To see the other types of publications on this topic, follow the link: Critical Path Method (CPM).

Dissertations / Theses on the topic 'Critical Path Method (CPM)'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 37 dissertations / theses for your research on the topic 'Critical Path Method (CPM).'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Montazeri, Behzad. "Comparing Critical Chain Project Managemenet with Critical Path Method: A Case Study." TopSCHOLAR®, 2017. http://digitalcommons.wku.edu/theses/1935.

Full text
Abstract:
Scheduling is a major task in project management. The current scheduling technique, Critical Path Method (CPM), has been widely applied for several decades, but a large number of projects fail to be completed on time and schedule delays occur in many projects. This raises question about the validity of the current project scheduling system. Critical Chain Project Management (CCPM), derived from Theory of Constraints, is a relatively new alternative approach toward scheduling projects. This study compared CCPM and CPM to determine which scheduling method delivers a shorter project duration and
APA, Harvard, Vancouver, ISO, and other styles
2

Kelleher, Andrew Hodgson. "An Investigation of the Expanding Role of the Critical Path Method by ENR'S Top 400 Contractors." Thesis, Virginia Tech, 2003. http://hdl.handle.net/10919/9889.

Full text
Abstract:
The Critical Path Method (CPM) is a widely used tool throughout the construction industry. Since its creation, the use and application of the Critical Path Method has grown tremendously. Up to date, three studies have been performed on how Engineering News Record's (ENR) Top 400 Contractor use CPM. The first study was performed by Edward Davis in 1974 and the second was performed by Amir Tavakoli and Roger Riachi in 1990. This paper is a summary of the third survey, which took place in 2003. The results from the three studies indicate that CPM use by the Top 400 Contractors is growing and the
APA, Harvard, Vancouver, ISO, and other styles
3

Alsaqqa, Obada. "Fuzzy Time-Delay Model in Fault-Tree Analysis for Critical Path Method." The Ohio State University, 2015. http://rave.ohiolink.edu/etdc/view?acc_num=osu1429772426.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Herout, Jan. "Tvorba softwarové podpory metody CCPM v prostředí MS Project." Master's thesis, Vysoká škola ekonomická v Praze, 2009. http://www.nusl.cz/ntk/nusl-19066.

Full text
Abstract:
Project management, to which the thesis "Development of software support for CCPM method in MS Project" aims, is a very important part of everyday life for most present companies. The project management has gone through rapid development, through the second half of last century, during which many new techniques and methods, for planning and managing projects, were developed. One of these methods was critical chain project management method (CCPM), developed by E. M. Goldratt in the mid 80th of last century. At the end of the 20th century the market began to be flooded by software applications
APA, Harvard, Vancouver, ISO, and other styles
5

Šatalíková, Bohumila. "Řízení projektů s pomocí MS Excel." Master's thesis, Vysoká škola ekonomická v Praze, 2010. http://www.nusl.cz/ntk/nusl-75582.

Full text
Abstract:
The thesis discusses the possibilities of project management and analysis and it is focused on solving project analysis using the network analysis. The text describes chosen used methods of analysis. This text together with other findings in the theoretical part is used in the solution of practice part. The aim of this thesis was to create a functional Microsoft Project-based add-in of Microsoft Excel to ensure planning and management of simple projects. This created add-in can manage the project, manage project resources, allocate these resources to individual project activities and carry out
APA, Harvard, Vancouver, ISO, and other styles
6

Turner, Lyle Robert. "Production structure models and applications within a Statistical Activity Cost Theory (SACT) Framework." Thesis, Queensland University of Technology, 2007. https://eprints.qut.edu.au/16310/1/Lyle_Turner_Thesis.pdf.

Full text
Abstract:
Statistical Activity Cost Theory (SACT) is an axiomatic and statistical theory of basic accounting measurement practice. The aim of the SACT analysis, among others, is to determine the statistical nature of both the physical production system of an accounting entity and its related costs, which can then be examined and applied to various decision-making problems. A central proposition of SACT is that the physical system of the entity, and the costs related to this system, are separate structures which can be modelled as such. To date, however, mini- mal progress has been made in describing
APA, Harvard, Vancouver, ISO, and other styles
7

Turner, Lyle Robert. "Production structure models and applications within a Statistical Activity Cost Theory (SACT) Framework." Queensland University of Technology, 2007. http://eprints.qut.edu.au/16310/.

Full text
Abstract:
Statistical Activity Cost Theory (SACT) is an axiomatic and statistical theory of basic accounting measurement practice. The aim of the SACT analysis, among others, is to determine the statistical nature of both the physical production system of an accounting entity and its related costs, which can then be examined and applied to various decision-making problems. A central proposition of SACT is that the physical system of the entity, and the costs related to this system, are separate structures which can be modelled as such. To date, however, mini- mal progress has been made in describing pr
APA, Harvard, Vancouver, ISO, and other styles
8

Matušů, Milan. "Využití nástrojů projektového managementu při tvorbě firemní identity." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2017. http://www.nusl.cz/ntk/nusl-318363.

Full text
Abstract:
This thesis is focused on the project management methods within planning project of creation visual identity with photographing the products and creation of the web graphic for customer. Except the planning of project the thesis also analyzes current situation and decides whether the project is suitable for realisation. Thesis also includes teoretical background required for understanding this issue. The result of this thesis can be used as a basis for realization of the project.
APA, Harvard, Vancouver, ISO, and other styles
9

Plotnick, Fredric Leigh Martin Joseph P. "RDM - relationship diagramming method /." Philadelphia, Pa. : Drexel University, 2008. http://hdl.handle.net/1860/2934.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Mann, Timothy Lee 1950. "Critical path tracing as a diagnostic evaluation method for sequential systems." Thesis, The University of Arizona, 1988. http://hdl.handle.net/10150/276675.

Full text
Abstract:
Diagnostic tests are designed to detect and isolate faults in sequential systems. The problem is to evaluate the effectiveness of the design. For stuck faults a diagnostic model can be used. A fault simulation strategy is presented for generating this model. First, definitions, for identifying critical inputs are derived. A definition is a statement of the conditions to sensitize an input. Then a fault free simulation is used to generate a critical value array. A critical path is traced through the sensitized inputs marked in the array using a critical value array tracing algorithm that is dev
APA, Harvard, Vancouver, ISO, and other styles
11

Tomášek, Pavel. "Srovnání nástrojů projektového řízení." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2017. http://www.nusl.cz/ntk/nusl-318292.

Full text
Abstract:
Thesis deals with evaluation of possibilities and conditions for application of key project management methods. Particular parts involve description and delimitation of chosen project management. Traditional methods that are represented by CPM and PERT methods. Furthermore, the thesis is enriched on the basis facts of the Theory of Constraints, which led to the creation of a separate project management system based on the Critical Chain method. This part is followed by an analysis and comparison of these methods in the phase of planning, managing and controlling from a perspective of single pr
APA, Harvard, Vancouver, ISO, and other styles
12

Pereira, José Manuel Brandão. "A gestão de projectos." Master's thesis, Universidade de Évora, 2001. http://hdl.handle.net/10174/15100.

Full text
Abstract:
A dissertação é uma análise da doutrina publicada sobre gestão de projectos e destina-se a assistir qualquer empresa/organismo na definição da sua própria doutrina neste domínio. A caracterização de "gestão de projectos", mostra a diferença entre este tipo de gestão e a gestão convencional. Embora a organização dum projecto e o procedimento a utilizar dependam de diversos factores, essencialmente do tipo de projecto e da situação orgânica em que ele se desenvolve, é vantajoso que cada organismo defina a sua própria doutrina comum a todas as situações de gestão de projectos. Nesta ordem de idei
APA, Harvard, Vancouver, ISO, and other styles
13

Bezděkovská, Radka. "Optimalizace procesů v dostihovém sportu." Master's thesis, Vysoká škola ekonomická v Praze, 2008. http://www.nusl.cz/ntk/nusl-15775.

Full text
Abstract:
This thesis is concerned with the use of some optimization methods in harness racing. In the first part of the thesis, both critical path method and critical chain method of the project management are applied to horse racing projects. Then a comparison is made in order to choose a suitable method under various conditions. As a result, we can suggest improvements in horse racing organization. In order to determine optimal number of racing days, races and other aspects within a season, an optimization model is created in the second part of the thesis. Minimization of cost or maximization of numb
APA, Harvard, Vancouver, ISO, and other styles
14

Drápal, Dušan. "Návrh a realizace projektu pro vytvoření online marketingu Event teamu společnosti Unifer o.p.s." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2015. http://www.nusl.cz/ntk/nusl-225107.

Full text
Abstract:
This master’s thesis describes the use of project management for a design and implementation of the project to create web portal for event team of the company UNIFER o.p.s. The thesis descibes in detail the pre-project, project and post-project phase according to project management methods.
APA, Harvard, Vancouver, ISO, and other styles
15

Klaudíny, Michal. "Návrh projektu a aplikace metodiky projektového managementu v podniku." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2012. http://www.nusl.cz/ntk/nusl-223559.

Full text
Abstract:
The master's thesis considers a project proposal for improvement of hardware equipment in the company VURAL, a.s.. Project management methods and procedures defined by IPMA (International Project Management Association) are used in this thesis.
APA, Harvard, Vancouver, ISO, and other styles
16

Nascimento, Carlos Augusto Dornellas do. "Gerenciamento de prazos: uma revisão crítica das técnicas em uso em empreendimentos em regime EPC." Universidade de São Paulo, 2007. http://www.teses.usp.br/teses/disponiveis/3/3135/tde-27072007-152858/.

Full text
Abstract:
O segmento de Consultoria em Engenharia, ao lado das Universidades e Centros de Pesquisas, é um dos pilares do desenvolvimento científico-tecnológico do país e é considerado um dos responsáveis pela otimização de investimentos, redução dos prazos e dos custos de implantação de empreendimentos públicos e privados, industrial ou de infra-estrutura. Atualmente, esses empreendimentos vêm passando por modificações significativas, exigindo cada vez um melhor desempenho de seus contratados, tanto nos aspectos de qualidade, desempenho, prazo e custos, quanto nos aspectos associados aos riscos contratu
APA, Harvard, Vancouver, ISO, and other styles
17

Oliveira, Erneson Alves de. "Geração de fraturas autossimilares em meios desordenados: técnicas do caminho crítico e do caminho mínimo." reponame:Repositório Institucional da UFC, 2008. http://www.repositorio.ufc.br/handle/riufc/9657.

Full text
Abstract:
OLIVEIRA, Erneson Alves de. Geração de fraturas autossimilares em meios desordenados: técnicas do caminho crítico e do caminho mínimo. 2008. 54 f. Dissertação (Mestrado em Física) - Programa de Pós-Graduação em Física, Departamento de Física, Centro de Ciências, Universidade Federal do Ceará, Fortaleza, 2008.<br>Submitted by Edvander Pires (edvanderpires@gmail.com) on 2014-11-03T20:05:53Z No. of bitstreams: 1 2008_dis_eaoliveira.pdf: 13308297 bytes, checksum: 51bfea9dc79470d1077454f8be1b593a (MD5)<br>Approved for entry into archive by Edvander Pires(edvanderpires@gmail.com) on 2014-11-03T20:12
APA, Harvard, Vancouver, ISO, and other styles
18

Morais, Carlos Henrique Bittencourt. "Gerenciamento de ambientes multiprojetos pelo método da corrente crítica em empresas brasileiras: um estudo de multicasos." Universidade de São Paulo, 2011. http://www.teses.usp.br/teses/disponiveis/12/12139/tde-09022012-200309/.

Full text
Abstract:
A presente obra aborda a experiência recente de empresas brasileiras no gerenciamento continuado de ambientes multiprojetos pelo Método da Corrente Crítica, ou CCPM, Critical Chain Path Method, através de um estudo de casos múltiplos, conduzido frente às empresas EMBRAER e EMBRACO. O desenvolvimento do estudo bibliográfico permitiu pontuar as diferenças conceituais de gerenciamento de portfólios, gerenciamento de programas, gerenciamento de projetos e gerenciamento de ambientes multiprojetos, posicionar o CCPM dentro do rol de algoritmos de solução de ambientes multiprojetos e identificar as c
APA, Harvard, Vancouver, ISO, and other styles
19

Faísco, Maria Margarida da Silva. "Escalonamento de processos de recrutamento : um problema de otimização de tempo." Master's thesis, Instituto Superior de Economia e Gestão, 2020. http://hdl.handle.net/10400.5/20955.

Full text
Abstract:
Mestrado em Métodos Quantitativos para a Decisão Económica e Empresarial<br>Este trabalho de projeto proporciona uma alternativa ao processo de recrutamento de recursos humanos incorrido por diversas empresas nos dias de hoje. Numa primeira abordagem, é analisado o processo de recrutamento de recursos humanos da empresa com recurso a uma metodologia de Critical Path Method (CPM). Com a análise realizada, chega-se à conclusão que o processo de recrutamento da mesma é muito moroso e que os gerentes das diversas áreas funcionais passam bastante tempo envolvidos no mesmo, o que pode ter impacto
APA, Harvard, Vancouver, ISO, and other styles
20

Országh, Martin. "Aplikace moderních prvků v klasickém projektovém řízení." Master's thesis, Vysoká škola ekonomická v Praze, 2013. http://www.nusl.cz/ntk/nusl-199207.

Full text
Abstract:
This thesis deals with project management and with different ways in which can be cur-rently approached. Beside the conventional, classical approach based on processes, modern approaches based on the theory of constraints and agile principles are discussed. Based on analysis, the main objective of the thesis is firstly to find weaknesses in the classical project management and strong key elements of modern approaches and after that to make suggestions to enhance the classical approach with the selected strong elements of modern approaches.
APA, Harvard, Vancouver, ISO, and other styles
21

Braimah, Nuhu. "An investigation into the use of construction delay and disruption analysis methodologies." Thesis, University of Wolverhampton, 2008. http://hdl.handle.net/2436/38824.

Full text
Abstract:
Delay and disruption (DD) to contractors’ progress, often resulting in time and cost overruns, are a major source of claims and disputes in the construction industry. At the heart of the matter in dispute is often the question of the extent of each contracting party’s responsibility for the delayed project completion and extra cost incurred. Various methodologies have been developed over the years as aids to answering this question. Whilst much has been written about DD, there is limited information on the extent of use of these methodologies in practice. The research reported in this thesis w
APA, Harvard, Vancouver, ISO, and other styles
22

Oliveira, Erneson Alves de. "GeraÃÃo de fraturas auto-similares em meios desordenados: tÃcnicas do caminho crÃtico e do caminho mÃnimo." Universidade Federal do CearÃ, 2008. http://www.teses.ufc.br/tde_busca/arquivo.php?codArquivo=1938.

Full text
Abstract:
FundaÃÃo de Amparo à Pesquisa do Estado do CearÃ<br>CoordenaÃÃo de AperfeiÃoamento de NÃvel Superior<br>Conselho Nacional de Desenvolvimento CientÃfico e TecnolÃgico<br>Neste trabalho propomos dois modelos para a geraÃÃo de fraturas em substratos regulares. No primeiro modelo, empregamos iterativamente o conceito de caminho crÃtico para determinar sistematicamente o elemento de menor âcondutividadeâ da rede. Estes elementos sÃo entÃo identificados como âfalhasâ e removidos permanentemente da estrutura atà que uma fratura macroscÃpica destrua a conectividade global da rede. Uma vez detectada, e
APA, Harvard, Vancouver, ISO, and other styles
23

BRUNO, GIOVANNA. "QUANTUM OBSERVABLES OF OPEN-SHELL SYSTEMS. A THEORETICAL STUDY." Doctoral thesis, Università degli Studi di Milano, 2022. http://hdl.handle.net/2434/936434.

Full text
Abstract:
This PhD thesis reports original research results concerning the development of theoretical models and computational protocols for the quantification and analysis of two of the most important quantum observables of open-shell systems: the electron spin density and the phosphorescence energy gap. In the first part, a comprehensive theory of the electron spin density topology is proposed for the first time [1]. Several new notions (spin density critical points, molecular spin graphs, spin density basins, spin maxima and spin minima joining paths etc.) and descriptors (local and integral spin po
APA, Harvard, Vancouver, ISO, and other styles
24

Vojta, Lubomír. "Návrh na zavedení metodiky řízení projektu do firmy." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2015. http://www.nusl.cz/ntk/nusl-224988.

Full text
Abstract:
This diploma theses deals with the challenges of a project management in a particular construction company that handles projects on daily basis. I focused on the analysis of a particular project in this company, that has been successfully implemented. This analysis served as a starting point for the designing of the changes, as well as a devising a tool that simplifies the set up of the changes into practice. Selected problem was solved by comparing the project management methodology in the project with the project management practices officially proposed in the literature. Tool design was car
APA, Harvard, Vancouver, ISO, and other styles
25

Raudenská, Lenka. "Metriky a kriteria pro diagnostiku sociotechnických systémů." Doctoral thesis, Vysoké učení technické v Brně. Fakulta strojního inženýrství, 2010. http://www.nusl.cz/ntk/nusl-233879.

Full text
Abstract:
This doctoral thesis is focused on metrics and the criteria for socio-technical system diagnostics, which is a high profile topic for companies wanting to ensure the best in product quality. More and more customers are requiring suppliers to prove reliability in the production and supply quality of products according to given specifications. Consequently the ability to produce quality goods corresponding to customer requirements has become a fundamental condition in order to remain competitive. The thesis firstly lays out the basic strategies and rules which are prerequisite for a successful w
APA, Harvard, Vancouver, ISO, and other styles
26

Menesi, Wail. "Construction Scheduling using Critical Path Analysis with Separate Time Segments." Thesis, 2010. http://hdl.handle.net/10012/5327.

Full text
Abstract:
Project managers today rely on scheduling tools based on the Critical Path Method (CPM) to determine the overall project duration and the activities’ float times. Such data provide important information about the degree of flexibility with respect to the project schedule as well as the critical and noncritical activities, which leads to greater efficiency in planning and control of projects. While CPM has been useful for scheduling construction projects, years of practice and research have highlighted a number of serious drawbacks that limit its use as a decision support tool. The traditiona
APA, Harvard, Vancouver, ISO, and other styles
27

Jayachandran, Baskaran. "Resource constrained project scheduling." Thesis, 1994. https://eprints.qut.edu.au/226898/1/Resource%20Constrained%20Project%20Scheduling_Jayachandran_19994.pdf.

Full text
Abstract:
The applicability of Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) in scheduling is limited by the inability of these techniques to cope with conflicting resource demands. This research assesses the effectiveness of five of the heuristic extensions to the critical path method which resolve conflicts that develop between the resources demanded by an activity and those available. These heuristic rnles are evaluated on their ability to solve three actual constmction projects with multi-resource scheduling problems. The performance of the heuristic rules are
APA, Harvard, Vancouver, ISO, and other styles
28

Wu, Yu-Tzu, and 吳郁慈. "Using Program Evaluation and Review Technique (PERT) / Critical Path Method (CPM) to Assess Project Process Scheduling - An Example of the R&;D in Medical Devices Equipment Production." Thesis, 2016. http://ndltd.ncl.edu.tw/handle/yb4vd6.

Full text
Abstract:
碩士<br>中原大學<br>工業與系統工程研究所<br>104<br>This thesis discusses the using of PERT/CPM to assess the time and cost tradeoff in the R&;D phase of medical equipment production. The project managers not only have to implement the execution of the project in a specific time, but also need to handle the risk that might happen during the project. The risk usually arises from the uncertainty which affect project duration and cost. In order to make project more stable and reduce the uncertainty, the PERT/CPM method is used. This real case presents and uses project network to figure out the whole project proce
APA, Harvard, Vancouver, ISO, and other styles
29

Yang, Jian-Li, and 楊建利. "CCPM:The Dynamic Collaborative Chain Scheduling of Critical Path Method." Thesis, 2004. http://ndltd.ncl.edu.tw/handle/12575272721336926715.

Full text
Abstract:
碩士<br>國立雲林科技大學<br>資訊管理系碩士班<br>92<br>The development of technology on the computer and communication change more and more fast, especially so-called internet exert a great influence on the development of the products. So Supply Chain Management(SCM) become the hot issue at present , even develop into the issue of product design chain management. Shortens of cost and time is one of trend issue, but as so far the paper of design chain scheduling seems very rarely. The foundation of this research supposes the theory- the dynamic collaborative chain is ideal framework of the design chain in the fut
APA, Harvard, Vancouver, ISO, and other styles
30

CHANG, TING-YU, and 張庭毓. "A flexible construction scheduling framework combining Critical Path Method & Linear Scheduling Method concepts." Thesis, 2017. http://ndltd.ncl.edu.tw/handle/e9ea4j.

Full text
APA, Harvard, Vancouver, ISO, and other styles
31

"Critical path method as a project modelling technique in coal refurbishment projects." Thesis, 2015. http://hdl.handle.net/10210/13828.

Full text
Abstract:
M.Ing. (Engineering Management)<br>South African power demand has been increasing over the past years due to increase in energy consumption from industrial, commercial and residential sectors. In order to meet the growing power demand Eskom Holdings Limited SOC (Eskom) has implemented a number of initiatives such as the energy efficiency programme, power generating capacity increase and refurbishment of the operational coal fired power stations. Energy efficiency initiatives have been designed to encourage residential, commercial and industrial customers to use energy efficient technologies wh
APA, Harvard, Vancouver, ISO, and other styles
32

Chung, Hung-Yue, and 張弘岳. "The Study on Searching Method of Critical Path for Automatic Tolerance Analysis." Thesis, 2016. http://ndltd.ncl.edu.tw/handle/61241865453701020886.

Full text
Abstract:
碩士<br>國立中興大學<br>機械工程學系所<br>104<br>Tolerance design and analysis is important to achieve the performance of a product. Tolerance analysis, however, has to build the product hierarchy, tolerance network and critical path in order to calculate tolerance stack-up. This process is tedious and time-consuming that often results in mistakes in the process. In particular, the determination of critical path is based on the designer’s knowledge, experience and the force flow in the product thus makes it even worse for an engineer to pick up the critical path in tolerance design. This research is aimed to
APA, Harvard, Vancouver, ISO, and other styles
33

CHANG, WAN-PING, and 張琬萍. "Based on the Critical Path Method used in production planning and scheduling for aerospace industries." Thesis, 2011. http://ndltd.ncl.edu.tw/handle/04889308970904079991.

Full text
Abstract:
碩士<br>逢甲大學<br>工業工程與系統管理學研究所<br>99<br>In addition to limited production schedule length required to put more costs and risks, we compared to other manufacturing for the aerospace industry company are harder. We need to face the challenge of international supplier on time delivery and flexibility . With the rising cost , raw material shortages and the challenge of fill material to raise with the leading of aerospace industry company, living in Taiwan is located at the bottom of the aerospace industry to achieve delivery on time, meet customer needs, flexibility in production planning and schedul
APA, Harvard, Vancouver, ISO, and other styles
34

DavidHsu and 徐建智. "A comparison of time/cost trade-off between step-wise approach and overall approach of critical path method in project management." Thesis, 2002. http://ndltd.ncl.edu.tw/handle/64277876968264163884.

Full text
Abstract:
碩士<br>國立臺北科技大學<br>商業自動化與管理研究所<br>90<br>With the immense accessibility of Internet, business must improve its productivity, enhance the quality, reduce the production costs and improve its management efficiency to survive under today’s competitive environment. Traditional organizational structure has been proved inefficient to manage business activities in the e era. As a result, more and more companies have adopted project management as a vehicle for problem solving. The scope of project management mainly comprises project scheduling, cost controlling, team communication, text sav
APA, Harvard, Vancouver, ISO, and other styles
35

Nageeb, Meena. "The Effectiveness of the Hybrid Graphical Representation Method in Visually Combining and Communicating Logical and Spatial Relationships between Scheduled Activities." Thesis, 2012. http://hdl.handle.net/1969.1/ETD-TAMU-2012-05-11042.

Full text
Abstract:
This research endeavor investigated the possibility to combine the visual advantages of both graphical schedule visualization methods, the Linked Gantt Charts (LGC) and Flowline graphs (FLG), derived from the activity-based and location-based scheduling systems, to help resolve some of their shortcomings by capitalizing on their combined strengths. In order to accomplish the goal of the research, a graphical representation system that combines these two scheduling visualization methods, LGC and FLG, is developed. Afterwards, the research attempted to empirically validate the ability of the pro
APA, Harvard, Vancouver, ISO, and other styles
36

Krausová, Anna. "Obnova národa White Earth: sledování dlouhodobého procesu ústavní reformy." Doctoral thesis, 2018. http://www.nusl.cz/ntk/nusl-382746.

Full text
Abstract:
Native nation building is a phenomenon largely neglected by mainstream political science. There are empirical and theoretical gaps in the study of political structures of Native nations. The empirical focus of this dissertation is on the rebuilding process of the White Earth Nation located in northwestern Minnesota. The objective is to investigate the long-term process of White Earth governance in order to get insights into the background of the present state of the White Earth institutional stalemate. I trace external and internal factors that influenced the formation, preservation, and trans
APA, Harvard, Vancouver, ISO, and other styles
37

Teixeira, João Rui Junqueira Barbosa. "Sistemas de controlo de gestão : projetos de investimento da EDP Produção." Master's thesis, 2015. http://hdl.handle.net/10400.14/20029.

Full text
Abstract:
Este Trabalho Final de Mestrado foi elaborado no âmbito de um estágio com a duração de seis meses, na Direção de Orçamento e Controlo de Gestão (DOC) da EDP – Gestão da Produção de Energia, S.A., empresa do Grupo EDP. Ao realizar este estágio, não só tive a oportunidade de conhecer a realidade do quotidiano empresarial, mas também tive a oportunidade de colocar os conhecimentos já adquiridos na Universidade Católica Portuguesa de modo a acrescentar valor à empresa. Hoje em dia assiste-se a uma dificuldade crescente no controlo da execução de projetos de investimento de grandes e complexos em
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!