Academic literature on the topic 'Delay analysis for construction projects'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Delay analysis for construction projects.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Journal articles on the topic "Delay analysis for construction projects"

1

P, Aneesha, and Fazil P. "Delay Analysis in Educational Building Construction Projects." International Journal of Science and Research (IJSR) 10, no. 6 (2021): 1542–46. https://doi.org/10.21275/mr21625144634.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Shui, Steven, Andri Irfan Rifai, and Mulia Pamadi. "The Analysis Performance of Project Delays in Pile Foundation Work." IJEBD (International Journal of Entrepreneurship and Business Development) 6, no. 1 (2023): 172–82. http://dx.doi.org/10.29138/ijebd.v6i1.2158.

Full text
Abstract:
Purpose: Delays are common in construction projects. The term "project delay" refers to a project's completion date later than anticipated. Lack of performance by contractors or project managers in resolving issues can result in project delays. The factors that cause project delays must be considered to reduce delays. This study aims to examine the elements contributing to Batam island’s pile foundation construction delays.
 Findings: The factor of delays is an important key of the analysis to prevent delays in future projects
 Design/methodology/approach: This research uses a case s
APA, Harvard, Vancouver, ISO, and other styles
3

Thabani, Nyoni. "AN EMPIRICAL ASSESSMENT OF CAUSES & EFFECTS OF DELAY IN RESIDENTIAL CONSTRUCTION PROJECTS IN HARARE, ZIMBABWE." International Journal of Advances in Engineering & Scientific Research 5, no. 1 (2018): 34–46. https://doi.org/10.5281/zenodo.10777109.

Full text
Abstract:
<strong>ABSTRACT</strong> <em>Construction delay is one of the major problems faced by the construction industry in Zimbabwe. Understanding the causes and effects of construction delay is important to minimize and or avoid the impact of delay in residential construction projects in Zimbabwe. This research seeks to empirically determine the causes and effects of delay in construction projects in Zimbabwe. From the analysis of the questionnaire, causes and effects of delay were ranked using the Relative Importance Index (RII) approach. The overall results analysis indicate that poor financial co
APA, Harvard, Vancouver, ISO, and other styles
4

Viles, Elisabeth, Natalia Carolina Rudeli, and Adrian Santilli. "Causes of delay in construction projects: a quantitative analysis." Engineering, Construction and Architectural Management 27, no. 4 (2019): 917–35. http://dx.doi.org/10.1108/ecam-01-2019-0024.

Full text
Abstract:
Purpose The purpose of this paper is to perform a quantitative analysis of the literature in order to determine the main causes of delay in construction projects. Design/methodology/approach A set of 47 articles from the literature were analyzed, yielding 1,057 different causes of delay. In order to analyze and compare the main causes of delay, their degree of impact was studied statistically. Next, a mention count method was used to determine the primary causes of construction project delays and through the use of Pareto diagrams, the main causes of delays in construction projects were determ
APA, Harvard, Vancouver, ISO, and other styles
5

Malunjkar, Himanshu, and Madhura Aher. "Delay Analysis of Road Construction Projects using RII Method." International Journal for Research in Applied Science and Engineering Technology 11, no. 5 (2023): 4979–85. http://dx.doi.org/10.22214/ijraset.2023.52668.

Full text
Abstract:
Abstract: The aim of this paper is to propose and recommend a tool for contractors before the bidding stage to calculate the effect of delay in road construction projects by finding the relative importance index (RII) method. Through a rigorous literature search and interviews with road construction professionals, 95 delay causes were discovered and classified into 9 broad groups for this purpose. The relative importance index approach was used to calculate the relative relevance of delay factors and groups. The ranking of these factors and groups were illustrated in terms of their impact on d
APA, Harvard, Vancouver, ISO, and other styles
6

Melvin, Melvin, Andri Irfan Rifai, and Amanatullah Savitri. "Analysis Performance for Evaluation of Schedule Irregularities on Bore Pile Foundation with FTA." IJEBD (International Journal of Entrepreneurship and Business Development) 6, no. 1 (2023): 122–29. http://dx.doi.org/10.29138/ijebd.v6i1.2110.

Full text
Abstract:
Purpose: In construction projects, delays are disruptive and expensive. Therefore, the reason for the schedule delay needs to be identied. The delay factors determined in previous research were predominantly studied through surveys. In these studies, the participants were a stakeholder in construction projects, and the reason for schedule lateness was identied through their point of view.&#x0D; Design/methodology/approach: This research is conducted at a bored pile project in Opus Apartment, Batam, Indonesia. The studies are done through the Fault Tree Analysis method to find the root causes o
APA, Harvard, Vancouver, ISO, and other styles
7

Amin, Sherif, and Mohamed Abdelalim Ahmed. "Delay Analysis Techniques and Claim Assessment in Construction Projects." International Journal of Management and Commerce Innovations 10, no. 2 (2023): 316–25. https://doi.org/10.5281/zenodo.7509156.

Full text
Abstract:
<strong>Abstract:</strong> The purpose of this research was to provide an understanding of what causes delays and claims in construction projects, along with the identification of multiple techniques that can be used for those issues causing delays. The true significance of this research lies in the bridging of gaps that were identified through a review of literature, along with the provision of essential findings based on a singular topic housing all of the associated variables so that every domain of related information could be explored and presented to the concerned people such as the cons
APA, Harvard, Vancouver, ISO, and other styles
8

K.V., Prasad, Vasugi V., Venkatesan R., and Nikhil Bhat. "Analysis of causes of delay in Indian construction projects and mitigation measures." Journal of Financial Management of Property and Construction 24, no. 1 (2019): 58–78. http://dx.doi.org/10.1108/jfmpc-04-2018-0020.

Full text
Abstract:
Purpose Construction projects in India continue to suffer excessive delays. This paper aims to investigate the delay causes in India by project sector (transport, power, buildings and water) and carry out a comparative study of delay causes in design build (DB) projects with that of design bid build (DBB) projects along with mitigation measures. Design/methodology/approach A questionnaire survey was conducted among major clients, contractors and consultants in India. Importance Index was used for ranking of the delay causes. Projects were categorized based on the type, and causes of delay in e
APA, Harvard, Vancouver, ISO, and other styles
9

Saha, Saibal Kumar, Anchal Patil, Ashish Dwivedi, and Aparna S. Pillai. "Analyzing the interactions among delay factors in construction projects: A multi criteria decision analysis." Reports in Mechanical Engineering 4, no. 1 (2023): 241–55. http://dx.doi.org/10.31181/rme040116112023s.

Full text
Abstract:
The construction industry is a crucial sector that drives economic growth and facilitates socio-economic development. However, construction projects often get delayed due to multiple controllable and uncontrollable circumstances. In this scenario, the construction industry is striving for potential solutions to resolve project delays. Thus, the present study objectives to analyze the delay factors that affect the timely accomplishment of construction projects in the context of emerging economies. The study adopts a mixed methodology comprising of Delphi, Total Interpretive Structural Modelling
APA, Harvard, Vancouver, ISO, and other styles
10

Barqawi, Mohammad, Heap-Yih Chong, and Emil Jonescu. "A Review of Employer-Caused Delay Factors in Traditional and Building Information Modeling (BIM)-Enabled Projects: Research Framework." Advances in Civil Engineering 2021 (April 22, 2021): 1–24. http://dx.doi.org/10.1155/2021/6696203.

Full text
Abstract:
Construction delays are considered a common worldwide problem. Previous studies have investigated construction delay factors from the perspectives of different project stakeholders. However, a thorough analysis of such delays on different types of construction projects in different geographies is still lacking, precisely the effect of employers’ delays in traditional and building information modeling (BIM)-enabled projects. This research proposes a research framework to address potential employer-caused delay factors in traditional and BIM-enabled projects. A cross-sectional literature search
APA, Harvard, Vancouver, ISO, and other styles
More sources

Dissertations / Theses on the topic "Delay analysis for construction projects"

1

Ghaziani, Aydin. "A Fuzzy Delay Assessment Tool For Construction Projects." Master's thesis, METU, 2012. http://etd.lib.metu.edu.tr/upload/12614595/index.pdf.

Full text
Abstract:
It is a known fact that construction projects do not often complete on time due to several reasons related with the unexpected changes in the project conditions, external factors or performance of project participants. Since construction projects are unique and limited information is available at the beginning of the projects, prediction of delays is a difficult task. However, if the delays can be assessed at the early stages, their impacts might be minimized, some of the delays can even be eliminated. This study introduces a delay assessment methodology which can be used to predict delays bot
APA, Harvard, Vancouver, ISO, and other styles
2

Besogul, Ercan. "Reasons Of Delays In Steel Construction Projects: An Application Of A Delay Analysis Methodology." Master's thesis, METU, 2006. http://etd.lib.metu.edu.tr/upload/12607159/index.pdf.

Full text
Abstract:
Delay is one of the most common problems in the steel construction industry. At the time of bidding steel contractors plan tasks and assign resources according to the site visits, the information given in the contract and specifications related with the project. However, as the project progresses some conditions of the work may change. These changes may affect originally planned means and methods. Finally, the affected activities cause the project total cost and duration to increase. In steel construction projects, if not managed properly in accordance with the contract, changes are likely to
APA, Harvard, Vancouver, ISO, and other styles
3

Dayi, Songul. "Schedule Delay Analysis In Construction Projects: A Case Study Using Time Impact Analysis Method." Master's thesis, METU, 2010. http://etd.lib.metu.edu.tr/upload/12612823/index.pdf.

Full text
Abstract:
Inadequate or weak preparatory work before starting construction of any structure may cause serious problems during the construction period. For example, projects without sufficient detailed drawings or construction schedules and a disorganized building site can create many problems in the management and completion of the construction works. Consequently, the cost of construction increases digressively, the construction duration of the project extends and the quality of construction is affected adversely. This study dwells on the importance of construction schedules in achieving the aim of p
APA, Harvard, Vancouver, ISO, and other styles
4

Shebob, Abdulhamid. "Development of a methodology for analysing and quantifying delay factors affecting construction projects in Libya." Thesis, Teesside University, 2012. http://hdl.handle.net/10149/315373.

Full text
Abstract:
Construction delays are one of the biggest issues facing the construction industry and affecting delivery in terms of time, budget and the required quality. The characteristics of delay factors and their level of impact vary from project to project, ranging from a few days to years. They have significant financial, environmental and social impacts in construction projects; therefore, it is vital to investigate the causes of delay and analyse their impact. In this context, the research study was initiated to develop a new methodology for analysing and quantifying the impacts of delay factors on
APA, Harvard, Vancouver, ISO, and other styles
5

Keane, Patrick J. "A computer-aided systematic approach to time delay analysis for extension of time claims on construction projects." Thesis, Loughborough University, 1994. https://dspace.lboro.ac.uk/2134/6758.

Full text
Abstract:
A review of existing literature and research findings indicated that whilst the incidence of time extension claims is increasing, Contractors are failing to gather, analyse and present data as evidence to such an extent that there is a high rejection rate of claims made, and a consequent significant dissatisfaction rate amongst Contractors with awards being made. The current difficulties experienced by Contractors in managing information on site locations, combined with the low investment in, and usage of Information Technology, forms a major contribution to the problems arising in the prepara
APA, Harvard, Vancouver, ISO, and other styles
6

Al-Humaidi, Hanouf M. "A fuzzy logic approach to model delays in construction projects." Columbus, Ohio : Ohio State University, 2007. http://rave.ohiolink.edu/etdc/view?acc%5Fnum=osu1185539202.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Ozdemir, Mustafa. "A Probabilistic Schedule Delay Analysis In Construction Projects By Using Fuzzy Logic Incorporated With Relative Importance Index (rii) Method." Master's thesis, METU, 2010. http://etd.lib.metu.edu.tr/upload/12612169/index.pdf.

Full text
Abstract:
The aim of this thesis is to propose a decision support tool for contractors before the bidding stage to quantify the probability of schedule delay in construction projects by using fuzzy logic incorporated with relative importance index (RII) method. Eighty three (83) different schedule delay factors were identified through detailed literature review and interview with experts from a leading Turkish construction company, then categorized into nine (9) groups and visualized by utilizing Ishikawa (Fish Bone) Diagrams. The relative importances of schedule delay factors were quantified by relativ
APA, Harvard, Vancouver, ISO, and other styles
8

Karami, Hamidreza. "Causality Analysis of Construction Delays and Value Engineering Protocols in Marine Projects." Thesis, Curtin University, 2021. http://hdl.handle.net/20.500.11937/84946.

Full text
Abstract:
The central argument of this study is that if delay causation themes are known, but they are not analyzed by project peculiarities, research outcomes are not likely to deliver clear impact. Thus, this study aims to examine delay causations and how they apply to marine projects, and whether they can be mitigated by specific value engineering (VE) processes.
APA, Harvard, Vancouver, ISO, and other styles
9

Beşoğul, Ercan Supervisor :. Dikmen Toker İrem. "Reasons of delays in steel construction projects : an application of a delay analysis methodology \h [Electronic resource] / \c Ercan Beşoğul, Supervisor Assoc. Prof. Dr. İrem Dikmen Toker." Ankara : METU, 2006. http://etd.lib.metu.edu.tr/upload/12607159/index.pdf.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Alsaqqa, Obada. "Fuzzy Time-Delay Model in Fault-Tree Analysis for Critical Path Method." The Ohio State University, 2015. http://rave.ohiolink.edu/etdc/view?acc_num=osu1429772426.

Full text
APA, Harvard, Vancouver, ISO, and other styles
More sources

Books on the topic "Delay analysis for construction projects"

1

Keane, P. J. Delay analysis in construction. John Wiley & Sons, 2008.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
2

Keane, P. J., and A. F. Caletka. Delay Analysis in Construction Contracts. John Wiley & Sons, Ltd, 2015. http://dx.doi.org/10.1002/9781118631102.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

American Society of Civil Engineers. Schedule delay analysis. American Society of Civil Engineers, 2017.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
4

Lowsley, Stephen. About time: Delay analysis in construction. RICS, 2006.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
5

Westmoreland, Michael Keith. Analysis of design changes on Navy construction projects. Available from the National Technical Information Service, 1991.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
6

John, Kelly. Value management of construction projects. Blackwell Science, 2003.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
7

Bruce, Campbell. Methods of cost-effectiveness analysis for highway projects. Transportation Research Board, National Research Council, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
8

M, Larson Susan, ed. Carbon monoxide analysis for highway projects: Final report. Univeristy of Illinois, Dept. of Civil Engineering, [2000], 1999.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
9

Gajurel, Ashish. Performance-based contracts for road projects: Comparative analysis of different types. Springer, 2014.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
10

Aghazadeh, Fereydoun. Analysis of user waiting costs for construction projects on Louisiana's interstate highway system. Louisiana Transportation Research Center, 2003.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
More sources

Book chapters on the topic "Delay analysis for construction projects"

1

Abonassrya, M., M. Alam, and A. Saifullah. "Analysis of Categories That Delay Global Construction Projects." In Lecture Notes in Civil Engineering. Springer Nature Singapore, 2023. http://dx.doi.org/10.1007/978-981-99-3330-3_15.

Full text
Abstract:
AbstractDelay in construction projects is a significant issue and concern for most construction companies. Many studies have addressed this issue by identifying the top-ranked causes, which vary according to project type, location, and the research method used. The combined factors of delay/time overrun need further analysis to understand the top-ranked factors considering the project context. We identified 360 delay/time overrun factors of construction projects from articles published in the past 10 years in top-quality journals ranked as per scientific journal ranking (SJR). The factors were
APA, Harvard, Vancouver, ISO, and other styles
2

Shukla, Bishnu Kant, Vaishnavi Bansal, S. Varadharajan, et al. "Identification and Analysis of Factors of Delay in Road Construction Projects." In Lecture Notes in Civil Engineering. Springer Nature Singapore, 2022. http://dx.doi.org/10.1007/978-981-19-4739-1_47.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Kuncoro, Bernadette Mega Claudia, and Tanti Octavia. "Analysis of Time Delay Factors in Multi Storey Building Construction Projects in Indonesia on Professionalism and Work Ethics." In Lecture Notes in Civil Engineering. Springer Nature Singapore, 2025. https://doi.org/10.1007/978-981-96-5654-7_32.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Sanyal, Aaditya Pratap, and Shankha Pratim Bhattacharya. "Using Confirmatory Factor Analysis to Identify Leading Causes of Construction Delay in Residential Real Estate Projects of India." In Lecture Notes in Civil Engineering. Springer Nature Singapore, 2025. https://doi.org/10.1007/978-981-96-4898-6_23.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Soetjipto, Jojok Widodo, Amalia Martha Sukmana, and Syamsul Arifin. "Investigating Construction Project Delay Using Fault Tree Analysis Based on Its Dominant Risk on Private Project." In Proceedings of the 5th International Conference on Rehabilitation and Maintenance in Civil Engineering. Springer Nature Singapore, 2022. http://dx.doi.org/10.1007/978-981-16-9348-9_78.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

AlGheth, Abdulhamid, and Md Ishak Sayuti. "Review of Delay Causes in Construction Projects." In Proceedings of AICCE'19. Springer International Publishing, 2019. http://dx.doi.org/10.1007/978-3-030-32816-0_28.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Edison, J. C. "Economic analysis of projects." In Infrastructure Development and Construction Management. Routledge, 2020. http://dx.doi.org/10.1201/9781003055624-4.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Burr, Andrew. "Forensic programme analysis." In Delay and Disruption in Construction Contracts, 6th ed. Informa Law from Routledge, 2024. http://dx.doi.org/10.4324/9780429196676-16.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Robertson, Graham. "Change management, delay analysis and disruption." In Essentials of Construction Planning and Scheduling. ICE Publishing, 2021. http://dx.doi.org/10.1680/ecps.65925.147.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Kambli, Akhil G., and Rohit R. Salgude. "Techniques of Construction Delay Analysis-A Review." In Lecture Notes in Civil Engineering. Springer Nature Singapore, 2024. http://dx.doi.org/10.1007/978-981-99-9458-8_54.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Conference papers on the topic "Delay analysis for construction projects"

1

Ikhsan, Ikhsan, Rosmariani Arifuddin, and Muhammad Asad Abdurrahman. "Risk Analysis of Delay in Construction Project Based on Design and Build Contract." In International Conference on Research in Engineering and Science Technology (IC-REST) 2023. Trans Tech Publications Ltd, 2025. https://doi.org/10.4028/p-gkp9mr.

Full text
Abstract:
The selection of a procurement system through Design-Build is one of the alternatives for reducing the project implementation schedule, but time delays still occur. This study aims to determine the priority of risk sources and risk control strategies using the house of risk method through a questionnaire given to experts as respondents. Forty risk events and 17 risk agents will be assigned to contractors experienced in design-build construction on building projects. Based on the analysis results, the highest risk priority was that the contract between the project owner and the design-build con
APA, Harvard, Vancouver, ISO, and other styles
2

Shankar, K. Vinoth, and D. Bhuvaneshwari. "Study on delay analysis in construction projects." In INNOVATIONS IN THERMAL, MANUFACTURING, STRUCTURAL AND ENVIRONMENTAL ENGINEERING: ICITMSEE’24. AIP Publishing, 2025. https://doi.org/10.1063/5.0264653.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Al Marri, Dana Ahmad, and Noof Mohamed Al Kaabi. "Why Construction Projects are delayed in PWA: Problems and Solutions." In The 2nd International Conference on Civil Infrastructure and Construction. Qatar University Press, 2023. http://dx.doi.org/10.29117/cic.2023.0049.

Full text
Abstract:
Construction is, by its nature, complex and uncertain. Changes and variations are inherently part of many construction projects, which require serious efforts to overcome. Project delay is a construction problem resulting in contractual claims, increased project cost, and decreased end-user satisfaction. This study investigates the root causes of project delay in Public Works Authority construction projects and gathers different perceptions on the causes of delay to propose a solution matrix that mitigate the effect of those delays and prevents its reoccurrence in future projects. A sample of
APA, Harvard, Vancouver, ISO, and other styles
4

Gammanage, S. H., and N. Gunarathna. "Delays and disruptions in the construction industry during the global pandemic." In 10th World Construction Symposium. Building Economics and Management Research Unit (BEMRU), University of Moratuwa, 2022. http://dx.doi.org/10.31705/wcs.2022.27.

Full text
Abstract:
COVID-19 pandemic has become a global catastrophe today dragging many nations towards severe economic distress. The Sri Lankan economy has no exception. Not surprisingly, the sluggish economic conditions in the country have adversely affected the construction industry in Sri Lanka. The pandemic has resulted in almost every construction project getting delayed or disrupted. This research aims to determine the factors that caused delays and disruptions in large scale construction projects in Sri Lanka due to pandemic. The overall impact of the global pandemic on construction projects in both loc
APA, Harvard, Vancouver, ISO, and other styles
5

Fawzy, Salwa, and Islam El-Adaway. "Applying Delay Analysis Techniques to the World Bank Funded Projects." In Construction Research Congress 2012. American Society of Civil Engineers, 2012. http://dx.doi.org/10.1061/9780784412329.002.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Sánchez, Omar, Karen Castañeda, Guillermo Mejía, and Eugenio Pellicer. "Delay Factors: A Comparative Analysis between Road Infrastructure and Building Projects." In Construction Research Congress 2020. American Society of Civil Engineers, 2020. http://dx.doi.org/10.1061/9780784482889.024.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Ud Din, Zia, Ali Raza, and Muhammad Babar Khan. "Comparative Analysis of Factors Causing Delay in Residential Construction Projects in Pakistan." In Construction Research Congress 2020. American Society of Civil Engineers, 2020. http://dx.doi.org/10.1061/9780784482889.067.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Madhu, V., and V. Sree Lakshmi. "Delay analysis of road construction projects from contractors, consultants and engineers perception." In ADVANCES IN SUSTAINABLE CONSTRUCTION MATERIALS. AIP Publishing, 2023. http://dx.doi.org/10.1063/5.0144449.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Yang, Jyh-Bin, Kuei-Mei Huang, Chang-Hung Lee, and Sheue-Meei Chen. "Delay Impact Analysis Method for Lost Productivity in Construction Projects." In 28th International Symposium on Automation and Robotics in Construction. International Association for Automation and Robotics in Construction (IAARC), 2011. http://dx.doi.org/10.22260/isarc2011/0175.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Yang, Jyh-Bin, Kuei-Mei Huang, and Chang-Hung Lee. "Evaluation of Delay Analysis Methodologies on Lost Productivity in Construction Projects." In 27th International Symposium on Automation and Robotics in Construction. International Association for Automation and Robotics in Construction (IAARC), 2010. http://dx.doi.org/10.22260/isarc2010/0072.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Reports on the topic "Delay analysis for construction projects"

1

Padhye, Suyash, Aishwarya Sharma, Hesam Arefkhani, et al. INDOT Project Change Orders: Root Causes and Recommendations. Purdue University, 2024. https://doi.org/10.5703/1288284317747.

Full text
Abstract:
This study analyzed the historical trends in change orders (COs) associated with the Indiana Department of Transportation (INDOT) highway contracts. It also investigated correlations between COs and base factors (district, project type, contract type, award amount, geographical area (rural vs. urban)), and sought to understand the effect of the root causes but not to predict CO based on root causes. Unlike the base factors, the root causes are unknown prior to construction. The study developed models that forecasted CO characteristics—CO likelihood, CO frequency (count), and CO severity (magni
APA, Harvard, Vancouver, ISO, and other styles
2

Boone, Jonathan, Bobby Sells, Matthew Davis, and Dan McDonald. Alternative analysis for construction progress data spatial visualization. Engineer Research and Development Center (U.S.), 2021. http://dx.doi.org/10.21079/11681/42166.

Full text
Abstract:
The U.S. Army Corps of Engineers (USACE) construction projects have multiple stakeholders that collaborate with project delivery team members during the execution of these projects. Many of these stakeholders are located across the U.S., which makes virtual interactions a common communication method for these teams. These interactions often lack spatial visualization, which can add complications to the progress reports provided and how the information is received/interpreted. The visualization of project progress and documents would be invaluable to the stakeholders on critical projects constr
APA, Harvard, Vancouver, ISO, and other styles
3

Fleming, Glen. An Analysis of Oregon Department of Transportation Planned Highway Construction Projects for Selected /years from 1978 to 1992. Portland State University Library, 2000. http://dx.doi.org/10.15760/etd.6947.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Howell, G. An analysis of the situation and current trends in the management of construction projects at Los Alamos National Laboratory. Office of Scientific and Technical Information (OSTI), 1994. http://dx.doi.org/10.2172/441730.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Kim, Joseph, and Jose Arroyo-Turcios. Conceptual Critical Success Factors Model on Infrastructure Sustainability Rating System for California Construction Projects. Mineta Transportation Institute, 2025. https://doi.org/10.31979/mti.2024.2324.

Full text
Abstract:
This report addresses the sensitivity and reliability of the sustainability rating systems by comparing each category’s verified scores with its respective submitted scores to evaluate how points are awarded for infrastructure projects, examine which categories present the most challenges for verification, and identify the best category for verification in the sustainability rating system. The authors conducted three analyses using credit score data obtained from fourteen actual civil infrastructure projects certified under Envision. First, the Natural World category had the highest average sc
APA, Harvard, Vancouver, ISO, and other styles
6

Kim, Joseph, and Patricia McCarthy. Evaluation of Sustainability Determinants to Develop a Sustainability Rating System for California Infrastructure Construction Projects. Mineta Transportation Institute, 2022. http://dx.doi.org/10.31979/mti.2022.2142.

Full text
Abstract:
This study evaluates the important sustainability determinants that affect factors’ success in meeting their sustainability goals when conducting infrastructure construction projects in California. The study implemented the online survey method to evaluate the sustainability characteristics that infrastructure industry professionals currently are aware of under the current situation in California. A data set of 25 validated survey responses is used for statistical data analysis using analysis of variables, Kruskal-Wallis tests, and two sample t-tests. The analysis results showed that the media
APA, Harvard, Vancouver, ISO, and other styles
7

Diggs-McGee, Brandy, Eric Kreiger, Megan Kreiger, and Michael Case. Print time vs. elapsed time : a temporal analysis of a continuous printing operation. Engineer Research and Development Center (U.S.), 2021. http://dx.doi.org/10.21079/11681/41422.

Full text
Abstract:
In additive construction, ambitious goals to fabricate a concrete building in less than 24 hours are attempted. In the field, this goal relies on a metric of print time to make this conclusion, which excludes rest time and delays. The task to complete a building in 24 hours was put to the test with the first attempt at a fully continuous print of a structurally reinforced additively constructed concrete (ACC) building. A time series analysis was performed during the construction of a 512 ft2 (16’x32’x9.25’) building to explore the effect of delays on the completion time. This analysis included
APA, Harvard, Vancouver, ISO, and other styles
8

Dinovitzer, Aaron. PR-214-134502-R01 Weld Hydrogen Cracking Risk Management Guide. Pipeline Research Council International, Inc. (PRCI), 2019. http://dx.doi.org/10.55274/r0011591.

Full text
Abstract:
PRCI and other organizations have funded research and development programs related to weld hydrogen cracking to develop tests, define hardness limits, understand diffusible hydrogen delivery, evaluate hydrogen cracking delay time and define weldment material hydrogen cracking susceptibility. These projects have produced results that can be used in developing or approving welding procedures, and electrodes or consumables. With all of this information available, hydrogen cracking is still being observed in new construction and in-service welds. This report has assembled samples of this informati
APA, Harvard, Vancouver, ISO, and other styles
9

Durden, Susan, Tyson Vaughan, and Brook Herman. Other social effects and social vulnerability analysis : existing resources. Engineer Research and Development Center (U.S.), 2022. http://dx.doi.org/10.21079/11681/44662.

Full text
Abstract:
The following technical note (TN) provides a summary of existing resources available to the US Army Corps of Engineers’ (USACE) districts that address benefits in the Other Social Effects account for evaluating the effects of water resource projects. Consideration of social factors is key to a complete, robust, water-resources analysis, and these resources provide planners and project development teams with approaches and tools for their consideration. "social effects—the constituents of life that influence personal and group definitions of satisfaction, well-being, and happiness —OSE Primer,
APA, Harvard, Vancouver, ISO, and other styles
10

Pulugurtha, Srinivas S., Abimbola Ogungbire, and Chirag Akbari. Modeling and Evaluating Alternatives to Enhance Access to an Airport and Meet Future Expansion Needs. Mineta Transportation Institute, 2023. http://dx.doi.org/10.31979/mti.2023.2120.

Full text
Abstract:
The continued growth of air travel calls for the incessant construction effort at many airports and their surroundings. Thus, there is a need to determine how airports can better manage existing infrastructure to accommodate this growth. This study, therefore, focuses on (1) investigating how changes in transportation infrastructure have affected travel time reliability (TTR) of the surrounding road network within the airport vicinity over time, and, (2) exploring selected unconventional intersection designs and proposing new inbound/outbound access routes from the nearby major roads to the ai
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!