Academic literature on the topic 'Critical Path Method (CPM)'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Critical Path Method (CPM).'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Journal articles on the topic "Critical Path Method (CPM)"
Purwantoro, Almuntofa, Attie Wawey Lagi To’unni, and Subrata Aditama K. A. Uda. "TIME CONTROL AND RESCHEDULING USING METHOD CPM (CRITICAL PATH METHOD)." Jurnal Civil Engineering Study 4, no. 01 (2024): 19–29. http://dx.doi.org/10.34001/ces.v4i01.801.
Full textHein Soe, Paing, and Thein Min Htike. "Critical path analysis programming method without network diagram." MATEC Web of Conferences 192 (2018): 01027. http://dx.doi.org/10.1051/matecconf/201819201027.
Full textHusnul Khotimah, Indah, Moh Sholahuddin, Nova Nevila Rodhi, and Andi Tjandra. "Analisis Pengendalian Waktu Proyek Menggunakan Metode Critical Path Method (CPM)." Jurnal Teknik Sipil 9, no. 2 (2024): 60–69. http://dx.doi.org/10.56071/deteksi.v9i2.951.
Full textRio, Wahyu Yusuf, and Eti Herawati. "Penerapan Critical Path Method di Perumahan Gunung Empat Balikpapan." Jurnal Teknik Sipil MACCA 7, no. 3 (2022): 206–13. http://dx.doi.org/10.33096/jtsm.v7i3.593.
Full textShurrab, Mohammed, and Ghaleb Abbasi. "Buffer Sizing Methods to Compare Critical Chain Project Management with Critical Path." International Journal of Information Technology Project Management 7, no. 3 (2016): 74–87. http://dx.doi.org/10.4018/ijitpm.2016070105.
Full textFitria, Lulu Mari, Mutiasari Kurnia Devi, Muhammad Sani Roychansyah, Yori Herwangi, and Siti Nurjanah. "Identifikasi Perilaku Perjalanan Melalui Metode Critical Path Method (CPM)." TATALOKA 22, no. 3 (2020): 453–62. http://dx.doi.org/10.14710/tataloka.22.3.453-462.
Full textHartawan, Ade Sholeh, Budi Witjaksana, and Esti Wulandari. "TIME ANALYSIS WITH CRITICAL PATH METHOD." INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY ENGINEERING AND INFORMATION SYSTEM (IJATEIS) 3, no. 3 (2024): 370–84. https://doi.org/10.55047/ijateis.v3i3.1174.
Full textKadang, Tandi, Puji Wahyu Hidayah, Kamelia Simarmata, Nathasya A. Putri, and Krisvinus Krisvinus. "Analysis of Consultant Building Project Management Using the CPM (Critical Path Method)." Journal of Business Management and Economic Development 2, no. 03 (2024): 1169–79. http://dx.doi.org/10.59653/jbmed.v2i03.891.
Full textWang, Mei Yan, Lian Guan Shen, and Yi Min Deng. "Exploiting Critical Path Method for Evaluation of Conceptual Design." Advanced Materials Research 97-101 (March 2010): 4429–32. http://dx.doi.org/10.4028/www.scientific.net/amr.97-101.4429.
Full textAhmad, Hikmad Tullah, Safrizal, and Dewi Rosa Indah. "Analysis Project Management on Cv. Nbw. Id by Cpm Method (Critical Path Method)." Jurnal Sinar Manajemen 11, no. 1 (2024): 37–44. https://doi.org/10.56338/jsm.v11i1.5084.
Full textDissertations / Theses on the topic "Critical Path Method (CPM)"
Montazeri, Behzad. "Comparing Critical Chain Project Managemenet with Critical Path Method: A Case Study." TopSCHOLAR®, 2017. http://digitalcommons.wku.edu/theses/1935.
Full textKelleher, Andrew Hodgson. "An Investigation of the Expanding Role of the Critical Path Method by ENR'S Top 400 Contractors." Thesis, Virginia Tech, 2003. http://hdl.handle.net/10919/9889.
Full textAlsaqqa, Obada. "Fuzzy Time-Delay Model in Fault-Tree Analysis for Critical Path Method." The Ohio State University, 2015. http://rave.ohiolink.edu/etdc/view?acc_num=osu1429772426.
Full textHerout, Jan. "Tvorba softwarové podpory metody CCPM v prostředí MS Project." Master's thesis, Vysoká škola ekonomická v Praze, 2009. http://www.nusl.cz/ntk/nusl-19066.
Full textŠatalíková, Bohumila. "Řízení projektů s pomocí MS Excel." Master's thesis, Vysoká škola ekonomická v Praze, 2010. http://www.nusl.cz/ntk/nusl-75582.
Full textTurner, Lyle Robert. "Production structure models and applications within a Statistical Activity Cost Theory (SACT) Framework." Thesis, Queensland University of Technology, 2007. https://eprints.qut.edu.au/16310/1/Lyle_Turner_Thesis.pdf.
Full textTurner, Lyle Robert. "Production structure models and applications within a Statistical Activity Cost Theory (SACT) Framework." Queensland University of Technology, 2007. http://eprints.qut.edu.au/16310/.
Full textMatušů, Milan. "Využití nástrojů projektového managementu při tvorbě firemní identity." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2017. http://www.nusl.cz/ntk/nusl-318363.
Full textPlotnick, Fredric Leigh Martin Joseph P. "RDM - relationship diagramming method /." Philadelphia, Pa. : Drexel University, 2008. http://hdl.handle.net/1860/2934.
Full textMann, Timothy Lee 1950. "Critical path tracing as a diagnostic evaluation method for sequential systems." Thesis, The University of Arizona, 1988. http://hdl.handle.net/10150/276675.
Full textBooks on the topic "Critical Path Method (CPM)"
L, Plotnick Fredric, ed. CPM in construction management. 7th ed. McGraw-Hill, 2010.
Find full textRodgers, Robert B. CPM scheduling for construction contractors. Rodgers Construction Management Associates, 1985.
Find full textInc, Federal Publications, ed. CPM scheduling in program management & claims: Course manual. Federal Publications, 1986.
Find full textEast, E. William. The standard data exchange format for critical path method scheduling. US Army Corps of Engineers, Construction Engineering Research Laboratories, 1995.
Find full textBook chapters on the topic "Critical Path Method (CPM)"
Nahler, Gerhard. "critical path method (CPM)." In Dictionary of Pharmaceutical Medicine. Springer Vienna, 2009. http://dx.doi.org/10.1007/978-3-211-89836-9_318.
Full textTan, Alexander, Isfenti Sadalia, and Rulianda Purnomo Wibowo. "The Efficiency of Project Planning in IT Service Provider Using Traditional Methods, and CPM." In Proceedings of the 19th International Symposium on Management (INSYMA 2022). Atlantis Press International BV, 2022. http://dx.doi.org/10.2991/978-94-6463-008-4_144.
Full textTomaskova, Hana, Andrea Zvackova, Patrik Urbanik, and Dominik Palla. "Risk Management and Process Optimization in Industry 4.0: Integrating Sensors with Critical Path and FMEA." In Lecture Notes in Computer Science. Springer Nature Switzerland, 2025. https://doi.org/10.1007/978-3-031-87908-1_7.
Full textParekh, Viraj, Karan Asnani, Yashraj Bhatt, and Rahul Mulchandani. "Comparison between Critical Path Method (CPM) and Last Planners System (LPS) for Planning and Scheduling METRO Rail Project of Ahmedabad." In Lecture Notes in Civil Engineering. Springer Singapore, 2019. http://dx.doi.org/10.1007/978-981-15-0802-8_81.
Full textBadiru, Adedeji B. "Critical Path Method." In Project Management for the Oil and Gas Industry, 2nd ed. CRC Press, 2025. https://doi.org/10.1201/9781032647180-5.
Full textVanhoucke, Mario. "The Critical Path Method." In Project Management with Dynamic Scheduling. Springer Berlin Heidelberg, 2013. http://dx.doi.org/10.1007/978-3-642-40438-2_3.
Full textBansal, Vijay Kumar. "Critical Path Method – I." In Project Management. Routledge, 2023. http://dx.doi.org/10.1201/9781003428992-5.
Full textBansal, Vijay Kumar. "Critical Path Method – II." In Project Management. Routledge, 2023. http://dx.doi.org/10.1201/9781003428992-6.
Full textVanhoucke, Mario. "The Critical Path Method." In Project Management with Dynamic Scheduling. Springer Berlin Heidelberg, 2012. http://dx.doi.org/10.1007/978-3-642-25175-7_3.
Full textWisniewski, Mik, and Jonathan H. Klein. "The Simplex method." In Linear Programming/Critical Path Analysis. Macmillan Education UK, 2001. http://dx.doi.org/10.1007/978-1-4039-3769-8_3.
Full textConference papers on the topic "Critical Path Method (CPM)"
Qiao, Yichen, Weixuan Yang, Yanjiao Tan, and Lin Chen. "A Dynamic Scheduling Method Based on Critical Path Task Insertion." In 2025 International Conference on Electrical Drives, Power Electronics & Engineering (EDPEE). IEEE, 2025. https://doi.org/10.1109/edpee65754.2025.00224.
Full textDeepika, S., S. Gomathi, S. Maheswaran, N. Indhumathi, G. Murugesan, and Prakash Duraisamy. "A Comparative Analysis for Optimal Project Completion Utilizing Critical Path Method and Precedence Diagram Method for Efficient Solar Power Plant Installation." In 2024 15th International Conference on Computing Communication and Networking Technologies (ICCCNT). IEEE, 2024. http://dx.doi.org/10.1109/icccnt61001.2024.10724572.
Full textYao, Jiarong, Chaopeng Tan, Hao Wu, Yumin Cao, and Keshuang Tang. "Critical Path Identification for Network Signal Coordination Control Using Connected Vehicle Data Based on Analytic Hierarchy Process Method." In 2024 18th International Conference on Control, Automation, Robotics and Vision (ICARCV). IEEE, 2024. https://doi.org/10.1109/icarcv63323.2024.10821709.
Full textNaijit, Pasfon, and Anchalee Supithak. "The Integration of Critical Path Method and Multiple Skilled Workforce in the Repetitive Construction Project Management by Using Simulation." In 2024 9th International Conference on Business and Industrial Research (ICBIR). IEEE, 2024. https://doi.org/10.1109/icbir61386.2024.10875897.
Full textNoviyarsi, M. Nursyaifi Yulius, and Eltira Mutiara. "Analysis of housing project scheduling using Critical Path Method (CPM)." In INTERNATIONAL CONFERENCE ON MECHANICAL MATERIALS AND RENEWABLE ENERGY (ICMMRE 2022). AIP Publishing, 2023. http://dx.doi.org/10.1063/5.0115177.
Full textShi, Jonathan Jingsheng. "Activity Based Construction (ABC) Simulation Modeling vs. Critical Path Method (CPM)." In Construction Congress VI. American Society of Civil Engineers, 2000. http://dx.doi.org/10.1061/40475(278)16.
Full textFreire, José L. F., Ronaldo D. Vieira, Pablo M. Fontes, Adilson C. Benjamin, Luis S. Murillo C., and Antonio C. Miranda. "The Critical Path Method for Assessment of Pipelines With Metal Loss Defects." In 2012 9th International Pipeline Conference. American Society of Mechanical Engineers, 2012. http://dx.doi.org/10.1115/ipc2012-90320.
Full text"Optimal Pressure Vessel Project Schedule Planning with Critical Path Method (CPM) at PT. XYZ." In 2nd International Conference Eco-Innovation in Science, Engineering, and Technology. Galaxy Science, 2021. http://dx.doi.org/10.11594/nstp.2021.1436.
Full textFinocchio Junior, Jose, and Marcelo Ramos Martins. "Offshore Platform Turn Around Using the Critical Chain Project Management Method (CCPM)." In ASME 2009 28th International Conference on Ocean, Offshore and Arctic Engineering. ASMEDC, 2009. http://dx.doi.org/10.1115/omae2009-79484.
Full textKhazanah, Rohilatul, and Sri Zuliarni. "Analysis Scheduling XYZ Project using Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) at PT. NOV Profab." In The International Conference on Applied Economics and Social Science. SCITEPRESS - Science and Technology Publications, 2021. http://dx.doi.org/10.5220/0010861200003255.
Full textReports on the topic "Critical Path Method (CPM)"
Lavelle, Francis M., Charles Goodhue, and Douglas Lyons. Critical path method assessment of community recovery. National Institute of Standards and Technology, 2020. http://dx.doi.org/10.6028/nist.gcr.20-023.
Full textEast, E. W. The Standard Data Exchange Format for Critical Path Method Scheduling. Defense Technical Information Center, 1995. http://dx.doi.org/10.21236/ada303566.
Full textAnderson, Earl B., and R. Stanton Hales. Critical path method applied to research project planning: Fire Economics Evaluation System (FEES). U.S. Department of Agriculture, Forest Service, Pacific Southwest Forest and Range Experiment Station, 1986. http://dx.doi.org/10.2737/psw-gtr-93.
Full textCOLLAPSE RESISTANCE CALCULATION WITH DIFFERENT STIFFNESS CONNECTIONS BASED ON THE COMPONENT METHOD. The Hong Kong Institute of Steel Construction, 2023. http://dx.doi.org/10.18057/ijasc.2023.19.1.1.
Full textCALCULATION OF THE RESISTANCE WITH DIFFERENT STIFFNESS CONNECTIONS AGAINST PROGRESSIVE COLLAPSE BASED ON THE COMPONENT METHOD. The Hong Kong Institute of Steel Construction, 2022. http://dx.doi.org/10.18057/icass2020.p.108.
Full text