To see the other types of publications on this topic, follow the link: Delay in construction project.

Journal articles on the topic 'Delay in construction project'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 journal articles for your research on the topic 'Delay in construction project.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.

1

Phadtare, Milind T. "Causes of Delay in Budget Hotel Construction Projects." International Journal of Information Systems and Social Change 5, no. 3 (2014): 49–63. http://dx.doi.org/10.4018/ijissc.2014070104.

Full text
Abstract:
Delay in construction projects is a universal phenomenon. However, the topic is not adequately studied in the Indian context. This paper attempts to identify the causes of delays in construction of budget hotels in India and suggest remedies to avoid some delays. A business group constructing budget hotels across the country is approached for this study. Forty causes of delay have been identified and Relative Importance Index was calculated. The contribution of each category of causes of delay to overall delay in the projects was computed. Remedies such as, joint effort of the participants of
APA, Harvard, Vancouver, ISO, and other styles
2

MR., KARTIK BAGRECHA, and AYUSHI BAIS MS. "STUDY ON DELAY CONSTRUCTION PROJECT IN INDIA." International Journal of Innovations in Engineering Research and Technology 4, no. 11 (2017): 6–10. https://doi.org/10.5281/zenodo.1098506.

Full text
Abstract:
The Indian construction project has experienced significant delays. The construction industry is large, volatile and requires high investment. Delays occur in almost all construction projects, and the importance of these delays varies widely from project to project. During construction, the delay may be defined as exceeding the completion date specified in the contract or exceeding the date on which the parties agreed to the delivery of the project. Delay means loss of revenue due to lack of production facilities and rental space, as well as dependency on current facilities. Project delays are
APA, Harvard, Vancouver, ISO, and other styles
3

Dr., P. P. Bhangale*. "INVESTIGATION OF CAUSES OF DELAY IN HIGH RISE BUILDING, CASE STUDY-PUNE." INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY 6, no. 10 (2017): 152–59. https://doi.org/10.5281/zenodo.1002679.

Full text
Abstract:
Delays in a construction project can be regarded as a failure. This paper aims to investigate the causes of delay in high rise building projects in Pune city.The industry which is experiencing frequent and costly delays is the building and construction industry. However, a numbers of construction projects which had the delay problems are very significant. Construction project involves many unpredicted factors which results from many sources. These sources include the performance of contractors, resources availability, weather conditions and contract systems. However it occurs in every construc
APA, Harvard, Vancouver, ISO, and other styles
4

Thapanont, Pornsirichotirat, Charoenpornpattana Santi, and Xinghatiraj Pruethipong. "Causes of delay on highway construction projects in Thailand." MATEC Web of Conferences 192 (2018): 02014. http://dx.doi.org/10.1051/matecconf/201819202014.

Full text
Abstract:
Delay in construction project is an important issue in construction management. This is because delay will cause negative impacts on both the owner and the contractor. For owner, it will lead to the late opening of new road. For contractor, it will cause extra operating cost. In this paper, therefore, the causes of delay in road construction projects are researched. This paper studied a list of road construction delay causes gathered from literature having different countries. Internationally, twenty-six factors that might cause delays of road construction projects are identified in this resea
APA, Harvard, Vancouver, ISO, and other styles
5

MR., KARTIK BAGRECHA. "STUDY ON DELAY CONSTRUCTION PROJECT IN INDIA." IJIERT - International Journal of Innovations in Engineering Research and Technology 4, no. 11 (2017): 6–10. https://doi.org/10.5281/zenodo.1456268.

Full text
Abstract:
<strong>The Indian construction project has experienced significant delays. The construction industry is large,volatile and requires high investment. Delays occur in almost all construction projects,and the importance of these delays varies widely from project to project. During construction,the delay may be defined as exceeding the completion date specified in the contract or exceeding the date on which the parties agreed to the delivery of the project. Delay means loss of revenue due to lack of production facilities and rental space,as well as dependency on current facilities. Project delays
APA, Harvard, Vancouver, ISO, and other styles
6

Barqawi, Mohammad, Heap-Yih Chong, and Emil Jonescu. "A Review of Employer-Caused Delay Factors in Traditional and Building Information Modeling (BIM)-Enabled Projects: Research Framework." Advances in Civil Engineering 2021 (April 22, 2021): 1–24. http://dx.doi.org/10.1155/2021/6696203.

Full text
Abstract:
Construction delays are considered a common worldwide problem. Previous studies have investigated construction delay factors from the perspectives of different project stakeholders. However, a thorough analysis of such delays on different types of construction projects in different geographies is still lacking, precisely the effect of employers’ delays in traditional and building information modeling (BIM)-enabled projects. This research proposes a research framework to address potential employer-caused delay factors in traditional and BIM-enabled projects. A cross-sectional literature search
APA, Harvard, Vancouver, ISO, and other styles
7

Ogunde, Ayodeji Olubunmi, Odje Emmanuel Dafe, Gbemisola Ajoke Akinola, et al. "Factors Militating Against Prompt Delivery of Construction Projects in Lagos Megacity, Nigeria: Contractors’ Perspective." Mediterranean Journal of Social Sciences 8, no. 3 (2017): 233–42. http://dx.doi.org/10.5901/mjss.2017.v8n3p233.

Full text
Abstract:
Abstract Delay is a common issue faced in the construction industry all over the world especially in developing countries. The aim of this study is to evaluate factors causing delays and their effects on construction projects in Lagos Mega City, Nigeria from the contractors’ perspective. It is predicated on the incessant delay experienced by contractors on construction projects. Purposive sampling method was adopted for the study;. Quantitative data was obtained by administration of One hundred (100) structured questionnaires distributed to contractors of construction project sites in Lagos St
APA, Harvard, Vancouver, ISO, and other styles
8

Stević, Željko, Mouhamed Bayane Bouraima, Marko Subotić, et al. "Assessment of Causes of Delays in the Road Construction Projects in the Benin Republic Using Fuzzy PIPRECIA Method." Mathematical Problems in Engineering 2022 (April 11, 2022): 1–18. http://dx.doi.org/10.1155/2022/5323543.

Full text
Abstract:
Purpose. The purpose of this study is to examine the causes of delays in road construction projects in the Benin Republic from the consultant, client, and contractor perspectives. Design/Methodology/Approach. Through construction project reports, 20 factors that could cause delays in road construction projects were identified. The factors were arranged into a questionnaire, which was distributed to three separate experts. The fuzzy PIPRECIA (PIvot Pairwise RElative Criteria Relevance Assessment) method was used to calculate the independent importance of each delay factor. The Spearman and Pear
APA, Harvard, Vancouver, ISO, and other styles
9

Ekwuno, Anthony Obododike, and Dr H. Nel. "ANALYZING THE PROJECT DELAY CAUSES IN THE SOUTH AFRICAN CONSTRUCTION INDUSTRY." International Journal of Engineering Applied Sciences and Technology 7, no. 6 (2022): 15–73. http://dx.doi.org/10.33564/ijeast.2022.v07i06.002.

Full text
Abstract:
Construction projects have experienced major delays in the past decades. Project delay is a big burden in setting up projects. Professionals have established that delay in a project can only be controlled if its symptom is detected and acknowledged on time. A project has been described as a one-time undertaking that is established for a purpose. A questionnaire was designed and used to obtain the stakeholders’ perceptions regarding the causes of project setbacks. The aim of this study is to detect and analyze the causes of project delays and their mitigation strategies. Fifty-four (54) causes
APA, Harvard, Vancouver, ISO, and other styles
10

Ghasan, Alfalah, and Al-Sakkaf Abobakr. "Analyzing Project Delivery Delays in Riyadh, Saudi Arabia: A Government Perspective." Journal of Scientific and Engineering Research 10, no. 7 (2023): 15–20. https://doi.org/10.5281/zenodo.10463342.

Full text
Abstract:
<strong>Abstract </strong>Just Delays in the construction sector have become a commonplace and a global issue, resulting in a slew of negative consequences such as litigation, claims, lost productivity and income, and contract termination amongst all parties concerned, and Saudi Arabia is no exception. All of these problems impede the growth of the building business. As a result, the purpose of this paper is to evaluate the delay factor of government project delivery in Riyadh, Saudi Arabia, by identifying the main causes of construction delay, determining the impact of delay factors in the co
APA, Harvard, Vancouver, ISO, and other styles
11

Pourrostam, Towhid, and Amiruddin Ismail. "Study of Methods for Minimizing Construction Delays: Evidences from a Developing Country." Advanced Materials Research 201-203 (February 2011): 2939–42. http://dx.doi.org/10.4028/www.scientific.net/amr.201-203.2939.

Full text
Abstract:
Delays are one of the biggest problems in construction projects in developing countries, as cause negative effects on the projects. Delays can be minimized only when their causes are identified. This paper aims to identify effective methods of minimizing delay in construction projects. The literature related the field of causes and effects of delay and methods for minimizing construction delay has been reviewed over the last decade. This paper highlighted methodology to reduce construction delays from consultant and contractor viewpoints. The perspective of contractors and consultants has been
APA, Harvard, Vancouver, ISO, and other styles
12

Vishalkranti.myneni@spav.ac.in and Kranti kumar Myneni. "CAUSES AND IMPACT OF DELAY IN CONSTRUCTION INDUSTRY OF INDIA." International Journal of Engineering Technologies and Management Research 8, no. 1 (2021): 35–44. http://dx.doi.org/10.29121/ijetmr.v8.i1.2021.851.

Full text
Abstract:
Delays can be well-defined as the escalation of the stipulated time for the completion of the project. Delay is always the major loss to any construction project. In construction projects delay is a very usual thing and it can have an adverse effect on the project’s time and cost. As construction is one of the largest economic activity in India, the effects of delay are still in millions, which surely decreases the GDP of the country. Delay makes the process tardy and management of delay is extremely challenging as most of the projects do not meet the expected requirement and fails to perform
APA, Harvard, Vancouver, ISO, and other styles
13

Melvin, Melvin, Andri Irfan Rifai, and Amanatullah Savitri. "Analysis Performance for Evaluation of Schedule Irregularities on Bore Pile Foundation with FTA." IJEBD (International Journal of Entrepreneurship and Business Development) 6, no. 1 (2023): 122–29. http://dx.doi.org/10.29138/ijebd.v6i1.2110.

Full text
Abstract:
Purpose: In construction projects, delays are disruptive and expensive. Therefore, the reason for the schedule delay needs to be identied. The delay factors determined in previous research were predominantly studied through surveys. In these studies, the participants were a stakeholder in construction projects, and the reason for schedule lateness was identied through their point of view.&#x0D; Design/methodology/approach: This research is conducted at a bored pile project in Opus Apartment, Batam, Indonesia. The studies are done through the Fault Tree Analysis method to find the root causes o
APA, Harvard, Vancouver, ISO, and other styles
14

Romzi, Nurul Asyilah, and Doh Shu Ing. "Underlying Causes of Construction Project Delay: A Review." CONSTRUCTION 2, no. 2 (2022): 07–11. http://dx.doi.org/10.15282/construction.v2i2.7775.

Full text
Abstract:
Delay is a worldwide problem which normally occurs in every project. Delay of the project occurs when a period of time of the completion date is late or postponed. Since the project is delayed, the cost of the project will have escalation which will risk the contractors. Instead of getting a benefit from the project, they gain losses. Similarly, other construction projects in different countries are prone to face delays. The aim of this study is to summarise the causes of delay in the construction project from previous study. Regarding the causes of construction project delay, the major countr
APA, Harvard, Vancouver, ISO, and other styles
15

Rivera, Ludwig, Hilario Baguec, and Chunho Yeom. "A Study on Causes of Delay in Road Construction Projects across 25 Developing Countries." Infrastructures 5, no. 10 (2020): 84. http://dx.doi.org/10.3390/infrastructures5100084.

Full text
Abstract:
Delays in road construction projects due to various reasons are a major problem facing construction professionals. The incapability of finishing projects punctually and within a given budget is a persistent issue worldwide. This study aims to determine the ten principal causes of delay in road construction projects in 25 developing countries across the globe. The study involves two steps. First, the authors compiled information regarding the most frequent delays in a road construction project. Second, they analyzed the intensity of each cause of delay in these projects. Being more accurate in
APA, Harvard, Vancouver, ISO, and other styles
16

Imaekhai, Lawrence, and I. Sinatra Atemonokhai. "Imperative Causes of Cost Overruns and Delay in Construction of Groundwater Projects in Nigeria." Journal of Advanced Research in Industrial Engineering 3, no. 2 (2021): 1–6. https://doi.org/10.5281/zenodo.5205699.

Full text
Abstract:
<em>Nigeria, over the years has experienced cost overruns and delays in construction of projects and the groundwater construction projects are inclusive. This study present result of a conducted questionnaire survey that identifies and evaluates the importance of the imperative factors responsible for the delay and cost overruns in Nigeria groundwater construction projects. The vital respondents of my survey cut across personnel&rsquo;s such as construction owners, construction consultants and recognized contractors involved in groundwater projects in Nigeria. The study&rsquo;s results expose
APA, Harvard, Vancouver, ISO, and other styles
17

Tope, Femi Okuntade. "Managing Construction Uncertainty In The Nigerian Construction Industry Through The Application Of Fuzzy Logic Model." International Journal of Business, Economics and Management Works 2, no. 5 (2015): 31–36. https://doi.org/10.5281/zenodo.17712.

Full text
Abstract:
Delays in construction projects can be due to a number of factors, which need to be classified and identified. For the success of a construction project, estimation of the plausibility of delay resulting from different factors must be carried out or fully investigated. This research is the extension of delay analysis techniques by using fuzzy logic method. The paper presents a practical application of fuzzy logic theory in predicting construction project delay using Fuzzy toolbox of MATLAB Program Software, the delay factors are identified based on literature review from other studies and opin
APA, Harvard, Vancouver, ISO, and other styles
18

Asmi, Ade, and Aurino RA Djamaris. "Project Delay Factor Ranking among Contractor, Client and Project Management Consultant in Construction Industry." WIDYAKALA: JOURNAL OF PEMBANGUNAN JAYA UNIVERSITY 8, no. 2 (2021): 48. http://dx.doi.org/10.36262/widyakala.v8i2.389.

Full text
Abstract:
A construction project delay can result in financial losses to various parties involved both to the Contractor, Client and Project Management Consultant (PMC). This paper presents the results of a survey questionnaire conducted among Contractors, Clients and PMC. Data was analyzed with statistical tools to rank factors that influenced construction delays. From the results of the analysis there were 58 project delay factors that affected the delay of construction projects based on previous research. The project delay factors ranked so as to produce a project delay ranking sequence. Project dela
APA, Harvard, Vancouver, ISO, and other styles
19

Haseeb, M., Xinhai Lu, Aneesa Bibi, Maloof-ud Dyian, and Wahab Rabbani. "PROBLEMS OF PROJECTS AND EFFECTS OF DELAYS IN THE CONSTRUCTION INDUSTRY OF PAKISTAN." Australian Journal of Business and Management Research 01, no. 06 (2012): 41–50. http://dx.doi.org/10.52283/nswrca.ajbmr.20110106a05.

Full text
Abstract:
The problem of project delays is a fact that occurs mostly in construction industry of Pakistan. Delays are always measured as expensive to all parties concerned in the projects and very often it will result in clash, claims, total desertion and much difficult for the feasibility and it slows the growth of construction sector. For analyzing the causes of delay, an appraisal on construction project’s time performance was conducted. The main objective of this study is the identification of factors of delay and their effects on the success and completion of project. The most common factor of dela
APA, Harvard, Vancouver, ISO, and other styles
20

Khoiry, Muhamad Azry, Suhaniya Kalaisilven, and Azlina Abdullah. "A Review of Minimizing Delay in Construction Industries." E3S Web of Conferences 65 (2018): 03004. http://dx.doi.org/10.1051/e3sconf/20186503004.

Full text
Abstract:
Construction is an important industry to determine the development of a country. However, this industry faced delay issues caused by various factors that affect proper construction project. Hence, minimizing delay in construction should be focused on overcoming the delay issue. Thus, the objective of this study is to critically review the main criteria of minimizing delay based on the most significant items that suggested in the previous journals. This paper reviewed 47 journals that studied the issues of delays in construction projects. Through this study, the authors have classified four mai
APA, Harvard, Vancouver, ISO, and other styles
21

Javed, Shakila, Mohammed Ihtesham Hussain, Ahmed Majid Al Aamri, and Javed Akhtar. "Investigation on factors causing construction delay and their effects on the development of Oman’s construction industry." EUREKA: Physics and Engineering, no. 6 (November 29, 2022): 33–44. http://dx.doi.org/10.21303/2461-4262.2022.001865.

Full text
Abstract:
Construction delay in projects is a common manifestation in the construction industry. Delay in construction will lead to a bad relationship between the parties involved and will also lead to an increase in the allocated completion time. Delay in the ongoing project might result in the loss of the money, time and other facilities by the client and cause a lot of financial damage to the contractor due to its investment in the purchase of equipment, construction materials and the hire of skilled workers. Delay in construction is a common problem that occurs mostly due to the unforeseen problems
APA, Harvard, Vancouver, ISO, and other styles
22

Javed, Shakila, Mohammed Ihtesham Hussain, Aamri Ahmed Majid Al, and Javed Akhtar. "Investigation on factors causing construction delay and their effects on the development of Oman's construction industry." EUREKA: Physics and Engineering, no. 6 (November 29, 2022): 33–44. https://doi.org/10.21303/2461-4262.2022.001865.

Full text
Abstract:
Construction delay in projects is a common manifestation in the construction industry. Delay in construction will lead to a bad relationship between the parties involved and will also lead to an increase in the allocated completion time. Delay in the ongoing project might result in the loss of the money, time and other facilities by the client and cause a lot of financial damage to the contractor due to its investment in the purchase of equipment, construction materials and the hire of skilled workers. Delay in construction is a common problem that occurs mostly due to the unforeseen problems
APA, Harvard, Vancouver, ISO, and other styles
23

Saha, Saibal Kumar, Anchal Patil, Ashish Dwivedi, and Aparna S. Pillai. "Analyzing the interactions among delay factors in construction projects: A multi criteria decision analysis." Reports in Mechanical Engineering 4, no. 1 (2023): 241–55. http://dx.doi.org/10.31181/rme040116112023s.

Full text
Abstract:
The construction industry is a crucial sector that drives economic growth and facilitates socio-economic development. However, construction projects often get delayed due to multiple controllable and uncontrollable circumstances. In this scenario, the construction industry is striving for potential solutions to resolve project delays. Thus, the present study objectives to analyze the delay factors that affect the timely accomplishment of construction projects in the context of emerging economies. The study adopts a mixed methodology comprising of Delphi, Total Interpretive Structural Modelling
APA, Harvard, Vancouver, ISO, and other styles
24

Gashayyish, Imad Jabbar, Majid Hameed Yahya, and Husam Ghazi Hadi. "Identifying the reasons for the prolongation of school construction projects in Najaf." Open Engineering 12, no. 1 (2022): 197–203. http://dx.doi.org/10.1515/eng-2022-0023.

Full text
Abstract:
Abstract There are several problems facing the construction industry in Iraq. Delays in construction projects affect one of the most important factors in project success, namely time. This delay causes many problems such as increasing the cost of the project, lack of timely operation, and on a larger scale, economic and social impact on the country. As being one of the metropolises of Iraq, the city of Najaf needs a lot of development projects in the development path. Public school construction projects are an example of projects needed in the city, and delays in these projects in recent years
APA, Harvard, Vancouver, ISO, and other styles
25

Shui, Steven, Andri Irfan Rifai, and Mulia Pamadi. "The Analysis Performance of Project Delays in Pile Foundation Work." IJEBD (International Journal of Entrepreneurship and Business Development) 6, no. 1 (2023): 172–82. http://dx.doi.org/10.29138/ijebd.v6i1.2158.

Full text
Abstract:
Purpose: Delays are common in construction projects. The term "project delay" refers to a project's completion date later than anticipated. Lack of performance by contractors or project managers in resolving issues can result in project delays. The factors that cause project delays must be considered to reduce delays. This study aims to examine the elements contributing to Batam island’s pile foundation construction delays.&#x0D; Findings: The factor of delays is an important key of the analysis to prevent delays in future projects&#x0D; Design/methodology/approach: This research uses a case s
APA, Harvard, Vancouver, ISO, and other styles
26

IJRAME, Journal. "IMPROVING CONSTRUCTION PROJECT SCHEDULE BY USING AGILE RULES." International Journal of Research in Aeronautical and Mechanical Engineering 12, no. 8 (2024): 76–90. https://doi.org/10.5281/zenodo.13622513.

Full text
Abstract:
Construction projects utilizing the agile technique may go seamlessly as long as each stage of the project is effectively supervised. An essential principle of an agile approach is that project alterations may be made as work is being performed, with minimum impact on other project components. This study employs the influential project factors, with specific emphasis on the project timeline. To determine the cause of the project schedule delay, the RII approach is employed. Subsequently, a poll of experts in the area assesses the impact of the component with a higher score on the timeliness of
APA, Harvard, Vancouver, ISO, and other styles
27

Khatib, Basem, Yap Poh, and Ahmed El-Shafie. "Delay Factors in Reconstruction Projects: A Case Study of Mataf Expansion Project." Sustainability 10, no. 12 (2018): 4772. http://dx.doi.org/10.3390/su10124772.

Full text
Abstract:
Delays in construction projects are a common phenomenon throughout the industry. This problem has many negative impacts on the time, cost, and sustainability of the projects. Many studies were conducted to identify the main causes of this delay in new construction projects in different regions but very few studies have focused on finding an explanation for the causes of delay in major reconstruction projects that have great religious and cultural sustainability. This paper examines the factors that contributed to work delays in one of the most major reconstruction projects that took place rece
APA, Harvard, Vancouver, ISO, and other styles
28

Venkatesh, M. Paranthaman, S. Muthalvan Renuka, and C. Umarani. "Causes of Delay in Indian Construction Industry." Applied Mechanics and Materials 174-177 (May 2012): 2768–73. http://dx.doi.org/10.4028/www.scientific.net/amm.174-177.2768.

Full text
Abstract:
Delays in a construction project can be regarded as a failure. This paper aims to investigate the causes of delay in Indian construction projects undertaken by private, government and nongovernmental organizations. In view of this 45 causes of delay were identified and developed the questionnaire for the quantitative confirmation of the most causes of delay. Consequently the questionnaire was distributed to construction professionals like Managers, Engineers and others. Subsequently the collected data was analyzed using statistical tool and the factors were measured and ranked under each group
APA, Harvard, Vancouver, ISO, and other styles
29

Ismaila, Usman, Wooyong Jung, and Chan Young Park. "Delay Causes and Types in Nigerian Power Construction Projects." Energies 15, no. 3 (2022): 814. http://dx.doi.org/10.3390/en15030814.

Full text
Abstract:
Numerous events cause delays to entire power projects’ completion timelines, leading to loss. This paper focuses on revealing the critical delay causes in Nigerian power projects and identifying the delay types such as excusable delay, compensable delay, critical delay, and concurrent delay from the different perspectives of owner and contractor. Based on the survey of the 84 industrial experts in power distribution and transmission projects in Nigeria, this study provides the mean score and rank of 39 delay causes. Among the causes, 14 are identified as critical in the Nigerian power project.
APA, Harvard, Vancouver, ISO, and other styles
30

M. Hery Indra Setiawan, Budi Witjaksana, and Jaka Purnama. "Analysis of Time Delays in The Implementation of The Construction of A Light Brick Factory in Lamongan Using The Earned Value Method." International Journal of Mechanical, Electrical and Civil Engineering 2, no. 1 (2025): 193–98. https://doi.org/10.61132/ijmecie.v1i1.149.

Full text
Abstract:
Factory is an Industrial Building that processing raw material. This Light Weight Brick Factory Constructions will help the region to develop their economies further. In this case, the Lightweight Brick Factory Constructions have several problem that cause construction delays. This research was carried out because of delays in the lightweight brick factory construction project in Lamongan which was scheduled for completion in the 15th week with a contract value of IDR 1,835,474,186. in week 10 there was a delay of - 42.73%, week 11 there was a delay of - 42.66%, week 12 there was a delay of -
APA, Harvard, Vancouver, ISO, and other styles
31

Rauzana, Anita, and Wira Dharma. "Causes of delays in construction projects in the Province of Aceh, Indonesia." PLOS ONE 17, no. 1 (2022): e0263337. http://dx.doi.org/10.1371/journal.pone.0263337.

Full text
Abstract:
Implementations of construction projects in Indonesia, especially in Aceh Province, are often delayed. Time, quality, and cost are three important components of planning a construction project. The benchmark for a successful construction project is the project completion time being in accordance with the time period specified in the contract. In project implementation, there is often a risk of delays in completing construction projects that can cause losses and fines; therefore, it is necessary to know the risk factors potentially causing project delays. The purpose of this study was to identi
APA, Harvard, Vancouver, ISO, and other styles
32

Ali, Noori Sadeq, and Khalil Ismail Wali. "Evaluation of Construction Delay of Public Projects in Erbil Governorate." Cihan University-Erbil Scientific Journal 3, no. 1 (2019): 18–26. http://dx.doi.org/10.24086/cuesj.v3n1y2019.pp18-26.

Full text
Abstract:
Delay is one of the greatest challenges facing the implementation of construction projects. The completion project time is considered one of the measure indicators for assessing the success of any project. Delays usually have negative impacts of financial and social to all parties involved in the projects. The aim of the study is to find the most important causes of delay by evaluating the common causes of delays in terms of frequency, severity, and important indices in implementation of public construction projects in Erbil Governorate related to owners, contractors, consultants, and external
APA, Harvard, Vancouver, ISO, and other styles
33

K.V., Prasad, Vasugi V., Venkatesan R., and Nikhil Bhat. "Analysis of causes of delay in Indian construction projects and mitigation measures." Journal of Financial Management of Property and Construction 24, no. 1 (2019): 58–78. http://dx.doi.org/10.1108/jfmpc-04-2018-0020.

Full text
Abstract:
Purpose Construction projects in India continue to suffer excessive delays. This paper aims to investigate the delay causes in India by project sector (transport, power, buildings and water) and carry out a comparative study of delay causes in design build (DB) projects with that of design bid build (DBB) projects along with mitigation measures. Design/methodology/approach A questionnaire survey was conducted among major clients, contractors and consultants in India. Importance Index was used for ranking of the delay causes. Projects were categorized based on the type, and causes of delay in e
APA, Harvard, Vancouver, ISO, and other styles
34

C.O., Aigbavboa, and Mukuka M. J. . "Construction Project delays in Lusaka, Zambia: Causes and Effects." Journal of Economics and Behavioral Studies 6, no. 11 (2014): 848–57. http://dx.doi.org/10.22610/jebs.v6i11.544.

Full text
Abstract:
This paper assesses the construction professionals’ perception on the major causes of construction project delays and there consequential effects of on the Lusaka – Zambia, construction industry. This is due to the fact that the Zambia construction industry is a major key sector in the development and economic growth of Zambia. Despite this belief, the industry has not escaped the challenges facing other countries worldwide in terms of construction projects performance with regards to the delivery of projects on time as stipulated in the contracts. Data used in this study were derived from
APA, Harvard, Vancouver, ISO, and other styles
35

Mukhtar, Mahmoud Mukhtar Ahmad, and Mohamed Ali Elghadaffi Mohamed. "Causes Of Time Delay In Construction Projects In Libya." IOSR Journal of Mechanical and Civil Engineering 21, no. 6 (2024): 10–15. https://doi.org/10.9790/1684-2106021015.

Full text
Abstract:
Time delay in the construction industry is a global problem and considered as one of the most significant problems worldwide. Libyan construction industry is also no exception to it, and it is known that to consider the project successful is complete on time within predicted costt. As a result of many reasons, this is more noticeably in developing countries as time delay is a normal result of poor project performance. In Libyan construction industry, budget overrun and time extension are the main problems facing all project parties including clients, contractors, subcontractors and suppliers.
APA, Harvard, Vancouver, ISO, and other styles
36

Thabani, Nyoni. "AN EMPIRICAL ASSESSMENT OF CAUSES & EFFECTS OF DELAY IN RESIDENTIAL CONSTRUCTION PROJECTS IN HARARE, ZIMBABWE." International Journal of Advances in Engineering & Scientific Research 5, no. 1 (2018): 34–46. https://doi.org/10.5281/zenodo.10777109.

Full text
Abstract:
<strong>ABSTRACT</strong> <em>Construction delay is one of the major problems faced by the construction industry in Zimbabwe. Understanding the causes and effects of construction delay is important to minimize and or avoid the impact of delay in residential construction projects in Zimbabwe. This research seeks to empirically determine the causes and effects of delay in construction projects in Zimbabwe. From the analysis of the questionnaire, causes and effects of delay were ranked using the Relative Importance Index (RII) approach. The overall results analysis indicate that poor financial co
APA, Harvard, Vancouver, ISO, and other styles
37

Sasane, Prathamesh Y. "A Project Report on Planning, Scheduling, and Delay Analysis of a Construction Project during Covid-19 Pandemic: A Case Study." International Journal for Research in Applied Science and Engineering Technology 10, no. 12 (2022): 539–53. http://dx.doi.org/10.22214/ijraset.2022.47924.

Full text
Abstract:
Abstract: Time delay is one of the biggest problems faced by the construction industry in India. Completing projects on time isthe key factor of the project, but the construction process is subject to many variables and unpredictable factors, which result from many sources such as the availability of resources, external factors, the performance of parties, and the type the structure. Delay in the project, leadsto loss of productivity,increased cost, contract termination, and disputes between contractor and owner. These types of unrealistic exceptions are usually avoided by using a clean and ef
APA, Harvard, Vancouver, ISO, and other styles
38

Viles, Elisabeth, Natalia Carolina Rudeli, and Adrian Santilli. "Causes of delay in construction projects: a quantitative analysis." Engineering, Construction and Architectural Management 27, no. 4 (2019): 917–35. http://dx.doi.org/10.1108/ecam-01-2019-0024.

Full text
Abstract:
Purpose The purpose of this paper is to perform a quantitative analysis of the literature in order to determine the main causes of delay in construction projects. Design/methodology/approach A set of 47 articles from the literature were analyzed, yielding 1,057 different causes of delay. In order to analyze and compare the main causes of delay, their degree of impact was studied statistically. Next, a mention count method was used to determine the primary causes of construction project delays and through the use of Pareto diagrams, the main causes of delays in construction projects were determ
APA, Harvard, Vancouver, ISO, and other styles
39

Banobi, Edwin Thomas, and Wooyong Jung. "Causes and Mitigation Strategies of Delay in Power Construction Projects: Gaps between Owners and Contractors in Successful and Unsuccessful Projects." Sustainability 11, no. 21 (2019): 5973. http://dx.doi.org/10.3390/su11215973.

Full text
Abstract:
Few studies have verified the different causes of project delays between the owner and contractor perspectives. This article’s goal is to find what the causes of delay are and how to mitigate this delay depending on project performance. Thus, this study investigated 82 owner-side experts and 106 contractor-side experts in Tanzanian power construction projects. In successful projects (less than 10% time delay), the owners and contractors weighted similar causes such as vandalism and permits from authorities. They suggested similar mitigation strategies such as close project supervision, capacit
APA, Harvard, Vancouver, ISO, and other styles
40

Yuliana, Candra. "The Influence of Delays in the Implementation of Work on Budget Plan and Field Management on Building Project in Banjarmasin." MATEC Web of Conferences 280 (2019): 05010. http://dx.doi.org/10.1051/matecconf/201928005010.

Full text
Abstract:
The construction service company needs to think about the best strategy for dealing with delay in the project work schedule so that the cost overruns can be reduced to a minimum. The purpose of this research is to make a strategy for overcoming the delay of building project construction work in Banjarmasin. Primary data were obtained by field survey and interviews. The survey was conducted to project directors, project managers and the field, supervisors, and experts who are experienced in handling construction projects. The survey aims to collect data on the dominant factors causing delays in
APA, Harvard, Vancouver, ISO, and other styles
41

Thanh Binh, Nguyen. "Applying Lean Construction to Construction Project." Advanced Materials Research 834-836 (October 2013): 1976–83. http://dx.doi.org/10.4028/www.scientific.net/amr.834-836.1976.

Full text
Abstract:
Lean construction is aimed to improve construction performance by eliminating wastes that do not add value to the customer. This project studies lean construction and its application in concrete construction projects at both the operation and project levels. In conjunction with a concrete contractor, actual concrete construction projects were observed, and problem areas contributing to delay and other wastes were identified. At the project level, the lack of coordination among subcontractors was cited as one of the major factors contributing to schedule delays. This paper proposes to use the l
APA, Harvard, Vancouver, ISO, and other styles
42

Sajiah, Faslan Syam. "Causes of Multi Years Contract Project Delay." Jurnal Anggaran dan Keuangan Negara Indonesia (AKURASI) 2, no. 2 (2020): 145. http://dx.doi.org/10.33827/akurasi2020.vol2.iss2.art80.

Full text
Abstract:
Delay in construction projects is considered one of the most common problems, causing a multitude of negative effects on the project and its participating parties. Delays can cause losses to the economy, cost overruns, disputes, arbitration, abandonment, and poor quality of finished project. This paper aims to identify the main causes of delay in multi years infrastructure projects in Indonesia. Based on secondary data from documents for Proposals and Completion of Extension of Multi-Year Contract Approval in the FY 2018 and 2019 which are processed at the Ministry of Finance, 19 factors that
APA, Harvard, Vancouver, ISO, and other styles
43

Misnan, Mohd Saidin, Nuraqilah Fauzan, Muzani Mustapa, Nurshikin Mohamad Shukery, and Mohd Zahierruden Ismail. "Challenges in Construction Project Management: Time Extensions and Claims Implications." International Journal of Research and Innovation in Social Science IX, no. I (2025): 4027–44. https://doi.org/10.47772/ijriss.2025.9010312.

Full text
Abstract:
In construction projects, delays are widely recognized as the most prevalent, costly, complex, and risky issue. Diverse project scheduling and planning methodologies may employ disparate approaches for evaluating extensions of time (EoT). Extension of Time (EoT) claims are a critical component of construction project management, providing contractors with the enforceable right to extend project deadlines due to unforeseen delays beyond their control. Notwithstanding their significance, the submission and handling of EoT claims frequently results in disputes, overspending, and delays, all of wh
APA, Harvard, Vancouver, ISO, and other styles
44

Mahima, Harit, and Judson Luke. "Mitigation Strategies for Delay Factors in Healthcare Projects." Journal of Building Construction 5, no. 1 (2023): 1–16. https://doi.org/10.5281/zenodo.7615101.

Full text
Abstract:
<em>Delay in project completion is the foremost concern in Indian construction industry. The healthcare facilities in India like in many other countries need significant investments. Healthcare projects are known for having a high degree of complexity in design, construction and operations. Furthermore, the design of healthcare facilities is highly constrained by existing set of regulations containing a wide range of prescriptive requirements.</em> <em>These types of infrastructure projects face the risk of running behind schedule and causing delays. Identifying and minimizing the reasons of d
APA, Harvard, Vancouver, ISO, and other styles
45

Khan, Raza Ali, and Muhammad Umer. "Impact of Delays on Cost of Construction Project- A Cross Sectional Study of Pakistani Construction Industry." Mehran University Research Journal of Engineering and Technology 39, no. 4 (2020): 815–25. http://dx.doi.org/10.22581/muet1982.2004.14.

Full text
Abstract:
It is widely believed that construction sector helps developing aggregate economy and reducing unemployment. Currently, Pakistan is experiencing a major transformational phase in the back drop of China-Pakistan Economic Corridor (CPEC). CPEC is valued at US$ 62 Billion. The present study is undertaken to ascertain the impact of time overrun of projects on their cost, the correlation between stakeholders and to predict the effect of delays on cost overruns. Causes of delays are identified by stakeholders of the construction industry of Pakistan. Two models for projects that had delay less and g
APA, Harvard, Vancouver, ISO, and other styles
46

Anggraini, Devi, Jati Utomo Dwi Hatmoko, and Mudjiastuti Handajani. "Quantifying Delay Risk Potential of Road Projects during Construction Phase: A Case Study." MATEC Web of Conferences 280 (2019): 05009. http://dx.doi.org/10.1051/matecconf/201928005009.

Full text
Abstract:
A comprehensive plan is required to anticipate risks in a construction project. In practice, however, anticipated or unanticipated risks may eventually lead to delays in the project completion date. The aim of this research is to quantify the delay risk potential of a road project during the construction phase. A project at Batang-Kendal road has carried out thorough planning for all required aspects. However, in the implementation of a project, there is often the occurrence of irregular events, which act as a case study for this research, from which delays were identified, observations mapped
APA, Harvard, Vancouver, ISO, and other styles
47

Zavvar, Kazim, Sharif Mohammad, and Ahmed Akil. "Strategies for Reducing Construction Project Delays and Cost Overruns." International Journal of Civil and Structural Engineering Research 11, no. 1 (2023): 91–98. https://doi.org/10.5281/zenodo.8385877.

Full text
Abstract:
<strong>Abstract:</strong> The present research aims to analyze the causes of delays and cost overruns in construction projects and to identify the methods to minimize delays and cost overruns. In the present era of rising need for infrastructure and growing competitiveness, construction projects must be completed on time and without cost overrun. Most construction projects are complex and filled with challenges, unexpected hindrances, and frequently emerging issues, leading to time and cost overruns. This research identified several government construction projects that suffered from delays a
APA, Harvard, Vancouver, ISO, and other styles
48

Amaral, Eliseu Soares Parerira. "Case Study of Delay Construction Projects in Bidau Dili Timor-Leste Bridge." IJTI (International Journal of Transportation and Infrastructure) 3, no. 1 (2020): 20–28. http://dx.doi.org/10.29138/ijti.v3i1.1052.

Full text
Abstract:
The process of implementing development projects has many obstacles that were not predicted beforehand resulting in delays in project completion which have an impact on increasing the cost of project implementation. sometimes the project is not completed in accordance with a predetermined schedule that may be caused by certain factors. Various ways can be done to anticipate and be a solution to the delay. The purpose of the study is to analyze the factors that influence delays in bridge construction projects in Bidau Timor - Leste and how to anticipate delays in project work. The research meth
APA, Harvard, Vancouver, ISO, and other styles
49

Demissew, Abebe, and Fasika Abiy. "Causes and Impacts of Delays in Ethiopian Public Construction Projects (Case on Debre Markos University Construction Projects)." Advances in Civil Engineering 2023 (June 8, 2023): 1–14. http://dx.doi.org/10.1155/2023/6577676.

Full text
Abstract:
The construction project is regarded successful when it is given over to the owner within the time, cost, and standards necessary while minimizing delays in public construction projects. Debre Markos University (DMU) is one of the public universities undergoing massive development projects that are experiencing significant delays. This article evaluates the most prevalent delay issues encountered by Ethiopian government-funded construction projects, particularly those using DMU, analyzes their impacts, and suggests a delay management system. The study applied qualitative as well as quantitativ
APA, Harvard, Vancouver, ISO, and other styles
50

Abeysinghe, Nadeesha, and Ruwan Jayathilaka. "Factors influencing the timely completion of construction projects in Sri Lanka." PLOS ONE 17, no. 12 (2022): e0278318. http://dx.doi.org/10.1371/journal.pone.0278318.

Full text
Abstract:
Timely completion is a crucial factor for the success of a construction project, especially in the Sri Lankan context. This study aims to identify the most influential factors that affect the timely completion of construction projects in Sri Lanka. Thirty-nine factors were identified through a comprehensive literature review and experts’ opinions. A questionnaire incorporating the 39 project delay factors was distributed among 163 Civil Engineers, and responses were obtained. Random sampling method was adopted to select the sample. The Relative Importance Index (RII) analysed and ranked the pr
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!