Academic literature on the topic 'Delay in construction project'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Delay in construction project.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Journal articles on the topic "Delay in construction project"

1

Phadtare, Milind T. "Causes of Delay in Budget Hotel Construction Projects." International Journal of Information Systems and Social Change 5, no. 3 (2014): 49–63. http://dx.doi.org/10.4018/ijissc.2014070104.

Full text
Abstract:
Delay in construction projects is a universal phenomenon. However, the topic is not adequately studied in the Indian context. This paper attempts to identify the causes of delays in construction of budget hotels in India and suggest remedies to avoid some delays. A business group constructing budget hotels across the country is approached for this study. Forty causes of delay have been identified and Relative Importance Index was calculated. The contribution of each category of causes of delay to overall delay in the projects was computed. Remedies such as, joint effort of the participants of
APA, Harvard, Vancouver, ISO, and other styles
2

MR., KARTIK BAGRECHA, and AYUSHI BAIS MS. "STUDY ON DELAY CONSTRUCTION PROJECT IN INDIA." International Journal of Innovations in Engineering Research and Technology 4, no. 11 (2017): 6–10. https://doi.org/10.5281/zenodo.1098506.

Full text
Abstract:
The Indian construction project has experienced significant delays. The construction industry is large, volatile and requires high investment. Delays occur in almost all construction projects, and the importance of these delays varies widely from project to project. During construction, the delay may be defined as exceeding the completion date specified in the contract or exceeding the date on which the parties agreed to the delivery of the project. Delay means loss of revenue due to lack of production facilities and rental space, as well as dependency on current facilities. Project delays are
APA, Harvard, Vancouver, ISO, and other styles
3

Dr., P. P. Bhangale*. "INVESTIGATION OF CAUSES OF DELAY IN HIGH RISE BUILDING, CASE STUDY-PUNE." INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY 6, no. 10 (2017): 152–59. https://doi.org/10.5281/zenodo.1002679.

Full text
Abstract:
Delays in a construction project can be regarded as a failure. This paper aims to investigate the causes of delay in high rise building projects in Pune city.The industry which is experiencing frequent and costly delays is the building and construction industry. However, a numbers of construction projects which had the delay problems are very significant. Construction project involves many unpredicted factors which results from many sources. These sources include the performance of contractors, resources availability, weather conditions and contract systems. However it occurs in every construc
APA, Harvard, Vancouver, ISO, and other styles
4

Thapanont, Pornsirichotirat, Charoenpornpattana Santi, and Xinghatiraj Pruethipong. "Causes of delay on highway construction projects in Thailand." MATEC Web of Conferences 192 (2018): 02014. http://dx.doi.org/10.1051/matecconf/201819202014.

Full text
Abstract:
Delay in construction project is an important issue in construction management. This is because delay will cause negative impacts on both the owner and the contractor. For owner, it will lead to the late opening of new road. For contractor, it will cause extra operating cost. In this paper, therefore, the causes of delay in road construction projects are researched. This paper studied a list of road construction delay causes gathered from literature having different countries. Internationally, twenty-six factors that might cause delays of road construction projects are identified in this resea
APA, Harvard, Vancouver, ISO, and other styles
5

MR., KARTIK BAGRECHA. "STUDY ON DELAY CONSTRUCTION PROJECT IN INDIA." IJIERT - International Journal of Innovations in Engineering Research and Technology 4, no. 11 (2017): 6–10. https://doi.org/10.5281/zenodo.1456268.

Full text
Abstract:
<strong>The Indian construction project has experienced significant delays. The construction industry is large,volatile and requires high investment. Delays occur in almost all construction projects,and the importance of these delays varies widely from project to project. During construction,the delay may be defined as exceeding the completion date specified in the contract or exceeding the date on which the parties agreed to the delivery of the project. Delay means loss of revenue due to lack of production facilities and rental space,as well as dependency on current facilities. Project delays
APA, Harvard, Vancouver, ISO, and other styles
6

Barqawi, Mohammad, Heap-Yih Chong, and Emil Jonescu. "A Review of Employer-Caused Delay Factors in Traditional and Building Information Modeling (BIM)-Enabled Projects: Research Framework." Advances in Civil Engineering 2021 (April 22, 2021): 1–24. http://dx.doi.org/10.1155/2021/6696203.

Full text
Abstract:
Construction delays are considered a common worldwide problem. Previous studies have investigated construction delay factors from the perspectives of different project stakeholders. However, a thorough analysis of such delays on different types of construction projects in different geographies is still lacking, precisely the effect of employers’ delays in traditional and building information modeling (BIM)-enabled projects. This research proposes a research framework to address potential employer-caused delay factors in traditional and BIM-enabled projects. A cross-sectional literature search
APA, Harvard, Vancouver, ISO, and other styles
7

Ogunde, Ayodeji Olubunmi, Odje Emmanuel Dafe, Gbemisola Ajoke Akinola, et al. "Factors Militating Against Prompt Delivery of Construction Projects in Lagos Megacity, Nigeria: Contractors’ Perspective." Mediterranean Journal of Social Sciences 8, no. 3 (2017): 233–42. http://dx.doi.org/10.5901/mjss.2017.v8n3p233.

Full text
Abstract:
Abstract Delay is a common issue faced in the construction industry all over the world especially in developing countries. The aim of this study is to evaluate factors causing delays and their effects on construction projects in Lagos Mega City, Nigeria from the contractors’ perspective. It is predicated on the incessant delay experienced by contractors on construction projects. Purposive sampling method was adopted for the study;. Quantitative data was obtained by administration of One hundred (100) structured questionnaires distributed to contractors of construction project sites in Lagos St
APA, Harvard, Vancouver, ISO, and other styles
8

Stević, Željko, Mouhamed Bayane Bouraima, Marko Subotić, et al. "Assessment of Causes of Delays in the Road Construction Projects in the Benin Republic Using Fuzzy PIPRECIA Method." Mathematical Problems in Engineering 2022 (April 11, 2022): 1–18. http://dx.doi.org/10.1155/2022/5323543.

Full text
Abstract:
Purpose. The purpose of this study is to examine the causes of delays in road construction projects in the Benin Republic from the consultant, client, and contractor perspectives. Design/Methodology/Approach. Through construction project reports, 20 factors that could cause delays in road construction projects were identified. The factors were arranged into a questionnaire, which was distributed to three separate experts. The fuzzy PIPRECIA (PIvot Pairwise RElative Criteria Relevance Assessment) method was used to calculate the independent importance of each delay factor. The Spearman and Pear
APA, Harvard, Vancouver, ISO, and other styles
9

Ekwuno, Anthony Obododike, and Dr H. Nel. "ANALYZING THE PROJECT DELAY CAUSES IN THE SOUTH AFRICAN CONSTRUCTION INDUSTRY." International Journal of Engineering Applied Sciences and Technology 7, no. 6 (2022): 15–73. http://dx.doi.org/10.33564/ijeast.2022.v07i06.002.

Full text
Abstract:
Construction projects have experienced major delays in the past decades. Project delay is a big burden in setting up projects. Professionals have established that delay in a project can only be controlled if its symptom is detected and acknowledged on time. A project has been described as a one-time undertaking that is established for a purpose. A questionnaire was designed and used to obtain the stakeholders’ perceptions regarding the causes of project setbacks. The aim of this study is to detect and analyze the causes of project delays and their mitigation strategies. Fifty-four (54) causes
APA, Harvard, Vancouver, ISO, and other styles
10

Ghasan, Alfalah, and Al-Sakkaf Abobakr. "Analyzing Project Delivery Delays in Riyadh, Saudi Arabia: A Government Perspective." Journal of Scientific and Engineering Research 10, no. 7 (2023): 15–20. https://doi.org/10.5281/zenodo.10463342.

Full text
Abstract:
<strong>Abstract </strong>Just Delays in the construction sector have become a commonplace and a global issue, resulting in a slew of negative consequences such as litigation, claims, lost productivity and income, and contract termination amongst all parties concerned, and Saudi Arabia is no exception. All of these problems impede the growth of the building business. As a result, the purpose of this paper is to evaluate the delay factor of government project delivery in Riyadh, Saudi Arabia, by identifying the main causes of construction delay, determining the impact of delay factors in the co
APA, Harvard, Vancouver, ISO, and other styles
More sources

Dissertations / Theses on the topic "Delay in construction project"

1

Ghaziani, Aydin. "A Fuzzy Delay Assessment Tool For Construction Projects." Master's thesis, METU, 2012. http://etd.lib.metu.edu.tr/upload/12614595/index.pdf.

Full text
Abstract:
It is a known fact that construction projects do not often complete on time due to several reasons related with the unexpected changes in the project conditions, external factors or performance of project participants. Since construction projects are unique and limited information is available at the beginning of the projects, prediction of delays is a difficult task. However, if the delays can be assessed at the early stages, their impacts might be minimized, some of the delays can even be eliminated. This study introduces a delay assessment methodology which can be used to predict delays bot
APA, Harvard, Vancouver, ISO, and other styles
2

Mehdi, Riazi Salman Riazi. "The use of supply chain management to reduce delays as result of pre-construction deficiencies in Malaysian public sector construction projects." Thesis, Queensland University of Technology, 2014. https://eprints.qut.edu.au/74750/1/Salman%20Riazi_Mehdi%20Riazi_Thesis.pdf.

Full text
Abstract:
This thesis examined the delay causes of Malaysian public sector projects. Using a systematic approach, the researcher identified the main delay factors and categorised them into pathogens. The pathogens were matched with beneficial Supply Chain Management (SCM) tools and developed into a holistic SCM framework to facilitate improvements in Malaysian public sector projects. The researcher concluded that SCM is the potential saviour for the delay dilemma and that it is necessary for the Malaysian government to initiate the revolutionary practice.
APA, Harvard, Vancouver, ISO, and other styles
3

Besogul, Ercan. "Reasons Of Delays In Steel Construction Projects: An Application Of A Delay Analysis Methodology." Master's thesis, METU, 2006. http://etd.lib.metu.edu.tr/upload/12607159/index.pdf.

Full text
Abstract:
Delay is one of the most common problems in the steel construction industry. At the time of bidding steel contractors plan tasks and assign resources according to the site visits, the information given in the contract and specifications related with the project. However, as the project progresses some conditions of the work may change. These changes may affect originally planned means and methods. Finally, the affected activities cause the project total cost and duration to increase. In steel construction projects, if not managed properly in accordance with the contract, changes are likely to
APA, Harvard, Vancouver, ISO, and other styles
4

Dayi, Songul. "Schedule Delay Analysis In Construction Projects: A Case Study Using Time Impact Analysis Method." Master's thesis, METU, 2010. http://etd.lib.metu.edu.tr/upload/12612823/index.pdf.

Full text
Abstract:
Inadequate or weak preparatory work before starting construction of any structure may cause serious problems during the construction period. For example, projects without sufficient detailed drawings or construction schedules and a disorganized building site can create many problems in the management and completion of the construction works. Consequently, the cost of construction increases digressively, the construction duration of the project extends and the quality of construction is affected adversely. This study dwells on the importance of construction schedules in achieving the aim of p
APA, Harvard, Vancouver, ISO, and other styles
5

Plummer, Judith Kate. "Assessing the effects of pre-construction delay in hydropower projects." Thesis, University of Cambridge, 2014. https://www.repository.cam.ac.uk/handle/1810/283946.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Al, Jashaami Mohammed Ahmed Mohammed. "Improving delay management of construction projects by creating a systematic scoring scale to minimise/avoid delays." Thesis, Queensland University of Technology, 2021. https://eprints.qut.edu.au/226717/1/Mohammed_Al%20Jashaami_Thesis.pdf.

Full text
Abstract:
This thesis is a study of the worldwide problem of construction project delays. Checkland’s Soft Systems Methodology and content analysis of previous studies were used to acquire a systematic and holistic understanding of construction delays, which revealed that the futile thinking of management teams plays a vital role in the occurrence of delays. This finding was incorporated into a questionnaire survey of 130 engineers working for contractors, consultants and project management companies in the UAE to help identify the sub and super structural elements involved, and ultimately develop a sys
APA, Harvard, Vancouver, ISO, and other styles
7

Alkharmany, Abdullah. "Project management : the effect of Saudi national culture on the attitudes of key stakeholders towards delay in construction projects in Saudi Arabia." Thesis, University of Brighton, 2017. https://research.brighton.ac.uk/en/studentTheses/8ed9c665-677f-4769-980b-49e70a801717.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Eizak, Shiri Farhad. "Planning intentionality and its implications for project planned time." Thesis, University of Manchester, 2015. https://www.research.manchester.ac.uk/portal/en/theses/planning-intentionality-and-its-implications-for-project-planned-time(db4669e5-68be-4426-9bc4-73f71f7361b4).html.

Full text
Abstract:
Within the construction industry, proximity of actual to scheduled completion time is a primary performance measure, and deviations from planned schedules remain a popular concern in the field of construction management. Prevailing research assumes that delays arise either from flawed execution of the plan or from failure to plan effectively. Thus, solutions suggested include improving execution and developing ever more sophisticated planning techniques. In spite of these efforts, accuracy in scheduling construction projects has shown little or no improvement, and clients continue to incur the
APA, Harvard, Vancouver, ISO, and other styles
9

Staflund, Johan, and Rickard Östblom. "Identification of the Critical Delay Factors in the Subway Tunnel Construction in Stockholm : An explanatory Study Investigating the Project Delay and its Consequences on Property Developers." Thesis, KTH, Fastigheter och byggande, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-298227.

Full text
Abstract:
Stockholm is one of the fastest growing conurbations in Europe, to accommodate for the increased population and urban growth, the current subway system needs to be extended. Appropriately, a joint initiative regarding housing and infrastructure development was signed in January 2014 by the Swedish government, Stockholm County Council and the afflicted municipalities Stockholm, Solna, Nacka and Järfälla. The joint initiative, the 2013 Stockholm negotiation, presented an extension of the current subway system with a total length of 19,6 km and 11 new stations in Stockholm, Solna, Nacka and Järfä
APA, Harvard, Vancouver, ISO, and other styles
10

Shebob, Abdulhamid. "Development of a methodology for analysing and quantifying delay factors affecting construction projects in Libya." Thesis, Teesside University, 2012. http://hdl.handle.net/10149/315373.

Full text
Abstract:
Construction delays are one of the biggest issues facing the construction industry and affecting delivery in terms of time, budget and the required quality. The characteristics of delay factors and their level of impact vary from project to project, ranging from a few days to years. They have significant financial, environmental and social impacts in construction projects; therefore, it is vital to investigate the causes of delay and analyse their impact. In this context, the research study was initiated to develop a new methodology for analysing and quantifying the impacts of delay factors on
APA, Harvard, Vancouver, ISO, and other styles
More sources

Books on the topic "Delay in construction project"

1

Tsitsirigos, Christos. The effect of leadership on project delays in small and medium construction companies in Greece. University of Portsmouth, 2003.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
2

T, Callahan Michael, ed. Construction delay claims. 4th ed. Aspen Publishers, 2011.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
3

Bramble, Barry B. Construction delay claims. Wiley, 1987.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
4

T, Callahan Michael, ed. Construction delay claims. 3rd ed. Aspen Law & Business, 2000.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
5

T, Callahan Michael, ed. Construction delay claims. 2nd ed. Wiley Law Publications, 1992.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
6

Keane, P. J. Delay analysis in construction. John Wiley & Sons, 2008.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
7

Keane, P. J., and A. F. Caletka. Delay Analysis in Construction Contracts. John Wiley & Sons, Ltd, 2015. http://dx.doi.org/10.1002/9781118631102.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Law, Society of Construction. Delay and disruption protocol. Society of Construction Law, 2003.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
9

Carnell, Nicholas J., ed. Causation and Delay in Construction Disputes. Blackwell Publishing Ltd, 2005. http://dx.doi.org/10.1002/9780470759356.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Lowsley, Stephen. About time: Delay analysis in construction. RICS, 2006.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
More sources

Book chapters on the topic "Delay in construction project"

1

Burr, Andrew. "Project control." In Delay and Disruption in Construction Contracts, 6th ed. Informa Law from Routledge, 2024. http://dx.doi.org/10.4324/9780429196676-11.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Burr, Andrew. "Project procurement." In Delay and Disruption in Construction Contracts, 6th ed. Informa Law from Routledge, 2024. http://dx.doi.org/10.4324/9780429196676-3.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Abonassrya, M., M. Alam, and A. Saifullah. "Analysis of Categories That Delay Global Construction Projects." In Lecture Notes in Civil Engineering. Springer Nature Singapore, 2023. http://dx.doi.org/10.1007/978-981-99-3330-3_15.

Full text
Abstract:
AbstractDelay in construction projects is a significant issue and concern for most construction companies. Many studies have addressed this issue by identifying the top-ranked causes, which vary according to project type, location, and the research method used. The combined factors of delay/time overrun need further analysis to understand the top-ranked factors considering the project context. We identified 360 delay/time overrun factors of construction projects from articles published in the past 10 years in top-quality journals ranked as per scientific journal ranking (SJR). The factors were
APA, Harvard, Vancouver, ISO, and other styles
4

AlGheth, Abdulhamid, and Md Ishak Sayuti. "Review of Delay Causes in Construction Projects." In Proceedings of AICCE'19. Springer International Publishing, 2019. http://dx.doi.org/10.1007/978-3-030-32816-0_28.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Yan, Jiafu, Yonghui Xie, and Zhigang Zhou. "Application of BIM Technology in Nuclear Power Construction Schedule Management." In Springer Proceedings in Physics. Springer Nature Singapore, 2023. http://dx.doi.org/10.1007/978-981-99-1023-6_19.

Full text
Abstract:
AbstractSchedule management is one of the important contents of nuclear power project management, which often leads to the lack of theoretical system due to the lack of sufficient information support. BIM technology provides a new solution for nuclear power project schedule management, ensures the effective linkage of all levels of schedule, reduces project delay and saves construction time. Combined with the theoretical basis of BIM and the characteristics of nuclear power project schedule management, this paper summarizes the application advantages of BIM technology in nuclear power construc
APA, Harvard, Vancouver, ISO, and other styles
6

Fertitta, Thomas D., Anthony L. Nedinsky, and Jeffrey G. Gilmore. "Construction Project Delays and Time Extensions." In Construction Contract Claims, Changes, and Dispute Resolution. American Society of Civil Engineers, 2016. http://dx.doi.org/10.1061/9780784414293.ch05.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Burke, Christopher M., and Michael J. Harris. "Acceleration and Mitigation of Project Delays." In Construction Contract Claims, Changes, and Dispute Resolution. American Society of Civil Engineers, 2016. http://dx.doi.org/10.1061/9780784414293.ch06.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Soetjipto, Jojok Widodo, Amalia Martha Sukmana, and Syamsul Arifin. "Investigating Construction Project Delay Using Fault Tree Analysis Based on Its Dominant Risk on Private Project." In Proceedings of the 5th International Conference on Rehabilitation and Maintenance in Civil Engineering. Springer Nature Singapore, 2022. http://dx.doi.org/10.1007/978-981-16-9348-9_78.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Mbala, Mbuyamba, Clinton Aigbavboa, and John Aliu. "Causes of Delay in Various Construction Projects: A Literature Review." In Advances in Human Factors, Sustainable Urban Planning and Infrastructure. Springer International Publishing, 2018. http://dx.doi.org/10.1007/978-3-319-94199-8_47.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Patil, Smita, Thejas Jain, Nikhil Kumar, and Tarun Varghese. "Factors Contributing to Delay in Indian Construction Projects - Subcontractor’s Perspective." In Lecture Notes in Civil Engineering. Springer Nature Singapore, 2025. https://doi.org/10.1007/978-981-96-4902-0_23.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Conference papers on the topic "Delay in construction project"

1

Ikhsan, Ikhsan, Rosmariani Arifuddin, and Muhammad Asad Abdurrahman. "Risk Analysis of Delay in Construction Project Based on Design and Build Contract." In International Conference on Research in Engineering and Science Technology (IC-REST) 2023. Trans Tech Publications Ltd, 2025. https://doi.org/10.4028/p-gkp9mr.

Full text
Abstract:
The selection of a procurement system through Design-Build is one of the alternatives for reducing the project implementation schedule, but time delays still occur. This study aims to determine the priority of risk sources and risk control strategies using the house of risk method through a questionnaire given to experts as respondents. Forty risk events and 17 risk agents will be assigned to contractors experienced in design-build construction on building projects. Based on the analysis results, the highest risk priority was that the contract between the project owner and the design-build con
APA, Harvard, Vancouver, ISO, and other styles
2

Almutairi, Bader, and Abdulrahman Bin Mahmoud. "An Exploration into Delay-Influencing Factors on Healthcare Construction Projects: The Case of Saudi Arabia." In The 2nd International Conference on Civil Infrastructure and Construction. Qatar University Press, 2023. http://dx.doi.org/10.29117/cic.2023.0039.

Full text
Abstract:
The construction project's delay is one of the biggest challenges that concern practitioners in the construction industry. The success or failure of construction projects is usually measured by the building team's achievement of the project's goals and objectives (ex., time and cost). The Kingdom of Saudi Arabia (KSA), one of the largest construction industries in the MENA region, is experiencing significant delays in some construction industry projects for different reasons. The major causes of delays in project completion in the construction sector in the KSA and how sensitive it is to healt
APA, Harvard, Vancouver, ISO, and other styles
3

Gammanage, S. H., and N. Gunarathna. "Delays and disruptions in the construction industry during the global pandemic." In 10th World Construction Symposium. Building Economics and Management Research Unit (BEMRU), University of Moratuwa, 2022. http://dx.doi.org/10.31705/wcs.2022.27.

Full text
Abstract:
COVID-19 pandemic has become a global catastrophe today dragging many nations towards severe economic distress. The Sri Lankan economy has no exception. Not surprisingly, the sluggish economic conditions in the country have adversely affected the construction industry in Sri Lanka. The pandemic has resulted in almost every construction project getting delayed or disrupted. This research aims to determine the factors that caused delays and disruptions in large scale construction projects in Sri Lanka due to pandemic. The overall impact of the global pandemic on construction projects in both loc
APA, Harvard, Vancouver, ISO, and other styles
4

Al Marri, Dana Ahmad, and Noof Mohamed Al Kaabi. "Why Construction Projects are delayed in PWA: Problems and Solutions." In The 2nd International Conference on Civil Infrastructure and Construction. Qatar University Press, 2023. http://dx.doi.org/10.29117/cic.2023.0049.

Full text
Abstract:
Construction is, by its nature, complex and uncertain. Changes and variations are inherently part of many construction projects, which require serious efforts to overcome. Project delay is a construction problem resulting in contractual claims, increased project cost, and decreased end-user satisfaction. This study investigates the root causes of project delay in Public Works Authority construction projects and gathers different perceptions on the causes of delay to propose a solution matrix that mitigate the effect of those delays and prevents its reoccurrence in future projects. A sample of
APA, Harvard, Vancouver, ISO, and other styles
5

B., Sreejith, and Sreeja V. "The Construction Agile Managements of Different Infrastructure Projects." In The International Conference on scientific innovations in Science, Technology, and Management. International Journal of Advanced Trends in Engineering and Management, 2023. http://dx.doi.org/10.59544/wkyj3792/ngcesi23p105.

Full text
Abstract:
Agile methodology is a type of project management process, mainly used for software development, where demands and solutions evolve through the collaborative effort of self-functional teams and their customers. During the past few decades, fundamental changes have taken place in project development, planning, and execution. This has taken from with embracing new techniques such as various agile project management, instead of using the traditional waterfall project management. . It is mainly suitable for complex project, where there is delay in construction projects &amp; final deliverable in a
APA, Harvard, Vancouver, ISO, and other styles
6

Niazai, Ghulam Abbas, and Kassim Gidado. "Causes of Project Delay in the Construction Industry in Afghanistan." In International Conference on Engineering, Project, and Production Management. Association of Engineering, Project, and Production Management, 2012. http://dx.doi.org/10.32738/ceppm.201209.0007.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Ellk, Dunya Sahib. "Road construction project timelines in Iraq: Rationales for delay." In CONFERENCE ON MATHEMATICAL SCIENCES AND APPLICATIONS IN ENGINEERING: CMSAE-2021. AIP Publishing, 2023. http://dx.doi.org/10.1063/5.0148883.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Abeywardhana, S. S., and P. M. Jeewandarage. "Exploring The Factors Influencing Delays in Road and Building Projects in Sri Lanka." In 3rd SLIIT International Conference on Engineering and Technology. SLIIT, 2024. http://dx.doi.org/10.54389/ajpw8797.

Full text
Abstract:
The Sri Lankan road and building construction industry currently grapples with significant time overruns compared to the planned schedules. Project delays pose substantial challenges for contractors, consultants, and clients alike. This research aims to identify the key factors contributing to delays in the construction of buildings and roads. A thorough literature review revealed 48 primary causes of construction delays. A questionnaire survey was conducted, incorporating these 48 delay factors and categorizing them into four major groups: contractor related, client-related, consultant-relate
APA, Harvard, Vancouver, ISO, and other styles
9

Jayasinghe, I., N. Domingo, A. L. Thi Hoai, and M. Sutrisna. "A Systematic review of vertical construction project characteristics." In World Construction Symposium - 2023. Ceylon Institute of Builders - Sri Lanka, 2023. http://dx.doi.org/10.31705/wcs.2023.4.

Full text
Abstract:
The construction industry is one of the key contributors to the development of any country. Depending on the orientation of the construction, it divides into two types; vertical and horizontal constructions. However, different project characteristics play a vital role in the industry as it has the power to influence the decision-making on projects. While vertical construction project characteristics are more specific, to identify the project characteristics of vertical construction and their influence on vertical construction projects, mixed method data analysis comprising science mapping and
APA, Harvard, Vancouver, ISO, and other styles
10

Karunakaran, S., M. Z. Ramli, M. A. Malek, et al. "Causes of delay on highway construction project in Klang valley." In GREEN DESIGN AND MANUFACTURE: ADVANCED AND EMERGING APPLICATIONS: Proceedings of the 4th International Conference on Green Design and Manufacture 2018. Author(s), 2018. http://dx.doi.org/10.1063/1.5066883.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Reports on the topic "Delay in construction project"

1

Padhye, Suyash, Aishwarya Sharma, Hesam Arefkhani, et al. INDOT Project Change Orders: Root Causes and Recommendations. Purdue University, 2024. https://doi.org/10.5703/1288284317747.

Full text
Abstract:
This study analyzed the historical trends in change orders (COs) associated with the Indiana Department of Transportation (INDOT) highway contracts. It also investigated correlations between COs and base factors (district, project type, contract type, award amount, geographical area (rural vs. urban)), and sought to understand the effect of the root causes but not to predict CO based on root causes. Unlike the base factors, the root causes are unknown prior to construction. The study developed models that forecasted CO characteristics—CO likelihood, CO frequency (count), and CO severity (magni
APA, Harvard, Vancouver, ISO, and other styles
2

Dinovitzer, Aaron. PR-214-134502-R01 Weld Hydrogen Cracking Risk Management Guide. Pipeline Research Council International, Inc. (PRCI), 2019. http://dx.doi.org/10.55274/r0011591.

Full text
Abstract:
PRCI and other organizations have funded research and development programs related to weld hydrogen cracking to develop tests, define hardness limits, understand diffusible hydrogen delivery, evaluate hydrogen cracking delay time and define weldment material hydrogen cracking susceptibility. These projects have produced results that can be used in developing or approving welding procedures, and electrodes or consumables. With all of this information available, hydrogen cracking is still being observed in new construction and in-service welds. This report has assembled samples of this informati
APA, Harvard, Vancouver, ISO, and other styles
3

Pulugurtha, Srinivas S., Abimbola Ogungbire, and Chirag Akbari. Modeling and Evaluating Alternatives to Enhance Access to an Airport and Meet Future Expansion Needs. Mineta Transportation Institute, 2023. http://dx.doi.org/10.31979/mti.2023.2120.

Full text
Abstract:
The continued growth of air travel calls for the incessant construction effort at many airports and their surroundings. Thus, there is a need to determine how airports can better manage existing infrastructure to accommodate this growth. This study, therefore, focuses on (1) investigating how changes in transportation infrastructure have affected travel time reliability (TTR) of the surrounding road network within the airport vicinity over time, and, (2) exploring selected unconventional intersection designs and proposing new inbound/outbound access routes from the nearby major roads to the ai
APA, Harvard, Vancouver, ISO, and other styles
4

Strey, Daniel J. Tee Complex Construction Project. Iowa State University, Digital Repository, 2013. http://dx.doi.org/10.31274/farmprogressreports-180814-532.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Barnett, Cole, and Philip W. Thor. Construction Cost Analysis : Residential Construction Demonstration Project Cycle II. Office of Scientific and Technical Information (OSTI), 1990. http://dx.doi.org/10.2172/6555469.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Mitchell, Brian G., Amir Neori, Charles Yarish, D. Allen Davis, Tzachi Samocha, and Lior Guttman. The use of aquaculture effluents in spray culture for the production of high protein macroalgae for shrimp aqua-feeds. United States Department of Agriculture, 2013. http://dx.doi.org/10.32747/2013.7597934.bard.

Full text
Abstract:
The FAO has projected a doubling in world demand for seafood during the 21 ed from aquaculture of marine fish and shrimps fed primarily on fishmeal-based aquafeeds. However, current practices of high intensity monoculture of shrimp in coastal ponds and fish in offshore pens have been strongly criticized as being ecologically and socially unsustainable. This view derives from un- checked eutrophication of coastal marine ecosystems from fish farm effluents, and the destruction of coastal estuarine ecosystems by shrimp farm constructions, plus aquaculture’s reliance on wild-caught small fish - wh
APA, Harvard, Vancouver, ISO, and other styles
7

Worachek, Alden, and Forest Button. Bethel Wind Energy Construction Project. Office of Scientific and Technical Information (OSTI), 2020. http://dx.doi.org/10.2172/1607624.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Akinleye, Taiwo, Idil Deniz Akin, Amanda Hohner, et al. Evaluation of Electrochemical Treatment for Removal of Arsenic and Manganese from Field Soil. Illinois Center for Transportation, 2021. http://dx.doi.org/10.36501/0197-9191/21-019.

Full text
Abstract:
Soils containing inorganic compounds are frequently encountered by transportation agencies during construction within the right-of-way, and they pose a threat to human health and the environment. As a result, construction activities may experience project delays and increased costs associated with management of inorganic compounds containing soils required to meet environmental regulations. Recalcitrance of metal-contaminated soils toward conventional treatment technologies is exacerbated in clay or organic content-rich fine-grained soils with low permeability and high sorption capacity becaus
APA, Harvard, Vancouver, ISO, and other styles
9

Makowsky, Peter, Jenny Town, Michelle Kae, and Samantha Pitz. Examining Kim's Approach to Construction: Project Wonsan. National Geospatial-Intelligence Agency, 2020. https://doi.org/10.63836/64cv-f02a.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Quaid, Maureen, Rick Kunkle, and Brian Lagerberg. Appliance Analysis :Residential Construction Demonstration Project Cycle 2. Office of Scientific and Technical Information (OSTI), 1991. http://dx.doi.org/10.2172/10143740.

Full text
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!