To see the other types of publications on this topic, follow the link: Deployment cost.

Books on the topic 'Deployment cost'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 books for your research on the topic 'Deployment cost.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse books on a wide variety of disciplines and organise your bibliography correctly.

1

Posteucă, Alin. Manufacturing Cost Policy Deployment (MCPD) Profitability Scenarios. Productivity Press, 2018. http://dx.doi.org/10.4324/9781351015752.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Posteucă, Alin, and Shigeyasu Sakamoto. Manufacturing Cost Policy Deployment (MCPD) and Methods Design Concept (MDC). Productivity Press, 2017. http://dx.doi.org/10.1201/9781315155838.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Jensen, Mark. Deployment cost study: SWIFT, Seattle Wide-area Information For Travelers. Science Applications International Corporation, 1998.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
4

Church of England. Ministry Co-ordinating Group., ed. The ordained ministry: Numbers, cost and deployment : a discussion paper. General Synodof the Church of England, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
5

D, Shaver R., and Rand Corporation, eds. How much is enough ?: Sizing the deployment of baggage screening equipment by considering the economic cost of passenger delays. Rand, 2004.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
6

D, Shaver R., and Rand Corporation, eds. How much is enough ?: Sizing the deployment of baggage screening equipment to minimize the cost of flying ; executive summary. Rand, 2004.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
7

Wesley, Hoerl Roger, ed. Six Sigma beyond the factory floor: Deployment strategies for financial services, health care, and the rest of the real economy. Pearson Prentice Hall, 2005.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
8

Hacker, Earl W. One-year UDP: A cost/benefit analysis of a proposed alternative to the Marine Corps' Unit Deployment Program for fighter aviation. Naval Postgraduate School, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
9

Office, General Accounting. Composite health care system: Outpatient capability is nearly ready for worldwide deployment : report to the chairmen, Senate and House Committees on Armed Services. The Office, 1992.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
10

United States. Congress. Senate. Committee on Armed Services. and United States. Congress. House. Committee on Armed Services., eds. Composite health care system: Outpatient capability is nearly ready for worldwide deployment : report to the Chairmen, Senate and House Committees on Armed Services. The Office, 1992.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
11

Office, General Accounting. Defense acquisitions: Space-based infrared system-low at risk of missing initial deployment date : report to the Chaitman, Subcommittee on Defense, Committee on Appropriations, House of Representatives. U.S. General Accounting Office, 2001.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
12

United States. Coast Guard Reserve, ed. U.S. Coast Guard port security units. U.S. Coast Guard Reserve, 1997.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
13

United States. Congress. Senate. Committee on Armed Services. Declaration of policy of the United States concerning national missile defense deployment: Report of the Committee on Armed Services, House of Representatives, on H.R. 4, together with additional and dissenting views (including cost estimate of the Congressional Budget Office). U.S. G.P.O., 1999.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
14

United States. Congress. Senate. Committee on Armed Services. Declaration of policy of the United States concerning national missile defense deployment: Report of the Committee on Armed Services, House of Representatives, on H.R. 4, together with additional and dissenting views (including cost estimate of the Congressional Budget Office). U.S. G.P.O., 1999.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
15

Wipke, Keith B. Evaluation of stationary fuel cell deployments, costs, and fuels. National Renewable Energy Laboratory, 2013.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
16

E, Eureka William, and Ryan Nancy E. 1959-, eds. Quality up, costs down: A manager's guide to Taguchi methods and QFD. ASI Press, 1995.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
17

Office, United States Government Accountability. Coast Guard: Challenges affecting Deepwater asset deployment and management and efforts to address them : report to the Subcommittee on Homeland Security, House and Senate Commmittees on Appropriations. United States Government Accountability Office, 2007.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
18

Office, General Accounting. Air Force ADP: The Personnel Concept III system is not ready for deployment : report to the chairman, Subcommittee on Defense, Committee on Appropriations, House of Representatives. The Office, 1990.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
19

Office, General Accounting. Air Force ADP: The Personnel Concept III system is not ready for deployment : report to the chairman, Subcommittee on Defense, Committee on Appropriations, House of Representatives. The Office, 1990.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
20

Office, United States Government Accountability, and United States Government Accountability Office. Military personnel: Financial costs and loss of critical skills due to DOD's homosexual conduct policy cannot be completely estimated : report to Congressional requesters. U.S. Government Acccountability Office, 2005.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
21

Posteucă, Alin. Manufacturing Cost Policy Deployment (MCPD) Transformation. Productivity Press, 2018. http://dx.doi.org/10.4324/9781315106328.

Full text
APA, Harvard, Vancouver, ISO, and other styles
22

Manufacturing cost policy deployment (MCPD) transformation: Uncovering hidden reserves of profitability. 2018.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
23

Posteuca, Alin. Manufacturing Cost Policy Deployment Profitability Scenarios: Systematic and Systemic Improvement of Manufacturing Costs. Productivity Press, 2018.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
24

Posteuca, Alin. Manufacturing Cost Policy Deployment Profitability Scenarios: Systematic and Systemic Improvement of Manufacturing Costs. Productivity Press, 2018.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
25

Posteuca, Alin. Manufacturing Cost Policy Deployment Profitability Scenarios: Systematic and Systemic Improvement of Manufacturing Costs. Productivity Press, 2018.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
26

Posteuca, Alin. Manufacturing Cost Policy Deployment Profitability Scenarios: Systematic and Systemic Improvement of Manufacturing Costs. Taylor & Francis Group, 2018.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
27

Manufacturing Cost Policy Deployment Profitability Scenarios: Systematic and Systemic Improvement of Manufacturing Costs. Productivity Press, 2018.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
28

Posteuca, Alin. Manufacturing Cost Policy Deployment Transformation: Uncovering Hidden Reserves of Profitability. Productivity Press, 2018.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
29

Posteuca, Alin. Manufacturing Cost Policy Deployment Transformation: Uncovering Hidden Reserves of Profitability. Productivity Press, 2018.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
30

Manufacturing Cost Policy Deployment and Methods Design Concept: The Path to Competitiveness. Productivity Press, 2017.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
31

Sakamoto, Shigeyasu, and Alin Posteuca. Manufacturing Cost Policy Deployment and Methods Design Concept: The Path to Competitiveness. Productivity Press, 2017.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
32

Sakamoto, Shigeyasu, and Alin Posteuca. Manufacturing Cost Policy Deployment and Methods Design Concept: The Path to Competitiveness. Taylor & Francis Group, 2017.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
33

Sakamoto, Shigeyasu, and Alin Posteuca. Manufacturing Cost Policy Deployment and Methods Design Concept: The Path to Competitiveness. Productivity Press, 2017.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
34

Phase 2 Committee on the Assessment of Technologies for Improving Fuel Economy of Light-Duty Vehicles, Board on Energy and Environmental Systems, National Research Council, and Division on Engineering and Physical Sciences. Cost, Effectiveness, and Deployment of Fuel Economy Technologies for Light-Duty Vehicles. National Academies Press, 2015.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
35

Sakamoto, Shigeyasu, and Alin Posteuca. Manufacturing Cost Policy Deployment and Methods Design Concept: The Path to Competitiveness. Productivity Press, 2017.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
36

Cost, Effectiveness, and Deployment of Fuel Economy Technologies for Light-Duty Vehicles. National Academies Press, 2015. http://dx.doi.org/10.17226/21744.

Full text
APA, Harvard, Vancouver, ISO, and other styles
37

Cost, Effectiveness and Deployment of Fuel Economy Technologies for Light-Duty Vehicles. National Academies Press, 2015.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
38

Phase 2 Committee on the Assessment of Technologies for Improving Fuel Economy of Light-Duty Vehicles, Board on Energy and Environmental Systems, National Research Council, and Division on Engineering and Physical Sciences. Cost, Effectiveness, and Deployment of Fuel Economy Technologies for Light-Duty Vehicles. National Academies Press, 2015.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
39

Phase 2 Committee on the Assessment of Technologies for Improving Fuel Economy of Light-Duty Vehicles, Board on Energy and Environmental Systems, National Research Council, and Division on Engineering and Physical Sciences. Cost, Effectiveness, and Deployment of Fuel Economy Technologies for Light-Duty Vehicles. National Academies Press, 2015.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
40

Garrigan, Robert J. A cost analysis of MH-53E avionics maintenance support alternatives for remote deployment. 1987.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
41

Wigodsky, Andrew. RAPID Value Management for the Business Cost of Ownership: Readiness, Architecture, Process, Integration, Deployment. Elsevier Science & Technology Books, 2003.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
42

Ummel, Kevin, and Charles Fant. Planning for large-scale wind and solar power in South Africa: Identifying cost-effective deployment strategies through spatiotemporal modelling spatiotemporal modelling South Africa: Identifying cost-effective deployment strategies through spatiotemporal modelling. UNU-WIDER, 2014. http://dx.doi.org/10.35188/unu-wider/2014/842-1.

Full text
APA, Harvard, Vancouver, ISO, and other styles
43

Wigosky, Andrew S. RAPID Value Management for the Business Cost of Ownership: Readiness, Architecture, Process, Integration, Deployment (HP Technologies). Elsevier Digital Press, 2004.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
44

Corporation, Rand. How Much Is Enough ?: Sizing the Deployment of Baggage Screening Equipment by Considering the Economic Cost of Passenger Delays. Rand Corporation, 2004.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
45

Chaisty, Paul, Nic Cheeseman, and Timothy J. Power. Budgetary Authority and Coalition Management. Oxford University Press, 2018. http://dx.doi.org/10.1093/oso/9780198817208.003.0008.

Full text
Abstract:
This chapter considers how presidents use their budget powers and the allocation of targeted discretionary spending to manage their coalitions. It considers the costs of budget tool deployment (in terms of time, controversy, and economic resources), and the factors that affect these costs: system-level factors (government transparency, federalism, personal-vote elections), coalition-level factors (coalition size, fragmentation, and heterogeneity), and conjunctural factors (economic crises and energy prices). It explores these factors with cases of budget tool deployment in Ukraine, Ecuador, an
APA, Harvard, Vancouver, ISO, and other styles
46

Hoerl, Roger W., and Ron D. Snee. Six Sigma Beyond the Factory Floor: Deployment Strategies for Financial Services, Health Care, and the Rest of the Real Economy (Six Sigma). Prentice Hall, 2004.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
47

Hoerl, Roger W., and Ron D. Snee. Six Sigma Beyond the Factory Floor: Deployment Strategies for Financial Services, Health Care, and the Rest of the Real Economy (Six Sigma). Prentice Hall, 2004.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
48

Yuliani, Dewi. Is Feed-In-Tariff Policy Effective for Increasing Deployment of Renewable Energy in Indonesia? Oxford University Press, 2017. http://dx.doi.org/10.1093/oso/9780198802242.003.0008.

Full text
Abstract:
To achieve the targeted portion of renewable energy and to attract more investment in renewable electricity Indonesia’s government has issued several feed-in-tariff regulation, which is policy instrument successfully applied in many countries. This study is an exploratory research to evaluate how the policy works in Indonesia, especially in the field. The study shows that while the policy triggers investment interests, many obstacles are encountered due to imperfections in the feed-in-tariff policy package, and other non-cost factors. Several unanticipated side effects were also identified as
APA, Harvard, Vancouver, ISO, and other styles
49

Chaisty, Paul, Nic Cheeseman, and Timothy J. Power. Towards a Framework for Analysis. Oxford University Press, 2018. http://dx.doi.org/10.1093/oso/9780198817208.003.0004.

Full text
Abstract:
This chapter outlines the book’s framework for analysing coalition management under multiparty presidentialism. It defines the concepts of coalition and coalition management, and states the book’s assumptions about the motivations of formateurs. It specifies the five main tools that comprise the multi-dimensional understanding of coalition management: legislative, cabinet, partisan, budget, and informal tools (the ‘exchange of favours’), which are known collectively as the ‘presidential toolbox’. It also outlines the costs associated with the deployment of each tool. Finally, it presents the a
APA, Harvard, Vancouver, ISO, and other styles
50

Internet Freedom and Broadband Deployment Act of 2001: Report together with dissenting views (to accompany H.R. 1542) (including cost estimate of the Congressional Budget Office). U.S. G.P.O., 2001.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!