Dissertations / Theses on the topic 'Delay analysis for construction projects'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 dissertations / theses for your research on the topic 'Delay analysis for construction projects.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Ghaziani, Aydin. "A Fuzzy Delay Assessment Tool For Construction Projects." Master's thesis, METU, 2012. http://etd.lib.metu.edu.tr/upload/12614595/index.pdf.

Full text
Abstract:
It is a known fact that construction projects do not often complete on time due to several reasons related with the unexpected changes in the project conditions, external factors or performance of project participants. Since construction projects are unique and limited information is available at the beginning of the projects, prediction of delays is a difficult task. However, if the delays can be assessed at the early stages, their impacts might be minimized, some of the delays can even be eliminated. This study introduces a delay assessment methodology which can be used to predict delays bot
APA, Harvard, Vancouver, ISO, and other styles
2

Besogul, Ercan. "Reasons Of Delays In Steel Construction Projects: An Application Of A Delay Analysis Methodology." Master's thesis, METU, 2006. http://etd.lib.metu.edu.tr/upload/12607159/index.pdf.

Full text
Abstract:
Delay is one of the most common problems in the steel construction industry. At the time of bidding steel contractors plan tasks and assign resources according to the site visits, the information given in the contract and specifications related with the project. However, as the project progresses some conditions of the work may change. These changes may affect originally planned means and methods. Finally, the affected activities cause the project total cost and duration to increase. In steel construction projects, if not managed properly in accordance with the contract, changes are likely to
APA, Harvard, Vancouver, ISO, and other styles
3

Dayi, Songul. "Schedule Delay Analysis In Construction Projects: A Case Study Using Time Impact Analysis Method." Master's thesis, METU, 2010. http://etd.lib.metu.edu.tr/upload/12612823/index.pdf.

Full text
Abstract:
Inadequate or weak preparatory work before starting construction of any structure may cause serious problems during the construction period. For example, projects without sufficient detailed drawings or construction schedules and a disorganized building site can create many problems in the management and completion of the construction works. Consequently, the cost of construction increases digressively, the construction duration of the project extends and the quality of construction is affected adversely. This study dwells on the importance of construction schedules in achieving the aim of p
APA, Harvard, Vancouver, ISO, and other styles
4

Shebob, Abdulhamid. "Development of a methodology for analysing and quantifying delay factors affecting construction projects in Libya." Thesis, Teesside University, 2012. http://hdl.handle.net/10149/315373.

Full text
Abstract:
Construction delays are one of the biggest issues facing the construction industry and affecting delivery in terms of time, budget and the required quality. The characteristics of delay factors and their level of impact vary from project to project, ranging from a few days to years. They have significant financial, environmental and social impacts in construction projects; therefore, it is vital to investigate the causes of delay and analyse their impact. In this context, the research study was initiated to develop a new methodology for analysing and quantifying the impacts of delay factors on
APA, Harvard, Vancouver, ISO, and other styles
5

Keane, Patrick J. "A computer-aided systematic approach to time delay analysis for extension of time claims on construction projects." Thesis, Loughborough University, 1994. https://dspace.lboro.ac.uk/2134/6758.

Full text
Abstract:
A review of existing literature and research findings indicated that whilst the incidence of time extension claims is increasing, Contractors are failing to gather, analyse and present data as evidence to such an extent that there is a high rejection rate of claims made, and a consequent significant dissatisfaction rate amongst Contractors with awards being made. The current difficulties experienced by Contractors in managing information on site locations, combined with the low investment in, and usage of Information Technology, forms a major contribution to the problems arising in the prepara
APA, Harvard, Vancouver, ISO, and other styles
6

Al-Humaidi, Hanouf M. "A fuzzy logic approach to model delays in construction projects." Columbus, Ohio : Ohio State University, 2007. http://rave.ohiolink.edu/etdc/view?acc%5Fnum=osu1185539202.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Ozdemir, Mustafa. "A Probabilistic Schedule Delay Analysis In Construction Projects By Using Fuzzy Logic Incorporated With Relative Importance Index (rii) Method." Master's thesis, METU, 2010. http://etd.lib.metu.edu.tr/upload/12612169/index.pdf.

Full text
Abstract:
The aim of this thesis is to propose a decision support tool for contractors before the bidding stage to quantify the probability of schedule delay in construction projects by using fuzzy logic incorporated with relative importance index (RII) method. Eighty three (83) different schedule delay factors were identified through detailed literature review and interview with experts from a leading Turkish construction company, then categorized into nine (9) groups and visualized by utilizing Ishikawa (Fish Bone) Diagrams. The relative importances of schedule delay factors were quantified by relativ
APA, Harvard, Vancouver, ISO, and other styles
8

Karami, Hamidreza. "Causality Analysis of Construction Delays and Value Engineering Protocols in Marine Projects." Thesis, Curtin University, 2021. http://hdl.handle.net/20.500.11937/84946.

Full text
Abstract:
The central argument of this study is that if delay causation themes are known, but they are not analyzed by project peculiarities, research outcomes are not likely to deliver clear impact. Thus, this study aims to examine delay causations and how they apply to marine projects, and whether they can be mitigated by specific value engineering (VE) processes.
APA, Harvard, Vancouver, ISO, and other styles
9

Beşoğul, Ercan Supervisor :. Dikmen Toker İrem. "Reasons of delays in steel construction projects : an application of a delay analysis methodology \h [Electronic resource] / \c Ercan Beşoğul, Supervisor Assoc. Prof. Dr. İrem Dikmen Toker." Ankara : METU, 2006. http://etd.lib.metu.edu.tr/upload/12607159/index.pdf.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Alsaqqa, Obada. "Fuzzy Time-Delay Model in Fault-Tree Analysis for Critical Path Method." The Ohio State University, 2015. http://rave.ohiolink.edu/etdc/view?acc_num=osu1429772426.

Full text
APA, Harvard, Vancouver, ISO, and other styles
11

Plummer, Judith Kate. "Assessing the effects of pre-construction delay in hydropower projects." Thesis, University of Cambridge, 2014. https://www.repository.cam.ac.uk/handle/1810/283946.

Full text
APA, Harvard, Vancouver, ISO, and other styles
12

Popescu-Kohler, Anamaria Iuliana. "Improvements to construction delay analysis techniques /." Digital version accessible at:, 1998. http://wwwlib.umi.com/cr/utexas/main.

Full text
APA, Harvard, Vancouver, ISO, and other styles
13

Tanaka, Toshiharu. "Analysis of claims in U.S. construction projects." Thesis, Massachusetts Institute of Technology, 1988. http://hdl.handle.net/1721.1/44665.

Full text
APA, Harvard, Vancouver, ISO, and other styles
14

Aghamohammadi, Parisa. "THEORETICAL ANALYSIS OF CONTRACT CHANGE IN CONSTRUCTION PROJECTS." 京都大学 (Kyoto University), 2014. http://hdl.handle.net/2433/192172.

Full text
APA, Harvard, Vancouver, ISO, and other styles
15

Westmoreland, Michael Keith. "Analysis of design changes on Navy construction projects." Thesis, Monterey, California. Naval Postgraduate School, 1991. http://hdl.handle.net/10945/25669.

Full text
APA, Harvard, Vancouver, ISO, and other styles
16

Hughes, Will. "Organizational analysis of building projects." Thesis, Liverpool John Moores University, 1989. http://researchonline.ljmu.ac.uk/4908/.

Full text
Abstract:
The principles of organization theory are applied to the organization of construction projects. This is done by proposing a framework for modelling the whole process of building procurement. This consists of a framework for describing the environments within which construction projects take place. This is followed by the development of a series of hypotheses about the organizational structure of construction projects. Four case studies are undertaken, and the extent to which their organizational structure matches the model is compared to the level of success achieved by each project. To this e
APA, Harvard, Vancouver, ISO, and other styles
17

Al, Jashaami Mohammed Ahmed Mohammed. "Improving delay management of construction projects by creating a systematic scoring scale to minimise/avoid delays." Thesis, Queensland University of Technology, 2021. https://eprints.qut.edu.au/226717/1/Mohammed_Al%20Jashaami_Thesis.pdf.

Full text
Abstract:
This thesis is a study of the worldwide problem of construction project delays. Checkland’s Soft Systems Methodology and content analysis of previous studies were used to acquire a systematic and holistic understanding of construction delays, which revealed that the futile thinking of management teams plays a vital role in the occurrence of delays. This finding was incorporated into a questionnaire survey of 130 engineers working for contractors, consultants and project management companies in the UAE to help identify the sub and super structural elements involved, and ultimately develop a sys
APA, Harvard, Vancouver, ISO, and other styles
18

Parry, Andrew. "The improvement of delay analysis in the UK construction industry." Thesis, Northumbria University, 2015. http://nrl.northumbria.ac.uk/27294/.

Full text
Abstract:
Delays are a common feature of construction projects and frequently lead to disputes between the parties. In resolving these disputes it is essential to have a robust methodology for analysing delays. It is argued that current understanding of available delay analysis methodologies is inadequate and hindered by taxonomic confusion. There is a need for guidance on available delay analysis methodologies and an explanation of how these are implemented, and, as a result, models have been proposed that aid practitioners in the selection of a defendable and most appropriate delay analysis method und
APA, Harvard, Vancouver, ISO, and other styles
19

Melik, Serhat. "Cash Flow Analysis Of Construction Projects Using Fuzzy Set Theory." Master's thesis, METU, 2010. http://etd.lib.metu.edu.tr/upload/12612517/index.pdf.

Full text
Abstract:
Construction industry is a one of the most risky sectors due to high level of uncertainties included in the nature of the construction projects. Although there are many reasons, the deficiency of cash is one of the main factors threatening the success of the construction projects and causing business failures. Therefore, an appropriate cash planning technique is necessary for adequate cost control and efficient cash management while considering the risks and uncertainties of the construction projects. The main objective of this thesis is to develop a realistic, reliable and cost-schedule inte
APA, Harvard, Vancouver, ISO, and other styles
20

Bilgin, Gozde. "An Ontology-based Approach For Delay Analysis." Master's thesis, METU, 2011. http://etd.lib.metu.edu.tr/upload/12613981/index.pdf.

Full text
Abstract:
Delay is a common problem of construction sector. Recent improvements in the sector increased the competition and this led the construction projects to be more complex than before and difficult to be completed in time. This situation not only increased the delay problems, but also made the analysis of delays difficult and that caused further problems as disputes between parties to the contract. Sound knowledge in delay analysis subject is needed to enhance the solution of the delay problem in construction projects. So, this study aims to share knowledge in delay analysis issue by construction
APA, Harvard, Vancouver, ISO, and other styles
21

Ranasinghe, Kulatilaka Arthanayake Malik Kumar. "Quantification of risks during feasibility analysis for capital projects." Thesis, University of British Columbia, 1986. http://hdl.handle.net/2429/26730.

Full text
Abstract:
The purpose of this thesis is to propose a consistent theory and a model based on it to estimate the uncertainty of project duration, cost, revenue, and net present value probabilistically. The model can be used to assist decision making on such strategic, feasibility analysis issues as contingency provision, reliability of an estimate for the "go-no go" decision, adopting phased or fast-track construction, etc. Project cost and revenue are evaluated in terms of current and discounted dollars, thereby emphasising the economic effect of time and inflation on net present value which is consider
APA, Harvard, Vancouver, ISO, and other styles
22

Abayneh, Alembo Zinash. "User delay costs and uncertainty in the traffic forecast for road projects." Thesis, KTH, Väg- och banteknik, 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-149465.

Full text
Abstract:
There are experimental based software packages as well as traffic simulation models that are used for analyzing life cycle cost of road projects. Among those our study was focused on currently available models to analyze the road user delay costs and to identify factors affecting road user delay costs. Sensitivity analyses were performed to identify the important factors that influence the user delay cost. Finally, prediction of future traffic demand as well as user delay cost, using the binomial lattice model, were presented to include the uncertainty of future traffic and user delay costs. T
APA, Harvard, Vancouver, ISO, and other styles
23

Mehdi, Riazi Salman Riazi. "The use of supply chain management to reduce delays as result of pre-construction deficiencies in Malaysian public sector construction projects." Thesis, Queensland University of Technology, 2014. https://eprints.qut.edu.au/74750/1/Salman%20Riazi_Mehdi%20Riazi_Thesis.pdf.

Full text
Abstract:
This thesis examined the delay causes of Malaysian public sector projects. Using a systematic approach, the researcher identified the main delay factors and categorised them into pathogens. The pathogens were matched with beneficial Supply Chain Management (SCM) tools and developed into a holistic SCM framework to facilitate improvements in Malaysian public sector projects. The researcher concluded that SCM is the potential saviour for the delay dilemma and that it is necessary for the Malaysian government to initiate the revolutionary practice.
APA, Harvard, Vancouver, ISO, and other styles
24

Howick, Susan M. "An exploration of the role of system dynamics in the analysis of disruption and delay for litigation." Thesis, University of Strathclyde, 2001. http://oleg.lib.strath.ac.uk:80/R/?func=dbin-jump-full&object_id=21576.

Full text
Abstract:
System Dynamics (SD) is a modelling approach that has been used to support litigation cases that are investigating overruns on large engineering projects caused by Disruption and Delay (D&D). However, the role that SD can play in the analysis of D&D in large projects is not fully understood. The first aim of the research is to explore the appropriateness of SD as a modelling approach in the analysis of D&D for litigation. Criteria on the suitability of SD to model a situation are taken from the SD literature and explored to understand their level of contribution to the research. Experiences fr
APA, Harvard, Vancouver, ISO, and other styles
25

McMillan, Lauren Ashley. "Analysis of Naval Facilities Engineering Command Military Construction projects and the overall Military Construction process." Thesis, (674 KB), 2005. http://library.nps.navy.mil/uhtbin/hyperion/05Aug%5FMcMillan.pdf.

Full text
APA, Harvard, Vancouver, ISO, and other styles
26

Bermúdez, Marcos José. "Analysis and quantification of risk of cost overruns in construction projects." Thesis, Massachusetts Institute of Technology, 1985. http://hdl.handle.net/1721.1/15145.

Full text
Abstract:
Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Civil Engineering, 1985.<br>MICROFICHE COPY AVAILABLE IN ARCHIVES AND ENGINEERING<br>Bibliography: leaves 121-123.<br>by José Bermúdez Marcos.<br>M.S.
APA, Harvard, Vancouver, ISO, and other styles
27

Braimah, Nuhu. "An investigation into the use of construction delay and disruption analysis methodologies." Thesis, University of Wolverhampton, 2008. http://hdl.handle.net/2436/38824.

Full text
Abstract:
Delay and disruption (DD) to contractors’ progress, often resulting in time and cost overruns, are a major source of claims and disputes in the construction industry. At the heart of the matter in dispute is often the question of the extent of each contracting party’s responsibility for the delayed project completion and extra cost incurred. Various methodologies have been developed over the years as aids to answering this question. Whilst much has been written about DD, there is limited information on the extent of use of these methodologies in practice. The research reported in this thesis w
APA, Harvard, Vancouver, ISO, and other styles
28

Bonander, Johan, and Hampus Ulriksson. "Risk Management in Residential Construction – An analysis of the risk management process of a Swedish construction company." Thesis, KTH, Fastigheter och byggande, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-190211.

Full text
Abstract:
Risk can be described as the absence of information when a decision is to be made at any time throughout a process. The construction industry is often considered as complex and defragmented due to working in a project based format; with a unique product and a process where there are times when decisions need to be made with insufficient information. Therefore, proper risk management processes can be vital to minimizing risks, maximizing opportunities and securing a successful project process. This master thesis has been conducted at a large Swedish construction company that houses both a const
APA, Harvard, Vancouver, ISO, and other styles
29

Ikpe, Elias Okede. "Development of cost benefit analysis model of accident prevention on construction projects." Thesis, University of Wolverhampton, 2009. http://hdl.handle.net/2436/98842.

Full text
Abstract:
The Health and Safety Executive estimated the annual cost to British employers and other duty holders failing to comply with health and safety requirements to be up to £18 billion. It is estimated that the construction industry contributed £2billion of these appalling statistics. To date, health and safety management is still perceived as being costly and counterproductive in the construction industry. This research investigated the net benefit of accident prevention and explored the relationship between preventative costs and these benefits, with a view to drawing attention to the economic co
APA, Harvard, Vancouver, ISO, and other styles
30

Akhavian, Reza. "A Framework for Process Data Collection, Analysis, and Visualization in Construction Projects." Master's thesis, University of Central Florida, 2012. http://digital.library.ucf.edu/cdm/ref/collection/ETD/id/5092.

Full text
Abstract:
Automated data collection, simulation and visualization can substantially enhance the process of designing, analysis, planning, and control of many engineering processes. In particular, managing processes that are dynamic in nature can significantly benefit from such techniques. Construction projects are good examples of such processes where a variety of equipment and resources constantly interact inside an evolving environment. Management of such settings requires a platform capable of providing decision-makers with updated information about the status of project entities and assisting site p
APA, Harvard, Vancouver, ISO, and other styles
31

Simpeh, Eric Kwame. "An analysis of the causes and impact of rework in construction projects." Thesis, Cape Peninsula University of Technology, 2012. http://hdl.handle.net/20.500.11838/1046.

Full text
Abstract:
A dissertation presented to the Higher Degrees Committee of the Cape Peninsula University of Technology in fulfilment of the requirements for the degree of Master of Technology: Construction Management, 2012<br>This study investigated the underlying causes of rework in construction projects and the impact on overall project performance so that effective containment and reduction strategies can be developed. The objectives of the study were as follows: (i) to determine the influence different project types have on the causes of rework in construction projects; (ii) to determine the impact of re
APA, Harvard, Vancouver, ISO, and other styles
32

Garcia, Sergio, Jose Michael Pisfil, Sandra Rodriguez, and Roger Luna. "Optimization of construction projects budget minimizing risks using the Monte Carlo method." Institute of Electrical and Electronics Engineers Inc, 2020. http://hdl.handle.net/10757/656565.

Full text
Abstract:
El texto completo de este trabajo no está disponible en el Repositorio Académico UPC por restricciones de la casa editorial donde ha sido publicado.<br>Currently, it is common for the risks in construction projects to generate significant budgetary deviations due to their null or insufficient identification and quantification. In relation to this point, and with the focus on improving the competitiveness of construction companies when developing and complying with their budgets, it is essential to have an accurate methodology for estimating the contingency associated with risks from an early s
APA, Harvard, Vancouver, ISO, and other styles
33

Wärmark, Katarina. "Assessment of water footprint for civil construction projects." Thesis, Institutionen för vatten och miljö, Sveriges Lantbruksuniversitet (SLU), 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-257147.

Full text
Abstract:
Water is an irreplaceable resource and the strain on it is getting tougher. Around 40 per cent of the water withdrawn in Europe is for industrial use. With a growing population and an increased demand for food and energy per capita, the demand and pressure on our water resources will increase. CEEQUAL is a rating scheme for the civil construction industry and has raised the water footprint as an important sustainability issue to consider when choosing building materials. There is however little knowledge within the industry of how to do this. This paper offers information regarding available
APA, Harvard, Vancouver, ISO, and other styles
34

Vasilyeva-Lyulina, Alena. "The Study on Methodological Framework for Comparing Delay Analysis Methods in Construction Contracts." 京都大学 (Kyoto University), 2013. http://hdl.handle.net/2433/174901.

Full text
APA, Harvard, Vancouver, ISO, and other styles
35

Wu, Jian. "A behavioral analysis of learning processes amongst construction project team members in China." Click to view the E-thesis via HKUTO, 2008. http://sunzi.lib.hku.hk/hkuto/record/B42841847.

Full text
APA, Harvard, Vancouver, ISO, and other styles
36

Membah, Joseph F. J. "Parametric Cost Estimating and Risk Analysis of Transportation Tunneling Projects." Diss., North Dakota State University, 2016. http://hdl.handle.net/10365/25908.

Full text
Abstract:
Due to the increased scrutiny of construction costs for infrastructure projects by the public and legislators, it is becoming increasing important for project developers to prepare accurate conceptual cost estimates for transportation tunnel projects at the feasibility stage to aid in making investment decisions. Past studies have emphasized that tunnel-project costs have been significantly underestimated, and cost uncertainties and risks have been identified as the cause of cost under or overestimation. A broad understanding of the factors that contribute to cost underestimation is impo
APA, Harvard, Vancouver, ISO, and other styles
37

Wang, Tao 1973. "Analysis of real options in hydropower construction projects : a case study in China." Thesis, Massachusetts Institute of Technology, 2003. http://hdl.handle.net/1721.1/30038.

Full text
APA, Harvard, Vancouver, ISO, and other styles
38

Staflund, Johan, and Rickard Östblom. "Identification of the Critical Delay Factors in the Subway Tunnel Construction in Stockholm : An explanatory Study Investigating the Project Delay and its Consequences on Property Developers." Thesis, KTH, Fastigheter och byggande, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-298227.

Full text
Abstract:
Stockholm is one of the fastest growing conurbations in Europe, to accommodate for the increased population and urban growth, the current subway system needs to be extended. Appropriately, a joint initiative regarding housing and infrastructure development was signed in January 2014 by the Swedish government, Stockholm County Council and the afflicted municipalities Stockholm, Solna, Nacka and Järfälla. The joint initiative, the 2013 Stockholm negotiation, presented an extension of the current subway system with a total length of 19,6 km and 11 new stations in Stockholm, Solna, Nacka and Järfä
APA, Harvard, Vancouver, ISO, and other styles
39

Rogers, Jennifer Kathleen. "Safety Benchmarking of Industrial Construction Projects Based on Zero Accidents Techniques." Thesis, Virginia Tech, 2012. http://hdl.handle.net/10919/42859.

Full text
Abstract:
Safety is a continually significant issue in the construction industry. The Occupation Safety and Health Administration as well as individual construction companies are constantly working on verifying that their selected safety plans have a positive effect on reduction of workplace injuries. Worker safety is a large concern for both the workers and employers in construction and the government also attempts to impose effective regulations concerning minimum safety requirements. There are many different methods for creating and implementing a safety plan, most notably the Construction Industry
APA, Harvard, Vancouver, ISO, and other styles
40

Alkharmany, Abdullah. "Project management : the effect of Saudi national culture on the attitudes of key stakeholders towards delay in construction projects in Saudi Arabia." Thesis, University of Brighton, 2017. https://research.brighton.ac.uk/en/studentTheses/8ed9c665-677f-4769-980b-49e70a801717.

Full text
APA, Harvard, Vancouver, ISO, and other styles
41

Hassanzadeh, Saïna. "Analysis of the causes of delay in collaborative decision-making under uncertainty in pharmaceutical R and D projects." Thesis, Toulouse, INPT, 2012. http://www.theses.fr/2012INPT0164/document.

Full text
Abstract:
Les décisions collaboratives sous incertitude dans les situations non urgentes peuvent être retardées, surtout lorsque la santé humaine et des investissements élevés sont en jeu comme c’est le cas des projets de R and D pharmaceutiques. Cette thèse étudie les causes des retards récurrents dans la prise de décision collaborative sous incertitude et les pratiques efficientes pour réduire ces retards. Pour mieux comprendre le problème des retards dans la prise de décision face à l’incertitude, nous étudions d’abord la notion d’incertitude et proposons une définition de l’incertitude adaptée au ma
APA, Harvard, Vancouver, ISO, and other styles
42

Fong, Hok-shing Michael, and 方學誠. "An analysis of the construction safety policy for public works projects in Hong Kong." Thesis, The University of Hong Kong (Pokfulam, Hong Kong), 2000. http://hub.hku.hk/bib/B31966160.

Full text
APA, Harvard, Vancouver, ISO, and other styles
43

Dlakwa, Mohammed Musa. "Analysis of some problems in the management and cost control of public sector construction projects in Nigeria." Thesis, University of Stirling, 1990. http://hdl.handle.net/1893/2144.

Full text
Abstract:
Development is a difficult, painful and long-term enterprise. Not only because of world wide social and economic changes with extensive debts problems, inflation, recession and slow growth, but it is also a matter of finding the technically and economically optimum solution. Over the long-term, the challenge for developing countries is to use their limited resources more efficiently and more equitably through the management of all investment outlays in both the public and private sector. Construction is a major investment sector in Nigeria, attracting an average of over 60% of all capital inve
APA, Harvard, Vancouver, ISO, and other styles
44

Bertagnoli, Troy D. "An analysis of pre-planning risk management practices utilized in residential and commercial construction projects." Online version, 2002. http://www.uwstout.edu/lib/thesis/2002/2002bertagnolit.pdf.

Full text
APA, Harvard, Vancouver, ISO, and other styles
45

Bektas, Sinasi. "Shortcomings Of Delay Analysis Practices: A Case Study Using An Integrated Approach." Master's thesis, METU, 2012. http://etd.lib.metu.edu.tr/upload/12614791/index.pdf.

Full text
Abstract:
Many factors such as unforeseeable events, managerial or financial problems of Contractor, insufficient technical capacity of Engineer&#039<br>s site team and so on may lead to delays in construction projects. Proper analysis of compensability and quantum of a delay event is very important. Any delay analysis application can be considered as a result of the combination of contract documents, scheduler, record keeping mechanism at site, communication among project participants, delay analyst and delay analysis methodology. The main purpose of this study is to analyze the shortcomings frequently
APA, Harvard, Vancouver, ISO, and other styles
46

Cook, Iain Murray. "Risk analysis and management systems in South African construction project management practices." Thesis, Nelson Mandela Metropolitan University, 2016. http://hdl.handle.net/10948/3469.

Full text
Abstract:
Risk management (RM) should be seen as one of the most important functions in the South African built environment. Without the effective management of the risks associated with the industry, the noble vision of a sector that is efficient, profitable, and sustainable cannot be achieved. By embracing tried and tested policies that successfully mitigate risk, industry stakeholders will achieve many project successes, and will outlast any competitors that choose to ignore, or are ignorant of the fact, that the negative impact risk has on projects is inversely proportional to the level of RM employ
APA, Harvard, Vancouver, ISO, and other styles
47

Wu, Jian, and 武健. "A behavioral analysis of learning processes amongst construction project team members in China." Thesis, The University of Hong Kong (Pokfulam, Hong Kong), 2008. http://hub.hku.hk/bib/B42841847.

Full text
APA, Harvard, Vancouver, ISO, and other styles
48

Nicholas, Thomas C. "SFTYCHEF: A Consultative, Diagnostic Expert System for Trench Excavation Safety Analysis on Light Commercial Construction Projects." Thesis, Pennsylvania State University, 1987. http://hdl.handle.net/10945/41619.

Full text
Abstract:
Approved for public release, distribution unlimited<br>All original copies missing. Best digital copy available.<br>The development of a prototype knowledge-based expert system to assist safety analyses of short term, trench excavations on light commercial construction projects is presented. Background information for trench excavation hazards, OSHA safety compliance regulations, in-the-field soils analysis techniques, timber shoring design, and expert system development is introduced. Detailed discussion of the design and construction of a knowledge base for the safety analyses of short term
APA, Harvard, Vancouver, ISO, and other styles
49

Oakes, Patrick W. "Projects in the Design and Construction of a Scanning Tunneling Microscope and UHV Sample Analysis Chamber." Thesis, Boston College, 2004. http://hdl.handle.net/2345/464.

Full text
Abstract:
Thesis advisor: Vidya Madhavan<br>Three projects have been undertaken during the design and the construction of a scanning tunneling microscope. The first project focuses on a method of testing the movement of piezoelectric ceramics by means of a modified Michelson interferometer. These tests determine the magnitude and the direction of motion on the scale of a few angstroms. These piezos are then used in moving the tip of the STM. The second project concerned the design of a surface analysis chamber to be used for thin film depositions. This chamber will operate at UHV levels and will produce
APA, Harvard, Vancouver, ISO, and other styles
50

Zhu, Jin. "A System-of-Systems Framework for Assessment of Resilience in Complex Construction Projects." FIU Digital Commons, 2016. http://digitalcommons.fiu.edu/etd/2556.

Full text
Abstract:
Uncertainty is a major reason of low efficiency in construction projects. Traditional approaches in dealing with uncertainty in projects focus on risk identification, mitigation, and transfer. These risk-based approaches may protect projects from identified risks. However, they cannot ensure the success of projects in environments with deep uncertainty. Hence, there is a need for a paradigm shift from risk-based to resilience-based approaches. A resilience-based approach focuses on enhancing project resilience as a capability to cope with known and unknown uncertainty. The objective of this re