To see the other types of publications on this topic, follow the link: Coordenação e planeamento de projetos.

Dissertations / Theses on the topic 'Coordenação e planeamento de projetos'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 dissertations / theses for your research on the topic 'Coordenação e planeamento de projetos.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Alberto, Paula. "Relatório de atividade profissional no Mestrado em Tecnologia Ambiental : sensibilização ambiental e sensibilização para o consumo de energia." Master's thesis, Escola Superior de Tecnologia do Instituto Politécnico de Setúbal, 2013. http://hdl.handle.net/10400.26/4504.

Full text
Abstract:
Dissertação de Mestrado em Tecnologia Ambiental
A apresentação do presente relatório visa a obtenção do grau de Mestre em Tecnologia Ambiental, de acordo com o estabelecido no regulamento para obtenção do Grau de Mestre por Licenciados "Pré-Bolonha", que abrange as licenciaturas de cinco anos com, pelo menos, cinco anos de experiência profissional. O presente documento é composto por dois capítulos. No primeiro capítulo encontra-se a descrição sucinta do Curriculum Vitae, nomeadamente a experiência de formação, aptidões e competências. O segundo capítulo é composto pela apresentação detalhada da experiência e atividades desenvolvidas, organizada por temas ambientais tratados ao longo do percurso profissional. Será ainda apresentado neste documento uma breve reflexão para cada atividade desempenhada, permitindo demonstrar mais facilmente a evolução das competências adquiridas. O percurso académico e profissional realizado permitiram a aquisição de conhecimentos, na área da Engenharia do Ambiente, e um vasto conjunto de aptidões como a capacidade de trabalhar em equipa, capacidade organizacional, competências sociais e gestão de projetos. A constante vontade em atualizar conhecimentos e adquirir novas competências técnicas tem sido um incentivo para continuar a frequentar cursos de formação, seminários, workshps e conferências dedicadas à área do ambiente e a outras temáticas específicas.
APA, Harvard, Vancouver, ISO, and other styles
2

Rodríguez, Marco Antonio Arancibia. "Coordenação técnica de projetos." Florianópolis, SC, 2005. http://repositorio.ufsc.br/handle/123456789/102898.

Full text
Abstract:
Tese (doutorado) - Universidade Federal de Santa Catarina, Centro Tecnológico. Programa de Pós-Graduação em Engenharia de Produção.
Made available in DSpace on 2013-07-16T02:15:23Z (GMT). No. of bitstreams: 1 221661.pdf: 1298161 bytes, checksum: 77a614850c2c86267941f7e09fdc5e56 (MD5)
Nos últimos anos, a gestão do processo de projeto de edificações vem sendo formalizada principalmente pela aplicação de conceitos relativos à gestão da qualidade, gestão de projetos, compatibilização de projetos e engenharia simultânea. Entretanto, para uma melhora efetiva do processo, há necessidade de desenvolver ferramentas gerenciais que relacionem esses conceitos e diretrizes como o dia-a-dia do desenvolvimento dos projetos de construção.
APA, Harvard, Vancouver, ISO, and other styles
3

Simões, Isabel Cristina Neves. "Impacte do código dos contratos públicos: trabalhos a mais, erros e omissões." Master's thesis, Universidade de Aveiro, 2014. http://hdl.handle.net/10773/14491.

Full text
Abstract:
Mestrado em Engenharia Civil
A construção em Portugal tem sido afetada por uma grave crise económica e financeira, pelo que, faz sentido nos dias de hoje controlar os custos das obras através de um planeamento rigoroso, quer em fase de projeto (planeamento, elaboração dos projetos, descrição dos cadernos de encargos, medições, etc.) quer na sua fase de execução (gestão de obra, coordenação dos projetos, fiscalização, etc.), sendo transversal a todo este processo as normas legais e regulamentares aplicáveis em cada momento. O Código dos Contratos Públicos veio regulamentar os procedimentos de contratação de empreitadas de obras públicas, sendo que, decorridos mais de 6 anos após a sua entrada em vigor, considerou-se pertinente a realização de um estudo ao nível do impacte e contribuição daquele regime, sobretudo ao nível de trabalhos a mais (TM) e suprimento de erros e omissões (E&O). Assim, é intenção da presente dissertação criar uma plataforma de conhecimento sobre as causas e consequências de ocorrência de derrapagens financeiras e desvios temporais decorrentes dos E&O e TM, quer na fase de projeto quer na fase de execução, resultantes da investigação efetuada em termos bibliográficos e da análise prática de casos de estudos em Portugal. O objetivo final consiste em determinar as eventuais soluções possíveis para minimizar a problemática dos E&O e TM em empreitadas de obras públicas. É concluído, tendo subjacente os 7 casos de estudo, que as especialidades com maiores imprevistos (TM, E&O) ocorrem na construção civil, estruturas e sistemas de aquecimento, ventilação e ar condicionado, fruto de uma análise prévia insuficiente às condições técnicas, geotécnicas e/ou geológicas existentes no terreno. Sobre este assunto importa salientar Sarmento et al e FLyvbjerg que concluem nos seus artigos a importância da qualidade do projetos elaborados (arquitetura e especialidades) e a sua coordenação. Referem também que as obras são comumente suborçamentadas, o que que implica que o preço base não corresponda à realidade do mercado. Por fim são apresentadas algumas ferramentas que permitem a articulação dos diferentes projetos e consequentemente a minimização de erros, omissões e/ou descoordenações entre os mesmos, promovendo, deste modo, a qualidade dos projetos e a eficiência e eficácia de execução das obras.
During the last years the construction sector in Portugal has been affected by a severe economic and financial crisis. These circumstances, increase the importance of costs control through reliable planning during the design phase (planning, preparation of designs, description of specifications, measurements, etc.) and in the execution phase (project management, coordination, inspection, etc.), crossing the whole process the legal and technical rules in each moment. The Public Contracts Code came into force to regulate public works procedures and contracts. More than six years from its inception it was considered an important conduct to study about its impact and contribution, particularly in terms of the control of over works (TM) and of errors and omissions (E&O). Thus, this dissertation aim to create a knowledge platform on the causes and occurrence of consequences of financial overruns and temporal deviations arising from E&O and TM either in the design phase either in the execution phase. To achieve this goal bibliographic research and the analysis of Portuguese case studies was performed. Finally it is pointed out possible solutions to minimize the problem of E&O and TM in public works contracts. It is concluded, which derives from the 7 case studies, the specialties with higher contingencies (TM, E&O) occur in construction, structures and heating systems, ventilation and air conditioning, resulting of insufficient preliminary analysis of the technical conditions, geotechnical and / or geological existing on the site. On this subject it should be noted that Sarmento et al and Flyvbjerg conclude in its articles the importance of quality projects (architecture and specialties) and their coordination. Refer also that the works are commonly subestimated, which implies that the base price does not correspond to market reality. Some tools are identify that allow the articulation of different projects and consequently the minimization of errors, omissions and / or lack of coordination between them, promoting thereby the quality of projects and the efficiency and effectiveness of the works are finally presented.
APA, Harvard, Vancouver, ISO, and other styles
4

Bellan, Melissa. "Práticas e ferramentas para coordenação de projetos de edifícios." Universidade de São Paulo, 2009. http://www.teses.usp.br/teses/disponiveis/18/18141/tde-25042013-174028/.

Full text
Abstract:
O mercado da construção civil vem tendo crescimento significativo e as construtoras e incorporadoras, visando sua manutenção no mercado, vêm buscando procedimentos para produzir edifícios rapidamente, com qualidade e a um preço acessível, para suprir a demanda mercadológica. Neste contexto, nos deparamos com a coordenação de projetos de edifícios, que visa garantir ao empreendimento a sua construção no prazo, com qualidade e sem desperdícios e retrabalho, fazendo uso de um processo seriado com procedimentos padrões. Por essa razão, o presente trabalho aborda a coordenação de projetos de edifícios, seus conceitos, suas atividades, como estas são realizadas e quais ferramentais de apoio são indispensáveis à garantia dessa qualidade esperada. Objetiva-se discutir a coordenação de projeto de edifícios, mostrando sua importância e necessidade, bem como mostrar as suas melhores práticas e as suas ferramentas de apoio indispensáveis. Para a realização da pesquisa foi feita revisão bibliográfica sobre o tema e um estudo de caso realizado em duas empresas que são construtoras e incorporadoras e que possuem um departamento interno responsável pela coordenação de projetos de edifícios. Como ferramenta do estudo de caso foram utilizadas entrevistas com profissionais das empresas e com profissionais externos à empresa, que atuam na área em estudo. Nos departamentos de coordenação de projetos de edifícios das empresas estudadas, foram coletados documentos que formalizam a coordenação. Os dados coletados da empresa na prática foram confrontados com a literatura pesquisada para o embasamento da pesquisa. Com isso, foi possível mostrar, neste trabalho, as melhores práticas e suas ferramentas de apoio para coordenação de projetos de edifícios, por meio desse confronto teoria-prática.
The construction market has had significant growth and builders and developers in order to maintain the market are seeking procedures to produce buildings faster and with a high quality and affordable to meet the market demand. In this context, we are faced with the coordination of building projects aimed at ensuring the development of their construction on time quality and without waste and rework through the process in series. For this reason, this paper addresses the coordination of building projects its concepts their activities as they are carried out and what kind of support tools are needed to ensure the expected quality. It aims to promote the coordination of building design, showing their importance and need, demonstrating their best practices and the tools that are essential. The study was conducted through a literature review on the subject and a case study carried out in two businesses company that are builders and developers and have an internal department responsible for the coordination of building projects. To support the case study were used interviews with business people and professionals outside the company working in the study area. In the departments of project coordination buildings of the companies studied were collected documents formalizing the coordination. The data collected from the company\'s practice were confronted with the literature in order to support the fundamentals of the research. Thus it was possible to demonstrate in this work, best practices and tools to support coordination of building projects, through the comparison between theory and practice.
APA, Harvard, Vancouver, ISO, and other styles
5

Bragaglia, Umberto João. "Formalização de um sistema de procedimentos para gerenciamento e coordenação de projetos em escritórios de arquitetura." Florianópolis, SC, 2006. http://repositorio.ufsc.br/xmlui/handle/123456789/88322.

Full text
Abstract:
Dissertação (mestrado) - Universidade Federal de Santa Catarina, Centro Tecnológico. Programa de Pós-Graduação em Engenharia Civil.
Made available in DSpace on 2012-10-22T07:42:25Z (GMT). No. of bitstreams: 1 230680.pdf: 2423724 bytes, checksum: 5e23fa810c863509cbfcbe3ffa1cc0fb (MD5)
O desenvolvimento do projeto de uma edificação se inicia na organização dos programas e do planejamento, não se resume somente na entrega de um jogo de desenhos e documentos. Inclui todo um conjunto de projetos de arquitetura e engenharia que são elaborados em diversas etapas, seguindo uma seqüência de atividades a serem desenvolvidas simultaneamente, que nem sempre utilizam algum sistema de gerenciamento. A eficiência deste processo de produção de serviços demonstra sua necessidade de integração e permite garantir o controle e a organização das atividades, bem como a interoperabilidade entre todos os profissionais envolvidos. Como resultado final a equipe de trabalho busca a qualidade, de forma a garantir a satisfação do cliente e o crescimento da empresa. Assim, esta pesquisa objetiva elaborar e formalizar um sistema de procedimentos enfocando a organização das atividades projectuais, seu gerenciamento e o intercambio de informações. Este trabalho pretende contribuir, entivando mudanças nos escritórios de arquitetura ao apresentar um sistema adequado às suas necessidades, caracterizado por sua implicidade, agilidade e capacidade de gestão.
APA, Harvard, Vancouver, ISO, and other styles
6

Alencastro, João Paulo Ulrich de. "Diagnóstico das práticas de coordenação e compatibilização de projetos no mercado de construção civil de Florianópolis-SC." Florianópolis, SC, 2006. http://repositorio.ufsc.br/handle/123456789/103126.

Full text
Abstract:
Dissertação (mestrado) - Universidade Federal de Santa Catarina, Centro Tecnológico. Programa de Pós-Graduação em Arquitetura
Made available in DSpace on 2013-07-16T03:05:07Z (GMT). No. of bitstreams: 1 238066.pdf: 902240 bytes, checksum: 6c9e71813018e2915ed934a58198e968 (MD5)
Muitos dos problemas relacionados à inadequações técnicas, mercadológicas e financeiras de empreendimentos, têm como causa principal a ineficiência do processo de projeto. Este importante processo, como pode ser observado por diversos pesquisadores, ocorre de maneira informal, normalmente desenvolvido de forma não planejada, fragmentada, sem uma visão global e integrada entre projeto e produção. É evidente a falta de integração e comunicação entre os diversos agentes envolvidos. Por outro lado, construtores e incorporadores brasileiros, seguindo a tendência mundial, começam a buscar metodologias e modelos de gestão do processo de desenvolvimento de projetos. Esta tendência visa agregar qualidade a produtos e processos, e por conseqüência garantir melhor satisfação de clientes internos e externos. A presente pesquisa, tem como principal objetivo diagnosticar as práticas de gestão do processo de projetos no mercado da construção civil da cidade de Florianópolis - SC. Para levantamento de dados, o autor lança mão do uso de pesquisa de campo, realizando entrevistas estruturadas com gestores técnicos de 20 empresas da região citada. Os resultados obtidos, a partir das entrevistas, são cruzados com o referencial teórico, propondo assim um diagnóstico das práticas de gestão do projeto, bem como levantando oportunidades de melhorias para este importante processo.
APA, Harvard, Vancouver, ISO, and other styles
7

Addor, Míriam Roux Azevedo. "Proposta de metodologia de avaliação para salas de coordenação de projetos em BIM." Universidade de São Paulo, 2015. http://www.teses.usp.br/teses/disponiveis/3/3146/tde-27072016-100052/.

Full text
Abstract:
A Modelagem da Informação da Construção (Building Information Modeling - BIM) é um novo processo para produzir uma edificação e que pode englobar todo o seu ciclo de vida. Pressupõe a construção de um modelo tridimensional contemplando-se as informações dos objetos a serem construídos. Pela grande amplitude em que este processo pode atuar, ele pode causar muitos impactos em toda a cadeia produtiva e, consequentemente, muitas formas atuais de trabalho deverão ser revistas ou alteradas. Entre estas, a atividade de coordenação de projetos. Este trabalho tem como objetivo o desenvolvimento de uma metodologia de avaliação de salas de coordenação de projetos em BIM e está contextualizado nos usuários do setor imobiliário que utilizam este processo em seus projetos. Ao se coordenar projetos em BIM, são requeridas mídias diferentes daquelas utilizadas quando a análise é baseada em papel. Surgem novas necessidades aos participantes da reunião de coordenação como visualizar, navegar ou verificar um modelo 3D, fazer croquis digitais, e outras atividades que devem tornar a reunião presencial produtiva, com o objetivo de resolver os problemas dos projetos. Neste trabalho são propostos critérios e métricas para avaliação da qualidade de leiautes de salas de coordenação a serem utilizadas no processo BIM (BIM Rooms). Para validação dos resultados, foram analisados e avaliados 14 leiautes diferentes para uma mesma sala em relação às métricas e critérios propostos. Com a finalidade de estabelecer qual a relação de importância entre todos os 10 critérios propostos para atendimento às necessidades dos participantes de reuniões BIM, foi aplicado o método AHP de decisão multicritério baseado na análise de comparações em pares. Os resultados permitiram determinar os melhores leiautes para uma sala equipada com 2 projetores de curta distância. Os critérios e métricas apresentados, bem como a metodologia para medi-los, são úteis para a avaliação de outras salas e leiautes para atender aos usuários de salas de reuniões de projetos baseados em BIM.
Building Information Modeling (BIM) is a new process to produce a building that may include its entire lifecycle. It requires the construction of a three-dimensional model contemplating the information of the objects to be built. Due to the great extent to which this process can serve, it can cause many impacts throughout the production chain and, therefore, many current forms of work should be reviewed or changed. Among these, is the design coordination task. This work aims to develop a methodology for evaluating BIM coordination rooms contextualized in real state users using this process in their projects. When coordinating projects using BIM, different media are required from those used when the analysis is paper-based. New meeting participants\' needs surface like visualizing, browsing or checking a 3D model, making digital sketches, and other activities that make face-to-face meetings productive, in order to solve project problems. In this work, criteria and metrics for evaluating the quality of layouts of BIM coordination rooms are proposed. To validate the results, fourteen different layouts for the same room were analyzed and evaluated regarding proposed metrics and criteria. In order to establish the relative importance among all the ten proposed criteria, the AHP method of multi-criteria decision based on pair comparisons analysis was applied. The results determined the best layouts for a room equipped with two interactive projectors. The criteria and metrics presented, as well as the methodology to measure them, are useful for the evaluation of other rooms and layouts to serve meeting room users based on BIM.
APA, Harvard, Vancouver, ISO, and other styles
8

Silva, Maria Vitória Marim Ferraz Pinto da. "As atividades de coordenação e a gestão do conhecimento nos projetos de edificações." Universidade Federal de São Carlos, 2004. https://repositorio.ufscar.br/handle/ufscar/4675.

Full text
Abstract:
Made available in DSpace on 2016-06-02T20:09:16Z (GMT). No. of bitstreams: 1 DissMVMFPS.pdf: 1684766 bytes, checksum: 9cc15b8359f2044024c5e80b37c36fff (MD5) Previous issue date: 2004-11-26
Financiadora de Estudos e Projetos
This work presents a study about the coordination of building designs and knowledge management. In the coordination activities, the focus is on the coordination management, related to the planning and to the administration of design process, and on the technical coordination, regarding the integration and the design development, all of them being promoted through the coordination meetings, the compatibilization and the critical analysis. The building design coordination has as its attribution to reconcile and to integrate the knowledge of several specialties. The work introduces the application of the knowledge management into the building design and discusses the knowledge and competences needed for the coordination activities and development of the building design. The knowledge management is fundamental to reorganize the processes of generating, registering, diffusing and usage of the organizational knowledge. Moreover, the information systems and the computing resources have also been studied in this work as instruments of this management. To base adequately the theme of the dissertation, case studies were accomplished in two big construction and real estate development companies and in three building design offices. The case studies in the five companies made it possible to characterize the practices adopted for the design coordination, according to the alternatives used for its accomplishment (internal or external work or outsorced, besides the consultancy in coordination). A case study on knowledge management was also conducted in one of the major companies researched, aiming at studying its applicability in the building construction. The introduction of the concepts of knowledge management in the culture and in the organizational strategy of the company, as well as its reflex in the building design are presented. In agreement to this approach, by introducing the discussion about knowledge management, this work contributes to the process of development of designs and to its coordination, enabling the accomplishment of designs with better level of quality and constructability, to agree with the demands of the modern projects.
Esta dissertação apresenta um estudo sobre coordenação de projetos e gestão do conhecimento. Nas atividades de coordenação são enfocadas a gestão da coordenação, relativa ao planejamento e ao gerenciamento do processo de projeto; e a coordenação técnica, referente à integração e ao desenvolvimento dos projetos, promovidas através das reuniões de coordenação, da compatibilização e da análise crítica. A coordenação de projetos tem por atribuição conciliar e integrar o conhecimento de diversas especialidades. O trabalho introduz a aplicação da gestão do conhecimento nos projetos de edificações e discute os conhecimentos e as competências necessários nas atividades de coordenação e desenvolvimento dos projetos. A gestão do conhecimento é fundamental para reorganizar os processos de geração, registro, difusão e utilização do conhecimento organizacional. Assim, são abordados, também, os sistemas de informação e os recursos de informática, como instrumentos dessa gestão. Para embasar, adequadamente, o tema da dissertação, foram realizados estudos de caso em duas incorporadoras-construtoras de grande porte e em três escritórios de projeto. Os estudos de caso nas cinco empresas permitem caracterizar as práticas adotadas para a coordenação de projetos, conforme as alternativas empregadas para a sua realização (interna, externa ou terceirizada, além da consultoria em coordenação). Foi também realizado estudo de caso sobre gestão do conhecimento, em uma das empresas de grande porte pesquisadas, tendo por objetivo estudar a sua aplicabilidade no setor. É apresentado um histórico da introdução dos conceitos de gestão do conhecimento na cultura e na estratégia organizacional da empresa e seu reflexo nos projetos de edificações. Sob estes enfoques, ao introduzir a discussão sobre gestão do conhecimento no processo de desenvolvimento dos projetos e na sua coordenação, a dissertação contribui para a realização de projetos com melhores níveis de qualidade e de construtibilidade, em atendimento às exigências dos empreendimentos atuais.
APA, Harvard, Vancouver, ISO, and other styles
9

Bretas, Eneida Silveira. "O processo de projetos de edificações em instituições públicas: proposta de um modelo simplificado de coordenação." Universidade Federal de Minas Gerais, 2010. http://hdl.handle.net/1843/ISMS-8D2P9P.

Full text
Abstract:
The present work aims discussing the process of building design in public institutions, which has some specific aspects when compared with Real Estate Projects, as well as the constraints imposed by Brazilian law 8666, other legal requirements, annual budgets, short term, and focus on reforms, proposing a simplified model for design coordination.A conceptual framework based on a concurrent design and other research projects about design process coordination and modeling, supplemented by studies of specific subject that the public sector issubmitted, were the basis for research that took place in a public financial institution that invest significantly in reform of buildings and has a self design engineering team and also engages design in the market. The design process employed was mapped and analyzed, and was proposed and applied a simplified model of design coordination.The results showed that the design coordination, based on concepts of concurrent design, is an integration factor between the stages of design process of reforms in public institutions, fragmented by legal and organizational constraints, improving interfaces, between clients and customers, disciplines and agents involved and between design and construction.
Este trabalho aborda o processo de projeto de edificações em instituições públicas, que possui especificidades que o tornam diferenciado dos processos do setor privado, como as imposições da Lei 8666 e outras exigências legais, orçamentos anuais, curtos prazos, e foco em reformas, propondo um modelo simplificado para coordenação de projetos. Uma fundamentação teórica baseada em projeto simultâneo e outras pesquisas sobre coordenação e modelagem do processo de projeto, complementada por estudos sobre as especificidades a que estão sujeitas o setor público, foi a base para a pesquisa-ação que aconteceu em uma instituição financeira pública que investe de maneira significativa em reforma de edificações, possui equipe interna de engenharia e também contrata projetos e obras no mercado. O processo de projeto adotado pela instituição foi mapeado e analisado, e numa segunda etapa, foi proposto e aplicado um modelosimplificado de coordenação. O Modelo abrange as etapas de pré-projetação, projetação e pós-projetação e foi sintetizado em planilhas indicando etapas, atividades, pré-requisitos, responsáveis,produtos, além de ferramentas para a realização de algumas das atividades, como fichas para diagnóstico, controle de interfaces entre disciplinas, alterações de projeto na obra. Os resultados mostraram que a coordenação de projetos, baseada em premissas de projetosimultâneo, é um fator de integração entre as etapas do processo de projeto de edificações nas instituições públicas, fragmentado por limitações legais e organizacionais, melhorando as interfaces com o cliente, entre as disciplinas e agentes envolvidos e entre projeto e obra.
APA, Harvard, Vancouver, ISO, and other styles
10

Cruz, Gabriela Pontes Silva. "Coordenação e compatibilização de projetos para construção de edifícios: estudos de casos em instituições públicas e privadas." Universidade Federal de Viçosa, 2011. http://locus.ufv.br/handle/123456789/3750.

Full text
Abstract:
Made available in DSpace on 2015-03-26T13:28:02Z (GMT). No. of bitstreams: 1 texto completo.pdf: 4444175 bytes, checksum: 4c54c7974911a1f247d991755f5572b3 (MD5) Previous issue date: 2011-05-13
Problems related to the design, as detailing insufficient information and of compatibility or coordination failures, are causes of large portion of losses of efficiency in building construction. As a result, in this essay was performed the study of two public buildings and exploration of design process in three building in Viçosa-MG. Public works, are presented two studies: one of the Engineering Laboratory Building and another building of the Center for Humanities II. At first, the analysis was made of the executive design, with evaluation of projects, incompatibilities between the various disciplines of design, and the presentation of the masonry design. The second, we present and discuss the incompatibility errors design discovered during construction. A team of technical reports guides both studies from Universidade Federal de Viçosa (UFV). In the three companies in the city of Viçosa-MG, was performed a survey of the design process, whereby could be studied several points related to the design and its consequences for the production of a building. This survey included: discussion of the design and its implementation; projects performed by companies, executive design developed by the company, understanding and use of constructive rationalization, design coordination and compatibility by companies, and the construction from the design developed by companies. The observed in the cases studied in the public and private companies confirms the need and importance of coordination in the design process and the essential compatibility of executive design for the production of a building, essential aspects for efficiency and achievement of quality in execution and use of buildings.
Problemas relacionados com projeto, como detalhamento insuficiente das informações e falhas de compatibilização ou coordenação, são causas de grande parcela das perdas de eficiência na construção de edifícios. Em função disso, neste trabalho, foram realizados o estudo de projetos de dois edifícios públicos e a prospecção de processo de projetos em três construtoras de Viçosa-MG. Das obras públicas, são apresentados dois estudos: um do Edifício de Laboratórios de Engenharia e outro do Edifício do Centro de Ciências Humanas II. No primeiro, foi feita a análise do projeto executivo, com avaliação dos projetos, das incompatibilidades entre os projetos das várias disciplinas, e a apresentação do projeto de alvenaria. Quanto ao segundo, apresentam-se e discutem-se os erros de incompatibilidades de projeto percebidos durante a execução da obra. Ambos os estudos são pautados por relatórios técnicos de uma equipe da Universidade Federal de Viçosa (UFV). Nas três empresas da cidade de Viçosa-MG, foi realizada uma prospecção do processo de projetos, por meio da qual puderam ser estudados vários pontos relacionados ao projeto e suas consequências para a produção de um edifício. Dessa prospecção consta: discussão relativa a projeto e sua execução; projetos executados pelas empresas; projetos executivos elaborados pelas empresas; entendimento e uso da racionalização construtiva, da coordenação e da compatibilização de projetos pelas empresas; e a construção dos projetos elaborados pelas empresas. O constatado nos casos estudados nos setores público e privado confirma a necessidade e a importância de uma coordenação no processo de projetos e a indispensável compatibilização dos projetos executivos para a produção de um edifício, aspectos indispensáveis para a eficiência e obtenção da qualidade na execução e uso de edificações.
APA, Harvard, Vancouver, ISO, and other styles
11

Ohayon, Pierre. "Metodologia de avaliação "ex-post" de projetos de pesquisa em orgãos governamentais: de coordenação e apoio a P&D do Brasil e da França." São Paulo (SP), 1985. http://repositorio.ufsc.br/handle/123456789/101366.

Full text
APA, Harvard, Vancouver, ISO, and other styles
12

Lourenço, Fábio Óscar de Almeida. "Relatório de estágio na Comissão de Coordenação e Desenvolvimento Regional do Norte." Master's thesis, Universidade de Aveiro, 2011. http://hdl.handle.net/10773/7310.

Full text
Abstract:
Mestrado em Administração e Gestão Pública
O presente texto advém no âmbito do estágio curricular do mestrado em Administração e Gestão Pública na Universidade de Aveiro. Primeiro contextualiza-se e caracteriza-se a entidade de acolhimento – a CCDR-N –, apontando-se as principais tarefas realizadas. De seguida passa-se à descrição da Política de Coesão em Portugal com o objectivo de enquadrar e perceber o objecto deste estudo – o PROVERE. Ainda visando o PROVERE, realiza-se uma breve reflexão sobre as políticas públicas, com o intuito de compreender como se processam. Posteriormente tenta-se enquadrar QREN, PO Norte e EEC PROVERE no movimento da reforma da Administração Pública, recorrendo para esse efeito a três lógicas que o têm acompanhado – Administração Pública Tradicional; Nova Gestão Pública; Gestão do Valor Público. Finalmente apresenta-se o balanço da experiência do estágio.
The present text arises in the ambit of the internship integrated in the master in Public Administration and Management of University of Aveiro. First, it contextualizes and characterizes the hosting organization – CCDR-N –, pointing the main tasks performed. Then it describes the Cohesion Policy in Portugal with the purpose of framing and understanding the object of this study – the PROVERE. Still concerning the PROVERE, it performs a brief reflection about public policies with the purpose of understanding how they process. Posteriorly, it tries to frame QREN, PO Norte and EEC PROVERE within the movement of the Public Administration reform, using for that effect the three logics which have accompanied it – Traditional Public Administration; New Public Management; Public Value Management. Ultimately, it presents the appreciation of the experience of the internship.
APA, Harvard, Vancouver, ISO, and other styles
13

Gomes, Isaías da Luz Ramos. "Metodologia de otimização estocástica para coordenação eólico-fotovoltaica." Master's thesis, Universidade de ÉVora, 2016. http://hdl.handle.net/10174/18451.

Full text
Abstract:
Esta dissertação incide sobre o tema da coordenação entre sistemas eólicos e fotovoltaicos que participam no mercado de eletricidade. A incerteza da potência eólica e fotovoltaica é uma caraterística predominante nesta coordenação, devendo ser considerada no planeamento ótimo de sistemas eólico-fotovoltaicos. A fim de modelizar a incerteza é apresentada uma metodologia de otimização estocástica baseada em programação linear para maximizar o lucro esperado de uma empresa produtora de energia elétrica que participa no mercado diário. A coordenação entre sistemas eólicos e fotovoltaicos visa mitigar os desequilíbrios de energia, resultantes das ofertas horárias submetidas no mercado diário e, consequentemente, reduzir as penalizações financeiras. Os resultados da coordenação entre um sistema eólico e um sistema fotovoltaico são comparados com os resultados obtidos para a operação não coordenada. Estes resultados permitem concluir que a metodologia desenvolvida aplicada à coordenação apresenta um lucro esperado superior ao lucro obtido para a operação não coordenada; Abstract Stochastic Optimization Methodology for Wind-Photovoltaic Coordination This dissertation focuses on the issue of coordination between wind and photovoltaic systems participating in electricity markets. The uncertainty of wind and photovoltaic power is a main characteristic of these systems, which must be included in the optimal scheduling of the coordination of wind with photovoltaic systems. In order to model the uncertainty is presented a stochastic approach based on linear programming to maximize the profit of a wind photovoltaic power producer which participates in electricity markets. The coordination of wind with photovoltaic systems aims to mitigate the energy deviations, as a result of the participation in day-ahead market and therefore reducing economic penalties. The results obtained by the coordination are compared to results obtained by the separated operation of wind and photovoltaic systems. The results allow concluding that the proposed approach applied to the coordination presents an expected profit higher than the expected profit without coordination.
APA, Harvard, Vancouver, ISO, and other styles
14

Licio, Elaine Cristina. "Para além da recentralização : os caminhos da coordenação federativa do Programa Bolsa Família (2003-2010)." reponame:Repositório Institucional da UnB, 2012. http://repositorio.unb.br/handle/10482/10759.

Full text
Abstract:
Tese (doutorado)—Universidade de Brasília, Departamento de Serviço Social, Programa de Pós-Graduação em Política Social, 2012.
Submitted by Jaqueline Ferreira de Souza (jaquefs.braz@gmail.com) on 2012-06-19T15:26:55Z No. of bitstreams: 1 2012_ElaineCristinaLicio.pdf: 2567860 bytes, checksum: cbca9ed12e964bca8190a7aeadd3a10b (MD5)
Approved for entry into archive by Jaqueline Ferreira de Souza(jaquefs.braz@gmail.com) on 2012-06-19T15:27:09Z (GMT) No. of bitstreams: 1 2012_ElaineCristinaLicio.pdf: 2567860 bytes, checksum: cbca9ed12e964bca8190a7aeadd3a10b (MD5)
Made available in DSpace on 2012-06-19T15:27:09Z (GMT). No. of bitstreams: 1 2012_ElaineCristinaLicio.pdf: 2567860 bytes, checksum: cbca9ed12e964bca8190a7aeadd3a10b (MD5)
A Tese busca reconstruir um processo histórico de modo a verificar o grau explicativo da teoria da recentralização nas transformações recentes do federalismo brasileiro. Adotamos como unidade de análise a implementação do Programa Bolsa Família (PBF), iniciativa federal de combate à pobreza que atua transversalmente junto aos sistemas descentralizados das políticas nacionais de saúde, educação e assistência social. A articulação de uma iniciativa de natureza centralizada – como a transferência de renda – a serviços sociais básicos – cuja oferta é organizada pela lógica da descentralização – ilustra o dilema de implementação das políticas sociais presente em nosso modelo federativo, o qual revela a tensão entre a homogeneidade das políticas sociais e a heterogeneidade da capacidade institucional dos entes. Essa investigação teve como objetivos analisar a trajetória do PBF e a forma como lidou com o dilema de implementação das políticas sociais no federalismo brasileiro no período 2003-2010, de modo a demonstrar a insuficiência da teoria da recentralização para explicar esse processo. O trabalho se desenvolveu com base na teoria do federalismo como pacto, com foco nas relações de reciprocidade entre o federalismo e políticas sociais. Para o caso nacional, adotamos a perspectiva da coordenação federativa desenvolvida por Abrucio (2005) e Franzese (2010), segundo a qual haveria a necessidade de uma atuação coordenadora do governo federal, centralizando algumas funções e descentralizando outras. Nossa hipótese é de que a explicação de que o PBF é um exemplo da tendência de recentralização não ilustra sua trajetória, nem a forma como lidou com o dilema de implementação das políticas sociais no federalismo brasileiro. Na análise, dividimos a trajetória federativa do PBF em dois momentos: (1) sua criação e implementação inicial (2003-2004), sob um padrão hierarquizado de relações intergovernamentais; e (2) a construção de uma nova forma de articulação com estados e municípios (2005-2010), primeiro a partir da articulação com o Sistema Único de Assistência Social (SUAS) para estruturação da dimensão da transferência de renda e, posteriormente, pelo aprofundamento da sua relação com os sistemas de políticas públicas da saúde, educação, de forma a estruturar a dimensão das condicionalidades. Em síntese, identificamos três principais variáveis que favoreceram essa maior coordenação federativa do Programa: (1) o poder de implementação dos governos subnacionais (2) a intersetorialidade presente na natureza do Programa, sobretudo na dimensão das condicionalidades; e (3) a articulação com os sistemas de políticas públicas decorrentes dessa característica intersetorial. As conclusões da tese permitem afinal questionar a hipótese da recentralização sob três perspectivas: (1) da natureza da política pública, de modo que a transferência de renda aumentou a demanda pela oferta descentralizada dos serviços públicos; (2) do processo, de forma a garantir a oferta descentralizada desses serviços e legitimidade junto aos governos subnacionais para manutenção da qualidade do Cadastro Único; e (3) dos resultados, de modo que a articulação da transferência condicionada de renda com o SUAS é algo que depende, para dar certo, de uma nova relação entre centralização e descentralização, a qual vem se aprofundando com o Programa Brasil sem Miséria no sentido da articulação e negociação federativa. _______________________________________________________________________________________ ABSTRACT
The dissertation aims to rebuild a historical process in order to validate the explanatory capability of the recentralization theory on the recent transformations of brazilian federalism. We focus our unit of analysis on the implementation of the Bolsa Família Program (PBF) – a federal initiative that tackles poverty and acts transversely close to the decentralized systems of national social policies, such as health, education and social assistance. The implementation of a program combining a centralized initiative – such as cash transfers – with basic social services – whose supply is organized by the logic of decentralization – illustrates the dilemma of implementing social policies in our federative model, and exposes the tension between the homogeneity of social policies and the heterogeneity of institutional capacity of federative entities. This research analyzes the evolution of the PBF in dealing with the dilemma of implementing social policies in brazilian federalism, in the period 2003-2010, in order to demonstrate the inadequacy of the recentralization theory to explain this process. The work was developed based on the theory of federalism as a covenant, focusing on relations of reciprocity between federalism and social policy. For the national case, we adopt the perspective of federative coordination developed by Abrucio (2005) and Franzese (2010), whereby it is necessary a coordinating role of the federal government by centralizing some functions and decentralizing others. In our hypothesis, the path of PBF and the way it dealt with the dilemma of implementation of social policies in brazilian federalism does not support the theory that it is an example of the trend of recentralization. We divided the federal path of the PBF in two stages: (1) formulation and initial implementation (2003-2004) under a hierarchical pattern of intergovernmental relations, and (2) building of a new form of relation with states and municipalities (2005-2010), first by the articulation with the Unified Social Assistance System (SUAS) to structure the dimension of the cash transfer and, later, deepening its relationship with the systems of public health and education policies, in order to structure the dimension of conditionalities. In summary, we have identified three main variables that increased federal coordination of PBF:(1) the implementation power of subnational governments; (2) the intersectoral nature of PBF, especially in the dimension of conditionalities; and (3) its coordination with systems of public policy arising from its intersectoral character. The conclusions allow questioning the hypothesis of recentralization from three different perspectives: (1) of public policy nature, in such a way that cash transfer increased the demand for the supply of decentralized public services; (2) of the process, to ensure the supply of decentralized services and the legitimacy with subnational governments, in order to maintain quality of the Unified Registry; and (3) of the results, as the articulation of the conditional cash transfer with SUAS is something that depends on a new relationship between centralization and decentralization, which has been deepened with the Program ‘Brazil without Poverty’ in the sense of the federative negotiation.
APA, Harvard, Vancouver, ISO, and other styles
15

NEDER, Cláudia Regina Bastos. "Processo de desenvolvimento e coordenação de projetos na construção civil: um estudo multi-caso em empresas de Belém (PA)." Universidade Federal do Pará, 2010. http://repositorio.ufpa.br/jspui/handle/2011/3548.

Full text
Abstract:
Submitted by Edisangela Bastos (edisangela@ufpa.br) on 2013-03-12T16:13:19Z No. of bitstreams: 2 license_rdf: 23898 bytes, checksum: e363e809996cf46ada20da1accfcd9c7 (MD5) Dissertacao_ProcessoDesenvolvimentoCoordenacao.pdf: 1232001 bytes, checksum: 63d2d569f8a8a0c526ffe268089a7c3d (MD5)
Approved for entry into archive by Ana Rosa Silva(arosa@ufpa.br) on 2013-03-13T16:10:52Z (GMT) No. of bitstreams: 2 license_rdf: 23898 bytes, checksum: e363e809996cf46ada20da1accfcd9c7 (MD5) Dissertacao_ProcessoDesenvolvimentoCoordenacao.pdf: 1232001 bytes, checksum: 63d2d569f8a8a0c526ffe268089a7c3d (MD5)
Made available in DSpace on 2013-03-13T16:10:52Z (GMT). No. of bitstreams: 2 license_rdf: 23898 bytes, checksum: e363e809996cf46ada20da1accfcd9c7 (MD5) Dissertacao_ProcessoDesenvolvimentoCoordenacao.pdf: 1232001 bytes, checksum: 63d2d569f8a8a0c526ffe268089a7c3d (MD5) Previous issue date: 2010
Este trabalho faz uma reflexão sobre a coordenação de projetos na indústria da construção de edifícios, identifica as etapas do processo de projeto, aponta a participação da equipe de projeto, durante as atividades de coordenação, apresenta a atuação do coordenador de projetos e sistematiza os procedimentos de controle e retroalimentação. Para desenvolver a pesquisa, foram realizados estudos bibliográficos sobre a Gestão e Coordenação de Projetos, no desenvolvimento do processo de projeto na construção civil. Também foram feitos estudos de campo, envolvendo 10 empresas de construção civil na área urbana da cidade de Belém-PA, com atuação nos mercados de incorporação e/ou construção de obras privadas ou públicas, visando propor diretrizes da gestão de projetos, integrada ao processo de desenvolvimento e coordenação dos mesmos. Como resultado, vimos que 100% das empresas pesquisadas afirmou que o planejamento técnico do projeto é dividido por etapas, conforme apresentação de fluxogramas distintos. 77,77% das empresas em questão respondeu que realiza a coordenação de projetos através de reuniões com as equipes responsáveis. Também 100% das empresas aponta como funções do coordenador de projetos a compatibilização entre os projetos e a manutenção do fluxo de informações entre os projetistas. Em 88,88% das empresas, foi possível observar que a retroalimentação do projeto acontece através do controle por meio de check list e planilhas. Por fim, são desenvolvidas e apresentadas diretrizes para aplicação da coordenação de projeto, como forma de melhorar o desempenho do desenvolvimento do processo de projeto e a execução dos edifícios, com a valorização do projeto e conseqüente economia de recursos, tempo e dinheiro, evitando erros, desperdício e trabalho nos empreendimentos.
Paper that presents a discussion about the projects coordination of the buildings construction industry; it identifies the stages of the project, shows the participation of the project team during the coordination activities, presents the performance of the project coordinator and systematizes the procedures of control and feedback. Bibliographic researches about Management and Coordination of Project in the development of the design process in construction were made to develop the study. There were also made field studies, involving 10 construction companies in the urban area of Belem, which operate in the incorporation markets and/or private or public construction, to propose guidelines to project management, integrated to the development and coordination of the project. Among the results presented: 100% of the surveyed companies said that the technical planning of the project is divided in stages according to the presentation of separate flowcharts. 77.77% of the companies involved said they made the coordination of projects through meetings with the project team. Also 100% of businesses say as functions of the project coordinator, the compatibilization of projects and the maintenance of the information flow among designers. In 88.88% of companies, it was observed that the project feedback takes place through control of check list and worksheets. Finally, there are developed and presented guidelines to the application of project management in order to improve the performance of the project design process development and the buildings implementation, with the enhancement of the project and the consequent saving of resources, time and money, avoiding mistakes, waste and rework in projects.
APA, Harvard, Vancouver, ISO, and other styles
16

Cardoso, Shirley Cristina Bessa Barbosa, and 92-99393-7825. "Projeto simultâneo em edificações: uma proposta de monitoramento na Universidade Federal do Amazonas." Universidade Federal do Amazonas, 2017. http://tede.ufam.edu.br/handle/tede/6191.

Full text
Abstract:
Submitted by Divisão de Documentação/BC Biblioteca Central (ddbc@ufam.edu.br) on 2018-03-02T14:08:49Z No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertação_Shirley C. B. B. Cardoso.pdf: 5691643 bytes, checksum: ed7baf29158489d49fb56b34b26b6d50 (MD5)
Approved for entry into archive by Divisão de Documentação/BC Biblioteca Central (ddbc@ufam.edu.br) on 2018-03-02T14:09:02Z (GMT) No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertação_Shirley C. B. B. Cardoso.pdf: 5691643 bytes, checksum: ed7baf29158489d49fb56b34b26b6d50 (MD5)
Made available in DSpace on 2018-03-02T14:09:02Z (GMT). No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertação_Shirley C. B. B. Cardoso.pdf: 5691643 bytes, checksum: ed7baf29158489d49fb56b34b26b6d50 (MD5) Previous issue date: 2017-12-19
The management and coordination of the building projects process are essential to achieve the excellence of on edification, as they involve the elaboration stages, the organization of the work team and the tools to consolidate the activities that result in the final product. The building projects process of public institutions has peculiarities resulting from the restrictions imposed by the Law of Tenders, and other requirements. Considering the legal mechanisms that need to be met, a systematic proposal was formulated for the management and coordination of building projects that cover project phases, tools, responsible and deadline, having as theoretical reference the main bibliographic sources, Brasil (2014), Fabricio (2002), Melhado (2001) and PMBOK (2017), that deal with subjects involving process models, management and coordination of projects, complemented by studies on the peculiarities that the public sector is subject to and analysis of the building projects process of a public institution, prioritizing the use of the concept of the Simultaneous Project. In this way, it is hoped to improve the integration between the stages of the building projects process, the interfaces with client, between the disciplines and agents involved and between project and work.
A gestão e a coordenação do processo de projeto de edificações são essenciais para atingir a excelência de um empreendimento, pois envolvem as etapas de elaboração, a organização da equipe de trabalho e as ferramentas para consolidar as atividades que resultam no produto final. O processo de projetos de edificações das instituições públicas possui particularidades decorrentes das restrições impostas pela Lei de Licitações e outras exigências. Considerando os mecanismos legais que precisam ser atendidos, foi formulada uma proposta sistemática de gestão e coordenação de projetos de edificações abrangendo etapas de projetos, ferramentas, responsáveis e prazo, tendo como referencial teórico as principais fontes bibliográficas, Brasil (2014), Fabricio (2002), Melhado (2001) e PMBOK (2017), que tratam de assuntos envolvendo modelos de processo, gestão e coordenação de projetos, complementada por estudos sobre as peculiaridades a que o setor público está sujeito e a análise do processo de projeto de construções de edificações de uma instituição pública, priorizando a utilização dos conceitos do Projeto Simultâneo. Dessa forma, espera-se melhorar a integração entre as etapas do processo de projeto de edificações, as interfaces com cliente, entre as disciplinas e agentes envolvidos e entre o projeto e a obra.
APA, Harvard, Vancouver, ISO, and other styles
17

Sampaio, Miguel Ângelo Rei. "Desenvolvimento de ferramentas de apoio ao planeamento de industrialização de novos produtos." Master's thesis, Universidade de Aveiro, 2017. http://hdl.handle.net/10773/21563.

Full text
Abstract:
O presente trabalho resultou da realização de um estágio curricular na empresa Bosch Termotecnologia, SA. localizada em Cacia, Aveiro, Portugal. O trabalho consiste na proposta e implementação de um conjunto de ações de melhoria na área do planeamento de projetos de industrialização de novos produtos, com base na metodologia de planeamento Scrum e com apoio das melhores práticas. Ao longo do projeto é possível verificar uma adaptação à realidade de gestão e planeamento de projetos da organização e da equipa em questão, assim como a realização de um levantamento das dificuldades e necessidades do departamento. As soluções propostas e implementadas baseiam-se essencialmente num conjunto de medidas para simplificar e acelerar o processo de planeamento de projetos de industrialização, mantendo a exigência e eficiência técnica dos projetos desta envergadura. A metodologia Scrum, foi essencial para este projeto e para atingir as melhorias apresentadas.
The current work represents the result of a curricular internship at Bosch Termotecnologia, SA. located at Cacia, Aveiro, Portugal. The work is based on a set of actions to improve industrialization of new products, project planning, taking the Scrum planning methodology and further best practices of project planning, as it basis. Throughout the project, it is possible to verify an adaptation to the team’s and the company’s, new planning and management practices, and also, an interpretation of the requirements and the needs in question. The proposed and implemented solutions are based essentially on a set of measures, created to simplify and increment some velocity on the industrialization planning process, keeping the demand and technical efficiency related to these type of projects. Scrum, methodology was essential to this project and to achieve the proposed goals.
APA, Harvard, Vancouver, ISO, and other styles
18

Navarini, Cleila Cristina. "Diretrizes da coordenação modular para o uso do bloco 44 cm como elemento principal em projetos arquitetônicos de alvenaria estrutural cerâmica." reponame:Repositório Institucional da UFSC, 2012. http://repositorio.ufsc.br/xmlui/handle/123456789/93635.

Full text
Abstract:
Dissertação (mestrado) - Universidade Federal de Santa Catarina, Centro Tecnológico, Programa de Pós-graduação em Engenharia Civil, Florianópolis, 2010
Made available in DSpace on 2012-10-25T01:12:55Z (GMT). No. of bitstreams: 1 279594.pdf: 3083799 bytes, checksum: 424ba81778f471b3d982397de1bdd1c6 (MD5)
A Alvenaria Estrutural é um sistema construtivo cuja racionalização se deve à coordenação dimensional e integração dos projetos. A adoção desse sistema construtivo racionalizado propicia maior rapidez, facilidade e qualidade à execução. Visando a racionalização dos componentes da edificação em obras de Alvenaria Estrutural Cerâmica este estudo tem como objetivo principal estudar diretrizes para auxiliar o bloco 44cm como elemento principal em projetos arquitetônicos de Alvenaria Estrutural Cerâmica de acordo com a Coordenação Modular. Para isso, primeiramente foi realizada uma pesquisa de campo com as dimensões disponíveis no mercado de Santa Catarina das unidades de Alvenaria Estrutural, as esquadrias e os revestimentos cerâmicos. Em seguida uma revisão bibliográfica dos conceitos e os princípios fundamentais de Coordenação Modular, Alvenaria Estrutural, Construtibilidade e Projeto. Como resultado o estudo apresenta arranjos de paredes utilizando as unidades 14x19x44cm e uma série de medidas preferidas para a padronização das dimensões dos ambientes das esquadrias e dos revestimentos cerâmicos.
The structural masonry is a building system which rationalization is taken from the dimensional coordination and the integration of projects. The adoption of this rationalized building system provides greater speed, facility and quality to the implementation. Intending to rationalize the building components in Ceramics Structural Masonry this study's main objective is to study guidelines to help the 44cm block as main element in architectural projects of Ceramics Structural Masonry according to the Modular Coordination. For that, it was firstly made a field research with the available dimensions in Santa Catarina's market of Structural Masonry units, frames and ceramic tiling. Afterwards, a bibliographic review of the concepts and the fundamental principles of Modular Coordination, Structural Masonry, Constructability and Project, was made. As result, the study shows walls arrangements using the 14x19x44cm units and a series of ideal measurements for standardization of frame's environment dimensions and ceramic's tiling.
APA, Harvard, Vancouver, ISO, and other styles
19

Grabarz, Regina Candeloro. "Contribuição para o emprego de portas modulares em projetos de alvenaria estrutural." Universidade Federal de São Carlos, 2012. https://repositorio.ufscar.br/handle/ufscar/4678.

Full text
Abstract:
Made available in DSpace on 2016-06-02T20:09:17Z (GMT). No. of bitstreams: 1 4800.pdf: 10440406 bytes, checksum: e74b9d2a19207b02796d6d5a98de2254 (MD5) Previous issue date: 2012-08-15
Financiadora de Estudos e Projetos
The construction industry often related to high handwork production processes, which results in waste of physical and financial resources. The current great demand for new buildings leads to the need of industrialized elements, components and technologies in order to push the evolution of the construction process. In view of these aspects, modular coordination stands out as an excellent strategic tool since it aims to organize the dimensions of buildings, in order to reduce the variety of sizes in which the elements and components are produced, allowing its ready installation without the need of any modification. The structural masonry stands out in this direction since its design is guided by modular coordination, allowing the application of this concept and thereby to rationalize the subsystems of larger impact of the building: the partitions and the building structure. However, although this system contributes to the modular coordination, other construction components and elements must also have modular measures, being the element door an example. With that in mind, this research seeks to contribute to the dimensional standardization of "opening doors with one leaf" through the diagnosis of modular dimensions suitable for structural masonry designs. Initially, it was diagnosed the possible modular dimensions for the door space. The analyses resulted in the possible horizontal space before de door installation of widths with final 1 (61, 71, 81, cm) and 6 (66, 76, 86, cm). The vertical modular space is equal to 221 cm before any other construction element is added and 217 cm considering a regularization capping and floor tile over the slab (nominal). The width of wood door leaf is currently commercialized with dimensions ending with 0 (60, 70, 80, cm) and 2 (62, 72, 82, cm). These dimensions were diagnosed suitable to modular masonry design when combined with door post thickness of 2 and 2,5 cm respectively. However the 210 cm height, available in the market, proved to be inadequate. With this dimension a construction solution is need to fill the gap between the door and masonry, which is not wanted and becoming very undesirable today. The study leaded to the conclusion that a door leaf height of 212,5 cm would be ideal. Also, although it is possible wood-doors of 0 and 2 endings widths (current standard) changing the standards to width with endings dimensions of 3 (63, 73, 83, ... cm) and 8 (68, 78, 88, cm) would make possible to have the same width standard for door leafs of several materials (wood, metal). The metal doors of steel and aluminum are available in the market in several different. Although most of them are suitable for the modular dimensions the proposals are made here to standardize and reduce the number of different dimensions. The first one has lower impact, just recommends to eliminated some of the marketed dimensions standardizing to width endings with 1 (61, 71, 81, cm) and in height 211 cm. The other suggestion has higher impact, but allows the same dimensions for doors of different materials, thus having only one dimension standard for door leafs regardless of its material.
A construção civil é uma indústria muitas vezes vinculada a processos produtivos artesanais, refletindo em desperdício de recursos físicos e financeiros. A grande demanda por edificações leva a necessidade de industrializar elementos, componentes e tecnologias construtivas como alavanca ao desenvolvimento tecnológico e evolução do processo construtivo. Tendo em vista estes aspectos a coordenação modular se destaca como excelente ferramenta estratégica uma vez que objetiva organizar as dimensões das construções, de forma a reduzir a variedade de tamanhos nos quais os elementos e componentes são produzidos, permitindo seu uso sem modificações, cortes ou retoques. O sistema construtivo em alvenaria estrutural se destaca nesse sentido uma vez que é concebido através da coordenação modular, possibilitando fazer uso deste conceito e com isso racionalizar os subsistemas de maior impacto da edificação, a vedação e estrutura da edificação. No entanto, embora esse sistema contribua com a coordenação modular, os demais componentes e elementos construtivos que conformam a edificação, em sua maioria, não possuem medidas modulares, sendo o elemento porta um exemplo. Tendo isso em mente esta pesquisa busca contribuir com a padronização dimensional de portas de abrir com uma folha , através do diagnostico de dimensões modulares adequadas a projetos de alvenaria estrutural. Para tanto se diagnosticou os possíveis vãos modulares da alvenaria, apresentando na largura final 1 e 6 (nominal), e na altura 221 cm sem contrapiso e 217 cm com contrapiso e piso (nominal). No material madeira as larguras de folha de final 0 (zero) e 2 (dois), disponíveis atualmente no mercado, foram diagnosticadas adequadas a projetos de alvenaria estrutural quando combinadas respectivamente com batentes de 2 e 2,5 cm de espessura. Já a altura de 210 cm, disponível no mercado, se mostrou inadequada, apontando a necessidade de soluções para preencher o vão. Através do estudo diagnosticou-se como dimensões ideais de folhas de madeira, na largura final 3 (três) e 8 (oito), e 212,5 cm de altura (nominal). No caso das portas mistas, batente metálico envolvente e folha de porta de madeira, constatou-se como a melhor solução trabalhar com as dimensões de folha diagnosticadas ideais para portas de madeira, ao invés das dimensões disponíveis no mercado, possibilitando padronizar a dimensão do batente metálico assim como a folha da porta. As portas metálicas (aço e alumínio) se destacam por apresentarem dimensões disponíveis no mercado, largura e altura, adequadas a projetos de alvenaria estrutural. No entanto através do estudo diagnosticou-se duas soluções dimensionais mais adequadas, uma de menor impacto, padronizando somente as portas metálicas, sendo folhas de final 1 (um) na largura e 211 cm de altura, e outra de maior impacto buscando padronizar as dimensões de folha de porta metálica e de madeira, permitindo o intercambio destes materiais, portanto folhas de final 3 (três) e 8 (oito) com altura de 212,5 cm e batente padronizado em 1,5 cm (parte com rebaixo).
APA, Harvard, Vancouver, ISO, and other styles
20

MATOS, Luri Sabina Cosme da Silva. "Diretrizes para o controle dos projetos executivos no canteiro de obras." Universidade Federal de Goiás, 2011. http://repositorio.bc.ufg.br/tede/handle/tde/1344.

Full text
Abstract:
Made available in DSpace on 2014-07-29T15:18:23Z (GMT). No. of bitstreams: 1 Dissertacao Luri S Cosme.pdf: 5064670 bytes, checksum: 9bfdc739d813d29ca283fc14e7a4dcac (MD5) Previous issue date: 2011-05-30
Este trabalho tem por objetivo propor diretrizes para o uso das ferramentas de controle dos projetos executivos destinados a construção civil, com base em investigações ocorridas durante o período de andamento de uma obra, dentro do canteiro de obras. Como a disponibilidade financeira tem sido o indicativo para o início de um empreendimento e não a conclusão de um planejamento que contemple um minucioso programa de necessidade e auxilie no desenvolvimento do projeto, as empresas passam a procurar uma maneira de se enquadrarem ao ritmo de crescimento do setor da construção civil e ao mesmo tempo buscam soluções para controlar os projetos por meio de ferramentas de gestão de projetos. Para o desenvolvimento da investigação dessas ferramentas a metodologia do trabalho teve duas etapas, sendo a primeira a pesquisa-ação que concilia o conhecimento acadêmico ao prático, onde a coleta de dados ocorreu por meio da vivência numa obra industrial na cidade de Vitória - ES, com atuação dentro do setor de coordenação de projetos, utilizando-se de registro fotográfico, observação, aplicação de check lists e entrevista semiestrutrada aos agentes envolvidos no processo. A segunda etapa foi composta por um estudo de caso múltiplo, em quatro construtoras da cidade de Goiânia, com a realização de registro fotográfico e entrevista semiestrutrada a fim de levantar dados referentes ao controle do projeto dentro da obra. Os resultados estão relacionados às informações coletadas, as quais serviram de subsídio para a análise das ferramentas que auxiliam na gestão dos projetos dentro do canteiro de obras, esclarecendo a importância dessas no controle dos projetos durante a execução da obra, evitando erros causados pelo uso de projeto obsoleto e mapeando a tramitação do projeto dentro da obra. A junção de todas essas investigações levou à formulação de diretrizes para o controle dos projetos no canteiro de obras, as quais serão relevantes para os profissionais que gerenciam ou gerenciarão projetos executivos.
APA, Harvard, Vancouver, ISO, and other styles
21

Ramos, Carlos Edgar Feliciano. "Relatório de atividade profissional." Master's thesis, Escola Superior de Tecnologia do Instituto Politécnico de Setúbal, 2014. http://hdl.handle.net/10400.26/5671.

Full text
Abstract:
Dissertação de Mestrado em Engenharia Eletrotécnica e de Computadores
O mundo que nos rodeia encontra-se repleto de tecnologia que, cada vez mais, nos proporciona conforto, apoio, segurança e rentabilidade. Foi nessas vantagens que encontrei grande admiração pela tecnologia. No meu percurso estudantil tive o privilégio de estudar numa Escola que me ofereceu a oportunidade de criar protótipos de produtos que considero úteis. Após ter concluído a Licenciatura ingressei numa Empresa onde tive também a possibilidade de criar protótipos, e a oportunidade de os transformar em produtos para venda, podendo assim juntar o meu gosto pessoal com a minha vida profissional. Neste relatório de atividade profissional irei descrever a Empresa onde trabalho, as atividades e as tarefas realizadas, os projetos em que estive envolvido, e irei ainda focar as diversas competências que foram por mim adquiridas, através de uma reflexão crítica. Pretendo também com este relatório mostrar algumas diferenças entre o mundo académico e o profissional, sendo que estas se podem complementar de forma a tomarmos as melhores decisões na nossa vida profissional.
APA, Harvard, Vancouver, ISO, and other styles
22

Morais, Ana Margarida Gavião. "Atividades do Gabinete de Planeamento, Projetos e Atividades da Faculdade de Ciências do Desporto e Educação Física da Universidade de Coimbra." Master's thesis, FEUC, 2016. http://hdl.handle.net/10316/31433.

Full text
Abstract:
Relatório de estágio do mestrado em Gestão, apresentado à Faculdade de Economia da Universidade de Coimbra, sob a orientação de José Manuel Bernardo Vaz Ferreira.
No presente relatório vou apresentar as principais atividades que tenho desenvolvido, nas áreas de gestão de recursos humanos e financeira, no Gabinete de Planeamento, Projetos e Atividades da Faculdade de Ciências do Desporto e Educação Física da Universidade de Coimbra, onde exerço funções, bem como algumas propostas de melhoria dos procedimentos adotados, na sequência de uma reflexão crítica sobre esses procedimentos. A prestação de um serviço eficiente, eficaz e de qualidade, a racionalização, a simplificação e a celeridade dos processos, através do aperfeiçoamento, da formalização e da uniformização dos procedimentos, da reformulação dos documentos e formulários utilizados e a sua divulgação pelos diversos intervenientes, tem sido uma prioridade constante do Gabinete de Planeamento, Projetos e Atividades, contribuindo, assim, para o cumprimento dos prazos legais e dos prazos impostos pela Administração da Universidade de Coimbra e para a melhoria da qualidade do funcionamento da Faculdade de Ciências do Desporto e Educação Física da Universidade de Coimbra.
APA, Harvard, Vancouver, ISO, and other styles
23

Bandeira, Danieli. "AVALIAÇÃO DA APS: UMA ANÁLISE DA COORDENAÇÃO DA ATENÇÃO NOS MUNICÍPIOS DO INTERIOR DO RS." Universidade Federal de Santa Maria, 2016. http://repositorio.ufsm.br/handle/1/7467.

Full text
Abstract:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior
The Primary Health Care (PHC) is shown as a strategic space for the exercise of management and evaluation in health. In this scenario, the coordination of care is considered one of its four key attributes. This is understood by the ability to ensure continuity of care in the service network and the identification of issues that are addressed in other levels of the network. In this sense, this research aims to evaluate the PHC quality in the municipalities of the 4ªCRS / RS by checking the coordination of care, by applying the PCATool (Brazil) at the top-level health professionals and service users health, ≥ 18 years and whose access was not the first. This is a quantitative approach to research with cross-sectional design. Data collection was carried out from February to August 2015, the PHC services in the municipalities of the 4th CRS / RS / BR. The study population included 1,071 adults and 203 professionals working in PHC. Data collection was conducted through interviews by applying the research protocol (demographic questionnaire and PCATool-Brazil version Adult and Professional) and was held in a computerized manner. Data were collected using Epi Info 7.0 program and automatically extracted for notebooks. The analysis was performed using the Statistical Package for Social Sciences (SPSS) version 19.0 for Windows. scores were the Attention Coordination attribute. Please note that the ethical aspects of research involving human beings were respected, according to the National Health Council Resolution 422/12. The results revealed by this study show that the Warning Coordination attribute was evaluated as satisfactory, that is, obtained a Top rated in dimensions Integration and Care Information System, both in the adult version and the professional version. In the adult version scores in dimension Care Integration were: the Basic Health Units (BHU) 6.66 (6.28 to 7.03), in the Family Health Strategy (ESF) 6.34 (5.94 -6.73) and in mixed UBS 6.87 (6.30 to 7.43); the scores in the dimension Information System were: the UBS 7.22 (7.02 to 7.41), the ESF 7.09 (6.88 to 7.29) and in mixed UBS 7.26 (6.94 -7.57). In the professional version scores in dimension Care Integration were: the UBS 6.34 (5.79 to 6.88), the ESF 6.41 (6.01 to 6.80) and in mixed UBS 6.74 ( 6.24 to 7.23); the scores in the dimension Information System were: the UBS 8.84 (8.22 to 9.45), the ESF 8.77 (8.40 to 9.13) and in mixed UBS 8.54 (8.03 -9.04). The results presented in this study have important implications for the evaluated services and also for public policy attention to health of the 32 municipalities that make up the two health regions studied. In addition to strengthening the development of evaluation studies in order to improve the quality of PHC and coordination of care.
A Atenção Primária à Saúde (APS) mostra-se como um espaço estratégico para o exercício da gestão e avaliação em saúde. Neste cenário, a coordenação da atenção é considerada um dentre os seus quatro atributos essenciais. Esta é compreendida pela capacidade de garantir a continuidade da atenção na rede de serviços, bem como a identificação de problemas que são abordados em outros níveis da rede. Nesse sentido, a presente pesquisa tem como objetivo avaliar a qualidade da APS nos municípios que integram a 4ªCRS/RS por meio da verificação da coordenação da atenção, mediante a aplicação do PCATool (Brasil) aos profissionais de saúde de nível superior e usuários dos serviços de saúde, ≥ 18 anos e cujo o acesso não fosse o primeiro. Trata-se de uma pesquisa de abordagem quantitativa com delineamento transversal. A coleta de dados foi desenvolvida de fevereiro a agosto de 2015, nos serviços de APS nos municípios da 4ª CRS/RS/BR. A população do estudo contemplou 1.071 usuários adultos e 203 profissionais atuantes na APS. A coleta dos dados foi realizada por meio de entrevista mediante aplicação do protocolo de pesquisa (questionário sócio demográfico e PCATool-Brasil versão Adulto e Profissional) e foi realizada de maneira informatizada. Os dados foram coletados no Programa Epi Info 7.0 e extraídos automaticamente para notebooks. A análise foi realizada no Programa Statistical Package for the Social Sciences (SPSS®), versão 19.0 for Windows. Foram construídos escores do atributo Coordenação da Atenção. Salienta-se que foram respeitados os aspectos éticos das pesquisas com seres humanos, seguindo a Resolução 422/12 do Conselho Nacional de Saúde. Os resultados revelados pelo presente estudo mostram que o atributo Coordenação da Atenção foi avaliado como satisfatório, ou seja, obteve uma alta avaliação nas dimensões Integração de Cuidados e Sistema de Informações, tanto na versão adulto quanto na versão profissional. Na versão adulto os escores na dimensão Integração de Cuidados foram de: nas Unidades Básicas de Saúde (UBS) 6,66 (6,28-7,03), nas Estratégias de Saúde da Família (ESF) 6,34 (5,94-6,73) e nas UBS mistas 6,87 (6,30-7,43); os escores na dimensão Sistema de Informação foram de: nas UBS 7,22 (7,02-7,41), nas ESF 7,09 (6,88-7,29) e nas UBS mistas 7,26 (6,94-7,57). Na versão profissional os escores na dimensão Integração de Cuidados foram de: nas UBS 6,34 (5,79-6,88), nas ESF 6,41 (6,01-6,80) e nas UBS mistas 6,74 (6,24-7,23); os escores na dimensão Sistema de Informação foram de: nas UBS 8,84 (8,22-9,45), nas ESF 8,77 (8,40-9,13) e nas UBS mistas 8,54 (8,03-9,04). Os resultados apresentados neste estudo trazem importantes implicações para os serviços avaliados e também para as políticas públicas de atenção a saúde dos 32 municípios que compõe as duas regiões de saúde estudadas. Além de reforçar o desenvolvimento de estudos avaliativos a fim de melhorar a qualidade da APS e da coordenação da atenção.
APA, Harvard, Vancouver, ISO, and other styles
24

Conceição, Katiani Pereira. "Uma nova metodologia para o desenvolvimento de projetos de proteção de redes ativas de distribuição de energia elétrica." Universidade Estadual Paulista (UNESP), 2018. http://hdl.handle.net/11449/152797.

Full text
Abstract:
Submitted by KATIANI PEREIRA DA CONCEIÇÃO null (kathy_ani@hotmail.com) on 2018-02-22T19:01:33Z No. of bitstreams: 1 Tese_Katiani_Final.pdf: 4997816 bytes, checksum: b658322d2d003b3fd4a2a63664287751 (MD5)
Approved for entry into archive by Cristina Alexandra de Godoy null (cristina@adm.feis.unesp.br) on 2018-02-22T19:11:59Z (GMT) No. of bitstreams: 1 conceicao_kp_dr_ilha.pdf: 4997816 bytes, checksum: b658322d2d003b3fd4a2a63664287751 (MD5)
Made available in DSpace on 2018-02-22T19:11:59Z (GMT). No. of bitstreams: 1 conceicao_kp_dr_ilha.pdf: 4997816 bytes, checksum: b658322d2d003b3fd4a2a63664287751 (MD5) Previous issue date: 2018-02-16
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Neste trabalho, apresenta-se uma nova proposta de metodologia para alocar, determinar e es-pecificar os tipos de dispositivos de controle e proteção em redes de distribuição com geração distribuída (GD). Esta metodologia é baseada em técnicas de otimização multiobjetivo para efetuar a alocação otimizada, coordenada e seletiva destes dispositivos. O modelo é composto por duas funções objetivo que consideram aspectos econômicos e da confiabilidade da rede, e um conjunto de restrições composto por restrições físicas, operacionais e um subconjunto de restrições baseadas em regras práticas das empresas do setor de distribuição e previstas em normas técnicas nacionais e internacionais que estabelecem a especificação, coordenação e seletividade dos dispositivos de controle e proteção instalados na rede. No modelo considera-se a possibilidade de transferência de carga entre alimentadores vizinhos e a operação ilhada da GD. Dessa forma, obtém-se um modelo genérico de programação não linear inteira mista (PNLIM) cujo diferencial com relação a outros modelos matemáticos da literatura é propor que no mesmo processo de otimização seja realizada a alocação otimizada dos dispositivos de controle e proteção na rede juntamente com a coordenação do sistema de proteção. A eficiên-cia do modelo matemático é comprovada comparando-se os resultados obtidos entre dois tes-tes com o auxílio do algoritmo genético (AG) mono-objetivo que considera a ponderação dos objetivos, enquanto que para a solução do modelo multiobjetivo de PNLIM propõe-se o AG multiobjetivo NSGA-II (Nondominated Sorting Genetic Algorithm). A implementação da me-todologia do método proposto foi desenvolvida no ambiente do C++ e foram testados dois sistemas testes, o IEEE-34 barras modificado, e o sistema real de 135 barras da literatura.
This paper, presents a new methodology for placing, selecting and specifying the control and the protective devices system of distribution networks with distributed generation (DG). This methodology is based on multiobjective optimization techniques to perform the optimized, coordinated and selective allocation of the control and protective devices. The proposed mathematical model consists of two objective functions that consider economic factors and network continuity indexes. Physical and operational constraints are taken into account, with an emphasis on the set of constraints based on practical rules of distribution utilities defined in international technical standards, which require the specification, coordination, and selectivity of protective devices installed in the network. The possibility of load transfer from neighboring feeders and the islanded DG operation are also considered in the model. In this way, we obtain a generic model of mixed-integer nonlinear programming (MINLP) whose differential in relation to other mathematical models of the literature is to propose, in the same optimization process, the optimized allocation of the control and protective devices in the network along with the coordination of the protection system. The efficiency of the mathematical model is proven by comparing the results obtained in two tests with the aid of the genetic algorithm (GA) while for the solution of the multiobjective MINLP model the NSGA-II multiobjective genetic algorithm (Nondominated Sorting Genetic Algorithm) is proposed. The implementation of the proposed methodology was developed in the C++ environment and two test systems, the modified IEEE-34 buses, and the real 135-bus system were tested.
CNPq: 207715/2015-7
APA, Harvard, Vancouver, ISO, and other styles
25

Santos, Vinícius Carrião dos. "Compromissos em equipes de projeto de edifícios." Universidade Federal de Goiás, 2014. http://repositorio.bc.ufg.br/tede/handle/tede/4616.

Full text
Abstract:
Submitted by Erika Demachki (erikademachki@gmail.com) on 2015-10-09T20:24:01Z No. of bitstreams: 2 Dissertação - Vinicius Carriao dos Santos - 2014.pdf: 12345678 bytes, checksum: c979199bb9c9f0f150375e3a19944976 (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5)
Approved for entry into archive by Erika Demachki (erikademachki@gmail.com) on 2015-10-09T20:26:39Z (GMT) No. of bitstreams: 2 Dissertação - Vinicius Carriao dos Santos - 2014.pdf: 12345678 bytes, checksum: c979199bb9c9f0f150375e3a19944976 (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5)
Made available in DSpace on 2015-10-09T20:26:39Z (GMT). No. of bitstreams: 2 Dissertação - Vinicius Carriao dos Santos - 2014.pdf: 12345678 bytes, checksum: c979199bb9c9f0f150375e3a19944976 (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) Previous issue date: 2014-08-25
The ineffectiveness and inefficiency of the commitments set out within the building project teams cause losses as rework, delays and additional costs for the following phases of the project and undermine interpersonal relationships. Communication is the tool used to coordinate actions to achieve the completion of the whole project. The observation of the process of establishing commitment allowed to recognize the dynamics of actions that involves the commitments and the possible impacts of the quality of these commitments in the design process. The goal of the research was to investigate how the commitments are established through conversations and interaction between participants of the project coordination team through Conversation Analysis technique. The research has a qualitative and exploratory character and was developed a case study of project coordination meetings. As results can be seen that the Conversation Analysis technique is suitable as a support for the study of commitment, was identified what actions are more closely linked to commitment and also suggested guidelines for practitioners to value the time of commitments establishment. In the academic field, the research contributes to enhancing the theme of communication and interaction in Construction, approach still recent in Brazil and worldwide. To the practice of managing the design process, the research presents a technique that can help agents to improve their communication skills and grasp its commitments as set out in the workplace by providing means to assess and adjust the process while developing.
A ineficácia e a ineficiência dos comprometimentos estabelecidos dentro da equipe de projeto de edifícios acarretam perdas, como retrabalhos, atrasos e custos adicionais de serviços para as fases seguintes do empreendimento e fragilizam os relacionamentos interpessoais com prejuízos variados para todos os envolvidos. A comunicação é a ferramenta utilizada para coordenar as ações necessárias para se atingir os objetivos de conclusão do conjunto de projetos. A observação do processo de estabelecimento de compromisso permitiu reconhecer a dinâmica das ações que o envolve e perceber os possíveis impactos da qualidade destes compromissos no processo de projeto. O objetivo da pesquisa é investigar como os comprometimentos são estabelecidos através das conversações e da interação entre os participantes de equipes de projeto de edifícios no âmbito da coordenação de projetos por meio da técnica da análise da conversa. A pesquisa desenvolvida teve caráter qualitativo e exploratório e foi estruturada a partir de um estudo de caso de reuniões de coordenação de projetos. Como resultados pode-se perceber como a técnica de análise da conversa é adequada como suporte para o estudo do comprometimento, identificar quais ações estão mais intimamente ligadas ao comprometimento e ainda sugerir diretrizes para os agentes do processo para a valorização do momento do estabelecimento dos compromissos. No campo acadêmico, a pesquisa contribui para a valorização do tema da comunicação e da interação na Construção Civil, abordagem ainda recente no Brasil e no mundo. Para a prática de trabalho de gestão do processo de projeto, a pesquisa apresenta uma técnica que pode auxiliar os agentes do processo a aprimorarem suas habilidades comunicativas e apreenderem como estabelecem seus compromissos no contexto de trabalho facultando meios de avaliar e ajustar o processo enquanto o desenvolvem.
APA, Harvard, Vancouver, ISO, and other styles
26

Oliveira, Edgar Peixoto de. "Diretrizes para o processo de projeto de edifícios hospitalares." Universidade Federal de São Carlos, 2010. https://repositorio.ufscar.br/handle/ufscar/4651.

Full text
Abstract:
Made available in DSpace on 2016-06-02T20:09:12Z (GMT). No. of bitstreams: 1 3152.pdf: 1091086 bytes, checksum: 449d433a11946823c37ec5ada9876e61 (MD5) Previous issue date: 2010-08-12
Financiadora de Estudos e Projetos
This paper aims to propose guidelines for the design process of hospital buildings. To achieve this objective, literature review and case studies were conducted in three architectural firms specializing in projects for hospital buildings. It was possible to see how management is performed in the design process in each of these companies and what are the difficulties and differences between the design process of hospital buildings and design process of other built environments. The Company 1 has been operating for 11 years developing architectural plans for the hospital and residential segments, which contributed to identifying the differences between the design processes of these two segments. The Company 2 has been operating for 3 years coordinating the design process of residential, hospital, shopping and hotels, bringing a vision of the management process. The Company 3 has extensive experience in developing architectural plans for the hospital segment, serving for 32 years exclusively in this segment. The observation of the work of these companies, together with the literature review served as a subsidy for the drafting of guidelines for the design process of hospital buildings, as a contribution to the quality of it.
Este trabalho tem como objetivo propor diretrizes para o processo de projeto de edifícios hospitalares. Para alcançar este objetivo, foram realizados revisão bibliográfica e estudos de caso em três escritórios de arquitetura, especializados em projetos para edifícios hospitalares. Foi possível verificar como é realizada a gestão do processo de projeto em cada uma dessas empresas e quais as dificuldades e diferenças encontradas entre o processo de projeto de edifícios hospitalares e o processo de projeto de outros ambientes construídos. A Empresa 1 atua há 11 anos desenvolvendo projetos arquitetônicos para os segmentos hospitalar e residencial, o que contribuiu para verificar as diferenças entre o processo de projeto desses dois segmentos. A Empresa 2 atua há 3 anos coordenando o processo de projeto de obras residenciais, hospitalares, comerciais e de hotelaria, trazendo uma visão gerencial do processo. A Empresa 3 possui uma vasta experiência no desenvolvimento de projetos arquitetônicos para o segmento hospitalar, atuando há 32 anos exclusivamente neste segmento. A observação do trabalho destas empresas, juntamente com a revisão da literatura, serviu de subsídio para a elaboração das diretrizes para o processo de projeto de edifícios hospitalares, como forma de contribuir com a qualidade do mesmo.
APA, Harvard, Vancouver, ISO, and other styles
27

Marques, Rúben de Almeida. "Logística de abastecimento de células logísticas." Master's thesis, Universidade de Aveiro, 2015. http://hdl.handle.net/10773/16369.

Full text
Abstract:
Mestrado em Engenharia e Gestão Industrial
O ritmo e a exigência dos mercados atuais impõem um sistema logístico ágil e flexível, capaz de responder a novas reivindicações e, simultaneamente, manter um nível de serviço de excelência. Eliminar desperdícios faz parte da melhoria contínua, reduzindo custos e mantendo a organização competitiva. A Bosch Termotecnologia, S.A., também enfrenta estes desafios o que nos levou a identificar a eliminação de desperdícios na cadeia de abastecimento logística, introduzindo ganhos de eficiência e melhorias no nível de serviço ao cliente sem esquecer um aspeto importante, a segurança. Para atingir os ganhos esperados neste projeto, foram aplicadas metodologias de gestão específicas da área de projetos e standarização de processos.
The rhythm and demand of the actual markets, imposes an agile and flexible logistic system, able to respond to new claims and, simultaneously, keep a service level of excellence. To eliminate waste, make part of the continuous improvement, reducing costs and maintaining a competitive organization. Bosch Thermotecnology, S.A., also face this challenges which take us to identify the waste elimination in the logistic supply chain, introducing efficiency gains and improvements at client service level without forgetting an important aspect, security. To achieve the expected gains in this project, it was applied specific management methodologies of the project area and project standardization.
APA, Harvard, Vancouver, ISO, and other styles
28

Baptista, Gisela Filipa Paulos. "O papel do orçamento na gestão dos municípios portugueses." Master's thesis, Instituto Superior de Economia e Gestão, 2015. http://hdl.handle.net/10400.5/10654.

Full text
Abstract:
Mestrado em Contabilidade, Fiscalidade e Finanças Empresariais
Este estudo tem como objetivo analisar o papel do orçamento na gestão dos municípios Portugueses, e identificar se fatores culturais/políticos ou demográficos, explicam as diferenças encontradas na utilização destes papéis. Os papéis analisados englobam o planeamento, coordenação, comunicação, motivação, avaliação de desempenho e controlo. Enquanto os fatores em análise serão o partido/ideologia política, dimensão dos municípios, competitividade política, formação e experiência profissional dos inquiridos. O estudo incide sobre um questionário aplicado a todos os municípios portugueses (308), tendo a análise empírica sido desenvolvida a partir da amostra obtida de 156 inquiridos. Os resultados indicam que estes consideram como papéis de maior relevância o planeamento, coordenação, comunicação e controlo, e apenas a experiência profissional é identificada como variável com impacto na adoção do orçamento para planeamento. Quanto às restantes variáveis em estudo não foi detetada qualquer relação com a adoção dos papéis do orçamento. Observa-se ainda que os partidos de esquerda desvalorizam a aplicação do orçamento para quase todos os papéis, ao contrário dos da direita, e que a visão acerca do orçamento se difere dentro do mesmo município, de acordo com a função desempenhada pelos inquiridos.
This study aims to analyze what role the budget assume in management of the Portuguese municipalities, and identify if cultural/political or demographic factors explain the differences in the use of these roles. The analyzed roles cover the planning, coordination, communication, motivation, performance evaluation and control. While the factors will be the political party/ideology, size of municipalities, political competitiveness, education and professional experience of the respondents. The study focuses on a questionnaire applied to all of Portuguese municipalities (308), having the empirical analysis was developed from the sample obtained of the 156 respondents. The results indicate that these regard as most relevant papers the planning, coordination, communication and control, and only professional experience is identified as a variable with impact in adoption of budget for planning. In the remaining study variables was not detected none relation to the adoption of the budget roles. This study also allows us to observe that the left parties devalue the implementation of the budget for almost every role, as opposed to the right, and the vision regarding the budget differs within the same municipality, according of the developed function of the respondents.
APA, Harvard, Vancouver, ISO, and other styles
29

Arrotéia, Aline Valverde. "Gestão do projeto e sua interface com o canteiro de obras sob a ótica da preparação da execução de obras (PEO)." Universidade Federal de Goiás, 2013. http://repositorio.bc.ufg.br/tede/handle/tede/3299.

Full text
Abstract:
Submitted by Jaqueline Silva (jtas29@gmail.com) on 2014-10-06T20:56:54Z No. of bitstreams: 3 Dissertação - Aline Valverde Arrotéia - 2013 (1).pdf: 19845597 bytes, checksum: a0771de1e645df07c152873e59f534e2 (MD5) Dissertação - Aline Valverde Arrotéia - 2013 (2).pdf: 17441990 bytes, checksum: b1f22aee78d803aedac8b5d5827fa31b (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5)
Approved for entry into archive by Jaqueline Silva (jtas29@gmail.com) on 2014-10-06T20:57:05Z (GMT) No. of bitstreams: 3 Dissertação - Aline Valverde Arrotéia - 2013 (1).pdf: 19845597 bytes, checksum: a0771de1e645df07c152873e59f534e2 (MD5) Dissertação - Aline Valverde Arrotéia - 2013 (2).pdf: 17441990 bytes, checksum: b1f22aee78d803aedac8b5d5827fa31b (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5)
Made available in DSpace on 2014-10-06T20:57:05Z (GMT). No. of bitstreams: 3 Dissertação - Aline Valverde Arrotéia - 2013 (1).pdf: 19845597 bytes, checksum: a0771de1e645df07c152873e59f534e2 (MD5) Dissertação - Aline Valverde Arrotéia - 2013 (2).pdf: 17441990 bytes, checksum: b1f22aee78d803aedac8b5d5827fa31b (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) Previous issue date: 2013-09-26
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior - CAPES
During the last twenty years the construction field in Brazil has evolved significantly in response to its market growing and competitiveness. However this evolving path has faced many obstacles such as cultural barriers and the lack of efforts to achieve quality at the Brazilian construction site. As one of the causes of this facts the lack of integration between construction and the designing process generates waste, pathologies, work redone and improvised changes originated by incompatible projects which were taken by incapacitated personnel at an inconvenient moment. At the same time, the great amount of information generated on the designing or construction phases is lost due to the lack of an effective coordination of these activities. From this scenario Souza (2001), has developed two management methods in her doctorate thesis named Preparation for the Execution of Buildings (known as PEO) and the Pro-active Coordination (known as CPA), these methods are based on the application of the processes adopted by the French construction industry on Brazilian construction sites. These methodologies aim to establish the integration of the project phases by a set of actions and activities implemented by a system of meetings where the main objective is to discuss the projects and the planning of the construction site seeking to obtain a better quality and better outcome on the productive process. These methodologies aim to bring expressive improvements on the productivity, as well as on the lowering of waste, on the settlement of goals, on planning actions in accordance with all the agents involved and mainly on the reduction of costs allied to higher quality standards. Thus is an objective of this research to implement the Preparation on the Execution of Buildings (PEO) seeking to understand the management of the designing process and its interface with the construction site. The methodology applied on the development of the analysis is classified as qualitative and it will be carried by the practical application of the research and the evaluation of its results. Thus, the study was divided into two stages, one of them intended for a pilot study of PEO in Company A, and the other to the implementation of PEO on the company B. This way, the method was developed from a system meetings entitled structured in three different stages: the release of PEO; the development of PEO and the completion of the intensive phase of PEO, which were performed over a period from two to three months. The data analysis was structured upon five main aspects which were evaluated during the implementation of the method on the studied companies. These aspects were: the actions taken during the PEO phase, the development of the actions and the participation of the agents; the internal structure of the companies analyzed; The management and design coordination and the contract form of the contractors, architects and engineers. The results obtained demonstrated the PEO method's effectiveness and viability while a booster on the improvement of project management. Therefore, it can be concluded that the PEO is feasible to be applied in building construction companies, since this method can contribute to the integration of the design phases and construction, as well as to the improvement of the communication between the agents involved in the building construction field.
Nos últimos 20 anos, o setor da construção civil no Brasil evoluiu significativamente em resposta ao crescimento da competitividade no mercado. Entretanto, nesse processo de evolução ainda têm sido encontradas barreiras culturais e organizacionais, e, sobretudo, dificuldades nos esforços à qualidade nos canteiros de obras brasileiros. Aliada a este quadro, a falta de integração entre as atividades de construir e projetar provoca uma série de desperdícios, patologias, retrabalhos e alterações improvisadas decorrentes de projetos não compatibilizados, ora por ausência de detalhes nos projetos, ora por decisões tomadas por pessoas não capacitadas em momentos inadequados. A partir dessa realidade, Souza (2001) desenvolveu dois métodos de gestão nomeados Preparação da Execução de Obras (PEO) e Coordenação Pró-Ativa (CPA) em sua tese de doutoramento, por meio da transposição desses métodos adotados na gestão da interface projeto-execução de obras na França para a realidade dos canteiros de obras brasileiros. Esses métodos visam à integração das etapas de projeto e obra a partir de um conjunto de ações e atividades realizadas por meio de reuniões sistematizadas voltadas à discussão do projeto, ao planejamento e à organização do futuro canteiro de obras, a fim de obter melhor qualidade e desempenho no processo produtivo. Dessa forma, este trabalho tem como objetivo geral implementar o método da preparação da execução de obras (PEO) a fim de avaliar a interface entre a gestão do processo de projeto e a execução do canteiro de obras. A metodologia adotada para o desenvolvimento deste trabalho é classificada como qualitativa, a qual foi realizada por meio de uma pesquisa-ação, e dividida em duas etapas diferentes, sendo uma destinada ao estudo piloto da PEO na empresa A, e a outra à implementação da PEO na empresa B. Deste modo, a aplicação do método foi desenvolvida a partir de um sistema de reuniões em três fases intituladas: lançamento da PEO; desenvolvimento da PEO e finalização da fase intensiva de PEO, as quais foram realizadas em um período entre dois e três meses. A análise de dados foi estruturada a partir de cinco aspectos principais, os quais foram avaliados durante a aplicação do método nas empresas estudadas, sendo eles: quanto às ações desenvolvidas na fase de PEO, quanto ao desenvolvimento das reuniões e a participação dos agentes; quanto à estrutura organizacional e departamental das empresas; quanto à gestão e a coordenação de projetos; e quanto ao formato de contratação dos projetistas e subempreiteiros. Os resultados obtidos com a realização deste trabalho comprovaram a eficácia do método da PEO e a sua viabilidade enquanto potencializador na melhoria da gestão da interface projeto-execução de obras. Portanto, pode-se concluir que a PEO é viável de ser aplicada em empresas de construção e incorporação de edifícios, uma vez que este método pode contribuir para a integração das etapas de projeto e execução, bem como na melhoria da comunicação e na interação entre os agentes envolvidos na produção de edifícios.
APA, Harvard, Vancouver, ISO, and other styles
30

Gouveia, Rúben Alexandre dos Santos. "Fiscalização de obra de média dimensão por empresa certificada." Master's thesis, Universidade de Aveiro, 2017. http://hdl.handle.net/10773/21947.

Full text
Abstract:
Mestrado em Engenharia Civil
O presente relatório de estágio advém da conclusão da formação em Engenharia Civil e propõe-se a descrever o estágio curricular como opção contribuindo para a aplicação e consolidação dos conhecimentos teóricos adquiridos. Este relatório baseia-se na experiência desenvolvida na coordenação e fiscalização da empreitada de construção da Unidade de Armazenamento e Logística, em Vagos. Descreve e caracteriza as funções exercidas pela equipa de fiscalização na empreitada como o supervisionamento da execução da obra, o controlo da qualidade, do planeamento, dos custos, do ambiente e da segurança, higiene e saúde no trabalho. Avaliando os parâmetros de controlo da empreitada conclui-se que o planeamento foi o mais difícil de gerir, atrasando a obra cerca de um mês contratualmente, devido a atrasos inerentes ao empreiteiro geral e ao desgaste das negociações dos trabalhos a mais e a menos. Nas soluções construtivas utilizadas, foram detetadas diversas patologias pela equipa de fiscalização durante o acompanhamento da execução dos trabalhos e adotadas várias medidas de resolução demonstrando a importância da fiscalização numa obra desta dimensão. Apresentam-se também, em anexo, vários modelos dos documentos utilizados pela fiscalização nesta empreitada com o intuito de proporcionar uma maior perceção do trabalho desenvolvido.
This internship report comes from the conclusion of the Civil Engineering training and proposes to describe the curricular internship as an option, contributing to the application and consolidation of the theoretical knowledge acquired. This report is based on the experience of coordinating and supervising the construction of a Warehousing and Logistics Unit in Vagos. It describes and characterizes the functions carried out by the supervision team in the works, such as supervising the execution of the work, quality control, planning, costs, environment and health, safety and hygiene at work. Evaluating the control parameters of the design, it was concluded that planning was the most difficult to manage, delaying the work by about a month contractually, due to delays inherent to the general contractor and the wear and tear of the negotiations of the extra works. In the constructive solutions used, several pathologies were detected by the supervision team during the monitoring of the execution of the work and several resolution measures were adopted, concluding and demonstrating the importance of supervision in a construction of this size. Also presented, in annex, several models of the documents used by the supervision in the construction of this design with the intention of providing a better perception of the work developed.
APA, Harvard, Vancouver, ISO, and other styles
31

Silva, Filipa Soares. "Projeto educativo: participação dos educadores de infância num agrupamento." Master's thesis, Universidade de Aveiro, 2014. http://hdl.handle.net/10773/14360.

Full text
Abstract:
Mestrado em Ciências da Educação - Administração e Políticas Educativas
O presente trabalho teve como objetivo estudar e compreender o projeto educativo e a participação dos educadores de infância na sua construção. Após uma análise exaustiva de obras referentes ao tema podemos dizer que o projeto educativo é um documento imposto pela política vigente e que deverá ser um vértice importante em toda a dinâmica escolar de um agrupamento e de uma escola. Abordamos uma temática complexa, “A hipocrisia”. Em todas as instituições, e com o objectivo comum de homogeneizar comportamentos e atitudes, a direção da instituição tende a bloquear determinadas ações dos seus funcionários. No agrupamento de escolas em estudo foi visível esta dinâmica no receio das respostas das educadoras e nas respostas padronizadas que fomos obtendo. Foram efetuadas entrevistas a nove educadoras de infância e a uma Coordenadora do Agrupamento. A análise das entrevistas revela respostas contraditórias e que poderão originar alguns questionamentos sobre a real importância do projeto educativo e a sua utilização por parte das educadoras. No decorrer das entrevistas algumas das educadoras recusaram gravar com medo de represálias, apesar de terem sido informadas sobre a confidencialidade de todo o processo. Foi ainda notório que algumas respostas foram dadas de forma “obrigatória” pois politicamente eram as mais corretas. No final deste percurso podemos concluir que o projeto educativo não é compreendido corretamente e é visto como um documento obrigatório e não como ferramenta de apoio ao ensino. Os educadores de infância, têm tido cada vez um papel mais ativo na elaboração do projeto educativo. Este trabalho vem reforçar a investigação em Portugal que mostra a construção e disponibilização de documentos orientadores da vida das escolas apenas para dar cumprimento a exigências de ordem legal. Ainda estamos longe da sua instrumentalização ao serviço de propósitos pedagógicos e didáticos da ação concreta dos educadores.
This piece of research analyses the involvement of early childhood educators in the creation of school educational projects. After a thorough examination of reference works on the subject we can say that the educational project is an imposed document by the current policy and should be an important vertex throughout the school dynamics of a school group and a school. We approach a complicated subject – hypocrisy. In all institutions, and with the common goal to standardize behavior and attitudes, the direction of the institution tends to block certain actions of its employees. In the school cluster under study, was visible this dynamic in the fear of the answers of the educators and in the standard answers given by them. Interviews were made to nine early childhood educators and to one Coordinator of Schools Clusters. The data analysis reveals contradictory answers and that may lead to some questions about the real importance of the educational project and its use by educators. During the interviews some of the educators refused to record the interviews with fear of reprisals despite having been alerted to the confidentiality regime. Was also noticeable that some answers were “forced” just because were more ethically. At the end of this journey we can conclude that the educational project is not understood properly and is seen as a mandatory document and not as a support tool to teaching. Early childhood educators, have become increasingly more active in the development of the educational project. This work reinforces research in Portugal, showing the construction and delivery of guiding documents in the school life merely to fulfill the requirements of legal nature. We still far from its application to the service of teaching and didactic purposes of concrete action of educators.
APA, Harvard, Vancouver, ISO, and other styles
32

Costa, Sara Filipa Vital Sousa. "O desvio de custos e de tempos de execução nas obras públicas em Portugal." Master's thesis, Instituto Superior de Economia e Gestão, 2012. http://hdl.handle.net/10400.5/10339.

Full text
Abstract:
Mestrado em Ciências Empresariais
O objetivo do trabalho consistiu em analisar os desvios financeiros e temporais das obras públicas, em Portugal. O período de análise compreende os anos de 1999 a 2011, num horizonte temporal que ultrapassa uma década. Para a recolha dos dados quantitativos foram analisados relatórios do Tribunal de Contas e da Inspeção-Geral de Finanças. A amostra consistiu em 164 projetos com dados financeiros e 60 com dados de execução temporal. A pertinência do estudo prende-se com o facto de existirem poucos estudos internacionais e nenhum estudo sobre a realidade portuguesa relativamente à ineficiência do Sector Público em projetos de obras públicas e com a possibilidade de este ser comparado com outras formas de procurement. As principais conclusões do estudo permitem apontar que os projetos de obras púbicas têm os seus custos subestimados em 32% e que o seu tempo de execução corresponde ao dobro do tempo previsto. Embora não se podendo afirmar com total certeza, por não se ter realizado um estudo assente em métodos econométricos, é possível apontar uma correlação entre os anos de eleição (1999, 2002, 2005 e 2009) e o aumento dos custos, não se verificando neste caso grandes desvios temporais. Uma importante limitação do estudo é a amostra ser reduzida, e potencialmente tendenciosa, pois parte significativa do estudo tem por base a análise dos relatórios do Tribunal de Contas.
The aim of this study was to analyze the financial and temporal deviations of public works in Portugal. The period of analysis covers the years of 1999 to 2011, a time horizon that goes beyond a decade. For the collection of quantitative data we analyzed reports from the Court of Auditors and the General Inspectorate of Finances. The sample consisted of 164 projects with financial data and 60 with time performance data. The relevance of the study relates to the fact that there are few international studies and no study on the actual Portuguese reality regarding the inefficiency of the public sector in public works projects and the possibility of this being compared with other forms of procurement. The main conclusions of the study may point out that the public works projects have had their costs underestimated by 32% and that its execution time equals to twice of the allotted time. Although it cannot be stated with total certainty, for not having been conducted a study based on econometric methods, it is possible to identify a correlation between election years (1999, 2002, 2005 and 2009) and rising costs, despite large temporal deviations not being observed in this case. An important limitation of this study is the reduced sample size, and potentially biased, because a significant part of the study is based on the analysis of the reports of the Court of Auditors.
APA, Harvard, Vancouver, ISO, and other styles
33

Macedo, Luis. "Planeamento agregado de projetos." Dissertação, 2013. http://hdl.handle.net/10216/74035.

Full text
APA, Harvard, Vancouver, ISO, and other styles
34

Macedo, Luis Carlos da Silva. "Planeamento agregado de projetos." Dissertação, 2013. https://repositorio-aberto.up.pt/handle/10216/68710.

Full text
APA, Harvard, Vancouver, ISO, and other styles
35

Macedo, Luis Carlos da Silva. "Planeamento agregado de projetos." Master's thesis, 2013. https://repositorio-aberto.up.pt/handle/10216/68710.

Full text
APA, Harvard, Vancouver, ISO, and other styles
36

Pereira, José Cláudio da Silva. "Coordenação de projetos em edifícios de alvenaria estrutural." Master's thesis, 2012. http://hdl.handle.net/10400.13/563.

Full text
Abstract:
A engenharia estrutural em Portugal está em parte circunscrita às soluções em betão armado e às estruturas metálicas, facto que se deve ao domínio das técnicas construtivas associadas a essas soluções e à aceitação que têm perante a comunidade em geral. Nessa perspetiva, desenvolveu-se o presente estudo, com o intuito de apresentar uma alternativa igualmente adequada, que, quando bem planeada desde a conceção, pode permitir uma redução significativa dos custos. Ao longo do presente estudo procura-se discutir as situações em que a alvenaria estrutural pode ser adotada e como desenvolver os trabalhos de coordenação de projeto de modo a preparar uma execução de obra rentável e com qualidade. Nesse sentido, numa fase inicial do documento apresenta-se a história da alvenaria estrutural e a forma como esta evoluiu ao longo do tempo e, posteriormente, discute-se o estado atual da alvenaria estrutural em Portugal. Dado o interesse que este tema poderá ter para os mercados da construção nacional e, particularmente regional, entendeu-se necessário o contacto direto com a obra, tendo sido realizada uma visita a França com o propósito de observar, no terreno, as técnicas construtivas que lhe estão associadas. Adicionalmente, tirou-se partido de informação recolhida em anterior deslocação ao Brasil, sendo que, os dois países referidos apresentam uma sólida tradição de utilização da alvenaria estrutural na edificação. Posteriormente aborda-se o conceito de projeto, de modo a introduzir o tema da coordenação de projetos em edifícios de alvenaria estrutural. Sendo a fase de coordenação essencial para o sucesso do projeto e para o aumento da produtividade e da rentabilidade do sistema, foi dada particular relevância às várias especialidades que compõem um projeto, o modo como se deve processar e tratar a informação a transmitir entre os responsáveis por cada um desses projetos, e os cuidados a ter na sua compatibilização. Como forma de agilizar e melhorar o processo de compatibilização, é proposto um conjunto de checklists, com os principais itens que devem ser sujeitos a análise por parte dos projetistas envolvidos.
Universidade da Madeira
APA, Harvard, Vancouver, ISO, and other styles
37

Nóbrega, Maria Isabel Fernandes. "Planeamento inteligente em gestão de projetos." Master's thesis, 2016. http://hdl.handle.net/10400.13/1559.

Full text
Abstract:
The decision to opt for a dissertation in the area of Project Management, emerged from the desire to develop my knowledge in this area, gaining fundamental tools that will no doubt be an asset to my career. The aim of this thesis is to present both the research carried out on the use of artificial intelligence in planning and scheduling for project management, as well as to report the experience lived during the internship. The opportunity to undertake an internship, at the same time as I worked on my thesis, emerged from an interview performed with the goal of acquiring some advice and suggestions from an experienced professional in the position of project manager and it allowed me to increase my practical knowledge in the area. Since the internship I undertook is inserted in the project management area, it allowed me to put into practice some of the skills acquired during the research for the thesis. This thesis starts with the report of my internship, since it can be viewed as an introduction to project management and only afterwards do I present the results of the investigation I conducted on Artificial Intelligence Planning and Scheduling. I started by documenting the important concepts and definitions, followed by the results of my research completed with examples of existing systems. To conclude spoke of the projects for which I contributed during my internship and I finished with the results of my work during the internship attached in the end of the document.
A decisão de optar por uma dissertação na área de Gestão de Projetos, surgiu da vontade de aprofundar o meu conhecimento nessa área, ganhando mais ferramentas que serão sem dúvida uma mais-valia para a minha carreira profissional. A minha tese pretende apresentar tanto a investigação desenvolvida sobre o uso de inteligência artificial em planeamento e scheduling para gestão de projetos, assim como relatar a experiência vivida durante a realização do estágio. A oportunidade de realizar um estágio ao mesmo tempo que trabalhava na minha tese, surgiu de uma entrevista realizada com o intuito de obter a opinião de um profissional experiente no cargo de gestor de projetos e permitiu-me aprofundar o meu conhecimento prático na área. Uma vez que o estágio que realizei está inserido na área de gestão de projetos, este, permitiu-me por em prática algumas das competências adquiridas durante a investigação para a tese. A dissertação inicia-se pelo relato do estágio que realizei, uma vez que este pode ser visto como uma introdução ao tema de gestão de projetos. Seguem-se os resultados da investigação que realizei no tema de Planeamento e Scheduling de Inteligência Artificial, completo com alguns exemplos de sistemas já existentes. Para concluir falo dos projetos e das tarefas com as quais contribui durante o estágio e anexei no final do documento, alguns exemplos das tarefas que realizei.
APA, Harvard, Vancouver, ISO, and other styles
38

Mariano, Sílvio José Pinto Simões. "Sistemas de decisão óptima em coordenação hidrotérmica para planeamento operacional." Doctoral thesis, 2000. http://hdl.handle.net/10400.6/611.

Full text
Abstract:
A tese incide sobre o problema de afectação óptima de unidades e sobre os aspectos algorítmicos da sua solução, evoluindo no novo contexto da reestruturação do sector eléctrico. Para sistemas de energia eléctrica reais, o problema de afectação óptima de unidades assume grande dimensão e complexidade, que impossibilitam a sua resolução de forma directa, sendo aqui abordado recorrendo à relaxação Lagrangeana. A utilização da relaxação Lagrangeana permite resolver este problema de forma indirecta, exibindo contudo algumas dificuldades na obtenção de uma solução óptima e fazível é aqui conduzida de forma original uma análise ilustrada que evidencia quer as dificuldades deste problema ser abordado de forma directa, quer as limitações algorítmicas na obtenção da sua solução óptima utilizando relaxação Lagrangeana. Neste seguimento, é proposto um novo algoritmo que permite encontrar de forma automática a solução do problema relaxado. Evoluindo no novo contexto da reestruturação do sector eléctrico, aponta-se a estreita similaridade entre a interpretação económica destas técnicas de optimização e o mercado de energia eléctrica desregulado. Apresenta-se uma análise para diferentes cenários de mercado (regulado, desregulado e coexistência de ambos), verificando os seus comportamentos e reflectindo sobre a sua bondade. Por último, procurou-se satisfazer as exigências de optimização da exploração, no novo contexto da reestruturação do sector eléctrico, de novas empresas produtoras de energia eléctrica problema de optimização de uma central hidroeléctrica inserida num mercado desregulado.
APA, Harvard, Vancouver, ISO, and other styles
39

Marques, Ana Raquel Araújo. "Estudo de coordenação modular em projetos de reciclagem de contentores." Master's thesis, 2011. http://hdl.handle.net/10400.6/2226.

Full text
Abstract:
A elaboração desta tese tem como objetivo o estudo da coordenação modular a partir de unidades de contentores marítimos, a análise da sua viabilidade técnica e económica, bem como a sua reutilização e posterior conversão num espaço arquitetónico. Numa abordagem inicial do tema, o estudo será desenvolvido com a caraterização das diversas tipologias de contentores existentes, da sua dimensão e disponibilidades ou seja na identificação de como se pode dispor destas unidades para fins construtivos. Em seguida, um estudo de modulação será realizado tendo em conta as teorias que o governam. Para finalmente se expor as propostas de coordenação modular possíveis nos vários arranjos a fim de obter um conjunto arquitetónico de unidades que satisfaçam as exigências atuais de habitabilidade. Espera-se que este estudo sirva exactamente como um caso-estudo destinado a contribuir para a viabilização da reciclagem de unidades modulares, contribuição esta que indiretamente se relaciona com a preservação de recursos naturais com a proteção ambiental possibilitando vantagens económicas substanciais.
This thesis aims to study the modular coordination of shipping containers as modular units, the analysis of technical and economic feasibility, and its reuse and subsequent conversion into an architectural space. As an initial approach to the subject, the study will be developed with the characterization of different types of existing containers, its size and availability, to identify the possibilities of disposal to these units for construction purposes. Then, a study of modulation will be made taking into account its theories. Finally it will be exposed the different proposals of modular coordination and the possible arrangements in order to obtain an architectural composition of units that meet the current requirements for habitability. It’s expected that this study serves exactly like a case study to contribute to the viability of recycling modular units, contributing indirectly to natural resources preservation and environmental protection providing substantial economic benefits.
APA, Harvard, Vancouver, ISO, and other styles
40

Soares, Camila Jahn. "Gestão de projetos de formação e consultoria : potencialidades da metodologia de planeamento de projetos por objetivos na contextualização de projetos de formação." Master's thesis, 2013. http://hdl.handle.net/10400.14/16926.

Full text
Abstract:
Este trabalho visa analisar a eficácia da Metodologia de Planeamento de Projetos por Objetivos na customização de intervenções formativas à medida das necessidades das empresas. O mesmo realizou-se a partir do estudo de caso único cuja unidade de análise diz respeito a um projeto inserido no programa Formação PME gerido parcialmente pela CH Business Consulting. Com uma abordagem de cariz qualitativo, o caso foi explorado através da observação participante da investigadora aquando do cumprimento de um estágio curricular, juntamente com a realização de entrevistas aos atores envolvidos na execução desta metodologia no terreno. As conclusões apresentadas são fruto da articulação dos dados empíricos com o enquadramento teórico e assentam no modelo de análise criado exclusivamente para este fim. O principal resultado apurado indicou as limitações da MPPO no contexto estudado e permitiu uma análise crítica deste método com a identificação de um conjunto de fatores que corroboram esta realidade: (1) exigências temporais e de custos para a execução da metodologia; (2) situação económico-financeira das empresas; (3) motivação das organizações para participar do projeto; (4) elevado grau de exigência da metodologia que requer preparação por parte dos executantes; (5) limitações da MPPO devido às formalidades e exigências da AEP quanto aos procedimentos e o financiamento do projeto. Por fim, foi realizada uma síntese conclusiva do estudo e indicadas as principais limitações verificadas na investigação como àquelas inerentes ao próprio estudo de caso único; a falta de disponibilidade das empresas para análise do impacto da metodologia num contexto organizacional e a restrição da amostra. As mesmas deram origem à proposta de futuras linhas de investigação.
This report aims to examine the effectiveness of the Objectives-oriented Project Planning in the customization of training interventions tailored to company´s needs. The study was held from a single case study and has analyzed a project inserted in the PME training program, partially managed by CH Business Consulting. With an approach of a qualitative nature, the case was explored through the researcher´s participant observation during a traineeship, interviewing actors nvolved in the implementation of this methodology in the field. The findings presented are the result of the empirical data with the theoretical framework and it is based on the analysis model created exclusively for this purpose. The main result obtained indicated the limitations of the MPPO in the context studied and allowed a critical analysis of this method that has identified a set of factors that support this fact: (1) temporal requirements and costs for implementing the methodology, (2) the economic-financial situation of the companies, (3) the motivation of organizations to participate in this project, (4) the high demands of the methodology that requires preparation on the part of the consultants, (5) MPPO limitations due to AEP formalities and requirements on procedures and the project financing. Finally, concluding summary of the study was made indicating the main limitations of this investigation as those inherent in the single case study; the lack of companies´ willingness to analyze the impact of the methodology in an organizational context and the restriction of the sample. The same led to the proposal of researching lines.
APA, Harvard, Vancouver, ISO, and other styles
41

Poças, Ana Rita Fernandes. "Planeamento e controlo de projetos de construção com recurso ao BIM." Master's thesis, 2015. http://hdl.handle.net/1822/40606.

Full text
Abstract:
Dissertação de mestrado integrado em Engenharia Civil
Atualmente, o Building Information Modeling (BIM) é reconhecido como uma metodologia inovadora que pretende modernizar a indústria da arquitetura, engenharia e construção (AEC). O conceito geral do BIM visa proporcionar uma metodologia de elaboração de projetos holística, integrando uma série de tecnologias, políticas e processos colaborativos de apoio à gestão de projetos de construção. Através de um modelo digital é possível construir e gerir virtualmente o projeto durante todo o seu ciclo de vida. A adoção destas metodologias, por oposição às abordagens tradicionais de gestão de projetos, pode justificar-se pelo facto de os métodos tradicionais apresentarem, ainda hoje, muitas dificuldades e problemas relacionados com a falta de comunicação entre os vários intervenientes, com a baixa produtividade nos seus processos, entre outros. No entanto, a adoção do BIM não se verifica de forma generalizada. Alguns estudos realizados em diferentes países revelam que são poucos os profissionais do setor que adotaram ferramentas BIM e, desses profissionais, a grande maioria apenas as utiliza como ferramentas de desenho, aproveitando as suas funções de representação em 3 dimensões. Vários autores defendem, ainda, que só é possível usufruir da totalidade dos benefícios inerentes à utilização das ferramentas BIM quando estas são aplicadas a todo o ciclo de vida do projeto Desta forma, é de grande interesse o estudo das funcionalidades desta tecnologia no setor empresarial e como as suas funcionalidades e potencialidades poderão interagir com outros processos organizacionais tradicionais. Assim, o estudo desta dissertação centra-se na metodologia BIM aplicada ao planeamento e controlo de projetos de construção, através de um caso de estudo. O objetivo principal passa por contribuir para o desenvolvimento de processos mais eficientes no que diz respeito ao planeamento construtivo (BIM 4D) e à estimativa de custos (BIM 5D), utilizando metodologias BIM. Outro objetivo desta dissertação centra-se na análise da interoperabilidade de softwares BIM, ou seja, na verificação da viabilidade de exportação de dados dos modelos produzidos entre as ferramentas BIM.
The Building Information Modeling (BIM) is currently known as an innovative solution to modernize the architecture, engineering and construction industry (AEC). This concept provides an elaboration of the holistic design methodology, integrating a set of policies, technologies and collaborative processes that enable support to the management of the construction project and access to its data through a digital model, allowing to build and manage virtually the project through all its life cycle. The justification for the adoption of these more efficient methods, as opposed to traditional processes, relates to the fact that conventional processes, today, present many difficulties and problems associated with lack of communication between actors, low productivity in their processes, among others. However, the adoption of BIM does not occur in a general way. Studies in different countries reveals that only a minority of technicians of the sector experienced already BIM tools and, among these, the vast majority use them only as a drawing tool, taking advantage of their representative functions in 3 dimensions. Additionally, several authors argue that it’s only possible to take advantage of all the benefits inherent of using BIM tools when they are applied to the entire project life cycle. Thus, it is of great interest to study the features of this technology in the business sector and how its features and capabilities may interact with other traditional organizational processes. Thus, the study of this thesis focuses on the BIM methodology applied to the planning and control of construction projects, through a case study. The main objective becomes to contribute to the development of more efficient processes as regards the constructive planning (BIM 4D) and the estimated costs (BIM 5D) using BIM methodologies. Another objective of this dissertation focuses on reviewing the interoperability of BIM software, i.e., the verification of the data export viability of models produced between the BIM tools.
APA, Harvard, Vancouver, ISO, and other styles
42

Correia, Henrique Daniel Martins. "Planeamento de Rotas no Transporte de Alimentos em Projetos de Solidariedade Social." Master's thesis, 2019. https://hdl.handle.net/10216/121803.

Full text
Abstract:
O desperdício alimentar é um dos principais flagelos da Humanidade no séc. XXI.Estima-se que atualmente os portugueses desperdiçam 1 milhão de toneladas de alimentos por ano, traduzindo-se numa média de 132 kg de alimentos desperdiçados anualmente por cada pessoa.De forma a combater o desperdício alimentar, existem várias associações e movimentos que têm como foco o combate ao número de refeições confecionadas que não são aproveitadas.Além desta vertente, movimentos como o "Zero Desperdício" têm como alvo o combate ao desaproveitamento de géneros alimentares próximos do prazo de validade, contribuindo assim para a recuperação de uma vasta gama de produtos.No entanto, o reaproveitamento de certos produtos alimentares por parte de uma instituição de solidariedade social pode não compensar do ponto de vista económico ou ambiental, tornando-se mais vantajoso o reencaminhamento da doação para outra instituição.Nesta perspetiva, esta dissertação tem como meta principal investigar e trabalhar o conceito de "Distância Útil de Recuperação", que permitirá averiguar a utilidade da recuperação de alimentos, atendendo a múltiplos critérios.Foi então desenvolvido um Sistema de Apoio à Decisão, que após realizar a divisão dos doadores existentes por setores, poderá analisar as condições de um potencial novo doador. Caso este doador se verifique como útil será enquadrado numa das rotas previamente definidas.Importa também realçar que os bens doados jamais serão descartados. No caso de não se confirmar a utilidade desses bens para a instituição em causa, os mesmos serão reencaminhados para outras instituições beneficiárias.
APA, Harvard, Vancouver, ISO, and other styles
43

Bezerra, Marta Daniela Ramalho. "O planeamento e desenvolvimento de projetos sustentáveis : o caso da Terraprojectos Açores." Master's thesis, 2019. http://hdl.handle.net/10400.3/5260.

Full text
Abstract:
Mestrado (Relatório de Estágio), Ciências Económicas e Empresariais, 6 novembro de 2019, Universidade dos Açores.
O presente relatório é o resultado final do estágio curricular realizado no âmbito do mestrado em Ciências Económicas e Empresariais da Universidade dos Açores, que decorreu de 1 de outubro de 2018 a 30 de junho de 2019, na Terraprojectos Açores – Consultoria Agroalimentar, Lda. A atividade da empresa centra-se na prestação de serviços de consultoria. Neste relatório, apresentam-se as atividades desenvolvidas ao longo do período de estágio, tendo em consideração os conceitos adquiridos ao longo do percurso académico, na licenciatura em Gestão e no mestrado em Ciências Económicas e Empresariais, com especialização em Finanças e Contabilidade. Numa fase inicial, é efetuada a caracterização da empresa e das suas atividades, seguindo-se um breve estudo dos sistemas de incentivos existentes nos Açores. Posteriormente, descrevem-se as atividades realizadas ao longo do estágio, bem como desenvolve-se uma análise crítica às mesmas. O presente relatório é finalizado com uma interligação entre as atividades desenvolvidas e os conhecimentos adquiridos na licenciatura e no mestrado.
ABSTRACT: This report is the final result of the curricular internship for the Masters degree in Economics and Business Sciences of the University of the Azores, which ran from October 1st 2018 until June 30th 2019 at Terraprojectos Açores – Consultoria Agroalimentar, Lda. The main activity of this institution is the provision of consulting services. This report shows the activities developed during the internship, taking into account the theoretical concepts learned during the undergraduate degree in Management and master degree in Economics and Business Sciences, with specialization in Finance and Accounting. Firstly, I provide a caracterization of the firm and its activities, followed by a brief study of the Incentive Systems existing in the Azores. Subsequently, the activities carried out during the internship are described, as well as a critical analysis of the host institution. Finally, the activities developed are related to the skills acquired at the university.
APA, Harvard, Vancouver, ISO, and other styles
44

Monteiro, Andreia Alves Forte de Oliveira. "O planeamento de experiências no aperfeiçoamento de metaheuristicas." Master's thesis, 2013. http://hdl.handle.net/10400.2/2931.

Full text
Abstract:
Dissertação de Mestrado em Estatística, Matemática e Computação apresentada à Universidade Aberta
Os problemas de otimização combinatória têm, nas últimas décadas despertado um grande interesse por parte dos investigadores, quer pela sua aplicação prática, quer pela sua dificuldade. A área do ajuste dos parâmetros duma metaheurística tem crescido bastante, com um número cada vez maior de publicações. O facto da maioria dos problemas clássicos já terem sido resolvidos com as metaheurísticas existentes direciona a comunidade científica da área a trabalhar para que os modelos e técnicas existentes gerem cada vez melhores resultados. No 1º Capítulo é feita uma introdução ao Planeamento de Experiências e Metaheurísticas e explicada a motivação para a abordagem deste tema. No Capítulo 2 realiza-se uma apresentação dos Planos Fatoriais de base dois, importantes na definição dos parâmetros estatisticamente significativos e no Capítulo 3 dos Planos Fatoriais Fracionados que são essenciais quando o número de parâmetros aumenta. O Capítulo 4 tem como objetivo fazer uma breve caraterização das técnicas de Metodologia de Superfície de Resposta importantes na definição posterior das funções de desirability, utilizadas na resolução de problemas de otimização com múltiplas respostas. No Capítulo 5 define-se alguns conceitos básicos sobre o ajuste de parâmetros de metaheurísticas, realiza-se uma revisão de literatura e são apresentados quatro exemplos de metodologias adotadas. O Capítulo 6 é reservado para a apresentação de uma proposta de metodologia de ajuste dos parâmetros de metaheurísticas que faz uso das funções desirability e é apresentada uma aplicação dessa metodologia. No Capítulo 7 são feitas algumas considerações finais e registadas perspetivas futuras de trabalho.
In last years researchers have been increased their interest in the combinatorial optimization problems, due to their practical implementation and to its difficulty. The area of fine-tuning parameters of a metaheuristic has grown, with a growing number of publications. The fact that most of the classic problems have already been solved with the existing metaheuristics directs the research community to work on improving the existing models and techniques, so that they generate increasingly better results. The Chapter 1 is an introduction to the Design of experiments and metaheuristics and is explained the motivation for tackling this issue. In Chapter 2 is made a presentation of the Factorial Designs base 2 important in the definition of witch parameters are statistically significant and in Chapter 3 Fractional Factorial Design base 2, essential when the number of parameters increases. Chapter 4 aims to make a brief characterization of the techniques of Response Surface Methodology, important in the later definition of desirability functions, used in solving optimization problems with multiple responses. In Chapter 5 are defined out some basics about fine tuning parameters of metaheuristics, is carried out a literature review and are presented four examples of methodologies adopted. Chapter 6 is reserved for the presentation of a proposed methodology for setting the parameters of metaheuristics which makes use of desirability functions, and presents an application of this methodology. In chapter 7 some concluding remarks are made and recorded future work prospects.
APA, Harvard, Vancouver, ISO, and other styles
45

Salgado, Pedro Miguel Lopes. "Planeamento e controlo de projetos em ambiente colaborativo com recurso a ferramentas BIM." Master's thesis, 2016. http://hdl.handle.net/1822/40367.

Full text
Abstract:
Dissertação de mestrado integrado em Engenharia Civil
O setor da indústria da arquitetura, engenharia e construção (AEC) tem vindo a perder produtividade em relação aos outros setores da economia. Aliado ao fato do setor ter sido gravemente afetado pela crise económica na Europa, e de ainda ter uma importância considerável na economia dos Países Europeus. Estes fatores levam a uma busca por métodos e inovações por parte das empresas da indústria AEC, que lhes permita aumentar a produtividade e consequentemente serem mais competitivas. Assim a adoção de metodologias BIM assume-se como um grande impulsionador na busca de um novo impulso para o setor. Neste trabalho procurou-se demonstrar que apesar de recentes, os processos e metodologias BIM podem colmatar lacunas existentes no setor, mais particularmente na aplicação no planeamento de projetos de construção. Assim foi feita uma revisão bibliográfica a conceitos, métodos e processos utilizados tradicionalmente no planeamento de projetos na indústria AEC. Relativamente ao BIM foram estudados problemas como a interoperabilidade, novos formatos como o BCF. Dentro do estudo do BIM focou-se naturalmente o BIM 4D, estando diretamente ligado com o caso de estudo desta dissertação. Com o desenvolvimento de um caso de estudo, aplicado a um edifício com características de construção repetitiva, pretende-se demonstrar que a adoção de metodologias BIM apoiadas em softwares BIM 4D pode traduzir-se num aumento de produtividade, resultado de novos processos de trabalho. No seu desenvolvimento foram utilizados softwares BIM 4D como Autodesk® Navisworks, Synchro® Pro e Vico Office®. Foram ainda utilizados outros softwares como o Microsoft® Project como base de dados do cronograma de trabalhos do caso de estudo. No desenvolvimento do caso de estudo foram desenvolvidos fluxos de trabalho para criação de planeamentos 4D e a sua respetiva utilização e resposta a alterações usuais durante a execução dos projetos de construção.
The architecture, engineering and construction industry sector (AEC) has been losing productivity relative to other sectors of the economy. Coupled with the fact the sector have been severely affected by the economic crisis in Europe, and still have a considerable importance in the economy of European countries. These factors lead to a search for methods and innovations by the AEC industry companies, enabling them to increase productivity and hence be more competitive. Thus the adoption of BIM methodologies is assumed as a major driver in the search for a new impetus to the sector. In this work we tried to show that despite recent, the processes and methodologies BIM can bridge gaps in the sector, more particularly, in the application of the planning of construction projects. So it made a literature review the concepts, methods and processes traditionally used in project planning in the AEC industry. In relation to BIM, problems were studied as interoperability, new formats such as BCF. Within the BIM study, focused in BIM 4D, being directly connected with the case study of this thesis. With the development of a case study, applied to a building with repetitive construction characteristics, is intended to demonstrate that the adoption of BIM methodologies supported by BIM 4D software can lead to an increase in productivity as a result of new work processes. In its development BIM 4D software was used as Autodesk Navisworks, Synchro® Pro and Vico Office®. They were also used other software such as Microsoft Project as a database schedule of work of the case study. In developing the case study were developed workflows for creating schedules 4D and their respective use and response to usual changes during the execution of construction projects.
APA, Harvard, Vancouver, ISO, and other styles
46

Rosa, Maria Filipa Serra Ferreira. "Planeamento de uma solução de business intelligence na monitorização e controlo de projetos." Master's thesis, 2019. http://hdl.handle.net/10071/22209.

Full text
Abstract:
Dada a necessidade de controlar e acompanhar a performance dos projetos e a inerente necessidade de os gestores de projeto darem, superiormente, feedback acerca do estado do(s) seu(s) projeto(s), surge a presente investigação que tem como principal foco o planeamento de uma solução de Business Intelligence, como auxiliar na monitorização e controlo de projetos. Neste sentido, recorreu-se à técnica EVM (Earned Value Management), um método recomendado pelo PMBOK e eficaz no controlo e monitorização de projetos, para identificar os melhores indicadores e desenvolver a solução de Business Intelligence proposta para esta investigação. Com base nos questionários respondidos por gestores de projeto de diferentes setores e com experiências distintas, e com base na literatura sobre EVM e dashboards, foi possível formular uma solução de Business Intelligence que permite aos gestores de projeto avaliarem, através de um único ecrã, o estado do(s) seu(s) projeto(s). O dashboard desenvolvido diz respeito a um dashboard de tipologia tática, já que o seu propósito passa por medir o progresso e otimizar o processo, através de indicadores de ação e de resultado, de forma sumariada/detalhada com objetivo de favorecer a análise através de um Portal BI. A solução desenvolvida revela-se de grande importância e relevância para o dia-a-dia dos gestores de projeto que monitorizam e controlam periodicamente o(s) seu(s) projeto(s).
Due to the need to control and monitor the performance of projects and the inherent need for project managers to provide feedback on the status of their project(s), this study focuses mainly on the planning of a Business Intelligence solution, as an aid in the monitoring and control of projects. In this sense, the EVM (Earned Value Management) technique is used as a method recommended by PMBOK and it is effective in controlling and monitoring projects, to identify the best indicators and develop the proposed Business Intelligence solution for this research. Based on the questionnaires answered by project managers from different sectors and with different experiences, and based on the literature on EVM and dashboards, it was possible to formulate a Business Intelligence solution that allows project managers to evaluate, through a single screen, the status of their project(s). The developed dashboard refers to a dashboard of tactical typology, since its purpose is to measure progress and optimize the process through indicators of action and result, in summary / detailed form with the purpose of improving the analysis by a Portal BI. The solution achieved is of great importance and relevance to the day-to-day of the project managers who periodically monitor and control their project(s).
APA, Harvard, Vancouver, ISO, and other styles
47

Moreira, Maria Gabriela Fernandes dos Reis. "A coordenação do departamento curricular : concepções, lógicas e práticas." Master's thesis, 2008. http://hdl.handle.net/10400.2/6478.

Full text
Abstract:
Este estudo situa-se na área da gestão intermédia da organização escola e visa compreender o papel e a acção do Coordenador do Departamento Curricular, e, concomitantemente, as representações, lógicas e práticas da Coordenação do Departamento Curricular de modo a explicitar os contributos desta estrutura para a definição das políticas educativas de escola e para gestão intermédia da organização num agrupamento de escolas onde a autonomia é o grande desafio do momento. A investigação, de natureza qualitativa, foi realizada num Agrupamento de Escolas na região de Lisboa, e envolveu, essencialmente, a realização de entrevistas, que nos possibilitaram descrições dos modos de agir e de estar e as perspectivas dos entrevistados sobre o papel e o funcionamento desta estrutura de gestão intermédia. A opção por uma abordagem metodológica de índole qualitativa, de natureza descritiva e interpretativa, na forma de estudo de caso, constituiu, quanto a nós, a forma mais adequada de entrar em contacto directo com um determinado espaço organizacional no sentido de recolher e descrever as significações que os actores atribuem ao papel e acção do coordenador. Respondendo à problemática do nosso estudo, evidenciamos que esta estrutura organizacional e funcional da escola – a Coordenação do Departamento Curricular, exige: a) um actor – coordenador que reúna saber técnico, competência científica e autoridade profissional; b) uma liderança transformacional e pedagógica; c) uma valorização e “profissionalização”do cargo; d) dinâmicas de trabalho assentes na colaboração e na participação. Os resultados obtidos mostraram que: a) o profissional CDC exerce uma diversidade de papéis, funções e tarefas, cada vez mais complexas, sem formação específica para o cargo; b) As lógicas, igualitarista e paritária, explicam a quase inexistência da prática da supervisão e controlo pedagógico sobre as práticas docentes e a ausência de reconhecimento e valorização do cargo; c) A predominância da lógica disciplinar tem vindo a condicionar o trabalho nos departamentos e a dificultar o trabalho de articulação e gestão curricular, continuando a existir a prática do individualismo docente. Contudo, os elementos recolhidos sugerem algumas mudanças ao nível das formas de trabalho entre os professores. A prática de novas modalidades de trabalho pedagógico que passam pela prática colaborativa e colegial (trabalho em equipa, reflexão e avaliação conjunta de actividades, troca de experiências e materiais, cooperação entre professores, reflexão conjunta sobre práticas pedagógicas), procuram inverter a posição privilegiada ocupada pela prática do individualismo docente e são percepcionadas como um meio de crescimento profissional, de participação na organização e de qualidade do ensino. O actual momento político – educativo, com a publicação de novas leis relativas à carreira profissional dos professores e à gestão escolar, situam esta estrutura de gestão pedagógica intermédia e o seu coordenador numa encruzilhada entre o instituído e novos desafios que poderão contribuir para abrir fissuras nas lógicas e nas práticas instituídas.
This study deals with the intermediate management of school organization and aims to understand the role and action of the Curricula Department Coordinator as well as the logic and practical representations of the Curricula Department Coordination in order to express the contributions of this structure for the definition of school educational policies and the intermediate management of organization, in a Group of Schools where the autonomy is the great challenge of the moment. This qualitative research was carried out in a School near Lisbon and involved essentially the conduct of interviews with teachers, which made possible for us to analyze descriptions about the ways of behaving and acting as well as the interviewees’ views on the role and functioning of this intermediate management structure. The choice of a case study with a qualitative, descriptive and interpretative methodological approach was, in our point of view, the most suitable way to get in direct contact with a certain organizational environment in order to collect and describe the meanings that actors attach to the role and action of a coordinator. In answer to the issue focused in our study we proved that this organizational and functional structure of School - the Curricula Department Coordination requires: a) an actor-coordinator with technical knowledge, scientific competence and professional authority; b) a transformational and pedagogical leadership; c) a valuation and “professionalisation” of the post; d) work dynamics based on cooperation and participation. The achieved results show that: a) a CDC performs a diversity of more and more complex roles, functions and tasks without specific training for the post; b) the logics of equability and parity explain the almost non-existence of the practice of supervision and pedagogical control of the teaching practices and the absence of recognition and valuation of the post; c) the predominance of disciplinary logic has conditioned the work in the departments and made the curricula articulation and management more difficult, continuing to exist the practice of teaching individualism. However, the elements collected suggest some changes regarding the ways of working among teachers. The practice of new manners of pedagogical work that require the cooperative and collegiate practice (team work, combined reflection and evaluation of activities, exchange of experiences and materials, cooperation among teachers reflecting together about pedagogical practices), tries to reverse the privileged position of teaching individualism and is understood as a means of professional development, of participation in the organization and quality of teaching. The present political-educative moment with the recent legislation concerning the professional career of teachers and School management places this pedagogical intermediate management structure in the middle of what is established and the new challenges which can contribute to the opening of fissures in the established logics and practices.
APA, Harvard, Vancouver, ISO, and other styles
48

Crato, Luís Miguel Fanico Santana. "Fiscalização e coordenação de obras : Condomínio Zenith Towers, Luanda, Angola." Master's thesis, 2015. http://hdl.handle.net/10400.26/15420.

Full text
Abstract:
Relatório de estágio no âmbito do mestrado em Engenharia Civil - Área de especialização: Construção
Mestrado realizado no âmbito de uma parceria entre a EST Barreiro/IPS e a Universidade do Algarve
O presente relatório tem como objetivo apresentar o trabalho desenvolvido ao longo do estágio curricular realizado na empresa FICANGOL, Lda., a fim de possibilitar a atribuição do grau mestre do curso de Mestrado em Engenharia Civil, área de Construção, na Escola Superior de Tecnologia do Barreiro do Instituto Politécnico de Setúbal. O estágio teve a duração de 10 meses, tendo inicio a 31 de outubro de 2014 e terminado a 31 de Agosto do presente ano. O trabalho de estágio, foi orientado pela Professora Cristiana Gonilho Pereira, Professora Adjunto da Escola Superior de Tecnologia do Barreiro, e pelo Eng.º Renato José Sancho da Luz Ventosa, engenheiro civil e Diretor de Projeto na FICANGOL, Lda. O estagiário integrou a equipa de fiscalização de obra no condomínio ZENITH TOWERS, na cidade de Luanda, em Angola, desempenhando funções de engenheiro fiscal. A realização das atividades desenvolvidas ao longo do estágio possibilitaram adquirir e consolidar conhecimentos na área da fiscalização e coordenação de obras. Permitiram aplicar o conhecimento adquirido ao longo de todo o percurso académico, designadamente na participação e acompanhamento no controlo do planeamento de obra, no controlo de custos, no controlo de qualidade e na verificação da conformidade da obra com os projetos de execução.
With the aim of accomplish the Civil Engineering Master’s course on Construction, at Barreiro School of Technology, Polytechnic Institute of Setubal the main objective of this internship report is to present the knowledge and competences acquired and to describe the developed work along the curricular internship at FICANGOL, Lda. The internship lasted 10 months, began on the 31st October of 2014 and finished on the 31st August of 2015, and was supervised by Professor Cristiana Gonilho Pereira, Associate Professor at Barreiro School of Technology, and by Engineer Renato Jose Sancho da Luz Ventosa, Civil Engineer and project director at FICANGOL, Lda. The student/trainee developed work as an inspection engineer and was integrated on the work inspection team at ZENITH TOWERS condominium, Luanda, Angola. The development of several activities during the internship, allowed competences acquirement on the work’s inspection and coordination areas. Moreover, it allowed to put in practice knowledge acquired along the whole academic pathway, especially by taking part and following the works control and planning, costs control, quality control and in the work conformity verification along with the execution projects.
APA, Harvard, Vancouver, ISO, and other styles
49

Pimenta, Luís Márcio Sousa. "Coordenação das MEP na implementação de modelos BIM." Master's thesis, 2015. http://hdl.handle.net/1822/40523.

Full text
Abstract:
Dissertação de mestrado integrado em Engenharia Civil
A crescente competitividade no setor da Indústria AEC (Arquitetura, Engenharia e Construção) levou, ao longo dos últimos anos, á necessidade das empresas se modernizarem e adotarem métodos e processos que permitam considerar antecipadamente todas as questões envolvidas no ciclo de vida de um edifício, pois esta modernização é de extrema importância para o sucesso dos empreendimentos e progresso deste setor (AEC). As inconsistências nos projetos geram um impacto negativo no decorrer das várias fases de planeamento e construção, como é o caso de Retrabalhos e Improdutividade, do qual advêm derrapagens orçamentais, gastos adicionais com correções e reparações, além de incumprimentos nos prazos de construção. A separação conceitual entre as atividades de projeto e execução ao longo das últimas décadas obriga à necessidade de compatibilização de todos os projetos de especialidades de uma construção, pois é a única forma de integrar todas as especialidades de uma obra, de forma a obter-se um ajuste perfeito entre eles. A utilização de sistemas BIM no processo construtivo aumenta em muito a produtividade, pois os conflitos físicos entre os elementos do modelo são facilmente detetados com verificações aos modelos virtuais e resolvidos em tempo útil, uma vez que são resolvidos ainda em fase de projeto, através da compatibilização de projetos, e se resolvem erros e conflitos entre as várias especialidades. Esta dissertação foi dividida em duas etapas distintas. A primeira consistiu em analisar regulamentos, manuais de boas práticas, casos de estudo e outra informação considerada relevante para o desenvolvimento do trabalho. A segunda foi a análise de um modelo BIM de um edifício hospitalar, em que se procedeu a uma verificação do respetivo modelo para identificar conflitos e posteriormente classificá-los e apresentar soluções de correção. Como conclusão do trabalho foi desenvolvida uma proposta de Guia de boas práticas de modelação e Coordenação de sistemas MEP em modelos BIM.
The growing competitiveness in the AEC Industry (Architecture, Engineering and Construction) sector has, over the last few years, made it necessary that companies modernize and adopt methods which permit anticipating all the questions which may evolve in the lifespan of a building because this modernization is of extreme importance to the success of the enterprise and to the progress of the AEC sector. Project inconsistencies result in a negative impact during the course of the various phases of planning and construction, things like rework and unproductiveness, from which stem budget overruns, extra costing with unnecessary corrections and the failure to meet deadlines. The conceptual separation between project and execution over the last couple of decades has meant the necessity that all project technical specialties become compatible, this is the only way that improved efficiency in their interaction can be achieved. The use of BIM systems in the constructive process amplifies productivity, any physical conflict between constructive elements is easily detected in the virtual model because of the project compatibility between the different technical parties which eases detection and correction of mistakes early on in the design process. This dissertation is divided into two distinct phases. The first consists in the analysis of regulations, manuals of best practice, case studies and all other information deemed relevant to this study. The second phase is the analysis of a BIM project model for a hospital where I proceeded to study the respective model to identify conflicts, classify them and give a solution. As a conclusion to this dissertation a proposal for a Good practices guide for Modeling and Coordination of MEP systems in BIM models was developed.
APA, Harvard, Vancouver, ISO, and other styles
50

Loureiro, Nuno Filipe Pedrosa. "Utilização do Simulated Anealling na resolução de problemas no planeamento da produção." Master's thesis, 2014. http://hdl.handle.net/10316/39053.

Full text
Abstract:
Relatório de estágio do Mestrado em Engenharia e Gestão Industrial apresentado à Faculdade de Ciências e Tecnologia da Universidade de Coimbra.
O objetivo deste trabalho é testar a utilização da meta-heurística Simulated Annealing na resolução de problemas comuns ao planeamento da produção. São desenvolvidos algoritmos de Simulated Annealing adaptados aos problemas concretos em estudo, o sequenciamento em máquina única e a afetação de tarefas em máquinas paralelas, de forma a obter resultados que possam ser utilizados para uma análise comparativa com valores de referência já conhecidos para estes problemas. Por fim são tiradas conclusões relativas ao desempenho deste método na obtenção de soluções que possam ser consideradas “boas”.
The main objective of this work is to test the use of meta-heuristic Simulated Annealing in solving common production planning problems. Simulated Annealing algorithms adapted to the specific problems under study, the single machine scheduling and the allocation of tasks to parallel machines, are developed in order to obtain results which can be used for a comparative analysis with reference values known for these problems. Finally are taken conclusions about the performance of this method in obtaining solutions that can be considered "good".
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!

To the bibliography