex Construction Projects. Informa Law from Routledge, 2024. http://dx.doi.org/10.4324/9781003387718-52.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Holm, Len, and John E. Schaufelberger. "Pricing balance of general contractor self-performed work." In Construction Cost Estimating. Routledge, 2021. http://dx.doi.org/10.1201/9781003023494-15.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Conference papers on the topic "Construction Contractor"

1

Powers, Greg. "Managing Construction Risk through Aggressive Schedule Management." In SSPC 2011. SSPC, 2011. https://doi.org/10.5006/s2011-00057.

Full text
Abstract:
Abstract Contractors often agree to deliver a project on a certain schedule. Then, once the work begins, the project suffers significant impacts, oftentimes through no fault of either the General Contractor or the Subcontractors, and then they do not have the tools in place to properly communicate the impacts, recover the losses and manage success.
APA, Harvard, Vancouver, ISO, and other styles
2

Ikhsan, Ikhsan, Rosmariani Arifuddin, and Muhammad Asad Abdurrahman. "Risk Analysis of Delay in Construction Project Based on Design and Build Contract." In International Conference on Research in Engineering and Science Technology (IC-REST) 2023. Trans Tech Publications Ltd, 2025. https://doi.org/10.4028/p-gkp9mr.

Full text
Abstract:
The selection of a procurement system through Design-Build is one of the alternatives for reducing the project implementation schedule, but time delays still occur. This study aims to determine the priority of risk sources and risk control strategies using the house of risk method through a questionnaire given to experts as respondents. Forty risk events and 17 risk agents will be assigned to contractors experienced in design-build construction on building projects. Based on the analysis results, the highest risk priority was that the contract between the project owner and the design-build con
APA, Harvard, Vancouver, ISO, and other styles
3

Fraebel, Troy, and Jerrith Hodskins. "Qa'ing the QC from a Distance." In Coatings+ 2020. SSPC, 2020. https://doi.org/10.5006/s2020-00017.

Full text
Abstract:
Abstract When it was time for a major fertilizer distribution facility in the Midwest to have its conveyor structure repainted, the owner started contemplating full-time independent third-party inspection. After reviewing the contractor's schedule and the size of the crew, it became apparent that this approach would interfere with the contractor's operations and be cost prohibitive for the owner. What to do? Since the contract required the contractor to perform quality control (QC) inspections, the owner decided to retain a quality assurance (QA) firm to monitor the contractor's QC activities
APA, Harvard, Vancouver, ISO, and other styles
4

Cobo del Arco, Diego, Steffen Mohr, Antonio Carmona Herrero, and José Ignacio Alameda Lopez. "Design and construction of a bow-string arch in Costa Rica." In IABSE Congress, San José 2024: Beyond Structural Engineering in a Changing World. International Association for Bridge and Structural Engineering (IABSE), 2024. https://doi.org/10.2749/sanjose.2024.1477.

Full text
Abstract:
&lt;p&gt;A composite steel bow string arch has been recently designed and built in Costa Rica in kilometer 44 of route 27 to jump over an active geological fault. Bridge was contracted by Globalvia (the concessionary of the route) to contractor COPISA on a design and built scheme on a fast-track basis. COPISA relied on BEWS for the detail design. Steel subcontractor was the company STEEL from Costa Rica. This paper summarizes the design and construction of the bridge.&lt;/p&gt;
APA, Harvard, Vancouver, ISO, and other styles
5

Putra, Luis Ode, Irwan Ridwan Rahim, and Rosmariani Arifuddin. "Analysis of Construction Disputes in South Sulawesi: Contractor Companies Perspective." In International Conference on Research in Engineering and Science Technology (IC-REST) 2023. Trans Tech Publications Ltd, 2025. https://doi.org/10.4028/p-pnnq84.

Full text
Abstract:
South Sulawesi is one of Indonesia's provinces with great potential in the construction sector. However, South Sulawesi faces various challenges in the construction sector, including construction disputes. This study aims to analyze the factors that cause construction disputes between small, medium, and large construction companies in South Sulawesi. Data were collected using questionnaires to project stakeholders and previous research. The method used was Structural Equation Modeling with a Partial Least Squares system. Seven factors cause disputes in construction projects, namely the problem
APA, Harvard, Vancouver, ISO, and other styles
6

Simkins, David. "Keeping the Schedule: Climate Control Helps Keep the Charles-de-Gaulles Bridge Project on Schedule." In SSPC 2013 Greencoat. SSPC, 2013. https://doi.org/10.5006/s2013-00062.

Full text
Abstract:
Using climate control proved its “cool” during a major, temperature sensitive construction project for the Charles-de-Gaulles Bridge Project between Montreal and Repentigny Canada. The air treatment company teamed with general contractor firm Construction Injection EDM Inc and Versailles 48 Inc. the coating contractor to successfully control the temperature and humidity of the containments on the underside of the bridge during a challenging retrofit and application of protective coatings of the steel structure.
APA, Harvard, Vancouver, ISO, and other styles
7

Palihakkara, A. D., and B. A. K. S. Perera. "IDENTIFICATION OF SIGNIFICANT RISK FACTORS OF GUARANTEED MAXIMUM PRICE (GMP) CONTRACTS." In The 9th World Construction Symposium 2021. The Ceylon Institute of Builders - Sri Lanka, 2021. http://dx.doi.org/10.31705/wcs.2021.30.

Full text
Abstract:
The construction industry is a risk-prone industry where projects are implemented in a dynamic environment with frequent exposure to various uncertainties. A construction contract is a document that allocates the risks associated with a construction project among the project stakeholders. Guaranteed Maximum Price (GMP) contracts have become popular as a project delivery method because they provide the client with a high degree of cost certainty through a fixed price cap that the contractor cannot exceed. However, most of the GMP projects are risky. Thus, the significant risk factors of GMP pro
APA, Harvard, Vancouver, ISO, and other styles
8

Arampath, A. M. N. N., R. Palliyaguru, and G. Karunasena. "Deficiencies in bespoke labour subcontract agreements: The case of large-scale contractors in the Sri Lankan construction industry." In 10th World Construction Symposium. Building Economics and Management Research Unit (BEMRU), University of Moratuwa, 2022. http://dx.doi.org/10.31705/wcs.2022.24.

Full text
Abstract:
Labour subcontracting has become popular and has been extensively utilized in the building construction industry due to the potential for a reduction in initial cost for site mobilization. However, there are high risks involved in labour subcontracting due to inadequate and ambiguous subcontract agreements, which lead to disputes between parties. Thus, this paper aims to identify the deficiencies in large-scale contractors’ bespoke labour subcontract agreements in the Sri Lankan construction industry. Eight semi-structured interviews were carried out with main contractors (CS1 and CS2 as per t
APA, Harvard, Vancouver, ISO, and other styles
9

O'Connor, James T., and Chong Yao Wang. "Owner and Contractor Jobsite Organizations." In Construction Research Congress 2012. American Society of Civil Engineers, 2012. http://dx.doi.org/10.1061/9780784412329.250.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

S., Sangeetha M., and Anu V. Thomas. "Analysis of Contractor-Related Delay Factors in Building Construction." In 6th International Conference on Modeling and Simulation in Civil Engineering. AIJR Publisher, 2023. http://dx.doi.org/10.21467/proceedings.156.13.

Full text
Abstract:
The unforeseen circumstances which can lead to delays are one among the most significant issues in the construction business. Listing the reasons for these delays is important to minimize and improve construction quality, time, and financial management. This will facilitate the on-time completion of the project. This research concentrates entirely on contractors' influence in these delays. Contractors, engineers, project managers, and civil engineers were asked for feedback on how to prioritize the identified elements. Overall results showed that labour shortages, material shortages, contracto
APA, Harvard, Vancouver, ISO, and other styles

Reports on the topic "Construction Contractor"

1

CORPS OF ENGINEERS WASHINGTON DC. Construction: Contractor Performance Evaluations. Defense Technical Information Center, 1993. http://dx.doi.org/10.21236/ada404148.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Author, Unknown. L52287 Pre-Construction Drillability Assessment for Horizontal Directional Drilling in Rock. Pipeline Research Council International, Inc. (PRCI), 2008. http://dx.doi.org/10.55274/r0011760.

Full text
Abstract:
Construction contractors often claim extra compensation associated with horizontally directionally drilled (HDD) pipeline installations is needed when drilling in rock. These claims result from HDD contractors' allegations that rock properties experienced during construction are significantly different from the properties on which the contractors' bids were based. This report provides information and recommendations that improve exploration and testing methods for assessing the drillability of rock to be encountered on HDD pipeline installations. These improvements will lead to a better unders
APA, Harvard, Vancouver, ISO, and other styles
3

Ashenfelter, Orley, David Ashmore, and Randall Filer. Contract Form and Procurement Costs: The Impact of Compulsory Multiple Contractor Laws in Construction. National Bureau of Economic Research, 1997. http://dx.doi.org/10.3386/w5916.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

EFFC/DFI Working Platforms Task Group. Guide to Working Platforms. European Federation of Foundation Contractors and Deep Foundations Institute, 2020. https://doi.org/10.37308/effc-dfi-wptg-guide-e1-2020.

Full text
Abstract:
On a typical construction site, the provision of a safe surface to work on involves and affects a number of the contracting parties (the client; principal designer; general contractor; specialty contractor; platform designer; platform installer or earthworks contractor; platform tester and platform maintainer), and as a consequence, the organisation of its design, installation and maintenance can be complex. As it concerns money and liability it is often a contentious issue, but nonetheless one that needs to be addressed. This document takes each step in turn and describes what good practice i
APA, Harvard, Vancouver, ISO, and other styles
5

Haddock, John E., Reyhaneh Rahbar-Rastegar, M. Reza Pouranian, Miguel Montoya, and Harsh Patel. Implementing the Superpave 5 Asphalt Mixture Design Method in Indiana. Purdue University, 2020. http://dx.doi.org/10.5703/1288284317127.

Full text
Abstract:
Recent research developments have indicated that asphalt mixture durability and pavement life can be increased by modifying the Superpave asphalt mixture design method to achieve an in-place density of 95%, approximately 2% higher than the density requirements of conventionally designed Superpave mixtures. Doing so requires increasing the design air voids content to 5% and making changes to the mixture aggregate gradation so that effective binder content is not lowered. After successful laboratory testing of this modified mixture design method, known as Superpave 5, two controlled field trials
APA, Harvard, Vancouver, ISO, and other styles
6

Chambers. PR-348-09602-R01 Determine New Design and Construction Techniques for Transportation of Ethanol. Pipeline Research Council International, Inc. (PRCI), 2013. http://dx.doi.org/10.55274/r0010546.

Full text
Abstract:
This report summarizes results of the research study titled, �Determine New Design and Construction Techniques for Transportation of Ethanol and Ethanol/Gasoline Blends in New Pipelines� (WP #394 / DTPH56-09-T-000003). It was prepared for the United States Department of Transportation, Pipeline and Hazardous Materials Safety Administration, Office of Pipeline Safety. The technical tasks in this study included activities to characterize the impact of selected metallurgical processing and fabrication variables on ethanol stress corrosion cracking (ethanol SCC) of new pipeline steels, develop a b
APA, Harvard, Vancouver, ISO, and other styles
7

Monreal, Michael. A Comparison of Current Naval Facilities Engineering Command Field Office Staffing Methods, State Staffing Methods and the Construction Industry Institutes Owner Contractor Work Structure. Defense Technical Information Center, 2001. http://dx.doi.org/10.21236/ada390413.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Kim, Hyeyoung, Jihyun Lee, and Gerardo Reyes-Tagle. Standardized PPP Contract in Korea and its Implications for Latin America and the Caribbean. Inter-American Development Bank, 2021. http://dx.doi.org/10.18235/0003708.

Full text
Abstract:
The standardization of PPP contracts in Korea has played a key role in establishing PPP institutional frameworks in the civil law system in which there must be legal and institutional safeguards for the long-term PPP contracts. The reliability of standardized contracts is secured due to the fact that the standardized PPP contract has been prepared by the statutory PPP agency under the approval of the Ministry of Economy and Finance, an influential ministry within the government. The standardization of PPP contracts has been of great utility for both the competent authorities and private partne
APA, Harvard, Vancouver, ISO, and other styles
9

Thornton, Michael D. Construction Contract Durations. Defense Technical Information Center, 1988. http://dx.doi.org/10.21236/ada196586.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Santhya, K. G., A. J. Francis Zavier, Snigdha Banerjee, and Shilpi Rampal. Ethical recruitment and employment in the construction industry in India: Perspectives and experiences of workers and micro-contractors. Population Council, 2022. http://dx.doi.org/10.31899/sbsr2022.1037.

Full text
Abstract:
In India, the construction industry is the second-largest employer, with 51 million workers currently employed. Contracting and subcontracting has contributed to the rise of intermediary labor contractors, who provide migrants with information about labor markets and bring them to construction sites for work. Engagement in physically demanding low-skill jobs, low wages, harsh working conditions, and often deplorable living arrangements characterize the lives of many migrant construction workers. The Population Council, in partnership with the Global Fund to End Modern Slavery and the Norwegian
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!