To see the other types of publications on this topic, follow the link: Delay in construction project.

Dissertations / Theses on the topic 'Delay in construction project'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 dissertations / theses for your research on the topic 'Delay in construction project.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Ghaziani, Aydin. "A Fuzzy Delay Assessment Tool For Construction Projects." Master's thesis, METU, 2012. http://etd.lib.metu.edu.tr/upload/12614595/index.pdf.

Full text
Abstract:
It is a known fact that construction projects do not often complete on time due to several reasons related with the unexpected changes in the project conditions, external factors or performance of project participants. Since construction projects are unique and limited information is available at the beginning of the projects, prediction of delays is a difficult task. However, if the delays can be assessed at the early stages, their impacts might be minimized, some of the delays can even be eliminated. This study introduces a delay assessment methodology which can be used to predict delays bot
APA, Harvard, Vancouver, ISO, and other styles
2

Mehdi, Riazi Salman Riazi. "The use of supply chain management to reduce delays as result of pre-construction deficiencies in Malaysian public sector construction projects." Thesis, Queensland University of Technology, 2014. https://eprints.qut.edu.au/74750/1/Salman%20Riazi_Mehdi%20Riazi_Thesis.pdf.

Full text
Abstract:
This thesis examined the delay causes of Malaysian public sector projects. Using a systematic approach, the researcher identified the main delay factors and categorised them into pathogens. The pathogens were matched with beneficial Supply Chain Management (SCM) tools and developed into a holistic SCM framework to facilitate improvements in Malaysian public sector projects. The researcher concluded that SCM is the potential saviour for the delay dilemma and that it is necessary for the Malaysian government to initiate the revolutionary practice.
APA, Harvard, Vancouver, ISO, and other styles
3

Besogul, Ercan. "Reasons Of Delays In Steel Construction Projects: An Application Of A Delay Analysis Methodology." Master's thesis, METU, 2006. http://etd.lib.metu.edu.tr/upload/12607159/index.pdf.

Full text
Abstract:
Delay is one of the most common problems in the steel construction industry. At the time of bidding steel contractors plan tasks and assign resources according to the site visits, the information given in the contract and specifications related with the project. However, as the project progresses some conditions of the work may change. These changes may affect originally planned means and methods. Finally, the affected activities cause the project total cost and duration to increase. In steel construction projects, if not managed properly in accordance with the contract, changes are likely to
APA, Harvard, Vancouver, ISO, and other styles
4

Dayi, Songul. "Schedule Delay Analysis In Construction Projects: A Case Study Using Time Impact Analysis Method." Master's thesis, METU, 2010. http://etd.lib.metu.edu.tr/upload/12612823/index.pdf.

Full text
Abstract:
Inadequate or weak preparatory work before starting construction of any structure may cause serious problems during the construction period. For example, projects without sufficient detailed drawings or construction schedules and a disorganized building site can create many problems in the management and completion of the construction works. Consequently, the cost of construction increases digressively, the construction duration of the project extends and the quality of construction is affected adversely. This study dwells on the importance of construction schedules in achieving the aim of p
APA, Harvard, Vancouver, ISO, and other styles
5

Plummer, Judith Kate. "Assessing the effects of pre-construction delay in hydropower projects." Thesis, University of Cambridge, 2014. https://www.repository.cam.ac.uk/handle/1810/283946.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Al, Jashaami Mohammed Ahmed Mohammed. "Improving delay management of construction projects by creating a systematic scoring scale to minimise/avoid delays." Thesis, Queensland University of Technology, 2021. https://eprints.qut.edu.au/226717/1/Mohammed_Al%20Jashaami_Thesis.pdf.

Full text
Abstract:
This thesis is a study of the worldwide problem of construction project delays. Checkland’s Soft Systems Methodology and content analysis of previous studies were used to acquire a systematic and holistic understanding of construction delays, which revealed that the futile thinking of management teams plays a vital role in the occurrence of delays. This finding was incorporated into a questionnaire survey of 130 engineers working for contractors, consultants and project management companies in the UAE to help identify the sub and super structural elements involved, and ultimately develop a sys
APA, Harvard, Vancouver, ISO, and other styles
7

Alkharmany, Abdullah. "Project management : the effect of Saudi national culture on the attitudes of key stakeholders towards delay in construction projects in Saudi Arabia." Thesis, University of Brighton, 2017. https://research.brighton.ac.uk/en/studentTheses/8ed9c665-677f-4769-980b-49e70a801717.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Eizak, Shiri Farhad. "Planning intentionality and its implications for project planned time." Thesis, University of Manchester, 2015. https://www.research.manchester.ac.uk/portal/en/theses/planning-intentionality-and-its-implications-for-project-planned-time(db4669e5-68be-4426-9bc4-73f71f7361b4).html.

Full text
Abstract:
Within the construction industry, proximity of actual to scheduled completion time is a primary performance measure, and deviations from planned schedules remain a popular concern in the field of construction management. Prevailing research assumes that delays arise either from flawed execution of the plan or from failure to plan effectively. Thus, solutions suggested include improving execution and developing ever more sophisticated planning techniques. In spite of these efforts, accuracy in scheduling construction projects has shown little or no improvement, and clients continue to incur the
APA, Harvard, Vancouver, ISO, and other styles
9

Staflund, Johan, and Rickard Östblom. "Identification of the Critical Delay Factors in the Subway Tunnel Construction in Stockholm : An explanatory Study Investigating the Project Delay and its Consequences on Property Developers." Thesis, KTH, Fastigheter och byggande, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-298227.

Full text
Abstract:
Stockholm is one of the fastest growing conurbations in Europe, to accommodate for the increased population and urban growth, the current subway system needs to be extended. Appropriately, a joint initiative regarding housing and infrastructure development was signed in January 2014 by the Swedish government, Stockholm County Council and the afflicted municipalities Stockholm, Solna, Nacka and Järfälla. The joint initiative, the 2013 Stockholm negotiation, presented an extension of the current subway system with a total length of 19,6 km and 11 new stations in Stockholm, Solna, Nacka and Järfä
APA, Harvard, Vancouver, ISO, and other styles
10

Shebob, Abdulhamid. "Development of a methodology for analysing and quantifying delay factors affecting construction projects in Libya." Thesis, Teesside University, 2012. http://hdl.handle.net/10149/315373.

Full text
Abstract:
Construction delays are one of the biggest issues facing the construction industry and affecting delivery in terms of time, budget and the required quality. The characteristics of delay factors and their level of impact vary from project to project, ranging from a few days to years. They have significant financial, environmental and social impacts in construction projects; therefore, it is vital to investigate the causes of delay and analyse their impact. In this context, the research study was initiated to develop a new methodology for analysing and quantifying the impacts of delay factors on
APA, Harvard, Vancouver, ISO, and other styles
11

Kruger, I. J. "Project management delays : project management delays with specific reference to the building and construction industry of the Western Cape." Thesis, Stellenbosch : Stellenbosch University, 2000. http://hdl.handle.net/10019.1/51888.

Full text
Abstract:
Thesis (MBA)--Stellenbosch University, 2000.<br>ENGLISH ABSTRACT: The purpose of this study is to investigate reasons for delays and disruptions in project management, with specific reference to the building and construction industries of the Western Cape. The reason for the study can be posed in the form of a question, "Why, even though the construction and building industry possess the skills of highly competent people do a substantial percentage of projects still experience significant delays and disruptions often leading to financial and program difficulties?" The study can point
APA, Harvard, Vancouver, ISO, and other styles
12

Al-Humaidi, Hanouf M. "A fuzzy logic approach to model delays in construction projects." Columbus, Ohio : Ohio State University, 2007. http://rave.ohiolink.edu/etdc/view?acc%5Fnum=osu1185539202.

Full text
APA, Harvard, Vancouver, ISO, and other styles
13

Filippi, Giancarlo Azevedo De. "Método para planejamento da produção e gestão de prazos de empreendimentos imobiliários." Universidade de São Paulo, 2017. http://www.teses.usp.br/teses/disponiveis/3/3146/tde-18072017-110219/.

Full text
Abstract:
Os atrasos de obra têm se tornado comuns na indústria da construção, afetando o desempenho dos empreendimentos e causando prejuízos consideráveis para todos os envolvidos. Este trabalho analisa as principais causas de atraso em projetos de construção e propõe um método estruturado que auxilie o uso efetivo de ferramentas de planejamento físico, bem como boas práticas e instrumentos de controle de prazo. Inicialmente, realizou-se uma ampla revisão bibliográfica sobre o tema. Em seguida, uma pesquisa de campo em 50 obras relacionadas a empreendimentos imobiliários (construídos em um período de c
APA, Harvard, Vancouver, ISO, and other styles
14

Motaleb, Omayma Hashim. "Development of a risk response model to handle delays of construction projects in the United Arab Emirates." Thesis, Robert Gordon University, 2014. http://hdl.handle.net/10059/1009.

Full text
Abstract:
Due to the complex nature of construction projects, delay risks are more widespread in the construction sector than elsewhere. This poses a problem for the industry, since it is already at risk because of the recent global economic recession. Indeed, the financial crisis in late 2008 arrested economic development in the construction sector in the United Arab Emirates (UAE), with the result that investors’ confidence in the sector is severely depressed. In this situation, effective risk response is urgently required, since it aims to ensure that all project objectives, including avoiding delays
APA, Harvard, Vancouver, ISO, and other styles
15

Keane, Patrick J. "A computer-aided systematic approach to time delay analysis for extension of time claims on construction projects." Thesis, Loughborough University, 1994. https://dspace.lboro.ac.uk/2134/6758.

Full text
Abstract:
A review of existing literature and research findings indicated that whilst the incidence of time extension claims is increasing, Contractors are failing to gather, analyse and present data as evidence to such an extent that there is a high rejection rate of claims made, and a consequent significant dissatisfaction rate amongst Contractors with awards being made. The current difficulties experienced by Contractors in managing information on site locations, combined with the low investment in, and usage of Information Technology, forms a major contribution to the problems arising in the prepara
APA, Harvard, Vancouver, ISO, and other styles
16

Altoryman, Anood Saleh. "Identification and assessment of risk factors affecting construction projects in the Gulf region : Kuwait and Bahrain." Thesis, University of Manchester, 2014. https://www.research.manchester.ac.uk/portal/en/theses/identification-and-assessment-of-risk-factors-affecting-construction-projects-in-the-gulf-region-kuwait-and-bahrain(62ddc6ab-7d43-4e69-bc8b-95b550c62b41).html.

Full text
Abstract:
Many construction projects suffer from mismanagement despite continuous improvement in the field of project risk management. With the construction boom in the Middle East, and especially the Gulf region, construction projects suffer from a high failure rate. The lack of the implementation of standard risk management methods in the construction industry of the Gulf region leads to construction projects that suffer from poor performance, delays, disputes and claims. In order to design a standard risk management model, there is a need for an in-depth study of the construction environment to lay d
APA, Harvard, Vancouver, ISO, and other styles
17

Ozdemir, Mustafa. "A Probabilistic Schedule Delay Analysis In Construction Projects By Using Fuzzy Logic Incorporated With Relative Importance Index (rii) Method." Master's thesis, METU, 2010. http://etd.lib.metu.edu.tr/upload/12612169/index.pdf.

Full text
Abstract:
The aim of this thesis is to propose a decision support tool for contractors before the bidding stage to quantify the probability of schedule delay in construction projects by using fuzzy logic incorporated with relative importance index (RII) method. Eighty three (83) different schedule delay factors were identified through detailed literature review and interview with experts from a leading Turkish construction company, then categorized into nine (9) groups and visualized by utilizing Ishikawa (Fish Bone) Diagrams. The relative importances of schedule delay factors were quantified by relativ
APA, Harvard, Vancouver, ISO, and other styles
18

Joseph, Mathews. "P-WOLC model for heavy duty pavements project evaluation." Thesis, Queensland University of Technology, 2001. https://eprints.qut.edu.au/36155/1/36155_Joseph_2001.pdf.

Full text
Abstract:
This research is aimed at developing a probabilistic based model for heavy-duty pavement project evaluation. To achieve this objective studies were conducted in the area of traffic flow, traffic delay modelling, pavement deterioration, pavement condition monitoring, maintenance diaries, vehicle operating cost parameters and economic theories related to asset management. Extensive literature reviews on related topics were carried out as part of the process of developing this model. The major features of the model are its ability to assign random probabilities to various pavement maintenance o
APA, Harvard, Vancouver, ISO, and other styles
19

Beşoğul, Ercan Supervisor :. Dikmen Toker İrem. "Reasons of delays in steel construction projects : an application of a delay analysis methodology \h [Electronic resource] / \c Ercan Beşoğul, Supervisor Assoc. Prof. Dr. İrem Dikmen Toker." Ankara : METU, 2006. http://etd.lib.metu.edu.tr/upload/12607159/index.pdf.

Full text
APA, Harvard, Vancouver, ISO, and other styles
20

Alsaqqa, Obada. "Fuzzy Time-Delay Model in Fault-Tree Analysis for Critical Path Method." The Ohio State University, 2015. http://rave.ohiolink.edu/etdc/view?acc_num=osu1429772426.

Full text
APA, Harvard, Vancouver, ISO, and other styles
21

Rosario, Mabel Andía Cabrera. "Propuesta de mejora del proceso de planificación de proyectos en una empresa de construcción con sistema drywall." Bachelor's thesis, Universidad Peruana de Ciencias Aplicadas (UPC), 2018. http://hdl.handle.net/10757/625852.

Full text
Abstract:
La presente tesis es una “Propuesta de mejora del proceso de planificación de proyectos en una empresa de construcción con sistema drywall” desarrollada en una PYME del rubro construcción. La propuesta está basada en herramientas de ingeniería para contrarrestar el problema identificado en la empresa en estudio que es la demora en la entrega de proyectos de construcción. Para ello, en la presente tesis está estructurada en 6 capítulos. En el capítulo 1 se presenta el Marco teórico, en el cual se define el sistema constructivo drywall, metodologías y herramientas de mejora aplicables al proc
APA, Harvard, Vancouver, ISO, and other styles
22

Segobia, De Lima Da Luz Lucas. "Methodological considerations about the worksite design for the restoration project of the church of S.Maria del Torrione in Ravenna." Master's thesis, Alma Mater Studiorum - Università di Bologna, 2020.

Find full text
Abstract:
The preservation of cultural heritage is, today, more than ever, a practice of remembering. Of researching the contact with the past, sometimes in very concrete forms. One of the major expressions of this linking activity is represented by the architecture, where memory becomes a visible, tangible and useful. Preserving the memory is preserving the link between our sense of civilization. Preserving, restructuring, consolidating are also productive practices, very complex ones if related with the new building productions. The practice of Restoration is very delicate and specific. This thesis
APA, Harvard, Vancouver, ISO, and other styles
23

Al-Keim, Ali. "Strategies to Reduce Cost Overruns and Schedule Delays in Construction Projects." ScholarWorks, 2017. https://scholarworks.waldenu.edu/dissertations/4586.

Full text
Abstract:
Senior managers fail to control time and costs of construction projects despite available advanced project management tools. Based on project management theory, the objective of this multiple case study was to explore the strategies senior managers use to reduce cost overruns and schedule delays in construction projects. Primary data were obtained from semistructured interviews with 3 senior managers from different construction project management companies who have successfully managed construction projects in Qatar. Data analysis process included a modified Van Kaam method. The transcribed in
APA, Harvard, Vancouver, ISO, and other styles
24

Karami, Hamidreza. "Causality Analysis of Construction Delays and Value Engineering Protocols in Marine Projects." Thesis, Curtin University, 2021. http://hdl.handle.net/20.500.11937/84946.

Full text
Abstract:
The central argument of this study is that if delay causation themes are known, but they are not analyzed by project peculiarities, research outcomes are not likely to deliver clear impact. Thus, this study aims to examine delay causations and how they apply to marine projects, and whether they can be mitigated by specific value engineering (VE) processes.
APA, Harvard, Vancouver, ISO, and other styles
25

Popescu-Kohler, Anamaria Iuliana. "Improvements to construction delay analysis techniques /." Digital version accessible at:, 1998. http://wwwlib.umi.com/cr/utexas/main.

Full text
APA, Harvard, Vancouver, ISO, and other styles
26

Salgado, Carlos A. "Construction project organizational structuring." College Park, Md. : University of Maryland, 2005. http://hdl.handle.net/1903/2468.

Full text
Abstract:
Thesis (Ph. D.) -- University of Maryland, College Park, 2005.<br>Thesis research directed by: Civil Engineering. Title from t.p. of PDF. Includes bibliographical references. Published by UMI Dissertation Services, Ann Arbor, Mich. Also available in paper.
APA, Harvard, Vancouver, ISO, and other styles
27

Freeman, John. "Effective construction project communications." Master's thesis, University of Cape Town, 2016. http://hdl.handle.net/11427/20714.

Full text
Abstract:
Large construction projects involve numerous participants, many of whom do not participate for the entire duration of the project. Participants often come from very different cultural and linguistic backgrounds. In the case of many large projects, the levels of education of these participants also vary widely, from graduate professionals to labourers with only a basic education. For a project to be developed, executed and handed over to the owner efficiently, the activities and delivered outputs of the project participants need to be coordinated. This requires effective communication to and fe
APA, Harvard, Vancouver, ISO, and other styles
28

Vu, Thu Hang. "Equity issues in land acquisition: A source of delays in large construction projects in Vietnam." Thesis, Queensland University of Technology, 2017. https://eprints.qut.edu.au/112385/9/Thu_Hang_Vu_Thesis.pdf.

Full text
Abstract:
Delays in construction projects are a recurring and global problem, with delays in land acquisition considered one of the largest contributors of delays in large construction projects in Vietnam. This research aims to investigate the formation of equity perceptions of land-acquired households and the relationship between equity issues and delays in construction projects. A theoretical model with four propositions, is proposed that links equity issues, comparisons, equity perceptions, and responses of land-acquired communities that cause delays in large construction projects in Vietnam. Using a
APA, Harvard, Vancouver, ISO, and other styles
29

Oztas, Ahmet. "The mitigation of the effects of delays in construction projects : a knowledge based system approach." Thesis, University of Manchester, 1995. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.683471.

Full text
APA, Harvard, Vancouver, ISO, and other styles
30

Alotaibi, Nasser Obaid M. "Managing Critical Factors Causing Delays in Public Construction Projects in the Kingdom of Saudi Arabia." Thesis, Curtin University, 2018. http://hdl.handle.net/20.500.11937/70732.

Full text
Abstract:
This thesis examines factors contributing to delays in public construction projects in Kingdom of Saudi Arabia (KSA) and the implications of applying project management knowledge, tools, and techniques in addressing the problem. Using a triangulation research approach, this study identifies factors influencing public construction delays in KSA and current knowledge of PM concepts for minimising construction delays. Based on the results from qualitative and quantitative studies undertaken, a framework for minimising delays was developed.
APA, Harvard, Vancouver, ISO, and other styles
31

Pastor, Melon Maria Pilar. "Apartment Project." Thesis, Halmstad University, School of Business and Engineering (SET), 2009. http://urn.kb.se/resolve?urn=urn:nbn:se:hh:diva-2941.

Full text
APA, Harvard, Vancouver, ISO, and other styles
32

Lim, Bobby Ting Chuan. "Causal modelling construction project performance." Thesis, Heriot-Watt University, 1987. http://hdl.handle.net/10399/1011.

Full text
APA, Harvard, Vancouver, ISO, and other styles
33

Sprinkle, Zachary Joseph. "Heuristics in Construction Project Management." Thesis, Virginia Tech, 2019. http://hdl.handle.net/10919/87089.

Full text
Abstract:
Modern construction projects are delivered in complex, fast pace environments. Stakeholders are required to participate in dynamic project settings with resource constraints, information constraints, and time constraints. To overcome gaps in knowledge, to deliver decisions quickly, and to overcome human limits in cognitive ability, decision makers typically employ heuristics, or rules of thumb to arrive at relatively quick answers. Heuristics are cognitive shortcuts that an individual employs to arrive at quick decisions (Goodwin et al., 2004). These heuristics are used in a variety of ways, r
APA, Harvard, Vancouver, ISO, and other styles
34

Townsend, Ryan. "Successful Infrastructure Construction Project Execution." Diss., Temple University Libraries, 2019. http://cdm16002.contentdm.oclc.org/cdm/ref/collection/p245801coll10/id/554341.

Full text
Abstract:
Business Administration/Interdisciplinary<br>D.B.A.<br>The following research builds on the existing project management success and critical success factor research by focusing on the social mechanisms used by project managers and project teams to achieve success. Through analysis of previous literature five criteria for success are determined and the critical success factor themes of personnel and communication emerge. Study One uses semi-structured interviews with ten current or former construction project managers to develop a conceptual model of six antecedents to the previously identified
APA, Harvard, Vancouver, ISO, and other styles
35

Williams, Peter J. "Project management and construction contracts." Thesis, Queensland University of Technology, 1990. https://eprints.qut.edu.au/36460/1/36460_Williams_1990.pdf.

Full text
Abstract:
The concept of the Professional Construction Engineer has emerged and developed over the past decade in response to pressures for construction capacity within the Australian Industry. Prior to that time, few contractors employed professional Engineers. The profession has evolved in response to the need for staff competent to handle compressed contract periods and technically difficult administration procedures. Contractors today enter into contracts requiring faster, more economical project completions. Indeed, to remain competitive, contractors and clients are continually developing co
APA, Harvard, Vancouver, ISO, and other styles
36

Helzer, Kimberly Faye. "Reinforcing functions of androgyny delay of reinforcement." CSUSB ScholarWorks, 1987. https://scholarworks.lib.csusb.edu/etd-project/246.

Full text
APA, Harvard, Vancouver, ISO, and other styles
37

Miterev, Maksim, and Ruxandra Nedelcu. "The Nature of the Relationship between Project Complexity and Project Delay : Case study of ERP system implementation projects." Thesis, Umeå universitet, Handelshögskolan vid Umeå universitet (USBE), 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-51701.

Full text
Abstract:
In the context of a growing social complexification, projects have evolved in the pastdecades from simple endeavours to complex and uncertain undertakings. Consequently,project complexity has emerged as an important research direction, and recently severalproject complexity frameworks have been suggested. However, little research has beendone in this area and there has been no study on the relationship of project complexity,in its holistic sense, and the risk of delay. Therefore, the study investigates the intricaterelationship between project complexity and project delay. The research is cond
APA, Harvard, Vancouver, ISO, and other styles
38

Ntoyanto, Sikholiwe. "Factors causing delay of modification projects at Koeberg Power Station." Master's thesis, University of Cape Town, 2016. http://hdl.handle.net/11427/23742.

Full text
Abstract:
Project delays are common in construction projects, and at Koeberg Nuclear Power Station, modification and outage projects are not exempted from these delays. Subsequently, these project delays have a detrimental effect on the Eskom organization in terms of its mandate to supply electricity to promote and boost the South African economy. Therefore, timely project delivery within the Eskom business is of paramount importance in ensuring the utility honours its mandate. The aim of this research study is to identify factors and that influence untimely delivery of plant system modification project
APA, Harvard, Vancouver, ISO, and other styles
39

Xiong, Riyue. "Leadership in project management." Thesis, Atlanta, Ga. : Georgia Institute of Technology, 2008. http://hdl.handle.net/1853/26596.

Full text
Abstract:
Thesis (M. S.)--Building Construction, Georgia Institute of Technology, 2009.<br>Committee Chair: Roper, Kathy; Committee Member: Ashuri,Baabak; Committee Member: Thomas, Linda. Part of the SMARTech Electronic Thesis and Dissertation Collection.
APA, Harvard, Vancouver, ISO, and other styles
40

Narh, Natasha Afi. "Evaluating delays in execution of public sector construction projects : a study of roads and highways in Ghana." Master's thesis, University of Cape Town, 2016. http://hdl.handle.net/11427/20539.

Full text
Abstract:
This study investigates delays in execution of public sector construction projects in Ghana. A review of literature revealed that previous studies on construction projects focused on cost, time overruns, as well as the causes of delays. It is against this background that this study assesses the causes and effects of construction project delays and means of averting such delays. The research design used in obtaining empirical data from a sample of 290 respondents was a survey research design. Questionnaires were used as instruments for data collection, and a Statistical Package for Social Scie
APA, Harvard, Vancouver, ISO, and other styles
41

Koseoglu, Oguzhan Ozan. "Construction Project Control Through Wireless Networking." Master's thesis, METU, 2004. http://etd.lib.metu.edu.tr/upload/3/12605292/index.pdf.

Full text
Abstract:
In this thesis, the latest developments in mobile telecommunications and mobile devices are investigated in order to integrate wireless connectivity and mobile computing in construction industry core business processes on site. The research includes current technologies and implementation in the construction industry and other industries. Wireless solutions are presented in order to improve information flow, quality of data, control and coordinate business processes in construction companies. The Marmaray project in Turkey is used as a project case study to present the necessary investment and
APA, Harvard, Vancouver, ISO, and other styles
42

Gormez, Baran. "On Construction Of Stable Project Schedules." Master's thesis, METU, 2005. http://etd.lib.metu.edu.tr/upload/12606826/index.pdf.

Full text
Abstract:
It is a well-known fact that project activities are subject to considerable uncertainty, which may lead to multiple schedule disruptions during project execution. As a result, the random nature of activity durations has been the subject of numerous research efforts since the introduction of the initial PERT. A common problem which arises in project management is the fact that the planned schedule is often disrupted by several uncontrollable factors like weather conditions, other environmental factors, additional time that might be required for rework and correction of detected defects. As a re
APA, Harvard, Vancouver, ISO, and other styles
43

Olatunji, Aiyetan Ayodeji. "Influences on construction project delivery time." Thesis, Nelson Mandela Metropolitan University, 2010. http://hdl.handle.net/10948/1548.

Full text
Abstract:
Construction delays are a global phenomenon. Factors causing construction delays in construction projects differ from country to country, due to different prevailing conditions. The prevailing conditions that could exert an influence on project delivery time are: political, economic, and physical factors as well as level of technological development; management style, and construction techniques. The construction industry is a major player in the economy, generating both employment and wealth. However, many projects experience extensive delays and thereby exceed initial time and cost estimates
APA, Harvard, Vancouver, ISO, and other styles
44

Haksever, A. Mehmet. "Information overload in construction project management." Thesis, University of Reading, 1998. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.245323.

Full text
APA, Harvard, Vancouver, ISO, and other styles
45

Blismas, Neoklis G. "Multi project environments of construction clients." Thesis, Loughborough University, 2001. https://dspace.lboro.ac.uk/2134/6807.

Full text
Abstract:
The single project paradigm which dominates the literature of both project and construction management research does not accurately reflect the reality of many construction clients, who have large ongoing construction portfolios rather than one off construction projects. It is contended that the forces behind the multi-project environment (MPE) of construction clients are different to those traditionally viewed within the single project paradigm. Although several concepts of MPEs exist, an investigation of the form and dynamic interactions of components within MPEs of construction clients was
APA, Harvard, Vancouver, ISO, and other styles
46

Vuorinen, Kim. "Quality Management in Offshore Construction Project." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Industriell organisation och produktion, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-43408.

Full text
Abstract:
Companies have a need to internationalize and locate all over the world to gain advantages against competition. However, when companies internationalize, they face difficulties. One of the major difficulties is how they can reach the same high quality around the world in their business facilities. Over one third of all construction projects reporting major defects. The purpose of this thesis is to research how companies implement Quality Management in offshore construction projects, what are the common challenges related to the subject and how to overcome these challenges. The theoretical fram
APA, Harvard, Vancouver, ISO, and other styles
47

Bergstrand, Karin, and Viktor Appel. "Shorter project lead times in construction." Thesis, KTH, Fastigheter och byggande, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-190278.

Full text
Abstract:
The manufacturing industry has made an extensive journey through the last century when it comes to increasing productivity. Results in the construction industry end up far behind manufacturing and do not show anywhere near the same efficiency increase, improved quality or decreased costs. There are a lot of potential savings in the form of activities that consumes resources without creating value for the end customer, also called waste. Waste in combination with uncertainty and variability in task duration forces the project duration to be longer than necessary. The purpose of this study is to
APA, Harvard, Vancouver, ISO, and other styles
48

Gardiner, Paul Duncan. "Conflict analysis in construction project management." Thesis, Durham University, 1993. http://etheses.dur.ac.uk/1560/.

Full text
APA, Harvard, Vancouver, ISO, and other styles
49

Latorre, V. "Construction manager's influence on project success." Thesis, University of Plymouth, 2009. http://hdl.handle.net/10026.1/2805.

Full text
Abstract:
Construction managers aim to deliver successful construction projects; however it is unclear how they perceive construction project success and how they influence that success. Focusing on the construction phase of the project, a Systems Conceptual Framework is induced from the literature review. In-depth interviews undertaken by 10 construction managers, whose experience accounts for over 130 construction projects, provide data to derive categories which populate the Systems Conceptual Framework initially developed. By adopting an unstructured approach to the data collection, a holistic view
APA, Harvard, Vancouver, ISO, and other styles
50

Dzokoto, Frank K. "Information behaviour of construction project actors." Thesis, Loughborough University, 2016. https://dspace.lboro.ac.uk/2134/23173.

Full text
Abstract:
Construction is one of the largest industry sectors in terms of size and output in the United Kingdom (UK). The sector contributes about 10% directly to the UK's Gross Domestic Product (GDP) and drives historical GDP growth. However, Construction projects and Organisations continue to underperform at significant levels which is underpinned by actors' Information Behaviours (IBs).
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!