Academic literature on the topic 'Critical Path Method (CPM)'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Critical Path Method (CPM).'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Journal articles on the topic "Critical Path Method (CPM)"

1

Purwantoro, Almuntofa, Attie Wawey Lagi To’unni, and Subrata Aditama K. A. Uda. "TIME CONTROL AND RESCHEDULING USING METHOD CPM (CRITICAL PATH METHOD)." Jurnal Civil Engineering Study 4, no. 01 (2024): 19–29. http://dx.doi.org/10.34001/ces.v4i01.801.

Full text
Abstract:
In some development projects, finishing the work inside a restricted time is normal. This can never again be kept away from after the utilization of labor with is presently not equally. CPM (Critical Path Method) is a critical path the that intends to decide project arranging and time estimates that are deterministic/positive. Poin of investigation utilizing this method is to decide the time and cost of the undertaking and figure out what activities are remembered for the fundamental activities. Project arranging helps show the relationship of every development to various activities and normal
APA, Harvard, Vancouver, ISO, and other styles
2

Hein Soe, Paing, and Thein Min Htike. "Critical path analysis programming method without network diagram." MATEC Web of Conferences 192 (2018): 01027. http://dx.doi.org/10.1051/matecconf/201819201027.

Full text
Abstract:
Project scheduling is an important task in project management which monitors the project duration, resource utilization and affects the benefit of project for all kinds of project such as construction, IT, renewable energy, product design and manufacturing etc. Among many methods for project management, critical path method (CPM) is one of the better-known planning and control techniques in project scheduling. In this study, CPM-based computerized program was developed together with modeling of step by step calculations of parameters of interest such as earliest starts and finishes, slack and
APA, Harvard, Vancouver, ISO, and other styles
3

Husnul Khotimah, Indah, Moh Sholahuddin, Nova Nevila Rodhi, and Andi Tjandra. "Analisis Pengendalian Waktu Proyek Menggunakan Metode Critical Path Method (CPM)." Jurnal Teknik Sipil 9, no. 2 (2024): 60–69. http://dx.doi.org/10.56071/deteksi.v9i2.951.

Full text
Abstract:
Pada pelaksanaan pekerjaan proyek tidak jarang sering dijumpai proyek yang mengalami ketidak sesuaian dengan yang direncanakan. Masalah ini disebabkan oleh kurangnya pengendalian terhadap waktu, biaya, dan mutu. Pada proyek Rehabilitasi Jalan Dander – Bubulan akan dilakukan pelebaran jalan pada titik STA 0+000 – 1+430. Namun adanya permasalahan pada proyek tersebut, mengakibatkan proyek mengalami perubahan waktu dengan penambahan waktu 30 hari kalender. Tujuan yang ingin dicapai dari penulisan ini adalah untuk mengetahui nilai optimasi waktu proyek dan untuk mengetahui selisih waktu antara ren
APA, Harvard, Vancouver, ISO, and other styles
4

Rio, Wahyu Yusuf, and Eti Herawati. "Penerapan Critical Path Method di Perumahan Gunung Empat Balikpapan." Jurnal Teknik Sipil MACCA 7, no. 3 (2022): 206–13. http://dx.doi.org/10.33096/jtsm.v7i3.593.

Full text
Abstract:
Penjadwalan waktu adalah masalah penting yang mempengaruhi apakah proyek konstruksi tersebut berhasil atau tidak. Menerapkan manajemen proyek dan pelaksanaan proyek yang efektif akan menurunkan atau dapat mengurangi kemungkinan proyek mengalami penundaan. Tujuan dari penelitian ini adalah menggunakan metode Critical Path Method (CPM) untuk menemukan durasi ideal dan aktivitas jalur kritis. Teknik penjadwalan yang disebut CPM, digunakan untuk menyelesaikan permasalahan ini. Berdasarkan hasil penelitian, dapat disimpulkan pekerjaan yang termasuk dalam jalur kritis adalah A-E-F-G-J-K-L-T-U-Y-Z-AB
APA, Harvard, Vancouver, ISO, and other styles
5

Shurrab, Mohammed, and Ghaleb Abbasi. "Buffer Sizing Methods to Compare Critical Chain Project Management with Critical Path." International Journal of Information Technology Project Management 7, no. 3 (2016): 74–87. http://dx.doi.org/10.4018/ijitpm.2016070105.

Full text
Abstract:
Critical Chain Project Management (CCPM) provided a tangible progress to the Project Management Body of Knowledge. The critical chain project management (CCPM) differs from the traditional Critical Path Method (CPM) which includes never changing resource dependencies. CCPM improves the project plan by aggregating uncertainty into buffers at the end of activity paths. In this research, one hundred twenty random projects were generated and analyzed using Microsoft Project software according to the traditional CPM and the CCPM once using the sum of squares (SSQ) method and another using the cut &
APA, Harvard, Vancouver, ISO, and other styles
6

Fitria, Lulu Mari, Mutiasari Kurnia Devi, Muhammad Sani Roychansyah, Yori Herwangi, and Siti Nurjanah. "Identifikasi Perilaku Perjalanan Melalui Metode Critical Path Method (CPM)." TATALOKA 22, no. 3 (2020): 453–62. http://dx.doi.org/10.14710/tataloka.22.3.453-462.

Full text
Abstract:
Mobilization in urban areas has increased every year along with the population growth and urban's development. Travel behaviors of the population in urban areas can be classified based on their travel characteristics. The identification of communities' travel behavior of Yogyakarta is based on the origin - destination and length of trip based on age characteristics. It will effects the travel patterns in the urban environment through spatial mapping. The method used in this research is critical path method. Critical Path Method (CPM) is used to determine the optimum path taken by the community
APA, Harvard, Vancouver, ISO, and other styles
7

Hartawan, Ade Sholeh, Budi Witjaksana, and Esti Wulandari. "TIME ANALYSIS WITH CRITICAL PATH METHOD." INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY ENGINEERING AND INFORMATION SYSTEM (IJATEIS) 3, no. 3 (2024): 370–84. https://doi.org/10.55047/ijateis.v3i3.1174.

Full text
Abstract:
Preparatory work in a construction project generally includes the fulfillment of work facilities, field investigations, and licensing, and is typically non-structural. The implementation of the Jakarta Sewerage Development Project Zone 1, Package 2: Construction of Sewers in Area 1-1, which is currently still in the preparatory work stage, is experiencing significant issues. Specifically, the project is facing a very complex licensing process, resulting in minimal work progress. This is due to the project planning phase not adequately considering the timeframe required for obtaining an impleme
APA, Harvard, Vancouver, ISO, and other styles
8

Kadang, Tandi, Puji Wahyu Hidayah, Kamelia Simarmata, Nathasya A. Putri, and Krisvinus Krisvinus. "Analysis of Consultant Building Project Management Using the CPM (Critical Path Method)." Journal of Business Management and Economic Development 2, no. 03 (2024): 1169–79. http://dx.doi.org/10.59653/jbmed.v2i03.891.

Full text
Abstract:
Critical Path Method (CPM) is a technique used to plan and organize project schedules by identifying the critical path which is one of the most contributing aspects to project success. This research aims to formulate the completion time of the consultant office building construction project using the CPM method. Data collection techniques in this study were carried out through various activities, including field observations, interviews, and literature studies. The results showed that the application of CPM in project planning and scheduling can determine the critical path and identify the sho
APA, Harvard, Vancouver, ISO, and other styles
9

Wang, Mei Yan, Lian Guan Shen, and Yi Min Deng. "Exploiting Critical Path Method for Evaluation of Conceptual Design." Advanced Materials Research 97-101 (March 2010): 4429–32. http://dx.doi.org/10.4028/www.scientific.net/amr.97-101.4429.

Full text
Abstract:
Conceptual design is a critical design phase during which initial design solutions, called design concepts, are developed. These design concepts must be evaluated to ensure they satisfy the specified design requirements and the most appropriate design concept must be selected. It is often difficult for the designer, especially for the novice, to make an appropriate design concept evaluation and selection. Existing work on design evaluation lacks an effective tool for evaluating the temporal performance of the design concepts. To address this problem, a Critical Path Method (CPM) from project m
APA, Harvard, Vancouver, ISO, and other styles
10

Ahmad, Hikmad Tullah, Safrizal, and Dewi Rosa Indah. "Analysis Project Management on Cv. Nbw. Id by Cpm Method (Critical Path Method)." Jurnal Sinar Manajemen 11, no. 1 (2024): 37–44. https://doi.org/10.56338/jsm.v11i1.5084.

Full text
Abstract:
Project implementation can be successful when existing resources are used effectively and efficiently. One attempt to use the critical path (CPM) method is a project scheduling method that uses project planning analysis and fixed tim e estimates for each activity. In other words, this method can help solve the scheduling problem by determining the timing of the longest production process schedules in the project so that the company can effectively and efficiently determine how long a project can be completed. Optimization must be done to restore the project duration to the actual schedule. The
APA, Harvard, Vancouver, ISO, and other styles
More sources

Dissertations / Theses on the topic "Critical Path Method (CPM)"

1

Montazeri, Behzad. "Comparing Critical Chain Project Managemenet with Critical Path Method: A Case Study." TopSCHOLAR®, 2017. http://digitalcommons.wku.edu/theses/1935.

Full text
Abstract:
Scheduling is a major task in project management. The current scheduling technique, Critical Path Method (CPM), has been widely applied for several decades, but a large number of projects fail to be completed on time and schedule delays occur in many projects. This raises question about the validity of the current project scheduling system. Critical Chain Project Management (CCPM), derived from Theory of Constraints, is a relatively new alternative approach toward scheduling projects. This study compared CCPM and CPM to determine which scheduling method delivers a shorter project duration and
APA, Harvard, Vancouver, ISO, and other styles
2

Kelleher, Andrew Hodgson. "An Investigation of the Expanding Role of the Critical Path Method by ENR'S Top 400 Contractors." Thesis, Virginia Tech, 2003. http://hdl.handle.net/10919/9889.

Full text
Abstract:
The Critical Path Method (CPM) is a widely used tool throughout the construction industry. Since its creation, the use and application of the Critical Path Method has grown tremendously. Up to date, three studies have been performed on how Engineering News Record's (ENR) Top 400 Contractor use CPM. The first study was performed by Edward Davis in 1974 and the second was performed by Amir Tavakoli and Roger Riachi in 1990. This paper is a summary of the third survey, which took place in 2003. The results from the three studies indicate that CPM use by the Top 400 Contractors is growing and the
APA, Harvard, Vancouver, ISO, and other styles
3

Alsaqqa, Obada. "Fuzzy Time-Delay Model in Fault-Tree Analysis for Critical Path Method." The Ohio State University, 2015. http://rave.ohiolink.edu/etdc/view?acc_num=osu1429772426.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Herout, Jan. "Tvorba softwarové podpory metody CCPM v prostředí MS Project." Master's thesis, Vysoká škola ekonomická v Praze, 2009. http://www.nusl.cz/ntk/nusl-19066.

Full text
Abstract:
Project management, to which the thesis "Development of software support for CCPM method in MS Project" aims, is a very important part of everyday life for most present companies. The project management has gone through rapid development, through the second half of last century, during which many new techniques and methods, for planning and managing projects, were developed. One of these methods was critical chain project management method (CCPM), developed by E. M. Goldratt in the mid 80th of last century. At the end of the 20th century the market began to be flooded by software applications
APA, Harvard, Vancouver, ISO, and other styles
5

Šatalíková, Bohumila. "Řízení projektů s pomocí MS Excel." Master's thesis, Vysoká škola ekonomická v Praze, 2010. http://www.nusl.cz/ntk/nusl-75582.

Full text
Abstract:
The thesis discusses the possibilities of project management and analysis and it is focused on solving project analysis using the network analysis. The text describes chosen used methods of analysis. This text together with other findings in the theoretical part is used in the solution of practice part. The aim of this thesis was to create a functional Microsoft Project-based add-in of Microsoft Excel to ensure planning and management of simple projects. This created add-in can manage the project, manage project resources, allocate these resources to individual project activities and carry out
APA, Harvard, Vancouver, ISO, and other styles
6

Turner, Lyle Robert. "Production structure models and applications within a Statistical Activity Cost Theory (SACT) Framework." Thesis, Queensland University of Technology, 2007. https://eprints.qut.edu.au/16310/1/Lyle_Turner_Thesis.pdf.

Full text
Abstract:
Statistical Activity Cost Theory (SACT) is an axiomatic and statistical theory of basic accounting measurement practice. The aim of the SACT analysis, among others, is to determine the statistical nature of both the physical production system of an accounting entity and its related costs, which can then be examined and applied to various decision-making problems. A central proposition of SACT is that the physical system of the entity, and the costs related to this system, are separate structures which can be modelled as such. To date, however, mini- mal progress has been made in describing
APA, Harvard, Vancouver, ISO, and other styles
7

Turner, Lyle Robert. "Production structure models and applications within a Statistical Activity Cost Theory (SACT) Framework." Queensland University of Technology, 2007. http://eprints.qut.edu.au/16310/.

Full text
Abstract:
Statistical Activity Cost Theory (SACT) is an axiomatic and statistical theory of basic accounting measurement practice. The aim of the SACT analysis, among others, is to determine the statistical nature of both the physical production system of an accounting entity and its related costs, which can then be examined and applied to various decision-making problems. A central proposition of SACT is that the physical system of the entity, and the costs related to this system, are separate structures which can be modelled as such. To date, however, mini- mal progress has been made in describing pr
APA, Harvard, Vancouver, ISO, and other styles
8

Matušů, Milan. "Využití nástrojů projektového managementu při tvorbě firemní identity." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2017. http://www.nusl.cz/ntk/nusl-318363.

Full text
Abstract:
This thesis is focused on the project management methods within planning project of creation visual identity with photographing the products and creation of the web graphic for customer. Except the planning of project the thesis also analyzes current situation and decides whether the project is suitable for realisation. Thesis also includes teoretical background required for understanding this issue. The result of this thesis can be used as a basis for realization of the project.
APA, Harvard, Vancouver, ISO, and other styles
9

Plotnick, Fredric Leigh Martin Joseph P. "RDM - relationship diagramming method /." Philadelphia, Pa. : Drexel University, 2008. http://hdl.handle.net/1860/2934.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Mann, Timothy Lee 1950. "Critical path tracing as a diagnostic evaluation method for sequential systems." Thesis, The University of Arizona, 1988. http://hdl.handle.net/10150/276675.

Full text
Abstract:
Diagnostic tests are designed to detect and isolate faults in sequential systems. The problem is to evaluate the effectiveness of the design. For stuck faults a diagnostic model can be used. A fault simulation strategy is presented for generating this model. First, definitions, for identifying critical inputs are derived. A definition is a statement of the conditions to sensitize an input. Then a fault free simulation is used to generate a critical value array. A critical path is traced through the sensitized inputs marked in the array using a critical value array tracing algorithm that is dev
APA, Harvard, Vancouver, ISO, and other styles
More sources

Books on the topic "Critical Path Method (CPM)"

1

L, Plotnick Fredric, ed. CPM in construction management. 7th ed. McGraw-Hill, 2010.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
2

O'Brien, James Jerome. CPM in construction management. 7th ed. McGraw-Hill, 2010.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
3

Rodgers, Robert B. CPM scheduling for construction contractors. Rodgers Construction Management Associates, 1985.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
4

Hutchings, Jonathan F. CPM construction scheduler's manual. McGraw Hill, 1996.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
5

O'Brien, James Jerome. CPM in construction management. 4th ed. McGraw-Hill, 1993.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
6

O'Brien, James Jerome. CPM in construction management. 6th ed. McGraw-Hill, 2005.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
7

O'Brien, James Jerome. CPM in construction management. 5th ed. McGraw-Hill, 1999.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
8

O'Brien, James Jerome. CPM in construction management. 7th ed. McGraw-Hill, 2010.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
9

Inc, Federal Publications, ed. CPM scheduling in program management & claims: Course manual. Federal Publications, 1986.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
10

East, E. William. The standard data exchange format for critical path method scheduling. US Army Corps of Engineers, Construction Engineering Research Laboratories, 1995.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
More sources

Book chapters on the topic "Critical Path Method (CPM)"

1

Nahler, Gerhard. "critical path method (CPM)." In Dictionary of Pharmaceutical Medicine. Springer Vienna, 2009. http://dx.doi.org/10.1007/978-3-211-89836-9_318.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Tan, Alexander, Isfenti Sadalia, and Rulianda Purnomo Wibowo. "The Efficiency of Project Planning in IT Service Provider Using Traditional Methods, and CPM." In Proceedings of the 19th International Symposium on Management (INSYMA 2022). Atlantis Press International BV, 2022. http://dx.doi.org/10.2991/978-94-6463-008-4_144.

Full text
Abstract:
AbstractThis research was conducted in an IT service provider that provides the installation of information systems for customers. Planned projects often did not meet their target set by both provider and customer. For example, an SAP project that was set to be completed in six months was delayed until two years by some problems in operational activities. So, the CPM methods were conducted to be used in this case to see the efficiency of meeting the target set previously. Generally, these methods are completed in steps such as identifying the scope and breaking it down into components activiti
APA, Harvard, Vancouver, ISO, and other styles
3

Tomaskova, Hana, Andrea Zvackova, Patrik Urbanik, and Dominik Palla. "Risk Management and Process Optimization in Industry 4.0: Integrating Sensors with Critical Path and FMEA." In Lecture Notes in Computer Science. Springer Nature Switzerland, 2025. https://doi.org/10.1007/978-3-031-87908-1_7.

Full text
Abstract:
Abstract In the era of Industry 4.0, there is a strong focus on automation, advanced smart technologies, and addressing emerging issues related to sustainability and efficient process management. This paper presents a new approach that integrates traditional risk analysis methods, such as Failure Mode and Effects Analysis (FMEA), with the Critical Path Method (CPM) and Business Process Model and Notation (BPMN). The contribution of this method is presented using a selected sample manufacturing process, namely pallet manufacturing. The goal is to show how sensors that monitor machine operation
APA, Harvard, Vancouver, ISO, and other styles
4

Parekh, Viraj, Karan Asnani, Yashraj Bhatt, and Rahul Mulchandani. "Comparison between Critical Path Method (CPM) and Last Planners System (LPS) for Planning and Scheduling METRO Rail Project of Ahmedabad." In Lecture Notes in Civil Engineering. Springer Singapore, 2019. http://dx.doi.org/10.1007/978-981-15-0802-8_81.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Badiru, Adedeji B. "Critical Path Method." In Project Management for the Oil and Gas Industry, 2nd ed. CRC Press, 2025. https://doi.org/10.1201/9781032647180-5.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Vanhoucke, Mario. "The Critical Path Method." In Project Management with Dynamic Scheduling. Springer Berlin Heidelberg, 2013. http://dx.doi.org/10.1007/978-3-642-40438-2_3.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Bansal, Vijay Kumar. "Critical Path Method – I." In Project Management. Routledge, 2023. http://dx.doi.org/10.1201/9781003428992-5.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Bansal, Vijay Kumar. "Critical Path Method – II." In Project Management. Routledge, 2023. http://dx.doi.org/10.1201/9781003428992-6.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Vanhoucke, Mario. "The Critical Path Method." In Project Management with Dynamic Scheduling. Springer Berlin Heidelberg, 2012. http://dx.doi.org/10.1007/978-3-642-25175-7_3.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Wisniewski, Mik, and Jonathan H. Klein. "The Simplex method." In Linear Programming/Critical Path Analysis. Macmillan Education UK, 2001. http://dx.doi.org/10.1007/978-1-4039-3769-8_3.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Conference papers on the topic "Critical Path Method (CPM)"

1

Qiao, Yichen, Weixuan Yang, Yanjiao Tan, and Lin Chen. "A Dynamic Scheduling Method Based on Critical Path Task Insertion." In 2025 International Conference on Electrical Drives, Power Electronics & Engineering (EDPEE). IEEE, 2025. https://doi.org/10.1109/edpee65754.2025.00224.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Deepika, S., S. Gomathi, S. Maheswaran, N. Indhumathi, G. Murugesan, and Prakash Duraisamy. "A Comparative Analysis for Optimal Project Completion Utilizing Critical Path Method and Precedence Diagram Method for Efficient Solar Power Plant Installation." In 2024 15th International Conference on Computing Communication and Networking Technologies (ICCCNT). IEEE, 2024. http://dx.doi.org/10.1109/icccnt61001.2024.10724572.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Yao, Jiarong, Chaopeng Tan, Hao Wu, Yumin Cao, and Keshuang Tang. "Critical Path Identification for Network Signal Coordination Control Using Connected Vehicle Data Based on Analytic Hierarchy Process Method." In 2024 18th International Conference on Control, Automation, Robotics and Vision (ICARCV). IEEE, 2024. https://doi.org/10.1109/icarcv63323.2024.10821709.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Naijit, Pasfon, and Anchalee Supithak. "The Integration of Critical Path Method and Multiple Skilled Workforce in the Repetitive Construction Project Management by Using Simulation." In 2024 9th International Conference on Business and Industrial Research (ICBIR). IEEE, 2024. https://doi.org/10.1109/icbir61386.2024.10875897.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Noviyarsi, M. Nursyaifi Yulius, and Eltira Mutiara. "Analysis of housing project scheduling using Critical Path Method (CPM)." In INTERNATIONAL CONFERENCE ON MECHANICAL MATERIALS AND RENEWABLE ENERGY (ICMMRE 2022). AIP Publishing, 2023. http://dx.doi.org/10.1063/5.0115177.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Shi, Jonathan Jingsheng. "Activity Based Construction (ABC) Simulation Modeling vs. Critical Path Method (CPM)." In Construction Congress VI. American Society of Civil Engineers, 2000. http://dx.doi.org/10.1061/40475(278)16.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Freire, José L. F., Ronaldo D. Vieira, Pablo M. Fontes, Adilson C. Benjamin, Luis S. Murillo C., and Antonio C. Miranda. "The Critical Path Method for Assessment of Pipelines With Metal Loss Defects." In 2012 9th International Pipeline Conference. American Society of Mechanical Engineers, 2012. http://dx.doi.org/10.1115/ipc2012-90320.

Full text
Abstract:
The Critical Path (CP) Method (CPM proposes a set of rules allowing the drawing of failure lines that represent adjacent areas positioned along selected circumferential and longitudinal directions of pipelines that contain colonies of corrosion defects. Failure pressures are calculated for each of those lines to determine the most critical one. This selected line is considered as the most probable path of rupture, and it corresponds to the minimum calculated internal pressure to take the pipeline to fracture. The proposed method was checked against twelve burst pressure tests performed on pipe
APA, Harvard, Vancouver, ISO, and other styles
8

"Optimal Pressure Vessel Project Schedule Planning with Critical Path Method (CPM) at PT. XYZ." In 2nd International Conference Eco-Innovation in Science, Engineering, and Technology. Galaxy Science, 2021. http://dx.doi.org/10.11594/nstp.2021.1436.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Finocchio Junior, Jose, and Marcelo Ramos Martins. "Offshore Platform Turn Around Using the Critical Chain Project Management Method (CCPM)." In ASME 2009 28th International Conference on Ocean, Offshore and Arctic Engineering. ASMEDC, 2009. http://dx.doi.org/10.1115/omae2009-79484.

Full text
Abstract:
The present study discusses the adequacy of the Critical Chain Project Management Method (CCPM) — also known as the Critical Chain Method — for scheduling projects involving shutdowns on oil platforms, as such projects involve decision-making processes under risk conditions. The CCPM is based on the Theory of Constraints and aims at providing more precise and more clearly focused control instruments than those traditionally used in the Critical Path Method (CPM). The CCPM also indicates the best moments to act and where and how the action should be directed. The hypothesis underlying the resea
APA, Harvard, Vancouver, ISO, and other styles
10

Khazanah, Rohilatul, and Sri Zuliarni. "Analysis Scheduling XYZ Project using Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) at PT. NOV Profab." In The International Conference on Applied Economics and Social Science. SCITEPRESS - Science and Technology Publications, 2021. http://dx.doi.org/10.5220/0010861200003255.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Reports on the topic "Critical Path Method (CPM)"

1

Lavelle, Francis M., Charles Goodhue, and Douglas Lyons. Critical path method assessment of community recovery. National Institute of Standards and Technology, 2020. http://dx.doi.org/10.6028/nist.gcr.20-023.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

East, E. W. The Standard Data Exchange Format for Critical Path Method Scheduling. Defense Technical Information Center, 1995. http://dx.doi.org/10.21236/ada303566.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Anderson, Earl B., and R. Stanton Hales. Critical path method applied to research project planning: Fire Economics Evaluation System (FEES). U.S. Department of Agriculture, Forest Service, Pacific Southwest Forest and Range Experiment Station, 1986. http://dx.doi.org/10.2737/psw-gtr-93.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

COLLAPSE RESISTANCE CALCULATION WITH DIFFERENT STIFFNESS CONNECTIONS BASED ON THE COMPONENT METHOD. The Hong Kong Institute of Steel Construction, 2023. http://dx.doi.org/10.18057/ijasc.2023.19.1.1.

Full text
Abstract:
The collapse performance of steel frames generally depends on their ability to resist local damage. However, this ability is decided by the connection behavior, which has not been determined methodically and reliably. Thus, developing a simplified connection model for predicting the structural collapse resistance is critical for preventing progressive collapse. In this study, component models were constructed with different stiffness connections, including the double web angle (DWA), top-seat with double web angle (TSDWA), and welded flange-bolted web (WUF) connections, according to the compon
APA, Harvard, Vancouver, ISO, and other styles
5

CALCULATION OF THE RESISTANCE WITH DIFFERENT STIFFNESS CONNECTIONS AGAINST PROGRESSIVE COLLAPSE BASED ON THE COMPONENT METHOD. The Hong Kong Institute of Steel Construction, 2022. http://dx.doi.org/10.18057/icass2020.p.108.

Full text
Abstract:
"The collapse performance of steel frames generally depends on their ability to resist local damage, however, this ability depends on the behaviour of beam-to-column connections that have not yet to be identified in a methodical and reliable manner. Thus, it is critical to develop a simplified joint model, which could predict the structural collapse resistance to prevent progressive collapse. In this study, component models with different stiffness connections, namely the double web angle (DWA) connection, top-seat with double web angle connection (TSDWA) and welded flange-bolted web connectio
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!