Dissertations / Theses on the topic 'Electric power supply'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the top 50 dissertations / theses for your research on the topic 'Electric power supply.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.
Zitouni, Salah. "An expert system for electric power system management." Thesis, University of Dundee, 1990. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.338200.
Full textLao, Keng Weng. "A novel electric traction power supply system using hybrid parallel power quality compensator." Thesis, University of Macau, 2011. http://umaclib3.umac.mo/record=b2550461.
Full textCamacho, Rojas Jorge Arturo. "Distributing power : a cratological study of emerging technologies for electric power supply." Thesis, University of East London, 2010. http://roar.uel.ac.uk/2601/.
Full textSmyth, Thomas Paton. "A review of the emergency electric power supply systems at PWR nuclear power plants." Master's thesis, University of Cape Town, 1989. http://hdl.handle.net/11427/22430.
Full textThe Emergency Electric Power Supply Systems at Pressurized Water Reactor Nuclear Power Plants are reviewed, problem areas are identified, and recommendations are made for existing and future Nuclear Power Plants. A simplified introduction to a typical Pressurized Water Nuclear Reactor is given and the problems associated with the commercial use of nuclear power are discussed. An overview of the Nuclear industry's solutions is presented and covers the Reliability of equipment and the American Regulatory requirements. The alternating and direct current power supply systems are examined in terms of plant operational state and equipment type (Diesel generators, Grid network, Lead-acid batteries, Battery chargers, Inverters, and Power Distribution networks). The trends in the design of Emergency Electric Power supply systems at Nuclear Power Plants are presented. The loss of all alternating current power, known as Station Blackout, is discussed and the American and European response to this. problem is presented. Problems experienced in the direct current systems are discussed and solutions are presented. The experience at Koeberg Nuclear Power station with Lead-acid batteries is included in the discussion. The thesis concludes with recommendations for designers and operators of the Electric Power Supply Systems at Nuclear Power Stations.
Commin, Andrew Neil. "Matching renewable electricity supply to electricity demand in Scotland." Thesis, University of Aberdeen, 2015. http://digitool.abdn.ac.uk:80/webclient/DeliveryManager?pid=230176.
Full textParikh, Rajiv D. "PC based simulation software package for an uninterruptable power supply." Thesis, This resource online, 1993. http://scholar.lib.vt.edu/theses/available/etd-11242009-020238/.
Full textLee, Kelvin. "A study of supply function equilibria in electricity markets /." Thesis, McGill University, 2008. http://digitool.Library.McGill.CA:80/R/?func=dbin-jump-full&object_id=112573.
Full textThis thesis analyzes market power in electricity markets through the notion of Nash equilibrium (NE) and, more specifically, through Supply Function Equilibrium (SFE). We will examine how SFE can be modified to incorporate capacity constraints on generators and generating companies (gencos) controlling more than one generator for a Poolco electricity market with marginal pricing.
A genco's supply function is assumed to be of the form gi=l-aibi . Gaming is done either with ai or bi only, while keeping the other parameter at true cost. Gaming with both variables cannot be analyzed since the problem would have too many degrees of freedom. For each possible generator output level (minimum output, maximum output, or in between), analytical methods are employed to determine all candidate Nash equilibria. Then, simulations are performed over the range of possible genco offers to determine whether these candidates meet the complete set of Nash equilibrium criteria, specifically whether any genco can or cannot improve its profit by gaming.
For various inelastic demand levels, study cases indicate that there are either no Nash equilibria or only one. In the multi-unit genco case, the price of electricity is found to be higher than in the case where each genco owns only one generator, illustrating the effect of market concentration on the price. Whether capacity constraints are considered or not, the price of electricity appears to be higher if gencos are allowed to game with bi instead of ai.
The inclusion of capacity constraints on generators and the consideration of the multi-unit genco case will allow for better genco modeling in a Poolco market with marginal pricing. In turn, this will lead to more accurate analysis of the effects of current and possible rules and regulations on the price of electricity.
Patel, Amit P. "High power-supply rejection current-mode low-dropout linear regulator." Thesis, Atlanta, Ga. : Georgia Institute of Technology, 2009. http://hdl.handle.net/1853/28115.
Full textCommittee Chair: Rincón-Mora, Gabriel; Committee Member: Ghovanloo, Maysam; Committee Member: Leach, W. Marshall.
Ghasemzadeh, H. R. "The power supply and automatic control of a mains electric tractor." Thesis, University of Nottingham, 1988. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.383690.
Full textGrenier, Jason. "Design of a MOSFET-Based Pulsed Power Supply for Electroporation." Thesis, University of Waterloo, 2006. http://hdl.handle.net/10012/844.
Full textIn this research, two Metal Oxide Field Effect Transistor (MOSFET)-based pulsed power supplies that are used for electroporation experiments were designed and built. The first used up to three MOSFETs in parallel to deliver high voltage pulses to highly conductive loads. To produce pulses with higher voltages, a second pulsed power supply using two MOSFETs connected in series was designed and built. The parallel and series MOSFET-based pulsed power supplies are capable of producing controllable square pulses with widths of a few hundred nanoseconds to dc and amplitudes up to 1500 V and 3000 V, respectively. The load in this study is a 1-mm electroporation cuvette filled with a buffer solution that is varied in conductivity from 0. 7 mS/m to 1000 mS/m. The results indicate that by controlling the circuit parameters such as the number of parallel MOSFETs, gate resistance, energy storage capacitance, and the parameters of the MOSFET driver gating pulses, the output pulse parameters can be made almost independent of the load conductivity.
Using the pulsed power supplies designed in this work, an investigation into electroporation-mediated delivery of a plasmid DNA molecule into the pathogenic bacterium E. coli O157:H7, was conducted. It was concluded that increasing the electric field strength and pulse amplitude resulted in an increase in the number of transformants. However, increasing the number of pulses had the effect of reducing the number of transformants. In all of the experiments the number of cells that were inactivated by the exposure to the pulsed electric field was measured.
Sharam, Andrea. "Market segmentation and domestic electricity supply in Victoria." Swinburne Research Bank, 2005. http://adt.lib.swin.edu.au/public/adt-VSWT20061109.101315.
Full textThesis submitted in fulfillment of the requirements of the degree of Doctor of Philosophy, Institute for Social Research, Swinburne University of Technology, 2005. Typescript. Bibliography: p. 188-207.
Jacobs, D. M. (Danver Maxwill). "Voltage control of medium to high power three-phase inverter supply systems." Thesis, Stellenbosch : Stellenbosch University, 2001. http://hdl.handle.net/10019.1/52608.
Full textENGLISH ABSTRACT: In this thesis a new voltage control method is developed for a three-phase inverter supply system. The inverter supply system consist of a Permanent Magnet Generator, a three-phase rectifier, a three-phase inverter plus LC-filter and a three-phase transformer in series. This system supplies power to a network or to a stand-alone load. The main focus of this thesis is on the control aspects of the inverter and the LC-filter. Different voltage control systems are investigated and compared to each other. From these methods the proposed voltage control method is developed where only the output voltages are measured to establish good voltage control. All these voltage control methods are also simulated with a software package. The proposed voltage control method compares very well with other voltage control methods. The results that are obtained in the simulations are satisfactory. The proposed voltage control method is also implemented in an 8 kW laboratory scale model and, again, very good practical results are obtained. A TMS320F240 nsp controller is used to implement the proposed voltage control method. The controller compensates well for load steps, and these results compare well to an alternative voltage control method, which was also evaluated practically.
AFRIKAANSE OPSOMMING: In hierdie tesis IS 'n nuwe spanningsbeheermetode ontwikkel VIr 'n drie-fase wisselrigter kragtoevoerstelsel. Die wisselrigter kragtoevoerstelsel bestaan uit 'n Permanent Magneet Generator, 'n drie-fase gelykrigter, 'n drie-fase wisselrigter plus Le-filter, en 'n drie-fase transformator in serie. Hierdie stelsel voorsien krag aan 'n netwerk sowel as aan 'n alleenstaande las. Die hooffokus van hierdie tesis is op die beheeraspekte van die wisselrigter en Le-filter. Verskillende spanningsbeheermetodes is deeglik ondersoek en vergelyk met mekaar. Uit hierdie metodes is dan die voorgestelde beheermetode ontwikkel waar slegs die uittreespanning gemeet word om goeie spanningsbeheer te kan doen. Al hierdie spanningsbeheermetodes is dan gesimuleer met 'n sagteware pakket. Die voorgestelde spanningsbeheermetode vergelyk baie goed met die ander spanningsbeheermetodes. Die resultate verky in die simulasies is ook baie bevredigend. Die voorgestelde beheermetode is ook geïmplementeer op 'n 8 kW laboratorium skaalmodel en weereens is baie goeie praktiese resultate verky. 'n TMS320F240 DSP-beheerder is gebruik om die voorgestelde beheermetode mee te implementeer. Die beheerder kompenseer baie goed vir lastrappe en vergelyk ook goed met 'n ander spanningsbeheermetode wat prakties ge-evalueer is.
Steyn, Grove. "Governance, finance and investment : decision making and risk in the electric power sector." Thesis, University of Sussex, 2001. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.390926.
Full textTambatamba, Terence. "Improvement of power supply reliability : Case Study: Zambia." Thesis, Norwegian University of Science and Technology, Department of Electrical Power Engineering, 2009. http://urn.kb.se/resolve?urn=urn:nbn:no:ntnu:diva-9854.
Full textThis thesis studied reliability of power supply in Zambia following two major power blackouts that affected the whole country. The case study focussed on the generation and transmission network owned by Zambias biggest utility company Zesco. Three methods of study were selected. The first method looked at the transient stability simulations of Zesco generators when subjected to a large disturbance after a three phase short circuit was applied at three selected buses which are considered critical to the system. The simulations were carried out in SIMPOW. The results show that with fault duration of less than 200 milliseconds, all generators regained synchronism after fault removal. However, extending the fault duration to 200 milliseconds resulted in loss of synchronism in generators at Victoria Falls power station. The second method studied the contingency of some critical components in the Zesco system. The contingency analysis was implemented using software called NETBAS. Study showed that the Zesco system is N-1 stable for contingencies involving transmission lines and transformers. However the system is vulnerable to contingencies involving major power stations such as Kafue gorge and Kariba North bank. The third study proposed modification to the distance protection system to include the effect of zero sequence mutual coupling resulting from parallel circuits following a fault involving earth on a protected line. Adaptive techniques were developed where the settings of the distance relay would change to suit the circuit configuration. This technique resulted in optimal performance of the distance relay under all conditions of parallel line operation. The thesis concludes by making recommendations based on the findings from the studies carried out.
Kaya, Ibrahim. "A Switch Mode Power Supply For Producing Half Wave Sine Output." Master's thesis, METU, 2008. http://etd.lib.metu.edu.tr/upload/12609781/index.pdf.
Full textanalysis, design and implementation of a DC-DC converter with active clamp forward topology is presented. The main objective of this thesis is generating a rectified sinusoidal voltage at the output of the converter. This is accomplished by changing the reference signal of the converter. The converter output is applied to an inverter circuit in order to obtain sinusoidal waveform. The zero crossing points of the converter is detected and the inverter drive signals are generated in order to obtain sinusoidal waveform from the output of the converter. Next, the operation of the DC-DC converter and sinusoidal output inverter coupled performance is investigated with resistive and inductive loads to find out how the proposed topology performs. The design is implemented with an experimental set-up and steady state and dynamic performance of the designed power supply is tested. Finally an evaluation of how better performance can be obtained from this kind of arrangement to obtain a sinusoidal output inverted is thoroughly discussed
Tsang, Siu-hing. "Research on the electricity supply and demand relationship in China and the development strategy to 2020 /." Hong Kong : University of Hong Kong, 1998. http://sunzi.lib.hku.hk/hkuto/record.jsp?B19874613.
Full textFerdoush, Md Asif. "System Stability of the Overhead Power Supply System used in the Electric Road System." Thesis, Scania CV AB, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-399815.
Full textGezgin, Cahit. "Simultaneous control-structure optimization of power converters." Diss., Georgia Institute of Technology, 1998. http://hdl.handle.net/1853/15796.
Full textMomen, Mustafa. "Long-term supply mix planning of power systems accounting for greenhouse gas emissions." Thesis, McGill University, 2008. http://digitool.Library.McGill.CA:80/R/?func=dbin-jump-full&object_id=115996.
Full textSuch steps provide a strong incentive to Canadian power systems to incorporate reduction of GHG emissions in their planning process. Thus, in the second part of the thesis, a long-term supply mix planning model is developed. Since significant decrease in GHG emissions is unlikely to occur without removal of highly polluting power plants, this model allows for decommissioning these power plants.
Finally, the supply mix planning model is applied to evaluate the strategy of joint planning (as opposed to separate planning) of the power systems of Quebec and Ontario. Results obtained from the model leads to the conclusion that joint planning is preferable from the point of view of overall social and financial cost.
Jooste, Kritzman Phillip. "A load management system for fixed appliances in a safe DC RDP house." Thesis, Cape Peninsula University of Technology, 2017. http://hdl.handle.net/20.500.11838/2634.
Full textThis dissertation represents the design and development of a load management system for fixed appliances in a safe direct current (DC) Reconstruction and Development Programme (RDP) house. A combination of valley filling, load shifting and peak clipping load management techniques were employed to assist in reducing the peaks observed in the RDP house load profile during peak hours. A DC RDP house laboratory model was developed. The study is based on the assumption that the normally 220 V alternative current (AC) grid is replaced by a 350 V DC grid. The assumption is thus that 350 V DC is available at the distribution box in the RDP house laboratory model. All theoretical work was based on a 350 V DC system, but due to the lack of a laboratory 350 V DC supply, all physical tests were conducted by making use of a 300 V DC supply which was available. Consequently all calculations were thus based on 300 V DC as well. The geyser was the main fixed appliance focused on since it contributes to a significant portion of the power used. An AC geyser was successfully modified in order to be used in the DC network. Safety of the system was considered in order to interrupt the power in case of overcurrent or to isolate the power. Electronic switches were also developed and implemented to ensure that the DC power could be safely switched on and off and that the low power DC was isolated from the high power DC. LabVIEW allowed all other appliances in the DC RDP house to be virtually represented so that a holistic view of the power use of the house could be represented. This also allowed the system to be successfully simulated before any physical work was conducted. The load management system was successfully implemented by making use of power line communication. This proved to be a cost effective means to apply the load management algorithm. The algorithm consisted mainly of power on / off instructions that were executed during peak and off-peak times. It follows the normal use of timers used in the AC system to help reduce demand. It was found that the load management system successfully reduced the demand during peak hours without compromising the basic needs of the user. The power line communication modem proved to be very reliable in implementing the load management algorithm.
Sharam, Andrea, and n/a. "Market segementation and domestic electricity supply in Victoria." Swinburne University of Technology, 2005. http://adt.lib.swin.edu.au./public/adt-VSWT20061109.101315.
Full textAbbanat, Cherie Miot. "The impact of deregulation of the electric supply industry on renewable power generation projects." Thesis, Massachusetts Institute of Technology, 1997. http://hdl.handle.net/1721.1/10501.
Full textJavanshir, Marjan. "DC distribution system for data center." Thesis, Click to view the E-thesis via HKUTO, 2007. http://sunzi.lib.hku.hk/hkuto/record/B39344952.
Full textTan, Pee-Chin 1975. "A VSI-based power quality conditioner for 25kV electrified railway systems." Monash University, Dept. of Electrical and Computer Systems Engineering, 2003. http://arrow.monash.edu.au/hdl/1959.1/5537.
Full textAminou, Moussavou Anges Akim. "Modelling and analysis of microgrid control techniques for grid stabilisation." Thesis, Cape Peninsula University of Technology, 2014. http://hdl.handle.net/20.500.11838/1184.
Full textIn recent times, renewable energy-based distributed generation (DG) has captivated the industrial sector and on a global scale this has become a leading research area. Distributed generation using wind, solar energy or biomass as a source of energy can produce electricity on a small scale. Therefore, there is a strong focus on using renewable energy as a safe alternative source of energy, especially because it can in future play a dominant role in the world’s energy production and help to tackle the increase of global warming caused by fossil energy. However, a major problem facing renewable energies is that they are highly dependent on weather conditions. Since the power generated by DG, as well as consumption, depends on the weather conditions, irregularity of production and consumption leads to frequency and voltage fluctuations, and it can become difficult to determine and monitor consumer usage at any given time. Distributed generation can then be subjected to discrepancies in consumer usage and this can lead to severe overloading. As a result, microgrids powered by DG, operating in a single, stand-alone controllable system mode, face new challenges in terms of balancing a cluster of loads. Balancing a cluster of loads by making sure at all times that the entire system operates without overloading, is an essential requirement for the proper operation of a power system. The microgrid load considered in this project is the sum of sensitive and non-sensitive loads, respectively 5 kW and 100 kW, which constitute load requirement of one village; this total load required by a number of villages is called a cluster load. Depending on the input power generated by a DG-based photovoltaic (PV) system, these loads can be controlled using a logic control switch (LCS). When the power produced is less than the minimum load required by a component of a cluster, overloading occurs. The purpose of using an LCS is to ensure that a stable system is maintained under various loads and resource conditions. An LCS is used to continuously monitor and adjust load through circuit breakers. It is a good alternative to load balancing for a cluster of villages in rural area where a microgrid is operating in stand-alone mode. The focus of this research is to design a photovoltaic system with a maximum capacity of 1 MW providing power to a cluster of rural villages, and operating in stand-alone mode, and then to apply different control techniques (droop control, dq0 reference frame + proportional integral (PI) controller, and PI controller alone) at the inverter terminal of the PV system, in order to evaluate the stability of the output voltage. Another goal of the research is to develop an energy management system (EMS) algorithm to support the PV system in reducing loads. Therefore, a iii stable system under various load and resource conditions, as well as suitable control mechanisms are required to model a PV system. There is a need for the modelling of a PV array using a physical modelling block in MATLAB (SIMULINK) software. The state flow provided by SIMULINK is used in this project to develop an algorithm for load balancing. The state flow gives possibilities of modelling complex algorithms by combining graphical and tabular representations to create sequential decision logic, derived from state transition diagrams and tables, flow charts and truth tables. Furthermore, the design of a microgrid using photovoltaic DG and an energy management system, has been developed. The present work mainly consists of a stand-alone microgrid operation, where the power generated must be equal to the load power. In addition, different control methods, consisting of a dq0 reference frame + PI controller, are analysed at the invertor terminal. Subsequently an LCS algorithm is developed; this is required to maintain the system within certain limits and prevents overloading. LCS algorithms are based on a flowchart and allow switching automatically selected loads, depending on the power (solar radiation) available. In addition, a flow chart provides an easy way of using a graphical transition state and state chart to establish a set of rules for the system. The simulation results show that both droop control and a dq0 reference frame + PI controller are much better than a PI controller alone; these results also compared well with similar studies found in the literature. Also, these results are further improved with an EMS in order to maintain the output voltage of the microgrid, by switching on and off certain loads depending on the input power. The modelling of the microgrid using DG, based on photovoltaic systems with a maximum capacity of 1 MW, supports and improves the PV system by reducing loads. Moreover, droop control, and dq0 transformation + PI control present a better result than PI controller alone.
曾紹興 and Siu-hing Tsang. "Research on the electricity supply and demand relationship in China and the development strategy to 2020." Thesis, The University of Hong Kong (Pokfulam, Hong Kong), 1998. http://hub.hku.hk/bib/B31269321.
Full textPetersen, Mervyn. "Improving outage process maturity level using a process maturity model." Thesis, Cape Peninsula University of Technology, 2016. http://hdl.handle.net/20.500.11838/2561.
Full textThe research study establishes the maturity level of the outage process of the Outage Management Department at Eskom. The outage process started in 2012 to contribute to the effective planning and execution of outages. The successful completion of outages depends on effective planning and execution of an outage. At the time of the research study, poor outage performance at Eskom’s power stations contributed to load shedding of electricity in South Africa. The research problem statement reads as follows: The absence of an outage process maturity indicator diminishes the ability of the Outage Management Department (OMD) to comprehend the current process maturity level. The research question: Will the Outage Management Department be able to identify improvement opportunities if the maturity level of the outage process is established? iv The key research objectives are: • To consider how process maturity enables improvement. • To identify critical elements in an outage process. • To determine what is included in outage planning, control and improvement. • To identify a suitable process maturity model. • To identify a measurement instrument to determine the maturity level of Eskom’s outage process The research study uses a descriptive research design and applies the survey research method. Greener and Martelli’s (2015: Online) Business Research Process (Sources: Greener & Martelli, 2015: Online) is used together with Farooq’s Research Steps for Survey Research (2015, Online). The survey questionnaire adopted from Smith’s Maintenance Planning and Scheduling Maturity Matrix (2013: Online) was used to develop the survey questionnaire. The author developed the Outage Management Maturity Framework by combining Business Process Management Maturity model and a Maintenance Planning and Scheduling Maturity Matrix. The research finding is that a process maturity model can determine the maturity level of the outage process and is useful as a process improvement tool. The research findings rank the maturity level of the outage process at Level 2, Experimenting.
Pantshwa, Athini. "Analysis of the reliability for the 132/66/22 KV distribution network within ESKOM’s Eastern Cape operating unit." Thesis, Nelson Mandela Metropolitan University, 2017. http://hdl.handle.net/10948/19750.
Full textKanduri, Venkata Ramanujam. "Distributed generation impact on fault response of a distrubution [i.e., distribution] network." Master's thesis, Mississippi State : Mississippi State University, 2004. http://library.msstate.edu/etd/show.asp?etd=etd-11122004-151757.
Full textCunningham, Edward A. IV (Edward Albert). "A portfolio approach to energy governance : state management of China's coal and electric power supply industries." Thesis, Massachusetts Institute of Technology, 2009. http://hdl.handle.net/1721.1/58272.
Full textCataloged from PDF version of thesis.
Includes bibliographical references (p. 226-244).
This study addresses the extent to which China's central state devolved ownership and investment levels in its energy sector to other actors during the modern reform period (1978- 2008). The project focused on China's coal and electric power industries, leveraging industry and government data, interviews, two firm case studies and a unique survey to measure policy, ownership and investment change over time. The results show that such devolution has been neither incrementally advancing nor consistently lacking, but has fluctuated according to the national electric power balance. The study suggests that China's central state actively manages the range of firms in the strategic coal and electric power industries as a dynamic portfolio of assets, resulting in such fluctuation. These findings run counter to what the dominant theories in the literature would otherwise predict. Neo-liberal theory would predict the incremental reduction of central state ownership in these sectors, as is evident in many of China's other sectors. Arguments predicated on the ability of the central state to sustain "self-reproducing authoritarianism" would predict fairly stable levels of central state investment and ownership in this strategic sector through time as well as quite limited liberalization. Finally, a theory privileging elite politics would indeed predict fluctuations, yet at different turning points in time than those found in this study, and without the sustained pattern that is evident in the extended time period under examination, which spans four distinct political eras.
(cont.) This first implication of this study is that neo-liberal means can be deployed to achieve state-led ends. Second, the study provides evidence that such means of economic liberalization reform need not be cumulative and are, in fact, reversible. Third, the case studies reveal that firm decisions have a significant impact on the execution of these powerful broad central state policy changes that periodically reshape the structure of China's energy sector. Finally, this study also raises important implications relating to public policy, and in particular the ability of the Chinese state to fulfill aggressive greenhouse gas emission reductions in an effort to mitigate climate change.
by Edward A. Cunningham, IV.
Ph.D.
Beran, Edward W. "An electromagnetic interference analysis of uninterruptible power supply systems in a data processing environment." Thesis, Monterey, Calif. : Springfield, Va. : Naval Postgraduate School ; Available from National Technical Information Service, 2002. http://library.nps.navy.mil/uhtbin/hyperion-image/02Dec%5FBeran.pdf.
Full textThesis advisor(s): Richard W. Adler, Wilbur R. Vincent. Includes bibliographical references (p. 103-104). Also available online.
Khobai, Hlalefang. "The relationship between electricity supply and economic growth in South Africa." Thesis, Nelson Mandela Metropolitan University, 2016. http://hdl.handle.net/10948/9251.
Full textYang, Gang. "Design of a High Efficiency High Power Density DC/DC Converter for Low Voltage Power Supply in Electric and Hybrid Vehicles." Thesis, Supélec, 2014. http://www.theses.fr/2014SUPL0011/document.
Full textIn this dissertation, a 2.5kW 400V/14V, 250kHz DC/DC converter prototype is developed targeted for electric vehicle/hybrid vehicle applications. Benefiting from numerous advantages brought by LLC resonant topology, this converter is able to perform high efficiency, high power density and low EMI. A first part of this dissertation is the theoretical analysis of LLC: topology analysis, electrical parameter calculation and control strategy. To arrange high output current, this thesis proposes parallel connected LLC structure with developed novel double loop control to realize an equal current distribution. The second part concerns on the system amelioration and efficiency improvement of developed LLC. A special transformer is dimensioned to integrate all magnetic components, and various types of power losses are quantified based on different realization modes and winding geometries to improve its efficiency. This converter also implements a robust synchronous rectification system with phase compensation, a power semiconductor module, and an air-cooling system. The power conversion performance of this prototype is presented and the developed prototype has a peak efficiency of 95% and efficiency is higher than 94% from 500W to 2kW, with a power density of 1W/cm3. The CEM analysis of this converter is also developed in this thesis
Cowan, Kelly R. "Technology Planning for Aligning Emerging Business Models and Regulatory Structures: the Case of Electric Vehicle Charging and the Smart Grid." PDXScholar, 2017. https://pdxscholar.library.pdx.edu/open_access_etds/4031.
Full textMyhre, Jørgen Chr. "Electrical Power Supply to Offshore Oil Installations by High Voltage Direct Current Transmission." Doctoral thesis, Norwegian University of Science and Technology, Faculty of Information Technology, Mathematics and Electrical Engineering, 2001. http://urn.kb.se/resolve?urn=urn:nbn:no:ntnu:diva-383.
Full textThis study was initiated to investigate if it could be feasible to supply offshore oil installations in the North Sea with electrical power from land. A prestudy of alternative converter topologies indicated that the most promising solution would be to investigate a conventional system with reduced synchronous compensator rating.
The study starts with a summary of the state of power supply to offshore installations today, and a short review of classical HVDC transmission. It goes on to analyse how a passive network without sources influences the inverter. The transmission, with its current controlled rectifier and large inductance, is simulated as a current source. Under these circumstances the analysis shows that the network frequency has to adapt in order to keep the active and reactive power balance until the controllers are able to react. The concept of firing angle for a thyristor is limited in a system with variable frequency, the actual control parameter is the firing delay time.
Sensitivity analysis showed some astonishing consequences. The frequency rises both by an increase in the active and in the reactive load. The voltage falls by an increase in the active load, but rises by an increase in the inductive load.
Two different control principles for the system of inverter, synchronous compensator and load are defined. The first takes the reference for the firing delay time from the fundamental voltage at the point of common coupling. The second takes the reference for the firing delay time from the simulated EMF of the synchronous compensator. Of these, the second is the more stable and should be chosen as the basis for a possible control system.
Two simulation tools are applied. The first is a quasi-phasor model running on Matlab with Simulink. The other is a time domain model in KREAN. The time domain model is primarily used for the verification of the quasi-phasor model, and shows that quasi-phasors is still a valuable tool for making a quick analysis of the main features when the details of the transients are of less importance.
The study indicates that power supply by HVDC transmission from land to offshore oil installations could be technically feasible, even without the large synchronous compensators normally required. It has been shown that in a network only supplied by an inverter, variations of active and reactive loads have significant influence on both voltage and frequency. Particularly it should be noted that the frequency shows a positive sensitivity to increases in load. This could make the system intrinsically unstable in the case of a frequency dependent load such as motors.
It was not a part of the study to optimize controllers, but even with simple controllers it was possible to keep the frequency within limits given by norms and regulations, but the voltages were dynamically outside the limits, though not very far. These voltage overswings take place in the first few instances after a disturbance, so it takes unrealistically fast controllers to handle them. They are partly due to the model, where the land based rectifier and the DC reactors are simulated by a constant current source, but partly they have to be handled by overdimensioning of the system.
The simulations indicate that it should be technically possible to supply an oil platform with electrical power from land by means of HVDC transmission with small synchronous compensators. Whether this is financially feasible has not been investigated. Neither has it been considered whether the necessary equipment can actually be installed on an oil platform.
Recently both ABB and Siemens have presented solutions for HVDC transmission in the lower and medium power range based on voltage source converters based on IGBTs. Fully controllable voltage source HVDC converters have properties that may be better suited than conventional line commutated current source thyristor inverters, to supply weak or passive networks, such as offshore oil installations, with electrical power. But they also have some disadvantages, and a complete technical and financial comparison must be performed in order to decide about any potential project.
Kamran, Farrukh. "A new UPS topology and deadbeat control techniques for improved utility interface compatibility." Diss., Georgia Institute of Technology, 1995. http://hdl.handle.net/1853/15773.
Full textAlghamdi, Turki. "Interactions of Connected Electric Vehicles with Modern Power Grids in Smart Cities." Thesis, Université d'Ottawa / University of Ottawa, 2021. http://hdl.handle.net/10393/42513.
Full textRossouw, Claire Angela. "The accelerated life cycle testing and modelling of Li-ion cells used in electric vehicle applications." Thesis, Nelson Mandela Metropolitan University, 2012. http://hdl.handle.net/10948/d1012709.
Full textZhou, Chen. "Design and analysis of an active power factor correction circuit." Thesis, Virginia Polytechnic Institute and State University, 1989. http://hdl.handle.net/10919/53729.
Full textMaster of Science
Gray, Matthew Alan. "A comparative analysis of proportional-integral compensated shunt active power filters." Master's thesis, Mississippi State : Mississippi State University, 2004. http://library.msstate.edu/etd/show.asp?etd=etd-11092004-083404.
Full textBarnes, Lemuel Gregory. "Voltage-source inverter output waveform compensation using adaptive intelligent control /." This resource online, 1994. http://scholar.lib.vt.edu/theses/available/etd-10192006-115605/.
Full textSeimbille, Denis. "Design of power supply system in DC electrified transit railways - Influence of the high voltage network." Thesis, KTH, Elektrisk energiomvandling, 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-153924.
Full textPublika sparburna transportsystem sasom tunnelbanor och lokalbanor transporterar miljontals manniskor varje dag. De esta korta linjer matas med likstrom. Utformningen av stromforsorjningen till dessa system ar avgorande for ett val fungerande , och forutsatter anvandningen av olika matematiska modeller. Detta natverk bestar av ett vaxelstroms hogspanningsnat som omformas till likstrom i era banmatningsstationer langs banan. Dessa matematiska modeller ignorerar dock ofta hogspanningsdelen i modelleringen, varfor resultatet ibland kan bli missvisande. I detta arbete har en belastningsfordelningsalgoritm baserad pa Newton-Raphsons metod implementerats for att skapa en battre modellering av hsgspanningsdelen i den bentliga programvaran Symphonie. Tre olika hogspanningsstrukturer har bearbetats och resultatet visar att spanningsfall och belastningsf ordelning varierar mellan de olika strukturerna. Speciellt nar era transformatorstationer ar kopplade till samma hogspanningssystem, kan spanningsfall vara patagligt for vissa transformatorstationer. Sammanfattningsvis maste utformningen av hogspanningsystemet till likstromsforsorjda jarnvagar utformas med hjalp av anpassade matematiska modeller som tar hansyn till placering av transformatorstationer liksom hogspanningsnatets kapacitet.
Grobler, Frederik Antonie. "The development of harmonic content and quality of electricity supply measuring system incorporating scada processing." Thesis, Bloemfontein : Central University of Technology, Free State, 2005. http://hdl.handle.net/11462/61.
Full textWhen Thomas Edison invented his carbon filament lamp in 1879, gas shares fell overnight. A committee of inquiry was set up to examine the future possibilities of the new method of lighting, and had reached the conclusion that electric light in the home was fanciful and absurd. Today electric light burns in practically every house in the civilised world, with many great advances in the production and use of electricity and electric power supplied by various utilities. The objective of the electric utility to deliver pure sinusoidal voltage at fairly constant magnitude throughout their system is complicated by the fact that there are currently loads on the system that produce harmonic voltages, which result in distorted voltages and currents that can adversely impact on the system performance in different ways. Because the numbers of harmonic producing loads have increased over the years, it has become necessary to address their influence, when making any additions or changes to an installation. Quality of supply measurements have long been used to characterise non-linearity on the power system, and have traditionally been measured with expensive portable analysers. A potentially faster, more integrated, and more flexible solution to measure the harmonics with a Supervisory System is accomplished by this research. Any script which aspired to cover in full detail the whole field of a subject so enormous as techniques to measure the quality of electricity supply on a SCADA system, would hardly be practical in less than a few volumes. The pretensions of this research are both modest and of a more immediate value to the reader.
Marais, Charel. "Analysis of fuel consumption reduction potential through the use of an electrically driven air conditioning compressor." Thesis, Nelson Mandela Metropolitan University, 2007. http://hdl.handle.net/10948/774.
Full textCollins, Edward Randolph Jr. "Torque and speed control of single-phase induction motors using an adjustable amplitude and phase angle auxiliary winding power supply." Diss., Georgia Institute of Technology, 1989. http://hdl.handle.net/1853/15472.
Full textMalgas, Isaac. "Towards risk management in a deregulated and competitive electricity supply industry." Thesis, Stellenbosch : Stellenbosch University, 2002. http://hdl.handle.net/10019.1/53195.
Full textENGLISH ABSTRACT: The energy sector of the South African economy is poised to change in extraordinary ways. In just a few short years from now, the days will be gone when generators are guaranteed of their income and where regional distributors have the monopoly in the regions that they are servicing. Other energy markets in the world, such as oil and gas, have been free of regulation for many years. More recently, local policymakers have been focussing on increasing competition in the electricity sector and in so doing, liberate electric utilities from government's long established control. The shift away from government regulation of energy will lead to something even more important than placing downward pressure on the price of a MWh. It will instigate the development of multiple trading centres and platforms that are dedicated to competition in the free trade of electricity and related products. With the deregulation of the electricity supply industry and the inevitable introduction of competition, the real risks of energy trading will be faced by generators and distributors alike. This research investigates the changes that are set to occur within the next few years, based on developments that have unfolded in countries where electricity supply industries have been privatised and utilities and distributors are managing their risks in this new competitive environment. It explains how the South African Electricity Supply Industry may change with respect to the develop of markets which provide risk cover to industry players, the practices assumed by utilities in international electricity supply industries to minimise their risk exposure, and how industry players can use derivative instruments to manage their risks better.
AFRIKAANSE OPSOMMING: Die elektrisiteitsvoorsieningssektor is gereed om groot veranderings te maak. Binne 'n paar jaar, sal ons die einde sien van die dae waar kragstasies gewaarborg is van hulle inkomste en waar streeksvoorsieners die monopolie het in die streke waarin hulle verskaf. Ander energie markte in die wêreld, soos die van olie en natuurlike gas, is al sonder regulering vir baie jare. Meer onlangs het beleidsrade hul tyd toegewy aan die instelling van kompetisie in die elektrisiteitsvoorsieningssektor om utiliteitsmaatskappye vry te maak van staatsbeheer. Hierdie beweging weg van staatsbeheer sal lei na iets meer as net die afwaardse druk op die prys van 'n MWh. Dit sal die begin merk van die ontwikkeling van veelvoudige verhoë wat toegewyd is aan kompetisie in die vrye handel van elektrisiteit en soortgelyke produkte. Met die deregulering en die onvermydelike indiening van kompetisie, sal die ware risikos van energie handel aanvaar word deur voortbrengers en verskaffers van elektrisiteit. Hierdie navorsing stel ondersoek in die veranderings wat van plan is om te gebeur in die volgende paar jaar en is gebaseer op die ontwikkelinge wat in lande afgespeel het waar elektrisiteitsvoorsieningsnywerhede geprivatiseer is en waar voortbrengers en verskaffers van elektrisiteit hulle risikos bestuur in hierdie nuwe mededingende sektor. Dit verduidelik hoe die Suid-Afrikaanse elektrisiteitsvoorsieningsnywerheid mag verander teen opsigte van die ontwikkeling van markte wat risiko versekering aanbied vir utiliteitsmaatskappye, die praktyke wat deur hierdie spelers toegepas word om hulle blootstelling aan risikos te verminder, en ook hoe hulle afgeleide instrumente gebruik om hulle risikos beter te bestuur.
Cetinkaya, Suleyman. "Repetitive Control Of A Three-phase Uninterruptible Power Supply With Isolation Transformer." Master's thesis, METU, 2007. http://etd.lib.metu.edu.tr/upload/12608150/index.pdf.
Full textIshaque, Mohammed. "A new method for calculating the economic benefits of varying degrees of power factor correction for industrial plant loads." PDXScholar, 1992. https://pdxscholar.library.pdx.edu/open_access_etds/4322.
Full textZANINI, ALEXANDRE. "ECONOMIC REGULATION IN THE BRAZILIAN ELECTRIC POWER SUPPLY SECTOR: A METHODOLOGY FOR DEFINING PRODUCTION EFFICIENCY FRONTIER AND ESTIMATING THE X-FACTOR." PONTIFÍCIA UNIVERSIDADE CATÓLICA DO RIO DE JANEIRO, 2004. http://www.maxwell.vrac.puc-rio.br/Busca_etds.php?strSecao=resultado&nrSeq=5566@1.
Full textO setor elétrico nos últimos anos vem passando por grandes mudanças estruturais em diversas regiões do planeta. Essas mudanças são devidas a processos de reestruturação do setor energético visando o aumento da eficiência e da qualidade. No Brasil, para este fim, foram criados órgãos responsáveis pelo setor, de modo que se viabilizem e regulamentem estas mudanças, seja por meio da criação de instrumentos de incentivos à competição ou permitindo a participação de agentes privados nos processos de geração, distribuição e comercialização de energia. Neste contexto foi criada a ANEEL (Agência Nacional de Energia Elétrica), responsável por instituir as regras de mercado de energia elétrica visando assegurar a competitividade do setor. Dentro das atribuições da ANEEL, está a realização de revisões tarifárias periódicas. Esta revisão tarifária compreende: a) reposicionamento das tarifas de fornecimento de energia elétrica em nível compatível com a preservação do equilíbrio econômico-financeiro do contrato de concessão; e b) determinação do Fator X que será aplicado nos reajustes tarifários com o objetivo de compartilhar ganhos de produtividade com os consumidores. Para determinar o Fator X é necessário medir a eficiência, o que pode ser feito basicamente através de duas alternativas: 1) comparar a empresa com fronteiras de eficiência construídas para o mercado regulado a partir de grupos de similaridade; 2) comparar a empresa com o mercado não regulado. Desta forma, o objetivo da tese é propor uma metodologia para definição de fronteiras de eficiência entre as empresas de distribuição de energia elétrica através da conjugação de redes neurais e de modelos econométricos, particularmante, os modelos de análise de fronteira estocástica.
In recent years, the electric power supply sector has undergone major structural changes in a variety of regions throughout the planet. These changes are due to restructuring processes taking place in the energy sector towards the increase of quality and efficiency. In Brazil, it was created agencies responsible for the sector, in order to foster and regulate those changes, either by means of creating instruments for promoting competition or by allowing private agents participation in the processes of generating, distributing and trading energy. In this context, it was created the Brazilian Electricity Regulatory Agency (ANEEL), responsible for binding rules to assure market competition in the electric power supply sector. Among the duties of the regulatory agency of the electric power supply sector in Brazil there is the periodical revision of energy prices. Such revisions involve estimating the X Factor applied to update prices so that gains in productivity are shared with consumers. To estimate the X Factor it is necessary to measure efficiency and, for this, two issues are important: the choices of benchmarks and of techniques for productivity measurement. This thesis proposes an approach to define frontier efficiency of electric power distribution utilities based on clustering homogeneous utilities using neural networks and estimating the frontiers through econometric techniques.
Groves, James O. "Small signal analysis of nonlinear systems with periodic operating trajectories." Diss., This resource online, 1995. http://scholar.lib.vt.edu/theses/available/etd-06062008-162614/.
Full text