Dissertations / Theses on the topic 'Construction manager'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the top 50 dissertations / theses for your research on the topic 'Construction manager.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.
Alho, Yasser, and Eillas Rostam Usef. "Learning time for graduated project manager." Thesis, Linköpings universitet, Kommunikations- och transportsystem, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-131974.
Full textMlčoch, Ondřej. "Formy a metody motivace manažera ve stavebnictví." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-227051.
Full textMitra, John Paul, Joseph Shrestha, Jeremy Ross, and Jinseok Hong. "Analysis of Construction Cost Variation of Construction Manager General Contractor (CM/GC) Project." Digital Commons @ East Tennessee State University, 2019. https://dc.etsu.edu/etsu-works/5472.
Full textCook, Paul Stephen. "Operation and Funding of the Regional Wartime Construction Manager." Thesis, Monterey, California: Naval Postgraduate School, 1990. http://hdl.handle.net/10945/43857.
Full textThis thesis prepares a training exercise scenario for the Navy's Regional Wartime Construction Manager - Mediterranean (RWCM). The RWCM is a reserve organization which has the responsibility for wartime or contingency construction management. To aid in the training exercise cf the management of resources, a Resource Cost Model is developed. First, a context for the use of the model is provided by examining the two funds used in contingency construction; Operations and Maintenance (0 & M) and Military Construction (MILCON). Next, the policies of Titles 10 and 41 of the U.S. Code, which permit the use of unobligated MILCON funds and deficiency spending, are discussed. Finally, the direct labor and overhead costs of the RWCM1 staff, the deputy, and the area managers are estimated. The total cost is estimated to range from $12.5 to $15.2 million per year.
Ayessaki, Winn-Yam Houdou. "Construction project manager health and safety interventions towards improving workers' performance." Thesis, Nelson Mandela Metropolitan University, 2016. http://hdl.handle.net/10948/12275.
Full textCrespo, Luis Gaspar. "Project Manager Strategies to Improve the Delivery of Construction Projects." ScholarWorks, 2018. https://scholarworks.waldenu.edu/dissertations/6194.
Full textSeaman, R. Anthony (Richard Anthony) 1970. "Multi-organizational project teams and construction innovation : the role of general contractor and construction manager." Thesis, Massachusetts Institute of Technology, 2000. http://hdl.handle.net/1721.1/9013.
Full textIncludes bibliographical references (p. 87-89).
With the advent of major advances in current information technology, many business leaders and academicians hail the arrival of a new decentralized economy based on globally networked teams. This dispersed "market-oriented" structure is a new reality for many current industrial organizations who must transform from fully-integrated, centralized organizations into loose networks of suppliers and sellers utilizing just-in-time collaboration to develop and manufacture new products and services world-wide. Recent trends in manufacturing, where companies are now pursuing ventures outside their own organizations, highlight the need for empirical studies on the nature of the collaborative innovative processes within multi-organizational project teams. In construction, temporary organizations of allied firms join together for the express purpose of completing large, complex projects. An analysis of the construction industry provides a unique opportunity to analyze the innovative nature of the multi organizational project team. A combination of organization, economic, and innovation theory is used to identify factors that enhance multi-organizational project team innovation. Various factors, including principal-agent relationships, cooperation mechanisms, learning mechanisms, and network utilization, are examined to determine their influence on multi-organizational project team innovation. Seven contracting companies are investigated in the performance of twenty-nine different construction projects. Project information is obtained from actual project team members. Fifty innovations are identified from the project sample and used for analysis. The innovations are measured by project in terms of their number and impact on the operations of the general contractor or construction manager. The analysis examines the correlation between various factors and the innovation activity found on each construction project. This research is a step towards understanding the nature of the multi-organizational project team and its capacity to innovate. Project leaders can use this information to better organize project teams for innovation while construction companies and other construction industry firms can use this information to evaluate their innovation strategy.
by R. Anthony Seaman.
S.M.
Ayache, Magali. "La construction de la relation managériale : le manager et son supérieur." Paris 10, 2013. http://www.theses.fr/2013PA100154.
Full textWhile academic literature focuses either on managers that are isolated from the hierarchy or on downward relationships, this doctoral research investigates the dynamics and the quality of the upward hierarchical relationship between a manager and his/her boss. A comprehensive research based on a qualitative and abductive double-loop methodology is conducted. We use two series of interviews with, respectively, twenty and twenty-six managers from various hierarchical levels and organizations. The first one examines autonomy and accountability issues. It leads us to propose a model of managerial relationship building on which second-stage interviews rely. We show that managers devote time and effort to building the relationship with their bosses. We identify a set of stages in which turning points mark the passage from one stage to another: (1) a seeding and learning stage during which the manager develops strategies aimed at reducing uncertainty about the superior’s expectations and way of functioning ; (2) the establishing of a “negative” (characterized by scarce interactions, low feedback and decreasing willingness of the manager to invest in the relationship) or “positive” trust (interactions are frequent and the relationship is emotionally-driven and self-sustaining) and (3) a potential decline stage
Owens, Rebecca M. "The Performance of Risk Management and Innovation in Construction Manager/General Contractor Delivery in Civil Construction Applications." BYU ScholarsArchive, 2013. https://scholarsarchive.byu.edu/etd/3883.
Full textFan, Yu-kit. "A study of the participation of property manager in project management." Click to view the E-thesis via HKUTO, 2003. http://sunzi.lib.hku.hk/hkuto/record/B31969331.
Full textJones, Chad B. "The Role of the Architect: Changes of the Past, Practices of the Present, and Indications of the Future." Diss., CLICK HERE for online access, 2006. http://contentdm.lib.byu.edu/ETD/image/etd1228.pdf.
Full textHorská, Lenka. "Požadavky na manažera ve stavebnictví." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240029.
Full textJirátková, Marie. "Time management v práci stavebního manažera." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-401472.
Full textDesmond, Martin, and Henrik Hansson. "The safety manager as a boundary spanner between communities of practice : The employment of a safety manager in a Swedish construction company." Thesis, KTH, Fastigheter och byggande, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-212069.
Full textArbetsmiljö och säkerhet är ett viktigt ämne inom byggbranschen. Många olika strategier och metoder för att förbättra arbetsmiljön finns också tillgängliga. Trots detta inträffar alltför många olycksfall. Denna studie undersöker strategin att anställa en safety manager i den svenska byggbranschen för att främja en bättre säkerhetskultur samt diskuterar hur en safety manager bör utöva sin profession. Ett kvalitativt abduktivt arbetssätt har tillämpats där intervjuer och observationer har växlats med litteraturstudier för att erhålla förståelse av ämnet. Studien är en multipel tvärsnittsfallstudie med semistrukturerade intervjuer samt en mindre enkätundersökning. Studien omfattar tre projekt i ett svenskt företag. Det teoretiska perspektivet utgår från, samt begränsas av koncepten human resource management (HRM), communities of practice och boundary spanning. Resultatet visar att safety managern kan fungera som en boundary role som länkar ihop olika osynkroniserade communities. Det identifieras att effektiv boundary spanning kan ske mellan HR-avdelningen och projektorganisationerna samt mellan produktionsledningen och yrkesarbetarna inom projektorganisationerna. Safety managern blir en double-sided boundary spanner som knowledge broker samt en support för anställda för att främja en god säkerhetskultur. Resultatet visar samtidigt att det råder oklarheter kring rollen och att bland annat ansvarsområden behöver förtydligas för att nå full potential. Studien bidrar med insikter i hur safety manager-rollen uppfattas och hur den fungerar, samt hur den kan förbättras. Vidare bidrar studien med förståelse för hur rollen kan främja kunskapsöverföring avseende arbetsmiljö mellan communities där hög grad av tyst kunskap råder.
Kolomazníková, Alžběta. "Některá specifika komunikace ve stavebnictví." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227615.
Full textIqbal, Muhammad Naveed, and Sidra Rizvi. "Construction Development and Consequences of Job Satisfaction : Banking Sector of Pakistan." Thesis, Högskolan i Gävle, Avdelningen för ekonomi, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:hig:diva-11920.
Full textHjelmqvist, Viktor. "Consultant service procurement in the public sector – The competence requirements for construction-and design managing consult-ants." Thesis, KTH, Fastigheter och byggande, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-190713.
Full textEfterfrågan på konsulttjänster har ökat avsevärt sedan många företag börjat köpa in dessa tjänster istället för att anställa egen personal. Att utnyttja konsulttjänster anses vara en av de svåraste tjänster som går att upphandla, vilket ställer krav på bred kompetens hos beställaren för att lyckas handla upp konsulter med rätt kompetens som matchar med projektens kom-plexitet. I den här rapporten undersöks hur fem svenska offentliga beställare uttryckte sin kompetens-kravsättning över bygg-och projekteringsledare tio år tillbaka i tiden. Det undersöks vilken typ av kompetens de riktar mest fokus på, samt hur konsulternas påstådda kompetens följs upp av de offentliga beställarna. Sammanfattningsvis kommer jag att redogöra för vad de fem offentliga beställarna tror kommer att hända med deras kompetenskrav inom den närmsta framtiden. I bakgrundskapitlet tillhandahålls en inblick i hur offentlig upphandling fungerar, där även konsulttjänsteupphandling och konsultföretagens affärsmodeller ser ut. Till grund för detta används faktorer bakom förändringar i organisationer, tillit mellan beställare och entre-prenör, hållbarhet i byggbranschen och outsourcing. Rapporten är uppbyggd i två delar, där ena delen utgörs av en analys av de offentliga bestäl-larnas tidigare kompetenskrav för åren 2005, 2010 och 2015. Den andra delen består av inter-vjuer med representanter från varje enskild beställare, samma fem beställare (Svenska bostä-der, Stockholms stad, Locum, Trafikverket och SL) som den tidigare delen baseras på. Perso-nerna som intervjuats har alla lång erfarenhet av projektledning, både från privat såväl som offentlig sektor. Slutligen presenteras hur kompetenskraven har utvecklats med tiden, tillsammans med tänk-bara faktorer som förklarar troliga anledningar till dess utveckling. Rapporten presenterar också vilka kompetenskrav som de offentliga beställarna ses som viktigast, hur de sköter granskningen av projektkonsulterna och vad de offentliga beställarna förutspår kommer att hända med sina kompetenskrav inom den närmsta framtiden.
Martincová, Tereza. "Práce manažera a uplatňování rovných příležitostí ve stavebnictví." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-227048.
Full textDamström, Matilda. "Digitalization and construction project management : What consequences the use of ICT-tools has had on the project manager role in the construction industry." Thesis, KTH, Ledning och organisering i byggande och förvaltning, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-277051.
Full textDigitalisering är ett hett ämne i byggbranschen, med mer och mer ICT-verktyg som används. Webb-baserade projektplattformar, digitala möten och BIM har alla existerat ett tag nu, men utvecklingen av användandet och utforskningen av deras potential tar tid. ICT-verktyg är ofta avsedda för att effektivisera informationsflödet och kommunikationen, vilket relaterar till projektledaren i ett byggprojekt. Därför är ändamålet med det här examensarbetet att förstå hur digitala verktyg har påverkat byggprojektledarollen på beställarens sida, under de senaste 5 åren. Syftet är att få kunskap om vad för konsekvenser användningen av digitala verktyg så som BIM, digitala projektplattformar och digitala möten har medfört för en projektledare och hur de hanterar konsekvenserna. I det här examensarbetet har en kvalitativ studie gjorts där byggprojektledare intervjuades om deras erfarenheter av ICT-verktyg och de förändringar som har skett över tid. Resultaten analyserades med hjälp av ett teoretiskt ramverk och diskuterades tillsammans med tidigare forskning och kunskap. Det teoretiska ramverket inkluderar vissa nyckelaspekter av ledarskap inom projektledning och 4 huvudsakliga kategorier som beskriver hur aktörer använder ICT. Användningen av BIM var särskilt analyserad genom Bew-Richards model för BIM mognadsgrad. Studien visar att det har varit en ökning av användandet av ICT-verktyg i byggprojekt de senaste 5 åren, och att det är både fördelar och utmaningar för projektledaren med de tre typerna av digitala verktyg som var med i denna studie. BIM, digitala projektplattformar och digitala möten. De främsta fördelarna visade sig vara att verktygen ökar tidseffektiviteten i projektledarrollen och underlättar kommunikationen. Det blir dock mindre personlig kontakt med projektdeltagare och andra utmaningar med att få med projektdeltagare på samma användande av verktygen. För att öka betydelsen av fördelarna och minska de negativa konsekvenserna, borde projektledaren implementera en ledarskapsstil som är mer fokuserad på den mänskliga sidan, med mer uppföljningar, struktur och rutiner. Teknisk kunskap om ICT-verktygen är också fördelaktiga för projektledarna att ha eftersom det ökar möjligheten att vägleda medlemmarna i projektet in på rätt väg.
Santana, David. "Manager la culture de sûreté : construction, représentations et usages de la "culture de sûreté" dans l’industrie nucléaire." Thesis, Paris, Institut d'études politiques, 2017. http://www.theses.fr/2017IEPP0037.
Full textThis thesis examines the concept of safety culture, new 'mantra' of high risk organizations (Silbey, 2009). It appeared in the late 1980s in order to better reflect the organization in the management of nuclear safety, and it is now widely used in the discourse as in the managerial policies of high-risk industry companies. The ethnographic investigation, based on observations, interviews and document analysis, analyzes the social construction of the concept of safety culture, its representations, its uses and its influence on the organization of work in nuclear power plants. The thesis reveals safety culture as a hybrid object between a speech that would be broadcast in high-risk industries and a security management tool. It analyzes how the notion of safety culture has settled in different social spaces of the nuclear industry thanks to its interpretative flexibility: international experts on nuclear safety, “safety science” researchers, EDF’s central administration and team managers in nuclear power plants. The comparison of three nuclear power plants’ local orders shows that in a highly standardized and proceduralized universe, safety culture has essentially become a discursive tool. Managers seize it to act on the constraints laid upon them and power relations in which they act, so as to make their work more effective. Thus, the thesis puts forward the ability of speech to act concretely on the organization of work
Serhan, Ahmad, and Asen Draganov. "Project managers’ communication skills and stakeholder engagement in sustainable construction projects." Thesis, Malmö högskola, Fakulteten för kultur och samhälle (KS), 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:mau:diva-22559.
Full textPrince, Rudolph F. A. "The construction briefing process : evaluating the influence of personality traits on the performance of the consultant project manager." Thesis, Heriot-Watt University, 2011. http://hdl.handle.net/10399/2483.
Full textRibeiro, Júlio Nuno Rodrigues de Freitas. "A gestão de projetos na construção/indústria em Portugal : a direção de obra face à gestão de projeto." Master's thesis, Instituto Superior de Economia e Gestão, 2018. http://hdl.handle.net/10400.5/16545.
Full textPropósito: A direção de obra face à gestão de projeto na perspetiva dos diretores de obra, no sector da Construção/Indústria em Portugal. O aparecimento de um novo interveniente, o gestor de projeto, no sector da Construção e Indústria em Portugal tem sido no meio profissional assunto de discussão e análise. O que se questiona profissionalmente é a forma de como será feita a inserção do gestor de projeto com as suas funções, num palco onde historicamente já existem intervenientes que pelo menos parcialmente as exerciam. De entre estes intervenientes destaca-se o diretor de obra cujas funções de coordenação, pelo menos aparentemente, parecem coincidir com as do gestor de projeto. O propósito da presente dissertação é o de abordar esta aparente sobreposição de funções do ponto de vista do diretor de obra. Como objetivos a dissertação pretende aferir as áreas de sobreposição, equacionar as relações de liderança e caracterizar as competências técnicas que os intervenientes devem possuir. Os resultados obtidos, a partir de uma análise qualitativa a inquéritos feitos a um painel de diretores de obra, confirmou a sobreposição das áreas de atuação e o potencial aparecimento de um risco de conflito de lideranças entre os intervenientes em estudo.
Purpose: The project direction versus the project management under the project direction point of view, on the Construction / Industry sector in Portugal. The emergence of a new stakeholder, the project manager, in the Construction and Industry sector in Portugal has been in the professional environment a subject of discussion and analysis. What is questioned professionally is the way in which the insertion of the project manager will be done with his functions, in a stage where historically there has been stakeholders that at least partially exercised them. Among these stakeholders stands out the project director (construction manager) whose coordination functions, at least apparently, seem to coincide with those of the project manager. The purpose of this dissertation is to address this apparent overlapping of functions from the point of view of the project director. As objectives the dissertation intends to assess the areas of overlap, to equate the relations of leadership and to characterize the technical competences that both the stakeholders must possess. The results obtained from a qualitative analysis of surveys carried out on a panel of project directors, confirmed the overlapping of the areas and the potential emergence of a risk of leadership conflict among the studied stakeholders.
info:eu-repo/semantics/publishedVersion
Kirchev, Filip, and Malin Bartoschek. "Labor Productivity Influence in the Construction Industry : An interpretive approach to project success." Thesis, Jönköping University, Internationella Handelshögskolan, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-52715.
Full textSILVA, ANDERSON FERREIRA DA. "CONSTRUCTION PROCESS POLICY ON DRUGS AND SEASDH AS HIS MANAGER IN THE STATE OF RIO DE JANEIRO FROM 2007." PONTIFÍCIA UNIVERSIDADE CATÓLICA DO RIO DE JANEIRO, 2012. http://www.maxwell.vrac.puc-rio.br/Busca_etds.php?strSecao=resultado&nrSeq=21545@1.
Full textCONSELHO NACIONAL DE DESENVOLVIMENTO CIENTÍFICO E TECNOLÓGICO
O presente estudo tem como objetivo realizar uma análise genealógica do discurso oficial sobre drogas no Rio de Janeiro, a partir do realinhamento da Política Nacional Antidrogas parentese PNAD barra2002 parentese e da inserção do Conselho Estadual Antidrogas parenteseCEAD prentese na estrutura da Secretaria de Estado de Assistência Social e Direitos Humanos parentese SEASDH prentese. Tendo por base a teoria foucaultiana sobre poder barra saber, realizamos uma pesquisa documental no acervo do CEAD sob a ótica das seguintes análises: a construção do discurso sobre drogas e sua inserção em regimes de verdade; a formulação do discurso sobre drogas em território brasileiro e o processo de aproximação, no Rio de Janeiro, entre a SEASDH e o realinhamento da PNAD barra 2002. As conclusões apontam para a manutenção de diversos elementos do caráter antidrogas no discurso oficial brasileiro e para um descompasso entre a política nacional e a estadual, que passa por processo de adequação aos preceitos de Política Pública estabelecidos pela Constituição Federal de 1988.
The present study aims to conduct a genealogical analysis of official discourse on drugs in Rio de Janeiro, from the realignment of National Anti-Drug Policy PNAD/2002 and the insertion of the State Council Anti-Drug CEAD in the structure of the Secretariat of State Social Welfare and Human Rights SEASDH. Based on the Foucault´s theory - power / knowledge - conducted documentary research in the archives of CEAD with the following analytical perspectives: the construction of discourse about drugs and their inclusion in systems of truth; formulation of discourse about drugs in Brazil and in the process approach, in Rio de Janeiro, between SEASDH and realignment of PNAD/2002. The conclusions point to the maintenance of various elements of the official Brazilian anti-drug discourse and a mismatch between National and state politics, which undergoes a process of adaptation to the precepts of Public Policy established by the Constitution of 1988.
Prince, Michael William. "Strategic planning in construction firms : perceptions and personal characteristics of the manager, strategic planning behaviour, and subjective performance in a large scale survey of the Canadian construction industry." Thesis, University of Bradford, 1988. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.385648.
Full textPatterson, Donald A. "An Investigation of Project Delivery Methods Relating to Repetitive Commercial Construction." BYU ScholarsArchive, 2014. https://scholarsarchive.byu.edu/etd/4218.
Full textSweet, Coretta A. "Comparison of module usage of project management information system and success rate of construction projects." Thesis, Atlanta, Ga. : Georgia Institute of Technology, 2009. http://hdl.handle.net/1853/28204.
Full textCommittee Chair: Dr. Linda Thomas-Mobley; Committee Member: Dr. Daniel Castro; Committee Member: Prof. Kathy Roper; Committee Member: Ron L. Smith.
Sadik, Faqé Bala, and Alnajjar Sanar Elias. "Kommunikation och resurseffektivisering i byggprojekt ur ett byggprojektledarperspektiv." Thesis, KTH, Fastigheter och byggande, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-297854.
Full textConstruction projects are long, expensive, resource-intensive and involve a large number of people cooperating towards a common goal. Construction projects, like other types of projects that involve a larger number of people, depend on well-functioning communication, especially when a lot of money and time is at stake. Construction project managers spend the greater majority of their working time communicating and acting as the spider in the web to ensure that the right information is conveyed to the right individuals and that everyone involved knows what their tasks are during a project. The purpose was to investigate the project manager's role in, and perception of, communication within a construction project. We examined the construction project managers' perspectives on what the main communication problems are in construction projects and what solutions are available. A literature study on general communication also on communication in projects and construction projects was conducted. 15 construction project managers were interviewed in a series of semi-structured interviews. The choice of this type of interview is based on the large amount of data that can be collected but it also increases the opportunity to attain more spontaneous and personal views. The conclusions for increasing communication efficiency in construction projects are to increase transparency in construction projects as it is considered that it should be clear to those involved what the purpose and plan is at each communication opportunity. This increased transparency reduces the risk of misunderstandings and reduces the contribution of the human factor to harm; which include misinterpretation and misinformation. To minimize the negative impact of the human factor on communication, it is profitable in the long term for construction companies to offer courses and training in communication and to create a communication plan at an early stage before each project. The number of digital tools used should be limited and standardized to a tool that the leading construction companies agree to use; to streamline communication.
Abd, Al Sater Wissam. "Effektiv logistik med lossningskalender på byggarbetsplatsen." Thesis, Högskolan i Borås, Akademin för textil, teknik och ekonomi, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:hb:diva-15340.
Full textLogistics has long been a topic for discussion that has recently gained more attention. In order for the supervisor to develop a logistics organization that works more than well, this always means that the internal logistics routines are well functioning. The procedures should work on guidelines and support for the supervisor in all types of projects. The study aims to study NCC-projects that use and / or do not use the new tool, release calendar, to identify its positive results. The study uses a qualitative method in which the author conducts interviews with 4 respondents within NCC. The result consists of three main categories processing collected data, these categories are: Efficiency, documentation and Support for work management. Electronic logistics tools like the unloading calendar are of great importance to the supervisor and can be decisive in the quality of all construction projects.
Roxner, Disa. "Att hantera hållbarhet i byggprojekt : En kvalitativ studie från ett projektledarperspektiv." Thesis, Karlstads universitet, Handelshögskolan (from 2013), 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:kau:diva-78971.
Full textThe importance for organizations and projects to adopt sustainability has increased. Previous research has so far mainly treated sustainability and project management as separate research areas, resulting in a lack of understanding in the merged field of sustainable project management. Therefore, is sustainable project management a research area of interest and the context of this study is construction projects, considering the significant environmental impact of the construction industry. The aim of this thesis is research how sustainability is manged in construction projects This qualitive study includes interviews with 11 project managers in the construction- and real estate sector. The result consists in four themes: (1) Who´s responsible?, (2) The power of knowledge, (3) Conflict between time, money and sustainability, and (4) Priorities. The study shows that the project managers have numerous sustainable requirements to acknowledge, which lead to managers having many different aspects in consideration during the project. Four factors were identified to impact the sustainable work in construction projects; economics and time, knowledge, and a tendency to hold other stakeholders responsible for the sustainability outcomes. The results establish the importance of project managers’ responsibility of projects’ sustainability, as well as knowledge of project management. Therefore, in order to improve the sustainability of construction projects, project managers need to take more responsibility of the sustainability work and deepen their knowledge of project management to manage the projects better and prioritize between different requirements.
Nilsson, Elina, and Kandan Bakhtiar. "En studie om digital avstämning av tidplan." Thesis, KTH, Byggteknik och design, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-213401.
Full textNyberg, Josefine, and Linda Rigby. "Arbetsledarrollen idag : En fallstudie av arbetsledarrollen på ett stort entreprenadföretag." Thesis, KTH, Fastigheter och byggande, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-231751.
Full textToday the construction industry is going through some major changes in several fields. The past decades development in technology and sustainability has been given larger focus and a desire to use this to improve and make the industry more efficient has developed. Another huge change has been recognized in the general culture in the industry. The industry has for a long time been tinged by male dominance and a “macho culture” which has gradually been changed. Former common occurrence of bribery is another aspect that the industry is currently trying to get rid of. To be able to successfully carry out these changes the role of the middle manager is important and within the construction industry this middle manager can be seen as the construction foreman. However, there has been few studies based on the role of the construction foreman. The purpose of this study is therefore to create a deeper understanding and knowledge about the role and what it involves. Above all, the writers are interested in understanding the role from the foreman's perspective. The study is therefore based on observations and interviews from six construction foremen at six different projects. The results from the study shows that the role of a construction foreman is more alike than first assumed. It includes a sample of similar tasks and there is a common pattern and structure that makes the role able to define. The main responsibility is to make sure that the construction runs smoothly which is done by leading the workers, collaborate with other parties within the organisation and handle problems that occur. More general, the role includes communication, motivation, planning and acting as a link between different levels in the organisation. The majority of the tasks is reactive, while the tasks that most of the foreman consider value creating is proactive. The biggest changes in the role that has been observed is connected to the leadership. The role has moved towards a softer more coaching form of leadership compared to the previous authoritarian. One of the biggest challenges within the role is to move it towards a more proactive approach instead of today's reactive approach and thus get an even better structure throughout the day. Future development of the role is therefore most likely about trying to steer the role in this direction, trying to impose a bit more structure. Another challenge is to learn to prioritize between different assignments. To find a good balance between outside and inside, between the management and the workers and between having full control and leaving some responsibility to others.
Lund, Sofia, and Felicia Selle. "Arbetsledarrollen : påverkan av bristande praktisk erfarenhet hos nyexaminerad byggnadsingenjör." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-29632.
Full textSyfte: Byggbranschen står inför en del förändringar då akademisk utbildning blir allt vanligare. Praktisk kompetens går förlorad då nyexaminerade byggnadsingenjörer ofta saknar praktisk erfarenhet. Då branschen präglas av en tydlig identifiering och samhörighet där ”man ska ha varit ute i produktionen”, blir denna förändring problematisk. Denna studie fokuserar på arbetsledarrollen där målet med rapporten är att analysera hur nyexaminerade byggnadsingenjörer hanterar bristande praktisk erfarenhet. Metod: För att uppnå målet med studien har arbetsledarrollen studerats på två större byggföretag. Platschefer och yrkesarbetare samt arbetsledare med både praktisk erfarenhet och teoretisk bakgrund har studerats för att få en djup och rättvis bild av rollen. Studien är av kvalitativ karaktär där empirisk data har samlats in i form av intervjuer, observation och analys av företagens interna dokument. Resultat: Analysen är att arbetsledarrollen präglas av ett visst antal arbetsuppgifter och arbetsmoment. Utifrån dessa kan tydliga kopplingar dras till hur ledandet bör ske och vilka egenskaper som krävs i samband med dessa moment. Sista delen innefattar den kollektiva identifieringen inom branschen samt dess påtryckningar på rollen. Från dessa aspekter sammanfattas resultatet till att arbetsledarrollen påverkas genom att nyexaminerade byggnadsingenjörer kräver ett mer analytiskt och informationssökande tänk vid avsaknaden av praktisk erfarenhet. Konsekvenser: Slutsatsen är att praktisk erfarenhet är en fördel i rollen som arbetsledare, samt att det är av vikt att ge arbetsledare möjligheten till ökad praktisk erfarenhet. Som kompensation för den bristande praktiska erfarenheten hos nyexaminerade byggnadsingenjörer har de en helhetsbild över byggprocessen samt att de i större utsträckning söker upp och analyserar information. De egenskaper som är viktigare att fokusera på än erfarenhet är engagemang, tydlighet, struktur och initiativtagande. Samt de avgörande faktorerna för att leda byggproduktionen är att kunna sprida information, ta initiativ, agera vid oväntade kriser, samt fördela resurser. Begränsningar: Studien fokuserar på arbetsledare vid två större byggföretag. Om studien även hade omfattat mindre byggföretag hade bredare och mer generella slutsatser för rollen i stort kunnat göras. Studien hade förbättrats om fler deltagande observationer hade varit möjligt att genomföra. Att även observera rollen utifrån olika yrkesgrupper hade kunnat bidra till andra aspekter i analysen. Nyckelord: Arbetsledarrollen i byggbranschen, Mintzbergs ledarroller, första linjens chef, praktisk erfarenhet/akademisk utbildning, kollektiv identitet.
Josse, Walid, and Borhan Hosseini. "Platschefens arbete i total- och generalentreprenad." Thesis, KTH, Byggvetenskap, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-174833.
Full textProblem: How is the job of the site manager effected by the contract forms turnkey and general contract? How can the work of the site manager be designed and defined based on the contract form? Purpose: The purpose of this essay is to study how the site managers’ work is effected by turnkey and general contract and to present suggestions on how the site managers’ work can be designed based on the contract form. Method: The method is qualitative analysis. Interviews are the main approach and seven managers and a business area manager were interviewed. Literature studies of previous theses and research papers as well as publications and articles from the construction industry have been studied. Conclusion: There are more important factors for site managers’ work than the contract form itself. These include the quality of the drawings and documents, the size of the project, the work teams’ experience and how well they function as a team, the organization and the available support resources and the site managers’ own experience and knowledge. The contract form is however not without significance. In a turnkey, the site managers should be given the opportunity to participate in the project design and planning in order to contribute with their practical building skills and guiding documents to be more construction-friendly. In a general contract there should be an organization for the management of CAW because it takes a lot of time from the site manager and entrepreneurs lose money on CAW because contractors generally are bad at charging for CAW.
Jorild, Johan, and Alexander Kovalonok. "PLATSCHEFENS FÖRMÅGA ATT ÖKA PRODUKTIVITETEN - en jämförande studie av fyra arbetsplatser hos Peab -." Thesis, Örebro universitet, Institutionen för naturvetenskap och teknik, 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:oru:diva-36193.
Full textThe construction industry has been criticised for lacking productivity. Previous reports and studies show a low productivity compared to other industries but also the complexity of productivity measurement. The report aims to examine the site manager's role and the factors that affect the ability to get out productivity on a construction site. The case study was conducted on four of Peab's projects and the issues were answered using qualitative and quantitative methods such as interviews and surveys. Factors that affect productivity such as communication, motivation, competence and cooperation are further investigated. As comparison, an incentive quota imposed in relation to the questionnaires and interviews, are applied. The results show clear differences between site managers' abilities, methods and qualities that lead to a difference in productivity in the workplace. The conclusion shows what qualities and methods that tend to give a high productivity.
Pětroš, Ondřej. "Motivace a etické otázky ve stavebním podniku." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227685.
Full textDemaret, Julie. "Le processus de construction de légitimité des contrôleurs de gestion." Phd thesis, Université François Rabelais - Tours, 2014. http://tel.archives-ouvertes.fr/tel-00997829.
Full textAldebe, Wesam, and Yacine Tararbit. "Tids- och kostnadseffektivisera byggproduktionen : Slöserier och störningar." Thesis, KTH, Byggteknik och design, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-231564.
Full textThe biggest challenge construction companies are facing at the moment is reducing the unnecessary costs and labor as well as to streamline the work. This is a matter and an investigation that has been done multiple times in recent years because this is a major problem in most construction companies. This report is commissioned by Peab for the purpose of identifying wastes and critical disorders, then drafting action proposals to reduce waste of time and costs. Four different, completed construction projects have been investigated, commissioned by Peab, and are located in Stockholm. These projects include the reconstruction of a roadway intersection and new construction of pedestrian and cycle tracks. These four projects vary in scale, giving a more varied result compared to four very similar projects The gathering of information for this work has mostly included lean construction with the various waste in the work industry, as well as the different principles and methods of lean construction, such as Just-In-Time. Other studies on the construction process have also been made, more specifically the production phase, the planning of the work. The difference between value creation time and non-value creation time has been dealt with, as well as risk management and how to conduct a risk analysis. Interviews have also been conducted with the aim of identifying the most critical wastes and interferences. The gathering of facts from the interviews has been reported in the results. It emerged that the four most critical wastes were defects/rework, waiting, transportation and extra processing. In summary, action proposals using lean construction, interviews and the knowledge from this report have been developed to reduce these disturbances and wastages with help of for example Jidoka and PDCA to increase time and cost efficiency in the production process. In short, the concept of waste and disturbance can be defined differently. Waste is an activity that does not contribute anything to the business, and a disturbance is a matter of disturbing the work.
Boström, Jenny, and Maria Danielsson. "En studie av byggnadsnämndens kontroll och tillsyn vid uppförande av flerbostadshus." Thesis, Växjö University, School of Technology and Design, 2009. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-5514.
Full textWhen a new building is constructed, or some changes are taking place in the already existing building, it is required according to PBL chapter 8 that the developer applies for planning permissions at the building committee in that municipality where the real estate is located. In the planning permission, the documents of the current building are examined.
The developer will appoint a quality manager that helps the developer to ensure that all necessary controls are done and that the requirements in these are met. The developer has the final responsibility to ensure that the building is built according to all requirements and rules. The building committee establishes a control plan that shows which controls have to be carried out and which certificates and documents have to be sent in during the time of the construction.
This study aims to finding out which documents that will be submitted at the construction of a new building, according to the laws found in PBL, if these documents are required and if they are examined of the municipalities before the building is approved.
Fredriksson, Emma, and Jolin Lejonqvist. "Kvinnlig chef i byggbranchen : faktorer som utgör hinder till avancemang." Thesis, Högskolan i Halmstad, Sektionen för ekonomi och teknik (SET), 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:hh:diva-19846.
Full textBakgrund: Studier genomförda på mansdominerade företag visar att det finns ytterst få kvinnor som lyckats avancera till de högre positionerna inom samtliga företag. Statistik visar att endast 4 % av cheferna i alla byggföretag i Sverige är kvinnor. Chefskapet har tidigare alltid klassats som mest lämpligt för män vilket har lett till att kvinnor som strävar efter chefspositioner hindras från att ta sig upp i hierarkin. Detta problem är idag mycket omtalat och kallas för glastaket. För att förbättra dagens situation måste både organisationens struktur och kultur moderniseras för att fler kvinnor ska lyckas och våga ta sig in i branschen. Fler kvinnor i byggbranschen skulle berika många företag och i stor utsträckning utöka dess kompetens. Syfte: Syftet med denna uppsats är att skapa en förståelse kring hur faktorerna struktur, kultur, familjesituation, nätverk samt ledarskap bidrar till fåtalet kvinnliga chefer i den producerande delen av byggbranschen. Vi ska även undersöka hur kvinnliga chefer, utifrån egna erfarenheter, anser att dessa hinder kan reduceras. Genomförande: För att uppfylla vårt syfte har vi valt att göra en kvalitativ studie med en deduktiv ansats. Vi har genomfört fyra stycken besöksintervjuer, tre med kvinnliga chefer och en med en tidigare chef på fyra olika byggföretag. Resultat: Vi har konstaterat att både kvinnor själva och företagen kan öka kvinnors chans att avancera inom byggbranschen. Kvinnor kan lättare nå en chefsposition i byggbranschen genom att anpassa sig till den manliga kulturen, uppnå balans mellan familj och arbete och skaffa nätverkskontakter. Företagen i byggbranschen kan öka andelen kvinnliga chefer genom att fokusera på rekrytering, organisationsstruktur, arbetsklimat, mentorskap och genom att ta hänsyn till kvinnans familjesituation. Vi har även kommit fram till att det är viktigt att behålla de kvinnor som redan finns i branschen idag för att intressera fler kvinnor att söka sig dit. Det är viktigt att det finns kvinnliga förebilder i företagen som kan vägleda och vara goda exempel för nyanställda. För att öka andelen kvinnor i byggbranschen krävs det att intresset för byggteknik ökar hos unga tjejer för att sedan få fler kvinnliga sökande till byggtekniska utbildningar. Att reducera problemen och skapa möjligheter för kvinnor att arbeta i byggbranschen skulle göra att fler kvinnor kan avancera inom företagen. Detta skulle även leda till att glastaket blir betydligt tunnare och i framtiden skulle kunna brytas helt.
Bernehjält, Matilda, and Isabella Carlbom. "How Global and Virtual Teams are Efficiently Managed by Project Managers : From a Construction Management Perspective." Thesis, KTH, Ledning och organisering i byggande och förvaltning, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-277050.
Full textGlobaliseringens acceleration har tvingat företag att hantera sin framdrift för att bli mer konkurrenskraftiga och internationaliserade, en internationalisering som vidare leder till vikten av att veta hur man ska hantera globala och virtuella team (GVT). Kunskapen i området idag har visat sig vara vag, generaliserad och svår att ta till sig, särskilt för den oerfarna GVT-projektledaren. Syftet med detta examensarbete är därför att studera huruvida uppfattningen om hur man ska hantera GVT skiljer sig mellan litteratur och i praktiken samt hur dessa upptäckter kan bidra till ett mer effektivt projektledningssätt. Denna studie undersöks med en kvalitativ metod baserad på litteratur och semi-strukturerade intervjuer. Grunden används sedan för att få en djupare förståelse av ämnet såväl som den sätter rapportens frågeställningar i rätt sammanhang. Intervjurespondenterna är från samma organisation, dock från kontor i fyra olika länder. Resultatet visar att det finns olika perspektiv på hur GVT ska ledas effektivt och att olika ledarskapspreferenser existerar. Dessutom finns det många möjligheter, men också utmaningar som måste hanteras för att nå teamets fulla potential. Dessa utmaningar är kopplade till virtuella arbetssätt och praktiska problem samt teamets heterogenitet och kommunikationsstruktur. Det konstaterades att det är viktigt att överväga syftet med samarbetet för att strategiskt planera för dess initiering och genomförande.
Öström, Jenny. "Kvinna, chef, bibliotekarie. Triss i stereotyper?" Thesis, Uppsala universitet, Institutionen för ABM, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-197235.
Full textKočí, Zdeněk. "Formy a metody motivace ve stavebnictví." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225658.
Full textSandlin, Darrell R. "A proactive design strategy for facility managers of laboratory environments." Thesis, Available online, Georgia Institute of Technology, 2004:, 2004. http://etd.gatech.edu/theses/available/etd-04022004-145554/unrestricted/sandlin%5Fdarrell%5Fr%5F200405%5Fms.pdf.
Full textRichard W. Trent, Committee Member; Felix T. Uhlik, Committee Member; Linda M. Thomas-Mobley, Committee Chair. Includes bibliographical references (leaves 79-81).
Hasselgren, Elin. "Kontroll för ökad kvalitet - mallar för kontrollplan-PBL, egenkontroll samt riskanalys." Thesis, Högskolan i Gävle, Avdelningen för bygg- energi- och miljöteknik, 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:hig:diva-9536.
Full textDet finns stora problem med bristande kvalitet, dålig tidplanering och undermåligt arbetsmiljöklimat i den svenska byggbranschen. Detta problem är något som berörda parter lagt ner mycket tid på för att komma till rätta med. Som ett led i strävan mot kvalitetssäkring träder en ny Plan- och bygglag i kraft den 2 maj, som ökar kravet på innehåll i kontrollplaner, och därmed egenkontrollplaner. Arbetsmiljöfrågor har under senare år även de blivit mer aktuella med krav på byggarbetsmiljösamordnare och riskanalys. För samtliga projekt som kräver bygglov, rivningslov, marklov eller anmälan krävs en kontrollplan. Dessutom ska en egenkontrollplan samt en riskanalys finnas för samtliga projektörer i samtliga projekt. Riskanalyser ligger ofta till grund för val av lösningar eller omdirigeringar för att undvika personskador. I denna rapport redovisas en grundlig utredning av nyckelpersoners roll i kvalitets- och arbetsmiljöarbetet, samt vad som egentligen ska kontrolleras och mot vad. Nyckelpersonerna identifieras efterhand i rapporten. Resultatet av utredningen är förslag på utformning av mallar för kontrollplan-PBL, egenkontrollplan samt riskanalys.
Branch, Harold Kenneth. "Strategies Construction Project Managers Use to Create Environmental Sustainability in Construction Projects." ScholarWorks, 2018. https://scholarworks.waldenu.edu/dissertations/6176.
Full textLarrabee, Richard A. "An analysis of mechanical and electrical construction competencies in the Wisconsin and Minnesota construction industry." Menomonie, WI : University of Wisconsin--Stout, 2007. http://www.uwstout.edu/lib/thesis/2007/2007larrabeer.pdf.
Full textKammoun, Mohja. "L'utilisation de l'intuition dans la prise de décision du dirigeant de PME : proposition d'un modèle intégrateur." Thesis, Lyon 2, 2013. http://www.theses.fr/2013LYO22012.
Full textThe purpose of this research is to contribute to the study of the concept of intuition in decision making managers of SMEs and provide theoretical and praxeological lighting around the notion that the conceptual foundations up 'now provided remain largely controversial.Indeed, SME managers are often described as taking decisions individually with a decision-making autonomy (Julien et Marchesnay, 1988). It is therefore likely that the personality characteristics of the manager and intuitive dimension are of great importance in the conduct of an SME (Legohérel et al., 2003).However, little empirical research exists and used to study the use of intuition in SMEs despite the personalized nature of decision making in these small structures. We will try in this study to understand how the use of intuition would be able to affect the decision of the manager of SMEs. First, we identify, from a qualitative study of 10 manager of SME, representations that are the leaders of intuition in order to propose an operational definition and to develop a scale of intuition according to the recommendations of Churchill (1979).Second, we integrate the variable intuition in a research model that seeks to integrate, in accordance with the systemic approach, the use of intuition in decision making, its determinants (context and nature of the decision) and its consequences (perceived performance of the decision) in a general framework. The interest of this systemic modeling for our research is that it allows a thorough understanding of the use of intuition through its dimensions and the analysis of this concept as a whole through its determinants and consequences. This model is tested by a quantitative survey of 178 managers of SMEs in the Tunisian context.The results of this research show that it is possible to develop a reliable and valid measure of the use of intuition in decision making. These allow endorsing a two-dimensional structure of the concept of intuition which corresponds to an experienced personality and an ability to represent overall situation. The results also support the one hand, the influence of the uncertainty of the environment, the origin and importance of the decision on the use of intuition and, secondly, the influence of the use of intuition on the satisfaction of the decision of the managers of SMEs
Brinkman, Trevor Joseph. "Constructing volatility surfaces for managed funds." Master's thesis, University of Cape Town, 2014. http://hdl.handle.net/11427/8530.
Full textIn this dissertation, a methodology is developed for constructing a volatility surface for a managed fund by extending the work of Bakshi et al. (2003) and Taylor (2014). The power utility assumption (with constant relative risk aversion for a specific maturity) and historical returns series data are used for the identified factors in influencing the return of the fund and the fund itself. The coefficient of relative risk aversion for a specific maturity and market is estimated from quoted option prices on a market index. This is used in combination with the identified factors and fund return series to estimate the risk-neutral skewness of the fund. An optimisation procedure is then used to determine the volatility smile of the fund for a specific maturity. Thereafter, the volatility surface of the fund is constructed by repeating each step for different maturities. Although this methodology produces sensible results, the optimisation routine used is sensitive to initial values and constraints.