Books on the topic 'Dynamic scheduling'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the top 50 books for your research on the topic 'Dynamic scheduling.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Browse books on a wide variety of disciplines and organise your bibliography correctly.
Koole, G. M. Stochastic scheduling and dynamic programming. Centrum voor Wiskunde en Informatica, 1995.
Find full textVanhoucke, Mario. Project Management with Dynamic Scheduling. Springer Berlin Heidelberg, 2012. http://dx.doi.org/10.1007/978-3-642-25175-7.
Full textVanhoucke, Mario. Project Management with Dynamic Scheduling. Springer Berlin Heidelberg, 2013. http://dx.doi.org/10.1007/978-3-642-40438-2.
Full textKoole, G. M. Stochastic scheduling and dynamic programming. Centrum voor Wiskunde en Informatica, 1995.
Find full textHirst, Eric. Ancillary-service details: Dynamic scheduling. Oak Ridge National Laboratory, 1997.
Find full textKoole, G. M. Stochastic scheduling and dynamic programming. Centrum voor Wiskunde en Informatica, 1995.
Find full textShaw, Michael J. Dynamic scheduling in cellular manufacturing systems. College of Commerce and Business Administration, University of Illinois at Urbana-Champaign, 1987.
Find full textservice), SpringerLink (Online, ed. Project Management with Dynamic Scheduling: Baseline Scheduling, Risk Analysis and Project Control. Springer Berlin Heidelberg, 2012.
Find full textBrown, Gerald J. Dynamic task scheduling for the Knowledge Worker System. U.S. Army Construction Engineering Research Laboratory, 1996.
Find full textReiman, M. I. Dynamic scheduling of a two-class queue with setups. Alfred P. Sloan School of Management, Massachusetts Institute of Technology, 1994.
Find full textWein, Lawrence M. Dynamic scheduling of a multiclass make-to-stock queue. Sloan School of Management, Massachusetts Institute of Technology, 1990.
Find full textNuzzolo, Agostino. Transit network modelling: The schedule- based dynamic approach. F. Angeli, 2003.
Find full textHa, Albert Y. Optimal dynamic scheduling policy for a made-to-stock production system. Yale School of Organization and Management, 1993.
Find full textAmbriz, Rodolfo. Dynamic scheduling with Microsoft Project 2013: The book by and for professionals. J. Ross Publising, 2015.
Find full text1960-, White John, ed. Dynamic scheduling with Microsoft Project 2010: The book by and for professionals. J. Ross Pub., 2011.
Find full textAmbriz, Rodolfo. Dynamic scheduling with Microsoft Office Project 2007: The book by and for professionals. J. Ross Pub., 2008.
Find full textMarkowitz, David Maxwell. The stochastic economic lot scheduling problem: Heavy traffic analysis of dynamic cyclic policies. Sloan School of Management, Massachusetts Institute of Technology], 1995.
Find full textVasfi, Gucer, and International Business Machines Corporation. International Technical Support Organization., eds. Getting started with Tivoli dynamic workload broker version 1.1. IBM InternationalTechnical Support Organization, 2007.
Find full textMarkowitz, David Maxwell. Heavy traffic analysis of dynamic cyclic policies: A unified treatment of the single machine scheduling problem. Sloan School of Management, Massachusetts Institute of Technology], 1996.
Find full textCenter, Ames Research, ed. The Dynamic Planner: The sequencer, scheduler, and runway allocator for aircraft traffic control automation. National Aeronautics and Space Administration, Ames Research Center, 2000.
Find full textWong, Gregory L. The Dynamic Planner: The sequencer, scheduler, and runway allocator for aircraft traffic control automation. National Aeronautics and Space Administration, Ames Research Center, 2000.
Find full textVasfi, Gucer, and International Business Machines Corporation. International Technical Support Organization., eds. Deployment guide series. International Technical Support Organization, 2008.
Find full textNareyek, Alexander. Constraint-based agents: An architecture for constraint-based modeling and local-search-based reasoning for planning and scheduling in open and dynamic worlds. Springer, 2001.
Find full textPrachanda, Pradhan, Gautam Upendra 1950-, Joshi Naveen Mangal, and Farmer Managed Irrigation Systems Promotion Trust (Kathmandu, Nepal), eds. Dynamics of farmer managed irrigation systems: Socio-institutional, economic and technical contexts : proceedings of the fifth international seminar held on 25-26 March 2010, Kathmandu, Nepal. Farmer Managed Irrigation Systems Promotion Trust, 2010.
Find full textCoordinated scheduling for dynamic real-time systems. National Aeronautics and Space Administration, 1994.
Find full textVanhoucke, Mario. Project Management with Dynamic Scheduling: Baseline Scheduling, Risk Analysis and Project Control. Springer Berlin / Heidelberg, 2016.
Find full textVanhoucke, Mario. Project Management with Dynamic Scheduling: Baseline Scheduling, Risk Analysis and Project Control. Springer Berlin / Heidelberg, 2013.
Find full textVanhoucke, Mario. Project Management with Dynamic Scheduling: Baseline Scheduling, Risk Analysis and Project Control. Springer London, Limited, 2013.
Find full textKanungo, Priyesh. Scheduling in Distributed Computing Environment Using Dynamic Load Balancing. Anchor Academic Publishing. ein Imprint der Diplomica Verlag GmbH, 2016.
Find full textReiman, M., and Lawrence M. Wein. Dynamic Scheduling of a Two-Class Queue with Setups. Creative Media Partners, LLC, 2018.
Find full textBuilding), CIOB (The Chartered Institute of. Guide to Good Practice in the Management of Time in Major Projects: Dynamic Time Modelling. Wiley & Sons, Incorporated, John, 2018.
Find full textBuilding), CIOB (The Chartered Institute of. Guide to Good Practice in the Management of Time in Major Projects: Dynamic Time Modelling. Wiley & Sons, Incorporated, John, 2018.
Find full textBuilding), CIOB (The Chartered Institute of. Guide to Good Practice in the Management of Time in Major Projects: Dynamic Time Modelling. Wiley-Blackwell, 2018.
Find full text(Editor), Ralph Bergmann, and Alexander Kott (Editor), eds. Integrating Planning, Scheduling, and Execution in Dynamic and Uncertain Environments: Papers from the 1998 Aips Workshop. AAAI Press, 1998.
Find full textVenkatachalam, Nithya, and Vaiyshnavi Perumal. Improved Scheduling Algorithm Using Dynamic Tree Construction for Wireless Sensor Networks. Anchor Academic Publishing. ein Imprint der Diplomica Verlag GmbH, 2016.
Find full textAmbriz, Rodolfo. Dynamic Scheduling with Microsoft Project 2013: The Book by and for Professionals. Ross Publishing, Incorporated, J., 2014.
Find full textKishor, Nand, and Jesus Fraile-Ardunuy. Modeling and Dynamic Behaviour of Hydropower Plants. Institution of Engineering & Technology, 2017.
Find full textModeling and Dynamic Behaviour of Hydropower Plants. Institution of Engineering & Technology, 2017.
Find full textDynamic Scheduling with Microsoft Project 2002: The Book by and for Professionals. Ebsco Publishing, 2003.
Find full textUyttewaal, Eric. Dynamic Scheduling With Microsoft Project 2002: The Book by and for Professionals. J. Ross Publishing, 2003.
Find full textReiman, Martin, Lawrence M. Wein, and David Maxwell Markowitz. Stochastic Economic Lot Scheduling Problem: Heavy Traffic Analysis of Dynamic Cyclic Policies. Creative Media Partners, LLC, 2018.
Find full textAmbriz, Rodolfo. Dynamic Scheduling with Microsoft Office Project 2007: The Book By and for Professionals. Ross Publishing, Incorporated, J., 2008.
Find full textJacob, Joseph. Automatic scheduling and dynamic load sharing of parallel computations on heterogeneous workstation clusters. 1995.
Find full textDynamic scheduling with Microsoft Office Project 2007: The book by and for professionals. J. Ross Pub., 2007.
Find full textDynamic Scheduling With Microsoft(r) Project 2000 : The Book By and For Professionals. Intl Inst for Learning, 2001.
Find full textDynamic Scheduling with Microsoft Office Project 2003: The Book by and for Professionals. J. Ross Publishing, 2004.
Find full textKimms, Alf. Multi-Level Lot Sizing and Scheduling: Methods for Capacitated, Dynamic, and Deterministic Models. Physica-Verlag, 2012.
Find full textAmbrix, Rodolfo, and White John. Dynamic Scheduling® with Microsoft® Project 2010: The Book by and for Professionals. Ross Publishing, Incorporated, J., 2011.
Find full text