Academic literature on the topic 'Construction time and cost overrun'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Construction time and cost overrun.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Journal articles on the topic "Construction time and cost overrun"

1

Mulye, Priyesh. "Significance and Analysis of Time and Cost Overrun in the Construction Industry of Mumbai." International Journal for Research in Applied Science and Engineering Technology 9, no. 11 (2021): 295–310. http://dx.doi.org/10.22214/ijraset.2021.38789.

Full text
Abstract:
Abstract: The occurrence of time and cost overrun has become quite significant in a majority of construction projects in India, which is negatively affecting the GDP and potential development of nation. As per the statistics of project cost and duration in March 2012, 179 projects out of 555 projects of worth 150 Crore INR have been facing cost and time overrun and others are at the very high risk, with the total construction cost overrun of 1.23 Lakh Crore INR. (Times, 2013) The time and cost overrun of the construction projects results in overextension of the time and finance of the client w
APA, Harvard, Vancouver, ISO, and other styles
2

Mohammad, Karukh Hassan, Noori Sadiq Ali, and Basira Majeed Najm. "Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate." Journal of Engineering 27, no. 2 (2021): 106–25. http://dx.doi.org/10.31026/j.eng.2021.02.08.

Full text
Abstract:
Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variat
APA, Harvard, Vancouver, ISO, and other styles
3

Louzolo-Kimbembé, Paul, Chrispin Pettang, and Thomas Tamo Tatiétsé. "Minimisation des surcoûts dans un contexte hors délai : cas des projets de construction dans les pays en développement." Canadian Journal of Civil Engineering 34, no. 9 (2007): 1180–91. http://dx.doi.org/10.1139/l07-089.

Full text
Abstract:
Cost overruns are frequent in the construction industry. They become greater the more the construction project is delayed. In developing countries, this situation is recurring and constitutes a significant financial problem. In a time-overrun context, our objective is to find a method that can enable us to reduce the delay while minimizing the subsequent cost overruns. We thus developed a mathematical model named CCOMTOC (construction cost optimisation model in time-overrun context). The model was tested and results reveal that the reduction of cost overruns is effective. We showed that in a t
APA, Harvard, Vancouver, ISO, and other styles
4

Leu, Sou-Sen, Yanni Liu, and Pei-Lin Wu. "Project Cost Overrun Risk Prediction Using Hidden Markov Chain Analysis." Buildings 13, no. 3 (2023): 667. http://dx.doi.org/10.3390/buildings13030667.

Full text
Abstract:
Construction project cost overrun is a common problem in the construction industry. The cost of construction projects is thought to have increased by approximately 33% on average. Several types of research on construction project cost overrun have been conducted and these generally rely on historical data. However, whilst each project has its own project characteristics and cost trend, real-time project cost data are more reliable to forecast its own cost trend. This paper proposes a real-time hidden Markov chain (HMM) model to predict cost overrun risk based on project-owned cost performance
APA, Harvard, Vancouver, ISO, and other styles
5

Sharad More, Mr Sanved. "Factors Affecting Time and Cost Overrun – Indian Scenario." INTERNATIONAL JOURNAL OF SCIENTIFIC RESEARCH IN ENGINEERING AND MANAGEMENT 09, no. 05 (2025): 1–9. https://doi.org/10.55041/ijsrem47227.

Full text
Abstract:
Abstract - In the Indian construction industry, time and cost overruns are an ongoing issue, especially for major road infrastructure projects. Using information from primary data gathered through structured surveys as well as literature, this study examines the main causes of these overruns. Finding the most significant causes, evaluating their relative effects, and making useful suggestions for minimizing them were the goals of the study. To determine the fundamental factors causing delays in projects and cost increases, a thorough literature review was carried out. A questionnaire survey wa
APA, Harvard, Vancouver, ISO, and other styles
6

Zavvar, Kazim, Sharif Mohammad, and Ahmed Akil. "Strategies for Reducing Construction Project Delays and Cost Overruns." International Journal of Civil and Structural Engineering Research 11, no. 1 (2023): 91–98. https://doi.org/10.5281/zenodo.8385877.

Full text
Abstract:
<strong>Abstract:</strong> The present research aims to analyze the causes of delays and cost overruns in construction projects and to identify the methods to minimize delays and cost overruns. In the present era of rising need for infrastructure and growing competitiveness, construction projects must be completed on time and without cost overrun. Most construction projects are complex and filled with challenges, unexpected hindrances, and frequently emerging issues, leading to time and cost overruns. This research identified several government construction projects that suffered from delays a
APA, Harvard, Vancouver, ISO, and other styles
7

M, Chandrabose, and Balaji B. "ANALYTICAL SOLUTION TO MITIGATE THE RISK ARISING OUT OF TIME OVERRUN IN THE CONSTRUCTION PROJECTS VIA FORECASTING." International Journal of Engineering Applied Sciences and Technology 7, no. 7 (2022): 86–91. http://dx.doi.org/10.33564/ijeast.2022.v07i07.016.

Full text
Abstract:
Construction industry is getting affected by cost overruns, time overruns, poor budgeting &amp; planning. Currently there is no analytical tool available which can act as a benchmarking system to measure the performance of a project based on the historical data of past projects. This is an effort to predict time overrun and cost overrun in projects for taking precautionary measures to minimize or reduce the impact.
APA, Harvard, Vancouver, ISO, and other styles
8

Berihu, Lielti Gebreegziabher, Berhane Grum, Zeru Tariku, and Bizuneh Asfaw Abebe. "Causes, Effects, and Mitigation Measures of Time and Cost Overruns in Water Supply Projects: Case of Tigrai Region, Northern Ethiopia." Advances in Civil Engineering 2023 (May 18, 2023): 1–19. http://dx.doi.org/10.1155/2023/7113730.

Full text
Abstract:
Project cost overrun and schedule delay are major and widespread problems in the construction industry. In Tigrai, most water supply construction projects are not completed within the predetermined contract time and planned budget. Hence, this research was carried out to investigate the causes and effects of time and cost overrun in water supply projects in Tigrai, northern Ethiopia and further recommend effective mitigation measures. A total of 87 questionnaires were distributed, 50 of them were collected, and desk study of 12 water supply projects were conducted. Data were analyzed using rel
APA, Harvard, Vancouver, ISO, and other styles
9

Alhammadi, Yasir, Mohammad S. Al-Mohammad, and Rahimi A. Rahman. "Modeling the Causes and Mitigation Measures for Cost Overruns in Building Construction: The Case of Higher Education Projects." Buildings 14, no. 2 (2024): 487. http://dx.doi.org/10.3390/buildings14020487.

Full text
Abstract:
The formidable need for building projects places greater pressure on stakeholders to deliver these projects on time, within the budget, and with high quality. However, many building projects have experienced extensive cost overruns despite extensive research on their causes and mitigation measures. Thus, the effectiveness of mitigation measures is questionable. This study examines the status of cost overrun in building construction projects and develops a structural equation model to establish the relationships between causes of cost overrun and mitigation measures, using higher education buil
APA, Harvard, Vancouver, ISO, and other styles
10

Sachchithananthan, M., K. Niranjan, and M. Thayaparan. "Simulation modelling of cost overruns in building projects: a panel data analysis." FARU Journal 11, no. 1 (2024): 36–46. http://dx.doi.org/10.4038/faruj.v11i1.312.

Full text
Abstract:
Cost overrun is often a challenge in the construction industry due to its complex nature and inefficient project management. Despite extensive research, cost overruns persist in construction. Hence, to minimise these challenges, factors attributing to the cost overrun need to be identified. A country-based assessment is needed since these factors vary from nation to nation. Research conducted almost two decades ago has identified the key cost-related factors influencing cost overrun of Sri Lankan building projects as variation, extra work, fluctuation of price and currency, day works and other
APA, Harvard, Vancouver, ISO, and other styles
More sources

Dissertations / Theses on the topic "Construction time and cost overrun"

1

Eke, Gerald. "Determining the probability distributions of cost and time overrun arising from different contractor selection strategies in construction projects." Thesis, Aston University, 2017. http://publications.aston.ac.uk/33316/.

Full text
Abstract:
Failing to adequately select the winning contractor can lead to problems in the project delivery phase such as bad quality and project delay; which ultimately results in cost overruns. There are two strategies involved with selecting contractors: one is the lowest tender, the other is called best value. Selecting the lowest tender is straightforward; the latter strategy would involve scoring the contractors' tenders on price and quality and ranking them. The aim of this research is to provide a model of determining the probability distributions of cost and time arising from choosing different
APA, Harvard, Vancouver, ISO, and other styles
2

Salam, Md. "Time and cost overruns on high-rise building construction in Bangladesh." Thesis, Abertay University, 2007. https://rke.abertay.ac.uk/en/studentTheses/15bbc393-0b06-4691-a6ec-1e6a6d925179.

Full text
Abstract:
Construction projects in developing countries may suffer from time overruns, which are associated with cost overruns. This research project investigated both time and cost overruns on high-rise building projects in Dhaka, Bangladesh. Surprisingly, preliminary data analysis showed negligible cost overruns in comparison to time overruns. So, further analysis o f cost overruns was not considered in this thesis. This research project also investigated how the causes o f time-overruns can be mitigated. 72 time-overrun and 22 cost-overrun variables were identified through a literature review. These
APA, Harvard, Vancouver, ISO, and other styles
3

Al-Gathafi, Mohammad Moammar. "Riskness of time and cost overruns and the effectiveness of risk response measure strategies in the Libyan construction industry." Thesis, University of Liverpool, 2005. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.435380.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Ahiaga-Dagbui, Dominic Doe. "Rethinking construction cost overruns : an artificial neural network approach to construction cost estimation." Thesis, University of Edinburgh, 2014. http://hdl.handle.net/1842/10454.

Full text
Abstract:
The main concern of a construction client is to procure a facility that is able to meet its functional requirements, of the required quality, and delivered within an acceptable budget and timeframe. The cost aspect of these key performance indicators usually ranks highest. In spite of the importance of cost estimation, it is undeniably neither simple nor straightforward because of the lack of information in the early stages of the project. Construction projects therefore have routinely overrun their estimates. Cost overrun has been attributed to a number of sources including technical error in
APA, Harvard, Vancouver, ISO, and other styles
5

Saidu, Ibrahim. "Management of material waste and cost overrun in the Nigerian construction industry." Thesis, Nelson Mandela Metropolitan University, 2016. http://hdl.handle.net/10948/3792.

Full text
Abstract:
While wastage of materials has become a serious problem requiring urgent attention in the Nigerian Construction Industry, cost overrun is a problem, which affects 90 percent of the completed projects in the world; the argument on how to reduce/eliminate cost overrun has been on-going for the past 70 years; as the on-site wastage of materials leads to increases in the final project cost. Studies from different parts of the world have shown that construction-material waste represents a relatively large percentage of the production costs. Consequently, as a result of low levels of awareness, the
APA, Harvard, Vancouver, ISO, and other styles
6

Islam, Muhammad Saiful. "Modelling cost overrun risks in power plant projects." Thesis, Queensland University of Technology, 2019. https://eprints.qut.edu.au/125508/1/Muhammad%20Saiful_Islam_Thesis.pdf.

Full text
Abstract:
Cost overruns in power plant projects frequently occur, and this very alarming phenomenon requires proper risk assessment and management in the early phase of power plant project development. A modified fuzzy group decision-making approach (FGDMA) was developed and the critical risks in different phases of thermal power plant project were identified. Further, a novel fuzzy canonical model (FCM) was developed and the complex causal risk-networks were modelled to understand the root causes of cost overruns. The benefits of this research to practitioners are such that it provides greater understa
APA, Harvard, Vancouver, ISO, and other styles
7

Celenligil, Onur. "Analogical Reasoning For Risk Assessment And Cost Overrun Estimation In Construction Projects." Master's thesis, METU, 2010. http://etd.lib.metu.edu.tr/upload/12612229/index.pdf.

Full text
Abstract:
Project cost increase is the main concern in international construction projects which usually results in disputes and conflicts among the project participants. The aim of this thesis is to construct a database that represents risk event history regarding international construction projects and construct a cost overrun prediction model. It is hypothesized that magnitudes of project related, company related and country related risk factors can be predicted by assessing the level of vulnerability by analogical reasoning with previous projects. The vulnerability and risk factors can further be
APA, Harvard, Vancouver, ISO, and other styles
8

Creedy, Garry D. "Risk factors leading to cost overrun in the delivery of highway construction projects." Thesis, Queensland University of Technology, 2006. https://eprints.qut.edu.au/16399/1/Garry_Creedy_Thesis.pdf.

Full text
Abstract:
Accurate client budget estimates are critical to the initial decision-to-build process for the highway construction projects. This decision-to-build point in a project's development is seen as the international standard for measuring any subsequent cost estimate inaccuracies involved (National Audit Office/Department of Transport, 1992; World Bank, 1994; Nijkamp and Ubbels, 1999), with accuracy being defined as the difference between the initial project estimate at the decision-to-build stage and the real, accounted project cost determined at the time of project completion. Expressed as a perc
APA, Harvard, Vancouver, ISO, and other styles
9

Creedy, Garry D. "Risk factors leading to cost overrun in the delivery of highway construction projects." Queensland University of Technology, 2006. http://eprints.qut.edu.au/16399/.

Full text
Abstract:
Accurate client budget estimates are critical to the initial decision-to-build process for the highway construction projects. This decision-to-build point in a project's development is seen as the international standard for measuring any subsequent cost estimate inaccuracies involved (National Audit Office/Department of Transport, 1992; World Bank, 1994; Nijkamp and Ubbels, 1999), with accuracy being defined as the difference between the initial project estimate at the decision-to-build stage and the real, accounted project cost determined at the time of project completion. Expressed as a perc
APA, Harvard, Vancouver, ISO, and other styles
10

Al-Omari, Tareq. "Stochastic regression modelling of cost and duration overrun of construction projects implemented in Kuwait." Thesis, University of Liverpool, 2004. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.418590.

Full text
APA, Harvard, Vancouver, ISO, and other styles
More sources

Books on the topic "Construction time and cost overrun"

1

Atkin, Brian. Time-cost planning of construction. Royal Institution of Chartered Surveyors, 1993.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
2

Baker, Robert D. Time-cost relationships in construction. Available from the National Technical Information Service, 1991.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
3

Company, R. S. Means. RSMeans building construction cost data 2015. 7th ed. RSMeans, 2015.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
4

Patty, Robert M. Lean operations for engineering, procurement, and construction: Shorten cycle time, eliminate error, improve quality, reduce costs. Universal Publishers, 2009.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
5

Patty, Robert M. Lean operations for front-end-loading, engineering, procurement, and construction: Lead innovation, shorten cycle time, eliminate error, improve quality, reduce costs. Universal Publishers, 2010.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
6

Napolitano, Maida. The time, space & cost guide to better warehouse design: A hands-on guide to help you improve the design and operations of your warehouse or distribution center. 2nd ed. Distribution Center Management, 2003.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
7

Napolitano, Maida. The time, space & cost guide to better warehouse design: A hands-on guide to help you improve the design and operations of your warehouse or distribution center. Distribution Center Management, 1994.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
8

Office, General Accounting. Nuclear waste: Greater use of removal actions could cut time and cost for cleanups : report to the Chairman, Subcommittee on Military Procurement, Committee on National Security, House of Representatives. U.S. General Accounting Office, 1996.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
9

Kazeykin, Valeriy, and Vladimir Tolstolugov. Theory and practice of implementation of high energy efficient technologies in construction based on Thermaron heat generators. INFRA-M Academic Publishing LLC., 2020. http://dx.doi.org/10.12737/1146805.

Full text
Abstract:
The monograph summarizes the legislative and regulatory framework, as well as shows the theory and practice of energy saving and energy efficiency development in Russia and in the world with the actualization of the use of a breakthrough domestic high-energy-efficient technology based on molecular heat generators Termaron. These devices use the principles of hydrolysis, cavitation, magnetism, resonance and synergy of these processes. The results of research conducted with the participation of specialists from Dubna state University, as well as the practice of using the Termaron ATP, showed tha
APA, Harvard, Vancouver, ISO, and other styles
10

Time-Cost Optimization of Building Projects. Project Management Institute, 2015.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
More sources

Book chapters on the topic "Construction time and cost overrun"

1

Maqsoom, Ahsen, Muhammad Umar Khan, Muhammad Tariq Khan, Shahfahad Khan, Naeemullah, and Fahim Ullah. "Factors Influencing the Construction Time and Cost Overrun in Projects: Empirical Evidence from Pakistani Construction Industry." In Proceedings of the 21st International Symposium on Advancement of Construction Management and Real Estate. Springer Singapore, 2017. http://dx.doi.org/10.1007/978-981-10-6190-5_69.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Sharma, Shubham, and Ashok Kumar Gupta. "Analysis of Factors Affecting Cost and Time Overruns in Construction Projects." In Lecture Notes in Civil Engineering. Springer Singapore, 2021. http://dx.doi.org/10.1007/978-981-33-6969-6_6.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Shashank, B. S. "Factors Affecting Time and Cost Overruns in Small Scale Construction Projects." In Lecture Notes in Civil Engineering. Springer Nature Singapore, 2025. https://doi.org/10.1007/978-981-96-4902-0_22.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Adam, Abderisak, Per-Erik Josephson, and Göran Lindahl. "Implications of Cost Overruns and Time Delays on Major Public Construction Projects." In Proceedings of the 19th International Symposium on Advancement of Construction Management and Real Estate. Springer Berlin Heidelberg, 2015. http://dx.doi.org/10.1007/978-3-662-46994-1_61.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Omotayo, Temitope, Udayangani Kulatunga, and Bankole Awuzie. "Continuous Improvement and Cost Overrun in Construction Projects." In Continuous Cost Improvement in Construction. Routledge, 2022. http://dx.doi.org/10.1201/9781003176077-10.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Kumar, Ashutosh, and Yaman Hooda. "Assessing Cost Overrun in Construction Industry: A Review." In Lecture Notes in Civil Engineering. Springer Nature Switzerland, 2024. https://doi.org/10.1007/978-3-031-70431-4_41.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Mahind, V. D., and B. M. Dawari. "Factors Leading to Cost Overrun and Time Overrun in Pune Metro Project." In Lecture Notes in Civil Engineering. Springer Nature Switzerland, 2023. http://dx.doi.org/10.1007/978-3-031-39663-2_50.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Schaufelberger, John E., and Len Holm. "Cost and time control." In Management of Construction Projects, 3rd ed. Routledge, 2024. http://dx.doi.org/10.1201/9781003394570-12.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Tahir, Muhammad Muhammad, Nuzul Azam Haron, Aidi Hizami Alias, and Ikechukwu A. Diugwu. "Causes of Delay and Cost Overrun in Malaysian Construction Industry." In GCEC 2017. Springer Singapore, 2018. http://dx.doi.org/10.1007/978-981-10-8016-6_5.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Sharma, Varun Kumar, Pardeep Kumar Gupta, and R. K. Khitoliya. "Investigation of Critical Factors Influencing Cost Overrun in Highway Construction Projects." In RILEM Bookseries. Springer International Publishing, 2020. http://dx.doi.org/10.1007/978-3-030-51485-3_22.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Conference papers on the topic "Construction time and cost overrun"

1

Mittlesteadt, Douglas, and David Morton. "Lifetime Corrosion Control Cost Minimization." In Coatings+ 2020. SSPC, 2020. https://doi.org/10.5006/s2020-00039.

Full text
Abstract:
Abstract Most capital projects in the energy market face significant cost overrun issues. There is a real need for innovation to improve productivity; reduce the need for completion on site and to minimise the annual operations maintenance budget. By optimising the coating specification we can increase the likelihood of paint completion during the project while increasing productivity and quality. Thus the chances of the project being completed in time are increased and the lifetime maintenance costs reduced. This paper will show the cost reduction benefits of using an optimised two coat paint
APA, Harvard, Vancouver, ISO, and other styles
2

Kazaz, Aynur, and Gökçen Arslan. "An Assessment of Risk Impact on Time and Cost Performance of Construction Projects." In Creative Construction Conference 2024. Budapest University of Technology and Economics, 2024. http://dx.doi.org/10.3311/ccc2024-084.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Kumarathunga, Janani Uvasara, W. M. C. L. K. Wijekoon, and Chanuri Kalugala. "Effect of Project Duration Decision at the Bidding Process on Cost Overruns of Sri-Lankan Building Projects." In SLIIT 2nd International Conference on Engineering and Technology. SLIIT, 2023. http://dx.doi.org/10.54389/kjke1371.

Full text
Abstract:
Cost overruns are a significant issue in the construction industry, particularly from the standpoint of clients. Many studies have been interested in the unpredictable situations that lead to cost overruns, with the primary goal of pinpointing the precise causative factors. There is a knowledge gap about whether cost overruns could be prevented through effective decision-making at a project’s earliest phases. Therefore, the aim of this research was to critically review if the impact of the project duration decision taken at the bidding process could lead to cost overruns of Sri Lankan building
APA, Harvard, Vancouver, ISO, and other styles
4

Manzano-Alvarado, Mateo, Laura Montalbán-Domingo, Tatiana García-Segura, Amalia Sanz-Benlloch, and Eugenio Pellicer. "Time and Cost Overrun in Construction Projects in Ecuador: Main Causes and Risk Factors." In Construction Research Congress 2024. American Society of Civil Engineers, 2024. http://dx.doi.org/10.1061/9780784485286.024.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Akinradewo, Opeoluwa, Clinton Aigbavboa, Matthew Ikuabe, Peter Adekunle, Wellington Didibhuku Thwala, and Shola Olatunji. "Project Planning: A Determinant of Project Delivery to Time and Cost." In 13th International Conference on Applied Human Factors and Ergonomics (AHFE 2022). AHFE International, 2022. http://dx.doi.org/10.54941/ahfe1001623.

Full text
Abstract:
Planning is not only the most basic of all the managerial functions, it also determines how the other functions will be implemented. With efficient project planning, utilisation of administrations, and hierarchical strategies, proper project operations can be sequenced to achieve a successful project delivery. This research study set out to appraise the project planning impact on project delivery. To achieve this, a qualitative research method was adopted in which archival data was obtained for public building projects executed between January and December 2021 within Lagos State, Nigeria. Ana
APA, Harvard, Vancouver, ISO, and other styles
6

Venkatesh, S., and V. R. Prasath Kumar. "Study on factors influencing the time and cost overrun of construction projects in rural areas." In INTELLIGENT SYSTEMS: A STEP TOWARDS SMARTER ELECTRICAL, ELECTRONIC AND MECHANICAL ENGINEERING: Proceedings of 2nd International Conference on Industrial Electronics, Mechatronics, Electrical and Mechanical Power (IEMPOWER), 2021. AIP Publishing, 2022. http://dx.doi.org/10.1063/5.0110242.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

S., Padmasree, and Niji T. N. "An Investigation on the Factors That Influence the Performance of Construction Projects." In The International Conference on scientific innovations in Science, Technology, and Management. International Journal of Advanced Trends in Engineering and Management, 2023. http://dx.doi.org/10.59544/kzon5523/ngcesi23p132.

Full text
Abstract:
Construction industry is considered as one of the most important and second largest industries in India after agriculture. It is well known that most construction projects in India, especially in Tamil Nadu are exposed to time and cost overrun or both. Time cost schedule is a crucial task in construction project management. This phenomenon may affect the progress of construction industry in India as well as may expose many institutions of construction to be destroyed. For instance; it can materially help to identify the expected financial requirements. It is also an important tool for the time
APA, Harvard, Vancouver, ISO, and other styles
8

R., Gouthami, Alan Verghese Ittyeipe, and Ramaswamy K. P. "Study on the Factors Causing Rework of Building Construction in Kerala using Interpretive Structural Modelling (ISM)." In 6th International Conference on Modeling and Simulation in Civil Engineering. AIJR Publisher, 2023. http://dx.doi.org/10.21467/proceedings.156.22.

Full text
Abstract:
The construction industry is one of India's most important and fastest-growing sectors. However, the construction industry is plagued with problems of cost and time overruns. Rework is one of the major causes of cost overrun and time overrun in the construction industry. This study investigates the factors causing the rework of building construction in Kerala. To compile a list of the factors that lead to rework, a thorough analysis of the literature was done. A questionnaire survey was conducted to collect the opinions from contractors, engineers, and design consultants and the factors were r
APA, Harvard, Vancouver, ISO, and other styles
9

Daniel, Varghese. "Maximize Workfront Availability to Reduce Project Delivery Time and Cost Using AI Advisors." In ADIPEC. SPE, 2024. http://dx.doi.org/10.2118/222111-ms.

Full text
Abstract:
Projects are declared ‘completed’ when construction activities are completed and pre-commissioning is done and handed over for commissioning and operations. So, the most important objective for a project management team is to ensure availability of continuous Workfront to carry out construction activities and any disruption or delay in availability of Workfronts will delay the project completion and cause other side effects like idling resources and reduced productivity, all of which will contribute to the final cost overrun. There is a solution: using AI Advisors within a digital Project Mana
APA, Harvard, Vancouver, ISO, and other styles
10

"Analysis of Overturns in Real Estate Project Using Artificial Network." In The International Conference on scientific innovations in Science, Technology, and Management. International Journal of Advanced Trends in Engineering and Management, 2023. http://dx.doi.org/10.59544/adlw6471/ngcesi23p82.

Full text
Abstract:
Cost overrun is one of the most important problem that encounter Real Estate projects success, since it reduces the contractor’s profit and sometimes lead to enormous losses. Cost overruns occur in every real estate project while the magnitude varies significantly from project to project. Throughout this research we tried to gather and analyze the main factors which cause cost overruns in real estate projects such as the factors determining percentage overrun include the financial condition of the owner ,the cash flow of the contractor, material cost increase, competition at tender stage, the
APA, Harvard, Vancouver, ISO, and other styles

Reports on the topic "Construction time and cost overrun"

1

Padhye, Suyash, Aishwarya Sharma, Hesam Arefkhani, et al. INDOT Project Change Orders: Root Causes and Recommendations. Purdue University, 2024. https://doi.org/10.5703/1288284317747.

Full text
Abstract:
This study analyzed the historical trends in change orders (COs) associated with the Indiana Department of Transportation (INDOT) highway contracts. It also investigated correlations between COs and base factors (district, project type, contract type, award amount, geographical area (rural vs. urban)), and sought to understand the effect of the root causes but not to predict CO based on root causes. Unlike the base factors, the root causes are unknown prior to construction. The study developed models that forecasted CO characteristics—CO likelihood, CO frequency (count), and CO severity (magni
APA, Harvard, Vancouver, ISO, and other styles
2

Tucker. L51728 Feasibility of a Pipeline Field Weld Real-Time Radiography (Radioscopy) Inspection System. Pipeline Research Council International, Inc. (PRCI), 1995. http://dx.doi.org/10.55274/r0010117.

Full text
Abstract:
Inspection of pipeline field girth welds during pipeline construction is accomplished by film radiographic: methods. Film radiography of materials is a 70 year old technology. There have been many advances in that 70 year history in equipment and films, but the process of making the radiograph is essentially the same. The film radiography process is time-consuming, costly, environmentally impacting and very operator (inspector) dependent. There are recent and almost daily advances in technologies using x-ray imaging other than film. Double-jointed pipe welds at pipe mills and at double-joint o
APA, Harvard, Vancouver, ISO, and other styles
3

Lam, Terence, and Keith Gale. Construction frameworks in the public sector: Do they deliver what they promise? Property Research Trust, 2021. http://dx.doi.org/10.52915/sbuk7331.

Full text
Abstract:
We demonstrate that the use of Performance Frameworks for the procurement of construction projects by public sector organizations in the UK (specifically, in England) leads to significantly improved outcomes in terms of time, cost, quality, sustainability and closer relationships, than the traditional ‘open tender’ approach of procuring discrete projects, individually. We identify the factors that lead to such improvements. We label these: supplier’s task performance factors (project staff, execution approach, competence of firm and structure of firm); supplier’s contextual performance factors
APA, Harvard, Vancouver, ISO, and other styles
4

ЛИЗИКОВА, М. С. ЛИЦЕНЗИРОВАНИЕ АЭС В СТРАНАХ-ЧЛЕНАХ ЕАЭС. DOI CODE, 2019. http://dx.doi.org/10.18411/0531-3467-2019-14515.

Full text
Abstract:
In the article researched the experience of licensing of nuclear power plants of member states of the EAEU, both already having functioning nuclear power plants and planning its construction. It noted the different approaches of states to the licensing of the activity in this area, which can lead to increased time and unnecessary increase in the cost of construction of nuclear power plants. On the basis of the analysis it makes the conclusion on the necessity of harmonization of the process of licensing activity of nuclear power plants in member states of the EAEU, as well as it exprecces an o
APA, Harvard, Vancouver, ISO, and other styles
5

Wang, Yong-Yi. PR-350-124504-R02 Essential Welding Variables Methodology for X70-X65 Linepipe Steels. Pipeline Research Council International, Inc. (PRCI), 2015. http://dx.doi.org/10.55274/r0010887.

Full text
Abstract:
High productivity mechanized welding processes, such as variants of multi-wire pulsed-gas metal arc welding (GMAW-P) have become increasingly popular due to their high production rates. Compared to the conventional single-wire GMAW processes, the high-productivity pro-cesses are more complex in welding procedure design, qualification, and field welding. The characteristics of these high productivity processes are different from that of the traditional sin-gle-wire/single-torch GMAW or shielded metal arc (manual) welding (SMAW) processes that have dominated pipeline construction in the past. Th
APA, Harvard, Vancouver, ISO, and other styles
6

Walmsley, Terrie, and Robert McDougall. Using Entropy to Compare IO tables. GTAP Research Memoranda, 2005. http://dx.doi.org/10.21642/gtap.rm09.

Full text
Abstract:
The importance of obtaining quality I-O tables for the GTAP Data Base has prompted the need for a method to compare contributed I-O tables. Comparisons are useful for a number of reasons. a) Time comparisons can be used to show how an economy has changed over time. b) Country comparisons may be used to show differences in cost or use structures between countries. c) Comparisons may also be used to highlight errors in construction procedures or mappings and therefore assist us in improving the quality of the data. In this document we look out how entropy can be used to compare I-O tables. The p
APA, Harvard, Vancouver, ISO, and other styles
7

El Badawy, Amro, and Ashraf Rahim. Evaluation of Nanoclay Additives for Improving Resistance to Moisture Damage in Hot Mix Asphalt (HMA). Mineta Transportation Institute, 2023. http://dx.doi.org/10.31979/mti.2023.2151.

Full text
Abstract:
Transportation has an enormous impact on the U.S. economy and on the lives of all Americans. Many modes of transportation rely on pavement, but pavement conditions deteriorate over time because of the combined effects of traffic and climate. Exposure to moisture often causes premature failure of asphalt pavements as it reduces the stiffness of the asphalt and enables stripping of the asphalt from the aggregate. This research evaluates the effectiveness of clay nanomaterials (i.e., nanoclays) in improving the resistance of hot mix asphalt (HMA) to moisture damage and compares the enhancement re
APA, Harvard, Vancouver, ISO, and other styles
8

Qvist Eliasen, Søren, Louise Ormstrup Vestergård, Hjördís Rut Sigurjónsdóttir, Eeva Turunen, and Oskar Penje. Breaking the downward spiral: Improving rural housing markets in the Nordic Region. Nordregio, 2020. http://dx.doi.org/10.6027/pb2020:4.2001-3876.

Full text
Abstract:
Housing issues usually play a major role in urban studies, but are often overlooked as a factor in rural development. This policy brief explores aspects of the dynamics of the ‘frozen’ rural housing market in the Nordic Region, with a specific focus on the role of financing, the part played by municipalities and the potential benefits of a larger rental market.Housing is generally seen as a human right, a consumable that serves as the framework for our lives. However, at the same time, real estate is a financial commodity on the market. In many rural areas, the market value of houses is low –
APA, Harvard, Vancouver, ISO, and other styles
9

Urban, Angela, Ryan Strange, Andrew Ward, Giselle Rodriguez, and Heidi Howard. Waste management and landfill facilities assessment using unmanned aircraft systems. Engineer Research and Development Center (U.S.), 2023. http://dx.doi.org/10.21079/11681/46714.

Full text
Abstract:
Finite and decreasing landfill space on Army installations is a significant concern. Efficient waste management is essential for achieving resiliency and extending the lifespan of remaining landfills. The purpose of this demonstration was to conduct independent performance tests of small unmanned aircraft systems (sUAS) and their utility for providing landfill assessments in remote areas where physical presence is either dangerous or inefficient. An active, near capacity construction and demolition (C&amp;D) landfill at Fort Gordon, Georgia, was identified for the demonstration. The flights, d
APA, Harvard, Vancouver, ISO, and other styles
10

Nestleroth. L52298 Augmenting MFL Tools With Sensors that Assess Coating Condition. Pipeline Research Council International, Inc. (PRCI), 2009. http://dx.doi.org/10.55274/r0010396.

Full text
Abstract:
External coatings are routinely used to protect transmission pipelines from corrosion; however, coatings may degrade or disbond over time enabling corrosion to occur. Transmission pipeline operators often use magnetic flux leakage (MFL) in-line inspection tools to detect metal loss corrosion defects. Rather than finding the cause of a problem, failure of the coating within a corrosive environment, MFL corrosion surveys only find the result of the problem, corrosion defects that may permanently alter the pressure carrying capacity of the pipeline. Stress corrosion cracking (SCC) can be detected
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!