To see the other types of publications on this topic, follow the link: Construction time and cost overrun.

Journal articles on the topic 'Construction time and cost overrun'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 journal articles for your research on the topic 'Construction time and cost overrun.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.

1

Mulye, Priyesh. "Significance and Analysis of Time and Cost Overrun in the Construction Industry of Mumbai." International Journal for Research in Applied Science and Engineering Technology 9, no. 11 (2021): 295–310. http://dx.doi.org/10.22214/ijraset.2021.38789.

Full text
Abstract:
Abstract: The occurrence of time and cost overrun has become quite significant in a majority of construction projects in India, which is negatively affecting the GDP and potential development of nation. As per the statistics of project cost and duration in March 2012, 179 projects out of 555 projects of worth 150 Crore INR have been facing cost and time overrun and others are at the very high risk, with the total construction cost overrun of 1.23 Lakh Crore INR. (Times, 2013) The time and cost overrun of the construction projects results in overextension of the time and finance of the client w
APA, Harvard, Vancouver, ISO, and other styles
2

Mohammad, Karukh Hassan, Noori Sadiq Ali, and Basira Majeed Najm. "Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate." Journal of Engineering 27, no. 2 (2021): 106–25. http://dx.doi.org/10.31026/j.eng.2021.02.08.

Full text
Abstract:
Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variat
APA, Harvard, Vancouver, ISO, and other styles
3

Louzolo-Kimbembé, Paul, Chrispin Pettang, and Thomas Tamo Tatiétsé. "Minimisation des surcoûts dans un contexte hors délai : cas des projets de construction dans les pays en développement." Canadian Journal of Civil Engineering 34, no. 9 (2007): 1180–91. http://dx.doi.org/10.1139/l07-089.

Full text
Abstract:
Cost overruns are frequent in the construction industry. They become greater the more the construction project is delayed. In developing countries, this situation is recurring and constitutes a significant financial problem. In a time-overrun context, our objective is to find a method that can enable us to reduce the delay while minimizing the subsequent cost overruns. We thus developed a mathematical model named CCOMTOC (construction cost optimisation model in time-overrun context). The model was tested and results reveal that the reduction of cost overruns is effective. We showed that in a t
APA, Harvard, Vancouver, ISO, and other styles
4

Leu, Sou-Sen, Yanni Liu, and Pei-Lin Wu. "Project Cost Overrun Risk Prediction Using Hidden Markov Chain Analysis." Buildings 13, no. 3 (2023): 667. http://dx.doi.org/10.3390/buildings13030667.

Full text
Abstract:
Construction project cost overrun is a common problem in the construction industry. The cost of construction projects is thought to have increased by approximately 33% on average. Several types of research on construction project cost overrun have been conducted and these generally rely on historical data. However, whilst each project has its own project characteristics and cost trend, real-time project cost data are more reliable to forecast its own cost trend. This paper proposes a real-time hidden Markov chain (HMM) model to predict cost overrun risk based on project-owned cost performance
APA, Harvard, Vancouver, ISO, and other styles
5

Sharad More, Mr Sanved. "Factors Affecting Time and Cost Overrun – Indian Scenario." INTERNATIONAL JOURNAL OF SCIENTIFIC RESEARCH IN ENGINEERING AND MANAGEMENT 09, no. 05 (2025): 1–9. https://doi.org/10.55041/ijsrem47227.

Full text
Abstract:
Abstract - In the Indian construction industry, time and cost overruns are an ongoing issue, especially for major road infrastructure projects. Using information from primary data gathered through structured surveys as well as literature, this study examines the main causes of these overruns. Finding the most significant causes, evaluating their relative effects, and making useful suggestions for minimizing them were the goals of the study. To determine the fundamental factors causing delays in projects and cost increases, a thorough literature review was carried out. A questionnaire survey wa
APA, Harvard, Vancouver, ISO, and other styles
6

Zavvar, Kazim, Sharif Mohammad, and Ahmed Akil. "Strategies for Reducing Construction Project Delays and Cost Overruns." International Journal of Civil and Structural Engineering Research 11, no. 1 (2023): 91–98. https://doi.org/10.5281/zenodo.8385877.

Full text
Abstract:
<strong>Abstract:</strong> The present research aims to analyze the causes of delays and cost overruns in construction projects and to identify the methods to minimize delays and cost overruns. In the present era of rising need for infrastructure and growing competitiveness, construction projects must be completed on time and without cost overrun. Most construction projects are complex and filled with challenges, unexpected hindrances, and frequently emerging issues, leading to time and cost overruns. This research identified several government construction projects that suffered from delays a
APA, Harvard, Vancouver, ISO, and other styles
7

M, Chandrabose, and Balaji B. "ANALYTICAL SOLUTION TO MITIGATE THE RISK ARISING OUT OF TIME OVERRUN IN THE CONSTRUCTION PROJECTS VIA FORECASTING." International Journal of Engineering Applied Sciences and Technology 7, no. 7 (2022): 86–91. http://dx.doi.org/10.33564/ijeast.2022.v07i07.016.

Full text
Abstract:
Construction industry is getting affected by cost overruns, time overruns, poor budgeting &amp; planning. Currently there is no analytical tool available which can act as a benchmarking system to measure the performance of a project based on the historical data of past projects. This is an effort to predict time overrun and cost overrun in projects for taking precautionary measures to minimize or reduce the impact.
APA, Harvard, Vancouver, ISO, and other styles
8

Berihu, Lielti Gebreegziabher, Berhane Grum, Zeru Tariku, and Bizuneh Asfaw Abebe. "Causes, Effects, and Mitigation Measures of Time and Cost Overruns in Water Supply Projects: Case of Tigrai Region, Northern Ethiopia." Advances in Civil Engineering 2023 (May 18, 2023): 1–19. http://dx.doi.org/10.1155/2023/7113730.

Full text
Abstract:
Project cost overrun and schedule delay are major and widespread problems in the construction industry. In Tigrai, most water supply construction projects are not completed within the predetermined contract time and planned budget. Hence, this research was carried out to investigate the causes and effects of time and cost overrun in water supply projects in Tigrai, northern Ethiopia and further recommend effective mitigation measures. A total of 87 questionnaires were distributed, 50 of them were collected, and desk study of 12 water supply projects were conducted. Data were analyzed using rel
APA, Harvard, Vancouver, ISO, and other styles
9

Alhammadi, Yasir, Mohammad S. Al-Mohammad, and Rahimi A. Rahman. "Modeling the Causes and Mitigation Measures for Cost Overruns in Building Construction: The Case of Higher Education Projects." Buildings 14, no. 2 (2024): 487. http://dx.doi.org/10.3390/buildings14020487.

Full text
Abstract:
The formidable need for building projects places greater pressure on stakeholders to deliver these projects on time, within the budget, and with high quality. However, many building projects have experienced extensive cost overruns despite extensive research on their causes and mitigation measures. Thus, the effectiveness of mitigation measures is questionable. This study examines the status of cost overrun in building construction projects and develops a structural equation model to establish the relationships between causes of cost overrun and mitigation measures, using higher education buil
APA, Harvard, Vancouver, ISO, and other styles
10

Sachchithananthan, M., K. Niranjan, and M. Thayaparan. "Simulation modelling of cost overruns in building projects: a panel data analysis." FARU Journal 11, no. 1 (2024): 36–46. http://dx.doi.org/10.4038/faruj.v11i1.312.

Full text
Abstract:
Cost overrun is often a challenge in the construction industry due to its complex nature and inefficient project management. Despite extensive research, cost overruns persist in construction. Hence, to minimise these challenges, factors attributing to the cost overrun need to be identified. A country-based assessment is needed since these factors vary from nation to nation. Research conducted almost two decades ago has identified the key cost-related factors influencing cost overrun of Sri Lankan building projects as variation, extra work, fluctuation of price and currency, day works and other
APA, Harvard, Vancouver, ISO, and other styles
11

Omran, Abdelnaser, Mohamed Saad Hamad Saleh, and Abdelwahab Omran Gebril. "Factors Causing Time and Cost Overruns of Construction Projects in Malaysia." DESIGN, CONSTRUCTION, MAINTENANCE 3 (October 18, 2023): 179–86. http://dx.doi.org/10.37394/232022.2023.3.15.

Full text
Abstract:
Cost overrun is a problem that the construction industry faces in many countries, including Malaysia. It is a significant problem in Malaysia because most Malaysian construction projects have seen cost overruns of between 5 and 10% of the overall contract sum. This study aims to look at the factors that could lead to time and cost overruns in Malaysian construction projects. This study's objective was accomplished by using a quantitative approach to gather data which involved the use of questionnaire surveys. The study employed a stratified random selection method for the collection of informa
APA, Harvard, Vancouver, ISO, and other styles
12

Helwande, Mohit Vijay, Dr Yashvant Patil, and Prof Pallavi. "Cost and Time Over Run in Construction Projects." International Journal for Research in Applied Science and Engineering Technology 11, no. 7 (2023): 535–41. http://dx.doi.org/10.22214/ijraset.2023.54703.

Full text
Abstract:
Abstract: Construction industry is one of the biggest and fast-growing industry in India which is providing employment to millions of people and also contributing for economic development of nation. But the major and common problem faced by this industry is cost overrun and time overrun. Therefore, there is need to study this topic. This research paper will help to understand cost and time overrun in construction project. Hence the main aim of these paper is to identify the factors affecting cost overrun and time overrun in construction project and provide suitable strategies to avoid it. Meth
APA, Harvard, Vancouver, ISO, and other styles
13

Famiyeh, Samuel, Charles Teye Amoatey, Ebenezer Adaku, and Collins Sena Agbenohevi. "Major causes of construction time and cost overruns." Journal of Engineering, Design and Technology 15, no. 2 (2017): 181–98. http://dx.doi.org/10.1108/jedt-11-2015-0075.

Full text
Abstract:
Purpose In Ghana, the duration of construction projects from inception to completion is becoming a great concern, recently, especially among clients and beneficiaries, because of the rising interest rates, inflation, development plan targets, among other factors. Hence the need to understand the causes of delays and cost overrun in the construction sector has become more important than ever. This study therefore aims to identify the major factors underlying time and cost overruns in projects related to the education sector in Ghana to proffer practical solutions in addressing them. Design/meth
APA, Harvard, Vancouver, ISO, and other styles
14

Nassar, Aymen, and Ahmed Elbisy. "Evaluation of Factors Leading to Time Delays and Cost Overruns in Marine Construction Projects." Engineering, Technology & Applied Science Research 14, no. 5 (2024): 16095–102. http://dx.doi.org/10.48084/etasr.8116.

Full text
Abstract:
Marine construction projects are among the most complex endeavors undertaken, as they are subject to numerous variables and constraints that make them more vulnerable to cost overruns and time delays than other project types. This study investigates the potential factors that influence time delays and cost overruns in marine construction projects. For this purpose, 43 factors that affect marine construction projects in terms of cost overrun and time delay were identified and categorized into nine main groups through a detailed literature review process, as well as interviews with experts from
APA, Harvard, Vancouver, ISO, and other styles
15

Baila, MAR, N. Mutuku Raphael, Danso Humphrey, and Hamady Touré Alhousseynou. "Assessment of the Factors Contributing to Cost and Time Overrun in Building Construction Project: A Case Study of Mauritania." Assessment of the Factors Contributing to Cost and Time Overrun in Building Construction Project: A Case Study of Mauritania 8, no. 11 (2023): 16. https://doi.org/10.5281/zenodo.10219489.

Full text
Abstract:
The paper examines the issues of cost and time overruns in the context of construction activities in Mauritania. The construction industry as the main engine of economic growth faces the worldwide problems of delays and overspending. These challenges contribute to financial losses and project delays in the Mauritanian context hence the need to understand what causes them. The primary goal of this study is to determine and understand what causes cost and time overrun in project in Mauritania. Using both quantitative and qualitative research techniques, information was gathered via questionnaire
APA, Harvard, Vancouver, ISO, and other styles
16

Bagale, S., and N. Bohara. "Factors Affecting Construction Project Performance: Bharatpur Metro Case Study." Journal of UTEC Engineering Management (JUEM) 2, no. 1 (2024): 13–24. https://doi.org/10.5281/zenodo.13169480.

Full text
Abstract:
This study is conducted to evaluate the time, cost overrun, time-cost relationship and to identify and evaluate the major factors affecting the performance of construction projects in Bharatpur metropolitan city. The study of 11 recently completed ward office building construction projects, revealed that all of them experienced time overruns, ranging from 28% to 150% beyond the contract time. Additionally, 9 of the 11 projects suffered from cost overruns, ranging from 18.54% to 41.03% over the contract amount. In Bharatpur metropolitan city, there is a positive but moderately predictive relati
APA, Harvard, Vancouver, ISO, and other styles
17

Chadee, Aaron, Salisha R. Hernandez, and Hector Martin. "The Influence of Optimism Bias on Time and Cost on Construction Projects." Emerging Science Journal 5, no. 4 (2021): 429–42. http://dx.doi.org/10.28991/esj-2021-01287.

Full text
Abstract:
The unresolved scholarly debate to curtail cost and time performances in projects has led to alternate solutions, departing from the dominant technical school of thought to include concepts from behavioural sciences. In this paper, we consider the psychological effect, namely optimism bias, as one of the root causes for delays in cost overruns on projects. The research objectives were to determine the level of bias among project participants, rank time and cost overrun causes according to the participants’ bias score and establish a mitigation strategy to curb potential delays and cost overrun
APA, Harvard, Vancouver, ISO, and other styles
18

Gowtham, Kishor Kumar B., and Palson P. "Factors Influencing Cost Overrun and Delay with Their Risks in Construction Management." International Journal of Recent Technology and Engineering (IJRTE) 9, no. 3 (2020): 439–43. https://doi.org/10.35940/ijrte.C4549.099320.

Full text
Abstract:
Cost overrun and delay are the most important factors which affect the rate of progress in construction industries. There are numerous Risks are involved in cost and schedule overrun which leads to unprofitable situation or dropping the project. Previous literature studies are mainly focused only on cost overrun and delay but they do not deal with their risks which is important to study. This study is to assess the factors influencing time and cost overruns on construction projects and their risks also. The objectives of the study were achieved through valid questionnaire. The questionnaires a
APA, Harvard, Vancouver, ISO, and other styles
19

Idrees, Shehryar, and Muhammad Tariq Shafiq. "Factors for Time and Cost Overrun in Public Projects." Journal of Engineering, Project, and Production Management 11, no. 3 (2021): 243–54. http://dx.doi.org/10.2478/jeppm-2021-0023.

Full text
Abstract:
Abstract The construction industry in Pakistan is experiencing a surge in public sector projects due to major investments in infrastructure projects. Project delays and cost overrun are common features in public sector construction projects in Pakistan. Therefore, an understanding of the causes of time and cost overrun in public projects is essential. This paper investigates delay and cost overrun factors within the context of public sector projects in Pakistan. This study identifies 48 potential factors from existing literature and semi-structured interviews were used to refine the identified
APA, Harvard, Vancouver, ISO, and other styles
20

Melaku Belay, Solomon, Seifu Tilahun, Mitiku Yehualaw, Jose Matos, Helder Sousa, and Endalew Temesgen Workneh. "Analysis of Cost Overrun and Schedule Delays of Infrastructure Projects in Low Income Economies: Case Studies in Ethiopia." Advances in Civil Engineering 2021 (November 17, 2021): 1–15. http://dx.doi.org/10.1155/2021/4991204.

Full text
Abstract:
Today, several developing countries struggle to improve the cost and time performances of major infrastructure works due to various reasons. Cost overrun and delay are one of the major challenges being faced by the construction and infrastructure sector. Hence, the aim of this study is to explore the extent of cost overrun and schedule delays in building and road infrastructure projects across the Ethiopian construction industry. Primary data were collected through a structured questionnaire survey to evaluate the potential risks leading to those challenges. Various data analysis tools were em
APA, Harvard, Vancouver, ISO, and other styles
21

Irfan, Muhammad, Muhammad Sohail Anwar Malik, and Syyed Sami Ul Haq Kaka Khel. "Effect of factors of organizational structure influencing nonphysical waste in road projects of developing countries." Engineering, Construction and Architectural Management 27, no. 10 (2020): 3135–53. http://dx.doi.org/10.1108/ecam-06-2019-0327.

Full text
Abstract:
PurposeThe purpose of this research is to rank the most significant factors of organizational structure that can reduce time and cost overruns (nonphysical waste) in road projects of the developing countries. Additionally, the effect of factors of organizational structure on nonphysical waste in road projects is also measured.Design/methodology/approachFactors of organizational structure causing time and cost overrun are extracted through a content analysis of the published literature. Moreover, a questionnaire survey is carried out involving 128 professionals to assess the effect of organizat
APA, Harvard, Vancouver, ISO, and other styles
22

Dosumu, O. S., O. G. Dosumu, and J. Uwanyirigira. "Assessment of Cost and Time of Errors in Construction Documents on Selected Building Projects in Nigeria." Environmental Technology and Science Journal 14, no. 1 (2023): 104–15. http://dx.doi.org/10.4314/etsj.v14i1.11.

Full text
Abstract:
The construction industry has generally been tagged with poor project performance. Cost and time overruns are the leading causes of poor performance. Design and construction errors are equally leading causes of cost and time overruns. The objectives of this study are to investigate the prevalent types of errors in construction documents, the cost implication of the errors, the time implication of the errors, and strategies adopted to mitigate the errors. The study involves an interview of construction professionals on 51 selected building projects across the southwestern States of Nigeria thro
APA, Harvard, Vancouver, ISO, and other styles
23

Ameh, Oko, and Emeka Osegbo. "Study of relationship between time overrunand productivity on construction sites." International Journal of Construction Supply Chain Management 1, no. 1 (2011): 56–67. http://dx.doi.org/10.14424/ijcscm101011-56-67.

Full text
Abstract:
The history of the construction industry worldwide is full of projects that were completed with significant time and cost overruns. In an attempt to reverse this trend, this study aims at establishing the relationship between time overrun and labour productivity on construction sites in Lagos, Nigeria. 43 technical and management staff of some medium and large construction firms based in Lagos, Nigeria were sampled and administered a questionnaire survey. The questionnaire contained 18 causes of project time overrun and 14 causes of low labour productivity which had been identified from the li
APA, Harvard, Vancouver, ISO, and other styles
24

Shaikh, F. A. "Financial Mismanagement: A Leading Cause of Time and Cost Overrun in Mega Construction Projects in Pakistan." Engineering, Technology & Applied Science Research 10, no. 1 (2020): 5247–50. https://doi.org/10.5281/zenodo.3659571.

Full text
Abstract:
One important and well-known issue for the majority of construction projects such as buildings, roads, bridges, airports and many more projects all over the world is time and cost overrun. Project pricing and time period delay are also major issues. The current investigation is taking into consideration the mega construction projects in the provinces of Pakistan, looking into various components controlling and dominating time and cost overrun. A total of 29 factors were identified from literature work and one questionnaire was designed and distributed among 160 respondents. All collected data
APA, Harvard, Vancouver, ISO, and other styles
25

Mtana, Method, George Mwaluko, and Juma Matindana. "Current and Future Trends of Construction Project Performance Models: A Review." Tanzania Journal of Engineering and Technology 42, no. 1 (2023): 58–71. http://dx.doi.org/10.52339/tjet.v42i1.888.

Full text
Abstract:
The construction industry (CI) has experienced outstanding growth and contributed to economic growth for many countries, with enormous foreign investments that require quality projects. High pressure to reduce the construction cost and time commonly put the industry at risk of lower quality and safety of the construction facilities. Like many other developing countries, Tanzania needs more stringent quality control measures in the construction sector to contribute positively to sustainable growth. This study thus reviews current and future trends in construction industry performance in Tanzani
APA, Harvard, Vancouver, ISO, and other styles
26

Anandhi, B., and K. Mukilan. "Analysis the Severity Factors of Time and Cost Overrun in Construction Projects." International Journal of Scientific Engineering and Research 5, no. 4 (2017): 49–54. https://doi.org/10.70729/ijser151307.

Full text
APA, Harvard, Vancouver, ISO, and other styles
27

Roslan, Nadzirah, Noor Yasmin Zainun, and Aftab Hameed Memon. "Relevancy of Factors and Mitigation Measures in Controlling Time and Cost Overrun towards Malaysian Environment." Applied Mechanics and Materials 773-774 (July 2015): 1007–11. http://dx.doi.org/10.4028/www.scientific.net/amm.773-774.1007.

Full text
Abstract:
Construction projects are facing time and cost overrun globally. Since, this problem occurs due to various factors, hence for achieving successful construction projects, it is very important to control the responsible factors causing time and cost overrun. This study assessed the relevancy for each mitigation measures in relation with causative factors of time and cost overrun in Malaysian construction projects. A total of 56 mitigation measures were identified and correlated with the critical factors of time and cost overrun which were categorized into four phases of project life cycle. Data
APA, Harvard, Vancouver, ISO, and other styles
28

Oza, Dharmesh. "Quality-Induced Impacts on Time Overrun, Cost Overrun, Dispute, and Litigation in EPC Contracts." International Journal for Research in Applied Science and Engineering Technology 11, no. 10 (2023): 914–19. http://dx.doi.org/10.22214/ijraset.2023.56126.

Full text
Abstract:
Abstract: This research paper delves into the intricate relationship between quality assurance measures and their consequential effects on time overrun, cost overrun, disputes, and litigation within Engineering, Procurement, and Construction (EPC) contracts of National Highway. Through an extensive qualitative study and in-depth analysis in SPSS, this paper aims to shed light on the critical high risk contract clauses which make project delays, budget overruns, and legal conflicts impacted by quality. The findings presented herein offer valuable insights for stakeholders in the construction in
APA, Harvard, Vancouver, ISO, and other styles
29

Seddeeq, Abdulaziz Bin, Sadi Assaf, Abdullatif Abdallah, and Mohammad A. Hassanain. "Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry." Buildings 9, no. 2 (2019): 41. http://dx.doi.org/10.3390/buildings9020041.

Full text
Abstract:
Many construction projects exceed time and budget. The Saudi Arabian construction projects are not an exception to this phenomenon. However, the causes of time and cost overrun of Saudi Arabian oil and gas construction projects have never been studied. Thus, this paper endeavors to investigate the main causes of time and cost overrun in Saudi Arabian oil and gas construction projects. Thirty-eight causes of time and cost overrun were identified through the literature and an interview. Responses from 48 professionals based in the Eastern Province of Saudi Arabia were obtained. The respondents w
APA, Harvard, Vancouver, ISO, and other styles
30

Adryani, Ayu, Tatang Akhmad Taufik, and Haryo Dwito Armono. "Analysis of Cost Overrun & Time Overrun Causal Factors Affecting Construction Project Cost Performance Using Dematel & ANP." Dinasti International Journal of Economics, Finance & Accounting 5, no. 5 (2024): 4969–78. http://dx.doi.org/10.38035/dijefa.v5i5.3613.

Full text
Abstract:
The estimation of project costs and completion timelines are crucial aspects that need to be accurately predicted, as they are key indicators of a project's success. Issues like cost overruns and delays in project completion have become common in the construction industry. PT XYZ, a mining construction company, encountered a cost overrun in May 2023, leading to a 21.6% increase in the budget. According to the initial project baseline, it was expected to be completed by September 2023, but faced an 8-month delay. This study aims to explore the external factors causing cost and time overruns, id
APA, Harvard, Vancouver, ISO, and other styles
31

Leu, Sou-Sen, Cheng-Yu Lu, and Pei-Lin Wu. "Dynamic-Bayesian-Network-Based Project Cost Overrun Prediction Model." Sustainability 15, no. 5 (2023): 4570. http://dx.doi.org/10.3390/su15054570.

Full text
Abstract:
One common problem in the construction industry is project cost overrun. Cost overrun can have significant impacts on financial profitability, project completion, project quality, and stakeholder satisfaction. The average percentage of construction project overrun can vary widely depending on the project type, size, complexity, and location. Many approaches can be adopted to prevent or mitigate project cost overrun, and one of them is a more accurate cost estimate and prediction. Several studies on the construction project cost overrun estimation and prediction have been conducted based on his
APA, Harvard, Vancouver, ISO, and other styles
32

Shaikh, F. A. "Financial Mismanagement: A Leading Cause of Time and Cost Overrun in Mega Construction Projects in Pakistan." Engineering, Technology & Applied Science Research 10, no. 1 (2020): 5247–50. http://dx.doi.org/10.48084/etasr.3271.

Full text
Abstract:
One important and well-known issue for the majority of construction projects such as buildings, roads, bridges, airports and many more projects all over the world is time and cost overrun. Project pricing and time period delay are also major issues. The current investigation is taking into consideration the mega construction projects in the provinces of Pakistan, looking into various components controlling and dominating time and cost overrun. A total of 29 factors were identified from literature work and one questionnaire was designed and distributed among 160 respondents. All collected data
APA, Harvard, Vancouver, ISO, and other styles
33

Al-Hazim, Nabil, and Zaydoun Abusalem. "Delay and cost overrun in road construction projects in Jordan." International Journal of Engineering & Technology 4, no. 2 (2015): 288. http://dx.doi.org/10.14419/ijet.v4i2.4409.

Full text
Abstract:
This study aims to identify the most important factors that cause delay in road construction projects in Jordan, which results in cost and time overrun allocated for this type of engineering projects and cause critical problems for both the developer and the contractor. The gap between the cost at completion and that originally estimated, known as cost overrun, can be regarded as one of the most important parameters reflecting the success of projects. In the public sector, money spent on project change orders results in increased construction time which in return reduces the number and size of
APA, Harvard, Vancouver, ISO, and other styles
34

Ali, Ammar. "Risk Factors That Leading to Cost and Time Overrun in Mega Construction Projects in Malaysia." ABC Research Alert 6, no. 3 (2018): Malaysia. http://dx.doi.org/10.18034/ra.v6i3.332.

Full text
Abstract:
The construction industry is truly the engine of national economy through which the total of physical development is achieved. The construction industry is a vital element of the economy and has a significant effect on the efficiency and productivity of other industry sectors. One cannot think of widespread investment in manufacturing, agriculture, or service sectors unless the construction results of infrastructure facilities are in place. In some of the developing countries, the growth rate of construction activity outstrips that of population and of GDP (Chitkara, 2004).&#x0D; Cost, time, a
APA, Harvard, Vancouver, ISO, and other styles
35

De Marco, Alberto, and Timur Narbaev. "Factors of Schedule and Cost Performance of Tunnel Construction Megaprojects." Open Civil Engineering Journal 15, no. 1 (2021): 38–49. http://dx.doi.org/10.2174/1874149502115010038.

Full text
Abstract:
Aims: This study illustrates the main factors that influence the cost overruns and schedule delays of tunnel construction megaprojects. Objective: An empirical analysis was carried out based on a dataset collected from a number of recent tunnel megaprojects worldwide. Methods: Analyses of variances and regression analyses were conducted to infer statistical significance and understand the relationships that exist between cost overruns, time delays and variables of context, technical, and governance characteristics of the sample projects. Results: The most significant factors are those related
APA, Harvard, Vancouver, ISO, and other styles
36

G., Dhanasekar, Sivakumar A., Madhumitha L., and Karthikeyan P. "Effective Selection of Resources for Construction using Program Tool." International Journal of Engineering and Advanced Technology (IJEAT) 9, no. 3 (2020): 2927–31. https://doi.org/10.35940/ijeat.C5411.029320.

Full text
Abstract:
In the Indian scenario construction industry facing a major problem is cost and time overrun. Effective time performance and cost performance are very important to execute the project in a successful manner by keeping them within the prescribed schedule and cost. Overall cost and duration of construction projects affected by the effective resource selection factor. This paper&#39;s objective is to rectify the improper selection of resources by a programming tool. Field survey and codebook study did collect the needed data to feed in the programming tool. The prepared tool gets distributed and
APA, Harvard, Vancouver, ISO, and other styles
37

Ramanathan, Chidambaram, Narayanan Sambu Potty, and Arazi B. Idrus. "Analysis of Time and Cost Overrun in Malaysian Construction." Advanced Materials Research 452-453 (January 2012): 1002–8. http://dx.doi.org/10.4028/www.scientific.net/amr.452-453.1002.

Full text
Abstract:
The construction industry in Malaysia is very important for creating employment, both directly and indirectly. It faces two repeated problems during the construction stage: slippage of project-schedules, i.e. time overrun and overrun of project cost; to the dislike of owners, contractors and consultants. This paper studies the time delay and cost overrun factors for Design and Build D&amp;B projects in Malaysia. A Questionnaire was used to collect data from practitioners and analyse the responses and rank the factors and groups on overall view of the contracting parties. Identified risk factor
APA, Harvard, Vancouver, ISO, and other styles
38

Rauzana, Anita. "FACTORS CAUSING COST OVERRUNS IN CONSTRUCTION PROJECTS." International Journal of Engineering Technologies and Management Research 9, no. 10 (2022): 1–9. http://dx.doi.org/10.29121/ijetmr.v9.i10.2022.1231.

Full text
Abstract:
The complexity of a project often causes differences in what has been planned and its implementation in the field, resulting in delays and cost overruns. The successful implementation of a construction project is the target and expectation of the project owner and contractor, who has an effective time with a budget that is according to plan. But, in project implementation, there are often problems with the emergence of cost overruns that can cause losses. The purpose of this study was to analyze the dominant factors causing cost overruns in irrigation projects in Aceh Besar District. This stud
APA, Harvard, Vancouver, ISO, and other styles
39

M.karim, Karukh Hassan, Noori Ali, and Basira Majeed. "The Causes of Variation Orders and Their Effects on Cost and Time of Projects in Sulaimani Governorate." Kurdistan Journal of Applied Research 5, no. 1 (2020): 218–35. http://dx.doi.org/10.24017/science.2020.1.16.

Full text
Abstract:
Variation orders are a permanent phenomenon in the construction of projects and industries around the world, and particularly in the province of Sulaymaniyah. Where construction industries suffer from variation orders. It includes an amendment of the initial scope of work as in the awarded contract. This study analyses the causes of variation orders and their effects on cost and time of projects in Sulaimani governorate. This study involves a questionnaire survey to selected 36 causes and 10 effects of variation orders from the perspective of owner, design consultant, and contractors. A total
APA, Harvard, Vancouver, ISO, and other styles
40

Soviana, Widya, Eva Herlina, Sukma Soviati, and Andi Musrian. "Identifikasi Faktor–Faktor Penyebab Cost Overrun dan Time Overrun pada Proyek Konstruksi Gedung Di Kota Banda Aceh." Tameh 11, no. 1 (2024): 11–20. http://dx.doi.org/10.37598/2xzs4s51.

Full text
Abstract:
Projects of building construction develops acordance with the implementation of the fulfillment of human life. During implementation, the project did not always as expected. These things happen due to cost and time deviations. The problem in this research is what are the factors that cause cost overrun and time overrun in the implementation of building construction projects in Banda Aceh city. The purpose of the study was to determine the causes of cost overrun and time overrun in the implementation of building construction projects toward minimize the impact of failure in the implementation o
APA, Harvard, Vancouver, ISO, and other styles
41

Ahiaga-Dagbui, Dominic D., and Simon D. Smith. "Rethinking construction cost overruns: cognition, learning and estimation." Journal of Financial Management of Property and Construction 19, no. 1 (2014): 38–54. http://dx.doi.org/10.1108/jfmpc-06-2013-0027.

Full text
Abstract:
Purpose – Drawing on mainstream arguments in the literature, the paper presents a coherent and holistic view on the causes of cost overruns, and the dynamics between cognitive dispositions, learning and estimation. A cost prediction model has also been developed using data mining for estimating final cost of projects. The paper aims to discuss these issues. Design/methodology/approach – A mixed-method approach was adopted: a qualitative exploration of the causes of cost overrun followed by an empirical development of a final cost model using artificial neural networks. Findings – A conceptual
APA, Harvard, Vancouver, ISO, and other styles
42

Memon, Aftab Hameed, Abdul Qadir Memon, Mohsin Ali Soomro, Muneeb Ayub Memon, and Jam Shahzaib Khan Sahito. "Structural model of cost overrun factors affecting Pakistani construction projects." Mehran University Research Journal of Engineering and Technology 42, no. 2 (2023): 108. http://dx.doi.org/10.22581/muet1982.2302.12.

Full text
Abstract:
Cost overruns are a global challenge to successfully completing construction projects. Cost overrun has a substantial impact resulting in most construction projects failing to be completed. Several factors have contributed significantly to the industry's decline. The factors were discovered in the literature, assessed, and applied to the construction industry in Pakistan. This study scrutinized and identified the relationships between the factors causing cost overruns in the Pakistani construction industry using the Partial Least Squares Structural Equation Modelling (PLS-SEM) approach. The st
APA, Harvard, Vancouver, ISO, and other styles
43

Roumeissa, Salhi. "Impact of Delay on Cost Overrun in Construction Projects in Algeria." European Journal of Interdisciplinary Studies 5, no. 2 (2019): 25. http://dx.doi.org/10.26417/ejis-2019.v5i2-281.

Full text
Abstract:
Project success is the ultimate goal of the various project stackeholders (Salhi.R 2018). Asuccessful project means that the project is completed on time, within the agreed budget and according to the contract specifications. Delay is one of the most reccuring problems in construction project in Algeria, and it is considered as the main cause of cost overrun, time overrun, disput and claims.The objective of this paper is to mesure the impact of schedule delay on cost overrun, using the simple linear regression method and the coefficient of correlation. The proposed model can be used by practit
APA, Harvard, Vancouver, ISO, and other styles
44

Roumeissa, Salhi. "Impact of Delay on Cost Overrun in Construction Projects in Algeria." European Journal of Interdisciplinary Studies 5, no. 2 (2019): 25. http://dx.doi.org/10.26417/ejis.v5i2.p25-30.

Full text
Abstract:
Project success is the ultimate goal of the various project stackeholders (Salhi.R 2018). Asuccessful project means that the project is completed on time, within the agreed budget and according to the contract specifications. Delay is one of the most reccuring problems in construction project in Algeria, and it is considered as the main cause of cost overrun, time overrun, disput and claims.The objective of this paper is to mesure the impact of schedule delay on cost overrun, using the simple linear regression method and the coefficient of correlation. The proposed model can be used by practit
APA, Harvard, Vancouver, ISO, and other styles
45

ŽUJO, Vahida, Diana CAR-PUŠIĆ, Valentina ŽILESKA-PANČOVSKA, and Marko ĆEĆEZ. "TIME AND COST INTERDEPENDENCE IN WATER SUPPLY SYSTEM CONSTRUCTION PROJECTS." Technological and Economic Development of Economy 23, no. 6 (2015): 895–914. http://dx.doi.org/10.3846/20294913.2015.1071292.

Full text
Abstract:
Time and price of contracted construction as well as their overrun are among highly pronounced issues in the construction practice. Numerous studies indicate that there is a dependency between these parameters at various construction markets. The paper shows the results of a research conducted on a group of 40 projects related to water supply systems carried out in the Federation of Bosnia and Herzegovina from 2001 to 2012. Collected data, obtained through interviewing chief engineers of construction companies, have been used as input parameters for implementation of single linear regression b
APA, Harvard, Vancouver, ISO, and other styles
46

Shakya, Kumar Gourav, and Er Himmi Gupta. "Indexing of Factors Affecting Time and Cost Overrun in Construction Projects." International Journal for Research in Applied Science and Engineering Technology 10, no. 7 (2022): 1305–11. http://dx.doi.org/10.22214/ijraset.2022.45477.

Full text
Abstract:
Abstract: In a construction project, time overrun occurs when the work specified in the contract is not executed within the specified time frame and when the entire project cost exceeds for whatever causes, this is referred to as cost overrun. This study aim to analyze these factors that cause above delays in construction projects. A total 47 such factors were identified and classified into 8 segments, which are then indexing by using the method Relative Importance Index (RII).
APA, Harvard, Vancouver, ISO, and other styles
47

Ramanathan, Chidambaram, Narayanan Sambu Potty, and Arazi B. Idrus. "Analysis of Time and Cost Overrun in Malaysian Construction." Advanced Materials Research 452-453 (January 2012): 1002–8. http://dx.doi.org/10.4028/scientific5/amr.452-453.1002.

Full text
APA, Harvard, Vancouver, ISO, and other styles
48

Chandramohan, Arun, S. Lakshmi Narayanan, Ashish Gaurav, and Neethu Krishna. "Cost and time overrun analysis for green construction projects." International Journal of Green Economics 6, no. 2 (2012): 167. http://dx.doi.org/10.1504/ijge.2012.050340.

Full text
APA, Harvard, Vancouver, ISO, and other styles
49

Fenil, Patel, and Pipaliya Jaydeep. "Factors Affecting Cost and Time Overrun In Construction Project." International Journal of Advance and Applied Research 4, no. 10 (2023): 11–15. https://doi.org/10.5281/zenodo.7820456.

Full text
Abstract:
The building sector is India&#39;s largest fiscal sector. Timeliness and sticking to set price are&nbsp;two most important factors in&nbsp;overall achievement of&nbsp;project&#39;s plans. The primary objective of this study is to pinpoint&nbsp;main reasons why building projects run over budget and behind schedule. To identify factors influencing the increase in construction time and cost, an extensive literature review was managed. Taking these considerations into account, questionnaire was created &amp; distributed to various owners, clients. Following factors have been identified as the most
APA, Harvard, Vancouver, ISO, and other styles
50

Nneka, Ikwueze, Stella, and Nnadi Ezekiel Ejiofor. "Impact of Project Management Practices on Cost and Time Overruns in Construction Projects in Nigeria." NEWPORT INTERNATIONAL JOURNAL OF SCIENTIFIC AND EXPERIMENTAL SCIENCES 5, no. 2 (2024): 26–34. http://dx.doi.org/10.59298/nijses/2024/10.5.262634.

Full text
Abstract:
A major contributor to economic growth in Nigeria, the construction sector is frequently beset by large cost and schedule overruns that jeopardize project profitability and impede the development of infrastructure. This study looks into how project management techniques affect these overruns in building construction projects in Nigeria. The goal of the study is to pinpoint the major project management variables that lead to overspending and delays while also offering recommendations for best practices to address these problems. A mixed-methods strategy was used, integrating qualitative case st
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!