Academic literature on the topic 'Gantt charts'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Gantt charts.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Journal articles on the topic "Gantt charts"

1

Geraldi, Joana, and Thomas Lechter. "Gantt charts revisited." International Journal of Managing Projects in Business 5, no. 4 (September 7, 2012): 578–94. http://dx.doi.org/10.1108/17538371211268889.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Wilson, James M. "Gantt charts: A centenary appreciation." European Journal of Operational Research 149, no. 2 (September 2003): 430–37. http://dx.doi.org/10.1016/s0377-2217(02)00769-5.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Genua, Caterina, Silvestro Giuffrida, and Salvatore Rinaudo. "“GANTT CHARTS FOR PRODUCTION FLOW” FRAMEWORK." IFAC Proceedings Volumes 39, no. 3 (2006): 691–96. http://dx.doi.org/10.3182/20060517-3-fr-2903.00350.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Ixebayeva, Zh S., K. Jetpisov, and Zh M. Muratova. "INFORMATION SYSTEM FOR CONSTRUCTING GANTT CHARTS." SERIES PHYSICO-MATHEMATICAL 2, no. 342 (June 29, 2022): 64–75. http://dx.doi.org/10.32014/2022.2518-1726.130.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Малышева, А. К., and А. М. Абдуллаева. "SELECTING AN EFFECTIVE SOFTWARE PRODUCT FOR SCHEDULING A STRATEGIC PROFILE OF A COMPANY." Proceedings in Cybernetics 23, no. 1 (2024): 47–53. http://dx.doi.org/10.35266/1999-7604-2024-1-6.

Full text
Abstract:
Management as well as the use of software for scheduling the project company’s strategy are vital components of an organization’s economic sustainability. When working on a project, modern managers frequently employ visual aids such as task diagrams. The Gantt chart is a highly effective type of diagrams. Many project companies now include software products for designing Gantt charts as a key tool in their technical scope. The article presents the results of a study using the Choice («Vybor») decision support system. Thomas Saaty’s mathematical method of analytic hierarchy process implies the selection of the most favorable choice in decision-making. Using the analytic artifi cial intelligence system, the choices were ranged in a form of software products for building Gaant charts, and the most effective software decision was selected.
APA, Harvard, Vancouver, ISO, and other styles
6

Lee, Sangkon, and Olga A. Shvetsova. "Optimization of the Technology Transfer Process Using Gantt Charts and Critical Path Analysis Flow Diagrams: Case Study of the Korean Automobile Industry." Processes 7, no. 12 (December 3, 2019): 917. http://dx.doi.org/10.3390/pr7120917.

Full text
Abstract:
This research is focused on the technology transfer process in the automobile industry using project management tools. The aim of this research is the development of a technology-transfer model using Gantt charts and Critical Path Analysis flow diagrams to achieve a sustainable planning process in the global environment. To achieve this goal, the authors use Gantt charts and Critical Path Analysis flow diagrams. The hypothesis and three research questions are presented, which suggest a relationship between project management tools and the sustainable planning process of technology transfer. During the research, we use the case study of the Korean automobile industry as an excellent example of the technology-transfer process in global markets. A single project of technology transfer is discussed: the technology knowledge transfer from Korean headquarters to a Russian manufacturing subsidiary (Hyundai Motor Corporation). Quantitative data were collected through the open resources of the corporation; the qualitative data were analyzed through a case study and model parameter evaluation. The significant result that the combination of Gantt Charts and Critical Path Analysis flow diagrams methods improves the planning process for technology-transfer projects was found in this survey. It is noticed that (a) it is useful to apply project-management tools for technology transferring models; (b) Gantt Charts and Critical Path Analysis flow diagrams have a sustainable impact on technology transfer projects; and (c) critical paths and operational reserves in network diagrams help to optimize the planning process for technology transfer.
APA, Harvard, Vancouver, ISO, and other styles
7

De Gaetani, Carlo Iapige, Mertkan Mert, and Federica Migliaccio. "Interoperability Analyses of BIM Platforms for Construction Management." Applied Sciences 10, no. 13 (June 27, 2020): 4437. http://dx.doi.org/10.3390/app10134437.

Full text
Abstract:
It is incontrovertible that an exchange of files is essentially required at several stages of the workflow in the architecture, engineering, and construction (AEC) industry. Therefore, investigating and detecting the capabilities/inabilities of building information modeling (BIM) software packages with respect to interoperability can be informative to stakeholders who exchange data between various BIM packages. The work presented in this paper includes a discussion on the interoperability of different software platforms commonly used in the AEC industry. Although, in theory, flawless interoperability of some types of files between different BIM platforms is ensured, in practical applications, this is not always the case. Hence, this research aims to identify faults in data exchange by assessing different possible scenarios where a sample Industry Foundation Classes (IFC) four-dimensions (4D) BIM model and related Gantt charts are exchanged. Throughout the interoperability analysis of both IFC file and Gantt charts, the following checks were carried out: geometrical and nongeometrical information exchange through IFC files, 4D information correct readability, and presence of missing schedule information in Gantt charts after their import/export procedure. The results show that interoperability between the analyzed platforms is not always ensured, providing useful insight into realistic scenarios.
APA, Harvard, Vancouver, ISO, and other styles
8

Gujar, Shubham Mohan, and Najla Shafighi. "Project Management in the Manufacturing Sector." Archives of Business Research 11, no. 8 (August 26, 2023): 257–70. http://dx.doi.org/10.14738/abr.118.15160.

Full text
Abstract:
This study will analyze the role of automation cloud-based project management software in managing and optimizing manufacturing plans and data. The objective is to understand the evolution of automated and cloud-based project management software like Jira and Asana by incorporating beneficial of traditional Gantt charts and work breakdown structures for manufacturing companies. The questionnaire was designed to collect data from 100 project managers employed in various manufacturing units. The data were quantitatively analyzed using both statistical analysis and a test of association. The objective was to understand the factors contributing to the automated and cloud-based project management software, and the challenges faced by the project managers in the incorporation of traditional Gantt charts and work breakdown structures, in the complex and time-consuming tasks associated with project management.
APA, Harvard, Vancouver, ISO, and other styles
9

Chang, Liang-Cheng. "Rethinking the Project Management Process by Using Unified Modeling Language." International Journal of Information Technology Project Management 6, no. 3 (July 2015): 58–73. http://dx.doi.org/10.4018/ijitpm.2015070104.

Full text
Abstract:
Project management skills such as WBS, Gantt Chart and PERT have been applied in many fields, but system analysts preferred UML to project tools. This article recommend transformation rules from project items into objects and project charts into UML diagrams, to model all project items and processes by using UML. Therefore, UML can be applied not only to system analysis and design, but also to entire project processes. Stakeholders in a project can rethink the project in terms of object orientation and communicate with system developers using the same tool as UML.
APA, Harvard, Vancouver, ISO, and other styles
10

Goemans, Michel X., and David P. Williamson. "Two-Dimensional Gantt Charts and a Scheduling Algorithm of Lawler." SIAM Journal on Discrete Mathematics 13, no. 3 (January 2000): 281–94. http://dx.doi.org/10.1137/s0895480197330254.

Full text
APA, Harvard, Vancouver, ISO, and other styles
More sources

Dissertations / Theses on the topic "Gantt charts"

1

Kantar, Martin. "Ganttovy diagramy." Master's thesis, Vysoké učení technické v Brně. Fakulta strojního inženýrství, 2014. http://www.nusl.cz/ntk/nusl-231384.

Full text
Abstract:
The thesis is aimed at Gantt charts. Primarily on their use in production processes, such as planning and scheduling. The thesis also includes an introduction, explaining what are the Gantt charts, for what are using and what is their principle. The thesis also includes analysis and software possibilities for implementing Gantt charts with using OOP. Programmatic and theoretical analysis of the various functions that are characteristic of Gantt charts, including their internal logic and program implementation. These programmed characteristic functions of Gantt charts were composed in the form of a DLL library, which provides a simple implementation of Gantt charts. By using this library is realized the software for production management. The work is included on the DVD, except the DLL itself software with detailed descriptions of each part of the source code.
APA, Harvard, Vancouver, ISO, and other styles
2

Vydrová, Michaela. "Plánování a realizace výstavbového projektu zhotovitelem." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227275.

Full text
Abstract:
This thesis deals with the planning and implementation of construction project by the contractor. In the theoretical part, I wrote the basic concepts of project management, construction participants and temporal models of construction. Furthermore, I focused on the public procurement and its by tendering documentation. In the practical part I focused on a specific project, where I proposed an alternative course of the contract and the contract followed from its very beginning to evaluation.
APA, Harvard, Vancouver, ISO, and other styles
3

Zacpal, Jan. "Řízení stavební zakázky ve stavebním podniku." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265417.

Full text
Abstract:
The thesis discusses the issues of organization of construction contracts from the perspective of the general contractor. The aim is to describe the principles, methods and tools for managing construction projects follow their camp on specific construction projects.
APA, Harvard, Vancouver, ISO, and other styles
4

Шамшина, Наталія Володимирівна, and Nataliia Volodymyrivna Shamshyna. "Комп’ютерне моделювання діаграми Ганта в Exсel." ФОП Цьома С. П, 2017. http://repository.sspu.sumy.ua/handle/123456789/2879.

Full text
Abstract:
Автор розглядає особливості проектної діаграми Ганта як засобу планування та управління проектами, описує історію виникнення діаграми Ганта, аналізує специфіку створення діаграми Ганта в Excel. Підкреслює, що комп’ютерне моделювання нестандартних діаграм сприяє інтелектуальному та творчому розвитку особистості.
The author considers the features of the Gantt chart as a means of planning and managing projects, describes the history of the appearance of the Gantt chart, analyzes the specifics of creating a Gantt chart in Excel. Notes, that computer modeling of non-standard diagrams contributes to the intellectual and creative development of the individual.
Автор рассматривает особенности проектной диаграммы Ганта как средства планирования и управления проектами, описывает историю возникновения диаграммы Ганта, анализирует специфику создания диаграммы Ганта в Excel. Отмечает, что компьютерное моделирование нестандартных диаграмм способствует интеллектуальному и творческому развитию личности.
APA, Harvard, Vancouver, ISO, and other styles
5

Fillner, Patrik. "Program pro optimalizaci provozu servisního střediska." Master's thesis, Vysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií, 2020. http://www.nusl.cz/ntk/nusl-433251.

Full text
Abstract:
This diploma thesis focuses on problematic about optimizing of service center and provides a base for creation of program for simulation and optimization. This diploma thesis also deals with hierarchical breakdown and logical structures of processes. Also there are quality determining methods and methods for visualization of processes.
APA, Harvard, Vancouver, ISO, and other styles
6

Šilon, Dávid. "Využití nástrojů projektového managementu v praxi." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2019. http://www.nusl.cz/ntk/nusl-402032.

Full text
Abstract:
The diploma thesis deals with the problematic of application project management methodology in creating a new e-commerce solution, with its base as an internet shop. The first part is devoted to defining theoretical solutions. In the second part there is an analysis of the environment and analysis of products, based on which a specific project proposal and its economic evaluation are elaborated in the last part.
APA, Harvard, Vancouver, ISO, and other styles
7

Straka, Nikolas. "Využití nástrojů projektového managementu v praxi." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2021. http://www.nusl.cz/ntk/nusl-444614.

Full text
Abstract:
The diploma thesis deals with the use of project management methods in practice, specifically the project design for the deployment of a suitable device for a mobile solution of a selected company. The introductory part is devoted to the theoretical basis, which are then used in the design part. The analytical part is focused on analyzing the project methodology of the selected company. The design part contains the actual design of the project phase of the project.
APA, Harvard, Vancouver, ISO, and other styles
8

Kubala, Matej. "Využití nástrojů projektového managementu v praxi." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2017. http://www.nusl.cz/ntk/nusl-318304.

Full text
Abstract:
This master's thesis focuses on using project management methods in implementation of Microsoft SharePoint 2013 product and creating intranet portal in Promokov a.s. At the beginning, thesis maps and describes actual situation by SLEPT analysis, SWOT analysis and analytic workshop made directly at the customer site. Last part is dedicated to the realization of recommended change.
APA, Harvard, Vancouver, ISO, and other styles
9

Mauder, Tomáš. "Optimalizační modely s aplikacemi v organizaci výroby." Master's thesis, Vysoké učení technické v Brně. Fakulta strojního inženýrství, 2008. http://www.nusl.cz/ntk/nusl-228134.

Full text
Abstract:
The diploma thesis deals with linear integer optimization in production logistics via mathematical programming. This tool is used for optimization of the time production schedule with a number of various jobs performed by a company with limited resources. The thesis solves the problem in conjunction with TOSHULIN, a.s. company, which is interested in solving the problem. As a result is the software implementation in which Gantt chart is created as its output.
APA, Harvard, Vancouver, ISO, and other styles
10

Zavadilová, Veronika. "Aplikace projektového řízení na proces osvojení nového produktu." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2017. http://www.nusl.cz/ntk/nusl-317069.

Full text
Abstract:
The master thesis deals with the application of the methodology of project management in a business case in the company Meopta - optika, s.r.o. following the product life cycle. After the company’s analysis, it evaluates the real project management solution focusing on the critical sides of project. The last chapter specifies solutions for effective project management and risk elimination.
APA, Harvard, Vancouver, ISO, and other styles
More sources

Books on the topic "Gantt charts"

1

Kirk, Andy. Gantt Chart. 1 Oliver’s Yard, 55 City Road, London EC1Y 1SP United Kingdom: SAGE Publications, Ltd., 2016. http://dx.doi.org/10.4135/9781529777161.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Lim, Chee Wah. An intelligent aid to scheduling with Gantt chart. [s.l: The Author], 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
3

1861-1919, Gantt Henry Laurence, ed. The Gantt chart: A working tool of management. U.S.A.]: General Books, 2013.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
4

Koivunen-Niemi, Laura. Learn to Create a Gantt Chart in R With Data From Wikipedia (2020). 1 Oliver’s Yard, 55 City Road, London EC1Y 1SP United Kingdom: SAGE Publications, Ltd., 2021. http://dx.doi.org/10.4135/9781529773347.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Trade, United States Congress House Committee on Ways and Means Subcommittee on. Proposals to conform the customs user fee on merchandise processing and the superfund tax differential with U.S. GATT obligations: Hearing before the Subcommittee on Trade of the Committee on Ways and Means, House of Representatives, One Hundred First Congress, first session, January 25, 1989. Washington: U.S. G.P.O., 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
6

Trade, United States Congress House Committee on Ways and Means Subcommittee on. Proposals to conform the customs user fee on merchandise processing and the superfund tax differential with U.S. GATT obligations: Hearing before the Subcommittee on Trade of the Committee on Ways and Means, House of Representatives, One Hundred First Congress, first session, January 25, 1989. Washington: U.S. G.P.O., 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
7

Trade, United States Congress House Committee on Ways and Means Subcommittee on. Proposals to conform the customs user fee on merchandise processing and the superfund tax differential with U.S. GATT obligations: Hearing before the Subcommittee on Trade of the Committee on Ways and Means, House of Representatives, One Hundred First Congress, first session, January 25, 1989. Washington: U.S. G.P.O., 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
8

Walter N. (Walter Nicholas) Polakov. Gantt Chart. Creative Media Partners, LLC, 2023.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
9

Peach, Ken. Managing Projects. Oxford University Press, 2017. http://dx.doi.org/10.1093/oso/9780198796077.003.0012.

Full text
Abstract:
This chapter reviews and provides examples of elements and techniques of project management. In the good old days, when conception to completion was a few months, the process of project management was relatively informal. However, with the increasing complexity and cost of projects, many routinely costing millions and some costing billions, the process has become more formalized. This chapter discusses the roles of the client, the sponsor, the leader, the manager and the team member. In addition, the three key parameters of project management, quality, cost and schedule, are defined and discussed. Finally, various project management methodologies and tools, such as work breakdown structures, Gantt charts and milestones, are presented.
APA, Harvard, Vancouver, ISO, and other styles
10

Gantt, Henry Laurence. Gantt Chart, a Working Tool of Management. Creative Media Partners, LLC, 2018.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
More sources

Book chapters on the topic "Gantt charts"

1

Nahmias, Steven. "Gantt Charts." In Encyclopedia of Operations Research and Management Science, 631–33. Boston, MA: Springer US, 2013. http://dx.doi.org/10.1007/978-1-4419-1153-7_375.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Bianconi, Francesco. "Gantt Charts." In Data and Process Visualisation for Graphic Communication, 175–81. Cham: Springer Nature Switzerland, 2024. http://dx.doi.org/10.1007/978-3-031-57051-3_13.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Mettler, Cory J. "Developing Gantt Charts." In Engineering Design, 213–31. Cham: Springer International Publishing, 2023. http://dx.doi.org/10.1007/978-3-031-23309-8_11.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Dunn, Mike. "Guns or Gantt Charts? — The Leadership Challenge for UK Defence." In The New Public Leadership Challenge, 99–118. London: Palgrave Macmillan UK, 2010. http://dx.doi.org/10.1057/9780230277953_7.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Nakamura, Shohei, and Yoshihiro Okada. "Co-browsing Cubic Gantt Charts with VR Goggles for Collaborative Immersive Visual Data Analytics." In Complex, Intelligent and Software Intensive Systems, 384–94. Cham: Springer Nature Switzerland, 2023. http://dx.doi.org/10.1007/978-3-031-35734-3_39.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Koehler, Wolfgang, and Yanguo Jing. "Automatic Generation of Improvement Suggestions for Legacy, PLC Controlled Manufacturing Equipment Utilizing Machine Learning." In Machine Learning for Cyber Physical Systems, 93–102. Berlin, Heidelberg: Springer Berlin Heidelberg, 2020. http://dx.doi.org/10.1007/978-3-662-62746-4_10.

Full text
Abstract:
AbstractThe manufacturing industry and, for this research, the automotive manufacturing industry specifically, is always on the lookout for opportunities to improve production throughput with a minimum of investment. Identifying these opportunities often requires the observation of the current production process by experts. This paper is the continuation of the previous work ’Automated, Nomenclature Based Data Point Selection for Industrial Event Log Generation’. One of its aims is to provide strategies that can be used to pre-process an in-depth, slightly flawed industrial equipment log to allow for further analysis. The pre-processing is achieved by identifying the flaws, removing the non-value added events and a heuristic methodology to cluster the log into individual sequences. Expert knowledge then is encoded into engineering features to extend the log matrix and prepare it for machine learning model generation for identification of the complete cases. To derive value from the available data, the sequences are plotted into Gantt charts, and eight hypotheses are introduced that allow for automated annotations within this chart to highlight potential areas of improvement. Application of the framework to real life logs, obtained from stations considered bottlenecks within the evaluated automotive body shop, lead to the discovery of improvement potential between two and twelve seconds per cycle.
APA, Harvard, Vancouver, ISO, and other styles
7

Nahler, Gerhard. "Gantt chart." In Dictionary of Pharmaceutical Medicine, 78. Vienna: Springer Vienna, 2009. http://dx.doi.org/10.1007/978-3-211-89836-9_582.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Cox, Karl. "Gantt Chart." In Business Analysis, Requirements, and Project Management, 123–35. Boca Raton: Auerbach Publications, 2021. http://dx.doi.org/10.1201/9781003168119-8.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Schwabish, Jonathan. "Gantt Chart." In Data Visualization in Excel, 111–23. New York: A K Peters/CRC Press, 2023. http://dx.doi.org/10.1201/9781003321552-13.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Pidaparti, Ramana. "Typical Gantt Chart." In Capstone Engineering Design, 22. Cham: Springer International Publishing, 2021. http://dx.doi.org/10.1007/978-3-031-79693-7_10.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Conference papers on the topic "Gantt charts"

1

Luz, Saturnino, and Masood Masoodian. "Comparing Static Gantt and Mosaic Charts for Visualization of Task Schedules." In 2011 15th International Conference Information Visualisation (IV). IEEE, 2011. http://dx.doi.org/10.1109/iv.2011.53.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Gupta, Shrey, Maxime Dumas, Michael J. McGuffin, and Thomas Kapler. "MovementSlicer: Better Gantt charts for visualizing behaviors and meetings in movement data." In 2016 IEEE Pacific Visualization Symposium (PacificVis). IEEE, 2016. http://dx.doi.org/10.1109/pacificvis.2016.7465265.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Freedman, Eric. "Mapping the Flow of Class Discussion With Gantt Charts: Two Examples From Ninth-Grade History." In 2019 AERA Annual Meeting. Washington DC: AERA, 2019. http://dx.doi.org/10.3102/1438084.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Krawczuk, Patrycja, George Papadimitriou, Shubham Nagarkar, Mariam Kiran, Anirban Mandal, and Ewa Deelman. "Anomaly Detection in Scientific Workflows using End-to-End Execution Gantt Charts and Convolutional Neural Networks." In PEARC '21: Practice and Experience in Advanced Research Computing. New York, NY, USA: ACM, 2021. http://dx.doi.org/10.1145/3437359.3465597.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Nafianto, Chandratya, Warih Puspitasari, and Muhardi Saputra. "Development of Flexible Production Scheduling by Applying Gantt Charts In Manufacturing Module Open Source ERP (Case Study CV. XYZ)." In 2019 International Conference on Sustainable Engineering and Creative Computing (ICSECC). IEEE, 2019. http://dx.doi.org/10.1109/icsecc.2019.8907025.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Farahat, Abdallah Magdy, and Domenico Defina. "Novel Adaptive Approach for Applying and Combining Traditional Waterfall and Agile Project Management Methodologies." In ADIPEC. SPE, 2022. http://dx.doi.org/10.2118/210867-ms.

Full text
Abstract:
Abstract In modern oil and gas projects, especially in brown field contexts, there are always challenges of working with uncertainties and un-definitions in particular at the late stage of project development. On the other hand, engineering firms need to adapt and implement these changes, in every phase of the development cycle, with high accuracy to reduce delay time and meet client expectations. Hybrid Agile methods ensure that change can be adopted during the development process since they are based on an empirical control model that works through frequent increments, inspections and adaptations. During a brownfield NGL project, EniProgetti Egypt was responsible for detailed design engineering activities to replace traditional cold box heat exchanger with Printed Circuit Heat Exchanger (PCHE). The early phase of the project was characterized by collaborations with involved stakeholders from operations and projects departments in order to define the requirements. Due to the fact that the project was executed in detail engineering following feasibility study neglecting the intermediate front-end engineering design (FEED) phase, there were several criticalities, project un-definitions, risks and uncertainties. This continuous change and uncertainties were a trigger to enable the hybrid agile project management approach, which combines waterfall model and agile. This approach was followed to allow the execution of the engineering design respecting quality standards, meeting deadlines and optimizing the project budget. The paper presents efficient ways to implement and tailor the agile approach in oil and gas projects and how it can be combined with the structured waterfall methodology. The Scrum framework was activated in the early stage of the project development to create the product backlog and categorize requirements and feature stories. Planning was done via Gantt-Agile to outline the devoted deliverable through multiple sprints and monitor performance with S-curve dashboards and burn down charts. The Scrumban with sprint cycles has been applied to each sprint, ending with a review and retrospective meeting to identify lessons learned and improve the remaining sprints. The findings presented in this paper are a novel adaptation of the Agile framework and the predictive methodology for oil and gas projects that determine the important tailor-made process that directly impacts the project success, which in turn helps formulate policies to ensure reliable planning and execution.
APA, Harvard, Vancouver, ISO, and other styles
7

Huang, Bang-fu, Xiao-lei Zhou, Gui-fang Zhang, and Zhe Shi. "Calculation Model of Turnover Steel Ladle Based on Gantt Chart." In 2014 International Conference on Materials Science and Energy Engineering (CMSEE 2014). WORLD SCIENTIFIC, 2015. http://dx.doi.org/10.1142/9789814678971_0002.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Bdair, Noor, Wael Alzyadat, and Shadi AlZubi. "Intelligent Model for Optimizing Gantt Chart in the Planning Stage." In 2023 International Conference on Information Technology (ICIT). IEEE, 2023. http://dx.doi.org/10.1109/icit58056.2023.10225762.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Fang Hua, Chen Tian, Xie Ying, and Sun Yu. "Order planning and scheduling of rod and wire production based on gantt chart." In 2014 11th World Congress on Intelligent Control and Automation (WCICA). IEEE, 2014. http://dx.doi.org/10.1109/wcica.2014.7053283.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Wang, J. Q., S. F. Zhang, J. Chen, S. Wang, and Y. F. Zhang. "Three-dimensional gantt chart based resource-constrained multiple projects scheduling and critical chain identification." In EM 2011). IEEE, 2011. http://dx.doi.org/10.1109/icieem.2011.6035465.

Full text
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!

To the bibliography