Journal articles on the topic 'Estimasi biaya'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the top 50 journal articles for your research on the topic 'Estimasi biaya.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.
Roring, Hence Sandi David, and Ramon Charles Rumambi. "Model Estimasi Biaya Signifikan pada Bangunan Rumah Tinggal dengan Metode Path Analysis menggunakan Aplikasi Amos versi 20." Jurnal Teknik Sipil Terapan 5, no. 2 (2023): 115. http://dx.doi.org/10.47600/jtst.v5i2.700.
Full textRidho Satrio, Muhammad, and Akhmad Dofir. "ESTIMASI BIAYA KONSEPTUAL KONSTRUKSI GUDANG." Jurnal ARTESIS 1, no. 2 (2021): 111–16. http://dx.doi.org/10.35814/artesis.v1i2.3215.
Full textSumardjo, Sumardjo, Galeh Nur Indriatno Putra Pratama, and Turas Nur Vemantyasto. "EFEKTIVITAS MODUL ESTIMASI BIAYA KONSTRUKSI JALAN PADA MATA PELAJARAN ESTIMASI BIAYA KONSTRUKSI DI SMK N 1 PURWOREJO." Jurnal Pendidikan Teknik Sipil 2, no. 2 (2020): 104–16. http://dx.doi.org/10.21831/jpts.v2i2.36345.
Full textRoring, Hence Sandi David. "ESTIMASI BIAYA KONSTRUKSI DERMAGA DENGAN METODE COST SIGNIFICANT MODEL." Jurnal Ilmiah Realtech 15, no. 1 (2019): 47–52. http://dx.doi.org/10.52159/realtech.v15i1.83.
Full textSusanti, Suci, and Maria Magdalena. "ESTIMASI BIAYA KEMACETAN DI KOTA MEDAN." Jurnal Transportasi Multimoda 13, no. 1 (2017): 21–30. https://doi.org/10.25104/mtm.v13i1.193.
Full textQadir, Muh, and Ikhsan . "Analisa Perbandingan Estimasi Anggaran Biaya Antara Metode Ahsp Sni 2016 Dengan Metode Perhitungan Kontraktor ( Studi Kasus Proyek Canal Wall Strengthening Sorowako Kabupaten Luwu Timur)." Journal of Applied Civil and Environmental Engineering 2, no. 1 (2022): 62. http://dx.doi.org/10.31963/jacee.v2i1.3429.
Full textAstana, I. Nyoman Yudha. "ESTIMASI BIAYA KONSTRUKSI GEDUNG DENGAN COST SIGNIFICANT MODEL." Jurnal Riset Rekayasa Sipil 1, no. 1 (2017): 7. http://dx.doi.org/10.20961/jrrs.v1i1.14706.
Full textWijoyo, Agung. "Sistem Pemasaran Digital Estimasi Harga Furniture." Gema Wiralodra 13, no. 2 (2022): 791–98. http://dx.doi.org/10.31943/gw.v13i2.269.
Full textAnggraini, Refina Putri, and Ayu Herzanita. "ESTIMASI BIAYA STRUKTUR BANGUNAN MENGGUNAKAN BIM (BUILDING INFORMATION MODELLING)." Jurnal ARTESIS 2, no. 1 (2022): 19–25. http://dx.doi.org/10.35814/artesis.v2i1.3756.
Full textDillak, Rocky Yefrenes. "ESTIMASI BIAYA PERANGKAT LUNAK MENGGUNAKAN IMPROVED BACKPROPAGATION." Jurnal Ilmiah Flash 2, no. 1 (2016): 42. http://dx.doi.org/10.32511/jiflash.v2i1.23.
Full textDillak, Rocky Yefrenes. "ESTIMASI BIAYA PERANGKAT LUNAK MENGGUNAKAN IMPROVED BACKPROPAGATION." Jurnal Ilmiah Flash 2, no. 1 (2016): 42. http://dx.doi.org/10.32511/flash.v2i1.23.
Full textDANANG WIJANARKO and NOVI ANDIRA ANGGREANI. "STUDI ANALITIK ESTIMASI BIAYA TETAP PROYEK KONSTRUKSI." JURNAL DAKTILITAS 3, no. 1 (2024): 17–24. http://dx.doi.org/10.36563/daktilitas.v3i1.819.
Full textDewanti, Ratih, Akhmad Aminullah, and Henricus Priyosulistyo. "Estimasi Biaya Struktur Gedung Rumah Sakit dengan Bentuk Persegi Panjang Menggunakan Metode Artificial Neural Network." Journal of Civil Engineering and Planning 2, no. 2 (2021): 139. http://dx.doi.org/10.37253/jcep.v2i2.5351.
Full textAzis, Miiftahul, Aceng Hidayat, and Ahyar Ismail. "Estimasi Biaya Transaksi dalam Pengelolaan Saluran Irigasi Vanderwicjk." Agro Bali : Agricultural Journal 4, no. 3 (2021): 332–40. http://dx.doi.org/10.37637/ab.v4i3.739.
Full textAlrasyid, Kevin Abdullah, and Dian Ariestadi. "Analisis Conceptual Cost Estimation (CCE) untuk Pembangunan Gedung Kuliah Bersama Tambahan (GKB 3)." Jurnal Indonesia Sosial Teknologi 6, no. 1 (2025): 528–36. https://doi.org/10.59141/jist.v6i1.8790.
Full textPaikun, Irpan Nurpa'i, Daniel Arie Susanto, and Nadhya Susilo Nugroho. "ESTIMASI BIAYA MENGGUNAKAN METODE COST SIGNIFICANT MODEL PADA PEMBANGUNAN PENINGKATAN JALAN." Jurnal TESLINK : Teknik Sipil dan Lingkungan 2, no. 2 (2020): 38–50. http://dx.doi.org/10.52005/teslink.v1i3.58.
Full textKhamistan, Khamistan. "ANALISIS ESTIMASI BIAYA DENGAN METODE COST SIGNIFICANT MODEL SEBAGAI DASAR PERHITUNGAN KONSTRUKSI JEMBATAN BETON BERTULANG DI KABUPATEN ACEH TAMIANG." Teras Jurnal 8, no. 2 (2019): 444. http://dx.doi.org/10.29103/tj.v8i2.168.
Full textAlfin, Nur, and Sugiyanto Sugiyanto. "ANALISA PERBANDINGAN ANGGARAN BIAYA METODE SNI DAN BOW PADA PROYEK PEMBANGUNAN KANTOR OPERASI CEMENT MILL TUBAN 3-4 PT. SEMEN INDONESIA (PERSERO) TBK." Rang Teknik Journal 5, no. 2 (2022): 248–66. http://dx.doi.org/10.31869/rtj.v5i2.3120.
Full textPradita, Dinda, and Manlian Ronald Adventus Simanjuntak. "Analisis Estimasi Penyelesaian Proyek Konstruksi terhadap Waktu dan Biaya." Prosiding TAU SNARS-TEK Seminar Nasional Rekayasa dan Teknologi 2, no. 1 (2024): 127–34. https://doi.org/10.47970/snarstek.v2i1.600.
Full textRamadhani, M. Faisal, Nurhakim Nurhakim, and Romla Noor Hakim. "OPTIMASI DAN ESTIMASI BIAYA PENAMBANGAN DAN PENGOLAHAN BATUBARA DI PT BHUMI RANTAU ENERGI." Jurnal Himasapta 6, no. 1 (2021): 9. http://dx.doi.org/10.20527/jhs.v6i1.3434.
Full textMulyono, Bagyo, and Paulus Setyo Nugroho. "Estimasi Biaya Konseptual Pada Jembatan Beton Bertulang Dengan Metode Indek Biaya." Dinamika Rekayasa 13, no. 2 (2017): 105. http://dx.doi.org/10.20884/1.dr.2017.13.2.185.
Full textSumartini, Wa Ode, and Ferdi Sanjaya. "ANALISIS PERBANDINGAN RENCANA ANGGARAN BIAYA PEMBANGUNAN LANTAI PONDASI RUMAH TINGGAL DITINJAU DARI ASPEK EKONOMIS (STUDI KASUS: PERUMAHAN PALM SPRING KOTA BATAM)." Jurnal Teknik Sipil 12, no. 2 (2023): 83–91. http://dx.doi.org/10.36546/tekniksipil.v12i2.830.
Full textSiti Fatonah, Onah, and Yasmi Afrizal. "MODEL ESTIMASI BIAYA PERANGKAT LUNAK MENGGUNAKAN COCOMO II (STUDI KASUS PT. X)." Jurnal Tata Kelola dan Kerangka Kerja Teknologi Informasi 2, no. 2 (2016): 54–61. https://doi.org/10.34010/jtk3ti.v2i1.302.
Full textMulya, Muhamad Femy, Nofita Rismawati, Millati Izzatillah, and Saipul Anwar. "Analisis dan Perancangan Aplikasi Pelanggan Bengkel Menggunakan Android Studio dan Firebase Dengan Metode Time Driven Activity Based Costing." Jurnal SISKOM-KB (Sistem Komputer dan Kecerdasan Buatan) 6, no. 1 (2022): 20–28. http://dx.doi.org/10.47970/siskom-kb.v6i1.323.
Full textSantosa, Eris Rakhmat, Agus Rachmat, and Yushar Kadir. "Estimasi Biaya Awal Pembangunan Hotel Dengan Metode “Cost Significance Model”." TECHNO-SOCIO EKONOMIKA 14, no. 1 (2021): 15–29. http://dx.doi.org/10.32897/techno.2021.14.1.574.
Full textYahya, Muhammad Tahta. "Estimasi Usaha Dan Biaya Proyek Pengembangan Aplikasi Web Di Cv. Technobit Indonesia Menggunakan Metode Use Case Point." Jurnal Sistem Informasi, Teknologi Informasi, dan Edukasi Sistem Informasi 4, no. 2 (2023): 64–73. http://dx.doi.org/10.25126/justsi.v4i2.162.
Full textPeginusa, Stefani Switly, Geertje E. Kandiyoh, Dian Puspita Sari, Dwars Soukotta, and Mycle Wala. "Model Estimasi Biaya Dengan Cost Significant Model Proyek Peningkatan Jalan di Minahasa Tenggara." Jurnal Teknik Sipil Terapan 6, no. 1 (2024): 33. http://dx.doi.org/10.47600/jtst.v6i1.873.
Full textIlallah, Aydan Fafirru, and Johan Paing Heru Waskito. "PENERAPAN METODE COST SIGNIFICANT MODEL PADA ESTIMASI BIAYA PEMBANGUNAN KANTOR PELAYANAN MASYARAKAT DI KOTA SURABAYA." axial : jurnal rekayasa dan manajemen konstruksi 8, no. 2 (2020): 139. http://dx.doi.org/10.30742/axial.v8i2.1035.
Full textAptiyasa, Putu A. A., Cosmas P. Y. Pao Effi, and Stefanus Rada. "Cost Model Estimasi Konseptual Untuk Bangunan Gedung Rumah Sakit." Journal of Research and Inovation in Civil Engineering as Applied Science (RIGID) 4, no. 2 (2025): 65–70. https://doi.org/10.58466/rigid.v4i2.1761.
Full textQurniawan, Rony, Agus Rachmat, and Yushar Kadir. "ANALISIS ESTIMASI BIAYA PROYEK PEMBANGUNAN KARGO BANDARA INTERNASIONAL JAWA BARAT (BIJB) KERTAJATI DENGAN METODE COST SIGNIFICANT MODEL." TECHNO-SOCIO EKONOMIKA 14, no. 2 (2021): 148. http://dx.doi.org/10.32897/techno.2021.14.2.580.
Full textHidayat, Muhammad, Muhammad Danur Arya Pratama, and Nadhya Susilo Nugroho. "Estimasi biaya rehabilitasi berat pada bangunan sekolah menggunakan metode cost significant model." Jurnal TESLINK : Teknik Sipil dan Lingkungan 4, no. 2 (2023): 181–94. http://dx.doi.org/10.52005/teslink.v4i2.135.
Full textWateno, Prof, Eddy Pancoro, and Sutoyo Sutoyo. "PENERAPAN COST SIGNIFICANT MODEL PROYEK JALAN DAN JEMBATAN DI KABUPATEN GRESIK." E-Jurnal SPIRIT PRO PATRIA 6, no. 1 (2020): 51–62. http://dx.doi.org/10.29138/spirit.v6i1.1101.
Full textJohari, Ganjar Jojon, and Muhammad Rifqy Almuhsy. "Penerapan Metode Cost Significant Model pada Estimasi Biaya Pembangunan Peningkatan Jalan." Jurnal Konstruksi 22, no. 1 (2024): 1–12. http://dx.doi.org/10.33364/konstruksi/v.21-2.1427.
Full textSaputro, Wibisono Dwi, and Miftahul Huda. "PERBANDINGAN ANGGARAN BIAYA PROYEK PERUMAHAN DI SURABAYA DENGAN METODE COST SIGNIFICANT MODEL." axial : jurnal rekayasa dan manajemen konstruksi 7, no. 3 (2019): 207. http://dx.doi.org/10.30742/axial.v7i3.777.
Full textSina, Maria Trivonia Sedo, Findia Findia, and Achmad Jaya Adhi Nugraha. "Perbandingan Estimasi Rencana Anggaran Biaya (RAB) Antara Metode AHSP Dengan BOW Proyek Rekonstruksi Jalan Patung Lembuswana – Sebulu." Kurva S : Jurnal Keilmuan dan Aplikasi Teknik Sipil 11, no. 3 (2023): 150. https://doi.org/10.31293/teknikd.v11i3.8384.
Full textKusumo, Yafet Jaya, Titasari Rahmawati, I. Gede Wiarta Sena, Ariel Kristianto, and Hermawan Andika. "Pengembangan Sistem Informasi Estimasi Biaya Proyek Perangkat Lunak Berbasis Function Point." Journal of Information System,Graphics, Hospitality and Technology 7, no. 1 (2025): 1–7. https://doi.org/10.37823/insight.v7i1.428.
Full textRamadhan, As'ary. "Estimasi Pada Effort Perangkat Lunak dengan Pendekatan Feed Forward Neural Network Backpropagation (FFNN-BP)." Technologia: Jurnal Ilmiah 12, no. 2 (2021): 89. http://dx.doi.org/10.31602/tji.v12i2.4576.
Full textArbaningrum, Rizka. "Desain Polder yang Ekonomis di Wilayah Semarang Timur." Jurnal Perkotaan 10, no. 2 (2019): 147–62. http://dx.doi.org/10.25170/perkotaan.v10i2.309.
Full textSavitri, Nadine Marwa. "Conceptual Cost Estimation (CCE) pada Pembangunan Gedung Kuliah Bersama (Gkb 3) Universitas Negeri Malang (UM)." Ranah Research : Journal of Multidisciplinary Research and Development 7, no. 3 (2025): 2128–35. https://doi.org/10.38035/rrj.v7i3.1354.
Full textAriyanto, Amelia Devi Putri, Lutfiyatul ‘Azizah, and Umi Laili Yuhana. "Analisis Metode Estimasi Biaya pada Perangkat Lunak Beserta Faktor-Faktor yang Mempengaruhi : A Systematic Literature Review." Jurnal Teknologi Informasi dan Ilmu Komputer 9, no. 4 (2022): 699. http://dx.doi.org/10.25126/jtiik.2021864611.
Full textPaikun, Mochammed Paikun. "ESTIMASI KONSEPTUAL BIAYA PEMBANGUNAN DRAINASE DI WILAYAH KOTA SUKABUMI MENGGUNAKAN MODEL." Jurnal Ilmiah Teknik Sipil 25, no. 1 (2021): 41. http://dx.doi.org/10.24843/jits.2021.v25.i01.p05.
Full textAriani, Vivi, and Martalius Peli. "Studi Estimasi Biaya Keselamatan dan Kesehatan Kerja (K3) Pada Proyek Konstruksi Bangunan (Studi Kasus: Pembangunan Gedung Xyz Kab. Dharmasraya)." CIVED 7, no. 3 (2020): 117. http://dx.doi.org/10.24036/cived.v7i3.109518.
Full textSutirto, Sutirto. "FAKTOR PENYEBAB TERJADINYA INFLASI KERUGIAN PELAKSANAAN PEKERJAAN FISIK JASA KONSTRUKSI." JUTEKS - Jurnal Teknik Sipil 2, no. 2 (2018): 169. http://dx.doi.org/10.32511/juteks.v2i2.171.
Full textNatalia, Monika, Fauna Adibroto, Desmon Hamid, Mafriyal Muluk, and Rahma Dinna. "Analisa Harga Satuan Pekerjaan Beton Bertulang Berdasarkan Analisa Pada Proyek Dan Analisa Harga Satuan Pekerjaan (AHSP) SNI 2016 Pada Proyek Pembangunan Aeon Mixed Use Project Phase II-Apartemen 3 Sentul City Bogor." Jurnal Ilmiah Rekayasa Sipil 16, no. 2 (2019): 92–102. http://dx.doi.org/10.30630/jirs.16.2.222.
Full textAdianto, Yohanes Lim Dwi, Mia Wimala, and Aldo Mayla Harun. "Faktor-faktor Pengaruh Besaran Estimasi Biaya Tidak langsung Pada Penawaran Pekerjaan Jalan Oleh Kontraktor X." Jurnal Rekayasa Sipil (JRS-Unand) 18, no. 1 (2022): 52. http://dx.doi.org/10.25077/jrs.18.1.52-59.2022.
Full textFarhana, Amalina, and Vendie Abma. "IMPLEMENTASI KONSEP BIM 5D PADA PEKERJAAN STRUKTUR PROYEK GEDUNG." Racic : Rab Construction Research 7, no. 2 (2022): 116–27. http://dx.doi.org/10.36341/racic.v7i2.3004.
Full textArinta, Riska, Dianni Yusuf, and Dewi Widyastutik. "MANAJEMEN RISIKO PADA MODEL ESTIMASI BIAYA PERANGKAT LUNAK." JUTI: Jurnal Ilmiah Teknologi Informasi 10, no. 1 (2012): 48. http://dx.doi.org/10.12962/j24068535.v10i1.a30.
Full textZettyara, Devi, and Mona Shinta Safitri. "Estimasi Biaya Pengembangan Jaringan Irigasi Tersier Poktan Madukismo." Portal: Jurnal Teknik Sipil 14, no. 1 (2022): 10. http://dx.doi.org/10.30811/portal.v14i1.2677.
Full textRahmat Tri Prasetya, Totok Yulianto, Meriana Wahyu Nugroho, and Titin Sundari. "Analisis Waktu dan Biaya Berdasarkan Acuan Produktivitas Lapangan Menggunakan Metode Estimasi Biaya Aktual." JURAL RISET RUMPUN ILMU TEKNIK 2, no. 2 (2023): 11–20. http://dx.doi.org/10.55606/jurritek.v2i2.1570.
Full textRatnasari, Titi. "ESTIMASI BIAYA KLAIM ASURANSI MENGGUNAKAN MODEL REGRESI ZERO-ADJUSTED INVERSE GAUSSIAN (ZAIG)." Jurnal Kajian Teknik Elektro 1, no. 2 (2016): 106. https://doi.org/10.52447/jkte.v1i2.450.
Full text