Academic literature on the topic 'Coordenação e planeamento de projetos'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Coordenação e planeamento de projetos.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Journal articles on the topic "Coordenação e planeamento de projetos"
AZEVEDO, Ana Carina. "O Secretariado da Reforma Administrativa: Os anos iniciais de um projeto de reforma nos meandros da “Primavera Marcelista” (1967-1970)." Varia Historia 37, no. 74 (August 2021): 591–621. http://dx.doi.org/10.1590/0104-87752021000200010.
Full textJoaquim, Bárbara Andreia, Maria José Carvalho, and Paula Maria Batista. "REVISÃO SISTEMÁTICA SOBRE O PERFIL DE COMPETÊNCIAS DO GESTOR DESPORTIVO." Movimento (ESEFID/UFRGS) 17, no. 1 (January 12, 2011): 255–79. http://dx.doi.org/10.22456/1982-8918.15104.
Full textBellan, Melissa, and Márcio Minto Fabricio. "Práticas e ferramentas gerenciais de apoio a integração e coordenação de projetos." PARC Pesquisa em Arquitetura e Construção 1, no. 5 (November 1, 2010): 32. http://dx.doi.org/10.20396/parc.v1i5.8634494.
Full textOkamoto, Patricia Seiko, Mario Sergio Salerno, and Silvio Burrattino Melhado. "A COORDENAÇÃO DE PROJETOS SUBCONTRATADOS NA CONSTRUÇÃO CIVIL." Gestão & Tecnologia de Projetos 9, no. 1 (August 31, 2014): 123. http://dx.doi.org/10.11606/gtp.v9i1.68149.
Full textNoia Souza, Beatriz, and Heike Schmitz. "GESTÃO ESCOLAR COMPARTILHADA E ESTRATÉGICA: UMA PESQUISA EMPÍRICA EM UMA ESCOLA PÚBLICA BRASILEIRA." Teoria e Prática da Educação 23, no. 2 (December 1, 2020): 61–80. http://dx.doi.org/10.4025/tpe.v23i2.54536.
Full textMouraz Lopes, Ana Maria, and Adriana Aparecida De Lima Terçariol. "A Coordenação Pedagógica na Escola." Dialogia, no. 33 (December 21, 2019): 2–4. http://dx.doi.org/10.5585/dialogia.n33.16113.
Full textPessoa Santos, Diego, Kamila Pagel de Oliveira, and Mauro César Silveira. "Coordenação e Alinhamento entre Escritórios de Projetos: Um Estudo de Caso Na Administração Pública Mineira." Revista de Gestão e Projetos 4, no. 2 (August 1, 2013): 128–52. http://dx.doi.org/10.5585/gep.v4i2.134.
Full textAddor, Miriam Roux Azevedo, and Eduardo Toledo Santos. "Salas de coordenação de projetos em BIM: proposta de um método de avaliação." Ambiente Construído 17, no. 4 (December 2017): 403–23. http://dx.doi.org/10.1590/s1678-86212017000400204.
Full textSantos, Vinícius Carrião dos, Tatiana Gondim Amaral, and José de Paula Barros Neto. "Comprometimento e interação na coordenação de projetos de edifícios: um estudo de caso." Ambiente Construído 18, no. 2 (April 2018): 251–72. http://dx.doi.org/10.1590/s1678-86212018000200253.
Full textSilva, Isadora Souza, and Cristiano Sant'Anna De Medeiros. "A coordenação pedagógica como elemento de interseção das diferenças culturais." Dialogia, no. 33 (December 21, 2019): 131–42. http://dx.doi.org/10.5585/dialogia.n33.13969.
Full textDissertations / Theses on the topic "Coordenação e planeamento de projetos"
Alberto, Paula. "Relatório de atividade profissional no Mestrado em Tecnologia Ambiental : sensibilização ambiental e sensibilização para o consumo de energia." Master's thesis, Escola Superior de Tecnologia do Instituto Politécnico de Setúbal, 2013. http://hdl.handle.net/10400.26/4504.
Full textA apresentação do presente relatório visa a obtenção do grau de Mestre em Tecnologia Ambiental, de acordo com o estabelecido no regulamento para obtenção do Grau de Mestre por Licenciados "Pré-Bolonha", que abrange as licenciaturas de cinco anos com, pelo menos, cinco anos de experiência profissional. O presente documento é composto por dois capítulos. No primeiro capítulo encontra-se a descrição sucinta do Curriculum Vitae, nomeadamente a experiência de formação, aptidões e competências. O segundo capítulo é composto pela apresentação detalhada da experiência e atividades desenvolvidas, organizada por temas ambientais tratados ao longo do percurso profissional. Será ainda apresentado neste documento uma breve reflexão para cada atividade desempenhada, permitindo demonstrar mais facilmente a evolução das competências adquiridas. O percurso académico e profissional realizado permitiram a aquisição de conhecimentos, na área da Engenharia do Ambiente, e um vasto conjunto de aptidões como a capacidade de trabalhar em equipa, capacidade organizacional, competências sociais e gestão de projetos. A constante vontade em atualizar conhecimentos e adquirir novas competências técnicas tem sido um incentivo para continuar a frequentar cursos de formação, seminários, workshps e conferências dedicadas à área do ambiente e a outras temáticas específicas.
Rodríguez, Marco Antonio Arancibia. "Coordenação técnica de projetos." Florianópolis, SC, 2005. http://repositorio.ufsc.br/handle/123456789/102898.
Full textMade available in DSpace on 2013-07-16T02:15:23Z (GMT). No. of bitstreams: 1 221661.pdf: 1298161 bytes, checksum: 77a614850c2c86267941f7e09fdc5e56 (MD5)
Nos últimos anos, a gestão do processo de projeto de edificações vem sendo formalizada principalmente pela aplicação de conceitos relativos à gestão da qualidade, gestão de projetos, compatibilização de projetos e engenharia simultânea. Entretanto, para uma melhora efetiva do processo, há necessidade de desenvolver ferramentas gerenciais que relacionem esses conceitos e diretrizes como o dia-a-dia do desenvolvimento dos projetos de construção.
Simões, Isabel Cristina Neves. "Impacte do código dos contratos públicos: trabalhos a mais, erros e omissões." Master's thesis, Universidade de Aveiro, 2014. http://hdl.handle.net/10773/14491.
Full textA construção em Portugal tem sido afetada por uma grave crise económica e financeira, pelo que, faz sentido nos dias de hoje controlar os custos das obras através de um planeamento rigoroso, quer em fase de projeto (planeamento, elaboração dos projetos, descrição dos cadernos de encargos, medições, etc.) quer na sua fase de execução (gestão de obra, coordenação dos projetos, fiscalização, etc.), sendo transversal a todo este processo as normas legais e regulamentares aplicáveis em cada momento. O Código dos Contratos Públicos veio regulamentar os procedimentos de contratação de empreitadas de obras públicas, sendo que, decorridos mais de 6 anos após a sua entrada em vigor, considerou-se pertinente a realização de um estudo ao nível do impacte e contribuição daquele regime, sobretudo ao nível de trabalhos a mais (TM) e suprimento de erros e omissões (E&O). Assim, é intenção da presente dissertação criar uma plataforma de conhecimento sobre as causas e consequências de ocorrência de derrapagens financeiras e desvios temporais decorrentes dos E&O e TM, quer na fase de projeto quer na fase de execução, resultantes da investigação efetuada em termos bibliográficos e da análise prática de casos de estudos em Portugal. O objetivo final consiste em determinar as eventuais soluções possíveis para minimizar a problemática dos E&O e TM em empreitadas de obras públicas. É concluído, tendo subjacente os 7 casos de estudo, que as especialidades com maiores imprevistos (TM, E&O) ocorrem na construção civil, estruturas e sistemas de aquecimento, ventilação e ar condicionado, fruto de uma análise prévia insuficiente às condições técnicas, geotécnicas e/ou geológicas existentes no terreno. Sobre este assunto importa salientar Sarmento et al e FLyvbjerg que concluem nos seus artigos a importância da qualidade do projetos elaborados (arquitetura e especialidades) e a sua coordenação. Referem também que as obras são comumente suborçamentadas, o que que implica que o preço base não corresponda à realidade do mercado. Por fim são apresentadas algumas ferramentas que permitem a articulação dos diferentes projetos e consequentemente a minimização de erros, omissões e/ou descoordenações entre os mesmos, promovendo, deste modo, a qualidade dos projetos e a eficiência e eficácia de execução das obras.
During the last years the construction sector in Portugal has been affected by a severe economic and financial crisis. These circumstances, increase the importance of costs control through reliable planning during the design phase (planning, preparation of designs, description of specifications, measurements, etc.) and in the execution phase (project management, coordination, inspection, etc.), crossing the whole process the legal and technical rules in each moment. The Public Contracts Code came into force to regulate public works procedures and contracts. More than six years from its inception it was considered an important conduct to study about its impact and contribution, particularly in terms of the control of over works (TM) and of errors and omissions (E&O). Thus, this dissertation aim to create a knowledge platform on the causes and occurrence of consequences of financial overruns and temporal deviations arising from E&O and TM either in the design phase either in the execution phase. To achieve this goal bibliographic research and the analysis of Portuguese case studies was performed. Finally it is pointed out possible solutions to minimize the problem of E&O and TM in public works contracts. It is concluded, which derives from the 7 case studies, the specialties with higher contingencies (TM, E&O) occur in construction, structures and heating systems, ventilation and air conditioning, resulting of insufficient preliminary analysis of the technical conditions, geotechnical and / or geological existing on the site. On this subject it should be noted that Sarmento et al and Flyvbjerg conclude in its articles the importance of quality projects (architecture and specialties) and their coordination. Refer also that the works are commonly subestimated, which implies that the base price does not correspond to market reality. Some tools are identify that allow the articulation of different projects and consequently the minimization of errors, omissions and / or lack of coordination between them, promoting thereby the quality of projects and the efficiency and effectiveness of the works are finally presented.
Bellan, Melissa. "Práticas e ferramentas para coordenação de projetos de edifícios." Universidade de São Paulo, 2009. http://www.teses.usp.br/teses/disponiveis/18/18141/tde-25042013-174028/.
Full textThe construction market has had significant growth and builders and developers in order to maintain the market are seeking procedures to produce buildings faster and with a high quality and affordable to meet the market demand. In this context, we are faced with the coordination of building projects aimed at ensuring the development of their construction on time quality and without waste and rework through the process in series. For this reason, this paper addresses the coordination of building projects its concepts their activities as they are carried out and what kind of support tools are needed to ensure the expected quality. It aims to promote the coordination of building design, showing their importance and need, demonstrating their best practices and the tools that are essential. The study was conducted through a literature review on the subject and a case study carried out in two businesses company that are builders and developers and have an internal department responsible for the coordination of building projects. To support the case study were used interviews with business people and professionals outside the company working in the study area. In the departments of project coordination buildings of the companies studied were collected documents formalizing the coordination. The data collected from the company\'s practice were confronted with the literature in order to support the fundamentals of the research. Thus it was possible to demonstrate in this work, best practices and tools to support coordination of building projects, through the comparison between theory and practice.
Bragaglia, Umberto João. "Formalização de um sistema de procedimentos para gerenciamento e coordenação de projetos em escritórios de arquitetura." Florianópolis, SC, 2006. http://repositorio.ufsc.br/xmlui/handle/123456789/88322.
Full textMade available in DSpace on 2012-10-22T07:42:25Z (GMT). No. of bitstreams: 1 230680.pdf: 2423724 bytes, checksum: 5e23fa810c863509cbfcbe3ffa1cc0fb (MD5)
O desenvolvimento do projeto de uma edificação se inicia na organização dos programas e do planejamento, não se resume somente na entrega de um jogo de desenhos e documentos. Inclui todo um conjunto de projetos de arquitetura e engenharia que são elaborados em diversas etapas, seguindo uma seqüência de atividades a serem desenvolvidas simultaneamente, que nem sempre utilizam algum sistema de gerenciamento. A eficiência deste processo de produção de serviços demonstra sua necessidade de integração e permite garantir o controle e a organização das atividades, bem como a interoperabilidade entre todos os profissionais envolvidos. Como resultado final a equipe de trabalho busca a qualidade, de forma a garantir a satisfação do cliente e o crescimento da empresa. Assim, esta pesquisa objetiva elaborar e formalizar um sistema de procedimentos enfocando a organização das atividades projectuais, seu gerenciamento e o intercambio de informações. Este trabalho pretende contribuir, entivando mudanças nos escritórios de arquitetura ao apresentar um sistema adequado às suas necessidades, caracterizado por sua implicidade, agilidade e capacidade de gestão.
Alencastro, João Paulo Ulrich de. "Diagnóstico das práticas de coordenação e compatibilização de projetos no mercado de construção civil de Florianópolis-SC." Florianópolis, SC, 2006. http://repositorio.ufsc.br/handle/123456789/103126.
Full textMade available in DSpace on 2013-07-16T03:05:07Z (GMT). No. of bitstreams: 1 238066.pdf: 902240 bytes, checksum: 6c9e71813018e2915ed934a58198e968 (MD5)
Muitos dos problemas relacionados à inadequações técnicas, mercadológicas e financeiras de empreendimentos, têm como causa principal a ineficiência do processo de projeto. Este importante processo, como pode ser observado por diversos pesquisadores, ocorre de maneira informal, normalmente desenvolvido de forma não planejada, fragmentada, sem uma visão global e integrada entre projeto e produção. É evidente a falta de integração e comunicação entre os diversos agentes envolvidos. Por outro lado, construtores e incorporadores brasileiros, seguindo a tendência mundial, começam a buscar metodologias e modelos de gestão do processo de desenvolvimento de projetos. Esta tendência visa agregar qualidade a produtos e processos, e por conseqüência garantir melhor satisfação de clientes internos e externos. A presente pesquisa, tem como principal objetivo diagnosticar as práticas de gestão do processo de projetos no mercado da construção civil da cidade de Florianópolis - SC. Para levantamento de dados, o autor lança mão do uso de pesquisa de campo, realizando entrevistas estruturadas com gestores técnicos de 20 empresas da região citada. Os resultados obtidos, a partir das entrevistas, são cruzados com o referencial teórico, propondo assim um diagnóstico das práticas de gestão do projeto, bem como levantando oportunidades de melhorias para este importante processo.
Addor, Míriam Roux Azevedo. "Proposta de metodologia de avaliação para salas de coordenação de projetos em BIM." Universidade de São Paulo, 2015. http://www.teses.usp.br/teses/disponiveis/3/3146/tde-27072016-100052/.
Full textBuilding Information Modeling (BIM) is a new process to produce a building that may include its entire lifecycle. It requires the construction of a three-dimensional model contemplating the information of the objects to be built. Due to the great extent to which this process can serve, it can cause many impacts throughout the production chain and, therefore, many current forms of work should be reviewed or changed. Among these, is the design coordination task. This work aims to develop a methodology for evaluating BIM coordination rooms contextualized in real state users using this process in their projects. When coordinating projects using BIM, different media are required from those used when the analysis is paper-based. New meeting participants\' needs surface like visualizing, browsing or checking a 3D model, making digital sketches, and other activities that make face-to-face meetings productive, in order to solve project problems. In this work, criteria and metrics for evaluating the quality of layouts of BIM coordination rooms are proposed. To validate the results, fourteen different layouts for the same room were analyzed and evaluated regarding proposed metrics and criteria. In order to establish the relative importance among all the ten proposed criteria, the AHP method of multi-criteria decision based on pair comparisons analysis was applied. The results determined the best layouts for a room equipped with two interactive projectors. The criteria and metrics presented, as well as the methodology to measure them, are useful for the evaluation of other rooms and layouts to serve meeting room users based on BIM.
Silva, Maria Vitória Marim Ferraz Pinto da. "As atividades de coordenação e a gestão do conhecimento nos projetos de edificações." Universidade Federal de São Carlos, 2004. https://repositorio.ufscar.br/handle/ufscar/4675.
Full textFinanciadora de Estudos e Projetos
This work presents a study about the coordination of building designs and knowledge management. In the coordination activities, the focus is on the coordination management, related to the planning and to the administration of design process, and on the technical coordination, regarding the integration and the design development, all of them being promoted through the coordination meetings, the compatibilization and the critical analysis. The building design coordination has as its attribution to reconcile and to integrate the knowledge of several specialties. The work introduces the application of the knowledge management into the building design and discusses the knowledge and competences needed for the coordination activities and development of the building design. The knowledge management is fundamental to reorganize the processes of generating, registering, diffusing and usage of the organizational knowledge. Moreover, the information systems and the computing resources have also been studied in this work as instruments of this management. To base adequately the theme of the dissertation, case studies were accomplished in two big construction and real estate development companies and in three building design offices. The case studies in the five companies made it possible to characterize the practices adopted for the design coordination, according to the alternatives used for its accomplishment (internal or external work or outsorced, besides the consultancy in coordination). A case study on knowledge management was also conducted in one of the major companies researched, aiming at studying its applicability in the building construction. The introduction of the concepts of knowledge management in the culture and in the organizational strategy of the company, as well as its reflex in the building design are presented. In agreement to this approach, by introducing the discussion about knowledge management, this work contributes to the process of development of designs and to its coordination, enabling the accomplishment of designs with better level of quality and constructability, to agree with the demands of the modern projects.
Esta dissertação apresenta um estudo sobre coordenação de projetos e gestão do conhecimento. Nas atividades de coordenação são enfocadas a gestão da coordenação, relativa ao planejamento e ao gerenciamento do processo de projeto; e a coordenação técnica, referente à integração e ao desenvolvimento dos projetos, promovidas através das reuniões de coordenação, da compatibilização e da análise crítica. A coordenação de projetos tem por atribuição conciliar e integrar o conhecimento de diversas especialidades. O trabalho introduz a aplicação da gestão do conhecimento nos projetos de edificações e discute os conhecimentos e as competências necessários nas atividades de coordenação e desenvolvimento dos projetos. A gestão do conhecimento é fundamental para reorganizar os processos de geração, registro, difusão e utilização do conhecimento organizacional. Assim, são abordados, também, os sistemas de informação e os recursos de informática, como instrumentos dessa gestão. Para embasar, adequadamente, o tema da dissertação, foram realizados estudos de caso em duas incorporadoras-construtoras de grande porte e em três escritórios de projeto. Os estudos de caso nas cinco empresas permitem caracterizar as práticas adotadas para a coordenação de projetos, conforme as alternativas empregadas para a sua realização (interna, externa ou terceirizada, além da consultoria em coordenação). Foi também realizado estudo de caso sobre gestão do conhecimento, em uma das empresas de grande porte pesquisadas, tendo por objetivo estudar a sua aplicabilidade no setor. É apresentado um histórico da introdução dos conceitos de gestão do conhecimento na cultura e na estratégia organizacional da empresa e seu reflexo nos projetos de edificações. Sob estes enfoques, ao introduzir a discussão sobre gestão do conhecimento no processo de desenvolvimento dos projetos e na sua coordenação, a dissertação contribui para a realização de projetos com melhores níveis de qualidade e de construtibilidade, em atendimento às exigências dos empreendimentos atuais.
Bretas, Eneida Silveira. "O processo de projetos de edificações em instituições públicas: proposta de um modelo simplificado de coordenação." Universidade Federal de Minas Gerais, 2010. http://hdl.handle.net/1843/ISMS-8D2P9P.
Full textEste trabalho aborda o processo de projeto de edificações em instituições públicas, que possui especificidades que o tornam diferenciado dos processos do setor privado, como as imposições da Lei 8666 e outras exigências legais, orçamentos anuais, curtos prazos, e foco em reformas, propondo um modelo simplificado para coordenação de projetos. Uma fundamentação teórica baseada em projeto simultâneo e outras pesquisas sobre coordenação e modelagem do processo de projeto, complementada por estudos sobre as especificidades a que estão sujeitas o setor público, foi a base para a pesquisa-ação que aconteceu em uma instituição financeira pública que investe de maneira significativa em reforma de edificações, possui equipe interna de engenharia e também contrata projetos e obras no mercado. O processo de projeto adotado pela instituição foi mapeado e analisado, e numa segunda etapa, foi proposto e aplicado um modelosimplificado de coordenação. O Modelo abrange as etapas de pré-projetação, projetação e pós-projetação e foi sintetizado em planilhas indicando etapas, atividades, pré-requisitos, responsáveis,produtos, além de ferramentas para a realização de algumas das atividades, como fichas para diagnóstico, controle de interfaces entre disciplinas, alterações de projeto na obra. Os resultados mostraram que a coordenação de projetos, baseada em premissas de projetosimultâneo, é um fator de integração entre as etapas do processo de projeto de edificações nas instituições públicas, fragmentado por limitações legais e organizacionais, melhorando as interfaces com o cliente, entre as disciplinas e agentes envolvidos e entre projeto e obra.
Cruz, Gabriela Pontes Silva. "Coordenação e compatibilização de projetos para construção de edifícios: estudos de casos em instituições públicas e privadas." Universidade Federal de Viçosa, 2011. http://locus.ufv.br/handle/123456789/3750.
Full textProblems related to the design, as detailing insufficient information and of compatibility or coordination failures, are causes of large portion of losses of efficiency in building construction. As a result, in this essay was performed the study of two public buildings and exploration of design process in three building in Viçosa-MG. Public works, are presented two studies: one of the Engineering Laboratory Building and another building of the Center for Humanities II. At first, the analysis was made of the executive design, with evaluation of projects, incompatibilities between the various disciplines of design, and the presentation of the masonry design. The second, we present and discuss the incompatibility errors design discovered during construction. A team of technical reports guides both studies from Universidade Federal de Viçosa (UFV). In the three companies in the city of Viçosa-MG, was performed a survey of the design process, whereby could be studied several points related to the design and its consequences for the production of a building. This survey included: discussion of the design and its implementation; projects performed by companies, executive design developed by the company, understanding and use of constructive rationalization, design coordination and compatibility by companies, and the construction from the design developed by companies. The observed in the cases studied in the public and private companies confirms the need and importance of coordination in the design process and the essential compatibility of executive design for the production of a building, essential aspects for efficiency and achievement of quality in execution and use of buildings.
Problemas relacionados com projeto, como detalhamento insuficiente das informações e falhas de compatibilização ou coordenação, são causas de grande parcela das perdas de eficiência na construção de edifícios. Em função disso, neste trabalho, foram realizados o estudo de projetos de dois edifícios públicos e a prospecção de processo de projetos em três construtoras de Viçosa-MG. Das obras públicas, são apresentados dois estudos: um do Edifício de Laboratórios de Engenharia e outro do Edifício do Centro de Ciências Humanas II. No primeiro, foi feita a análise do projeto executivo, com avaliação dos projetos, das incompatibilidades entre os projetos das várias disciplinas, e a apresentação do projeto de alvenaria. Quanto ao segundo, apresentam-se e discutem-se os erros de incompatibilidades de projeto percebidos durante a execução da obra. Ambos os estudos são pautados por relatórios técnicos de uma equipe da Universidade Federal de Viçosa (UFV). Nas três empresas da cidade de Viçosa-MG, foi realizada uma prospecção do processo de projetos, por meio da qual puderam ser estudados vários pontos relacionados ao projeto e suas consequências para a produção de um edifício. Dessa prospecção consta: discussão relativa a projeto e sua execução; projetos executados pelas empresas; projetos executivos elaborados pelas empresas; entendimento e uso da racionalização construtiva, da coordenação e da compatibilização de projetos pelas empresas; e a construção dos projetos elaborados pelas empresas. O constatado nos casos estudados nos setores público e privado confirma a necessidade e a importância de uma coordenação no processo de projetos e a indispensável compatibilização dos projetos executivos para a produção de um edifício, aspectos indispensáveis para a eficiência e obtenção da qualidade na execução e uso de edificações.
Books on the topic "Coordenação e planeamento de projetos"
Oliveira, Mário Cézar Amorim de, Nilson de Souza Cardoso, and Jaqueline Rabelo de Lima. Itinerários de resistência: pluralidade e laicidade no Ensino de Ciências e Biologia. Editora Realize, 2021. http://dx.doi.org/10.46943/viii.enebio.2021.01.000.
Full textBook chapters on the topic "Coordenação e planeamento de projetos"
DALMAZ, D. S. S., and Lucas MACEDO. "ALFABETIZAÇÃO MIDIÁTICA E INFORMACIONAL – AMI DA UNESCO: A PERSPECTIVA DE EDUCAÇÃO PARA O SÉCULO XXI." In EDUCAÇÃO NO SÉCULO XXI: TECNOLOGIA E ENSINO, 183–99. Arco Editores, 2020. http://dx.doi.org/10.48209/978-65-14-oncet-9.
Full textLopes, Sérgio. "Uma visão global sobre a gestão do risco de cheias torrenciais na Madeira. Perspetivas e desafios." In Estudos Cindínicos, 99–133. RISCOS - Associação Portuguesa de Riscos, Prevenção e Segurança e Serviço Regional de Proteção Civil, IP-RAM, 2020. http://dx.doi.org/10.34037/978-989-54942-9-3_9_4.
Full textConference papers on the topic "Coordenação e planeamento de projetos"
Andery, Paulo, and Erica Castro. "Coordenação de projetos no setor público: um estudo de caso." In 2º Simpósio Brasileiro de Qualidade do Projeto no Ambiente Construído. Rio de Janeiro: Universidade Federal do Rio de Janeiro, 2011. http://dx.doi.org/10.4237/sbqp.11.250.
Full textMelhado, Silvio, Eliane Adesse, Ricardo Bunemer, Maria Cecília Levy, Márcio Luongo, and Marco Antonio Manso. "A GESTÃO DE PROJETOS DE EDIFICAÇÕES E O ESCOPO DE SERVIÇOS PARA COORDENAÇÃO DE PROJETOS." In VI Seminário Internacional da LARES. Latin American Real Estate Society, 2006. http://dx.doi.org/10.15396/lares_2006_artigo-silvio-melhado-a-gestao-de-projetos-vfinal.
Full textLordsleem Jr., Alberto C., and Michelli T. V. Fialho. "Avaliação de Boas Práticas do Processo de Coordenação de Projetos em Construtoras." In 2º Simpósio Brasileiro de Qualidade do Projeto no Ambiente Construído. Rio de Janeiro: Universidade Federal do Rio de Janeiro, 2011. http://dx.doi.org/10.4237/sbqp.11.263.
Full textFarina, Humberto, and Karina Matias Coelho. "IMPACTOS NA COORDENAÇÃO DE PROJETOS ASSISTIDA PELA MODELAGEM DA INFORMAÇÃO DA CONSTRUÇÃO." In VII Encontro de Tecnologia de Informação e Comunicação na Construção - Edificações, Infra-estrutura e Cidade: Do BIM ao CIM. São Paulo: Editora Edgard Blücher, 2015. http://dx.doi.org/10.5151/engpro-tic2015-006.
Full textBARBOSA, Patrícia Elizabeth Ferreira Gomes, and Paulo Roberto Pereira ANDERY. "O PROCESSO DE PROJETO E A NBR 15.575:2013: O PAPEL DA COORDENAÇÃO DE PROJETOS." In VI SIMPOSIO BRASILEIRO DE QUALIDADE DO PROJETO NO AMBIENTE CONSTRUIDO. PPGAU/FAUeD/UFU, 2019. http://dx.doi.org/10.14393/sbqp19015.
Full textBatista, Marcos Vinícius, Yuri Dos Reis, Tharles de S. Andrade, Elymar Pereira Cabral, and Renata Luiza Da Costa. "Sistema de Informação dos Atendimentos da Coordenação de Apoio Pedagógico ao Discente." In V Encontro Nacional de Computação dos Institutos Federais. Sociedade Brasileira de Computação - SBC, 2018. http://dx.doi.org/10.5753/encompif.2018.3563.
Full textAddor, Miriam, and Eduardo Toledo Santos. "Infraestrutura para uma sala de coordenação de projetos em BIM: avaliação dos padrões de comunicação e requisitos." In Encontro Nacional de Tecnologia do Ambiente Construído. Marketing Aumentado, 2014. http://dx.doi.org/10.17012/entac2014.615.
Full textPhilippsen Jr, Luiz A., and Márcio M. Fabricio. "Avaliação da gestão e coordenação de projetos aspecto qualidade de obras públicas vinculadas à Lei n.º 8.666/93." In 2º Simpósio Brasileiro de Qualidade do Projeto no Ambiente Construído. Rio de Janeiro: Universidade Federal do Rio de Janeiro, 2011. http://dx.doi.org/10.4237/sbqp.11.344.
Full textLima, Adailton Magalhães, and Rodrigo Quites Reis. "Uma Proposta de Ferramenta para Execução Descentralizada de Processos de Software." In Simpósio Brasileiro de Qualidade de Software. Sociedade Brasileira de Computação - SBC, 2007. http://dx.doi.org/10.5753/sbqs.2007.15586.
Full textSILVA, Francisco Thiago, and Sheley Cristina Corrêa da SILVA. "O lugar do currículo nos Projetos Político-Pedagógicos dos Anos Iniciais da Coordenação Regional de Ensino de Brazlândia - DF." In XI Encontro Internacional de Formação de Professores e Estágio Curricular Supervisionado. Recife, Brasil: Even3, 2018. http://dx.doi.org/10.29327/112662.11-1.
Full text