To see the other types of publications on this topic, follow the link: Equipment specifications.

Dissertations / Theses on the topic 'Equipment specifications'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 dissertations / theses for your research on the topic 'Equipment specifications.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Carter, N. J. "The revision of EMC specifications for military aircraft equipment." Thesis, University of Surrey, 1985. http://epubs.surrey.ac.uk/847291/.

Full text
Abstract:
This thesis evaluates standard EMC aircraft equipment specifications highlighting their weaknesses and suggesting modifications, some of which have already been included in the new generation of specifications now being introduced. The relationship of the equipment level EMC test to the whole aircraft EMC test is discussed and improvements to this latter activity, which have been developed as a result of the work programme described in this thesis, are presented and evaluated.
APA, Harvard, Vancouver, ISO, and other styles
2

Shankaranarayanan, S. "Detection of Coreferences in Automatic Specifications Analysis." Thesis, Virginia Tech, 1994. http://hdl.handle.net/10919/42360.

Full text
Abstract:
Specifications on digital hardware systems typically contain descriptions and requirements expressed in natural language and diagrams of various types. The objective of the research reported here is the automatic detection of common references ("coreferences") to objects in natural language specification statements in order to permit automatic integration of requirements. This thesis describes a prototype system for detecting coreferences. First, the natural language statements are translated into conceptual graphs (semantic nets). Then, these graphs are scanned by a rule-based system to de
APA, Harvard, Vancouver, ISO, and other styles
3

Calder, Neil. "A methodology for developing equipment specifications in the pharmaceuticals industry." Thesis, Brunel University, 2002. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.445937.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Cook, Stephen Clive. "A knowledge-based system for computer-aided generation of measuring instrument specifications." Thesis, City University London, 1990. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.278490.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Mhundwa, Russel. "Appraisal of experimental performance and modelling of an on-farm dairy milk bulk cooler: Fort Hare Dairy Trust, South Africa." Thesis, University of Fort Hare, 2017. http://hdl.handle.net/10353/4671.

Full text
Abstract:
South Africa contributes approximately 0.5 percent to the total world milk demand and is the third largest producer of fresh cow milk in Africa after Sudan and Kenya. In comparison to any other enterprise, the cost of milk production is influenced by numerous factors, that in turn affect the profitability of the farm enterprise; however one of such factors is high electricity cost. In this regard, there is need for efficient operation of the milk processing plant at all stages and at the same time maximising on product quality and minimising on the cost of production including energy. At the d
APA, Harvard, Vancouver, ISO, and other styles
6

PORTO, LUCIANA V. F. M. "Estudo do pior caso na validação de limpeza de equipamentos de produção de radiofármacos de reagentes liofilizados. Validação de metodologia de carbono orgânico total." reponame:Repositório Institucional do IPEN, 2015. http://repositorio.ipen.br:8080/xmlui/handle/123456789/27504.

Full text
Abstract:
Submitted by Marco Antonio Oliveira da Silva (maosilva@ipen.br) on 2017-05-25T13:52:23Z No. of bitstreams: 0<br>Made available in DSpace on 2017-05-25T13:52:23Z (GMT). No. of bitstreams: 0<br>Os radiofármacos são definidos como preparações farmacêuticas contendo um radionuclídeo em sua composição, são administrados intravenosamente em sua maioria, e, portanto, o cumprimento dos princípios de Boas Práticas de Fabricação (BPF) é essencial e indispensável à tais produtos. A validação de limpeza é um requisito das BPF e consiste na evidência documentada que demonstra que os procedimentos de limpez
APA, Harvard, Vancouver, ISO, and other styles
7

Williams, Dewi L. (Dewi Lloyd) Carleton University Dissertation Engineering Electrical. "A Functional-test specification language." Ottawa, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
8

Lamp, Shane B. "Equipment specification, process control, and plant simulation for a lignin-fueled fluidized bed combustor plant." Morgantown, W. Va. : [West Virginia University Libraries], 1998. http://etd.wvu.edu/templates/showETD.cfm?recnum=224.

Full text
Abstract:
Thesis (M.S.)--West Virginia University, 1998.<br>Title from document title page. Document formatted into pages; contains xv, 98 p. : ill. (some col.). Vita. Includes abstract. Includes bibliographical references (p. 84).
APA, Harvard, Vancouver, ISO, and other styles
9

Kaláb, Ondřej. "Polyfunkční dům Prudký - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372045.

Full text
Abstract:
The aim of this Diploma Thesis is constructionally - technological solution of the rough construction of polyfunctional house on the corner of Bánskobystrická and Medlánecká streets in Brno Řečkovice. In the Diploma Thesis I will deal with the plan of the work procedure of the execution of roof construction layers, machine sets, itemized budget, construction schedule, construction site equipment, inspection and testing plan, ecology and transport relations related to the construction. I would like to point out the complication of the construction with a lack of space because the construction i
APA, Harvard, Vancouver, ISO, and other styles
10

Doležel, Jakub. "Stavebně technologická příprava výstavby bytového domu v Brně." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265578.

Full text
Abstract:
This thesis focuses on developing technological preparation of the apartment house Kociánka in Brno. This work includes technical report, coordination situation transport routes, feasibility studies, time and financial plan object, building equipment, design of construction machines and equipment, schedule od work, technological prescription, itemized budget, inspection and test plan and dedicated the award to the assessment of traffic and the project of the traffic - engineering measures.
APA, Harvard, Vancouver, ISO, and other styles
11

Helán, Tomáš. "Rezidence Austerlitz, vybrané části stavebně technologického projektu." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240482.

Full text
Abstract:
Purpose of this master’s thesis is to compile structurally – technological aspects of the project of new housing building in Brno. Thesis concentrates on technological phase of upper rough construction, which involves prescriptions for masonry of walls and constructions from reinforced concrete. Thesis is also includes suggestions of constellation of machines, time plan, supplying of construction site, rules of workplace safety, quality requirements, solutions for organization of construction and maintenance of the building. Conclusion of this master’s thesis is comparison of different systema
APA, Harvard, Vancouver, ISO, and other styles
12

Mohammed, Yehia. "Öka kapaciteten i tillverkningsprocessen." Thesis, Mälardalens högskola, Akademin för innovation, design och teknik, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-33039.

Full text
Abstract:
This report includes a thesis in an advanced level and includes 30 credits in the subject product development. The work consist of a case study performed at Gnutti Carlo AB in Kungsör. The work has been carried out by a student from Mälardalen University spring term in 2016.In the manufacturing process in cell 1, there is a bottleneck problem due to various factors, which disrupt production that resulted in a loss of time. Gnutti Carlo AB Company has started a project where the goal is to let the manufacturing process work at full capacity, which it does not do today.The goal of the project wo
APA, Harvard, Vancouver, ISO, and other styles
13

Karásek, Jakub. "Polyfunkční stavba ve Vyškově, příprava a organizace stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372249.

Full text
Abstract:
This diploma thesis deals with processing of technological preparation of the polyfunctional building in Vyškov. The work includes a technical report, a time and financial plan of the construction, a study of the implementation of the main technological stages and an itemized budget for the main building. It also solves the project site equipment including design of construction machinery. It further elaborates the technical regulations for interior plaster, floor design and stacked ceiling for which a control and test plan is developed.
APA, Harvard, Vancouver, ISO, and other styles
14

Vosmík, Jan. "Rekonstrukce víceúčelového zařízení - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240410.

Full text
Abstract:
This thesis handles the construction and technological project of reconstruction of the Multipurpose Facility Construction in the village Slavice. The work is handled by a complete studies realization, including execution time and financial plan. Work also includes technological specification for the main building, inspection and test quality plan and a proposal for major construction machines and mechanisms. It is also a proposal of building equipment, and a plan for securing material resources.
APA, Harvard, Vancouver, ISO, and other styles
15

Škrobánková, Zuzana. "Vybrané části stavebně-technologického projektu Rozvodna 110 kV Ostrava Hrabová." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227631.

Full text
Abstract:
This thesis deals with construction and technological project of 110 kV substation in Ostrava Hrabová. Includes design mechanical assembly, time and financial plan, technological studies during the construction of the main building structure, schedule, project site equipment, budgets and other documents that are required to correct the construction.
APA, Harvard, Vancouver, ISO, and other styles
16

Osina, Lukáš. "Stavebně technologický projekt montované haly." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227664.

Full text
Abstract:
The subject of this diploma thesis is a construction technology project prefabricated tennis hall with facilities in Prostejov. The content of this work are technical regulations, technical reports, project site equipment, design of mechanical assemblies, schedule, budget, monitoring and test plan, work safety and environmental protection.
APA, Harvard, Vancouver, ISO, and other styles
17

Lukešová, Edita. "Lékařský dům ve Zlíně - příprava a organizace výstavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-226992.

Full text
Abstract:
Diploma thesis contains descriptions of technological process of Medical House Kotěrova. The project includes a technical report for masonry and monolithic constructions, mechanization plans, safety and guality of work, report scheduling and organization of construction.
APA, Harvard, Vancouver, ISO, and other styles
18

Hřiba, Jiří. "Obytný soubor Sadová – stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240369.

Full text
Abstract:
At master´s thesis is the construction and technological project of a residential building Sadova. In this work are addressing major technological specification of the building foundations, site equipment, time schedule of structural work, safety and health in work and financial.
APA, Harvard, Vancouver, ISO, and other styles
19

Libánská, Barbora. "Polyfunkční dům v Sezemicích - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225359.

Full text
Abstract:
Architectural and technological project to construct a new multipurpose facility. The work includes: a technical report explaining the construction technology of the project, a construction site plan, time and financial plan of the construction, an implementation study of the major technological stages of the building, a project of site equipment, a design of main construction machines and mechanisms, a work schedule of the main building structure, a technological specification and a plan of control and quality assurance.
APA, Harvard, Vancouver, ISO, and other styles
20

Kubrtová, Zuzana. "Vybrané části stavebně technologického projektu muzea motorsportu." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240058.

Full text
Abstract:
In this thesis I will deal with structural and technological preparation ELIZABETH - MUZEUM MOTORSPORTU. As a specific phase of construction, which I will focus, I chose a solution glass facade, designed by Schüco. This is the glass panels mounted in an aluminum frame. My work includes technical report, technological prescription for the installation of facades, design mechanical assemblies, time and financial plan, control plan and test plan.
APA, Harvard, Vancouver, ISO, and other styles
21

Kotulič, Dominik. "Záznamového zařízení pro oblast civilního letectví." Master's thesis, Vysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií, 2018. http://www.nusl.cz/ntk/nusl-376993.

Full text
Abstract:
In the thesis the design of the Data Storage System (DSS) is proposed with the respect to the V-Model methodology. The design is based on users requirements, from which the system requirements are created and the technical specification of the DSS is developed. In the technical specifications the functionality of the DMM and HMI DSS subsystems are described and sub-system requirements are assigned to them, then they are subdivided and assigned to individual DMM (Data memory module) and HMI hardware items. Moreover, requirements are analyzed on hardware items, specific electronic components, ar
APA, Harvard, Vancouver, ISO, and other styles
22

Alexa, Martin. "Stavebně technologický projekt mateřské školy." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-371896.

Full text
Abstract:
This thesis handles the construction and technological project of nursery school in the Brno. It deals with technical reports, technological methods of construction. The report contains technical reporst of building equipment, schedule, design of mechanical assembly, inspection and health and safety at work.
APA, Harvard, Vancouver, ISO, and other styles
23

Čermák, Jan. "Bytový komplex Netroufalky, objekt F - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2020. http://www.nusl.cz/ntk/nusl-409918.

Full text
Abstract:
The subject of the diploma thesis is to elaborate a selected part of the construction technology project for an apartment building in the Campus residential complex II, situated in Brno – Bohunice. Specifically, an apartment building (object F, designated SO 204) was selected, on which monolithic structures of the substructure will be solved. The content of the work is a technical report to the construction technology project, evaluation of transport routes, elaboration of technological regulations for selected technological stages, time schedule for the selected stage and partial detailed sec
APA, Harvard, Vancouver, ISO, and other styles
24

Honzík, Roman. "Kampus MU Brno (zelená etapa) - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227231.

Full text
Abstract:
The subject of this thesis is the solution of building technology project for the construction of the main processing stages University Campus Bohunice (green stage). It is a building consisting of nine pavilions which are mutually connected by two corridors. Corridors simultaneously combine green building stage with blue previous stage. All buildings are partial basement and three floors. Exceptions are SO IV-309, which consisted of four storeys with casing of an elliptic cylinder with a flat roof in the middle of the roof sheathing. In my thesis I deal specifically this very building object,
APA, Harvard, Vancouver, ISO, and other styles
25

Stašová, Darina. "VUT - Rekonstrukce objektu A1-stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240164.

Full text
Abstract:
Subject of this diploma thesis is construction technology project of reconstruction of object A1, faculty of mechanical engineering, BUT in Brno. This diploma thesis contains technical report of construction site, construction site equipment project, time and financial plan, budget of one building object, technological study of the major technology stages, design of mechanical equipment, technological specifications and quality controlling inspections.
APA, Harvard, Vancouver, ISO, and other styles
26

Němec, Lukáš. "Laboratorní centrum UTB Zlín - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227703.

Full text
Abstract:
This diplome thesis is focused on the technological project of the gross building of the Laboratory Center UTB in Zlín. Among other subjects, the work consists of technical report, technical rule, inspection and test plans, mechanical assembly desing, financial comparison of various casting methods, health and safety plan, environmental protection issues, budget, timetable and building site situation.
APA, Harvard, Vancouver, ISO, and other styles
27

Fatura, Josef. "Bioplynová stanice-stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227770.

Full text
Abstract:
The subject of my thesis is the technological phase biogas plant. I focused in detail on the buildings SO01 - Hala income and treatment of raw materials and SO02 - Operating building a cogeneration unit. The concreting, formwork and reinforcement substructure object SO01 I developed technological prescription. Furthermore, my work includes a technical report on the structural and technological project, construction situation, time and financial planning, study, implementation of major technological stages, construction machinery, crane assessment, project site equipment, plan for securing mate
APA, Harvard, Vancouver, ISO, and other styles
28

Herben, Tomáš. "Bytový dům Hlaváčkova – stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265294.

Full text
Abstract:
The subject of this thesis is the construction and technological project of a residential building Hlavackova. The work is mainly focused on the stage of construction. The work includes technical report building equipment, wider transport relations, design of mechanical assemblies, technological prescription monolithic structures and related inspection and test plans, safety, environmental protection, work contract, draft securing material resources for rough substructure and special use of roads, financing construction costs and schedule of construction.
APA, Harvard, Vancouver, ISO, and other styles
29

Bradáčová, Eliška. "Stavebně technologický projekt budovy C Technologického parku Brno." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-391890.

Full text
Abstract:
Theme of the diploma thesis is realisation of an administrative building in the area of Czech Technological Park Brno. Thesis contains of technical report of the technological project, situation of a place near the building site, the plan of traffic, for the objects time and financial plan, proposal of the main mechanisms, time schedule and partial time schedule for monolithic constructions. In the theses is also project of a construction site. In the thesis there also is a project of a construction site and also a monolithic constructions control and test plan. Then there is an Itemized budge
APA, Harvard, Vancouver, ISO, and other styles
30

Hrubá, Denisa. "Výšková budova AZ Tower - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-227005.

Full text
Abstract:
This master´s thesis is dealing with selected part of the construction technology project of the high-rise building AZ Tower. The main content becomes the realization of supporting gross upper structure. It compiles in detail the most optimal proposal of technological processes, working machines, schedule, control and test plan, occupational safety, environment protection, construction site equipment and last but not least, the coordination of four tower cranes. Apart from the architectural and technically impressive draft of the Czech Republic tallest building it will be interesting to deal w
APA, Harvard, Vancouver, ISO, and other styles
31

Zajíček, Miroslav. "Výrobní hala s administrativní částí v Lanškrouně, příprava a realizace stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372101.

Full text
Abstract:
The subject of the thesis is the construction technological planning and implementation of a production hall construction with an administrative part in Lanškroun. The thesis contains a technical report, site equipment, studies of technological implementation, a time and financial schedule, a design of the main building machines and mechanisms, a time schedule and time standard, technological specification and the relevant inspection and test plans will be written.
APA, Harvard, Vancouver, ISO, and other styles
32

Jůn, Michal. "Výrobní areál LIWA v Pelhřimově - příprava realizace a řízení stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265436.

Full text
Abstract:
The aim of the thesis is the process of building technological project LIWA manufacturing facility in Pelhřimov. It deals mainly a technological process for the realization of the main building. The thesis contains a technical report, technological specification, control and test plan. Other parts of the work are time and financial plan, machine and mechanic design, project about equipment of construction site and time schedule. The annexes are further addressed drawings of the building site equipment.
APA, Harvard, Vancouver, ISO, and other styles
33

Hanyášová, Hana. "Stavebně technologický projekt wellness hotelu Vista v Dolní Moravě." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265625.

Full text
Abstract:
The subject of this thesis is the constructional technology project of Wellness Hotel Vista in Dolní Morava with focusing on selected technological stage. The main stage is the realization of supporting structure of the building – monolithic reinforced concrete skeleton. For this stage is prepared technological regulation, inspection and test plan and drawing of site equipment. In this work is solved timetable and financial plan for individual objects, health and safety at work, mechanical assemblies and project of site equipment. For the main object is processed itemized budget and a detailed
APA, Harvard, Vancouver, ISO, and other styles
34

Carbol, Štěpán. "Stavebně technologický projekt výrobní haly Massag v Bílovci." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265322.

Full text
Abstract:
This thesis addresses the construction of steel buildings in Bílovec. In this work we are solved structurally technological study of the construction of steel buildings. The work deals with the traffic situation around the building and a landing distance. The thesis focuses on the installation for the steel skeleton and industrial floors of wire reinforced concrete, time and financial plan, project, site equipment, design of main construction machines and mechanisms, timelines, capital construction object, then control plan for the steel skeleton and industrial floor. Moreover, it is processed
APA, Harvard, Vancouver, ISO, and other styles
35

Zadák, Petr. "Výrobní hala Edscha v Jindřichově Hradci - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227282.

Full text
Abstract:
This thesis addresses the technological project of building a production hall in EDSCHA Henry Hradec. For the construction project will be developed technological studies major technological implementation stages, summary technical report, technological specification for installation of a steel frame and cladding halls, safety measures in the construction, inspection and test plan for the assembly skeleton, time and financial plan for the whole building, budget object SO01 production hall with an administrative extension and extension of production facilities.
APA, Harvard, Vancouver, ISO, and other styles
36

Dobrovská, Monika. "Výrobní hala s administrativní částí v Ústí nad Orlicí - Hylváty, stavebně technologická příprava stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-239956.

Full text
Abstract:
The subject of the thesis is the construction and technological preparation of a production hall building with an administrative part in Ústí nad Orlicí – Hylváty. For the construction project a technical report, site equipment, studies of technological implementation, a time and financial schedule, a design of the main building machines and mechanisms, a time schedule and time standard, technological specification and the relevant inspection and test plans will be written. The other task includes a comparison of the two building envelope technologies, a contract for work, a plan of risks for
APA, Harvard, Vancouver, ISO, and other styles
37

Šmíd, Radim. "Stavebně technologický projekt stanice Integrovaného záchranného systému." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392135.

Full text
Abstract:
The subject of this diploma thesis is construction-technological project of the integrated rescue system station. The building is situated in the village of Týn nad Vltavou and will be used to perform the service of fire protection of the population. The thesis is focused on the design of the construction site equipment, the time and financial plan, the design of the main building machines and mechanisms, the technological specification, the control and test plan, and also the occupational safety and health protection.
APA, Harvard, Vancouver, ISO, and other styles
38

Knotek, Vít. "Skladová hala v Šakvicích - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240405.

Full text
Abstract:
Main goal of this thesis is effective design and comprehensible description of the assembly of reinforced concrete skeleton warehouse in Šakvice. In several chapters of this thesis is for preparing of this investor´s plan solved supplies prefabricated components. As well as their assembly into construction, equipment of construction site, used technologies, quality control and safety of performed works. There is great emphasis on the construction budget and its chronology. The aim was to use the rapid progress of construction of the supporting skeleton, taking into account the financial coast
APA, Harvard, Vancouver, ISO, and other styles
39

Těžký, Filip. "Příprava realizace bytového domu v Brně - Slatině." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-391973.

Full text
Abstract:
The diploma thesis deals with the building - technological project of the apartment house in Brno - Slatina, Lučiny. The purpose will be an optimal design of construction progress with regard to finance and time. For this phase were processed the site equipment with the design of the lifting strap, the transport routes and the machine assembly. In addition, an item budget, which was followed by a detailed schedule. Based on these documents was created a balance of machines and workers. For monolithic constructions were developed a technological regulation and a control and test plan. Furthermo
APA, Harvard, Vancouver, ISO, and other styles
40

Toman, Jan. "Skladová a expediční hala včetně rekonstrukce-stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-227065.

Full text
Abstract:
Subject of this thesis is construction technology project storage and dispatch hall in Třebíč. This thesis contains technical report, construction site equipment project, time and financial plan, bill of quantities, technology study of the major technology stages, mechanical assembly design, technological specification, quality inspections.
APA, Harvard, Vancouver, ISO, and other styles
41

Chytal, Roman. "Výrobní hala nástrojárny firmy TOKOZ - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227181.

Full text
Abstract:
The thesis is focused on building technology solutions construction production hall toolmaking of company TOKOZ,a.s. in Žďár nad Sázavou. This thesis contains technical report, construction site equipment project, time and financial plan, bill of quantities, technology study of the major technology stages, mechanical assembly design, technological specification, quality inspections and risks in the implementation of ground works.
APA, Harvard, Vancouver, ISO, and other styles
42

Doruška, Jan. "Stavebně technologický projekt dostavby výrobní haly v Drnovicích." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240283.

Full text
Abstract:
This master’s thesis contains selected parts of construction-technological project of completion for a manufacturing hall in Drnovice. Based on the documentation used, the focus is aimed mainly at the technological report for the project and its coordination with broader relations of transport routes. Beside these topics, we discuss time and financial plans of the construction, equipment on the construction site, a proposal of main building machinery and mechanisms and the time plan of the main construction project. Furthermore, we provide a technological instructions, control trial plan for i
APA, Harvard, Vancouver, ISO, and other styles
43

Sovová, Romana. "Obchodní centrum Mohelnice - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227501.

Full text
Abstract:
The diploma thesis deals with construction technological project of department store in Mohelnice town – hypermarket Kaufland. It compiles in detail the most optimal proposal of technological construction process, working machinery, traffic proposal for transport, construction site equipment, schedule of work, inspection and test plan, safety of work, environment, and finally costing including bill of quantities etc. The thesis deals specifically main building object SO04, object of hypermarket, which is consisted of prefabricated reinforced concrete skeleton of single-storey building. I focus
APA, Harvard, Vancouver, ISO, and other styles
44

Škopík, Michal. "Stavebně technologická studie realizace haly Blansko." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227629.

Full text
Abstract:
This diploma thesis deals with solution of construction of steel hall in Blansko. In this thesis is solved constructional-technological study of construction of steel hall. The thesis focuses in assembly of steel skeleton. More specifically deals with traffic situation around building, time and financial plan of the building for individual objects, draft of equipment of construction site, design of the main lifting machines and mechanisms, schedule of the main building object, safety measures at the construction site and ensuring quality requirements for the installation of a steel skeleton. E
APA, Harvard, Vancouver, ISO, and other styles
45

Zaťko, Ondřej. "Příprava realizace kaskádových domů, Olomouc - Hejčín." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227258.

Full text
Abstract:
The content of this thesis is the construction of new technological project of apartment buildings A and B in Olomouc. Residential buildings A and B are identical, but are differently oriented to the cardinal points. Buildings are designed terraces. Buildings have a 4th floor 1PP. The supporting structure is made of monolithic reinforced concrete columns and ceilings. Infill walls are composed of ceramic blocks. In the 1st floor are located garage, the other floors are designed as residential.
APA, Harvard, Vancouver, ISO, and other styles
46

Novotný, Zdeněk. "Centrální objekt nemocnice v Uherském Hradišti - stavebně technologická příprava stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227165.

Full text
Abstract:
This diploma thesis deals with construction and technological preparation of the construction of the central hospital building in the town Uherske Hradiste. The work is composed of selected parts of the building and technological project, which is annexed to the diploma thesis. On some selected parts of the building and technological project is also prepared relevant drawings. The aim of the thesis is to choose a suitable and effective implementation process object depending on the circumstances and determine the resources of time, funds, personnel and materials.
APA, Harvard, Vancouver, ISO, and other styles
47

Hanáček, Patrik. "Bytový dům Hostivař - stavebně technologická příprava stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240053.

Full text
Abstract:
The theme of the diploma thesis is elaboration of selected parts of the construction technology project in building block of flats Hostivař. Content of this project is technological solution for realization of this project. It means working on time planning of construction, right using of human, material and machinery sources and controlling system for selected part of the building. In attachment of the diploma thesis, there are also drawings of building site equipment for different construction phases. The goal of the diploma thesis is design right and economical procedure for realization of
APA, Harvard, Vancouver, ISO, and other styles
48

Chu, Yu-Cheng, and 朱育成. "On the Feasibility to Incorporate safety Requirements As a Part of Equipment Purchase Specifications." Thesis, 2009. http://ndltd.ncl.edu.tw/handle/93656300023750438309.

Full text
Abstract:
碩士<br>國立高雄第一科技大學<br>環境與安全衛生工程所<br>97<br>For general users, it is often difficult for them to identify the hazards of machinery solely based on its appearance. Therefore, manufacturers are required to incorporate necessary safety measures in machinery designs to ensure safe operation for users. This stipulation, “Initial Control”, has been implemented for years in developed countries such as Europe and Japan. However, in Taiwan, the “Labor Safety and Health Organization Management & Self-Inspection Law”, requests enterprises to purchase to safe machinery, which indirectly puts pressure on machi
APA, Harvard, Vancouver, ISO, and other styles
49

Sillman, C. R. "Validation of post-installed anchors tested to European technical approval guideline 001 in South African concrete using portable test equipment." Thesis, 2012. http://hdl.handle.net/10210/4801.

Full text
Abstract:
M. Phil.<br>The purpose of this research is to see if on-site portable pull-out tests in South Africa on post-installed chemical and mechanical fixings can produce similar results to internationally laboratory tested fixings. The method used in the field study was to use typical South African 25 MPa, 75 mm slump ready mix concrete as supplied by a reputable supplier and to test several types of fixings in common situations, some covered in the European Technical Approval Guidelines (ETAG) and some not. The results were analyzed against published international values and theoretical calculation
APA, Harvard, Vancouver, ISO, and other styles
50

Sung, Chang Chin, and 張錦松. "The Influence of Product Specifications and R & D Personnel Capabilities on Average R & D Hours - The Case of Automation Equipment." Thesis, 2013. http://ndltd.ncl.edu.tw/handle/hqwkqh.

Full text
Abstract:
碩士<br>東海大學<br>高階經營管理碩士在職專班<br>101<br>The use of automation equipment has become an important strategy in the development of the economies of scale in manufacturing industry, and the forecast of working hours is one of the key success factors for automation equipment manufacturers to obtain orders. The purpose of this study is to establish a model for estimating the average working hours to help equipment manufacturers to enhance their competitiveness and increase the probability taking orders. Data were collected at the project level of customer-supplier relationships. The results were generat
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!