To see the other types of publications on this topic, follow the link: Critical Path Method (CPM).

Journal articles on the topic 'Critical Path Method (CPM)'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 journal articles for your research on the topic 'Critical Path Method (CPM).'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.

1

Purwantoro, Almuntofa, Attie Wawey Lagi To’unni, and Subrata Aditama K. A. Uda. "TIME CONTROL AND RESCHEDULING USING METHOD CPM (CRITICAL PATH METHOD)." Jurnal Civil Engineering Study 4, no. 01 (2024): 19–29. http://dx.doi.org/10.34001/ces.v4i01.801.

Full text
Abstract:
In some development projects, finishing the work inside a restricted time is normal. This can never again be kept away from after the utilization of labor with is presently not equally. CPM (Critical Path Method) is a critical path the that intends to decide project arranging and time estimates that are deterministic/positive. Poin of investigation utilizing this method is to decide the time and cost of the undertaking and figure out what activities are remembered for the fundamental activities. Project arranging helps show the relationship of every development to various activities and normal
APA, Harvard, Vancouver, ISO, and other styles
2

Hein Soe, Paing, and Thein Min Htike. "Critical path analysis programming method without network diagram." MATEC Web of Conferences 192 (2018): 01027. http://dx.doi.org/10.1051/matecconf/201819201027.

Full text
Abstract:
Project scheduling is an important task in project management which monitors the project duration, resource utilization and affects the benefit of project for all kinds of project such as construction, IT, renewable energy, product design and manufacturing etc. Among many methods for project management, critical path method (CPM) is one of the better-known planning and control techniques in project scheduling. In this study, CPM-based computerized program was developed together with modeling of step by step calculations of parameters of interest such as earliest starts and finishes, slack and
APA, Harvard, Vancouver, ISO, and other styles
3

Husnul Khotimah, Indah, Moh Sholahuddin, Nova Nevila Rodhi, and Andi Tjandra. "Analisis Pengendalian Waktu Proyek Menggunakan Metode Critical Path Method (CPM)." Jurnal Teknik Sipil 9, no. 2 (2024): 60–69. http://dx.doi.org/10.56071/deteksi.v9i2.951.

Full text
Abstract:
Pada pelaksanaan pekerjaan proyek tidak jarang sering dijumpai proyek yang mengalami ketidak sesuaian dengan yang direncanakan. Masalah ini disebabkan oleh kurangnya pengendalian terhadap waktu, biaya, dan mutu. Pada proyek Rehabilitasi Jalan Dander – Bubulan akan dilakukan pelebaran jalan pada titik STA 0+000 – 1+430. Namun adanya permasalahan pada proyek tersebut, mengakibatkan proyek mengalami perubahan waktu dengan penambahan waktu 30 hari kalender. Tujuan yang ingin dicapai dari penulisan ini adalah untuk mengetahui nilai optimasi waktu proyek dan untuk mengetahui selisih waktu antara ren
APA, Harvard, Vancouver, ISO, and other styles
4

Rio, Wahyu Yusuf, and Eti Herawati. "Penerapan Critical Path Method di Perumahan Gunung Empat Balikpapan." Jurnal Teknik Sipil MACCA 7, no. 3 (2022): 206–13. http://dx.doi.org/10.33096/jtsm.v7i3.593.

Full text
Abstract:
Penjadwalan waktu adalah masalah penting yang mempengaruhi apakah proyek konstruksi tersebut berhasil atau tidak. Menerapkan manajemen proyek dan pelaksanaan proyek yang efektif akan menurunkan atau dapat mengurangi kemungkinan proyek mengalami penundaan. Tujuan dari penelitian ini adalah menggunakan metode Critical Path Method (CPM) untuk menemukan durasi ideal dan aktivitas jalur kritis. Teknik penjadwalan yang disebut CPM, digunakan untuk menyelesaikan permasalahan ini. Berdasarkan hasil penelitian, dapat disimpulkan pekerjaan yang termasuk dalam jalur kritis adalah A-E-F-G-J-K-L-T-U-Y-Z-AB
APA, Harvard, Vancouver, ISO, and other styles
5

Shurrab, Mohammed, and Ghaleb Abbasi. "Buffer Sizing Methods to Compare Critical Chain Project Management with Critical Path." International Journal of Information Technology Project Management 7, no. 3 (2016): 74–87. http://dx.doi.org/10.4018/ijitpm.2016070105.

Full text
Abstract:
Critical Chain Project Management (CCPM) provided a tangible progress to the Project Management Body of Knowledge. The critical chain project management (CCPM) differs from the traditional Critical Path Method (CPM) which includes never changing resource dependencies. CCPM improves the project plan by aggregating uncertainty into buffers at the end of activity paths. In this research, one hundred twenty random projects were generated and analyzed using Microsoft Project software according to the traditional CPM and the CCPM once using the sum of squares (SSQ) method and another using the cut &
APA, Harvard, Vancouver, ISO, and other styles
6

Fitria, Lulu Mari, Mutiasari Kurnia Devi, Muhammad Sani Roychansyah, Yori Herwangi, and Siti Nurjanah. "Identifikasi Perilaku Perjalanan Melalui Metode Critical Path Method (CPM)." TATALOKA 22, no. 3 (2020): 453–62. http://dx.doi.org/10.14710/tataloka.22.3.453-462.

Full text
Abstract:
Mobilization in urban areas has increased every year along with the population growth and urban's development. Travel behaviors of the population in urban areas can be classified based on their travel characteristics. The identification of communities' travel behavior of Yogyakarta is based on the origin - destination and length of trip based on age characteristics. It will effects the travel patterns in the urban environment through spatial mapping. The method used in this research is critical path method. Critical Path Method (CPM) is used to determine the optimum path taken by the community
APA, Harvard, Vancouver, ISO, and other styles
7

Hartawan, Ade Sholeh, Budi Witjaksana, and Esti Wulandari. "TIME ANALYSIS WITH CRITICAL PATH METHOD." INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY ENGINEERING AND INFORMATION SYSTEM (IJATEIS) 3, no. 3 (2024): 370–84. https://doi.org/10.55047/ijateis.v3i3.1174.

Full text
Abstract:
Preparatory work in a construction project generally includes the fulfillment of work facilities, field investigations, and licensing, and is typically non-structural. The implementation of the Jakarta Sewerage Development Project Zone 1, Package 2: Construction of Sewers in Area 1-1, which is currently still in the preparatory work stage, is experiencing significant issues. Specifically, the project is facing a very complex licensing process, resulting in minimal work progress. This is due to the project planning phase not adequately considering the timeframe required for obtaining an impleme
APA, Harvard, Vancouver, ISO, and other styles
8

Kadang, Tandi, Puji Wahyu Hidayah, Kamelia Simarmata, Nathasya A. Putri, and Krisvinus Krisvinus. "Analysis of Consultant Building Project Management Using the CPM (Critical Path Method)." Journal of Business Management and Economic Development 2, no. 03 (2024): 1169–79. http://dx.doi.org/10.59653/jbmed.v2i03.891.

Full text
Abstract:
Critical Path Method (CPM) is a technique used to plan and organize project schedules by identifying the critical path which is one of the most contributing aspects to project success. This research aims to formulate the completion time of the consultant office building construction project using the CPM method. Data collection techniques in this study were carried out through various activities, including field observations, interviews, and literature studies. The results showed that the application of CPM in project planning and scheduling can determine the critical path and identify the sho
APA, Harvard, Vancouver, ISO, and other styles
9

Wang, Mei Yan, Lian Guan Shen, and Yi Min Deng. "Exploiting Critical Path Method for Evaluation of Conceptual Design." Advanced Materials Research 97-101 (March 2010): 4429–32. http://dx.doi.org/10.4028/www.scientific.net/amr.97-101.4429.

Full text
Abstract:
Conceptual design is a critical design phase during which initial design solutions, called design concepts, are developed. These design concepts must be evaluated to ensure they satisfy the specified design requirements and the most appropriate design concept must be selected. It is often difficult for the designer, especially for the novice, to make an appropriate design concept evaluation and selection. Existing work on design evaluation lacks an effective tool for evaluating the temporal performance of the design concepts. To address this problem, a Critical Path Method (CPM) from project m
APA, Harvard, Vancouver, ISO, and other styles
10

Ahmad, Hikmad Tullah, Safrizal, and Dewi Rosa Indah. "Analysis Project Management on Cv. Nbw. Id by Cpm Method (Critical Path Method)." Jurnal Sinar Manajemen 11, no. 1 (2024): 37–44. https://doi.org/10.56338/jsm.v11i1.5084.

Full text
Abstract:
Project implementation can be successful when existing resources are used effectively and efficiently. One attempt to use the critical path (CPM) method is a project scheduling method that uses project planning analysis and fixed tim e estimates for each activity. In other words, this method can help solve the scheduling problem by determining the timing of the longest production process schedules in the project so that the company can effectively and efficiently determine how long a project can be completed. Optimization must be done to restore the project duration to the actual schedule. The
APA, Harvard, Vancouver, ISO, and other styles
11

Silitonga, Salmawati. "IMPLEMENTATION OF THE CRITICAL PATH METHOD (CPM) IN EDUCATIONAL PLANNING." BRIGHT VISION Journal of Language and Education 3, no. 1 (2023): 63. http://dx.doi.org/10.30821/brightvision.v3i1.2991.

Full text
Abstract:
<p style="margin: 0cm 0.65pt 0pt 0cm; text-align: justify;"><span style="letter-spacing: -0.05pt; font-family: 'Cambria','serif'; font-size: 12pt; mso-ascii-theme-font: major-latin; mso-hansi-theme-font: major-latin;">This study aims to describe the application of the Critical Path Method (CPM) technique in educational planning at SD Negeri 101777 Saentis. This study uses a qualitative approach with a descriptive method, to explain the approach and method applied in the form of CPM techniques in educational planning. Obtaining data through observation techniques, interviews and doc
APA, Harvard, Vancouver, ISO, and other styles
12

Pratyusha, M. Navya, and Ranjan Kumar. "Solving neutrosophic critical path problem using Python." Journal of Information and Optimization Sciences 45, no. 4 (2024): 897–911. http://dx.doi.org/10.47974/jios-1614.

Full text
Abstract:
The study observation offers a method for project control known as the Neutrosophic Critical Path Method (NCPM) which combines the traditional Critical Path Method (CPM) with neutrosophic sets. Dealing with actual global situations that frequently pose demanding situations for CPM specifically while initiatives involve interconnected operations. The presence of uncertainties creates hurdles during challenge execution, due to incomplete and uncertain data. By illustrating surroundings for instance this research outlines the transition from CPM to NCPM and highlights its advantages. Numerical ex
APA, Harvard, Vancouver, ISO, and other styles
13

Rahayu, Sri, Pram Eliyah Yuliana, and Kelvin Kelvin. "PENERAPAN METODE CPM DAN CCPM UNTUK PERENCANAAN SUMBER DAYA DAN WAKTU PENYELESAIAN MULTI PROYEK." JISO : Journal of Industrial and Systems Optimization 5, no. 2 (2022): 92. http://dx.doi.org/10.51804/jiso.v5i2.92-98.

Full text
Abstract:
ABSTRAK Penelitian ini dilakukan pada perusahaan yang bergerak di bidang supplies dan engineering dan berlokasi di Surabaya. Perusahaan mempunyai beberapa proyek dalam waktu yang dekat maupun bersamaan. Salah satunya adalah proyek alat pengupas bawang dan proyek exhaust silencer yang harus diselesaikan sesuai dengan waktu yang ditetapkan dengan sumber daya yang terbatas. Untuk menyelesaikan hal tersebut maka pentingnya untuk dilakukan perencanaan terhadap jadwal dengan menggunakan metode critical path method dan juga critical chain project management. Pada critical path method bertujuan untuk
APA, Harvard, Vancouver, ISO, and other styles
14

Dara Firyal Oktatiyana, Muhardi, and Rabiatul Adwiyah. "Analisis Pengendalian Manajemen Proyek Penambahan Gedung Baru dengan Menggunakan Metode Jalur Kritis (CPM) untuk Mengoptimalisasi Biaya dan Waktu pada Puskesmas Batujajar." Bandung Conference Series: Business and Management 4, no. 1 (2024): 785–93. http://dx.doi.org/10.29313/bcsbm.v4i1.11976.

Full text
Abstract:
Abstract. Infrastructure development plays an important role in increasing a country's economic growth. One of the infrastructure developments is the construction of health facilities for the community. In the construction of a project, it is necessary to plan and control good project management so that it can be completed on time according to plan. This study aims to find out how to control project management using the Critical Path Management (CPM) method in the new Batujajar Health Center building project. According to Heizer, Render and Munson Critical Path Meethod (CPM) is a tool to help
APA, Harvard, Vancouver, ISO, and other styles
15

Lutfi Fahrul Arifin, Muhammad, Gatot Nursetyo, and Teguh Yuono. "TIME AND OPTIMIZATION ACCELERATION OF COSTS IN CONSTRUCTION PROJECTS USING THE CPM METHOD (CRITICAL PATH METHOD)." Journal of Civil Engineering and Infrastructure Technology 3, no. 1 (2024): 28–37. http://dx.doi.org/10.36728/jceit.v3i1.3544.

Full text
Abstract:
A housing and settlement building project (residential construction), is a housing or settlement development project based on development stages that are simultaneous with the provision of supporting infrastructure. Construction projects have obstacles, including delays in work implementation times and cost overruns. The aim of this research is to analyze the optimal and efficient time duration for housing construction projects using the CPM (Critical Path Method) method. This research uses the Critical Path Method (CPM). The data in this research comes from the work schedule (time schedule) a
APA, Harvard, Vancouver, ISO, and other styles
16

Kurnaini, Taufik, Helny Lalan, and M. Adli. "ANALISA CRITICAL PATH METHOD (CPM ) PADA PROYEK PEMBANGUNAN CEKDAM PAKET 2 – KOTA PADANG." Ensiklopedia Education Review 4, no. 2 (2022): 66–74. http://dx.doi.org/10.33559/eer.v4i2.1263.

Full text
Abstract:
Time control is part of project management which also plays an important role in the quality of the implementation of a job. But in reality perfect implementation is very difficult to realize. Sometimes in project implementation there is often a delay in project completion time which results in swelling of project implementation costs. So that the biggest loss and problem is the termination of the contract. It takes a method in project control. Critical Path Method (CPM) can be used in controlling project execution time to minimize deviations in project implementation. The objectives of this t
APA, Harvard, Vancouver, ISO, and other styles
17

Ruli Saefudin and Ade Fitriyanti Ulul Azmi. "Unisma Sports Center Building Project Control Analysis Using the Critical Path Method (CPM)." Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan 9, no. 1 (2024): 101–8. http://dx.doi.org/10.30736/cvl.v9i1.1195.

Full text
Abstract:
The purpose of this research is to determine the scheduling activities for the construction of the Sport Center Building at the Islamic University of Malang, to determine and analyze the control of building construction projects managed by the Islamic University of Malang using the CPM (Critical Path Method) method. This research uses the research method used in this research, namely the descriptive method. The data collection techniques used were observation, interviews, and library research. After obtaining information through interviews, data analysis was carried out using the CPM (Critical
APA, Harvard, Vancouver, ISO, and other styles
18

Ali, Mahardi Kamalika Khusna, Hanie Teki Tjendani, and Budi Witjaksana. "Identifying Critical Tasks in the Kadiri University 4 Floor Building Construction Project Using the Critical Path Method." International Journal of Science, Technology & Management 5, no. 3 (2024): 650–54. http://dx.doi.org/10.46729/ijstm.v5i3.1110.

Full text
Abstract:
This study aims to identify critical tasks in the construction of a 4-floor building at Kadiri University using the Critical Path Method (CPM). The project is planned to be completed within 43 weeks, from October 2023 to August 2024, with a budget of IDR 20,551,534,000. Data collection involved direct site visits for primary data and secondary data from project documentation, including the Cost Budget Plan (RAB) and project schedule. Using Microsoft Project software, a project network was mapped, and CPM analysis was performed to identify the critical path. The analysis revealed that several t
APA, Harvard, Vancouver, ISO, and other styles
19

Perdana, Surya, and Arif Rahman. "PENERAPAN MANAJEMEN PROYEK DENGAN METODE CPM (Critical Path Method) PADA PROYEK PEMBANGUNAN SPBE." AMALIAH: JURNAL PENGABDIAN KEPADA MASYARAKAT 3, no. 1 (2019): 242–50. http://dx.doi.org/10.32696/ajpkm.v3i1.235.

Full text
Abstract:
Sebuah perusahaan konstruksi yang bergerak dibidang pembangunan infrastruktur Stasiun Pengisian Bahan Bakar Elpiji (SPBE) sedang menjalankan banyak proyek pada beberapa wilayah di Indonesia. Dengan jadwal proyek yang begitu padat, maka perlu adanya manajemen proyek yang baik dalam menjalankannya. Kegiatan ini bertujuan untuk memberikan pemahaman kepada para karyawan perusahaan mengenai manajemen proyek dengan metode Critical Path Method (CPM) agar karyawan dapat menyelesaikan seluruh proyek yang sedang berjalan. Metode yang digunakan dalam pelaksaan pengabdian kepada masyarakat ini dibagi menj
APA, Harvard, Vancouver, ISO, and other styles
20

Muhammad, Alamsyah bin Muh Saleh Alam. "Analisa Perhitungan Pekerjaan Reparasi Kapal Dengan Metode Critical Path Method (CPM)." SPECTA Journal of Technology 4, no. 1 (2020): 84–91. http://dx.doi.org/10.35718/specta.v4i1.172.

Full text
Abstract:
Meranti Nusa Bahari carries out two types of businesses, firstly ship repair and secondly ship building services. Technical analysis of ship repair work using a simple table method. The purpose of this research is to find out how long the ship repairs. The method used is CPM (Critical Path Method). The results of this research are technical analysis of work using a simple table that is able to repair one unit of ship within 22 working days and 20 ships in a year. While the analysis with CPM method found 18 working days per unit of ship and 25 units of ships in a year. There has been a decrease
APA, Harvard, Vancouver, ISO, and other styles
21

V.Anusuya and P.Balasowandari. "Critical Path with Various Distances of Type-2 Fuzzy Numbers." International Journal of Fuzzy Mathematical Archive 13, no. 01 (2017): 01–07. http://dx.doi.org/10.22457/ijfma.v13n1a1.

Full text
Abstract:
The critical path method (CPM) is a vital tool for planning and controlling complex projects. The successful implementation of CPM requires the availability of clear determined time duration for each activity. In practical situations this requirement is usually hard to fulfill, since many of these activities are uncertain, which leads to the development of fuzzy critical path method. In this paper, we propose a new approach to find critical path and its path length using some various distances of trapezoidal type-2 fuzzy numbers. An example is included to demonstrate our proposed approach.
APA, Harvard, Vancouver, ISO, and other styles
22

Saputro, Erwin, and Siti Muhimatul Khoiroh. "Evaluasi Penjadwalan Proyek Produksi Conveyor Table Top Chain pada CV. XYZ dengan Pendekatan CPM." JURNAL SURYA TEKNIKA 12, no. 1 (2025): 15–20. https://doi.org/10.37859/jst.v12i1.9337.

Full text
Abstract:
This study evaluates the effectiveness of project scheduling for conveyor table top chain production at CV. XYZ using Critical Path Method (CPM). The study was motivated by frequent project delays in 2024, causing late deliveries and cost overruns. CPM identified the critical path as activities A–B–C–E–F–G–H–I–J–K–L–M–N, with one activity (Incoming Check Material) having slack. CPM estimated the project duration at 127 days of on-time completion. The findings show that CPM methode significantly improves time efficiency in project execution.
APA, Harvard, Vancouver, ISO, and other styles
23

Nalhadi, Ahmad, and Nana Suntana. "Analisa Infrastruktur Desa Sukaci-Baros Dengan Metode Critical Path Method (CPM)." Jurnal Sistem dan Manajemen Industri 1, no. 1 (2017): 35. http://dx.doi.org/10.30656/jsmi.v1i1.167.

Full text
Abstract:
CV. ABP a construction company worked in infrastructure building development for private and goverment. Now CV. ABP is handling infrastructure development project of the acropolitan area (Right Payment) Sukaci - Baros Village. This project has been late for 19 days from the dead line 126 days. Therefore the cost is getting higher. It’s happened because bad management is the problem source. Restoring the project time need to be focused on the cost and the due date based on the schedule. Scheduling evaluation using Critical Path Method (CPM) and Crashing to find optimal results using Critical Pa
APA, Harvard, Vancouver, ISO, and other styles
24

Ilwaru, Venn Yan Ishak, Dorteus L. Rahakbauw, and Jeky Tetimelay. "PENJADWALAN WAKTU PROYEK PEMBANGUNAN RUMAH DENGAN MENGGUNAKAN CPM (CRITICAL PATH METHOD)." BAREKENG: JURNAL ILMU MATEMATIKA DAN TERAPAN 12, no. 2 (2018): 061–68. http://dx.doi.org/10.30598/vol12iss2pp061-068ar617.

Full text
Abstract:
Penjadwalan proyek merupakan bagian yang paling penting dari sebuah perencanaan proyek, yaitu untuk menentukan kapan sebuah proyek dilaksanakan berdasarkan urutan tertentu dari awal sampai akhir proyek.CPM (Critical Path Method) merupakan salah satu metode yang di gunakan dalam menganalisis penjadwalan waktu kerja sebuah proyek. Tujuan dari penelitian ini adalah untuk mengetahui jalur kritis yang di dalamnya terdapat aktivitas-aktivitas kritis dan membandingkan penjadwalan waktu antara waktu kerja yang di jadwalkan pemilik proyek dan waktu kerja yang di jadwalkan dengan metode CPM, pada proyek
APA, Harvard, Vancouver, ISO, and other styles
25

Dwiretnani, Annisaa, Elvira Handayani, and Niko Saputra. "Evaluasi Penjadwalan Waktu Proyek Pembangunan Gedung Menggunakan Critical Path Method (CPM)." Jurnal Talenta Sipil 6, no. 2 (2023): 391. http://dx.doi.org/10.33087/talentasipil.v6i2.334.

Full text
Abstract:
Buildings are the physical form of the results of construction work that are integrated with their place of domicile, partly or wholly located on and/or in the land and/or water which functions as a place for humans to carry out their activities, both for housing (residence), religious activities, business activities, social activities, culture, and special activities (Article 1 Number 1 Law Number 28 of 2002 Concerning Building Buildings). The success or failure of a construction project is influenced by three aspects, namely costs that do not exceed the budget, quality according to specifica
APA, Harvard, Vancouver, ISO, and other styles
26

Sutanto, Sutanto. "APLIKASI METODA CRITICAL PATH METHOD (CPM) DALAM PENJADWALAN KEGIATAN PEMBANGUNAN PERUMAHAN." Gema Teknologi 19, no. 4 (2018): 6. http://dx.doi.org/10.14710/gt.v19i4.19149.

Full text
Abstract:
The development of housing development in Indonesia is now showing a very rapid progress in line with the rate of population growth and the increase in income per capita community, so that housing demand is getting bigger. For that much needed planning and scheduling activities of a good housing development projects in accordance with the progress of science and technology in order to have added value to the implementation of the housing development. The Critical Path Method (CPM) application research in guarding housing development activities and the impact on technical constraints in the fie
APA, Harvard, Vancouver, ISO, and other styles
27

Yamín, René A., and David J. Harmelink. "Comparison of Linear Scheduling Model (LSM) and Critical Path Method (CPM)." Journal of Construction Engineering and Management 127, no. 5 (2001): 374–81. http://dx.doi.org/10.1061/(asce)0733-9364(2001)127:5(374).

Full text
APA, Harvard, Vancouver, ISO, and other styles
28

Al-Putro, Akmal Puguh, Laksono Djoko Nugroho, and Haris Muhammadun. "Analysis of Work Network and Critical Trajectory on Penganten - Ngampal Road Reconstruction Project Using Critical Path Method (CPM)." TRANSPUBLIKA INTERNATIONAL RESEARCH IN EXACT SCIENCES 4, no. 1 (2025): 47–55. https://doi.org/10.55047/tires.v4i1.1599.

Full text
Abstract:
The Reconstruction Project of Penganten-Ngampal Road in Bojonegoro Regency faces challenges in time and resource management, leading to project delays. These delays affect time and cost efficiency, which are key issues in achieving the project's objectives. To address this problem, this study aims to analyze the project’s work schedule and critical path using the Critical Path Method (CPM). The research employs a quantitative method, with data collected through primary and secondary data sources. Primary data was obtained through field observations and questionnaires, while secondary data was
APA, Harvard, Vancouver, ISO, and other styles
29

Wulandari, Arin, M. Dachyar, and Farizal. "Scheduling of Empennage Structure Design Project of Indonesia’s Aircraft with Critical Path Method (CPM)." MATEC Web of Conferences 248 (2018): 03012. http://dx.doi.org/10.1051/matecconf/201824803012.

Full text
Abstract:
Production of the aircraft becomes very important to facilitate many passengers of aircraft in Indonesia in the future. The design of a very complex aircraft requires proper project management. This study aims to perform the best scheduling project of empennage structure design of Indonesia’s aircraft with limited resources. Critical Path Method (CPM) is used to schedule the project based on activity and resource. CPM scheduling results in completion time for activity data for 400 working days. CPM scheduling after assigning human resources results in a longer completion time for 1023.47 worki
APA, Harvard, Vancouver, ISO, and other styles
30

Wibowo, Nur Cahyo Hendro, Masy Ari Ulinuha, Khusnul Amalia, Falis Yusuf Hassan, and Hasyim Yahya. "DESAIN KURIKULUM MAHASISWA TEKNOLOGI INFORMASI UIN WALISONGO MENGGUNAKAN CRITICAL PATH METHOD (CPM)." Walisongo Journal of Information Technology 4, no. 1 (2022): 53–62. http://dx.doi.org/10.21580/wjit.2022.4.1.12292.

Full text
Abstract:
Desain kurikulum 2018 dan 2020 menyebutkan mahasiswa harus menempuh total 144 SKS, salah satu untuk mencapai lulusan tepat waktu dengan menggunakan Critical Path Method (CPM), dimana metode ini dapat menjelaskan dan menggambarkan dengan rinci atau detail tahap demi tahap dalam pengambilan matakuliah sekaligus menggambarkan juga resiko kegagalan dengan menggunakan Critical Path Method (CPM). Metode jalur kritis memodelkan semua mata kuliah dalam bentuk jaringan yang saling terhubung. Dalam pendekatan ini, durasi waktu tempuh semua mata kuliah sudah diketahui. Setelah input penjadwalan selesai,
APA, Harvard, Vancouver, ISO, and other styles
31

Syafrina, Mia, and Fandy Bestario Harlan. "Application Of CPM Methode (Critical Path Methode) In Controlling The Time 100 Teus Contrainer Ship Hull Construction Project." JURNAL AKUNTANSI, EKONOMI dan MANAJEMEN BISNIS 9, no. 1 (2021): 17–24. http://dx.doi.org/10.30871/jaemb.v9i1.3194.

Full text
Abstract:
Construction projects are generally the most high-risk businesses, especially shipbuilding projects. Efforts to reduce the risk can be done by minimizing the potential risk. This study aims to see potential high risk and prevent delays in the completion of ship construction using the Critical Path Method CPM at PT. XYZ. By using the Critical Path Method CPM critical paths can be given more attention so that they will not interfere ship construction projects. In addition, it is also a form of anticipation if there is a delay, it is possible to reschedule.
APA, Harvard, Vancouver, ISO, and other styles
32

Cynthia, Mayang Modelina, Hendra Cipta, and Riri Syafitri Lubis. "PENERAPAN CRITICAL PATH METHOD (CPM) DALAM MENGANALISIS MANAJEMEN WAKTU PADA PERENCANAAN IKLAN GMS DIGITAL MARKETING." Jurnal Lebesgue : Jurnal Ilmiah Pendidikan Matematika, Matematika dan Statistika 5, no. 2 (2024): 820–34. http://dx.doi.org/10.46306/lb.v5i2.627.

Full text
Abstract:
Planning helps monitor activities. to achieve the expected efficiency and effectiveness. In advertising planning at GMS Digital Marketing, there are often losses. The purpose of this study is to find out how to manage good time in advertising planning in GMS Digital Marketing and find out what efforts can be made so that advertising planning has efficient time. A mathematical approach called Critical Path Analysis (CPM) is used to organize the grouping of project operations. The project activities described using the CPM Method are a two-round procedure consisting of a forward and backward app
APA, Harvard, Vancouver, ISO, and other styles
33

Rizky Saputra Aminata and Minto Basuki. "Analisis Perbandingan Produktivitas Jam Kerja pada Proyek Reparasi Kapal TB. Ampenan 01 dengan Metode Critical Path Method & Critical Chain Project Management di Galangan Kapal Madura." Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim 2, no. 4 (2023): 77–89. https://doi.org/10.58192/ocean.v2i4.1490.

Full text
Abstract:
This final assignment compared the results of durations in the CCPM method and the Critical Path Method (CPM) by conducting a case study of ship repairs at Galangan Kapal Madura Ltd. Initial project scheduling employed the traditional method of a Gantt chart, which was then broken down in more detail and complete relationships among activities into CPM form. The results were then compared with the duration in CCPM scheduling by eliminating multitasking and safety time for each activity as well as providing a buffer in progress. The CPM method lasted for 30 days at a cost of IDR 246,600,000.00,
APA, Harvard, Vancouver, ISO, and other styles
34

Rama Putra, Gustian, Reza Ariftiarno, Lita Karlitasari, and Dinar Munggaran Akhmad. "Faculty Information Systems Project Management: A Comparison of CPM And PERT Methods." Komputasi: Jurnal Ilmiah Ilmu Komputer dan Matematika 22, no. 1 (2025): 12–20. https://doi.org/10.33751/komputasi.v22i1.5.

Full text
Abstract:
This research evaluates the Critical Path Method (CPM) and the Program Evaluation and Review Technique (PERT) to determine the most efficient scheduling method for the development of an information system at the Faculty of Economics and Business, Universitas Pakuan. The system aims to consolidate work unit information and assist faculty leaders in decision-making. Both methods identified the same critical path (A-B-C-E-G-H), ensuring focus on activities critical to project completion. The CPM method estimated a project duration of 50 days, while the PERT method estimated 52 days. The two-day d
APA, Harvard, Vancouver, ISO, and other styles
35

Azmi, Fachruddin, Mesiono Mesiono, Uswatun Hasanah, and Retno Pringadi. "The Application of Critical Path Method (CPM) in Education Planning at Madrasah Ibtidaiyah." Jurnal Basicedu 6, no. 6 (2022): 9590–97. http://dx.doi.org/10.31004/basicedu.v6i6.4124.

Full text
Abstract:
This study aims to describe the application of the Critical Path Method (CPM) technique in educational planning at MIS Insan Kusuma Madani Namorambe Kapubaten Deli Serdang. This study uses a qualitative approach with a descriptive method, to explain the approach and method applied in the form of CPM techniques in educational planning. Obtaining data through observation techniques, interviews and document studies. The research data analysis technique uses data reduction (sorting), data presentation and conclusion drawing. Then, the data will be declared valid after being tested with data triang
APA, Harvard, Vancouver, ISO, and other styles
36

Efendi, Ahmad, and Romy Talanipa. "EVALUASI WAKTU MENGGUNAKAN CRITICAL PATH METHOD (CPM) PADA PROYEK JALAN RABAT BETON DESA KAMELANTA." Sang Pencerah: Jurnal Ilmiah Universitas Muhammadiyah Buton 5, no. 1 (2019): 1–6. http://dx.doi.org/10.35326/pencerah.v5i1.316.

Full text
Abstract:

 
 
 
 
 
 
 
 
 EVALUASI WAKTU MENGGUNAKAN CRITICAL PATH METHOD (CPM) PADA PROYEK JALAN RABAT 
 BETON DESA KAMELANTA 
 
 
 
 
 Ahmad Efendi 1), Romy Talanipa 2)
 1)S Prodi Teknik Sipil, Universitas Muhammadiyah Buton
 2) Prodi Teknik Sipil, Universitas Halu Oleo
 Email: fahlan.efendi@gmail.com 
 
 
 
 
 
 Abstrak
 
 Tujuan penelitian ini adalah untuk mengetahui pengendalian manajemen waktu pada proyek jalan rabat beton Desa Kamelanta Kecamatan Kapontori Kabupaten
APA, Harvard, Vancouver, ISO, and other styles
37

Mandaku, Hanok, M. Thezar Afifudin, and Gloria C. Parera. "PENERAPAN METODE CRITICAL PATH METHOD (CPM) PADA PENJADWALAN REPARASI KAPAL PATROLI XVI 2012." Jurnal Mitra Teknik Industri 3, no. 1 (2024): 12–19. http://dx.doi.org/10.24912/jmti.v3i1.29720.

Full text
Abstract:
Ship repair work at shipyard facilities at the Ship Repair Laboratory, Faculty of Engineering, Pattimura University has not implemented project scheduling methods to optimize performance. Determining the time and scheduling of ship repair work is still done based on experience alone. As a result, time and cost inefficiencies occur which result in low performance, making it difficult for the docking and shipping industry to develop and contribute to the development of the maritime sector. This research aims to optimize the 2012 XVI Patrol Ship repair schedule. The method used in this research i
APA, Harvard, Vancouver, ISO, and other styles
38

., Silvianita, Guna Wirawan, Daniel M. Rosyid, Suntoyo ., and Wimala L. Dhanistha. "Implementation of Critical Chain Project Management (CCPM) and Critical Path Method (CPM) on Scheduling Ship Repair Project." Journal of Engineering and Applied Sciences 14, no. 14 (2019): 4736–41. http://dx.doi.org/10.36478/jeasci.2019.4736.4741.

Full text
APA, Harvard, Vancouver, ISO, and other styles
39

Iman, Firdaus Hidayatul, Hadi Wahyono, and Eka Bambang Gusminto. "Evaluasi Penjadwalan Waktu Pada Proyek Pembangunan Rumah Tipe 30 Di Istana Tegal Besar Kabupaten Jember Dengan Metode CPM." e-Journal Ekonomi Bisnis dan Akuntansi 5, no. 2 (2018): 153. http://dx.doi.org/10.19184/ejeba.v5i2.8651.

Full text
Abstract:
This research was conducted to evaluate the scheduling of time in the project of building type 30 house in Tegal Besar Jember Palace. This research is an action research research using CPM method. The data used in this research are primary data and secondary data. Primary data in this research is data about how long building type 30 housing and expenses incurred to build type 30 house in Tegal Besar Palace Jember. Based on the result of research known that building of type 30 house in Tegal Besar Jember Palace based on CPM method for 54 days. While the cost out to build a type 30 house based o
APA, Harvard, Vancouver, ISO, and other styles
40

Dwiretnani, Annisaa, and Arrazaq Kurnia. "OPTIMALISASI PELAKSANAAN PROYEK DENGAN METODE CPM (CRITICAL PATH METHODE)." Jurnal Talenta Sipil 1, no. 2 (2018): 58. http://dx.doi.org/10.33087/talentasipil.v1i2.8.

Full text
Abstract:
Bangunan Mapolsek Danau Teluk yang lama sudah tidak memadai baik dari segi kualitas maupun dari kuantitas untuk menampung seluruh kegiatan pengguna didalamnya dengan baik dan lancer. pembangunan satu unit kantor Mapolsek Danau Teluk, yang berlokasi di Jl. KH. M. Saleh., dimaksudkan untuk menggantikan fungsi bangunan lama. Mapolsek Danau Teluk ini bertingkat dua dengan luas lantai 232,5 m2. Data yang digunakan pada penelitian ini yaitu data primer dan sekunder.Dalam melakukan analisa, perhitungan yang dilakukan peneliti berdasarkan pada data dari Proyek Pembangunan Mapolsek Danau Teluk. Adapun
APA, Harvard, Vancouver, ISO, and other styles
41

Elfandani, Moh Alviko, and Said Salim Dahda. "Analisis Manajemen Proyek Menggunakan Metode CPM dan PERT pada Proyek Instalasi Pipa di PT. XYZ." Journal of Management and Bussines (JOMB) 7, no. 3 (2025): 200–209. https://doi.org/10.31539/jomb.v7i3.15063.

Full text
Abstract:
This study aims to analyze the application of project management in pipe installation activities at PT. XYZ using the Critical Path Method (CPM) and Project Evaluation and Review Technique (PERT). The research method used is a descriptive quantitative approach through field observation, literature study, project activity data collection, and analysis of the Activity on Node (AON) type network. The results of the study indicate that the critical path of the project includes activities A–B–D–F–H–I, with an estimated duration of 144 days using CPM and 142.4 days using PERT. The calculation of the
APA, Harvard, Vancouver, ISO, and other styles
42

Suramli, Suramli, Natalia Fredi, I. Made Arya Abdi Wijaksana, Feby Resti Putri, and Santa Melisa Sindi Rongko. "CPM Analysis on Boarding House Construction Projects in Samarinda City." Journal of Business Management and Economic Development 2, no. 03 (2024): 1389–99. http://dx.doi.org/10.59653/jbmed.v2i03.1021.

Full text
Abstract:
Population growth increases the need for practical and affordable housing, so boarding houses become the main choice. Boarding house construction projects need to be managed through good project management. This research discusses the use of the Critical Path Method (CPM) in the boarding house project on Jl. Mangkupalas Gg. Padai in Samarinda City. The CPM method is used to determine project duration and optimize costs, with information on work, costs and time for each stage. The results show the critical activity path A – B – C – E – F – G – H – I – K, reducing the project duration from 210 d
APA, Harvard, Vancouver, ISO, and other styles
43

Auzan, Zulfakar, Mediana Desfita, Nanda Nanda, and Kharisma Permata Sari. "ANALISIS PROYEK PEMBANGUNAN LABORATORIUM SENTRAL UNIVERSITAS ANDALAS DENGAN METODE CRITICAL PATH METHOD." JURNAL RIVET 4, no. 01 (2024): 1–5. https://doi.org/10.47233/rivet.v4i01.1613.

Full text
Abstract:
CPM (Critical Path Method) is a method for determining the priority of activities that must receive careful supervision attention so that activities can be completed according to plan. The problem in this study is that there are several jobs that are delayed and must be accelerated. The purpose of this study is to find out the activities that are on the critical path and compare the initial time and cost of the project with the time and cost after using the CPM method. This research method uses a quantitative approach. The results of the discussion in this study indicate that the critical path
APA, Harvard, Vancouver, ISO, and other styles
44

WANG, Chen, Hamzah ABDUL-RAHMAN, and Pui See CHOW. "DEVELOPMENT AND TEST RUN OF CIVIL ENGINEERING SCHEDULE ACCELERATION MODEL THROUGH ANT COLONY OPTIMIZATION." JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 22, no. 8 (2016): 1009–20. http://dx.doi.org/10.3846/13923730.2014.945954.

Full text
Abstract:
The traditional scheduling tool Critical Path Method (CPM) exhibits limitations in computational insufficiency due to exhaustive enumeration. Ant Colony Optimization (ACO) was therefore applied as a metaheuristic inspired by the ants behavior in foraging activities. A model development team was formed among construction engineers, IT professionals, and Mathematicians to develop a schedule acceleration model by integrating ACO into CPM to ensure proper resources allocated on critical path. The developed model CSAM-ACO targets on schedule acceleration by allocating resources on the newly found c
APA, Harvard, Vancouver, ISO, and other styles
45

Shankar, N. Ravi, B. Pardha Saradhi, and S. Suresh Babu. "Fuzzy Critical Path Method Based on a New Approach of Ranking Fuzzy Numbers using Centroid of Centroids." International Journal of Fuzzy System Applications 3, no. 2 (2013): 16–31. http://dx.doi.org/10.4018/ijfsa.2013040102.

Full text
Abstract:
The Critical Path Method (CPM) is useful for planning and control of complex projects. The CPM identifies the critical activities in the critical path of an activity network. The successful implementation of CPM requires the availability of clear determined time duration for each activity. However, in practical situations this requirement is usually hard to fulfil since many of activities will be executed for the first time. Hence, there is always uncertainty about the time durations of activities in the network planning. This has led to the development of fuzzy CPM. In this paper, a new appro
APA, Harvard, Vancouver, ISO, and other styles
46

Yuliani, Novita, Nabila Khairunnisa Az Zahra, and Sutrisno Sutrisno. "Penjadwalan Waktu Proyek Pembangunan Tempat Gym Menggunakan Metode CPM (Critical Path Method)." Industrika : Jurnal Ilmiah Teknik Industri 8, no. 4 (2024): 947–54. https://doi.org/10.37090/indstrk.v8i4.1466.

Full text
Abstract:
Project scheduling is a method of arranging a schedule of tasks to be carried out to realize or achieve certain goals, by filling in a table of the time needed to complete. Critical Part Method (CPM) is a program method that can calculate the time needed to complete all activities and determine which ones the project implementer should pay attention to to ensure they can be completed as planned. The purpose of this study is to identify the critical path to which critical activities are included, as well as evaluate the scheduling between the project owner's planned time and the duration of the
APA, Harvard, Vancouver, ISO, and other styles
47

Utomo, Gunaedy, Irna Hendriyani, and Siti Nor Aida. "Evaluasi Pelaksanaan Proyek Drainase Dengan Metode CPM Dan PERT." Media Ilmiah Teknik Sipil 9, no. 1 (2020): 44–52. http://dx.doi.org/10.33084/mits.v9i1.1884.

Full text
Abstract:
This research purposes to evaluate the implementation of the drainage project in Jl. Mulawarman, Gg. Arjuna, Sepinggan. This research uses the CPM (Critical Path Method) and the PERT (Project Evaluation and Review Technique). Based on the budget plan, time schedule, weekly report, documentation and interview found that the result of the CPM with two critical paths are work activities. The first critical path are: Activity A (Mobilization and Demobilization), Activity C (Landfilling activity), Activity F (Concrete works K-175, Ready Mix). The second critical path are: Activity A (Mobilization a
APA, Harvard, Vancouver, ISO, and other styles
48

Purba, Switamy Angnitha. "Analisis Jaringan Kerja dengan Metode Critical Path Method (CPM) dan Model Program Linier." Jurnal Absis: Jurnal Pendidikan Matematika dan Matematika 4, no. 1 (2021): 429–38. http://dx.doi.org/10.30606/absis.v4i1.993.

Full text
Abstract:
Network analysis is part of a project that requires time for each network activity. To produce a particular project there is more than one job/event that must be done. Each job/event is interconnected and placed in order according to the management of its implementation. In network projects, it is necessary to plan and supervise systematically, in order to obtain work efficiency. The network is represented in symbols and arrows. In this study, the problem-solving network analysis was solved using the CPM (Critical Path Method) method and with a linear programming model using the help of excel-
APA, Harvard, Vancouver, ISO, and other styles
49

Fadila ilaika, Dwi Indra Prasetya, and Dwi Irwati. "ANALISIS PENJADWALAN PROYEK PERUMAHAN DI PT DBUS MENGGUNAKAN METODE CRITICAL PATH METHOD (CPM) DAN PRECEDENCE DIAGRAM METHOD (PDM)." Journal Industrial Engineering and Management (JUST-ME) 6, no. 01 (2025): 43–48. https://doi.org/10.47398/justme.v6i01.110.

Full text
Abstract:
Penjadwalan sangat memengaruhi jumlah waktu yang tersedia untuk menyelesaikan proyek di PT DBUS, ini dilakukan untuk mencapai hasil terbaik dengan mempertimbangkan keterbatasan yang ada. PT DBUS sering mengalami masalah dengan waktu penyelesaian proyek yang tidak tepat waktu, masalah ini dapat mengurangi kepercayaan konsumen. Tujuan dari penelitian ini adalah untuk menganalisis metode penjadwalan mana yang lebih efektif antara Critical Path Method (CPM) dengan Precedence Diagram Method (PDM) dibandingkan dengan kondisi saat ini. Data yang digunakan dalam penelitian ini berasal dari data sekund
APA, Harvard, Vancouver, ISO, and other styles
50

Itani, Kishor. "Mastering Construction Schedules: The Power of CPM and Pert Integration." International Journal for Research in Applied Science and Engineering Technology 11, no. 10 (2023): 868–75. http://dx.doi.org/10.22214/ijraset.2023.56111.

Full text
Abstract:
Abstract: Mastering construction schedules is a crucial task in project management, requiring a careful strategy for timely completion and overall success. This overview explores how Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) methods work together, highlighting the strength that comes from combining them. CPM, a certain method, focuses on putting tasks in order to find the critical path, which decides the project's duration. PERT, a method that considers uncertainties, provides a realistic view of timelines. Blending these methods creates a strong scheduling
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!