Academic literature on the topic 'Ganttův diagram'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Ganttův diagram.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Journal articles on the topic "Ganttův diagram"

1

Luz, Saturnino, and Masood Masoodian. "A comparison of linear and mosaic diagrams for set visualization." Information Visualization 18, no. 3 (2018): 297–310. http://dx.doi.org/10.1177/1473871618754343.

Full text
Abstract:
Linear diagrams have been shown to compare favourably to better known forms of set visualization, such as Venn and Euler diagrams, in supporting non-interactive assessment of set relationships. Recent studies that compared several variants of linear diagrams have demonstrated that users perform best at tasks involving identification of intersections, disjointness and subsets when using a horizontally drawn linear diagram with thin lines representing sets and employing vertical lines as guide lines. The essential visual task the user needs to perform in order to interpret this kind of diagram i
APA, Harvard, Vancouver, ISO, and other styles
2

Lee, Sangkon, and Olga A. Shvetsova. "Optimization of the Technology Transfer Process Using Gantt Charts and Critical Path Analysis Flow Diagrams: Case Study of the Korean Automobile Industry." Processes 7, no. 12 (2019): 917. http://dx.doi.org/10.3390/pr7120917.

Full text
Abstract:
This research is focused on the technology transfer process in the automobile industry using project management tools. The aim of this research is the development of a technology-transfer model using Gantt charts and Critical Path Analysis flow diagrams to achieve a sustainable planning process in the global environment. To achieve this goal, the authors use Gantt charts and Critical Path Analysis flow diagrams. The hypothesis and three research questions are presented, which suggest a relationship between project management tools and the sustainable planning process of technology transfer. Du
APA, Harvard, Vancouver, ISO, and other styles
3

Sochnev, Aleksei. "METHODS FOR PRESENTING PETRI NETS MODELING RESULTS OF PRODUCTION SYSTEMS." Applied Mathematics and Control Sciences, no. 2 (June 30, 2020): 29–40. http://dx.doi.org/10.15593/2499-9873/2020.2.02.

Full text
Abstract:
The article considers the issues of presenting the results of simulation experiments with models based on Petri nets for a researcher. The need for a qualitative review of the applied methods for visualizing Petri nets of both the processes themselves and the modeling results has been identified and justified. An analysis of publications on the subject of Petri nets allowed us to conclude that the visualization of such models and the results of their modeling is a known weak point. It is this factor that significantly limits the use of Petri nets as a tool for solving practical problems. The c
APA, Harvard, Vancouver, ISO, and other styles
4

ASTAWA, I. WAYAN YOGA, NI KETUT TARI TASTRAWATI, and LUH PUTU IDA HARINI. "WAKTU PENYELESAIAN PROYEK KONSTRUKSI MENGGUNAKAN PRECEDENCE DIAGRAM METHOD DAN LINE OF BALANCE." E-Jurnal Matematika 9, no. 3 (2020): 190. http://dx.doi.org/10.24843/mtk.2020.v09.i03.p298.

Full text
Abstract:
Project is any work that has a beginning and ending, consisting of several jobs/activities that must be carried out in a certain order. Contractors typically use the Gantt Chart Method in scheduling home construction projects so that it is difficult to know the impact caused by the late completion of work on scheduling the entire project. The purpose of this study is to determine the time needed to complete two housing units using the Precedence Diagram Method and the Line of Balance Method. The data used in this research are the dependency relationship between activities, time schedule, cost
APA, Harvard, Vancouver, ISO, and other styles
5

Hundley, Hayden E., Mark E. Hudson, Ajay D. Wasan, and Trent D. Emerick. "Chronic pain clinic efficiency analysis: optimization through use of the Gantt diagram and visit diagnoses." Journal of Pain Research Volume 12 (December 2018): 1–8. http://dx.doi.org/10.2147/jpr.s173345.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Biazzo, Stefano, Alberto Fabris, and Roberto Panizzolo. "Virtual Visual Planning: A Methodology to Assess Digital Project Management Tools." International Journal of Applied Research in Management and Economics 3, no. 4 (2020): 1–10. http://dx.doi.org/10.33422/ijarme.v3i4.505.

Full text
Abstract:
In contemporary Project Management literature and practice, it is possible to distinguish two paradigms: the algorithmic-rational paradigm and the relational paradigm. The algorithmic-rational paradigm is characterized by a sequence of programming methodologies that constitute the classic corpus of knowledge on Project Management (WBS, CPM, PERT, Gantt diagrams). Following the diffusion of Agile methods, dissatisfaction with the algorithmic-rational paradigm has spread and a Visual Planning approach, based on the decentralization of planning and control and the abandonment of algorithmic techn
APA, Harvard, Vancouver, ISO, and other styles
7

Chang, Liang-Cheng. "Rethinking the Project Management Process by Using Unified Modeling Language." International Journal of Information Technology Project Management 6, no. 3 (2015): 58–73. http://dx.doi.org/10.4018/ijitpm.2015070104.

Full text
Abstract:
Project management skills such as WBS, Gantt Chart and PERT have been applied in many fields, but system analysts preferred UML to project tools. This article recommend transformation rules from project items into objects and project charts into UML diagrams, to model all project items and processes by using UML. Therefore, UML can be applied not only to system analysis and design, but also to entire project processes. Stakeholders in a project can rethink the project in terms of object orientation and communicate with system developers using the same tool as UML.
APA, Harvard, Vancouver, ISO, and other styles
8

Ren, Shedong, Fangzhi Gui, Yanwei Zhao, Min Zhan, Wanliang Wang, and Jianqiang Zhou. "An Extenics-Based Scheduled Configuration Methodology for Low-Carbon Product Design in Consideration of Contradictory Problem Solving." Sustainability 13, no. 11 (2021): 5859. http://dx.doi.org/10.3390/su13115859.

Full text
Abstract:
Low-carbon product design involves a redesign process that requires not only structural module modification, but more importantly, generating innovative principles to solve design contradictions. Such contradictions include when current design conditions cannot satisfy design requirements or there are antithetical design goals. On the other hand, configuration tasks in the reconfiguration process are interdependent, which requires a well-scheduled arrangement to reduce feedback information. This study proposes an effective configuration methodology for low-carbon design. Firstly, configuration
APA, Harvard, Vancouver, ISO, and other styles
9

Zhang, Yin Zi, Liang Cai Cai, and Min Fan. "Schedule Management of Airport Flying Area Construction Based on BIM." Applied Mechanics and Materials 584-586 (July 2014): 2653–58. http://dx.doi.org/10.4028/www.scientific.net/amm.584-586.2653.

Full text
Abstract:
Airport flying area construction is a complex dynamic process. Its typical features including: complex construction process, large construction area, underground pipe trench interwoven and so on. Traditional construction schedule management of airport flying area is based on Gantt charts and network diagrams, which is generated before the construction, not supporting real-time updates. A preliminary exploration of BIM-based schedule management in airport flying area engineering is conducted. Using Civil3D,Revit, Navisworks and MS Project software, the construction image progress model can be e
APA, Harvard, Vancouver, ISO, and other styles
10

Cuadros Domínguez, Juan Froylán, and Jesús Cuauhtémoc Téllez Gaytán. "Sistema Único Integrado de Gestión: Calidad, Ambiente, Seguridad y Salud." Teuken Bidikay - Revista Latinoamericana de Investigación en Organizaciones, Ambiente y Sociedad 10, no. 14 (2019): 121–56. http://dx.doi.org/10.33571/teuken.v10n14a6.

Full text
Abstract:
El artículo propone un Sistema Único Integrado (SUI) para fortalecer los sistemas de gestión ISO 9001, ISO 14001, OHSAS 18001 y Código ISM de cuatro unidades de negocio de un corporativo que opera en la industria petrolera marina en Méjico, en un entorno competitivo. La investigación es cuantitativa y parte del análisis de procesos, la consulta y selección de elementos específicos para mejorar la competitividad y desarrollar una propuesta de SUI alineada con el control interno. Se plantean indicadores de desempeño de procesos y se implementan a través de un diagrama de Gantt. Las limitaciones
APA, Harvard, Vancouver, ISO, and other styles
More sources

Dissertations / Theses on the topic "Ganttův diagram"

1

Číšecký, Jakub. "Zlepšení systému managementu kvality." Master's thesis, Vysoké učení technické v Brně. Fakulta strojního inženýrství, 2017. http://www.nusl.cz/ntk/nusl-318660.

Full text
Abstract:
This diploma thesis deals with the optimization of the production process, namely the assembly of the machine tool. It contains a detailed description of the assembly process and its integration throughout the standard business case. The PERT method is used as the main optimization tool, complemented by a Gantt diagram. The aim is to design a process for more efficient production planning.
APA, Harvard, Vancouver, ISO, and other styles
2

Hortová, Šárka. "Návrh projektu výstavby výzkumného centra." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2014. http://www.nusl.cz/ntk/nusl-224785.

Full text
Abstract:
This diploma thesis deals with creating a project proposal of the research center construction according to the required specifications by SEDOX Company Ltd. The theoretical part describes the basic knowledge and tools of a project management – analytical tools for evaluating the financial and time project costs, also risk analysis relating to competitiveness and maintaining on top of the market. The third part is devoted to the current situation of the development application market. There is the complete proposal of the research centre construction, using the tools according to the IPMA (Int
APA, Harvard, Vancouver, ISO, and other styles
3

Bordovský, Ondřej. "Analýza procesu řízení projektů." Master's thesis, Vysoké učení technické v Brně. Fakulta strojního inženýrství, 2008. http://www.nusl.cz/ntk/nusl-228202.

Full text
Abstract:
This diploma thesis is engaged in project management , Královopolská Brno. The company belongs to the biggest Czech crane and hoist device manufacturers. The subject of this diploma thesis is the analysis of projects. Detection of bottlenecks in the project management process and suggest improvment ideas.
APA, Harvard, Vancouver, ISO, and other styles
4

Zavadilová, Veronika. "Aplikace projektového řízení na proces osvojení nového produktu." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2017. http://www.nusl.cz/ntk/nusl-317069.

Full text
Abstract:
The master thesis deals with the application of the methodology of project management in a business case in the company Meopta - optika, s.r.o. following the product life cycle. After the company’s analysis, it evaluates the real project management solution focusing on the critical sides of project. The last chapter specifies solutions for effective project management and risk elimination.
APA, Harvard, Vancouver, ISO, and other styles
5

Vodák, Marek. "Návrh projektu pro zavedení voicebota." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2020. http://www.nusl.cz/ntk/nusl-416897.

Full text
Abstract:
Diploma thesis proposes the project for voicebot implementation. The thesis explains possible use of this technology in the context of the company and analyzes the current situation. Using project management tools the project is designed which can be used for implementation of this technology.
APA, Harvard, Vancouver, ISO, and other styles
6

Sokol, Jan. "Plán změny ICT infrastruktury v kancelářské budově." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2010. http://www.nusl.cz/ntk/nusl-222488.

Full text
Abstract:
The main goal of this work is to make complete project plan of a computer network for an office building of Markagro, s.r.o. company. The project will contain all information necessary to implement new data infrastructure. Plan of its implementation will contains detailed specification of individual activities and their time allocation
APA, Harvard, Vancouver, ISO, and other styles
7

Oliva, Radek. "Aplikace pro tvorbu kalkulací, nabídek a smluv v oblasti destination event managementu." Master's thesis, Vysoká škola ekonomická v Praze, 2017. http://www.nusl.cz/ntk/nusl-358845.

Full text
Abstract:
The aim of this master thesis is to develop an application for creating calculations and offers to potential customers and to develop an application for managing Gantt charts. These applications will be in future used for implementation to the information system of Wedding in Prague Inc. company. Along with the development of applications author of this thesis aims to design, create and implement a fully functional database to support the applications. Before the development of the applications the revision of the submitters demands and the revision of previously designed interface are made. I
APA, Harvard, Vancouver, ISO, and other styles
8

Hubert, Michal. "Využití metod projektového řízení ve vybraném podniku." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2017. http://www.nusl.cz/ntk/nusl-318584.

Full text
Abstract:
The goal of the thesis is to create a project documentation for extencion of services in selected company, which is focused on selling sport cameras in store in Prague and also with e-shop. For create were used the methods of project management.
APA, Harvard, Vancouver, ISO, and other styles
9

Šatalíková, Bohumila. "Řízení projektů s pomocí MS Excel." Master's thesis, Vysoká škola ekonomická v Praze, 2010. http://www.nusl.cz/ntk/nusl-75582.

Full text
Abstract:
The thesis discusses the possibilities of project management and analysis and it is focused on solving project analysis using the network analysis. The text describes chosen used methods of analysis. This text together with other findings in the theoretical part is used in the solution of practice part. The aim of this thesis was to create a functional Microsoft Project-based add-in of Microsoft Excel to ensure planning and management of simple projects. This created add-in can manage the project, manage project resources, allocate these resources to individual project activities and carry out
APA, Harvard, Vancouver, ISO, and other styles
10

Caha, Lukáš. "Využití nástrojů projektového managementu v praxi." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2017. http://www.nusl.cz/ntk/nusl-318611.

Full text
Abstract:
This diploma thesis deals with a project management issue. The aim of the thesis is to propose a project for the implementation of information system in a selected company with the use of theoretical knowledge discussed in the second chapter. The third chapter contains information about this company and the analysis of ice hockey statistical systems. In the fourth part of the thesis is presented the proposal of project documentation for the implementation and the benefits of suggested solutions.
APA, Harvard, Vancouver, ISO, and other styles
More sources

Books on the topic "Ganttův diagram"

1

Pinargote Chóez, Jesús de los Santos, Gema Monserrate Conforme Cedeño, Mercedes Marcela Pincay Pilay, Rosario Magdalena Romero Castro, and Vicente Fray Romero Castro. La gestión de proyectos desde la formación de equipos, gestión de cambios y la planificación mediante los diagramas de Gantt. Editorial Científica 3Ciencias, 2020. http://dx.doi.org/10.17993/ecoorgycso.2020.61.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Book chapters on the topic "Ganttův diagram"

1

Bosveld-de Smet, Leonie, and Daniël Houben. "Map or Gantt? Which Diagram Helps Viewers Best in Spatio-Temporal Data Exploration Tasks?" In Diagrammatic Representation and Inference. Springer International Publishing, 2020. http://dx.doi.org/10.1007/978-3-030-54249-8_28.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Gelbard, Roy, Jeffrey Kantor, and Liran Edelist. "Integrating Software Engineering and Costing Aspects within Project Management Tools." In Encyclopedia of Information Communication Technology. IGI Global, 2009. http://dx.doi.org/10.4018/978-1-59904-845-1.ch059.

Full text
Abstract:
This study proposes and prototypes a model that integrates these three aspects of software projects by automatically mapping SE objects and accounting–costing objects into PM objects. To validate the feasibility of the model and without loss of generality, it is demonstrated using former research platform focused on conversion of data flow diagrams (DFD), which are actually full enterprise set of use cases diagrams reflecting entire system-software project into Gantt charts.
APA, Harvard, Vancouver, ISO, and other styles
3

Gelbard, Roy, Jeffrey Kantor, and Liran Edelist. "Integrating Software Engineering and Costing Aspects within Project Management Tools." In Information Resources Management. IGI Global, 2010. http://dx.doi.org/10.4018/978-1-61520-965-1.ch308.

Full text
Abstract:
This study proposes and prototypes a model that integrates these three aspects of software projects by automatically mapping SE objects and accounting–costing objects into PM objects. To validate the feasibility of the model and without loss of generality, it is demonstrated using former research platform focused on conversion of data flow diagrams (DFD), which are actually full enterprise set of use cases diagrams reflecting entire system-software project into Gantt charts.
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!