Dissertations / Theses on the topic 'Estimating construction costs'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the top 50 dissertations / theses for your research on the topic 'Estimating construction costs.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.
Rouhana, Khalil G. "Neural networks applications in estimating construction costs." Thesis, This resource online, 1994. http://scholar.lib.vt.edu/theses/available/etd-12302008-063358/.
Full textAsif, Mohammad. "Simple generic models for cost-significant estimating of construction project costs." Thesis, University of Dundee, 1988. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.330103.
Full textVan, de Voorde James R. "Estimating indirect costs of injuries to construction worker." Thesis, Springfield, Virginia: Available from National Technical Information Service, 1991. http://hdl.handle.net/10945/28174.
Full textLloyd, P. "A comparison of some estimating techniques for construction." Thesis, University of Nottingham, 1986. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.381057.
Full textLicher, Monica Katherine. "Estimating Post-Construction Costs of a Changing Urban Stormwater Program." Diss., Virginia Tech, 2016. http://hdl.handle.net/10919/73679.
Full textPh. D.
Choi, Ming-hang Edmund, and 蔡銘鏗. "Evaluation of the cost estimating systems." Thesis, The University of Hong Kong (Pokfulam, Hong Kong), 2001. http://hub.hku.hk/bib/B31251651.
Full textMao, Yizheng. "A web-based framework for estimating premium costs of potential LEED new construction projects." Thesis, California State University, Long Beach, 2016. http://pqdtopen.proquest.com/#viewpdf?dispub=10004156.
Full textLEED-certified green buildings benefit the owner not only in reducing operating costs, but also in improving the wellbeing of the occupants. LEED premium cost is the extra money a project owner invests in order to upgrade a conventional building to a Green Building. From the financial perspective, the amount of the premium cost is the major concern that keeps investors from targeting LEED certified projects. This study presents the development of cost estimation simulation model: LEED Premium Aided Cost Estimation (LEED PACE) for accurate premium cost in order to help the project owner/investor/architect to estimate the premium cost for potential LEED projects. The estimation program is built off on traditional building code (normally referred to as local municipal codes) and LEED system, which provides project based premium cost estimation. LEED PACE provides potential LEED credits acquisition based on existing project design information. Furthermore, PACE lists all targetable LEED credit(s) with corresponding premium cost(s) to inform project owner what LEED credit(s) can be acquired by changing project design elements and contributing extra cost(s). The parameters used to calculate extra construction costs are extracted from Green Building Cost RS MEANS. Although LEED PACE estimates extra construction cost needed for a traditional project in the City of Los Angeles to target LEED certification, the framework of building LEED PACE can be used to make LEED premium cost estimation for traditional project without geographical limitations. This empirical tool is expected to assist building owner/investor/policymaker in making better-informed decisions towards LEED certification from the economic perspective of sustainability.
Van, Reede Van Oudtshoorn Armand. "A critical review of the possible reasons for construction cost overruns in light of cost estimating methodologies and models used in industry." Thesis, Stellenbosch : Stellenbosch University, 2012. http://hdl.handle.net/10019.1/95685.
Full textENGLISH ABSTRACT: This research report was conducted to critically review the methodologies and best practices prescribed by world class cost engineering experts and institutions, in order to develop a cost estimating model which organisations could use as a guideline for their cost estimates on large capital intensive projects.
AFRIKAANSE OPSOMMING: Hierdie navorsingsverslag is gedoen om ‘n kritiese oorsig te doen op die metodes en beste praktyke voorgeskryf deur wereldklas koste ingenieur deskundiges en instansies, om sodoende ‘n koste beramings model te ontwikkel wat gebruik kan word deur organisasies as handleiding gedurende die koste beraming van hulle kapitale intensiewe projekte.
Miroyannis, Aristides. "Estimation of ship construction costs." Thesis, Massachusetts Institute of Technology, 2006. http://hdl.handle.net/1721.1/36275.
Full textIncludes bibliographical references (p. 105-107).
Since the end of the Cold War naval procurement for the US Navy has seen a dramatic decrease. This decrease in defense spending has placed existing programs under more scrutiny than previous years. As a result there is less tolerance on the part of taxpayers and Congress for procurement cost growth. This Thesis attempts to examine the current method that the Navy conducts ship cost estimates and suggests changes in order to improve the confidence level and accuracy of the forecasts. An examination of how industry is conducting cost estimates was used as a comparison to the current Navy practices. Finally using only a weight based approach to ship cost estimating is insufficient. It is necessary to develop and use a model that incorporates other cost driving factors in order to develop estimates of sufficient quality at the preliminary design level.
by Aristides Miroyannis.
S.M.in Ocean Systems Management
Phaobunjong, Kan. "Parametric cost estimating model for conceptual cost estimating of building construction projects." Thesis, Full text (PDF) from UMI/Dissertation Abstracts International, 2002. http://wwwlib.umi.com/cr/utexas/fullcit?p3086790.
Full textOgunlana, Stephen Olu. "Accuracy in design cost estimating." Thesis, Online version, 1989. http://ethos.bl.uk/OrderDetails.do?did=1&uin=uk.bl.ethos.235888.
Full textChoi, Ming-hang Edmund. "Evaluation of the cost estimating systems /." Hong Kong : University of Hong Kong, 2001. http://sunzi.lib.hku.hk/hkuto/record.jsp?B25949780.
Full textChe, Haron Roziha. "Systems thinking paradigm in construction cost estimating reliability." Thesis, University of Reading, 2017. http://centaur.reading.ac.uk/75021/.
Full textWu, Kin-kwong. "A study of the cost management process and estimation techniques for estimating building services installations in the building construction industry /." Hong Kong : University of Hong Kong, 1998. http://sunzi.lib.hku.hk/hkuto/record.jsp?B25949597.
Full textAhiaga-Dagbui, Dominic Doe. "Rethinking construction cost overruns : an artificial neural network approach to construction cost estimation." Thesis, University of Edinburgh, 2014. http://hdl.handle.net/1842/10454.
Full textHardcastle, Clifford. "An information model of the construction cost estimating process." Thesis, Heriot-Watt University, 1992. http://hdl.handle.net/10399/1386.
Full textWu, Kin-kwong, and 吳健光. "A study of the cost management process and estimation techniques for estimating building services installations in the buildingconstruction industry." Thesis, The University of Hong Kong (Pokfulam, Hong Kong), 1998. http://hub.hku.hk/bib/B31251523.
Full textClark, Michael. "A Framework for BIM Model-Based Construction Cost Estimation." DigitalCommons@CalPoly, 2019. https://digitalcommons.calpoly.edu/theses/1997.
Full textSaket, Munther Musa. "Cost-significance applied to estimating and control of construction projects." Thesis, University of Dundee, 1986. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.276578.
Full textMair, Andrew John. "Estimating and control of construction projects using cost significant work packages." Thesis, University of Dundee, 1990. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.335780.
Full textWilkin, Kelly R. "Cost estimation performances of Nevada highway infrastructure construction projects." abstract and full text PDF (free order & download UNR users only), 2006. http://0-gateway.proquest.com.innopac.library.unr.edu/openurl?url_ver=Z39.88-2004&rft_val_fmt=info:ofi/fmt:kev:mtx:dissertation&res_dat=xri:pqdiss&rft_dat=xri:pqdiss:1436025.
Full textBlackwood, David John. "Rationalisation of design cost estimation in the construction industry." Thesis, University of Abertay Dundee, 1998. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.242114.
Full textTheodorakopoulos, Thomas F. "Integrated cost management system for delivering construction projects." Thesis, Loughborough University, 2017. https://dspace.lboro.ac.uk/2134/27629.
Full textCelik, T. "Developing a building construction associated social cost estimation system for Turkish construction industry." Thesis, University of Salford, 2014. http://usir.salford.ac.uk/34147/.
Full textOralkan, Gaye A. "An object-oriented design intent externalization and representation model for cost estimating applications." Thesis, This resource online, 1991. http://scholar.lib.vt.edu/theses/available/etd-10222009-125049/.
Full textAppau, Kwaku Addae. "An integrated model of computer-aided cost estimating/scheduling in construction management." Diss., Georgia Institute of Technology, 1994. http://hdl.handle.net/1853/23130.
Full textMembah, Joseph F. J. "Parametric Cost Estimating and Risk Analysis of Transportation Tunneling Projects." Diss., North Dakota State University, 2016. http://hdl.handle.net/10365/25908.
Full textSchade, Jutta. "Energy simulation and life cycle costs : estimation of a building's performance in the early design phase." Licentiate thesis, Luleå : Luleå University of Technology, 2009. http://pure.ltu.se/ws/fbspretrieve/2785427.
Full textStutesman, Jonathan Harley. "Identifying the Economic Barriers to CLT Cost Estimation Among Building Construction Professionals." Thesis, Virginia Tech, 2020. http://hdl.handle.net/10919/96712.
Full textMaster of Science
Cross-laminated timbers (CLTs) are strong and lightweight structural building materials that also serve as a method of sequestering carbon rather than emitting carbon like more traditional construction materials. CLT construction is straightforward and quick to assemble, requiring minimal time and labor. CLTs are made from abundant and renewable wood resources and have significant economic potential as a job creator and as a new value-added product for the United States. However, market penetration has been obstructed by product affordability and lack of availability for use. Previous studies and projects have surveyed opinions of designers and contractors about CLT use. However, no previous study has been found that examined the opinions of cost estimators, who serve an essential function in providing economic comparisons of different construction systems for designers and building owners to select in the commercial construction area. CLTs are currently not included in these cost estimates, and this lack of information may be limiting the potential of this construction system. The purpose of this study was to discover if cost estimation is being used to make structural decisions potentially affecting the marketability of CLT use in construction and building design because of the ability to estimate CLTs adequately. Through the use of a survey and discussions with subject matter experts, this study examined the knowledge level of crosslaminated timbers of under-surveyed building construction professions and the relationship between cost estimation and structural material choices. They are demonstrating the need for better cost estimation tools for cross-laminated timbers such as inclusion in the Construction Specifications Institute’s classification systems in order for CLTs to become a more competitive product. Cost estimation is performed early in the design process before the structural material has been chosen. However, making cost estimates of CLT materials early in the design process is not a practical solution at this point due to the lack of cost data available. As an alternative solution, this project developed a design tool that is meant to accelerate the design process and allow companies to approach suppliers for quotes, which require mostly complete designs. While this is not a complete solution, if designs are made faster and more effortless, they should also be a more affordable investment for clients. 5 | Page Building construction professionals perceived CLT construction as too expensive, unavailable to the consumer, or unwanted by the client. It was found that the lack of data, due primarily to the material being new to the US construction industry, was a significant barrier to CLT cost estimation. The custom design of many previous CLT projects, due to the lack of CLT construction in the current building codes, limits the collection of standard CLT construction data. There is also an issue with the discrete sizes of CLT panels limiting their competitiveness. These barriers were identified in this study, and further research is needed to develop complete solutions.
Celenligil, Onur. "Analogical Reasoning For Risk Assessment And Cost Overrun Estimation In Construction Projects." Master's thesis, METU, 2010. http://etd.lib.metu.edu.tr/upload/12612229/index.pdf.
Full textKaranci, Huseyin. "A Comparative Study Of Regression Analysis, Neural Networks And Case." Master's thesis, METU, 2010. http://etd.lib.metu.edu.tr/upload/12612514/index.pdf.
Full textduring conceptual (early) cost estimation, achieving high accuracy is very difficult. The level of uncertainty included in the cost estimations should be emphasized for making correct decisions throughout the dynamic stages of construction project management process, especially during early stages. By using range estimating, the level of uncertainties can be identified in cost estimations. This study represents integrations of parametric and probabilistic cost estimation techniques in a comparative base. Combinations of regression analysis, neural networks, case &ndash
based reasoning and bootstrap method are proposed for the conceptual (early) range cost estimations of mass housing projects. Practical methods for early range cost estimation of mass housing projects are provided for construction project management professionals. The methods are applied using bid offers of a Turkish contractor given for 41 mass housing projects. The owner of all projects is Housing Development Administration of Turkey (TOKI). The mass housing projects of TOKI are generally a mix of apartment blocks, social, health and educational facilities, and some projects may also have mosques. Results of the three different approaches are compared for predictive accuracy and predictive variability, and suggestions for early range cost estimation of construction projects are made.
Li, Jinmin. "Integrating Building Information Modelling (BIM), Cost Estimating and Scheduling for Buildings Construction at the Conceptual Design Stage." Thesis, Université d'Ottawa / University of Ottawa, 2016. http://hdl.handle.net/10393/35292.
Full textOzturk, Erhan. "Cost Estimation Of Trackworks Of Light Rail And Metro Projects." Master's thesis, METU, 2009. http://etd.lib.metu.edu.tr/upload/2/12610332/index.pdf.
Full textHackett, James Arthur. "The role of cost estimators in UK construction : a case for, and steps towards, an estimating profession." Thesis, University of Birmingham, 2011. http://etheses.bham.ac.uk//id/eprint/3001/.
Full textMackenzie, David Ian. "A review of project controls in the UK and methodologies to improve the processes." Thesis, Teesside University, 2010. http://hdl.handle.net/10149/112675.
Full textPanthi, Kamalesh. "A Methodological Framework for Modeling Pavement Maintenance Costs for Projects with Performance-based Contracts." FIU Digital Commons, 2009. http://digitalcommons.fiu.edu/etd/120.
Full textFarah, Toni E. "Review of current estimating capabilities of the 3d building information model software to support design for production/construction." Link to electronic thesis, 2005. http://www.wpi.edu/Pubs/ETD/Available/etd-082305-165125/.
Full textXu, Shen. "Automatic cost estimation of construction project based on building information modelling : a knowledge-based system approach." Thesis, University of Reading, 2015. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.699790.
Full textAlder, Morgan A. "Comparing Time and Accuracy of Building Information Modeling to On-Screen Takeoff for a Quantity Takeoff of a Conceptual Estimate." Diss., CLICK HERE for online access, 2006. http://contentdm.lib.byu.edu/ETD/image/etd1487.pdf.
Full textHan, Sedat. "Estimation Of Cost Overrun Risk In Interrnational Project By Using Fuzzy Set Theory." Master's thesis, METU, 2005. http://etd.lib.metu.edu.tr/upload/12606032/index.pdf.
Full textKato, Camila Seiço. "Método para estimar custos diretos da execução de edifícios: aplicação à alvenaria estrutural." Universidade de São Paulo, 2012. http://www.teses.usp.br/teses/disponiveis/3/3146/tde-19072013-110646/.
Full textThis thesis proposes a method to forecast direct costs for multi-storey building construction. The costs are estimated by comparison to another building which costs were estimated before. The cost estimation this method provides can be very useful to improve important decisions including: land purchasing, timing to initiate marketing campaigns, and selecting architectural concepts. The approach to develop this method was modelling; parametrical analyses were used to describe the cost prognosis. The conceptual model was tested for structural masonry direct cost estimate. To do so, bibliographical survey was used in order to identify and quantify the impact of technical and architectonic parameters on the cost of this service. The proposed method, although complex, presents many advantages when compared to existing methods including: its accuracy, speed when used for structural masonry estimates, the understanding of the trigger parameters, it is easy to include new information, allows diversity of users, and its ability to compare different architectural designs.
Shi, Xin, and 施歆. "A fuzzy reasoning cost estimation model of sustainable building refurbishment solutions for residential buildings in Hong Kong." Thesis, The University of Hong Kong (Pokfulam, Hong Kong), 2014. http://hdl.handle.net/10722/208599.
Full textpublished_or_final_version
Civil Engineering
Master
Master of Philosophy
Xu, Weili. "An Energy and Cost Performance Optimization Platform for Commercial Building System Design." Research Showcase @ CMU, 2017. http://repository.cmu.edu/dissertations/956.
Full textFolkesson, Linda. "Analys av nyckeltal på produktionskostnader i tidiga skeden : För säkrare kalkyler i egenregiprojekt." Thesis, KTH, Byggteknik och design, 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-148821.
Full textThis thesis aims to analyze the key figures of production costs in multi-family housing projects. Before committing to an investment these risks need to be identified and production calculations presented. These calculations often contain uncertain items as projects are largely undefined and still at the idea stage and estimations are required. In the introduction of the report the risks are identified and analyzed based on their severity and the effect of them. Followed by a presentation of Veidekke's desired risk management practices and concluded with the opportunities and barriers that exists within the current organization. The study based on interviews with representatives from various professions, in different phases of projects and from the three different Swedish regions. These interviews have shown that the greatest uncertainty lies in construction costs, land costs and the economy's effect on the housing market. The study also shows that an increased level of detail of the production cost per square meter would enhance the security of these cost estimates if handled correctly. The details need to especially consider the type of house, choice of foundation, garage solution, number of floors and the average size of the apartments. The thesis is concluded by presenting and analyzing new working methods with key figures There is a focus on the cooperation between the business areas as the informants lift it as the main tool for secure calculations.
Chee, Ronson Riley, and Ronson Riley Chee. "Prioritization of Potable Water Infrastructure Investments on the Navajo Nation." Diss., The University of Arizona, 2017. http://hdl.handle.net/10150/624473.
Full textFekete, László. "Ceny dopravních staveb se zaměřením na pozemní komunikace." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225705.
Full textPeng, Min. "Item-level quantity-based preliminary cost estimating system for highways structures and miscellaneous construction." Thesis, 2006. http://hdl.handle.net/2152/2607.
Full text"Analyzing the Distribution and Variations in Construction Costs for Commercial Tenant Improvement Projects." Master's thesis, 2016. http://hdl.handle.net/2286/R.I.41248.
Full textDissertation/Thesis
Masters Thesis Construction 2016
Wall, Darden Lee. "Parametric estimating for early electric substation construction cost." Thesis, 2009. http://hdl.handle.net/2152/ETD-UT-2009-12-455.
Full texttext
Lin, Bing-Yi, and 林秉毅. "Investigation of Cost Estimating Methods for Construction Projects." Thesis, 2004. http://ndltd.ncl.edu.tw/handle/bakkjd.
Full text國立交通大學
土木工程系所
92
Cost Estimating of Construction Projects, as the basis of execution of operation, an estimator plays an important role, whose knowledge of Cost Estimating is gained through fieldwork, accumulation of experiences, textbooks on Cost Estimating, and etc. However, this research reviews over twenty textbooks on Cost Estimating published in Taiwan and other countries, discovering the lack of statements about integral Cost Estimating. The shortcomings are as follows: 1. Cost Estimating Process at different stages-Current statements of calculating steps of Cost Estimating complicate an estimator’s understanding of when Cost Estimating is needed, what information on Cost Estimating is necessary, what the calculating process of Cost Estimating is, and which participant should be in charge. 2. Cost Estimating Methods at different stages-Current method of Cost Estimating focusing on the accomplishment of detailed design drawing fails to fully explain methods of Cost Estimating at other stages. 3. Literature reviews on Cost Estimating at different stages and recommendations for future work-Currently, no books containing literature reviews on Cost Estimating and recommendations can offer an estimator references when conducting future researches and real practicing. Through literature reviews on Cost Estimating and case studies, this research organizes the process of cost estimating at different stages, the methods of Cost Estimating, and illustrations of National Nano Device Laboratories (NDL). Furthermore, targeting at literature reviews on the process and the methods of Cost Estimating at different stages, this research illustrates current studies and recommends further issues, setting up the idea of Cost Estimating to train an estimator to utilize the methods of integral Cost Estimating.