Academic literature on the topic 'Earned Value Method'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Earned Value Method.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Journal articles on the topic "Earned Value Method"
KIM, YONG-WOO, and GLENN BALLARD. "EARNED VALUE METHOD AND CUSTOMER EARNED VALUE." Journal of Construction Research 03, no. 01 (2002): 55–66. http://dx.doi.org/10.1142/s1609945102000096.
Full textTripathi, Abhineet, Darshan B. Patel, Patel Rushil Ramanabhai, and Raja Sekhar Mamillapalli. "Comparative Study of Earned Schedule Method With Earned Value Method." International Journal of Technology 5, no. 2 (2015): 197. http://dx.doi.org/10.5958/2231-3915.2015.00021.8.
Full textSugiyanto, Andree, and Onnyxiforus Gondokusumo. "PERBANDINGAN METODE EARNED VALUE, EARNED SCHEDULE, DAN KALMAN FILTER EARNED VALUE UNTUK PREDIKSI DURASI PROYEK." JMTS: Jurnal Mitra Teknik Sipil 3, no. 1 (2020): 155. http://dx.doi.org/10.24912/jmts.v3i1.7069.
Full textVaibhava, S., B. Prakash Rao, Dheeraj Vishwanatha Shetty, and Chandra Prakash. "Application of earned value method and earned schedule method for a residential apartment." Journal of Physics: Conference Series 1706 (December 2020): 012117. http://dx.doi.org/10.1088/1742-6596/1706/1/012117.
Full textAnbari, F. T. "Earned value project management method and extensions." IEEE Engineering Management Review 32, no. 3 (2004): 97. http://dx.doi.org/10.1109/emr.2004.25113.
Full textAnbari, Frank T. "Earned Value Project Management Method and Extensions." Project Management Journal 34, no. 4 (2003): 12–23. http://dx.doi.org/10.1177/875697280303400403.
Full textBovteev, Sergei, and Marina Petrochenko. "Method “Earned Value Management” for Timescale Controlling in Construction Projects." Applied Mechanics and Materials 725-726 (January 2015): 1025–30. http://dx.doi.org/10.4028/www.scientific.net/amm.725-726.1025.
Full textWang, Wen Xiu, En Jian He, and Yan Fei Zhao. "Earned Value Analysis Application in Project Management." Advanced Materials Research 971-973 (June 2014): 2494–97. http://dx.doi.org/10.4028/www.scientific.net/amr.971-973.2494.
Full textCzarnigowska, Agata. "Earned value method as a tool for project control." Budownictwo i Architektura 3, no. 2 (2008): 015–32. http://dx.doi.org/10.35784/bud-arch.2320.
Full textXu, Wenjing. "Application of Earned Value Method in Project Cost Management and Schedule Management." Proceedings of Business and Economic Studies 4, no. 4 (2021): 146–52. http://dx.doi.org/10.26689/pbes.v4i4.2400.
Full textDissertations / Theses on the topic "Earned Value Method"
Abdulahad, Mumtaz. "A Comparison Of Earned Value Analysis Method To Earned Schedule As Of Time Duration." Digital WPI, 2015. https://digitalcommons.wpi.edu/etd-theses/518.
Full textAlmeida, Ricardo Jorge Nunes de. "O impacto da incerteza na medição do progresso em earned value analysis." Master's thesis, Instituto Superior de Economia e Gestão, 2019. http://hdl.handle.net/10400.5/18078.
Full textKanik, Yusuf. "Software Project Scheduling, Software Project Performance Measurement And Control." Master's thesis, METU, 2005. http://etd.lib.metu.edu.tr/upload/12606362/index.pdf.
Full textGozzi, Francesca. "Il Project Management nelle aziende che producono su commessa in ambito Energy: Planning e Progress Monitoring, il caso Rosetti Marino Spa." Master's thesis, Alma Mater Studiorum - Università di Bologna, 2020.
Find full textRiedrich, Timo. "Die Bedeutung der Earned-value-Methode für die Steuerung von Produktentwicklungsprojekten." Hamburg Kovač, 2006. http://www.verlagdrkovac.de/978-3-8300-2668-6.htm.
Full textRiedrich, Timo. "Die Bedeutung der Earned Value Methode für die Steuerung von Produktentwicklungsprojekten /." Hamburg : Kovač, 2007. http://www.gbv.de/dms/ilmenau/toc/519824687.PDF.
Full textBruchey, William J. "A Comparison of Earned Value and Earned Schedule Duration Forecast Methods on Department of Defense Major Defense Acquisition Programs." Thesis, Monterey, California. Naval Postgraduate School, 2012. http://hdl.handle.net/10945/17329.
Full textMoy, Mae. "Evaluating Federal Information Technology Program Success Based on Earned Value Management." ScholarWorks, 2016. https://scholarworks.waldenu.edu/dissertations/2075.
Full textPereme, Florian. "Augmentation de la productivité des projets de R&D sous-traités, sous fortes contraintes, une inférence des approches Earned value et agiles." Thesis, Strasbourg, 2019. http://www.theses.fr/2019STRAD022.
Full textHomolková, Lenka. "Zlepšení plánování a sledování vývojových inženýrských úkolů ve společnosti." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2012. http://www.nusl.cz/ntk/nusl-223492.
Full textBooks on the topic "Earned Value Method"
Graglia, Roberto D., Giuseppe Pelosi, and Stefano Selleri, eds. International Workshop on Finite Elements for Microwave Engineering. Firenze University Press, 2016. http://dx.doi.org/10.36253/978-88-6655-968-9.
Full textUnited States. Congress. House. Committee on Ways and Means. Subcommittee on Oversight., ed. Tax administration: New delinquent tax collection methods for IRS : report to the Chairman, Subcommittee on Oversight, Committee on Ways and Means, House of Representatives. The Office, 1993.
Find full textOffice, General Accounting. Tax administration: State tax administrators' views on delinquent tax collection methods : fact sheet for the Chairman, Subcommittee on Oversight, Committee on Ways and Means, House of Representatives. The Office, 1994.
Find full textBook chapters on the topic "Earned Value Method"
Meyer, Werner. "Earned Value Method." In Data Analytics in Project Management. Auerbach Publications, 2018. http://dx.doi.org/10.1201/9780429434891-6.
Full textWhite, J. Chris, and Robert M. Sholtes. "Critical Path Method and Earned Value Management." In The Dynamic Progress Method. CRC Press, 2016. http://dx.doi.org/10.1201/b21295-4.
Full textKuchta, Dorota. "Qualitative Factors in the Fuzzy Earned Value Method." In Advances in Intelligent Systems and Computing. Springer International Publishing, 2020. http://dx.doi.org/10.1007/978-3-030-51156-2_84.
Full textZheng, Qi-bin, and Xing Bi. "Optimization on Earned Value Method Combined with Critical Path." In Proceedings of 2013 4th International Asia Conference on Industrial Engineering and Management Innovation (IEMI2013). Springer Berlin Heidelberg, 2013. http://dx.doi.org/10.1007/978-3-642-40060-5_68.
Full textLamm-Tennant, Joan. "Comments on ‘Earned profit method’, ‘Indexed discount rate method’ and ‘Is Paul vs. Virginia dead?’." In The Fair Value of Insurance Liabilities. Springer US, 1998. http://dx.doi.org/10.1007/978-1-4757-6732-2_12.
Full textTyagi, Manoj Kumar, Ajay Sikandar, Dheerendra Kumar Tyagi, et al. "State Space Modeling of Earned Value Method for Iterative Enhancement Based Traditional Software Projects Tracking." In Communications in Computer and Information Science. Springer Singapore, 2021. http://dx.doi.org/10.1007/978-981-16-0404-1_25.
Full textStasinos, Christos, Antonios Panas, John-Paris Pantouvakis, Panagiota Ralli, and Dimitrios Karagiannakidis. "Investigation of the Earned Value Method (EVM) Applicability for Construction Operations Affected by the Learning Phenomenon." In Lecture Notes in Mechanical Engineering. Springer Singapore, 2020. http://dx.doi.org/10.1007/978-981-15-1910-9_20.
Full textKuchta, Dorota. "Combination of the Earned Value Method and the Agile Approach – A Case Study of a Production System Implementation." In Advances in Intelligent Systems and Computing. Springer International Publishing, 2018. http://dx.doi.org/10.1007/978-3-319-97490-3_9.
Full textGrundmann, Ralf. "Die Anwendung der Earned Value Methode im Projektcontrolling." In Beiträge zum Finanz-, Rechnungs- und Bankwesen. Deutscher Universitätsverlag, 2005. http://dx.doi.org/10.1007/978-3-322-81943-7_11.
Full textRubio, J., J. I. Muñoz, and J. R. Otegi. "Engineering Projects Assessment Using Earned Value Management with Performance Indexes Evaluation and Statistical Methods." In Lecture Notes in Management and Industrial Engineering. Springer International Publishing, 2015. http://dx.doi.org/10.1007/978-3-319-12754-5_5.
Full textConference papers on the topic "Earned Value Method"
CALVIN, HERBY. "Analysis Performance Cost and Implementation with Earned Value Method." In Eighth International Conference On Advances in Civil Structural and Mechanical Engineering ACSM 2018. Institute of Research Engineers and Doctors, 2018. http://dx.doi.org/10.15224/978-1-63248-154-2-26.
Full textXiao Ma and Bin Yang. "Optimization study of Earned Value Method in construction project management." In 2012 International Conference on Information Management, Innovation Management and Industrial Engineering (ICIII). IEEE, 2012. http://dx.doi.org/10.1109/iciii.2012.6339813.
Full textFan, Yali, Yifei Tong, and Zhou Jian. "Decision Making Optimization for Cost Control Based on Earned Value Method." In the 2018 International Conference. ACM Press, 2018. http://dx.doi.org/10.1145/3292425.3292430.
Full textHuang, Huijun, and Jiguang Zheng. "Quality earned value analysis based on IFPUG method in software project." In 2018 International Conference. ACM Press, 2018. http://dx.doi.org/10.1145/3226116.3226135.
Full textCai, Juan, and Zhengshi Chen. "The Research on Communication Networks Construction Based on Earned Value Analysis Method." In 2015 International Conference on Network and Information Systems for Computers (ICNISC). IEEE, 2015. http://dx.doi.org/10.1109/icnisc.2015.117.
Full textYing, Huang. "The Highway Construction Cost Control Model Based on the Improved Earned Value Method Theory." In 2016 International Conference on Smart City and Systems Engineering (ICSCSE). IEEE, 2016. http://dx.doi.org/10.1109/icscse.2016.0127.
Full textLe, The-Anh, Quyet-Thang Huynh, Thanh-Hung Nguyen, Nhat-Hai Nguyen, and Phuong-Nam Cao. "A Method for Project Completion Cost Predicting Using LSTM in Earned Value Management Technique." In 2020 4th International Conference on Recent Advances in Signal Processing, Telecommunications & Computing (SigTelCom). IEEE, 2020. http://dx.doi.org/10.1109/sigtelcom49868.2020.9199064.
Full text"Experimental Study on Incentive Effect of Cost and Schedule Factors Based on Earned Value Method." In 2018 2nd International Conference on Innovations in Economic Management and Social Science. Clausius Scientific Press, 2018. http://dx.doi.org/10.23977/iemss.2018.91432.
Full textWu, Meiqiong, Meng Wang, and Dongxiao Niu. "Schedule-cost Joint Management of Thermal Power Construction Project Based on Improved Earned Value Method." In 2017 3rd International Conference on Humanities and Social Science Research (ICHSSR 2017). Atlantis Press, 2017. http://dx.doi.org/10.2991/ichssr-17.2017.7.
Full textAttarzadeh, Iman, and Ow Siew Hock. "Using Enhancement Method to Improve Earned Value Index to Achieve an Accurate Project Time and Cost Estimation." In 2009 International Conference on Future Computer and Communication (ICFCC). IEEE, 2009. http://dx.doi.org/10.1109/icfcc.2009.68.
Full text