To see the other types of publications on this topic, follow the link: Design of the main building machines.

Dissertations / Theses on the topic 'Design of the main building machines'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 38 dissertations / theses for your research on the topic 'Design of the main building machines.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Izsová, Radka. "Design centrum HANÁK NÁBYTEK a.s., Popůvky u Kojetína - příprava a organizace výstavby objektu." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-227002.

Full text
Abstract:
This thesis addresses the Design centrum HANÁK NÁBYTEK a.s., Popůvky u Kojetína - This is a new object had the basement and a second floor. The thesis includes - Technical report on the construction technology of the project , which are described in each chapter building equipment, coordination of building relationships with the wider transport routes , the study of the main technological stages, the design of the main building machines and mechanisms. There is a solution on time and financial plan object , the schedule object SO03 - Rapid technological and construction timetable and plan for securing material resources SO03 object . This thesis addresses the technological specification for excavation work with the control and test plan then is solved problems of chemical anchoring pillars object SO203 , which are included tensile tests on chemical anchors.
APA, Harvard, Vancouver, ISO, and other styles
2

Poprová, Barbora. "Stavebně technologická příprava komplexu bytových domů v Liberci." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372082.

Full text
Abstract:
The content of this diploma thesis is construction-technological preparation of complex of apartment buildings. The work includes a technical report, a technology prescription, a control and test plan, a building site design, a main building machines, a budget, a timetable, building instructions, a BOZP plan, a noise study and a change in the use of a part of the building.
APA, Harvard, Vancouver, ISO, and other styles
3

Kytlík, David. "Stavebně technologický projekt vývojového centra v Jaroměři." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2020. http://www.nusl.cz/ntk/nusl-409971.

Full text
Abstract:
The content of this this diploma thesis is structurally technical project of development center in Jaroměř. The building is situated in a V shape and it consists of two production halls and the projection building. Halls and projection building are conected with a special hall. The building of projection have two floors and halls have one floor. The thesis contains a technical report of the construction-technological project, studies of realization of the main technological stages and report of the building equipment. The thesis also deals with design of the main building machines, report of the drilled piles and theirs inspection and test plan. There is also time and financial plan for individual objects and for the main building object, information about safety and healt protection during work and itemized budget. At least is the study of a green roof.
APA, Harvard, Vancouver, ISO, and other styles
4

Sviták, Roman. "Příprava realizace víceúčelového domu Brno - Klíčova." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-226985.

Full text
Abstract:
The thesis is focused on the preparation of realization the multipurpose building Brno - Klíčova. The content of this the thesis is study of construction technology followed by the construction technology project. The aim of the thesis is to identify the sources of the time, money, workers and materials of the building and then select the appropriate process of realization.
APA, Harvard, Vancouver, ISO, and other styles
5

Levin, Brock. "Design, synthesis, and structure of versatile supramolecular building blocks /." Search for this dissertation online, 2005. http://wwwlib.umi.com/cr/ksu/main.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Krištof, Marek. "Stavebně technologický projekt Univerzity Tomáše Bati ve Zlíně." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392073.

Full text
Abstract:
The subject of my diploma thesis is selected parts of the construction technology project of Tomas Bata University in Zlín. The content of the work is mainly elaborated technological regulation for making the monolithic ceiling shell of the main aula of the building, processing of the control and test plan and drawings of the ceiling shell. Next, I worked on the design of suitable transport routes to the construction site, the processing of the studies of the implementation of the main technological stages, the design and the processing of the drawings of the construction site, which varies in time depending on the progress of the technological stages, the design and assessment of the lifting mechanisms and machines, time and financial plan, the timetable for the rough construction and the main technological stages, budget of the rough construction, health and safety at work.
APA, Harvard, Vancouver, ISO, and other styles
7

Kopeloff, Leonardo. "Modern control theory application in mill main drive design." Thesis, Virginia Polytechnic Institute and State University, 1985. http://hdl.handle.net/10919/50037.

Full text
Abstract:
Modern Control Theory is applied to analyze an existing aluminum mill drive, which was originally designed by Classical Methods. The system is studied with Optimal Control and z-transform zero-pole locus tools. The results and also the original design are compared with the performance of simulation. The models are built with the transition matrix and iterative procedures. Conclusions about the appropriated design methods and improvements to the control scheme result from the investigation.<br>Master of Science<br>incomplete_metadata
APA, Harvard, Vancouver, ISO, and other styles
8

Koláček, Ivo. "Montovaná hala, areál firmy Bosh Diesel s r.o. - stavebně technologická příprava stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392063.

Full text
Abstract:
The masters thesis prepares the project of a prefabricated hall in the premises of Bosch Diesel s. r.o. The work completely elaborates the technical report, the coordination situation with the relations to the wider transport routes, the study of the main technological stages, the project of the building site, the design of the machines, the schedule of the main building, the material and human resources, the technological regulations, the control and test plan, safety and health protection during work, noise study, budget and building details.
APA, Harvard, Vancouver, ISO, and other styles
9

Pupíková, Ingrid. "Přístavba hotelu Tři Věžičky ve Stříteži - příprava realizace stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265509.

Full text
Abstract:
This thesis solves the construction technology project extension at Three Steeples in Střítež, building apartments. Work includes the complete study of the implementation, including timing and the financial plan, assessment of the wider relations of transport routes, the project site equipment, design of the main building machines and mechanisms, technological specifications for masonry, inspection and test quality plan for walling, technological prescription for clay plasters and itemized budget rough construction of the main building.
APA, Harvard, Vancouver, ISO, and other styles
10

Hladký, Dominik. "Obytný areál Ponavia park v Brně, příprava a organizace stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2020. http://www.nusl.cz/ntk/nusl-409926.

Full text
Abstract:
This thesis deals with the construction process of the apartment house Ponavia Park located in Brno. The thesis solves the individual realization phases of the main building phase. Building site equipment is designed for the projected construction process in three different variations. A technical report is also included in the building site. Critical points within the transport of materials and machines are also verified. A financial plan for the whole building is made as an summarizing time schedule for the apartment building. The sources for the financial plan are the figures taken from the Czech building objects classifications (JKSO). The summarizing time schedule is made in MS Projekt software and it’s designed as a Gantt diagram. A design of the main building machines and mechanisms was also made for the projected construction process. All of the machines were assessed for their respective required function on the building site. Also included in this thesis is a construction method for the reinforced concrete structures. The construction method deals with the realization process of waterproof concrete, reinforcement binding, formwork of the vertical and horizontal structures and also the process of concrete curing. The construction method is followed up by quality control and test plans for reinforced concrete structures, and a construction site safety plan that is made in the form of predicted main safety risks at the building site. For the noise load on the surrounding buildings a noise study is made. The study examines the intensity of noise in the protected outdoor space. This study was made in the Hluk+ software. The thesis also includes an item budget for the apartment house that was made in Build Power S software.
APA, Harvard, Vancouver, ISO, and other styles
11

Civjan, Scott Adam. "Investigation of retrofit techniques for seismic resistant steel moment connections /." Digital version accessible at:, 1998. http://wwwlib.umi.com/cr/utexas/main.

Full text
APA, Harvard, Vancouver, ISO, and other styles
12

Strnadová, Lenka. "Rekonstrukce a přístavba Městského muzea Česká Třebová - příprava realizace a řízení stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-227012.

Full text
Abstract:
Master thesis solves construction and technological project which deals with data processing, documentation and technological processes of building reconstruction and extension realization in Muzeum of Česká Třebová. The work contains technological building study, assessment of relationships to the wider transportation routes, time and financial plan, building-site organization project, design of the main building machines and mechanisms, technological prescriptions for excavation work and micropile injection, occupational safety and health protection management, project calculation budget.
APA, Harvard, Vancouver, ISO, and other styles
13

Endut, Esmawee Haji. "Traditional Malaysian built forms : a study of the origins, main building types, development of building forms, design principles and the application of traditional concepts in modern buildings." Thesis, University of Sheffield, 1994. http://etheses.whiterose.ac.uk/14839/.

Full text
APA, Harvard, Vancouver, ISO, and other styles
14

Boucník, Jan. "Příprava realizace administrativních objektů Palmovka Park." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-371812.

Full text
Abstract:
The diploma thesis deals with the preparation of the construction of Palmovka Open Park III administrative building. It contains a technological regulation for drilled piles, technological regulation for reinforced concrete monolithic constructions, broader transport routes, study of the implementation of the main technological stages, design of building machines and mechanisms, control and testing plan for drilling piles and reinforced concrete constructions, risk and measures, time and financial plan, calculation according to THU, drawing of site equipment, cycle, timetable, item budget, selected technological details.
APA, Harvard, Vancouver, ISO, and other styles
15

Carbol, Štěpán. "Stavebně technologický projekt výrobní haly Massag v Bílovci." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265322.

Full text
Abstract:
This thesis addresses the construction of steel buildings in Bílovec. In this work we are solved structurally technological study of the construction of steel buildings. The work deals with the traffic situation around the building and a landing distance. The thesis focuses on the installation for the steel skeleton and industrial floors of wire reinforced concrete, time and financial plan, project, site equipment, design of main construction machines and mechanisms, timelines, capital construction object, then control plan for the steel skeleton and industrial floor. Moreover, it is processed itemized budget including bills of quantities, Risk Plan for the steel skeleton and industrial flooring and design details. The basis for this work was the design documentation for the realization of this project.
APA, Harvard, Vancouver, ISO, and other styles
16

Huková, Martina. "Stavebně technologická příprava prodejny Smart Light v Bratislavě." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392005.

Full text
Abstract:
The main subject of this diploma thesis is elaboration of construction and technological preparation for the main structure of the Smart Light shop in Bratislava. For main structure has been processed time schedule of the construction, single item budget, machine configuration design, drawing of building site, coordination situation of the building with connection to the infrastructure, safety and health protection during work on building site. Part of the thesis is processing study of main construction technological parts. Diploma thesis in technological prescript focuses on implementation of floor structure with cast epoxy walking surface. There has been elaborated testing and quality plan of this technological part. Additional chapter approximates built-in technology – cooling ceiling structure. For elaboration of this diploma thesis were used programs AutoCAD, CONTEC, BuildPowerS, Microsoft Excel, Microsoft Word.
APA, Harvard, Vancouver, ISO, and other styles
17

Štefaňák, Jan. "Stavebně technologický projekt výrobní haly Rokycany." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225511.

Full text
Abstract:
Master´s Thesis describes the realization setup procedure of factory building in Rokycany. Building has precast concrete skeleton based on in-situ concrete piles. Document consists of concept of site accommodation, sizing of building machines, time schedule, technological rules and constraints for the chosen technological processes and plan of workplace safety and health.
APA, Harvard, Vancouver, ISO, and other styles
18

Malý, Filip. "Stavebně technologický projekt výstavby polyfunkčního domu lokalita Nová Nitra." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225445.

Full text
Abstract:
The content of this thesis is the construction project of technological multifunctional building new locality Nitra the Slovak Republic. Individual points outline the project, which are dealt with in this thesis can be divided into subcategories, depending on the type of information provided. The first category can include items such as a technical report to the STP, which describes the basic information about the objects constructed building including the construction situation, location of the site including links to transport and technical infrastructure and rough timetable for the construction of all buildings. The second category can include no specific calculation and optimization outputs such as itemized budget polyfunctional house SO-07.03, drawing of the site including all buildings proposed site and their economic evaluation, sizing of utilities for supplying water and electricity construction site, design of building machines and mechanisms including determining the time of deployment, technological regulation for the implementation of monolithic roof structure, including financial balance sheets prepared by the deployment of slab formwork. The last category included in the thesis are legislative requirements that must be observed and kept in the course of the construction plan is constructed as a safety and health at work, including security risks drawn up, inspection and testing schedule for monolithic construction and a list of environmental risks that may arise during implementation.
APA, Harvard, Vancouver, ISO, and other styles
19

Vasserbauer, Jiří. "Hasičská stanice Jaroměř - stavebně technologická příprava stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227298.

Full text
Abstract:
The subject of the diploma thesis is building-technology project of new building Fire station Jaroměř. This preparation includes the processing of technological regulation for, design of site equipment, time schedule, itemized budget, design of machinery confuguration, inspection and test plan, environmental plan and work safety plan.
APA, Harvard, Vancouver, ISO, and other styles
20

Krejčí, Vlastimil. "Bytový dům Terasy Havlíčkova - vybrané části STP." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225617.

Full text
Abstract:
Architectural and technological project of building the housing Terraces Havlickova contains technical report on construction technology project,coordination situation, building relationships with the wider transport routes, time and financial plan of the building object, study the implementation of major technological stages of a residential building,Project construction site, design of the main building machines,schedule of the main building construction object SO-01,plan for securing material resources for the construction of residential house,technological regulation for the implementation of excavations and roofs,inspection and test plan for the implementation of the excavations and roofs. The other award was prepared itemized budget apartment house SO-01, calculation of construction according to THU, health and safety plan and Listing of security risks and security measures on site
APA, Harvard, Vancouver, ISO, and other styles
21

Říha, Tomáš. "Stavebně technologický projekt výstavby skladu." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372177.

Full text
Abstract:
The aim of the diploma thesis is to elaborate parts of the frozen food warehouse construction project in Dašice in the area of MD logistics as, resulting in the elaboration of a technical report on the building technology project, the coordination situation of the building with the broader relations of the transport routes, the time and financial plan of the construction in the plane of the buildings, implementation of the main technological stages of the main building, drawing of the building site equipment, design of the main building machines, detailed time schedule of the main building, budget line, technological regulation for implementation of foundation structures consisting of drilled pilot and supporting walls, quality control and test plan for the given stage , drawings of the earthworks equipment and the construction of the hall.
APA, Harvard, Vancouver, ISO, and other styles
22

Mrózek, Jakub. "Stavebně technologické řešení bytového domu Hubertus v Karlově Studánce." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-226993.

Full text
Abstract:
In my master thesis I deal with construction and technological solutions of Residental House Hubertus in Karlova Studánka. Thesis mainly includes technical report of the construction technology project, coordination situation of building with relationships to the wider transportation routes, the implementation study of the main technological stages of the main building structure, technical report of building-site equipment with drawings of building-site equipment, design of the main building machines and mechanisms, project calculation budget, calculation of construction by the building structures, time schedule, technological prescription ceiling slab with inspection and test plan.
APA, Harvard, Vancouver, ISO, and other styles
23

Nečasová, Barbora. "Stavebně technologický projekt přípravy a realizace bytového domu v Brně Líšni." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225673.

Full text
Abstract:
The technological project deals with the processing of materials and documentation for the preparation and realization of the residential building in Brno Lišen.The project includes a technical report which closely provides basic information about the building. These information are complementing and justifying the project documentation of the construction technologies and other related documantation which are focusing on the creation of a control and test plans , support of the implementation of a safety plan on the construction site, proposal of the main building machines and mechanisms, design of the supply processes within the realization phase of the building process. It also contains technical regulations with detailed descriptions of chosen construction processes .
APA, Harvard, Vancouver, ISO, and other styles
24

Pospíšilová, Izabela. "Projekt přípravy a realizace polyfunkčního domu ve Velkých Bílovicích." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372125.

Full text
Abstract:
The thesis is focused on construction technology solution for realization of the construction of a polyfunctional building in Velké Bílovice. Part of the thesis is technical report for construction technology project, time and financial evaluation of selected building as well as the whole project. The thesis contains selected technological regulations of carried out activities, control, and test plans, safety and health protection at work, a design of major building machines and mechanisms, a concept of the construction site or instructions for using the building.
APA, Harvard, Vancouver, ISO, and other styles
25

Nováková, Martina. "Stavebně technologický projekt dálničního nadjezdu č. D1 - 150." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392186.

Full text
Abstract:
This diploma thesis deals with demolition of the motorway overpass. The bridge (overpass) is located over the D1 motorway from Prag to Brno at the 115,881 km. On the brigde runs the local comunication II/352 between villages Švábka and Měšín. The bridge demolition is part of the D1 renovation plan. The main reason behind the demolitions si that the bridge no longer meets it´s lenght requierments. During the demolition and construction will be any use of II/352 for public transport over the bulding site forbiden. This diploma thesis include technical report for construction technology project, time and financial evaluation of the project. Also the thesis deals with the selected technological regulations of carried out activities, timetable of controls and tests, trafice relationships on wider scale, a list of main building machines and mechanisms with their specification, a concept of the construction site, health and safety requlations, and in detail plans for realization of a road surface layers.
APA, Harvard, Vancouver, ISO, and other styles
26

Novotný, Zdeněk. "Centrální objekt nemocnice v Uherském Hradišti - stavebně technologická příprava stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227165.

Full text
Abstract:
This diploma thesis deals with construction and technological preparation of the construction of the central hospital building in the town Uherske Hradiste. The work is composed of selected parts of the building and technological project, which is annexed to the diploma thesis. On some selected parts of the building and technological project is also prepared relevant drawings. The aim of the thesis is to choose a suitable and effective implementation process object depending on the circumstances and determine the resources of time, funds, personnel and materials.
APA, Harvard, Vancouver, ISO, and other styles
27

Janíček, Jakub. "Školící středisko Zašová - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-227007.

Full text
Abstract:
The subject of work is building-technology project Training center in Zasova. The study includes a technical report on the construction technological project, technical report of the site equipment project including a drawings, design of the main building machines, technical report of transport relations, itemized budget, the detailed time plan of the construction, technology regulations to of the selected construction processes, inspection and testing plans, occupational safety, environment, contract for construction works, major lifting mechanisms evaluation from an economic perspective.
APA, Harvard, Vancouver, ISO, and other styles
28

Přikryl, Jan. "Příprava realizace skladovací haly v Kuřimi." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-391939.

Full text
Abstract:
The subject of my diploma thesis is preparation of the realization of a warehouse situated in Kuřim. The work contains technological regulations for the construction of the reinforced concrete skeleton and the realization of the industrial floor, the design of the main machines and mechanisms including the time deployment, the detailed time schedule of the main building object SO 101.3 Hall B, time schedule and financial plan of the building – the objects one. Due to the scale of the work, documents relating to safety and quality control are also processed. Further, the technical report of the site equipment, including drawings, is processed. In the chapter, which provides space for other assignments, the OSH plan is elaborated, the budget of object SO 101.3 Hall B, Safety measures for the installation of reinforced concrete skeleton. The last point of the diploma thesis deals with specialization in the field of realization of inland communication.
APA, Harvard, Vancouver, ISO, and other styles
29

Sokola, Jiří. "Administrativní budova v Brně, stavebně technologická příprava stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265247.

Full text
Abstract:
Thesis I worked on a project basis provided the building permit for an office complex of two identical fourth storey buildings which from the first storey intersects the inner atrium. The buildings are located within the CTZone Brno in the street Masna. The buildings are designed so that the ground floor is a garage for cars and retail space for rent and above-ground floors are reserved for office space lease. Objects are based on a floating pile conducted by the CFA, which builds prefabricated concrete skeleton. The cladding is formed by a combined system of aluminum windows, masonry face and sheet plotted on a system of stainless steel brackets. Roofing of buildings is done running flat roofs, the roofing of the atrium serves as a walkable roof. The garage is designed bearing slab plate fitted topping for added durability. Internal Partition Walls and walls are made of aerated concrete blocks. Thesis deals with construction technological preparations for the construction and contains a technical report, coordinating the situation buildings with wider relationships routes, time and financial plan, study the implementation of the main stages, the project site equipment, design tools, technological regulation, inspection and test plan, itemized budget, comparing two designs rough superstructure and appropriate drawings.
APA, Harvard, Vancouver, ISO, and other styles
30

Kazda, Jiří. "Realizace novostavby hasičské zbrojnice ve Ždírci nad Doubravou." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2020. http://www.nusl.cz/ntk/nusl-409932.

Full text
Abstract:
The master´s thesis describes the realization of new building of fire station in Ždírec nad Doubravou. The parts of the thesis are time and financial plan for all building objects, assessment of transport routes, design of site equipment and design of main machines. An itimized budget with a bill of quantities and a detailed construction schedule are prepared for the main building. A technological regulativ and quality control plan are prepared for the stage of industrial steelconcrete floor. In the end of the work, there is solved the noise study of construction and the topic of system infiltration tanks.
APA, Harvard, Vancouver, ISO, and other styles
31

Lenne, Loïse. "Le temps de l'événement architectural : fabrication et mise en scène de tours de bureaux et leurs quartiers : la City, la Défense, Francfort." Thesis, Paris Est, 2015. http://www.theses.fr/2015PESC1081.

Full text
Abstract:
L'ambition de cette recherche est d'interroger et de clarifier l'emploi du terme événement à propos de réalisations architecturales et des phénomènes qui les entourent. Elle a été menée grâce à l'étude de trois quartiers de tours et d'affaires européens – la City, la Défense, Francfort – qui apparaissent propices à la recherche d'événements. L'événement architectural y est vu, à l'instar de tout événement, non comme un donné immanent advenant par lui-même, mais comme un construit auquel participe chaque acteur en amont et en aval, du client qui organise un concours aux médias qui fabriquent sa réception. Cette construction est caractéristique de la période récente. L'événement architectural tel que nous le définissons n'est pas un simple mode d'existence de l'événement mais le produit d'un rapport au temps particulier que certains historiens voient comme étant uniquement tourné vers le présent et qualifient à l'aide de la notion de régime d'historicité. Dans les quartiers étudiés, l'événement prend la forme de mises en scène de l'existant lors de festivals ou grâce à la réalisation de bâtiments qui se présentent comme atemporels et hors de toute question de style. Il ne provoque plus nécessairement de rupture. Mais alors que ce phénomène tourne tous les regards vers l'architecture des bâtiments, il opère également une réduction dans leurs caractéristiques architecturales. L'architecture, en devenant événement ou en étant utilisée par un événement festif, n'est plus vue que sous l'angle de questions typologiques plus ou moins réduites et de différenciation pour faire mémoire. Ces deux points sont vus comme la part irréductible de l'architecture, indissoluble dans l'événement, dernier levier d'action pour les architectes aux prises avec une demande en événement<br>The aim of this research is to question and clarify the use of the term event when talking about architectural realizations and the phenomena that occur around them. It has been conducted by analyzing three European tall building and business districts – the City, La Défense, and Frankfurt – which seem propitious for the location of events. Just like any other event, the architectural one is not viewed here as a spontaneous given which occurs in and of itself but as a construction in which a variety of actors take part, from the client who organizes the competition beforehand all the way to the media who, in the aftermath of the event, generate its reception. This construction is characteristic of recent times. The architectural event such as we define it is not a mere mode of existence of the event but the product of a special relationship to time which some historians see as being only preoccupied with the present and define thanks to the notion of regime of historicity. In the districts studied, the event takes the form of a staging of the existing by way of festivals or thanks to the completion of buildings which present themselves as timeless and devoid of any question of style. It no longer necessarily leads to a breach. But while this phenomenon has all gazes turned toward the architecture of the buildings, it also diminishes their architectural characteristics. By becoming an event in itself or being used for festive events, architecture is henceforth only considered through the angle of a limited number of typological questions and that of its ability to distinguish itself in order to be remembered. These two aspects are seen as the irreducible facets of architecture, those which cannot be dissolved in the event. They are the final levers of action for the architect who is faced with a demand for events
APA, Harvard, Vancouver, ISO, and other styles
32

Karafiátová, Hana. "Stavebně technologický projekt výstavby penzionu pro seniory." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2013. http://www.nusl.cz/ntk/nusl-226094.

Full text
Abstract:
The purpose of the final thesis is to elaborate selected parts of a technology building project of the Pension for the elderly. The complex includes eleven building objects and the main one is developed in detail. The final thesis includes a technical report about the technology building project, a building schedule, suggestion for realization of the main stages of its construction, a design of mechanical assembly. The final thesis also includes the project of site equipment, technological regulations , an inspection and test plan, an occupational safety and health plan.
APA, Harvard, Vancouver, ISO, and other styles
33

Šmíd, Radim. "Stavebně technologický projekt stanice Integrovaného záchranného systému." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392135.

Full text
Abstract:
The subject of this diploma thesis is construction-technological project of the integrated rescue system station. The building is situated in the village of Týn nad Vltavou and will be used to perform the service of fire protection of the population. The thesis is focused on the design of the construction site equipment, the time and financial plan, the design of the main building machines and mechanisms, the technological specification, the control and test plan, and also the occupational safety and health protection.
APA, Harvard, Vancouver, ISO, and other styles
34

Škopík, Michal. "Stavebně technologická studie realizace haly Blansko." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227629.

Full text
Abstract:
This diploma thesis deals with solution of construction of steel hall in Blansko. In this thesis is solved constructional-technological study of construction of steel hall. The thesis focuses in assembly of steel skeleton. More specifically deals with traffic situation around building, time and financial plan of the building for individual objects, draft of equipment of construction site, design of the main lifting machines and mechanisms, schedule of the main building object, safety measures at the construction site and ensuring quality requirements for the installation of a steel skeleton. Extra is processed itemized budget with bill of quantities, risk plan of construction of steel hall and construction details. This building is very interesting about architectural design. The basis for this thesis was a drawing documentation for realization of this construction.
APA, Harvard, Vancouver, ISO, and other styles
35

Šrámek, Jiří. "Stavebně technologický projekt výrobní a administrativní haly ATX." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392191.

Full text
Abstract:
The subject of this master’s thesis is a solution of chosen parts of building construction project. The project solves industrial hall that contains productions and administrative space. This thesis includes technological regulations for substructure, study of performing the main technological stages, design of using machines, checking and testing plans. Other phrases parts are time schedules, budget, calculations, design of site equipment including engineering report and report for performing access road. Starting materials, which were used for this thesis, were engineering report also including working drawings.
APA, Harvard, Vancouver, ISO, and other styles
36

Trojánek, Lukáš. "Základní škola v Moravanech u Brna." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-226572.

Full text
Abstract:
The theme of this thesis is the preparation of project documentation at the level for the implementation of the construction of primary schools in the village Moravany u Brna. In the framework of the preparatory study work has been processed the entire campus, including outdoor sports facilities, paved surfaces, parking lots and additional objects required for the running of the school. The subject of this thesis is only part of the main object SO01 elementary school and part of it and this is a three storey building with the main longitudinal structural wall system. The carrier of the walls and the ceiling structure is of reinforced concrete. The roof structure is designed as a desktop with internal drainage. The façade of the building is divided according to the floor, the first floor is addressed to the contact insulation system for cladding of ceramic straps in the second and the third floor is designed to ventilated the facade of fiber cement plates with colored solution. The subject of the proposal is to solve traffic in peace into two parking lots and the Terminal for lifting children.
APA, Harvard, Vancouver, ISO, and other styles
37

Li, Ming-Liang, and 李明亮. "Excessive influence of the Campus Building main transformer design- A University." Thesis, 2015. http://ndltd.ncl.edu.tw/handle/cen93g.

Full text
Abstract:
碩士<br>國立宜蘭大學<br>電機資訊學院碩士在職專班<br>103<br>Electrical distribution system capacity over design is very popular in university campus. The excess transformer capacity not only increases initial capital cost but also endures higher Hysteresis loss in transformer core (iron loss) throughout transformer lifetime. This study is based on an example of existed campus building with 28,580KVA transformer capacity, 31,88KW in contract capacity and 11.07% in actual usage rate. After reviewed transformer utilization rate, cost analysis, remote meter monitoring system and building application power demand scheme, the optimized transformer capacity should be 10,030KVA. In this article, we also discuss the undesired capital depreciation, higher iron loss and power factor losses issues due to transformer capacity over design. Based on this study, the author proposes to utilize Demand Use Intensity (DUI) guideline from Bureau of Engergy, Department of Economics Affair, optimize transformer design, and minimize power factor loss for future building electricity planning and transformer design.
APA, Harvard, Vancouver, ISO, and other styles
38

Santos, Ângelo Emanuel Neves dos. "Design and simulation of a smart bottle with fill-level sensing based on oxide TFT technology." Master's thesis, 2016. http://hdl.handle.net/10362/19593.

Full text
Abstract:
Packaging is an important element responsible for brand growth and one of the main rea-sons for producers to gain competitive advantages through technological innovation. In this re-gard, the aim of this work is to design a fully autonomous electronic system for a smart bottle packaging, being integrated in a European project named ROLL-OUT. The desired application for the smart bottle is to act as a fill-level sensor system in order to determine the liquid content level that exists inside an opaque bottle, so the consumer can exactly know the remaining quantity of the product inside. An in-house amorphous indium–gallium–zinc oxide thin-film transistor (a-IGZO TFT) model, previously developed, was used for circuit designing purposes. This model was based in an artificial neural network (ANN) equivalent circuit approach. Taking into account that only n-type oxide TFTs were used, plenty of electronic building-blocks have been designed: clock generator, non-overlapping phase generator, a capacitance-to-voltage converter and a comparator. As it was demonstrated by electrical simulations, it has been achieved good functionality for each block, having a final system with a power dissipation of 2.3 mW (VDD=10 V) not considering the clock generator. Four printed circuit boards (PCBs) have been also designed in order to help in the testing phase. Mask layouts were already designed and are currently in fabrication, foreseeing a suc-cessful circuit fabrication, and a major step towards the design and integration of complex trans-ducer systems using oxide TFTs technology.
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!