To see the other types of publications on this topic, follow the link: Contract for capital construction.

Journal articles on the topic 'Contract for capital construction'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 journal articles for your research on the topic 'Contract for capital construction.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.

1

Mikhaylova, Elena. "Assessment of organizational and technological reliability of a construction organization during contract bidding." E3S Web of Conferences 258 (2021): 09064. http://dx.doi.org/10.1051/e3sconf/202125809064.

Full text
Abstract:
In the current system of contract bidding, there are a number of problems, one of which is the imperfection of the evaluation criteria by which applicants are selected. The article presents a methodology for assessing the organizational and technological reliability of a construction organization and its competitive offers for tenders for construction and installation works. It is proposed to use the indicator of its organizational and technological reliability as a criterion for evaluating a construction organization that claims to fulfill a construction order. To determine the reliability of
APA, Harvard, Vancouver, ISO, and other styles
2

Pavlov, Alexander S., and Roman V. Ostrovskii. "Public procurement in construction. Suggestions for improvement." Vestnik MGSU, no. 4 (April 2022): 501–15. http://dx.doi.org/10.22227/1997-0935.2022.4.501-515.

Full text
Abstract:
Introduction. The first article of the series showed the main results of the analysis of regulatory documents on the organization of tenders for construction and design work in leading foreign countries. The second article analyzes the main provisions of the domestic tender legislation concerning the construction, reconstruction and design of capital construction facilities. This article is the final article of the cycle; it proposes a concept for the public procurement for construction projects and works.
 
 Materials and methods. The authors tried not to touch on legal issues. They
APA, Harvard, Vancouver, ISO, and other styles
3

Novia, Rika, Benny Hidayat, and Akhmad Suraji. "Identification of Factors Causing Construction Contract Breaks and Recommendations for Improvement in West Pasaman Regency." CIVED 11, no. 3 (2024): 767–82. http://dx.doi.org/10.24036/cived.v11i3.573.

Full text
Abstract:
The implementation of construction projects in the Regional Government of West Pasaman Regency almost every year there is always a termination of the contract which results in not achieving the government's goal of increasing the standard of living of the community because the targets set by the Government are delayed and hampered. This research was carried out which aims to identify the causes of contract termination in the implementation of construction service procurement in West Pasaman Regency, analyze and evaluate the causes of contract termination in construction implementation, and det
APA, Harvard, Vancouver, ISO, and other styles
4

Жуков, Ф. Ф. "CARRYING OUT THE DEMOLITION OF A CAPITAL CONSTRUCTION OBJECT: LEGAL REGULATION AND SOME FEATURES." Вестник Тверского государственного университета. Серия: Право, no. 1(73) (March 20, 2023): 82–90. http://dx.doi.org/10.26456/vtpravo/2023.1.082.

Full text
Abstract:
Объектом исследования выступают нормы гражданского права и градостроительного права о сносе объектов капитального строительства. Целью работы является выявление гражданско-правовых и публичноправовых особенностей института сноса, которые отграничивают его от договора строительного подряда. Обосновывается необходимость введения института сноса в Гражданский кодекс Российской Федерации. Сформулирована позиция автора о наличии у сноса своих юридических особенностей, отграничивающих его от строительного подряда. The object of the study is the norms of the civil law and the town planning law on the
APA, Harvard, Vancouver, ISO, and other styles
5

Ostrynskyi, Vladyslav, Nataliia Nykytchenko, Iryna Sopilko, Viacheslav Krykun, and Vitalii Mykulets. "EPC-contracts using in renewable energy: Legal and practical aspect." Revista Amazonia Investiga 11, no. 52 (2022): 309–17. http://dx.doi.org/10.34069/ai/2022.52.04.33.

Full text
Abstract:
The relevance of the article is connected with the rapid growth of investor`s interest in the project implementation of renewable power plant construction, through the conclusion of so-called EPC-contracts because Ukrainian legislation can’t properly keep up to carry out legal regulation of the public relations, which forces business to use foreign jurisdiction rules or standard contract forms developed by specialized international organizations with a purpose for project implementation. The purpose of the study is clarification of the main features of the capital construction of renewable fac
APA, Harvard, Vancouver, ISO, and other styles
6

Kim, Hee-Sun, and Hyun-Seok Lee. "A Comparison Analysis of Efficiency between Construction Firms." Konkuk Research Institute of Real Estate and Urban Studies 15, no. 1 (2022): 5–26. http://dx.doi.org/10.22423/kreus.2022.15.1.5.

Full text
Abstract:
This study aims to compare the management efficiency of classified domestic construction firm to each categories by company sale scale, and sale type. In particular, the characteristics of contract-oriented construction firms with high construction sales and development-oriented construction firms with high parcel-out sales are compared and analyzed. We use the financial statement values for 10 years from 2011 to 2020 for companies registered with the Korea Construction Association, and compare the management efficiency of construction firms through the absolute efficiency (Dupont) and the rel
APA, Harvard, Vancouver, ISO, and other styles
7

Deng Zihao, Khoo Terh Jing, Ha Chin Yee, et al. "The Nexus Between Construction Contract Risk Assessment and Big Data in China." Journal of Advanced Research in Applied Sciences and Engineering Technology 33, no. 1 (2023): 441–48. http://dx.doi.org/10.37934/araset.33.1.441448.

Full text
Abstract:
The construction market in China is currently showing an increasing trend in terms of project size, complexity, and technical difficulty. With large initial investments and long capital payback periods, construction projects are vulnerable to the external environment during development and risk control is particularly important. Contracts are at the heart of project management and every step of project development revolves around the content of the contract signed by the contractor. Signing contracts to protect the rights of both parties has become the most effective way of controlling project
APA, Harvard, Vancouver, ISO, and other styles
8

Kukhariev, O. Ye. "Essence of contracts concluded for implementing corporate investment." Bulletin of Kharkiv National University of Internal Affairs 103, no. 4 (2023): 80–90. http://dx.doi.org/10.32631/v.2023.4.07.

Full text
Abstract:
The article is focused on clarifying the essence of contracts in the field of corporate investment. Achieving the specified purpose is realized through the analysis of the relevant norms of the current legislation of Ukraine, court case-law and provisions of the legal doctrine, which is the objective of this article.
 It has been emphasized that investment contracts cover various types of civil contracts. It has been determined by the subject matter and objectives of investment (joint operation agreements, capital construction contracts, credit granting agreements, purchase and sale agree
APA, Harvard, Vancouver, ISO, and other styles
9

Rafieizonooz, Mahdi, Mohd Razman Salim, Elnaz Khankhaje, Mohd Warid Hussin, Ali Zarebidaki, and Salmiati. "Determining the Causes of Delay by Using Factor Analysis in Tehran’s Construction Projects." Applied Mechanics and Materials 735 (February 2015): 109–16. http://dx.doi.org/10.4028/www.scientific.net/amm.735.109.

Full text
Abstract:
Construction industry is one of the most profitable sectors in Iran’s economic. Delay is common problem in the construction projects in Iran. By considering all viewpoints of the parties, this research identified the most effective and severe causes of delay in construction projects in the Capital of Iran, Tehran. Questionnaires were distributed among respondents who are involved in the construction project in Tehran. The process of data analysis and discussions were conducted based on the two statistical techniques namely descriptive analysis (RII) and factor analysis. Using factor analysis,
APA, Harvard, Vancouver, ISO, and other styles
10

Kahya, Vasfi. "The Role of the Psychological Contract in the Relationship Between Career Adjustment Ability and the Perception of Employability." Mehmet Akif Ersoy Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi 12, no. 1 (2025): 162–78. https://doi.org/10.30798/makuiibf.1469170.

Full text
Abstract:
Abstract The concept of employability has been more focused on in recent years. The concept of perceived employability expresses individuals' control over their lives and careers. Career adaptability means a hierarchical and multidimensional construct, including resources of control, concern, confidence, and curiosity. Employability is a sense of career adaptability in the context of individuals' social construct of managing career transitions. A mutually positive interaction between employability, psychological capital, and subjective well-being can exist. Using Savickas's career construction
APA, Harvard, Vancouver, ISO, and other styles
11

Kwak, Sungho, Sanghyo Lee, Kyonghoon Kim, and Jaejun Kim. "Impact of Business Diversification on the Business Performance of Construction Firms in the Republic of Korea." Buildings 15, no. 8 (2025): 1238. https://doi.org/10.3390/buildings15081238.

Full text
Abstract:
This study examines the dynamic relationship between changes in construction contract amounts across the diversified business areas within the portfolios of Korean construction firms and their overall business performance using a vector error correction model. It aims to provide a detailed evaluation of the effectiveness and characteristics of diversification strategies in the construction industry. This analysis employs key variables, including the debt ratio, return on total assets, diversification index, and construction contract amounts in domestic and overseas building, civil engineering,
APA, Harvard, Vancouver, ISO, and other styles
12

Kulaga, Е. "Legal regulation of forward contracts in construction investment." Uzhhorod National University Herald. Series: Law 1, no. 76 (2023): 208–13. http://dx.doi.org/10.24144/2307-3322.2022.76.1.32.

Full text
Abstract:
A brief overview of the legal regulation of forward contracts in construction investment is presented. The relevance of their application in modern conditions, taking into account international standards and the EU acquis, to stimulate the attraction of investments in the national economy, create a competitive environment and sustainable growth in the conditions of financial globalization and the development of communication technologies is substantiated.
 It was found that in order to implement Article 127 of the Association Agreement between Ukraine and the EU regarding the improvement
APA, Harvard, Vancouver, ISO, and other styles
13

R. Zeltser. "Institutional environment as a precondition for improving the technological progress of construction." Ways to Improve Construction Efficiency, no. 45 (October 16, 2020): 46–56. http://dx.doi.org/10.32347/2707-501x.2020.45.46-56.

Full text
Abstract:
The legislation of Ukraine on the regulation of urban planning activities establishes the legal and organizational foundations of urban planning activities, which are aimed at ensuring sustainable development of territories, taking into account State, public and private interests. In accordance with the legislative acts, a number of government decrees, orders of the Ministry of Development of Communities and Territories of Ukraine (formerly - the Ministry of Regional Development of Ukraine), state building codes (new or amended from among the current ones) have been developed. There is an urge
APA, Harvard, Vancouver, ISO, and other styles
14

Catterwell, Ryan. "Striking a Balance in Contract Interpretation: The Primacy of the Text." Edinburgh Law Review 23, no. 1 (2019): 52–74. http://dx.doi.org/10.3366/elr.2019.0524.

Full text
Abstract:
In Wood v Capita Insurance Services Ltd [2017] AC 1173, the UK Supreme Court emphasised that contract interpretation involves ‘striking a balance between the indications given by the language and the implications of the competing constructions’. This paper investigates the nature of the balancing act at the heart of construction. It argues that the balancing exercise is easier to comprehend if construction is understood in a particular way, namely, as a technique employed to infer objective intention from the choice of words in a contract. The admissible factors—ie, the potential meanings for
APA, Harvard, Vancouver, ISO, and other styles
15

Offei-Nyako, Kofi, Leslie Cyprian Ohene Tham, Mark Bediako, Charles Dela Adobor, and Richard Oduro Asamoah. "Deviations between Contract Sums and Final Accounts: The Case of Capital Projects in Ghana." Journal of Construction Engineering 2016 (June 7, 2016): 1–8. http://dx.doi.org/10.1155/2016/2814126.

Full text
Abstract:
Cost estimation is particularly difficult, often leading to considerable deviations. For capital projects, especially transport infrastructure projects, deviations hover around an average of 28% of the estimated cost. There are several factors that cause these deviations between the final accounts and the contract sum. How these factors combine to cause deviations between the contract sum and the final account in recent times has been of great concern to construction managers and researchers alike. This study sought to identify the significant factors that result in deviations between contract
APA, Harvard, Vancouver, ISO, and other styles
16

Kabanov, V. N., and S. D. Al-Rubaye. "Methodology for assessing the quality of a construction organisation." Izvestiya vuzov. Investitsii. Stroitelstvo. Nedvizhimost 13, no. 4 (2024): 602–11. http://dx.doi.org/10.21285/2227-2917-2023-4-602-611.

Full text
Abstract:
The quality assessment of construction organisations is a scientific task, representing a practical interest for customers of capital construction projects, self-regulating associations of builders, as well as for the contractors themselves, interested in improving the quality of enterprise management. The study aims to develop a methodology for the integral quality assessment of a construction organisation. The quality of a construction organisation within the framework of this study is understood as the ability of a construction organisation to comply with the terms of a contract, produce co
APA, Harvard, Vancouver, ISO, and other styles
17

Meneilyuk, O., O. Nikiforov, and L. Lukashenko. "Three-block model of contracting "subject of the contract – organizational structure of construction – risk distribution"." Ways to Improve Construction Efficiency 1, no. 47 (2021): 15–25. http://dx.doi.org/10.32347/2707-501x.2021.47(1).15-25.

Full text
Abstract:
The work contains the results of developing the contracting model for the enterprise of the full investment and construction cycle, depending not only on the subject of the agreement, but also on the organizational structure of construction and risk allocation.
 The wide range of services that need to be implemented by the company of the full investment and construction cycle, as well as the variety of organizational forms of implementation of this process lead to varying degrees of uncertainty in each case. This often hinders the formalization of contracts between the participants in the
APA, Harvard, Vancouver, ISO, and other styles
18

Cao, Guangmei, Yuesen Wang, Honghu Gao, et al. "Coordination Decision-Making for Intelligent Transformation of Logistics Services under Capital Constraint." Sustainability 15, no. 6 (2023): 5421. http://dx.doi.org/10.3390/su15065421.

Full text
Abstract:
The intelligent transformation of logistics plays a significant role in meeting the diverse needs of customers, improving operational efficiency, and reducing carbon emissions in logistics activities. Therefore, to achieve sustainable development, logistics enterprises need to face the decision-making problem of intelligent logistics transformation. In this paper, we construct a Stackelberg game model between a financially constrained logistics-service provider (LSP) and a well-funded logistics-service integrator (LSI) and discuss the impact of the wholesale price contract, the cost-sharing co
APA, Harvard, Vancouver, ISO, and other styles
19

Zawistowski, Jacek, and Janusz Kulejewski. "Influence of the contractor’s payment method on the economic effectiveness of the construction project from the contractor’s point of view." Open Engineering 8, no. 1 (2018): 562–70. http://dx.doi.org/10.1515/eng-2018-0055.

Full text
Abstract:
Abstract The scope of the paper is the problem of the economic effectiveness of the construction project from the contractor’s point of view. The two main construction contract types are taken under consideration: the unit price contract based on the bill of quantities and the lump sum contract. The net present value (NPV) is adopted in this paper as the basic economic efficiency criterion of the construction project. The NPV of the project for the contractor is calculated here as the sum of all future monthly contractor’s cash flows (both incoming and outgoing) discounted by using the monthly
APA, Harvard, Vancouver, ISO, and other styles
20

Radhakrishnan*, Dr K. G. Selvan. "ASSAULT OF RISKS IN MULTI STOREY BUILDING CONSTRUCTION." Global Journal of Engineering Science and Research Management 5, no. 2 (2018): 25–32. https://doi.org/10.5281/zenodo.1186511.

Full text
Abstract:
The Construction Industry is rapidly reviving after the jolt of demonetisation. The builders have understood the RERA and the benefits of same to both themselves and also to the buyers.   The increased income levels, rise in the movement of people from rural areas to urban areas for employment purposes, easy availability of long term institutional finance, increased rentals in city forcing people to sacrifice their other comforts for purchase of an apartment, growing economic development and Government’s initiative on House for All and many other reasons contribute to the excellent
APA, Harvard, Vancouver, ISO, and other styles
21

Nepal, Achyut, Ruhanita Maelah, and Vishnu Khanal. "Project Finance Criteria and Governance of Public-Private Partnership Hydropower Project in Nepal." Social & Management Research Journal 19, no. 1 (2022): 57–88. http://dx.doi.org/10.24191/smrj.v19i1.17245.

Full text
Abstract:
Project finance arrangement has obvious need for contract management during its life cycle. Contract management for private sector hydropower projects generally include Generation License, Project Development Agreement, Power Purchase Agreement, Financing Agreement, Construction Contract Agreement, and Operation Contract Agreement. Markets, hierarchies and hybrids are the forms of governance structure under the Transaction Cost Theory, while debt and equity often regarded as a basis for determining governance structure. Fundamental criteria for project finance arrangement include establishing
APA, Harvard, Vancouver, ISO, and other styles
22

Agustya Ningrum, Dewi, Nora Vista Arafah, Darno Darno, and Wulan Purnamasari. "Evaluasi Pengakuan Pendapatan Jasa Kontrak Konstruksi Menurut PSAK No. 34 pada PT. Nastek Mustika Abadi." Jurnal Pajak Vokasi (JUPASI) 2, no. 2 (2021): 70–77. http://dx.doi.org/10.31334/jupasi.v2i2.1431.

Full text
Abstract:
PT Nastek Mustika Abadi is a company that provides construction services in the field of services such as manufacturing iron machines or factory machinery, making electrical installations and building assets such as buildings, tunnels and roads, Based on its characteristics this business is a long-term business, due to contract activities that generally occur completed in different accounting periods as part of the Company's Financial Report. The methods and data analysis techniques made in this study, namely descriptive analysis, are studies that only collect, compile, clarify and interpret d
APA, Harvard, Vancouver, ISO, and other styles
23

Shang, Xingyu. "Research on investment and financing risk problems and countermeasures of PPP construction projects." Transactions on Economics, Business and Management Research 10 (October 10, 2024): 416–23. http://dx.doi.org/10.62051/b78rx394.

Full text
Abstract:
This study analyzes financing costs, capital liquidity, policy changes and contract execution risks in PPP project investment and financing, and puts forward strategies such as optimizing financing platforms, reducing costs, strengthening regulations, regulatory coordination and improving prevention capabilities. By exploring the causes and effects of risks, combined with domestic and foreign cases to verify the effectiveness of the strategy. This study enriches the theory of PPP risk management, provides guidance for the practical operation of the project, and promotes the healthy development
APA, Harvard, Vancouver, ISO, and other styles
24

Yang, Junyi, Fuchang Yue, Qian Gao, et al. "Construction of Theoretical Capital Progress Curve Model of Power Grid Infrastructure Project Based on Contract Payment Terms." E3S Web of Conferences 235 (2021): 01076. http://dx.doi.org/10.1051/e3sconf/202123501076.

Full text
Abstract:
In order to implement the central government’s major deployment of preventing and punishing statistical falsification, improving the authenticity of statistical data, and further improving the science and accuracy of power grid project funding forecasts. By studying the fund payment law of power grid infrastructure project and constructing the theoretical capital progress curve model of power grid infrastructure project, the progress and time point of fund payment in each link of the whole process of the project can be effectively controlled. Scientific prediction of the project life cycle at
APA, Harvard, Vancouver, ISO, and other styles
25

Fessler, Susanna. "Gunboat Diplomacy of a Different Kind: Robert H. Pruyn and Japan’s Purchase of U.S. Warships, 1862–1865." Journal of American-East Asian Relations 27, no. 1 (2020): 29–57. http://dx.doi.org/10.1163/18765610-02701003.

Full text
Abstract:
This article examines the handling of a contract between the Shogunate of Japan and private agents in the United States for the construction of three ships of war in 1862. Robert H. Pruyn, the U.S. minister, received the original order and down payment from the Japanese government and assigned the contract to two private citizens in Albany, New York. Over the course of the next three years, complications from the U.S. Civil War and fluctuations in the currency markets made it impossible for the U.S. builders to fulfill the order in full; the Japanese received only one ship. Historians consiste
APA, Harvard, Vancouver, ISO, and other styles
26

Putra, Budi Hutama, and Eliatun Eliatun. "STUDY OF CASH FLOW PLANNING ON THE SUNGAI RASAU VILLAGE BRIDGE CONSTRUCTION PROJECT, BUMI MAKMUR DISTRICT, TANAH LAUT REGENCY." CERUCUK 7, no. 2 (2023): 97. https://doi.org/10.20527/crc.v7i2.9633.

Full text
Abstract:
In the current era, construction projects are closely related to the development and needs of human life for now. construction projects must be processed professionally with good and weighted management. Cost control is indeed very important in the world of construction services, so everyone who has a business in the field of civil engineering or the field of connectivity is required to control their finances so a cash flow plan is needed. This cash flow planning itself is analyzed based on a down payment of 30% of the contract value plus its capital and bank loans.In the planning of cash flow
APA, Harvard, Vancouver, ISO, and other styles
27

Mokerova, E. Yu, and K. N. Tarasov. "Storage and Transportation of Copper Currency in Late 18th to Early 19th Century: Evidence from Vyatka Province." Nauchnyi dialog 14, no. 1 (2025): 469–88. https://doi.org/10.24224/2227-1295-2025-14-1-469-488.

Full text
Abstract:
This study examines the circulation of copper coins in Russia during the late 18th and early 19th centuries, focusing on the Vyatka Governorate. It specifically addresses the storage and transportation of copper currency both within and beyond the region. The research is based on materials from the Central State Archive of Kirov Oblast, including records from the sessions of the Vyatka Treasury Chamber, documents related to the construction and repair of storage facilities for currency in district towns, reports from the Treasury Chamber, contracts with merchants and peasants for the delivery
APA, Harvard, Vancouver, ISO, and other styles
28

Safa, Mahdi, Ming-Ho Yee, Derek Rayside, and Carl T. Haas. "Optimizing Contractor Selection for Construction Packages in Capital Projects." Journal of Computing in Civil Engineering 30, no. 5 (2016): 04016002. http://dx.doi.org/10.1061/(asce)cp.1943-5487.0000555.

Full text
APA, Harvard, Vancouver, ISO, and other styles
29

Janssen, Jörn. "After the 1910 Eight-Week Lockout: ‘Flächentarifvertrag’ in the German Construction Industry." Historical Studies in Industrial Relations 41, no. 1 (2020): 65–84. http://dx.doi.org/10.3828/hsir.2020.41.3.

Full text
Abstract:
The greatest industrial dispute before the First World War in Germany, a national lockout in the construction industry, lasting eight weeks and involving up to 245,000 workers, ended with a defeat of the German Construction Employers’ Federation - Deutscher Arbeitgeberbund für das Baugewerbe - on 18 June 1910 after a tripartite process of arbitration. This industrial dispute about a new national framework contract - Flächentarifvertrag - on collective employment relations and bargaining in the construction industry heralded a new stage in labour-capital relations. It led to a substantial uni
APA, Harvard, Vancouver, ISO, and other styles
30

Ivanenko, Polina E., and Elena S. Stegnienko. "PROBLEMS OF LEGAL REGULATION OF CONTRACTS ON CAPITAL CONSTRUCTION OBJECTS." Interexpo GEO-Siberia 7, no. 2 (2020): 3–8. http://dx.doi.org/10.33764/2618-981x-2020-7-2-3-8.

Full text
Abstract:
The article analyzes the system of legal regulation of contracts on capital construction objects. A number of problems in the law enforcement practice of concluding contracts on real estate objects were identified. Measures to improve the mechanisms for compliance with the forms of real estate contracts are suggested.
APA, Harvard, Vancouver, ISO, and other styles
31

Utarja, Josep Bely. "Can PPP Contracts Improve the Performance of the National Road Sector?" Journal of Infrastructure Policy and Management 2, no. 1 (2019): 1–38. http://dx.doi.org/10.35166/jipm.v2i1.32.

Full text
Abstract:
This article attempts to answer two questions. The first is whether Public-Private Partnership (PPP) contracts can be easily implemented for national road preservation projects. The second is how the PPP contracts can increase the value for money (VfM) of the national road preservation budget. The institutional environment of national road sector is discussed first in order to highlight the particular role of road preservation contracts between the Government and the business sectors in that environment. Then, the discussion continued with types of contracts that have been used in this sector,
APA, Harvard, Vancouver, ISO, and other styles
32

Nageri, Kamaldeen Ibraheem. "Ease of Doing Business and Capital Market Development in a Demand Following Hypothesis: Evidence from ECOWAS." Studia Universitatis „Vasile Goldis” Arad – Economics Series 30, no. 4 (2020): 24–54. http://dx.doi.org/10.2478/sues-2020-0023.

Full text
Abstract:
AbstractCapabilities of African businesses in a transformative role in solving the continent‘s challenges are underestimated and misunderstood. This study examined ease of doing business and financial development from a demand following hypothesis in the West African sub-region, employed Structural Equation Model covering the period of 2004 - 2017. Ten ease of doing business indicators and five distinct financial (capital market) development variables from the World Bank database were used. Findings indicate weak demand following the hypothesis of capital market development: positive and negat
APA, Harvard, Vancouver, ISO, and other styles
33

Mitrofanova, Inna, and Karine Yurchenko. "Capital Facilities Construction As a Result of Proactive Measures of National Projects (The Case of the Southern Federal District)." Regionalnaya ekonomika. Yug Rossii, no. 3 (October 2021): 75–86. http://dx.doi.org/10.15688/re.volsu.2021.3.7.

Full text
Abstract:
The article examines the role of capital facilities in the course of implementation of national, federal and regional projects, assesses the significance of the construction of corresponding facilities for achieving the goals and indicators, studies the relationship between these constructions and individual social and economic indicators of administrative territorial units, as well as elements of regional projects. Open data from the unified portal of budgetary system of the Russian Federation, information on government contracts for the construction of capital facilities taken from the unifi
APA, Harvard, Vancouver, ISO, and other styles
34

Verel, Bunga Olivia, Roi Milyardi, and Cindrawaty Lesmana. "Faktor Utama Keterlambatan Pembayaran Dalam Proyek Perumahan Subsidi dan Komersial." Jurnal Manajemen Teknologi & Teknik Sipil 7, no. 1 (2024): 14–29. http://dx.doi.org/10.30737/jurmateks.v7i1.5244.

Full text
Abstract:
In the implementation of housing development, the problem of late payment delays is a common issue encountered in commercial and subsidized housing projects during construction. These delays impact the timely completion and lead to disputes among the involved parties, which include owners, contractors, and subcontractors. This study aims to analyze the primary factors contributing to late payment in construction projects, specifically in commercial and subsidized housing. The analysis is conducted from the perspective of the owner, contractors, and subcontractors. The study involves six owner
APA, Harvard, Vancouver, ISO, and other styles
35

Chalova, A. Yu, and A. S. Borisov. "Co-Financing of Capital Investment Within the Frames of Federal Projects." Vestnik of the Plekhanov Russian University of Economics, no. 1 (January 28, 2025): 99–110. https://doi.org/10.21686/2413-2829-2025-1-99-110.

Full text
Abstract:
The article deals with issues of inter-budget and inter-departmental coordination to finance project activities connected with capital investment. Special attention was paid to evaluation of factors influencing budget expenses of all levels and non-budget sources, observation of dates of reaching control points and results of project events in conducting capital investment. The goal of the present research is to identify problems in mechanism of capital investment financing within the frames of federal and regional projects at different levels of management and work out recommendations aimed a
APA, Harvard, Vancouver, ISO, and other styles
36

Serdarevic, Nino, and Ajla Muratovic-Dedic. "Revenue Recognition and Real Earnings Management in Bosnian Construction Industry." Journal of Forensic Accounting Profession 1, no. 1 (2021): 21–34. http://dx.doi.org/10.2478/jfap-2021-0002.

Full text
Abstract:
Abstract This study explores revenue recognition and reporting expenses relevant to the stage of completion of the contract agreements. Literature suggests that the taxation effects financial reporting, realization of capital gains as well as revenue recognition. We argue that construction firms make use of these estimates to postpone revenue and value added tax recognition. The analysis grounds on the assumption that the value added tax effects timely recognition of revenues from construction agreements, where managers are incentivized to underestimating stage of completion and suppress recog
APA, Harvard, Vancouver, ISO, and other styles
37

Salnikov, Konstantin Evgenevich. "Reduction of construction time as a result of increase of labor efficiency." Финансы и управление, no. 4 (April 2021): 38–49. http://dx.doi.org/10.25136/2409-7802.2021.4.34480.

Full text
Abstract:
The subject of this research is the regulatory relations arising in the context of reduction of construction time as a branch of material production, which carries out the erection and reconstruction of buildings and structures of various designation. The object of this research is the construction sector overall; enterprises of different forms of property that functions in the investment and construction sector; organizational-legal forms of interaction between the actors of investment and construction process; state regulation in the sphere of capital construction. The goal of this work lies
APA, Harvard, Vancouver, ISO, and other styles
38

Rener, Andrew, Aslihan Karatas, and Benjamin Videan. "Innovative Design and Execution Model for Improving Productivity of Interior Prefabricated Commercial Wall Assemblies." Buildings 13, no. 1 (2022): 68. http://dx.doi.org/10.3390/buildings13010068.

Full text
Abstract:
Field productivity of building trades is the focus of prefabricated construction practitioners as a path to greater profitability and competitiveness in the marketplace. Construction firms are struggling to meet the demand of the marketplace due to shortages of skilled workers and flat to declining productivity. Human capital and productivity challenges are affecting the ability to both acquire new work and complete the work under contract. This study focuses on the development of an innovative model that defines a process for the design, project site preconstruction planning phase, and fabric
APA, Harvard, Vancouver, ISO, and other styles
39

MALIUSHEV, ALEKSANDR. "HISTORY OF DEVELOPMENT OF THE DOMESTIC LEGAL REGULATION OF THE CONSTRUCTION CONTRACT FROM ANCIENT TIMES TO 1995." LEGAL BULLETIN 3, no. 8 (2023): 21–31. https://doi.org/10.5281/zenodo.11190167.

Full text
Abstract:
Due to the rapid growth of civil and industrial construction, there is a demand for adequate and understandable legal regulation of the relevant socio-economic relations. There is a need for sources to which the participants of contractual legal relations could refer in order to resolve disputable situations. It seems important to refer to the history of the development of regulation of the institute of construction contracting, as this will help to establish what place the institute occupies in the systematics of domestic civil law, the basic principles of its work and characteristic features
APA, Harvard, Vancouver, ISO, and other styles
40

Bai, Shizhen, and Yonggan Wang. "Green Investment Decision and Coordination in a Retailer-Dominated Supply Chain Considering Risk Aversion." Sustainability 14, no. 20 (2022): 13606. http://dx.doi.org/10.3390/su142013606.

Full text
Abstract:
With the sustainable development of the global economy, environmental problems and the green economy are increasingly becoming points of concern for the community. However, the large amount of capital invested in green technology and the high price of green products have become the key problems hindering the development of a risk-averse green supply chain. In order to promote the supply chain to increase green investment level, improve the green degree of products, and reduce the impact of risk aversion on green investment, this paper studies a two-echelon green supply chain composed of a risk
APA, Harvard, Vancouver, ISO, and other styles
41

Basiru, Muazu Namaiwa, and –Namoda Kaura. "Causes of Late Payment of Commercial Debt and Challenges of Working Capital to Small and Medium Enterprises (SMES) in the Construction Industry of Zamfara State, Nigeria." International Journal of Innovative Science and Research Technology 7, no. 1 (2022): 689–96. https://doi.org/10.5281/zenodo.6044832.

Full text
Abstract:
One of the most significant current discussions in the construction industry is the issue of late payment of commercial debt to the contractors. Late payment of debts has been a very serious problem in the construction industry of both developed and developing countries. This research investigated late payment of commercial debt and challenges of working capital to small and medium enterprises (SMEs) in the construction industry of Zamfara state (Nigeria). The research was carried out through the use of structured quantitative questionnaire survey administered within the stakeholders in the co
APA, Harvard, Vancouver, ISO, and other styles
42

Umar, Safiya Mohammed, Adekunle Moshood Abioye, and Musa Mohammed Mukhtar. "Importance of Stakeholders' Engagement in the Implementation and Adoption of E-Procurement in Building Construction Projects in the Federal Capital Territory." African Journal of Stability and Development (AJSD) 17, no. 1 (2025): 67–90. https://doi.org/10.53982/ajsd.2025.1701.4-j.

Full text
Abstract:
Incorporating stakeholders’ engagement is essential for the successful implementation and adoption of e-procurement in building construction projects across the Federal Capital Territory (FCT). As digital technologies revolutionise the construction industry, e-procurement offers numerous benefits, including increased efficiency, transparency, cost savings, and streamlined procurement processes. However, achieving these advantages depends on the active involvement of key stakeholders, such as government agencies, construction firms, suppliers, policymakers, and technology providers. This study
APA, Harvard, Vancouver, ISO, and other styles
43

Isi, Lawani Raymond, Elemele Ogu, Peter Ifechukwude Egbumokei, Ikiomoworio Nicholas Dienagha, and Wags Numoipiri Digitemie. "Strategic Risk Mitigation and Contract Management in Multinational Oilfield Service Tendering: Lessons from Deepwater Operations." International Journal of Management and Organizational Research 1, no. 1 (2022): 75–86. https://doi.org/10.54660/ijmor.2022.1.1.75-86.

Full text
Abstract:
Multinational oilfield service tendering in deepwater operations involves complex contractual, financial, and operational risks that require strategic mitigation approaches. The high capital investment, technical challenges, regulatory compliance requirements, and geopolitical uncertainties present significant risks to project execution. Effective contract management is critical for balancing risk exposure, ensuring operational efficiency, and optimizing financial performance. This study explores best practices for risk mitigation and contract management in multinational oilfield service tende
APA, Harvard, Vancouver, ISO, and other styles
44

Muhammad, Faizan Khan, та Sanaullah Mufti. "استصناع (ایک تحقیقی جائزہ فقہ حنفی کےتناظر میں )". Al Meezan Research Journal of Social Sciences 01, № 01 (2021): 16. https://doi.org/10.5281/zenodo.6456258.

Full text
Abstract:
Istisna is a contract of sale of specified items to be manufactured or constructed, with an obligation on the part of the manufacturer or builder (contractor) to deliver them to the Customer upon completion. The legitimacy of Istisna is based on customary among people (تعامل). Istisna is the second exception to the rules of existence of subject matter at the time of sale as existence of subject matter is not necessary in Istisna Contract. It is necessary for the validity of Istisna that the price is fixed with the consent of the parties and that the necessary specification of the required item
APA, Harvard, Vancouver, ISO, and other styles
45

Yushan, Dai. "RESEARCH ON THE INCENTIVE PROBLEMS AND COUNTERMEASURES OF CORE STAFF IN JS BANK FROM THE PERSPECTIVE OF PSYCHOLOGICAL CONTRACT." EUrASEANs: journal on global socio-economic dynamics, no. 6(43) (November 3, 2023): 80–88. http://dx.doi.org/10.35678/2539-5645.6(43).2023.80-88.

Full text
Abstract:
As a regional joint-stock city commercial bank, JS Bank is faced with huge development problems such as weakening advantages of national and local support policies, weak core competitiveness and declining performance. JS Bank fully recognizes that talent is the source of power for banks to "produce" and "create" better products and services and to win market competition, and core employees who master core technology or have strong management ability are valuable human capital of banks. Through questionnaires and interviews, this research learned several incentive factors in which core employee
APA, Harvard, Vancouver, ISO, and other styles
46

GRIGOROVICH, ELENA. "LEGAL ASPECTS OF LIFE CYCLE CONTRACT INSURANCE." LEGAL BULLETIN 1, no. 6 (2021): 56–62. https://doi.org/10.5281/zenodo.11184220.

Full text
Abstract:
The article examines the possibility of applying the institute of insurance of life cycle contracts concluded in accordance with the Federal Law of 05.04.2013 N 44-Federal Law “On the contract system in State and Municipal procurement of goods, works, and services". The article examines the analogues of life cycle contract insurance in foreign legislation, analyzes the reasons for refusing to apply liability insurance contracts in this area in Russia, and identifies the positive aspects of life cycle contract insurance for the participants of the studied relations. In the course of the s
APA, Harvard, Vancouver, ISO, and other styles
47

Manzhula, A., and V. Kuripko. "FEATURES OF CONCLUSION OF AGREEMENTS IN THE FIELD OF ECONOMIC AND TRADE ACTIVITY." Scientific notes Series Law 1, no. 10 (2021): 30–33. http://dx.doi.org/10.36550/2522-9230-2021-10-30-33.

Full text
Abstract:
The article is devoted to the legal analysis of the peculiarities of concluding agreements in the sphere of economic and trade activity. The article emphasizes that among the civil law contracts, which are the basis for the obligation, a special place is occupied by the trade and economic contract. It is noted that the trade and economic agreement does not mean a separate type, but a set of agreements with a number of such inherent qualities that necessitate to establish within the general rules of contract law rules common to business agreements only - deliveries, contracts for capital constr
APA, Harvard, Vancouver, ISO, and other styles
48

Suleiman, S., I. I. Saidu, A. D. Adamu, and A. J. Tsado. "Management of bid evaluation risks in procurement of construction projects of public tertiary institutions in Nigeria." Environmental Technology and Science Journal 15, no. 1 (2024): 147–56. http://dx.doi.org/10.4314/etsj.v15i1.15.

Full text
Abstract:
Bid evaluation stage in project procurement is considered to be one of the critical stages in the public procurement process in Nigeria. This stage determines the outcome of tendering process and can easily be manipulated by procurement officer that wants to favour a particular bidder to be awarded a contract. However, this stage is plagued with risks that impact on contract parties and project objectives. Thus, this article aimed to assess bid evaluation risks management startegies for construction procurement of tertiary institution in Nigeria with a view to ensuring effective delivery of co
APA, Harvard, Vancouver, ISO, and other styles
49

Chen, Xiucheng. "Multidimensional Analysis of Rural Economic Development: Exploration of Problems, Reforms and Innovative Models." Frontiers in Business, Economics and Management 17, no. 3 (2024): 209–13. https://doi.org/10.54097/yhtq2b44.

Full text
Abstract:
Conducting in-depth analysis on rural economic construction, Firstly, it analyzes the existing problems in current rural economic construction, including the loss of vitality of the household contract responsibility system, incomplete rural land integration reform, inactive land transfer, and difficulty in integrating industrial and commercial capital into rural areas. These problems involve various factors such as labor force, land resources, benefit distribution, and talents. Then, it elaborates on the theory of the "three-share separation" reform model in detail, including its basic definit
APA, Harvard, Vancouver, ISO, and other styles
50

Soekarno, Subiakto, Eggy Muhammad Prayoga, and Indra Yudha Mambea. "DETERMINANTS OF CAPITAL STRUCTURE’S ADJUSTMENT SPEED: EMPIRICAL ANALYSIS OF REAL ESTATE, PROPERTY, AND CONSTRUCTION FIRMS." Jurnal Bisnis dan Manajemen 22, no. 1 (2021): 51–64. http://dx.doi.org/10.24198/jbm.v22i1.545.

Full text
Abstract:
This study explored the determinants of capital structure, optimal capital structure, and adjustment speed in real-estate, property, and construction firms in Indonesia. It conducted a quantitative analysis of the annual report of 25 listed firms by employing a generalized method of moment approach with panel data to estimate the result. Results showed that the determinants of capital structure, such as profitability, tangibility, size, and liquidity, have a negative impact on leverage. By contrast, a non-debt tax shield has a positive impact. Based on the regression result, firms have an opti
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!