To see the other types of publications on this topic, follow the link: Construction Contractor.

Dissertations / Theses on the topic 'Construction Contractor'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 dissertations / theses for your research on the topic 'Construction Contractor.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Pun, I. Chung. "Feasibility study of contractor registration system and contractor grading system in Macau." Thesis, University of Macau, 2012. http://umaclib3.umac.mo/record=b2586271.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Palaneeswaran, Ekambaram. "Contractor selection systems for design-build projects." Thesis, Hong Kong : University of Hong Kong, 2000. http://sunzi.lib.hku.hk/hkuto/record.jsp?B22582150.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Lindblom, Daniel, and Jonathan Isaksson. "Construction Management or Contractor : A client´s choice." Thesis, KTH, Fastigheter och byggande, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-101148.

Full text
Abstract:
Clients within the construction industry have become more aware of benefits that exist and can be reached when going through a major construction project, benefits that invite for efficiency improvements both during construction and its prophases. New methods of execution and their different advantages are evaluated. This change has opened the door for new business models such as Construction Management (CM) but it also demands the contractors to adapt and come up with more client-customized methods. The thesis goes further into the question of when to use which execution method and describes
APA, Harvard, Vancouver, ISO, and other styles
4

Johnson, Conrad C. "Significant Trade Contractor Performance Characteristics as Evaluated by Big-D Construction." Diss., CLICK HERE for online access, 2007. http://contentdm.lib.byu.edu/ETD/image/etd1764.pdf.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Fenn, James Ellis. "The Purposes and Evaluation Methods for State Residential General Contractor Licensing." Diss., CLICK HERE for online access, 2005. http://contentdm.lib.byu.edu/ETD/image/etd708.pdf.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Shum, Chun-pang. "The influence of organizational culture of main contractor to organizational culture of sub-contractor in the construction industry in Hong Kong." Click to view the E-thesis via HKU Scholars Hub, 2004. http://lookup.lib.hku.hk/lookup/bib/B37933140.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Mitra, John Paul, Joseph Shrestha, Jeremy Ross, and Jinseok Hong. "Analysis of Construction Cost Variation of Construction Manager General Contractor (CM/GC) Project." Digital Commons @ East Tennessee State University, 2019. https://dc.etsu.edu/etsu-works/5472.

Full text
Abstract:
Cost overrun is prevalent in the construction industry. Usually, an owner sets a budget at the preliminary phase of a project which changes over time. Past studies are focused on analyzing the cost growth of design-bid-build projects during construction. Limited efforts have been made to analyze details of projects delivered with the Construction Manager General Contractor (CM/GC) method. This study tracks and analyzes the construction cost variation of a project from the conceptual phase to the design completion phase. The analysis is presented with a case study of a new stadium construction
APA, Harvard, Vancouver, ISO, and other styles
8

Rogers, Maile Anne. "Contractor Variability in Construction of Cement Treated Base Layers." Diss., CLICK HERE for online access, 2006. http://contentdm.lib.byu.edu/ETD/image/etd1474.pdf.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Masrom, Md Asrul Nasid. "Developing a predictive contractor satisfaction model (CoSMo) for construction projects." Thesis, Queensland University of Technology, 2012. https://eprints.qut.edu.au/54737/1/Masrom_Md_Thesis.pdf.

Full text
Abstract:
Over the last few decades, construction project performance has been evaluated due to the increase of delays, cost overruns and quality failures. Growing numbers of disputes, inharmonious working environments, conflict, blame cultures, and mismatches of objectives among project teams have been found to be contributory factors to poor project performance. Performance measurement (PM) approaches have been developed to overcome these issues, however, the comprehensiveness of PM as an overall approach is still criticised in terms of the iron triangle; namely time, cost, and quality. PM has primari
APA, Harvard, Vancouver, ISO, and other styles
10

Seaman, R. Anthony (Richard Anthony) 1970. "Multi-organizational project teams and construction innovation : the role of general contractor and construction manager." Thesis, Massachusetts Institute of Technology, 2000. http://hdl.handle.net/1721.1/9013.

Full text
Abstract:
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 2000.<br>Includes bibliographical references (p. 87-89).<br>With the advent of major advances in current information technology, many business leaders and academicians hail the arrival of a new decentralized economy based on globally networked teams. This dispersed "market-oriented" structure is a new reality for many current industrial organizations who must transform from fully-integrated, centralized organizations into loose networks of suppliers and sellers utilizing just-in-time collaborati
APA, Harvard, Vancouver, ISO, and other styles
11

Larcher, Paul A. "A model for a contractor support agency." Thesis, Loughborough University, 2000. https://dspace.lboro.ac.uk/2134/7533.

Full text
Abstract:
This thesis is concerned with the development of small scale contractors in developing countries. The global trend towards privatisation has led to an increasing interest in the use of the private sector for the construction of buildings and infrastructure. In developing countries large projects are typically undertaken by large foreign contractors however, there are few small scale contractors to undertake small construction projects or maintenance work. The first stage of the study investigated three issues pertinent to the small scale contracting sector: 1. The problems experienced by small
APA, Harvard, Vancouver, ISO, and other styles
12

Stevenson, Colin. "An evaluation of the available methods of selecting a contractor, in order to satisfy the client's objectives, with a view to offering a systematic approach to which method should be adopted." Bachelor's thesis, University of Cape Town, 1986. http://hdl.handle.net/11427/28247.

Full text
Abstract:
Although the client's objectives of balancing cost, time and performance have not changed, the complexity of the design and construction of modern buildings today requires a thorough understanding of the factors affecting these objectives if they are to be accomplished. This study therefore begins by analysing the client's objectives to establish the factors affecting each objective and to determine the inter-relationship and possible conflict between these factors. The principal types of contracts and methods of selecting a contractor are then identified. The methods of selecting a contractor
APA, Harvard, Vancouver, ISO, and other styles
13

Al-Mansouri, O. "The relationship between the designer and contractor in Saudi Arabia." Thesis, University of Reading, 1988. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.381916.

Full text
APA, Harvard, Vancouver, ISO, and other styles
14

Tam, C. M. "Discriminant analysis model for predicting contractor performance in Hong Kong." Thesis, Loughborough University, 1992. https://dspace.lboro.ac.uk/2134/6842.

Full text
Abstract:
This thesis describes the development of an operational research model for the identification of determinating variables and prediction of contractor performance in Hong Kong. The mathematical technique used is the Discriminant Analysis approach. The model is also verified with two other analyses Multiple Regression Analysis and Unidimensional Scaling Analysis. One of the aims of the research is to betray the underlying factors that influence contractor performance which are measured in the clients' point of view. The second aim is to develop an accurate model for predicting contractor perform
APA, Harvard, Vancouver, ISO, and other styles
15

Hagan, George Nicholas. "Managing complex construction projects in it multiproject environment by the contractor." Thesis, University of Leeds, 2013. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.634205.

Full text
Abstract:
Complexity has been identified, in both literature and practice, as a critical project characteristic that needs to be managed to improve project delivery. Many authors have argued that complexity accounts for some of the delays and cost overruns experienced on projects. Within the construction industry, there has been a shift from procuring many, but smaller projects by clients, to few but large contracts, in response to the demand for more integration and one-stop responsibility. The characteristics of such projects have been found to be interdependent, non-linear, dynamic and uncertain. Pro
APA, Harvard, Vancouver, ISO, and other styles
16

Abu-Shabeen, Nadine Nabeel. "Development of multi-criteria decision analysis models for bidding and contractor selection." Thesis, Edinburgh Napier University, 2008. http://researchrepository.napier.ac.uk/Output/3746.

Full text
Abstract:
Estimating and bidding a job is one of those essential processes at the heart of a contractor's business. Risk and uncertainty are major considerations in bidding decisions for construction projects. Numerous factors need to be taken into account when making bidding decisions which make them multi-criteria decisions. The present study focuses on developing multi-criteria decision making models to assist in bidding decisions. The Analytical Hierarchy Process (AHP), which is a multi-criteria decision making tool, is used to quantify risk encountered in bidding decisions. The AHP has been employe
APA, Harvard, Vancouver, ISO, and other styles
17

Elsayah, Othoman S. "A framework for improvement of contractor selection procedures on major construction project in Libya." Thesis, Edinburgh Napier University, 2016. http://researchrepository.napier.ac.uk/Output/453191.

Full text
Abstract:
The construction sector constitutes one of the most important sectors in the economy of any country. Contractor selection is a critical decision that is undertaken by client organisations and is central to the success of any construction project. For major construction projects, final contractor selection often follows the contractor selection stage. Contractor selection is a process which involves investigating, screening and determining whether candidate contractors have the technical and financial capability to be accepted to formally tender for construction work. The process should be cond
APA, Harvard, Vancouver, ISO, and other styles
18

Day, Tiffany M. "Contractor selection process and safety guidelines for Hutchinson Technology Incorporated in Eau Claire, WI." Online version, 1999. http://www.uwstout.edu/lib/thesis/1999/1999dayt.pdf.

Full text
APA, Harvard, Vancouver, ISO, and other styles
19

Owens, Rebecca M. "The Performance of Risk Management and Innovation in Construction Manager/General Contractor Delivery in Civil Construction Applications." BYU ScholarsArchive, 2013. https://scholarsarchive.byu.edu/etd/3883.

Full text
Abstract:
Project teams that deliver high risk, complex projects in the civil construction industry need tools to enable successful delivery. Construction Manager/General Contractor (CM/GC) is an innovative alternate delivery method, providing one such a tool. CM/GC furnishes public agencies with an attractive option for delivering projects in a less adversarial and more constructive manner by involving the contractor during design. The sophisticated public owner does not have to relinquish control of the details of the design in order to accelerate the schedule or see the benefits of real-time cost est
APA, Harvard, Vancouver, ISO, and other styles
20

Nesan, Lenin Jawahar. "A generic model for effective implementation of empowerment in construction contractor organisations." Thesis, University of Wolverhampton, 1997. http://hdl.handle.net/2436/89117.

Full text
APA, Harvard, Vancouver, ISO, and other styles
21

Bill, Cecilia, and Hanna Widéen. "Implementation of construction innovation : A study of a large Swedish contractor firm." Thesis, KTH, Fastigheter och byggande, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-264392.

Full text
Abstract:
In the increasingly competitive market, innovation has become important if not crucial for entrepreneurial survival. The construction industry, although argued to be a bit behind, is catching on. As the ambition to become more innovative rapidly increase, several challenges must be managed within the building sector and one of them is the implementation of innovations. The aim of this study is therefore to investigate the implementation process of innovation in a construction organisation’s projects. More specifically, to increase the understanding of the important aspects, which could result
APA, Harvard, Vancouver, ISO, and other styles
22

Hong, Xiao. "A comparative study of contractor performance based on Japanese, UK and US construction practice." Thesis, University of Wolverhampton, 2002. http://hdl.handle.net/2436/88473.

Full text
APA, Harvard, Vancouver, ISO, and other styles
23

Al-Zahrani, Jaman Ibrahem. "The impact of contractors' attributes on construction project success." Thesis, University of Manchester, 2013. https://www.research.manchester.ac.uk/portal/en/theses/the-impact-of-contractors-attributes-on-construction-project-success(f68aea61-ab38-45d0-a976-7abb5d2a5546).html.

Full text
Abstract:
The construction industry is one of the most significant industrial contributors to the economy in terms of gross product and employment. As a result, the success of a construction project is a fundamental issue to most governments, users and communities. The thesis addresses the role of the contractor in construction project success as one of the main stakeholders in the project.The research aims to study the impact of contractors’ attributes on project success from a post-construction evaluation perspective to identify what goes right and to recognise the most critical success factors (CSFs)
APA, Harvard, Vancouver, ISO, and other styles
24

Dissanayake, D. M. Nayana S. "Fuzzy multi-attribute analysis (FMAA) model for Engineering-Procurement-Construction (EPC) contractor selection." Thesis, Queensland University of Technology, 2017. https://eprints.qut.edu.au/112812/2/D.%20M.%20Nayana%20Dissanayake%20Thesis.pdf.

Full text
Abstract:
This research develops a Fuzzy Multi-Attribute Analysis (FMAA) model to select the most appropriate contractors for Engineering-Procurement-Construction (EPC) projects. It will enable EPC project owners to eliminate the over-reliance on subjective contractor selection and risks associated with incomplete information, imprecise data and vagueness in human decision making. With the combination of fuzzy set theory and multi-attribute analysis, this model addresses the fuzzy nature in human decision making and helps EPC clients achieve the best value of the contract.
APA, Harvard, Vancouver, ISO, and other styles
25

Olofsson, Viktor. "Avfall i byggsektorn : Contractor Bygg i Skellefteå AB förberedelse samt implementering av den nya Avfallsförordningen (2020:614)." Thesis, Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-82660.

Full text
APA, Harvard, Vancouver, ISO, and other styles
26

Hinton, Mark Anthony. "Convenient immorality: a substantive theory of competitive procurement in the New Zealand construction industry." Thesis, University of Canterbury. Management, 2013. http://hdl.handle.net/10092/8714.

Full text
Abstract:
Fragmented and adversarial are words used routinely to describe firstly the structure of the construction industry, and secondly the inherent culture that continues to exist within it. Both are characteristics that ultimately serve to not only routinely constrain the efficiency, performance and resultant productivity of the New Zealand building sector, but moreover they persist to play a part in increasing related costs whilst diminishing the quality of the built environment surrounding us. The ubiquity of the outsource model goes some way towards mitigating much of the risk and financial encu
APA, Harvard, Vancouver, ISO, and other styles
27

Maholwana, Unathi. "Support for small enterprises in the construction sector : Coega development corporation contractor development programme." Thesis, Stellenbosch : Stellenbosch University, 2015. http://hdl.handle.net/10019.1/97336.

Full text
Abstract:
Thesis (MBA)--Stellenbosch University, 2015.<br>ENGLISH ABSTRACT: South Africa’s construction industry plays a key role in the development of the economy, not least through creating jobs and wealth. However, currently the distribution of economic benefits being enjoyed by construction companies is highly skewed, with a very small number of large firms being awarded a big stake of public-sector tender awards. It is against this background that government departments and institutions, including the Coega Development Corporation, have developed and implemented SMME-development programmes. T
APA, Harvard, Vancouver, ISO, and other styles
28

Al-Basir, Ziad. "To bid or not to bid: A framework for contractor decision making." Thesis, Queensland University of Technology, 2015. https://eprints.qut.edu.au/82801/4/Ziad_Albasir_Thesis.pdf.

Full text
Abstract:
This thesis is a framework to formalise contractors process for bidding decision making through categorising the factors effecting the decision to bid into five categories. It opens the door to introduce a strategic planning system for pre-contract and business development activities which cost the contractors up to 5% of the project cost which is considered as high risk investment and would have impact on submitted bid price and the project delivery quality.
APA, Harvard, Vancouver, ISO, and other styles
29

Davies, Philip J. "Assessing initial embodied energy in UK non-domestic construction projects." Thesis, Loughborough University, 2015. https://dspace.lboro.ac.uk/2134/20341.

Full text
Abstract:
There is an increasing need to reduce energy consumption to tackle the adverse effects of climate change. The UK government has established numerous directives and policies to encourage carbon dioxide (CO2) emission and energy reduction within the non-domestic sector. However these measures are primarily focused towards reducing operational energy (i.e. energy used during building occupier activity), largely overlooking initial embodied energy. The trend towards reduced operational energy consumption due to energy efficient design is leading initial embodied energy to become a more significant
APA, Harvard, Vancouver, ISO, and other styles
30

Mbeki, Sisa. "Causes, effects and impact of shortages of skilled artisans on contractor productivity." Thesis, Cape Peninsula University of Technology, 2014. http://hdl.handle.net/20.500.11838/1062.

Full text
Abstract:
A dissertation submitted to the Department of Construction Management and Quantity Surveying, Faculty of Engineering at the Cape Peninsula University of Technology in fulfilment of the requirements for the degree of Master of Technology Construction Management<br>This study investigated the causes and impact of the effects of shortages of skilled artisans on contractor productivity. The objectives of the study were as follows: (i) to identify causes of shortages of skills during the construction production phases; (ii) to define the effects of shortages of skills during the production phase
APA, Harvard, Vancouver, ISO, and other styles
31

Welsh, Matthew J. "Comparison of Union and Non-Union Bids on Ohio School Facilities Commission Construction Projects." Bowling Green State University / OhioLINK, 2009. http://rave.ohiolink.edu/etdc/view?acc_num=bgsu1231207723.

Full text
APA, Harvard, Vancouver, ISO, and other styles
32

Saleh, de la Garza Samara Yassim. "Green building construction practices : review of environmental management from the contractor perspective in the Canadian industry." Thesis, University of British Columbia, 2017. http://hdl.handle.net/2429/64164.

Full text
Abstract:
Green building is a practice applied to the whole life cycle of a building, which means its environmental performance is not only defined by design, but also by the management processes in the construction, operation, and maintenance of a building. Over the past 10 years, research in green buildings has been increasing, mostly focusing on the design and energy efficiency. Contractors now represent a critical role in sustainability, but they have received less support and attention than the design community. This thesis aims to conduct research in environmental sustainability by focusing on thr
APA, Harvard, Vancouver, ISO, and other styles
33

Bani, Hashemi Chaharom Seyed Yaser. "The choice and effects of governance mechanisms for regulating client-contractor relationships in large construction projects." Thesis, The University of Sydney, 2014. http://hdl.handle.net/2123/12879.

Full text
Abstract:
A questionnaire survey was conducted in Iran and Australia to study the choice and effects of governance mechanisms in regulating client-contractor relationships in two culturally and legally diverse environments. Data collected from 73 Iranian and 38 Australian client-contractor partnerships were then analyzed using the Partial Least Squares Structural Equation Modeling (PLS-SEM) method. The contributions of this thesis are threefold; first, it contributes to social capital theory and social exchange theory by revealing that social capital and collaboration play different roles in regulating
APA, Harvard, Vancouver, ISO, and other styles
34

Attah, Aloysius. "The Relationship Between Information Quality and Construction Safety." ScholarWorks, 2019. https://scholarworks.waldenu.edu/dissertations/6713.

Full text
Abstract:
Fatal occupational injury is a construction and management problem in the United States. Fatality rates among specialty trade contractors made up the largest percent of fatalities in construction at 62% per year. The purpose of this nonexperimental study was to examine the relationship between the quality of information in construction safety plans and construction safety among specialty trade contractors. The theoretical foundations for the study were Petersen'€™s accident/incident theory and work systems theory. The key research question was to examine the relationship between information qu
APA, Harvard, Vancouver, ISO, and other styles
35

Mzyece, Dingayo. "An investigation into the implementation of the construction (design and management) regulations in the construction industry." Thesis, University of Wolverhampton, 2015. http://hdl.handle.net/2436/558782.

Full text
Abstract:
The European Union (EU), in 1992, issued the Temporary or Mobile Construction Sites (TMCS) Directive, which requires EU members to introduce specific law to improve health and safety (H&S) performance outcomes by placing specific duties on key stakeholders. This Directive led to the introduction of the first Construction (Design and Management) (CDM) Regulations in the UK construction industry on 31 March 1995 and since their introduction, the overall performance of construction H&S has improved gradually. However, despite this positive outlook, there are still significant concerns surrounding
APA, Harvard, Vancouver, ISO, and other styles
36

Abubakar, Shehu Yabo. "Investigation of factors affecting rural road maintenance : the case of Sokoto State, Nigeria." Thesis, Loughborough University, 1998. https://dspace.lboro.ac.uk/2134/11704.

Full text
Abstract:
The study relates to road management in Nigeria, on one (land locked) state out of the 36 that comprise the country. The state (Sokoto) has a population of over four million people, and the acute shortage of road connections to the majority of its rural inhabitants necessitated the research. The practice of road management in Sokoto is broadly representative of other Nigerian States. Sokoto like all the northern states, is distant from the coast, and its main asset is an abundant supply of cheap labour. Roads provide the principal mode of access, and are a key factor to trade, industry and soc
APA, Harvard, Vancouver, ISO, and other styles
37

Gottmarsson, Jessica, and Sandra Valdani. "Opportunities and Challenges for a Contractor in a Change Towards a Circular Economy." Thesis, KTH, Fastigheter och byggande, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-297952.

Full text
Abstract:
Few have missed out on the fact that the world's carbon dioxide emissions need to be reduced, and the need to switch to a circular economy in order to save earth’s resources is increasingly discussed. In Sweden, the construction sector accounts for more than a third of all generated waste and almost a quarter of all hazardous waste. Therefore, it is necessary to prepare for a transition to a circular economy in the construction industry, where reuse and recycling of materials as well as waste management are highly prioritized issues. As the contractor is a crucial actor in achieving circular e
APA, Harvard, Vancouver, ISO, and other styles
38

Proverbs, David G. "A best practice for high-rise insitu concrete construction based on French, German and UK contractor performance measures." Thesis, University of Wolverhampton, 1998. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.264371.

Full text
Abstract:
This thesis addresses construction contractor performance for high-rise insitu concrete building forms. The principal aim of the research was to evaluate and compare the performance of contractors in three European countries; and from such evaluation develop best practice model(s) to engender improved construction contractor production performance. Initial investigations confirmed that in the evaluation of contractor performance, the common approach is to measure the extent to which the three 'superlative' client objectives (time, cost and quality) are satisfied. Due to the lack of a clear uni
APA, Harvard, Vancouver, ISO, and other styles
39

Eke, Gerald. "Determining the probability distributions of cost and time overrun arising from different contractor selection strategies in construction projects." Thesis, Aston University, 2017. http://publications.aston.ac.uk/33316/.

Full text
Abstract:
Failing to adequately select the winning contractor can lead to problems in the project delivery phase such as bad quality and project delay; which ultimately results in cost overruns. There are two strategies involved with selecting contractors: one is the lowest tender, the other is called best value. Selecting the lowest tender is straightforward; the latter strategy would involve scoring the contractors' tenders on price and quality and ranking them. The aim of this research is to provide a model of determining the probability distributions of cost and time arising from choosing different
APA, Harvard, Vancouver, ISO, and other styles
40

Cheong, Chit Sun. "Contractors business development for overseas markets." Thesis, Loughborough University, 2010. https://dspace.lboro.ac.uk/2134/7142.

Full text
Abstract:
The survival and sustainable development of construction contractors depends on their own capacity as well as their ability to cope with the ever changing environment. Hong Kong was once a large construction market by the world standards; but in the period 1998 to 2007 has suffered from long term market shrinkage. This shrinkage in the work load available in the market has demanded that Hong Kong contractors change their business strategy and consider expanding their construction business to the international marketplace. From surveys and studies of Hong Kong contractors, it is noted that trad
APA, Harvard, Vancouver, ISO, and other styles
41

Patterson, Donald A. "An Investigation of Project Delivery Methods Relating to Repetitive Commercial Construction." BYU ScholarsArchive, 2014. https://scholarsarchive.byu.edu/etd/4218.

Full text
Abstract:
The Design/Bid/Build (DBB) delivery method has historically been the most popular and the most effective means of determining the least cost for building a project based upon a set of construction documents. In recent years, however, other project delivery methods, including but limited to Construction Manager/General Contractor (CM/GC) and Design/Build (DB), have slowly taken a share of the construction market away from the DBB delivery method. The choice of delivery method that will produce the best value for an owner in the measurements of efficiency in quality, cost, and timeliness depends
APA, Harvard, Vancouver, ISO, and other styles
42

Baroudi, Bassam. "A systems approach to contractor prequalification." 2008. http://arrow.unisa.edu.au/vital/access/manager/Repository/unisa:36671.

Full text
Abstract:
Contractor prequalification systems have been the cause for much debate within government, industry and research circles. Their development has essentially been driven by client based organisations wishing to reduce risk when procuring construction contractors. As such, the topic in the past has been primarily viewed in terms of the appropriate selection of contractors for construction projects. Hence, the focus would appear to have been more on the functional aspects of prequalification systems. The research within this thesis sets out to investigate contractor prequalification systems in the
APA, Harvard, Vancouver, ISO, and other styles
43

Tsai, Lung-Ken, and 蔡榮根. "Predicting Construction Contractor Default with Market-based Credit Models - in Cases of North American Construction Contractors and Taiwan Construction Industry." Thesis, 2011. http://ndltd.ncl.edu.tw/handle/76512675340484743083.

Full text
Abstract:
博士<br>國立臺灣大學<br>土木工程學研究所<br>99<br>The prediction of construction contractor default has always been an important issue for construction owners and other stakeholders. Previous construction contractor default prediction models incorporated managerial or economic variables into traditional accounting-based models to enhance predicting power. However managerial variables are qualitative and depend on human judgment, while accounting numbers are subject to manipulation by management. Furthermore, both economic variables and accounting ratios are only available periodically and may not provide nece
APA, Harvard, Vancouver, ISO, and other styles
44

Wu, Jo-Ping, and 吳若萍. "Delayed Completion in Public Construction Contract with No Imputation to the Contractor." Thesis, 2008. http://ndltd.ncl.edu.tw/handle/34528067740089990809.

Full text
Abstract:
碩士<br>國立臺灣大學<br>法律學研究所<br>96<br>Due to the uncertainty, unpredictable factors during the performance of the construction, delay in completion are one of the most common types of construction disputes; however, the legal principles relating to delay claims have not been well developed yet. Among all the disputes, the situation to which the contractor is not imputed is the most controversial. This thesis, accordingly, focuses on such cases. As for the research method, except the analysis based on the domestic legel cases and the opinions of the scholars, this thesis also attempts to conduc
APA, Harvard, Vancouver, ISO, and other styles
45

Ya-Chi, Chen, and 陳雅琪. "Research on Contractor Prequalification System for Public Construction." Thesis, 1998. http://ndltd.ncl.edu.tw/handle/53565808851181511188.

Full text
Abstract:
碩士<br>國立臺灣科技大學<br>營建工程技術學系<br>86<br>In this study, the current practice of contractor prequalification and the major problems during the prequalification process are examined through comprehensive literature review and physical investigation. Both of prequalification and postqualification system of some typical internationalorganization such as the Guidelines Procurement developed by the World Bank,as well as the Agreement on Government Procurement of the World TradeOrganization are investigated. Results are then compared with those obtainedfrom some other developed countries including the Uni
APA, Harvard, Vancouver, ISO, and other styles
46

CHING, YEH HSIAO, and 葉曉青. "The ways to assure a sub-contractor to receive payment from the construction contract." Thesis, 2007. http://ndltd.ncl.edu.tw/handle/93705879925200142392.

Full text
Abstract:
碩士<br>國立臺北大學<br>法律專業研究所<br>95<br>When a construction job is contracted, contractors usually transfer some parts of the work to sub-contractors. So sub-contract work is a common practice in the construction business. It is expected that contractors pay sub-contractors based on a predetermined agreement. But in reality, contractors sometimes default on payments to the sub-contractors even if the contractors are paid by the owner of the construction job. Other times, the contractor is unable to pay sub-contractors due to bad management, financial planning, or other unforeseeable circumstances
APA, Harvard, Vancouver, ISO, and other styles
47

"Contract Administration Functions and Tools for Design-Build and Construction Manager/General Contractor Project Delivery in U.S. Highway Construction." Doctoral diss., 2019. http://hdl.handle.net/2286/R.I.53505.

Full text
Abstract:
abstract: The demand for new highway infrastructure, the need to repair aging infrastructure, and the drive to optimize public expenditures on infrastructure have led transportation agencies toward alternative contracting methods (ACMs) such as design-build (DB) and construction manager/general contractor (CM/GC). U.S. transportation agencies have substantial experience with traditional design-bid-build delivery. To promote ACMs, the Federal Highway Administration and the National Cooperative Highway Research Program (NCRHP) have published ACM guidance documents. However, the published materi
APA, Harvard, Vancouver, ISO, and other styles
48

Deep, Shumank. "Influence of ‘power’ and ‘dependence’ attributes on main contractor and sub-contractor collaboration in construction projects." Thesis, 2021. http://hdl.handle.net/1959.13/1426753.

Full text
Abstract:
Research Doctorate - Doctor of Philosophy (PhD)<br>Collaboration among construction project participants, specifically between the main contractor and sub-contractor, is essential for efficient project delivery. A review of the literature suggests that collaboration among project participants in construction projects is influenced by both relational aspects (e.g. trust, commitment, and reliability) and transactional aspects (e.g. contractual approach or procurement design). The transactional aspects are characterised by the contractual approach and procurement design that bind the project part
APA, Harvard, Vancouver, ISO, and other styles
49

JEN, CHIANG YU, and 江友仁. "OVERVIEW OF THE “CONSTRUCTION PROCESS EVALUATING SYSTEM OF CONTRACTOR”." Thesis, 2000. http://ndltd.ncl.edu.tw/handle/07927225349425349492.

Full text
Abstract:
碩士<br>中華大學<br>土木工程學系碩士班<br>88<br>ABSTRACT Since 1993, Water Conservancy Agency had been to carry out the “Construction Process Evaluating System of Contractor”. Recently, the factors that affect this system were changed so much, including the construction environment, the revising decrees and rules etc. So this system became hard to proceed nowadays. In this study, we interviewed many specialists and engineers about this system, and we got many useful opinions from them. We analyzed and combined these ideas, then proposed the optimum plan to improve this system
APA, Harvard, Vancouver, ISO, and other styles
50

Iselin, Steven Richard. "The construction contractor performance evaluation as a control mechanism." Thesis, 1986. http://hdl.handle.net/10945/21736.

Full text
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!