To see the other types of publications on this topic, follow the link: Construction time and cost overrun.

Dissertations / Theses on the topic 'Construction time and cost overrun'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 dissertations / theses for your research on the topic 'Construction time and cost overrun.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Eke, Gerald. "Determining the probability distributions of cost and time overrun arising from different contractor selection strategies in construction projects." Thesis, Aston University, 2017. http://publications.aston.ac.uk/33316/.

Full text
Abstract:
Failing to adequately select the winning contractor can lead to problems in the project delivery phase such as bad quality and project delay; which ultimately results in cost overruns. There are two strategies involved with selecting contractors: one is the lowest tender, the other is called best value. Selecting the lowest tender is straightforward; the latter strategy would involve scoring the contractors' tenders on price and quality and ranking them. The aim of this research is to provide a model of determining the probability distributions of cost and time arising from choosing different
APA, Harvard, Vancouver, ISO, and other styles
2

Salam, Md. "Time and cost overruns on high-rise building construction in Bangladesh." Thesis, Abertay University, 2007. https://rke.abertay.ac.uk/en/studentTheses/15bbc393-0b06-4691-a6ec-1e6a6d925179.

Full text
Abstract:
Construction projects in developing countries may suffer from time overruns, which are associated with cost overruns. This research project investigated both time and cost overruns on high-rise building projects in Dhaka, Bangladesh. Surprisingly, preliminary data analysis showed negligible cost overruns in comparison to time overruns. So, further analysis o f cost overruns was not considered in this thesis. This research project also investigated how the causes o f time-overruns can be mitigated. 72 time-overrun and 22 cost-overrun variables were identified through a literature review. These
APA, Harvard, Vancouver, ISO, and other styles
3

Al-Gathafi, Mohammad Moammar. "Riskness of time and cost overruns and the effectiveness of risk response measure strategies in the Libyan construction industry." Thesis, University of Liverpool, 2005. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.435380.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Ahiaga-Dagbui, Dominic Doe. "Rethinking construction cost overruns : an artificial neural network approach to construction cost estimation." Thesis, University of Edinburgh, 2014. http://hdl.handle.net/1842/10454.

Full text
Abstract:
The main concern of a construction client is to procure a facility that is able to meet its functional requirements, of the required quality, and delivered within an acceptable budget and timeframe. The cost aspect of these key performance indicators usually ranks highest. In spite of the importance of cost estimation, it is undeniably neither simple nor straightforward because of the lack of information in the early stages of the project. Construction projects therefore have routinely overrun their estimates. Cost overrun has been attributed to a number of sources including technical error in
APA, Harvard, Vancouver, ISO, and other styles
5

Saidu, Ibrahim. "Management of material waste and cost overrun in the Nigerian construction industry." Thesis, Nelson Mandela Metropolitan University, 2016. http://hdl.handle.net/10948/3792.

Full text
Abstract:
While wastage of materials has become a serious problem requiring urgent attention in the Nigerian Construction Industry, cost overrun is a problem, which affects 90 percent of the completed projects in the world; the argument on how to reduce/eliminate cost overrun has been on-going for the past 70 years; as the on-site wastage of materials leads to increases in the final project cost. Studies from different parts of the world have shown that construction-material waste represents a relatively large percentage of the production costs. Consequently, as a result of low levels of awareness, the
APA, Harvard, Vancouver, ISO, and other styles
6

Islam, Muhammad Saiful. "Modelling cost overrun risks in power plant projects." Thesis, Queensland University of Technology, 2019. https://eprints.qut.edu.au/125508/1/Muhammad%20Saiful_Islam_Thesis.pdf.

Full text
Abstract:
Cost overruns in power plant projects frequently occur, and this very alarming phenomenon requires proper risk assessment and management in the early phase of power plant project development. A modified fuzzy group decision-making approach (FGDMA) was developed and the critical risks in different phases of thermal power plant project were identified. Further, a novel fuzzy canonical model (FCM) was developed and the complex causal risk-networks were modelled to understand the root causes of cost overruns. The benefits of this research to practitioners are such that it provides greater understa
APA, Harvard, Vancouver, ISO, and other styles
7

Celenligil, Onur. "Analogical Reasoning For Risk Assessment And Cost Overrun Estimation In Construction Projects." Master's thesis, METU, 2010. http://etd.lib.metu.edu.tr/upload/12612229/index.pdf.

Full text
Abstract:
Project cost increase is the main concern in international construction projects which usually results in disputes and conflicts among the project participants. The aim of this thesis is to construct a database that represents risk event history regarding international construction projects and construct a cost overrun prediction model. It is hypothesized that magnitudes of project related, company related and country related risk factors can be predicted by assessing the level of vulnerability by analogical reasoning with previous projects. The vulnerability and risk factors can further be
APA, Harvard, Vancouver, ISO, and other styles
8

Creedy, Garry D. "Risk factors leading to cost overrun in the delivery of highway construction projects." Thesis, Queensland University of Technology, 2006. https://eprints.qut.edu.au/16399/1/Garry_Creedy_Thesis.pdf.

Full text
Abstract:
Accurate client budget estimates are critical to the initial decision-to-build process for the highway construction projects. This decision-to-build point in a project's development is seen as the international standard for measuring any subsequent cost estimate inaccuracies involved (National Audit Office/Department of Transport, 1992; World Bank, 1994; Nijkamp and Ubbels, 1999), with accuracy being defined as the difference between the initial project estimate at the decision-to-build stage and the real, accounted project cost determined at the time of project completion. Expressed as a perc
APA, Harvard, Vancouver, ISO, and other styles
9

Creedy, Garry D. "Risk factors leading to cost overrun in the delivery of highway construction projects." Queensland University of Technology, 2006. http://eprints.qut.edu.au/16399/.

Full text
Abstract:
Accurate client budget estimates are critical to the initial decision-to-build process for the highway construction projects. This decision-to-build point in a project's development is seen as the international standard for measuring any subsequent cost estimate inaccuracies involved (National Audit Office/Department of Transport, 1992; World Bank, 1994; Nijkamp and Ubbels, 1999), with accuracy being defined as the difference between the initial project estimate at the decision-to-build stage and the real, accounted project cost determined at the time of project completion. Expressed as a perc
APA, Harvard, Vancouver, ISO, and other styles
10

Al-Omari, Tareq. "Stochastic regression modelling of cost and duration overrun of construction projects implemented in Kuwait." Thesis, University of Liverpool, 2004. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.418590.

Full text
APA, Harvard, Vancouver, ISO, and other styles
11

Karakas, Kivanc. "Development Of A Multi Agent System For Negotiation Of Cost Overrun In International Construction Projects." Master's thesis, METU, 2010. http://etd.lib.metu.edu.tr/upload/12611941/index.pdf.

Full text
Abstract:
Multiagent systems (MAS) are systems consisting of several autonomous entities, called agents, which interact with each other to either further their own interests (competition) or in pursuit of a joint goal (cooperation). In systems composed of multiple autonomous agents, negotiation is a key form of interaction that enables groups of agents to arrive at a mutual agreement regarding some belief, goal or plan. The aim of this thesis is to develop a multiagent system that simulates the negotiation process between parties about sharing of cost overrun in international construction projects. The
APA, Harvard, Vancouver, ISO, and other styles
12

Baker, Robert D. "Time-cost relationships in construction." Thesis, Springfield, Virginia: Available from National Technical Information Service, 1991. http://hdl.handle.net/10945/28611.

Full text
APA, Harvard, Vancouver, ISO, and other styles
13

Atkin, B. L. "Time-cost planning of construction." Thesis, University of Reading, 1988. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.481844.

Full text
APA, Harvard, Vancouver, ISO, and other styles
14

El, Khawas Abdel Rahim, and Sanaz Aghaei. "Uncertainties and cost overruns in Construction Industry : An explanatory multiple case study investigating the differences in cost management under uncertainties in conventional and green construction companies." Thesis, Jönköping University, Internationella Handelshögskolan, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-48726.

Full text
Abstract:
Abstract Background Construction industry greatly affect the environment in the aspect of energy consumption and its contribution to global warming. Accordingly, green building construction is significantly growing, which makes it an interesting topic for researchers. Green buildings are defined as buildings constructed according to sustainability standards that keeps the natural environment healthy. However green construction is challenging in the economic aspect and the cost efficiency. Based on the researches, uncertainty is a main reason for cost overrun. In addition, procedures in early s
APA, Harvard, Vancouver, ISO, and other styles
15

Han, Sedat. "Estimation Of Cost Overrun Risk In Interrnational Project By Using Fuzzy Set Theory." Master's thesis, METU, 2005. http://etd.lib.metu.edu.tr/upload/12606032/index.pdf.

Full text
Abstract:
In the global construction market, most construction companies are willing to undertake international projects in order to maximise their profitability by taking advantage of attractive emerging markets and minimise dependence on unfavorable domestic market conditions. In order to be awarded a contract in highly competitive global construction market, companies should excel in choosing the most attractive markets and prepare winning bids for the selected construction projects in those markets. While preparing bids, the major concern of companies is to offer an optimum price that will enable th
APA, Harvard, Vancouver, ISO, and other styles
16

Mitra, John Paul, Joseph Shrestha, Jeremy Ross, and Jinseok Hong. "Analysis of Construction Cost Variation of Construction Manager General Contractor (CM/GC) Project." Digital Commons @ East Tennessee State University, 2019. https://dc.etsu.edu/etsu-works/5472.

Full text
Abstract:
Cost overrun is prevalent in the construction industry. Usually, an owner sets a budget at the preliminary phase of a project which changes over time. Past studies are focused on analyzing the cost growth of design-bid-build projects during construction. Limited efforts have been made to analyze details of projects delivered with the Construction Manager General Contractor (CM/GC) method. This study tracks and analyzes the construction cost variation of a project from the conceptual phase to the design completion phase. The analysis is presented with a case study of a new stadium construction
APA, Harvard, Vancouver, ISO, and other styles
17

STONE, ANDREA. "BENCHMARKING STUDY OF BRIDGE COST AND CONSTRUCTION TIME." University of Cincinnati / OhioLINK, 2007. http://rave.ohiolink.edu/etdc/view?acc_num=ucin1186761137.

Full text
APA, Harvard, Vancouver, ISO, and other styles
18

Kisamfu, Rehema Aman. "Investigating Contractual Challenges of Performing Cost Control in Building Construction Projects." Thesis, KTH, Fastigheter och byggande, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-297855.

Full text
Abstract:
Quantity Surveyors are considered as the most qualified cost specialists in the construction industry, with their experiences and skills in cost management and control as well as contract management. However, this role is not well recognized in Sweden compared to other countries such as the UK where it’s originated from. And so, the construction industry in Sweden uses other professions for the roles that were supposed to be done by quantity surveyors or cost managers. As a result, the quantity surveyors that have penetrated the Swedish construction industry, face challenges to perform their d
APA, Harvard, Vancouver, ISO, and other styles
19

Moret, Yvonne. "Modeling cost and time uncertainty in rail line construction." Thesis, Massachusetts Institute of Technology, 2011. http://hdl.handle.net/1721.1/66853.

Full text
Abstract:
Thesis (Ph. D.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 2011.<br>Cataloged from PDF version of thesis.<br>Includes bibliographical references (p. 437-443).<br>Transportation construction projects are often plagued by cost overruns and delays. Technical, economic-political, psychological, and legal causes explain the frequent underestimations. To counteract such underestimations, the author developed an innovative approach to capture cost and time uncertainty in rail line projects, and applied this to the construction of a new high speed rail line i
APA, Harvard, Vancouver, ISO, and other styles
20

Chinanuwatwong, Santi. "Scheduling overtime in construction using time-cost trade-off /." Digital version accessible at:, 1998. http://wwwlib.umi.com/cr/utexas/main.

Full text
APA, Harvard, Vancouver, ISO, and other styles
21

Moghayedi, Alireza. "Modelling uncertainty of cost and time in infrastructure projects." Doctoral thesis, Faculty of Engineering and the Built Environment, 2019. http://hdl.handle.net/11427/31079.

Full text
Abstract:
The construction of infrastructure projects is characterised by cost overruns and time delays. Scholars view that the estimation approach and inappropriate tools and techniques used to forecast possible uncertainty in the construction processes are a primary cause of cost overruns and time delays on construction projects. Uncertainties encountered in the construction process are underestimated and these impact on the final cost and time of construction projects through a combination of individual construction activities. The study, therefore, examines the initial and final cost of construction
APA, Harvard, Vancouver, ISO, and other styles
22

Zhang, Yanshuai, and 張彥帥. "Optimization of construction time and cost using the ant colony systemtechniques." Thesis, The University of Hong Kong (Pokfulam, Hong Kong), 2007. http://hub.hku.hk/bib/B38984362.

Full text
APA, Harvard, Vancouver, ISO, and other styles
23

Zhang, Yanshuai. "Optimization of construction time and cost using the ant colony system techniques." Click to view the E-thesis via HKUTO, 2007. http://sunzi.lib.hku.hk/hkuto/record/B38984362.

Full text
APA, Harvard, Vancouver, ISO, and other styles
24

Wong, Ricky Chin Wey. "Construction time and cost of multi-storey post-tensioned timber structures." Thesis, University of Canterbury. Department of Civil and Natural Resources Engineering, 2010. http://hdl.handle.net/10092/5256.

Full text
Abstract:
The environmentally friendly and high performance multi-storey LVL timber system developed at the University of Canterbury (UC) consisting of post-tensioned frames and shear walls is referred to as the Pres-Lam system. It is possible that this structural system has the ability to increase productivity and reduce construction costs when compared with concrete and steel construction materials. As the Pres-Lam system is a new technology, the actual construction time and cost are still unknown. The outcome of this research will add value to the construction industry and encourage the industry to c
APA, Harvard, Vancouver, ISO, and other styles
25

Shahandashti, Seyed Mohsen. "Analysis of construction cost variations using macroeconomic, energy and construction market variables." Diss., Georgia Institute of Technology, 2014. http://hdl.handle.net/1853/52281.

Full text
Abstract:
Recently, construction cost variations have been larger and less predictable. These variations are apparent in trends of indices such as Engineering News Record (ENR) Construction Cost Index (CCI) and National Highway Construction Cost Index (NHCCI). These variations are problematic for cost estimation, bid preparation and investment planning. Inaccurate cost estimation can result in bid loss or profit loss for contractors and hidden price contingencies, delayed or cancelled projects, inconsistency in budgets and unsteady flow of projects for owner organizations. Cost variation has become a ma
APA, Harvard, Vancouver, ISO, and other styles
26

Zheng, Xinmin, and 鄭新敏. "A fuzzy genetic algorithms (GAs) model for time-cost optimization in construction." Thesis, The University of Hong Kong (Pokfulam, Hong Kong), 2003. http://hub.hku.hk/bib/B27510839.

Full text
APA, Harvard, Vancouver, ISO, and other styles
27

McGowan, Paul Hugh. "Integrated cost and time models for measuring, valuing and controlling construction projects." Thesis, University of Dundee, 1994. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.282728.

Full text
APA, Harvard, Vancouver, ISO, and other styles
28

Djurisic, Stefan, and Pawel Glazowski. "Undersökning av kostnadsöverskridande i byggbranschen : Faktorer som påverkar att slutsumman blir högre än den estimerade kostnadskalkylen." Thesis, KTH, Byggteknik och design, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-287205.

Full text
Abstract:
The purpose of this study is to identify main factors when cost estimate is being exceeded in the construction industry both nationally and globally. If the cost estimation is exceeded, it may result in losses for the company, which can be severe and cause extensive damage. Therefore, a study is necessary to see if it is possible to perform a more detailed cost calculation.Cost overruns occur in both bigger and smaller projects. Factors causing cost overruns do not always have to be of the same category. Identifying negative factors as a guideline is troublesome due to the fact that one projec
APA, Harvard, Vancouver, ISO, and other styles
29

Perovic, Miljenka. "Overcoming the challenges of building heritage projects: Improvements to time, scope and cost performance." Thesis, Queensland University of Technology, 2015. https://eprints.qut.edu.au/91544/1/Miljenka_Perovic_Thesis.pdf.

Full text
Abstract:
This research was undertaken to encompass and identify challenges and impact factors that affect the successful outcomes of heritage building projects, especially those related to finding major causes of delays and cost overruns across projects in all Australian states. This project determined and analysed the causes of such delays and programme issues emanating from the planning and execution phases, whilst also analysing the requirements for management of multiple stakeholder relationships and the influence of unforeseen technical factors. The research proposes "call for action" guidance and
APA, Harvard, Vancouver, ISO, and other styles
30

Smith, Tobias James. "Feasibility of Multi Storey Post-Tensioned Timber Buildings: Detailing, Cost and Construction." Thesis, University of Canterbury. Civil and Natural Resources Engineering, 2008. http://hdl.handle.net/10092/2587.

Full text
Abstract:
This thesis describes a feasibility study into the use of a new method of timber construction developed in New Zealand. This new method combines the use of an engineered wood product (Laminated Veneer Lumber) and post-tensioned ductile connections. Three case study buildings are presented in concrete, steel and timber all representing current design and construction practice. A fourth building, referred to as the “timber plus” structure, is also considered with the addition of timber architectural components. The case study timber building consists of two lateral resisting systems. In one dir
APA, Harvard, Vancouver, ISO, and other styles
31

Gonzalez, Julian Santiago Sr. "Using Fuzzy Mathematical Models for construction project scheduling with time, cost and material restrictions." Ohio University / OhioLINK, 2007. http://rave.ohiolink.edu/etdc/view?acc_num=ohiou1180987976.

Full text
APA, Harvard, Vancouver, ISO, and other styles
32

Kriebel, Matilda, and Emma Wolgsjö. "Proaktiv ändringshantering i uppstart av byggprojekt : En fallstudie om hur projektledare kan förebygga kostnader för tillägg i mindre byggprojekt." Thesis, Högskolan i Gävle, Industriell ekonomi, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:hig:diva-30309.

Full text
Abstract:
A project can be defined as a temporary work that is within the scope of time and budget in terms of achieving a project goal. Due to the fact that construction projects are unique and usually very complex, project management therefore requires a working method that is adapted to the prerequisites of the project. The project manager's responsibility to follow up on the budget and ensure that resources such as working hours and consulting services are distributed correctly, is becoming increasingly challenging as the change paradox shows that flexibility decreases and costs for changes increase
APA, Harvard, Vancouver, ISO, and other styles
33

Piek, Philippus Jacobus. "An investigation into the time and cost factors for a decision between in-situ and hybrid concrete construction." Thesis, Stellenbosch : Stellenbosch University, 2014. http://hdl.handle.net/10019.1/95857.

Full text
Abstract:
Thesis (MEng)--Stellenbosch University, 2014.<br>ENGLISH ABSTRACT: The construction industry is a competitive market and contractors need to keep up-to-date with new construction methods and technologies. Project teams in South Africa are required to make decisions during the early stages of construction projects. These decisions often need to be made in a short time period, and include the decision between various construction methods, such as the decision between in-situ concrete construction and hybrid concrete construction. Hybrid concrete construction is a combination of pre-fabricat
APA, Harvard, Vancouver, ISO, and other styles
34

Weeks, Jason A. "Understanding the issues of project cost and time in sustainable construction from a general contractor's perspective: case study." Thesis, Georgia Institute of Technology, 2010. http://hdl.handle.net/1853/33914.

Full text
Abstract:
The green building market has seen tremendous growth in the past decade. Organizations such as the US Green Building Council have emerged to become a dominant leader in the building industry. Although the green building rating systems are cross-disciplinary, much of the focus has been directed towards design-related input. General Contractors play an important role in delivering successful sustainable construction projects. If an integrated project delivery method is chosen, the General Contractor may offer insightful preconstruction assistance by providing ideas on green construction me
APA, Harvard, Vancouver, ISO, and other styles
35

Gifra, Bassó Ester. "Desarrollo de un modelo para el seguimiento y control económico y temporal durante la fase de ejecución en la obra pública. Integration of information for advanced detection of cost overruns-IMADO." Doctoral thesis, Universitat de Girona, 2018. http://hdl.handle.net/10803/550975.

Full text
Abstract:
The primary objective of this research is to modify the models regularly used to record and monitor the implementation costs of public works projects from the perspective of the promotor, the project directors or the project managers. This is done with a structure similar to the traditional system of meticulously recording project costs to obtain additional trustworthy and accurate information about current and future economic deviations that may occur during project implementation and about the probable liquidation and closing horizon of the project. That is possible if the economic informati
APA, Harvard, Vancouver, ISO, and other styles
36

Ozcan-Deniz, Gulbin. "An Integrated Multi-Agent Framework for Optimizing Time, Cost and Environmental Impact of Construction Processes." FIU Digital Commons, 2011. http://digitalcommons.fiu.edu/etd/455.

Full text
Abstract:
Environmentally conscious construction has received a significant amount of research attention during the last decades. Even though construction literature is rich in studies that emphasize the importance of environmental impact during the construction phase, most of the previous studies failed to combine environmental analysis with other project performance criteria in construction. This is mainly because most of the studies have overlooked the multi-objective nature of construction projects. In order to achieve environmentally conscious construction, multi-objectives and their relationships
APA, Harvard, Vancouver, ISO, and other styles
37

Yakubu, Olawale Adisa. "Cost and time control practice of construction projects in the UK : the pursuit of effective management control." Thesis, University of the West of England, Bristol, 2010. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.525215.

Full text
Abstract:
The aim of project control is to ensure projects finish on time, within budget and achieve other project objectives. It is a complex task undertaken by project managers in practice. During the last few decades, numerous project control techniques, methods and software packages have been developed. Despite this many projects still do not achieve their cost and time objectives. Research in this area has so far has mainly been devoted to identifying causes of cost and time overruns. There is limited research geared at studying factors inhibiting the ability of practitioners to effectively control
APA, Harvard, Vancouver, ISO, and other styles
38

Inyim, Peeraya. "Time, Cost, and Environmental Impact Analysis for Sustainable Design at Multiple Building Levels." FIU Digital Commons, 2015. http://digitalcommons.fiu.edu/etd/1800.

Full text
Abstract:
Construction projects are complex endeavors that require the involvement of different professional disciplines in order to meet various project objectives that are often conflicting. The level of complexity and the multi-objective nature of construction projects lend themselves to collaborative design and construction such as integrated project delivery (IPD), in which relevant disciplines work together during project conception, design and construction. Traditionally, the main objectives of construction projects have been to build in the least amount of time with the lowest cost possible, thu
APA, Harvard, Vancouver, ISO, and other styles
39

Karimi, Hossein. "QUANTITATIVE ANALYSIS OF THE IMPACT OF CRAFT LABOR AVAILABILITY ON CONSTRUCTION PROJECT PERFORMANCE." UKnowledge, 2017. http://uknowledge.uky.edu/ce_etds/56.

Full text
Abstract:
A shortage of skilled craft labor in the North American construction industry has been an unfortunate cyclic trend since the late 1980s. This shortage has been reported and discussed frequently by numerous past studies in the context of construction industry. The 2008 U.S. recession was at least one period when the craft shortage temporarily improved, as witnessed by spikes in construction unemployment rates above 20% due to the work slowdowns. However, the current economic recovery period is once again experiencing craft shortages in some sectors of the U.S. construction industry. Although th
APA, Harvard, Vancouver, ISO, and other styles
40

Alder, Morgan A. "Comparing Time and Accuracy of Building Information Modeling to On-Screen Takeoff for a Quantity Takeoff of a Conceptual Estimate." Diss., CLICK HERE for online access, 2006. http://contentdm.lib.byu.edu/ETD/image/etd1487.pdf.

Full text
APA, Harvard, Vancouver, ISO, and other styles
41

Alsaqqa, Obada. "Fuzzy Time-Delay Model in Fault-Tree Analysis for Critical Path Method." The Ohio State University, 2015. http://rave.ohiolink.edu/etdc/view?acc_num=osu1429772426.

Full text
APA, Harvard, Vancouver, ISO, and other styles
42

Braimah, Nuhu. "An investigation into the use of construction delay and disruption analysis methodologies." Thesis, University of Wolverhampton, 2008. http://hdl.handle.net/2436/38824.

Full text
Abstract:
Delay and disruption (DD) to contractors’ progress, often resulting in time and cost overruns, are a major source of claims and disputes in the construction industry. At the heart of the matter in dispute is often the question of the extent of each contracting party’s responsibility for the delayed project completion and extra cost incurred. Various methodologies have been developed over the years as aids to answering this question. Whilst much has been written about DD, there is limited information on the extent of use of these methodologies in practice. The research reported in this thesis w
APA, Harvard, Vancouver, ISO, and other styles
43

Friberg, Martin, and Eric Ringtun. "Prefabricerade innerväggar : Kostnad- och tidseffektivitet för lätta prefabricerade innerväggar." Thesis, KTH, Byggvetenskap, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-174127.

Full text
Abstract:
Kostnad och tid är två parametrar som går hand i hand i näst intill alla sammanhang, inte minst i byggbranschen. Pressade tidsplaner och snäva budgetar kräver noggrannhet och effektivitet genom samtliga skeden i byggprocessen. Framför allt är en kortare byggtid av stor vikt, som ett resultat av det har det industriella byggandet fått en alltmer betydande roll. Syftet med denna rapport är att undersöka lönsamheten vid användandet av prefabricerade element gentemot konventionell platsbyggning. Arbetet har avgränsats till att undersöka ett enskilt område, nämligen lätta innerväggar. Rapporten har
APA, Harvard, Vancouver, ISO, and other styles
44

Ibrahim, Mohamed. "Analyzing Decision Making in Alternative Contracting for Highway Pavement Rehabilitation Projects." FIU Digital Commons, 2016. http://digitalcommons.fiu.edu/etd/2622.

Full text
Abstract:
The negative impacts associated with highway pavement rehabilitation projects drove state highway agencies (SHAs) towards increased adoption of alternative contracting methods (ACMs) to accelerate the construction of such projects; hence, reducing these impacts on the travelling public. However, the application of such methods showed mixed results due to the lack of specific guidelines addressing the adoption of such methods and the selection of the best ACM for each project. This lack of guidelines stems from the lack of research studies examining the impact of each of these methods on the ti
APA, Harvard, Vancouver, ISO, and other styles
45

Aronsson, Greta, and Emelie Emanuelsson. "Ökad lönsamhet genom rätt val av arbetstidsförläggning : En tid- och kostnadsjämförelse mellan olika typer av arbetsveckor i produktion." Thesis, KTH, Byggteknik och design, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-287207.

Full text
Abstract:
This bachelor’s thesis is written in collaboration with Skanska. The purpose of this thesis is to implement a time and cost analysis to compare the standard working week with five variations of work arrangements to investigate which is the most profitable. The thesis also examines which factors affects profitability and whether shift work is a good alternative in the construction industry. Depending on choice of working arrangement, it is possible to reduce both time and cost for a project.A calculation model has been created to be able to compare the different working arrangements. The purpos
APA, Harvard, Vancouver, ISO, and other styles
46

Tiene, Sara. "Genetic algorithms for construction management: the case study of a building envelope design optimization." Master's thesis, Alma Mater Studiorum - Università di Bologna, 2017.

Find full text
Abstract:
The present work deals with the study and analysis of the simultaneous optimization of time, cost and quality by using artificial intelligence technique; The approach is based on the use of genetic algorithms implemented in Matlab applied to a case study, the construction of a new University Campus in Cesena, focusing on the external walls of the building itself. The objective is to find a set of optimal solutions, equally valid, for the realization of stratigraphies of the different types of external masonry; It will then be the task of the designer to choose among possible solutions which he
APA, Harvard, Vancouver, ISO, and other styles
47

Paananen, Linnea, and Injonglan Gamm Burom. "En möjlighet till en hållbar byggbransch : Jämförelsestudie mellan stommaterialen KL-trä och prefabricerad betong." Thesis, KTH, Byggteknik och design, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-259934.

Full text
Abstract:
Byggbranschen står idag för cirka 21 procent av Sveriges totala årliga utsläpp av växthusgaser. En stor utmaning är att kunna uppnå klimatlagens mål som innebär att Sverige inte ska ha några nettoutsläpp av växthusgaser i atmosfären de kommande decennierna. Samtidigt ökar behovet av fler bostäder i samband med en ökad befolkning. Betong är det material som dominerar dagens industriella byggande av flervåningshus och i samband med den tidigare svenska lagen som förbjöd träkonstruktioner med fler än två våningar är träbyggandet i Sverige inte lika etablerat i samma utsträckning som betongkonstru
APA, Harvard, Vancouver, ISO, and other styles
48

Kjellman, Felix, and Hugo Pettersson. "Budgetöverskridanden i kommunala investeringsprojekt : En fallstudie på en liten kommun." Thesis, Luleå tekniska universitet, Institutionen för ekonomi, teknik, konst och samhälle, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-85188.

Full text
Abstract:
Världen över sker ständiga budgetöverskridanden. Offentliga verksamheter har inte varit något undantag för dessa kostnadsöverskridanden, vilket skapar incitament till att förstå varför de uppstår. I de offentliga projekten drabbas fler än bara de projektansvariga vid budgetöverskridelser. Det är samhället i stort som får betala för arbetet eftersom det är skattefinansierade projekt. Examensarbetet utgör en fallstudie som genomfördes med syftet att skapa förståelse för varför budgetöverskridanden sker i en liten kommun. För att uppnå syftet har både sekundär- och primärdata använts i form av en
APA, Harvard, Vancouver, ISO, and other styles
49

Pakgohar, Alireza. "Hierarchical multi-project planning and supply chain management : an integrated framework." Thesis, University of Exeter, 2014. http://hdl.handle.net/10871/15720.

Full text
Abstract:
This work focuses on the need for new knowledge to allow hierarchical multi-project management to be conducted in the construction industry, which is characterised by high uncertainty, fragmentation, complex decisions, dynamic changes and long-distance communication. A dynamic integrated project management approach is required at strategic, tactical and operational levels in order to achieve adaptability. The work sees the multi-project planning and control problem in the context of supply chain management at main contractor companies. A portfolio manager must select and prioritise the project
APA, Harvard, Vancouver, ISO, and other styles
50

Sidabutar, Marsingal, and Marouf Pervin Kilic. "Väggelement i trä : Prefab vs platsbyggt." Thesis, KTH, Byggteknik och design, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-302364.

Full text
Abstract:
Prefabricering av väggelement är en byggmetod under stark framväxt i byggandet av småhus de senaste decennierna. Kostnadseffektiviteten nämns ofta som ett skäl till att prefabricering av småhus har en sådan stor framväxt. Samtidigt har miljö- och klimatfrågan växt och då byggsektorn står för en stor del av Sveriges koldioxidutsläpp krävs det att byggsektorn ställer om till ett allt med hållbart byggande. Detta examensarbete har undersökt denna kostnadseffektivitet och hur och om en går att kombinera med ett hållbart byggande och sedan jämfört detta med platsbyggda väggar i trä. Underlag har ta
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!