To see the other types of publications on this topic, follow the link: FIDIC.

Journal articles on the topic 'FIDIC'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 journal articles for your research on the topic 'FIDIC.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.

1

Crawley, Shaun. "Are Notice Provisions for a Delay and Additional Payment under FIDIC 1999 and 1987 Compliant with the Civil Transaction Code, Law #5?" Arab Law Quarterly 25, no. 3 (2011): 255–75. http://dx.doi.org/10.1163/157302511x568510.

Full text
Abstract:
This article looks at whether the provisions which obligate a party to issue a notice upon certain delaying events occurring under FIDIC 1st edn., 1999 Conditions of Contract, Construction for Building and Engineering Works Designed by the Employer (FIDIC99), and FIDIC 4th edn., 1987 for Works of Civil Engineering Construction, reprinted in 1992 with further amendments (FIDIC4), are compliant with the relevant articles of the Civil Transaction Code, Law #5 of 1985 as amended by Law #1 of 1987. This is done by reviewing the applicable laws that apply and then the relevant provisions of the abov
APA, Harvard, Vancouver, ISO, and other styles
2

Nwogu, Prince Chinemerem, and Arinze Emedosi. "FIDIC Form of Contract: A Study Review." British Journal of Environmental Sciences 12, no. 2 (2024): 43–48. http://dx.doi.org/10.37745/bjes.2013/vol12n24348.

Full text
Abstract:
FIDIC (Fédération Internationale des Ingénieurs - Conseils) is an International body whose membership consists of National Associations of Consulting Engineers. It has in publication different suites of contracts used for international engineering projects, viz; FIDIC REDBOOK (Construction), FIDIC YELLOW BOOK (Plant& DB), SILVER BOOK (Turnkey/EPC) and FIDIC GREENBOOK (Short Form Contract). Generally, the FIDIC contract contains 20 Clauses but seventeen (17) of which have common clause names and the suitability of this FIDIC Suite is a measure of ‘Risk distribution’. Whereas there is an obv
APA, Harvard, Vancouver, ISO, and other styles
3

Kapuasiana, Kenny, and Sarwono Hardjomuljadi. "ANALISIS FAKTOR PENYEBAB KLAIM PADA FIDIC DESIGN BUILD 2017." Konstruksia 11, no. 1 (2020): 11. http://dx.doi.org/10.24853/jk.11.1.11-32.

Full text
Abstract:
Saat ini banyak proyek internasional dan pemerintah yang dikerjakan di Indonesia sebagai dampak dari perkembangan era globalisasi. Pihak internasional dan pihak pemerintah memberikan persyaratan untuk menggunakan model kontrak internasional. Salah satu model kontrak yang sering digunakan adalah FIDIC. Namun, pada kenyataannya banyak terjadi klaim konstruksi pada proyek-proyek yang menggunakan model kontrak FIDIC, khususnya FIDIC Design build (Yellow book). Berdasarkan hal itu, diperlukan penelitian untuk menemukan faktor-faktor yang menyebabkan klaim konstruksi dalam penggunaan FIDIC Design bu
APA, Harvard, Vancouver, ISO, and other styles
4

Daradkeh, Lafi. "Solution by Negotiation and Determination by Arbitration in Arab World Construction Disputes: Comparative Study between fidic Rules of 1987 and fidic Rules of 1999." Arab Law Quarterly 30, no. 4 (2016): 395–409. http://dx.doi.org/10.1163/15730255-12341334.

Full text
Abstract:
This article deals with dispute settlement mechanisms for construction, in particular, fidic contracts. The fidic Rules provide for a two-step process of dispute settlement. The first step, which is amiable in nature, relies on the consulting engineer under the fidic Rules of 1987 and on the Dispute Adjudication Board under the fidic Rules of 1999. In the second step, the dispute will be submitted to arbitration for a binding decision upon the request of one of the parties. This article is concerned with the first step, and offers a comparative analysis of the fidic Rules of 1987, which depend
APA, Harvard, Vancouver, ISO, and other styles
5

Ристић, Дражен. "ПРИМЈЕНА FIDIC УГОВОРА НА ПРОЈЕКТИМА". Zbornik radova Fakulteta tehničkih nauka u Novom Sadu 35, № 12 (2020): 2065–68. http://dx.doi.org/10.24867/10cg05ristic.

Full text
Abstract:
FIDIC уговори-стандардизовани модели уговора за различите типове пројеката. Дефинисање уговорних страна, и њихова улога на пројекту. Поређење домаће регулативе и FIDIC процедуре приликом уговарања пројекта, као и примјена FIDIC-a у току самог пројекта
APA, Harvard, Vancouver, ISO, and other styles
6

Amal, Boulghab. "A Vision On The Board Of Avoidance And Settlement Of Disputes As One Of The Means Of Settling Disputes In Fidic Contracts." Multicultural Education 7, no. 6 (2021): 682. https://doi.org/10.5281/zenodo.5112345.

Full text
Abstract:
<em>FIDIC contract is considered one of the interesting contracts in the construction sector, especially because of its distinguished means of settling disputes, which made it attractive models for investment. The most important of these means is the Dispute Resolution and Avoidance Council, which is the modified version in the second edition 2017 of FIDIC for the former Dispute Resolution Council, where the work of tribal settlement of the claim was added before it turned into a dispute presented to the Council</em> <em>In the foregoing, going directly to the council without trying to avoid c
APA, Harvard, Vancouver, ISO, and other styles
7

Kirsanov, A. N., and A. V. Korablin. "Types, characteristics and features of model FIDIC contracts." Journal of Law and Administration 17, no. 4 (2022): 51–56. http://dx.doi.org/10.24833/2073-8420-2021-4-61-51-56.

Full text
Abstract:
Introduction. The article examines the types of standard FIDIC contracts, as the most commonly applicable standard forms of a construction contract, analyzes the features of each type of FIDIC contract, the history and reasons for the emergence and use of new standard forms of contracts.Materials and methods. The implementation of research tasks was achieved on the basis of studying the theoretical and practical experience of foreign countries in the application of standard FIDIC construction contracts, the history of FIDIC contracts, their features. The methodological basis of the research wa
APA, Harvard, Vancouver, ISO, and other styles
8

Jovanović, Stefan. "Applicable law for construction contracts under FIDIC general conditions: The role of chosen law." Zbornik radova Pravnog fakulteta, Novi Sad 59, no. 1 (2025): 227–50. https://doi.org/10.5937/zrpfns59-57693.

Full text
Abstract:
In academic literature on construction contracts governed by the FIDIC General Conditions, extensive attention has been given to dispute resolution, particularly the various mechanisms established within these conditions. Nevertheless, the question of the applicable law governing the substantive aspects of disputes remains largely underexplored. The FIDIC General Conditions allow parties to select the law of a specific state or jurisdiction to govern their contractual relationship. This choice of law plays a crucial role in shaping the interpretation and application of FIDIC contracts. While F
APA, Harvard, Vancouver, ISO, and other styles
9

Wen, Zhen, and Qi Lan Zhou. "Some Suggestions for China Construction Project Investment Control Present Situation Based on FIDIC Contract." Applied Mechanics and Materials 209-211 (October 2012): 1294–97. http://dx.doi.org/10.4028/www.scientific.net/amm.209-211.1294.

Full text
Abstract:
FIDIC contract terms content is quite widespread, it cover project management, technology, economy, law, insurance and so on. It is a normative document been revolve around construction project consultation and management. FIDIC made very detailed regulations to construction management three fields (investment control, quality control and progress control) from law, management, economy, technology and other fields. FIDIC had been became internationally recognized standardization document. It could be use every stage of construction management. This paper through analyze FIDIC contract and comb
APA, Harvard, Vancouver, ISO, and other styles
10

Bara, Damian. "Procedura postępowania polubownego w Warunkach Kontraktowych FIDIC." Roczniki Nauk Prawnych 30, no. 4 (2021): 7–24. http://dx.doi.org/10.18290/rnp20304-1.

Full text
Abstract:
Celem artykułu jest przybliżenie procedury polubownego rozwiązania sporu zawartej w Warunkach Kontraktowych FIDIC (dalej: FIDIC). Przedsiębiorcy z branży budowlanej coraz częściej dostrzegają pozytywne aspekty stosowania polubownych metod rozwiązywania sporów, w szczególności rozwiązań przewidzianych przez FIDIC. Regulacje w nim zawarte, a dotyczące postępowania polubownego, pozwalają zminimalizować potencjalne szkody, jakie mogą powstać w przypadku sporu wynikłego w trakcie realizacji inwestycji budowlanej. FIDIC w przejrzysty sposób określa przebieg postępowania przed Inżynierem kontraktu lu
APA, Harvard, Vancouver, ISO, and other styles
11

Szigeti, Zsolt, and András Zsigmondi. "Az építési projektek megvalósítása során egy hagyományos beruházói ÁSZF hatékonyabb-e a FIDIC szerződéses rendszerénél." Közbeszerzési Értesítő Plusz 5, no. 12 (2023): 26–47. https://doi.org/10.37371/kep.2023.12.3.

Full text
Abstract:
A feltett kérdést a szerzők jogi, joggazdaságtani, jogi és műszaki kockázatelemzési, mérnöki, FIDIC döntnöki szempontból vizsgálják, különös tekintettel arra, hogy mind megrendelői, beruházói, mind pedig vállalkozói szinten negatív sztereotípiák tapasztalhatók Magyarországon a FIDIC szerződéses rendszer alkalmazásával kapcsolatosan. Nálunk - különös módon, az európai országok között - nem létezik semmilyen sztenderd (vagy szokvány) szerződéses forma a kivitelezési tevékenységre. A szerzők konklúziója, hogy jogi, joggazdaságtani, jogi és műszaki kockázatmenedzsment szempontból előnyösebb, racio
APA, Harvard, Vancouver, ISO, and other styles
12

Heaphy, Ian. "NEC versus Fidic." Proceedings of the Institution of Civil Engineers - Management, Procurement and Law 166, no. 1 (2013): 21–30. http://dx.doi.org/10.1680/mpal.11.00006.

Full text
APA, Harvard, Vancouver, ISO, and other styles
13

Vilkonis, Arvydas. "SELECTION OF STANDARD CONSTRUCTION CONTRACTS MODEL AND CONTRACT PURCHASE PRICING." Mokslas - Lietuvos ateitis 14 (January 25, 2022): 1–6. http://dx.doi.org/10.3846/mla.2022.16054.

Full text
Abstract:
The aim of the research is to determine for a contract’s “Design and construction works of Vilnius city wastewater treatment plant” the most suitable variant of the combination of the FIDIC standard construction contract model and the purchase pricing of contract works using the SAW. Based on expert assessments, a matrix of possible solutions is formed by interviewing 8 experts (4 public procurement specialists and 4 civil engineers). Calculations have shown that the most appropriate combination of the FIDIC standard construction contract model and contract purchase pricing is the FIDIC Yellow
APA, Harvard, Vancouver, ISO, and other styles
14

Sanni, A. G., O. J. Adebiyi, and N. V. Okorie. "RESIDUAL RISKS OF PAYMENT PROVISIONS IN FIDIC AND JCT CONDITIONS: A QUANTITY SURVEYOR’S VIEW." Open Journal of Physical Science (ISSN: 2734-2123) 1, no. 1 (2020): 26–40. http://dx.doi.org/10.52417/ojps.v1i1.87.

Full text
Abstract:
The obligee and obligor of all cost-related commitments in construction contracts are governed by the conditions of contract. Like in all human engagements, risk is inevitable in construction contracts. This exploratory overview examined residual risks associated with payment provisions in Federation Internationale Des Ingenieurs-Consiels (FIDIC) and Joint Contracts Tribunal (JCT) conditions of contract in Nigerian construction industry. The selected payment provisions were advance payment, interim valuation, retention and final payment. The methodology comprises: (i) critical examination of p
APA, Harvard, Vancouver, ISO, and other styles
15

Gusman Simon. "ANALISA KETENTUAN KESELAMATAN KERJA PADA KONTRAK KONSTRUKSI FIDIC BUKU MERAH 2017." Industry Xplore 8, no. 2 (2023): 293–302. http://dx.doi.org/10.36805/teknikindustri.v8i2.5191.

Full text
Abstract:
Occupational accidents in the construction sector have a very significant contribution. One of the constructive efforts that can be carried out is to apply the Occupational Health and Safety provisions as stated in the construction contract. Among the various construction contract formats, the FIDIC Red Book 2017 contains several Occupational Health and Safety provisions in its clauses which can be used as a reference for Employers and Contractors in terms of risk sharing and scope of responsibility. The research aims to describe the Occupational Health and Safety provisions in the 2017 Red Bo
APA, Harvard, Vancouver, ISO, and other styles
16

Ziemińska, Olga. "Assumptions of the concept of a phase model of an infrastructural project implemented on this basis of Yellow FIDIC conditions of contract." Scientific Papers of Silesian University of Technology. Organization and Management Series 2023, no. 178 (2023): 793–812. http://dx.doi.org/10.29119/1641-3466.2023.178.44.

Full text
Abstract:
Purpose: The aim of the article is to develop theoretical and practical assumptions of the phase model concept for infrastructural projects implemented from the perspective of design offices on the FIDIC rules. Design/methodology/approach: In the article, the author develops and presents the assumptions of the phase model concept based on the available literature in the field of project management and the assumptions of the FIDIC Contact Conditions. The research problem is as follows: What elements does the course of an infrastructural project based on the assumptions of the Yellow FIDIC Condi
APA, Harvard, Vancouver, ISO, and other styles
17

Kirsanov, A. N., and A. V. Korablin. "Lex Constructionis as a Regulator of an International Construction Contract in Russia." Journal of Law and Administration 18, no. 3 (2022): 26–31. http://dx.doi.org/10.24833/2073-8420-2022-3-64-26-31.

Full text
Abstract:
Introduction. The gaps in the international private legal regulation of legal relations arising from an international construction contract are filled by other sources of law, primarily Lex constructionis, which is a set of acts and documents developed by non-governmental organizations that do not have the force of law, but are actively used in business circulation.FIDIC contracts can be cited as standard contracts, which are a set of narrowly focused standard forms of contracts, each of which was developed for a specific situation and certain legal relations arising from an international cons
APA, Harvard, Vancouver, ISO, and other styles
18

Winata, Eduardus Gerald, and Sarwono Hardjomuljadi. "ANALISIS KLAUSULA KONTRAK YANG TERKAIT DENGAN KLAIM PADA FIDIC CONDITION OF CONTRACT 1999." Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan 5, no. 2 (2021): 501. http://dx.doi.org/10.24912/jmstkik.v5i2.12195.

Full text
Abstract:
Construction contracts are used in all construction works. Indonesia has entered an era of development where infrastructure development activities are increasing. The ever-increasing development attracts foreign investors to come and establish cooperative relationships. The contract agreements used are international contracts, one of which is FIDIC. However, there are often claims that lead to disputes when using this condition of contract. Therefore, research is needed to identify the clauses in the FIDIC Red Book 1999 which are related to claims by contractors, and it is also necessary to kn
APA, Harvard, Vancouver, ISO, and other styles
19

Simanjuntak, Indra Jadi, Sarwono Hardjomuljadi, and Mawardi Amin. "Faktor Penyebab Klaim yang Menyebabkan Sengketa Pada Proyek Pengerukan dan Reklamasi Berdasarkan FIDIC Form of Contract for Dredging and Reclamation Edition 2016 (Blue Book)." Konstruksia 15, no. 1 (2023): 15. http://dx.doi.org/10.24853/jk.15.1.15-26.

Full text
Abstract:
Pertumbuhan ekonomi dan industri di Indonesia mendorong pembangunan infrastruktur Pelabuhan yang pekerjaannya meliputi pekerjaan pengerukan dan reklamasi. Pekerjaan pengerukan dan reklamasi sebagian besar dilaksanakan oleh Penyedia Jasa spesialis dari luar negeri mengakibatkan FIDIC Form of Contract for Dredging and Reclamation (Blue Book) edisi tahun 2016 menjadi sering digunakan di Indonesia. Seiring dengan penggunaan FIDIC Blue Book edisi tahun 2016 banyak klaim dan perselisihan antara Pengguna Jasa dan Penyedia Jasa yang menyebabkan sengketa. Oleh karena itu diperlukan penelitian tentang a
APA, Harvard, Vancouver, ISO, and other styles
20

Lam, Le Doan, and Le Pham Anh Tho. "Dispute resolution mechanism by dispute resolution board according to FIDIC contract model and experience for Vietnam." International Journal of Multidisciplinary: Applied Business and Education Research 5, no. 1 (2024): 291–301. http://dx.doi.org/10.11594/ijmaber.05.01.26.

Full text
Abstract:
The article “Dispute resolution mechanism by the Dispute Board according to the FIDIC contract form and experience for Vietnam” researches the theoretical issues related to the FIDIC Contract and the Dispute Settlement Board of the FIDIC. In addition, the article also focuses on researching and analyzing the practice of applying dispute settlement mechanisms by Dispute Settlement Boards in various nations throughout the world. The article's usefulness stems from the knowledge gained while researching this dispute resolution mechanism in countries throughout the world, as well as the present si
APA, Harvard, Vancouver, ISO, and other styles
21

Živanović, Filip M. "SPECIFIČNOSTI OSIGURANJA U OKVIRU FIDIC-OVE „CRVENE KNJIGE” – USLOVI UGOVORANJA ZA GRAĐEVINSKE I OSTALE TEHNIČKE RADOVE PO PROJEKTU NARUČIOCA (IZDANJE IZ 1999." Strani pravni život 67, no. 3 (2023): 507–21. http://dx.doi.org/10.56461/spz_23308kj.

Full text
Abstract:
Predmet rada je analiza primene FIDIC-ove „Crvene knjige” – Uslovi ugovaranja za građevinske i ostale tehničke radove po projektu naručioca, iz 1999. godine, u kontekstu obaveza ugovaranja osiguranja (dalje u tekstu: FIDIC Crvena knjiga (1999)). Poseban osvrt dat je na specifičnosti ovde pomenutih uslova ugovora, s obzirom na njihovu terminološku i konceptualnu osobenost, imajući u vidu da dolaze iz common law sistema koji ima karakterističan pristup osiguranju radova. U tom pogledu analiziran je pristup redaktora FIDIC-ove „Crvene knjige” (1999) prilikom strukturiranja odredaba o osiguranju,
APA, Harvard, Vancouver, ISO, and other styles
22

Сухоставець, І. В. "Правове регулювання забезпечення контролю якості будівництва за договорами підряду: міжнародні норми та українські реалії". Форум права 64, № 5 (2020): 24–35. https://doi.org/10.5281/zenodo.4300610.

Full text
Abstract:
<strong>Постановка проблеми.</strong> Подальший ефективний розвиток будівельної галузі України та залучення інвестицій у цю сферу більшість фахівців пов&rsquo;язують сьогодні із впровадженням міжнародних стандартів будівництва FIDIC та залучення інженера-консультанта FIDIC, що тягне за собою необхідність аналізу відповідності прав та обов&rsquo;язків інженера-консультанта за українським законодавством світовим стандартам, втіленим у типових формах контрактів міжнародних стандартів, розроблених Міжнародною федерацією інженерів-консультантів (FIDIC). <strong>Метою роботи</strong> обґрунтування п
APA, Harvard, Vancouver, ISO, and other styles
23

Hasanica, Amina. "Izvršivost obavezujućih, ali ne i konačnih odluka odbora za rješavanja sporova prema FIDIC uvjetima ugovaranja." Zbornik radova Pravnog fakulteta u Splitu 61, no. 1 (2024): 99–118. http://dx.doi.org/10.31141/zrpfs.2024.61.151.99.

Full text
Abstract:
FIDIC uvjeti ugovaranja su danas najzastupljeniji standardizovani modeli ugovora koji se primjenjuju u međunarodnim građevinskim projektima. Toliku upotrebu duguju svojoj prilagođenosti kompleksnosti međunarodnih građevinskih projekata koje karakteriše velika vrijednost, veći broj učesnika, međunarodni element, učešće međunarodnih finansijskih institucija, te kompleksnost radova. Jedan od primjera te prilagođenosti je mehanizam za rješavanje sporova koji je uspostavio FIDIC već 1999. godine, sa određenim izmjenama koje su se desile 2017. godine. Mehanizam za rješavanje sporova, koji podrazumij
APA, Harvard, Vancouver, ISO, and other styles
24

Breyer, Wolfgang. "Einführung „Internationales Bauvertragsrecht – FIDIC“." Zeitschrift für Recht des Bauwesens, no. 4 (2012): XXIX—XXXIV. http://dx.doi.org/10.33196/zrb201204xxix01.

Full text
APA, Harvard, Vancouver, ISO, and other styles
25

Arief, Ediyanto, and Sarwono Hardjomuljadi. "ANALISIS PERBANDINGAN MODEL KONTRAK APBN DAN APBD TERHADAP MODEL KONTRAK FIDIC." Konstruksia 11, no. 2 (2020): 8. http://dx.doi.org/10.24853/jk.11.2.8-101.

Full text
Abstract:
Pemerintah Indonesia menginvestasikan ratusan triliun rupiah setiap tahun dalam membangun infrastruktur. Kontrak konstruksi adalah salah satu jaminan untuk memastikan keberhasilan proyek, oleh karena itu klausula-klausulanya harus efisien, adil dan berimbang. Makalah ini terdiri dari perbandingan Syarat-Syarat Umum Kontrak (SSUK) APBN dan APBD terhadap model kontrak FIDIC General Conditions of Contract (GCC) 1999. Selain itu bertujuan untuk menganalisis sepuluh penyebab utama klaim yang sering terjadi pada proyek konstruksi di Provinsi Banten. Kemudian mencocokkan penyebab klaim pada SSUK APBN
APA, Harvard, Vancouver, ISO, and other styles
26

Melnyk, Oleksandr, Jacqueline Raab, and Frank Lulei. "ÖNORM B 2203-1 as a Supplement to FIDIC Emerald Book in Conventional Tunnel Construction." Buildings 13, no. 7 (2023): 1837. http://dx.doi.org/10.3390/buildings13071837.

Full text
Abstract:
This paper explores how the ÖNORM B 2203-1 model can complement the FIDIC Emerald Book contracts in conventional tunnel construction projects, specifically focusing on cooperation, project management, reimbursement, and dispute resolution. The complex technical nature of such projects requires collaborative stakeholder engagement, efficient project management, and effective dispute resolution mechanisms. This article enhances the current body of literature by undertaking a qualitative comparative analysis of the FIDIC Emerald Book and the ÖNORM B 2203-1 model within the specific context of con
APA, Harvard, Vancouver, ISO, and other styles
27

Putra, Sevren Buana, and Sarwono Hardjomuljadi. "ANALISIS PEMILIHAN MODEL KONTRAK KONSTRUKSI PEKERJAAN PEMBANGUNAN PEMBANGKIT LISTRIK (FIDIC RAINBOW CONTRACT 2017)." Konstruksia 11, no. 2 (2020): 33. http://dx.doi.org/10.24853/jk.11.2.33-45.

Full text
Abstract:
Dalam melaksanakan pekerjaan pembangkit diharuskan ada suatu kontrak konstruksi yang dapat menghargai semangat keadilan atau keseimbangan antara hak dan kewajiban serta mudah diinterpretasikan oleh para pihak. Makalah ini terdiri dari perbandingan In-House Form of General Conditions of Contract in Indonesia terhadap Model Kontrak FIDIC conditions of contract for EPC/Turnkey. Selain itu bertujuan untuk menganalisis penyebab utama klaim yang sering terjadi pada proyek konstruksi pembangkit listrik di Indonesia. Kemudian mencocokkan penyebab klaim pada In-House Form of General Conditions of Contr
APA, Harvard, Vancouver, ISO, and other styles
28

Sukhostavets, I. V. "Legal and Regulatory Framework of Quality Management in Construction: International Norms and Ukrainian Realities." Forum prava 71, Suppl. (2021): t4—t14. https://doi.org/10.5281/zenodo.5075708.

Full text
Abstract:
<strong>p</strong><strong>roblem </strong><strong>statement</strong>. Further effective development of the construction industry in Ukraine and attracting investments in this field are associated by most experts nowadays with the implementation of international construction standards FIDIC and the involvement of FIDIC consulting engineer, which entails the need to analyze the compliance of the rights and responsibilities of consulting engineer under Ukrainian law to world standards embodied in standard forms of international standards developed by the International Federation of Consulting Eng
APA, Harvard, Vancouver, ISO, and other styles
29

Jiang, Weiyi. "Translation of Long Sentences in Engineering Contracts under the Theory of Functional Equivalence: Taking FIDIC Conditions of Contract for Construction (Red Book) as an Example." International Journal of Translation and Interpretation Studies 3, no. 3 (2023): 38–43. http://dx.doi.org/10.32996/ijtis.2023.3.3.5.

Full text
Abstract:
The FIDIC (Fédération lnternationale Des lngénieurs Conseils) Conditions of Contract for Construction are widely used in international engineering contracts, and their translation also plays an active role in the construction of China's own engineering contract texts. Due to the complexity and variety of the logical levels and modifiers, understanding and translation have become a major challenge. This paper will use functional equivalence theory as the theoretical guide, take the English and Chinese versions of FIDIC Conditions of Contract for Construction (1999 Red Book) as the main research
APA, Harvard, Vancouver, ISO, and other styles
30

KOTB, Moustafa, Mohamed Ibrahim Abdel Razik, and Reda Abbass Sabry. "FIDIC General Conditions / Payments Clause FIDIC refers to (Fédération Internationale Des Ingénieurs Conseils)." Asian Business Research 2, no. 3 (2017): 53. http://dx.doi.org/10.20849/abr.v2i3.225.

Full text
Abstract:
For any international construction project, Contract is one of the major documents for construction industry. FIDIC General Conditions are the most common used all over the world. Payments term is very important clause and all the project team members need to be aware completely about it. Thus, this paper is considering illustrated payments clauses by flow chart technique to ensure that all the engineers are handling easily those terms.Without real understanding of those clauses usually the project will get cash flow tribbles.
APA, Harvard, Vancouver, ISO, and other styles
31

Simanjuntak, Johan Oberlyn, Bartholomeus, Salomo Simanjuntak, Partahi Lumbangaol, and Astri Agnes. "ANALISA KONTRAK PROYEK KONSTRUKSI DI INDONESIA." Jurnal Visi Eksakta 2, no. 2 (2021): 205–14. http://dx.doi.org/10.51622/eksakta.v2i2.394.

Full text
Abstract:
The contract is a very importand document in the project. Contract are seen as laws that must be obeyed, govern and control the rights and obligations between service users and service providers in the project. In world of construction in Indonesia, the standard used for contract documents must be based on Law No.2 of 2017 on construction services as a guide and guidance in constructions activities in Indonesia. In the international world, FIDIC documents has long been recognized, which is a contractual rule that has been used by many countries. FIDIC has also been widely adapted to government
APA, Harvard, Vancouver, ISO, and other styles
32

Stojković, Sara. "Fidic Force Majeure Clause from the Viewpoint of Serbian Law." Anali Pravnog fakulteta u Beogradu 71, no. 3 (2023): 477–505. http://dx.doi.org/10.51204/anali_pfbu_23303a.

Full text
Abstract:
The purpose of this paper is to present force majeure as stipulated in FIDIC forms, which are nowadays frequently in use when negotiating the conclusion of construction contracts concerning major projects. An important remark is that these forms have been greatly influenced by common law systems where operation of force majeure is dependent on the contractual definition and wording of the clause. On the other hand, the Serbian Law on Obligations contains its own understanding of force majeure-related concept, which might be amended in accordance with the principle of party autonomy. The paper
APA, Harvard, Vancouver, ISO, and other styles
33

Liu, Zhao Hui. "Study of FIDIC Condition in Innovative Engineering Environment." Applied Mechanics and Materials 484-485 (January 2014): 531–34. http://dx.doi.org/10.4028/www.scientific.net/amm.484-485.531.

Full text
Abstract:
The FIDIC Condition has been widely applied in the international engineering. The practice applying in foreign-invested projects in China indicates it can speed up the process of standardization of construction project management and improve the level of construction project management. However, because of constraints of various factors, the application of the FIDIC Conditions is limited in China. This paper describes the questions of application and the measures to be taken currently.
APA, Harvard, Vancouver, ISO, and other styles
34

Lyapustina, Natalya Aleksandrovna, and Oleg Sergeevich Rybka. "Perspectives for the application of the provisions on indemnity established by FIDIC Silver Book in the field of construction contracts in Russia." Юридические исследования, no. 6 (June 2024): 1–14. http://dx.doi.org/10.25136/2409-7136.2024.6.70982.

Full text
Abstract:
The object of the study is the institute of compensation for property losses, fixed in one of the standard contracts of the International Federation of Consulting Engineers (FIDIC) - the Silver Book. The FIDIC Silver Book is the most interesting for providing a universal contract base in Russia, as a task set by the Government of the Russian Federation in the Strategy for Exporting Services until 2025. It is in this proforma that the main conditions of the EPC are reflected: design work, purchase of materials, construction work. One of the tools common in the Anglo-Saxon legal system is indemn
APA, Harvard, Vancouver, ISO, and other styles
35

Kaggwa, Ssegawa Joseph, Ntshwene Keneilwe, and Kamaruddeen Ahmed Mohammed. "Experiences Encountered while Using Construction Contracts during Project Delivery in Botswana." Journal of Civil Engineering and Urbanism 14, no. 3s (2024): 172–81. https://doi.org/10.54203/jceu.2024.17.

Full text
Abstract:
Various forms of contracts guide the construction project delivery processes across the world. To make procurement more accessible and faster, various institutions have developed what is known as standard forms of contracts (SFoC). These institutions believe that SFoCs could be used in an adopted or adapted mode to reduce the burden of writing contracts every time a project is procured. This article discusses the results of a study that investigated the effectiveness of identified SFoCs and the experiences encountered by key stakeholders in using the contracts during construction project deliv
APA, Harvard, Vancouver, ISO, and other styles
36

Цифра, Т. Ю. "ТРЕНДИ КОНТРАКТІВ FIDIC У ВІДНОВЛЮВАНІЙ ЕНЕРГЕТИЦІ ТА ЇХНІЙ ЗВ’ЯЗОК ІЗ ІНВЕСТИЦІЙНИМ ПРОЕКТУВАННЯМ, БУДІВНИЦТВОМ І РЕКОНСТРУКЦІЄЮ НА МІСЦЕВОМУ РІВНІ". Цифрова економіка та економічна безпека, № 1 (16) (27 січня 2025): 259–64. https://doi.org/10.32782/dees.16-39.

Full text
Abstract:
У статті розглядається застоcування проформ FIDIC у відновлюваній енергетиці та їхній зв’язок із інвестиційним проєктуванням, будівництвом і реконструкцією на місцевому рівні. Аналізуються юридичні, економічні, екологічні та технічні виклики впровадження міжнародних стандартів, зокрема адаптація до національного законодавства, розподіл ризиків та механізми фінансування. Визначено основні переваги використання FIDIC у проєктах ВДЕ, включаючи залучення міжнародних інвестицій, підвищення прозорості управління проєктами, підвищення рівня проєктної документації, взаємодії учасників інвестиційного п
APA, Harvard, Vancouver, ISO, and other styles
37

Zakaria, Zarabizan Bin, Syuhaida Binti Ismail, and Aminah Binti Md Yusof. "An Overview of Comparison between Construction Contracts in Malaysia: The Roles and Responsibilities of Contract Administrator in Achieving Final Account Closing Success." International Journal of Applied Mathematics and Informatics 16 (March 5, 2022): 1–8. http://dx.doi.org/10.46300/91014.2022.16.1.

Full text
Abstract:
The administration of construction contracts in Malaysia is facilitated through a standard form of contract. The application of each however depends on the type of project, mode of finance and owner of the project. International Federation of Consulting Engineers (FIDIC), Public Work Department 203A (PWD203A), Pertubuhan Akitek Malaysia (PAM) Standards form of contract are widely implemented in Malaysia. In generally, each standard form of contract aims at ensuring effective, efficient and non-disputable contract administration. Nonetheless, variations arise in certain matters. This paper appr
APA, Harvard, Vancouver, ISO, and other styles
38

Li, Dezhi, Huiyan Zhang, and Xuehua Fang. "The deficiency of dispute settlement mechanism seen in Chinese construction field from FIDIC." MATEC Web of Conferences 251 (2018): 05022. http://dx.doi.org/10.1051/matecconf/201825105022.

Full text
Abstract:
Since formally introduced the friendly Amicable Settlement mechanism in 1987, FIDIC’ s efforts to promote and improve the alternative dispute settlement mechanism for construction work have been greatly developed. The current laws and regulations in China on alternative dispute resolution mechanisms for construction disputes are not perfect, and the newly revised “Conditions of contract for Construction” (GF2017-0201) lacks operability. It is of great significance to improve the dispute settlement mechanism by drawing on the provisions of article 20 of FIDIC (New Red Book), accumulate internat
APA, Harvard, Vancouver, ISO, and other styles
39

Dąbrowska, Agnieszka. "Analysis of the FIDIC arbitration clause in the light of international jurisprudence." ASEJ Scientific Journal of Bielsko-Biala School of Finance and Law 23, no. 1 (2019): 27–30. http://dx.doi.org/10.5604/01.3001.0013.2655.

Full text
Abstract:
The aim of the paper is to present the subject matter related to the procedure of resolving disputes arising in connection with implementation of agreements concluded on the basis of contract models published by the international federation FIDIC in 1999 Red and Yellow Book. The intention of the authors of the FIDIC templates was to apply an autonomous multistage procedure (the so-called multi-step clause) for resolving disputes based on arbitration without taking the matter to court. However, the application of the procedure proposed by FIDIC raises controversies of legal and factual nature.
APA, Harvard, Vancouver, ISO, and other styles
40

Besaiso, Haytham, Peter Fenn, Margaret Emsley, and David Wright. "A comparison of the suitability of FIDIC and NEC conditions of contract in Palestine." Engineering, Construction and Architectural Management 25, no. 2 (2018): 241–56. http://dx.doi.org/10.1108/ecam-10-2016-0235.

Full text
Abstract:
Purpose The standard forms of construction contract are receiving greater attention in the management of projects scholarship as they probably influence the project success and project disputes. The extant literature suggests that the standard forms of construction contract are one of the top sources of disputes. The purpose of this paper is to examine the effectiveness of the standard forms of construction contract, FIDIC and NEC, in reducing disputes in the Palestinian construction industry. Design/methodology/approach The researchers have used qualitative methods to collect data and more sp
APA, Harvard, Vancouver, ISO, and other styles
41

Anggeriksari, Hari, and Sarwono Hardjomuljadi. "STUDI PARTICULAR CONDITION PADA PROYEK - PROYEK MILIK SWASTA." Konstruksia 11, no. 2 (2020): 73. http://dx.doi.org/10.24853/jk.11.2.73-88.

Full text
Abstract:
Sebagian besar kegiatan konstruksi di Indonesia, dilakukan berdasarkan FIDIC Conditions of Contracts. Pada studi ini dibahas mengenai proyek konstruksi yang menggunakan FIDIC Condition of Contract for Construction 1999. Studi ini terdapat kalimat pada klausula-klausula Particular Condition yang mengubah dan menghapus isi dari klausula-klausula General Condition. Maka dari itu diperlukan analisis terhadap Particular Condition pada kontrak. Studi ini dilakukan dengan tujuan untuk mengetahui Klausula-Klausula Particular Condition apa saja yang dominan menimbulkan masalah beserta dengan analisisny
APA, Harvard, Vancouver, ISO, and other styles
42

Pokharel, Sagar, and Megh Raj Marasini. "Practices of Price Adjustment in Selected Construction Projects." Journal of Lumbini Engineering College 4, no. 1 (2022): 7–13. http://dx.doi.org/10.3126/lecj.v4i1.49357.

Full text
Abstract:
Price adjustment affects all the stakeholders i.e. client, consultant and contractor. This research reveals the trend of the cost of components of construction i.e. labor, material, fuel, equipment etc., compare the different formulas of price adjustment and understand the view of client, consultant and contractor regarding price adjustment. Ten contracts commencing within 2010 A.D to 2019 A.D have been chosen. The four contracts have used FIDIC formula, five have used PPMO formula and one has used small works formula. Trend of cost of labor, bitumen, fuel has been analyzed for contracts using
APA, Harvard, Vancouver, ISO, and other styles
43

Boyd, J. M., and J. D. Padilla. "FIDIC and Integrity: A Status Report." Leadership and Management in Engineering 9, no. 3 (2009): 125–28. http://dx.doi.org/10.1061/(asce)1532-6748(2009)9:3(125).

Full text
APA, Harvard, Vancouver, ISO, and other styles
44

Furundžić, Božidar S. "GRAĐEVINSKI NADZOR: SRPSKI I FIDIC USLOVI." Zbornik radova Građevinskog fakulteta 31, no. 27 (2015): 779–84. http://dx.doi.org/10.14415/konferencijagfs2015.099.

Full text
APA, Harvard, Vancouver, ISO, and other styles
45

Perić, Milan. "POSTUPAK POTRAŽIVANJA PREMA FIDIC MODELIMA UGOVARANJA." Zbornik radova Građevinskog fakulteta 31, no. 27 (2015): 785–91. http://dx.doi.org/10.14415/konferencijagfs2015.100.

Full text
APA, Harvard, Vancouver, ISO, and other styles
46

Al-Matarneh, Shams. "Reasons for delay in construction projects in the municipality of Aiy." International Journal of Engineering and Artificial Intelligence 3, no. 4 (2022): 8–20. http://dx.doi.org/10.55923/jo.ijeal.3.4.104.

Full text
Abstract:
The research aimed to study the causes and difficulties that beset the process of executing construction projects, by studying the provisions of the standard contracting contract FIDIC, which is used by the Ministry of Public Works and other public institutions in Jordan, whether the fourth edition of it or the 99th edition, noting that the unified contracting contract book for the year 1996 is It is only the FIDIC contract with its fourth edition and its amendments. Also, this study aims to clarify the causes and these difficulties and to indicate the solutions that can be proposed to avoid t
APA, Harvard, Vancouver, ISO, and other styles
47

Varavenko, Victor Evgenyevich. "Prospects of application of typical agreements of International Federation of Consulting Engineers (FIDIC) in Russia in the practice of public procurement." Право и политика, no. 8 (August 2020): 8–17. http://dx.doi.org/10.7256/2454-0706.2020.8.33009.

Full text
Abstract:
The subject of this research is the general terms of three standard contracts set by International Federation of Consulting Engineers (FIDIC) in 2017 &amp;ndash; conditions of contract for engineering, construction and installation works designed by the contractor; conditions of contract for engineering, construction and installation works designed by the employer; conditions of contract for &amp;ldquo;turnkey projects&amp;rdquo; and norms of the Federal Law &amp;ldquo;On contractual system in the sphere of procurement, works, and services for state and municipal needs; as well as bylaws in th
APA, Harvard, Vancouver, ISO, and other styles
48

Waleed, Medhat, Abdelkhalek Hesham, and Mohamed Abdelalim Ahmed. "A Comparative Study of the International Construction Contract (FIDIC Red Book 1999) and the Domestic Contract in Egypt (the Administrative Law 182 for the year 2018)." International Journal of Management and Commerce Innovations 11, no. 1 (2023): 10–23. https://doi.org/10.5281/zenodo.7813262.

Full text
Abstract:
<strong>Abstract:</strong> This research aims to compare and contrast the F&eacute;d&eacute;ration Internationale des Ing&eacute;nieurs-Conseils (FIDIC) Conditions of Contract for Construction designed by the Employer (1999 &ndash; The Red Book) and Administrative Law 182 for the year 2018 in Egypt, with a focus on variations, delay damages, delayed payments, delayed drawings or instructions, adjustment of prices, and dealing with exceptional circumstances such as COVID-19. By analyzing these critical issues, the research provides new insights into how contracts in these conditions can be bett
APA, Harvard, Vancouver, ISO, and other styles
49

Gagula, Almir, and Zlatan Meškić. "Termination of the contract under FIDIC: The perspective of Bosnia and Herzegovina." Revija Kopaonicke skole prirodnog prava 2, no. 2 (2020): 57–75. http://dx.doi.org/10.5937/rkspp2002057g.

Full text
Abstract:
FIDIC Forms of Contract in recent years are often used for regulation of rights and obligations of the investors and the contractors on the construction projects in Bosnia and Herzegovina, in particular in construction of the highways, railways and dams. Majority of the projects is finalized without significant disputes between the parties. However, in certain cases disputes between the parties escalate in such magnitude that one of the parties decides to terminate the contract. Due to severity of the financial consequences of the termination, it is necessary to emphasise interplay between the
APA, Harvard, Vancouver, ISO, and other styles
50

Albada, Edward. "CONSIDERATION OF CONTRACTUAL RISKS ASSOCIATED WITH COASTAL AND MARITIME ENGINEERING WORKS." Coastal Engineering Proceedings, no. 36v (December 28, 2020): 18. http://dx.doi.org/10.9753/icce.v36v.management.18.

Full text
Abstract:
Coastal and maritime construction projects are fraught with risks associated with working in or around the sea. Common standard contracts such as those within the FIDIC Red Book do not adequately address the peculiarities associated with this unique environment. This paper will document the major areas of generic contractual risk and uncertainty with regard to coastal and maritime projects through review of literature, case law and other published disputes, as well as personal experience. Through identification and comparison of both the risks associated with these projects and the vulnerabili
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!