Academic literature on the topic 'Contractor'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Contractor.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Journal articles on the topic "Contractor"

1

Alsugair, Abdullah M., and Mansour M. Abuthnain. "Assessment of Government Contractor Classification System in Saudi Arabia." Advanced Materials Research 250-253 (May 2011): 345–55. http://dx.doi.org/10.4028/www.scientific.net/amr.250-253.345.

Full text
Abstract:
This paper presents results of a study to assess the Government Contractor Classification System in Saudi Arabia. Contract award procedures in public projects of Saudi Arabia are accomplished in two steps. The first one involves qualifying contractors to insure that their technical, financial, and managerial capabilities are suitable for the project to be awarded. This qualification is accomplished by the Contractor Classification Agency- Ministry of Municipal and Rural Affairs- in which the contractor is classified according to his specialty and capabilities. In the second step, bids of the c
APA, Harvard, Vancouver, ISO, and other styles
2

Mofokeng, Godfrey. "Mentorship Programmes within the Small and Medium Sized Contractor Development Programme: A Case Study of the Free State Province, South Africa." Journal of Economics and Behavioral Studies 4, no. 12 (2012): 712–22. http://dx.doi.org/10.22610/jebs.v4i12.371.

Full text
Abstract:
The South African government has been implementing various small and medium sized contractor development programmes in an effort to redress the legacy created by apartheid government. The programmes fulfil such an objective through awarding construction projects to the historically disadvantaged Black contractors to enable them develop competent skills, build viable construction firms, create jobs and redistribute wealth. A mentorship programme was put in place to assist the contractors with technical, managerial, contractual and business impediments they might be encountered in the project ex
APA, Harvard, Vancouver, ISO, and other styles
3

Chiang, Fu Yuan, and Pin Luarn. "Contractor Prequalification in Taiwan." Advanced Materials Research 905 (April 2014): 742–47. http://dx.doi.org/10.4028/www.scientific.net/amr.905.742.

Full text
Abstract:
It is very important for the project owner to screen out potential failure contractors from the bidding process. Contractor prequalification has been established as a standard practice in solving this problem. This study uses a prequalification that is a financial ratios model to assess the contractor's financial capability in Taiwan. Do not consider non-quantifiable factor, the model is effective in assessing the financial ability of construction contractors' selection.
APA, Harvard, Vancouver, ISO, and other styles
4

Zuhri, Zuhri, Muhammad Isya, and Hafnidar A.Rani. "PENGARUH FAKTOR-FAKTOR KUALIFIKASI KONTRAKTOR TERHADAP KUALITAS PROYEK KONSTRUKSI JALAN DI KOTA BANDA ACEH." Jurnal Arsip Rekayasa Sipil dan Perencanaan 1, no. 3 (2018): 113–21. http://dx.doi.org/10.24815/jarsp.v1i3.11775.

Full text
Abstract:
The number of contractor companies, especially in the field of roads every year continues to increase. Based on data obtained from LPJK website (Construction Services Development Agency) Province of Aceh Year 2016, shows that from 2,717 road contractors in Aceh Province, 1% of them are big qualification, 10% middle qualification and 89% small qualification. The problem is from the increasing number of road contractor companies in Aceh Province, it has not been followed by an increase in qualification and performance. These improvements can be seen from the quality of work, the timeliness of co
APA, Harvard, Vancouver, ISO, and other styles
5

Arteti, Novi, Syafwandi ., and Budi Susetyo. "Factors affecting the continuation of contractor participation in the tender process for the construction services project at the center for policy research and development and application of technology – research and development agency ministry of pub." International Journal of Engineering & Technology 9, no. 2 (2020): 501. http://dx.doi.org/10.14419/ijet.v9i2.30594.

Full text
Abstract:
The application of new technology as a result of research and development carried out by the Research and Development Agency of the Ministry of Public Works and Public Housing is one of the efforts for technological needs in infrastructure development. The implementation of technology implementation activities still faces many obstacles, one of which is the tender process. Project Characteristics Factors, Capability of Contractors and Application of New Technology can influence whether the contractor will continue or stop the tender process. This research is based on a sample of respondents fr
APA, Harvard, Vancouver, ISO, and other styles
6

Thackray, M. A. "CONTRACTOR SAFETY." APPEA Journal 37, no. 1 (1997): 682. http://dx.doi.org/10.1071/aj96049.

Full text
Abstract:
This paper deals with the efforts and results of a Management driven campaign to improve contractor safety performance in WAPET's operations.WAPET Management identified Contractor safety performance as one of four key safety focus areas in their 1995 Business Plan. The other focus areas were Hazard Analysis, Training and Audit and Review.Strategies adopted for achieving improvements in contractor safety included:aligning Contractor Goals and Objectives with WAPET's by involving major contractors in 'Best Practices' workshops. The workshops specifically addressed the Business Plan focus areas a
APA, Harvard, Vancouver, ISO, and other styles
7

Dwiky Suhermawan and Hammam Rofiqi Agustapraja. "Evaluasi Perbandingan Anggaran Biaya Konstruksi Antara Metode SNI Dengan Metode Kontraktor." Jurnal Teknik 21, no. 1 (2023): 92–101. http://dx.doi.org/10.37031/jt.v21i1.339.

Full text
Abstract:
It is very important to understand the more favorable cost estimation comparison between SNI 2022 and the Contractor, because this information is used as a reference in calculating contractors and preventing losses. The purpose of this research is to identify the differences and similarities between the contractor calculation method and SNI 2022, and also to find out which budgeting method is effective. This study uses the analysis method of SNI Number 1 of 2022 and the contractor calculation analysis method. Based on the research results, the effective price is Rp. 2,988,685,140.71 which is c
APA, Harvard, Vancouver, ISO, and other styles
8

Kadhim, Saraa Naseer, and Kadhim Raheim Erzaij. "Examining sensitivity of financial performance at construction projects prequalification stage." Journal of Engineering 26, no. 7 (2020): 175–89. http://dx.doi.org/10.31026/j.eng.2020.07.12.

Full text
Abstract:
Construction projects are complicated in nature and require many considerations in contractor selection. One of the complicated interactions is that between performance with the project size, and contractor financial status, and size of projects contracted. At the prequalification stage, the financial ‎requirements restrict the ‎contractors to meet minimum limits in financial criteria such as net worth, working capital and ‎annual turnover, etc. In construction projects, however, there are cases when contractors meet these requirements but show low performance in practice. The model used in th
APA, Harvard, Vancouver, ISO, and other styles
9

Yu, Vincent F., Fu-Yuan Chiang, Thi Huynh Anh Le, and Shih-Wei Lin. "Using the ISM Method to Analyze the Relationships between Various Contractor Prequalification Criteria." Applied Sciences 12, no. 8 (2022): 3726. http://dx.doi.org/10.3390/app12083726.

Full text
Abstract:
Construction contractors significantly contribute to the progress and success of projects. Contractor prequalification grants tendering rights only to competent contractors. The bidding process is one of the most critical phases in the construction industry. The project leader must assess the general, technical, and financial information of the contractors to prepare an accurate proposal and select the best contractor. In this study, contractor prequalification is considered, along with the complex relationships between various criteria. ISM is a computational method that involves a qualitativ
APA, Harvard, Vancouver, ISO, and other styles
10

Mateș, Dorel, Adriana Marina Puşcaş, and Daniela Pordea. "Accounting and Fiscal Considerations upon Performance Guarantees - Particular Case of Construction Works." Studia Universitatis „Vasile Goldis” Arad – Economics Series 28, no. 4 (2018): 81–96. http://dx.doi.org/10.2478/sues-2018-0022.

Full text
Abstract:
Abstract The performance guarantee represents the contractor's liability to ensure the beneficiary on the fulfillment of the quality conditions for the contracted works, as well as of their execution within the agreed contractual term. In the context of a growth trend in the industrial construction market since 2018, we considered it appropriate to study the impact of the performance guarantees on the financial balance of the contractors operating on this market. Through this research we aim to analyze the methods of guaranteeing the construction works, to assess the financial, accounting and
APA, Harvard, Vancouver, ISO, and other styles
More sources

Dissertations / Theses on the topic "Contractor"

1

Liston, John. "Contractor prequalification." Thesis, Queensland University of Technology, 1994.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
2

Stallworth, Rachel. "Private Sector Defense Contractor Management Strategies for Contract Fulfillment." ScholarWorks, 2018. https://scholarworks.waldenu.edu/dissertations/5420.

Full text
Abstract:
Private sector U.S. defense contractors failing to meet contract objectives experience lower profitability, pay costly penalties, and risk survivability. Using the theory of contracts, the purpose of this multiple case study was to the explore strategies that some leaders of U.S. defense contracting businesses use to meet all the contract terms with the U.S. Department of Defense. Data were collected from 5 leaders of private sector defense contracting companies in northwest Florida through face-to-face, semistructured interviews and through a review of operations manuals, quality assurance po
APA, Harvard, Vancouver, ISO, and other styles
3

Palaneeswaran, Ekambaram. "Contractor selection systems for design-build projects." Thesis, Hong Kong : University of Hong Kong, 2000. http://sunzi.lib.hku.hk/hkuto/record.jsp?B22582150.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Matthews, Jason D. "A project partnering approach to the main contractor - sub contractor relationship." Thesis, Loughborough University, 1996. https://dspace.lboro.ac.uk/2134/7111.

Full text
Abstract:
This research describes an investigation into developing closer working relationships through project partnering in order to reduce the occurrence of adversarial practices commonly found between main contractors and subcontractors. A literature review was undertaken that identified two main types of partnering: project partnering; and strategic partnering. One of the main differences between the two types of partnering were identified as being their durations: short term (project partnering); and long term (strategic partnering). It was concluded that the published literature had the following
APA, Harvard, Vancouver, ISO, and other styles
5

Gardner, Christopher P. "Balancing government risks with contractor incentives in performance-based logistics contracts." Wright-Patterson AFB : Air Force Institute of Technology, 2008. http://handle.dtic.mil/100.2/ADA480398.

Full text
Abstract:
Thesis (M.S. in Operations Research) --Air Force Institute of Technology, 2008.<br>Title from title page of PDF document (viewed on Aug 7, 2008). "AFIT/GLM/ENS/08-02" Includes bibliographical references.
APA, Harvard, Vancouver, ISO, and other styles
6

Slater, Henry John. "The distinction between a contract of employment and a contract with an independent contractor." Thesis, University of Port Elizabeth, 2001. http://hdl.handle.net/10948/276.

Full text
Abstract:
The purpose of this treatise was to determine the distinction between the contract of service (employment) and the contract of work (independent contractor). A comprehensive literary survey was undertaken so as to establish if such a distinction does indeed exist. A logical point of departure was to study the contract of service and determine how the employment relationship is established by it. It is also necessary to establish under what circumstances a contract may be terminated and what the rights and obligations of the parties to the contract were. The contract between the parties will de
APA, Harvard, Vancouver, ISO, and other styles
7

Pun, I. Chung. "Feasibility study of contractor registration system and contractor grading system in Macau." Thesis, University of Macau, 2012. http://umaclib3.umac.mo/record=b2586271.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Shapro, Stephen R. "The allocation of contractor environmental remediation costs to Department of Defense contracts." Thesis, Monterey, Calif. : Springfield, Va. : Naval Postgraduate School ; Available from National Technical Information Service, 1995. http://handle.dtic.mil/100.2/ADA300186.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Molla, Mohammad Mofigul Islam. "Contractor Prequalification Practices in Bangladesh." Thesis, North Dakota State University, 2013. https://hdl.handle.net/10365/27041.

Full text
Abstract:
Like many developing economies, the construction industry in Bangladesh is vital to its economic development and growth. However, the Bangladeshi construction industry is plagued by unethical practices, sub-standard construction work, and the inability of local contractors to partake in internationally funded (lucrative) contracts (as general contractors). A contractor prequalification process is proposed to address the problems facing the industry. In this work, an extensive literature review was used in combination with research surveys, statistical analyses of the literature and survey resu
APA, Harvard, Vancouver, ISO, and other styles
10

Lara, Luis F. "Analysis of the Medium Tactical Vehicle Replacement (MTVR) Contractor Logistics Support (CLS) contract." Thesis, Monterey, Calif. : Springfield, Va. : Naval Postgraduate School ; Available from National Technical Information Service, 2001. http://handle.dtic.mil/100.2/ADA401453.

Full text
APA, Harvard, Vancouver, ISO, and other styles
More sources

Books on the topic "Contractor"

1

Oregon. Dept. of Human Services., ed. DHS contracts: Contractor guidelines. Oregon Dept. of Human Services, Office of Contracts and Procurement, 2006.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
2

Spinelli, Gianpiero. Contractor. Mursia, 2009.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
3

Winter, Christoph. Contractor-Led Procurement. Deutscher Universitätsverlag, 2003. http://dx.doi.org/10.1007/978-3-322-81614-6.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Somervill, Barbara A. Green general contractor. Cherry Lake Pub., 2011.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
5

National Association of Home Builders (U.S.). State and Local Government Affairs Dept., ed. Contractor licensing manual. National Association of Home Builders, State and Local Government Affairs Dept., 1991.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
6

Gerber, Michael E. The E-Myth Contractor. HarperCollins, 2007.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
7

Fishman, Stephen. Consultant & independent contractor agreements. 2nd ed. Nolo, 2000.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
8

Duffy, Brigitte M., and Ariel D. Cudkowicz. Independent contractor vs. employee. MCLE, 2010.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
9

United States. Internal Revenue Service, ed. Independent contractor or employee--. Dept. of the Treasury, Internal Revenue Service, 1999.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
10

Fishman, Stephen. Consultant & independent contractor agreements. 5th ed. Nolo, 2005.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
More sources

Book chapters on the topic "Contractor"

1

Janssens, David E. L. "Contractor Selection." In Design-Build Explained. Macmillan Education UK, 1991. http://dx.doi.org/10.1007/978-1-349-21601-7_9.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Beadnall, Stuart, and Max Lemanski. "Contractor remuneration." In Offshore Floating Production. Informa Law from Routledge, 2022. http://dx.doi.org/10.4324/9781003243861-6.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Loots, Philip, and Donald Charrett. "The Contractor." In Contracts for Infrastructure Projects. Informa Law from Routledge, 2022. http://dx.doi.org/10.4324/9781003206873-9.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Sørensen, Jakob B. "The Contractor." In FIDIC Red Book: A Companion to the 2017 Construction Contract, Revised Edition. Emerald Publishing Limited, 2024. http://dx.doi.org/10.1680/978-1-83608-174-620241008.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Sørensen, Jakob B. "The Contractor." In FIDIC Silver Book: A Companion to the 2017 EPC/Turnkey Contract, Revised Edition. Emerald Publishing Limited, 2024. http://dx.doi.org/10.1680/978-1-83608-178-420241008.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Sørensen, Jakob B. "The Contractor." In FIDIC Yellow Book: A Companion to the 2017 Plant and Design-Build Contract, Revised Edition. Emerald Publishing Limited, 2024. https://doi.org/10.1680/978-1-83608-164-720242014.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Narayanan, Sudha. "The Contract." In Palgrave Studies in Agricultural Economics and Food Policy. Springer Nature Switzerland, 2025. https://doi.org/10.1007/978-3-031-76487-5_9.

Full text
Abstract:
Abstract It has been noted time and again that contract farming arrangements manifest a bewildering variety and that as an analytical category, perhaps the only thing that binds all contract schemes together is the contract. Yet even the notion of a contract is not straightforward in many developing country contexts. This chapter discusses the immense diversity of contracts and contract farming arrangements and the use of contracts to set the balance of power between contractor and grower. It highlights how at times contracts are written to control the production process and at other times to
APA, Harvard, Vancouver, ISO, and other styles
8

Farris, Michael. "Contractor Safety Management." In Handbook of Loss Prevention Engineering. Wiley-VCH Verlag GmbH & Co. KGaA, 2013. http://dx.doi.org/10.1002/9783527650644.ch28.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Boardman, Marty. "Independent Contractor Agreement." In Fixing and Flipping Real Estate. Apress, 2012. http://dx.doi.org/10.1007/978-1-4302-4645-9_25.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Miall, Hugh. "The Defence Contractor." In Nuclear Weapons: Who’s in Charge? Palgrave Macmillan UK, 1987. http://dx.doi.org/10.1007/978-1-349-18679-2_3.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Conference papers on the topic "Contractor"

1

Røssland, Torstein. "10 Years Experience with Functional Specifications for Surface Maintenance." In CORROSION 2006. NACE International, 2006. https://doi.org/10.5006/c2006-06022.

Full text
Abstract:
Abstract The first long term contract for surface maintenance painting based on a functional specification was awarded in 1996. An extensive audit carried out in September of 2005 showed that the contract concept has turned out to be very successful. Additionally, it has contributed to bringing coating contractors into the “premier league” of the Norwegian contractor industry. The functional specification for surface maintenance is now the technical basis for Company contracts covering 24 offshore platforms, 1 refinery and 2 onshore gas processing facilities with a total coated surface area of
APA, Harvard, Vancouver, ISO, and other styles
2

Parson, Phillip K., and John S. Tanner. "Federal Government Contracting “Contract Solicitation Basics”." In SSPC 2007. SSPC, 2007. https://doi.org/10.5006/s2007-00069.

Full text
Abstract:
Abstract To the contractor inexperienced in dealing with the federal government, the contracting process can be confusing and quite time consuming. However a systematic approach can reduce confusion and reduce the time needed to begin bidding on federal government contracts. This streamlined approach will aid the prospective federal contractor in securing a contract and avoiding costly errors.
APA, Harvard, Vancouver, ISO, and other styles
3

Tombaugh, Raymond S. "Using Lead Abatement Contractors for Surface Preparation on Commercial Properties - the Consequences of Sacrificing Quality for Safety." In SSPC 2016 Greencoat. SSPC, 2016. https://doi.org/10.5006/s2016-00070.

Full text
Abstract:
Abstract The Federal EPA requires that commercial/residential painting contractors be certified to prepare surfaces containing lead based paint on residential and public structures. As a result, when respirators equipped with HEPA filtration are required to be worn to reduce worker exposure levels to below the permissible exposure limit for lead, the surface preparation work is often subcontracted to a licensed lead abate contractor who holds these types of certifications. Unfortunately there have been several coating failures on commercial/residential buildings, originally containing lead pai
APA, Harvard, Vancouver, ISO, and other styles
4

Davis, Jeff. "Maintenance Coats: How to Increase Your Profitability." In Paint and Coatings Expo (PACE) 2007. SSPC, 2007. https://doi.org/10.5006/s2007-00020.

Full text
Abstract:
Abstract Residential contractors who focus on becoming a service business can bring in ongoing revenue from existing customers through regularly scheduled maintenance coats. Every contractor should have a long-range system for tracking maintenance due dates, notifying customers and even set-up maintenance contracts to gain pre-approval of future work. By proactively contacting customers for maintenance, residential contractors are providing a valuable service while at the same time laying the groundwork for increased profitability. A contractor’s best customer is his current customer. Acquirin
APA, Harvard, Vancouver, ISO, and other styles
5

Fraebel, Troy, and Jerrith Hodskins. "Qa'ing the QC from a Distance." In Coatings+ 2020. SSPC, 2020. https://doi.org/10.5006/s2020-00017.

Full text
Abstract:
Abstract When it was time for a major fertilizer distribution facility in the Midwest to have its conveyor structure repainted, the owner started contemplating full-time independent third-party inspection. After reviewing the contractor's schedule and the size of the crew, it became apparent that this approach would interfere with the contractor's operations and be cost prohibitive for the owner. What to do? Since the contract required the contractor to perform quality control (QC) inspections, the owner decided to retain a quality assurance (QA) firm to monitor the contractor's QC activities
APA, Harvard, Vancouver, ISO, and other styles
6

Lyras, Louis G., Dave Hatherill, and William LePage. "Proposed Standard for Levels of Inspection." In Paint and Coatings Expo (PACE) 2008. SSPC, 2008. https://doi.org/10.5006/s2008-00038.

Full text
Abstract:
Abstract This paper identifies the problems with current inspection procedures and discusses a proposed standard for levels of inspection that the owner will specify in the contract documents. The paper identifies the problems and cost to contractors and owners for inspection without clear and specified inspection standards and will demonstrate a savings without compromising the quality of the work. Levels of inspection will start with Level 1 and proceed to Level 4 with owner and inspection control increasing accordingly and contractor control decreasing as the levels increase.
APA, Harvard, Vancouver, ISO, and other styles
7

Theo, Jeff. "Building a Case for Commercial Contractor and Applicator Certifications." In SSPC 2014 Greencoat. SSPC, 2014. https://doi.org/10.5006/s2014-00057.

Full text
Abstract:
Abstract This paper builds a case for trained, certified commercial painting contractors and applicators. It discusses SSPC: The Society for Protective Coatings’ (SSPC’s) initiatives and progress in standards development for Commercial Contractor Certification and Commercial Certified Application Specialists.
APA, Harvard, Vancouver, ISO, and other styles
8

Fred Neville, J., and E. Joseph Wolf. "Prequalification of Contractors to Avoid Low Bid Syndrome." In CORROSION 1997. NACE International, 1997. https://doi.org/10.5006/c1997-97381.

Full text
Abstract:
Abstract The low bid syndrome and its resulting problems, exposure of hidden costs, etc., has been the bane of project managers for many years. What is being presented in this paper can save the client from falling into this insidious trap or, as the old saying goes, “pay me now or pay me later". The coating of concrete particularly for corrosion protection, presents many unique challenges to the contractor and, as a result, requires the contractor to be knowledgeable both of coatings as well as the properties of concrete. He must be experienced, financially stable and have the work ethic to d
APA, Harvard, Vancouver, ISO, and other styles
9

Menke, Joseph. "Corrosion Design Criteria for Electronics/Simulators." In CORROSION 1996. NACE International, 1996. https://doi.org/10.5006/c1996-96620.

Full text
Abstract:
Abstract A contract to provide simulation trainers contained specific corrosion control design and material requirements. The contractor requested assistance to determine how the requirements could be incorporated into the design. The contract corrosion control requirements are listed along with an interpretation of how to incorporate them into the design.
APA, Harvard, Vancouver, ISO, and other styles
10

DeVinney, Scott. "Practical Application of Coating Systems in Wastewater Treatment Facilities." In Paint and Coatings Expo (PACE) 2006. SSPC, 2006. https://doi.org/10.5006/s2006-00016.

Full text
Abstract:
Abstract Preservation of wastewater treatment assets and the evolution of the coating options required to mitigate the severity of the exposure environment, are giving coating contractors pause to examine alternative means of application. By expanding application versatility, the coating contractor will be able to compete across the range of preservation options.
APA, Harvard, Vancouver, ISO, and other styles

Reports on the topic "Contractor"

1

Wright, Jonathan L. Contractor Metrics for Service Contracts. Defense Technical Information Center, 2000. http://dx.doi.org/10.21236/ada377102.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Raitzer, David. User Guide for Procurement of Plant and Works (Design–Build): Standard Bidding Document. Asian Development Bank, 2024. https://doi.org/10.22617/tim240567-2.

Full text
Abstract:
This document guides borrowers on how to prepare a bidding document for a single- responsibility lumpsum type of contract and how to evaluate bids and award contracts using merit point criteria. This publication provides guidance for borrowers on how to prepare a bidding document for a single-responsibility lumpsum type of Plant and Works (Design-Build) contract using FIDIC Yellow Book (2017) general terms and conditions. Borrower can use this document for procurement of Electrical and Mechanical Plant, and for Building and Engineering Works, designed by the Contractor.
APA, Harvard, Vancouver, ISO, and other styles
3

Gearhart, Jared Lee, Kristin Lynn Adair, Katherine A. Jones, et al. Contingency contractor optimization. Office of Scientific and Technical Information (OSTI), 2013. http://dx.doi.org/10.2172/1104778.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Gearhart, Jared Lee, Kristin Lynn Adair, Katherine A. Jones, et al. Contingency contractor optimization. Office of Scientific and Technical Information (OSTI), 2013. http://dx.doi.org/10.2172/1090228.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Rickert, Timothy R. The Contractor Crisis. Defense Technical Information Center, 2011. http://dx.doi.org/10.21236/ada543826.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

CORPS OF ENGINEERS WASHINGTON DC. Construction: Contractor Performance Evaluations. Defense Technical Information Center, 1993. http://dx.doi.org/10.21236/ada404148.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Marshak, Ronni. Contractor Do’s and Don’ts. Patricia Seybold Group, 2014. http://dx.doi.org/10.1571/bp09-04-14cc.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Heer, T. RCE CI, Contractor Services. Office of Scientific and Technical Information (OSTI), 2020. http://dx.doi.org/10.2172/1670558.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Durfee, Justin David, Alisa Bandlow, Christopher Rawls Frazier, Kristin Lynn Adair, Jared Lee Gearhart, and Katherine A. Jones. Contingency Contractor Optimization Phase 3 Installation Instructions Contingency Contractor Optimization Tool - Prototype. Office of Scientific and Technical Information (OSTI), 2015. http://dx.doi.org/10.2172/1494625.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

EFFC/DFI Working Platforms Task Group. Guide to Working Platforms. European Federation of Foundation Contractors and Deep Foundations Institute, 2020. https://doi.org/10.37308/effc-dfi-wptg-guide-e1-2020.

Full text
Abstract:
On a typical construction site, the provision of a safe surface to work on involves and affects a number of the contracting parties (the client; principal designer; general contractor; specialty contractor; platform designer; platform installer or earthworks contractor; platform tester and platform maintainer), and as a consequence, the organisation of its design, installation and maintenance can be complex. As it concerns money and liability it is often a contentious issue, but nonetheless one that needs to be addressed. This document takes each step in turn and describes what good practice i
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!