Journal articles on the topic 'Generalized tardiness flow shop'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the top 50 journal articles for your research on the topic 'Generalized tardiness flow shop.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.
Park, Myoung-Ju, Byung-Cheon Choi, Yunhong Min, and Kyung Min Kim. "Two-Machine Ordered Flow Shop Scheduling with Generalized Due Dates." Asia-Pacific Journal of Operational Research 37, no. 01 (2020): 1950032. http://dx.doi.org/10.1142/s0217595919500325.
Full textFarhad, Ghassemi-Tari, and Meshkinfam Sareh. "Improving Performance of GAs by Use of Selective Breading Evolutionary Process." Improving Performance of GAs by Use of Selective Breading Evolutionary Process 22, no. 3 (2017): 1–21. https://doi.org/10.9734/BJMCS/2017/33498.
Full textİnal, Ali Fırat, Çağrı Sel, Adnan Aktepe, Ahmet Kürşad Türker, and Süleyman Ersöz. "A Multi-Agent Reinforcement Learning Approach to the Dynamic Job Shop Scheduling Problem." Sustainability 15, no. 10 (2023): 8262. http://dx.doi.org/10.3390/su15108262.
Full textKoulamas, Christos. "The proportionate flow shop total tardiness problem." European Journal of Operational Research 284, no. 2 (2020): 439–44. http://dx.doi.org/10.1016/j.ejor.2020.01.002.
Full textBestari, Hana Merlina Hesti, Pratya Poeri Suryadhini, and Nopendri Nopendri. "Flow Shop Scheduling Using a Combination of Ant Colony Optimization Algorithm and Tabu Search Algorithm to Minimize Total Tardiness." Jurnal Teknik Industri: Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri 10, no. 2 (2024): 383. http://dx.doi.org/10.24014/jti.v10i2.32320.
Full textDe Bontridder, K. M. J. "Minimizing Total Weighted Tardiness in a Generalized Job Shop." Journal of Scheduling 8, no. 6 (2005): 479–96. http://dx.doi.org/10.1007/s10951-005-4779-7.
Full textPan, Jason Chao-Hsien, Jen-Shiang Chen, and Chii-Ming Chao. "Minimizing tardiness in a two-machine flow-shop." Computers & Operations Research 29, no. 7 (2002): 869–85. http://dx.doi.org/10.1016/s0305-0548(00)00090-3.
Full textFaccio, Maurizio, Mojtaba Nedaei, and Francesco Pilati. "A Comparative Analysis of Job Scheduling for Optimum Performance of Parallel Machines by Considering the Energy Consumption." European Journal of Engineering Research and Science 3, no. 9 (2018): 6. http://dx.doi.org/10.24018/ejers.2018.3.9.841.
Full textFaccio, Maurizio, Mojtaba Nedaei, and Francesco Pilati. "A Comparative Analysis of Job Scheduling for Optimum Performance of Parallel Machines by Considering the Energy Consumption." European Journal of Engineering and Technology Research 3, no. 9 (2018): 6–11. http://dx.doi.org/10.24018/ejeng.2018.3.9.841.
Full textOnwubolu, Godfrey C., and Michael Mutingi. "Genetic algorithm for minimizing tardiness in flow-shop scheduling." Production Planning & Control 10, no. 5 (1999): 462–71. http://dx.doi.org/10.1080/095372899232993.
Full textChandra, Pankaj, Peeyush Mehta, and Devanath Tirupati. "Permutation flow shop scheduling with earliness and tardiness penalties." International Journal of Production Research 47, no. 20 (2009): 5591–610. http://dx.doi.org/10.1080/00207540802124301.
Full textZhao, Fu Qing, and Ning Li. "Flow Time and Tardiness Based on New Scheduling Rules for Dynamic Shop Scheduling with Machine Breakdown." Applied Mechanics and Materials 556-562 (May 2014): 4412–16. http://dx.doi.org/10.4028/www.scientific.net/amm.556-562.4412.
Full textBang Do-Ly, Linh Nguyen-Thuy, Thang Nguyen-Quoc, Uyen Phung-Duy, and Ngoc-Hien Do. "Job shop scheduling with combinatorial priority rules in a furniture company." World Journal of Advanced Engineering Technology and Sciences 10, no. 2 (2023): 213–22. http://dx.doi.org/10.30574/wjaets.2023.10.2.0312.
Full textPrathipati, Nikhil, K.N.Phanindra, Chalapathi P.Venkata, Ikram Mohammed, and B.Akhil. "Flexible Job Shop Scheduling using Software." International Journal of Engineering and Advanced Technology (IJEAT) 9, no. 3 (2020): 67–70. https://doi.org/10.35940/ijeat.B3430.029320.
Full textKaracan, Ismet, Ozlem Senvar, and Serol Bulkan. "A Novel Parallel Simulated Annealing Methodology to Solve the No-Wait Flow Shop Scheduling Problem with Earliness and Tardiness Objectives." Processes 11, no. 2 (2023): 454. http://dx.doi.org/10.3390/pr11020454.
Full textKapoor, Eirtty, Ashish Kumar, and Devendra Singh. "Energy-Efficient Flexible Flow Shop Scheduling With Due Date and Total Flow Time." International Journal on Recent and Innovation Trends in Computing and Communication 11, no. 2s (2023): 259–67. http://dx.doi.org/10.17762/ijritcc.v11i2s.6145.
Full textManoharan, Chandrasekaran. "AIS-SFHM APPROACH FOR OPTIMIZATION OF MULTI OBJECTIVE JOB SHOP PROBLEMS." JOURNAL OF ADVANCES IN CHEMISTRY 13, no. 7 (2017): 6363–68. http://dx.doi.org/10.24297/jac.v13i7.5633.
Full textKaweegitbundit, Parinya. "Evaluation Dispatching Rules for Two-Stage Hybrid Flow Shop Scheduling with Parallel Machines." Applied Mechanics and Materials 152-154 (January 2012): 1487–91. http://dx.doi.org/10.4028/www.scientific.net/amm.152-154.1487.
Full textEngin, Orhan, and Batuhan Engin. "Hybrid flow shop with multiprocessor task scheduling based on earliness and tardiness penalties." Journal of Enterprise Information Management 31, no. 6 (2018): 925–36. http://dx.doi.org/10.1108/jeim-04-2017-0051.
Full textOuchiekh, R., M. Fri, A. Touil, and A. Echchatbi. "Total Weighted Tardiness in the Permutation Flow Shop under Uncertainty." IFAC-PapersOnLine 54, no. 1 (2021): 1174–80. http://dx.doi.org/10.1016/j.ifacol.2021.08.138.
Full textXiao, Yi-Yong, Ren-Qian Zhang, Qiu-Hong Zhao, and Ikou Kaku. "Permutation flow shop scheduling with order acceptance and weighted tardiness." Applied Mathematics and Computation 218, no. 15 (2012): 7911–26. http://dx.doi.org/10.1016/j.amc.2012.01.073.
Full textSchaller, Jeffrey, and Jorge M. S. Valente. "Minimizing total earliness and tardiness in a nowait flow shop." International Journal of Production Economics 224 (June 2020): 107542. http://dx.doi.org/10.1016/j.ijpe.2019.107542.
Full textLakshmipathy, D., M. Chandrasekaran, T. Balamurugan, and P. Sriramya. "A New GT Heuristic for Solving Multi Objective Job Shop Scheduling Problems." Applied Mechanics and Materials 591 (July 2014): 184–88. http://dx.doi.org/10.4028/www.scientific.net/amm.591.184.
Full textLi, Shi-Sheng, De-Liang Qian, and Ren-Xia Chen. "Proportionate Flow Shop Scheduling with Rejection." Asia-Pacific Journal of Operational Research 34, no. 04 (2017): 1750015. http://dx.doi.org/10.1142/s0217595917500154.
Full textHuang, Rong-Hwa, and Shun-Chi Yu. "Clarifying Cutting and Sewing Processes with Due Windows Using an Effective Ant Colony Optimization." Mathematical Problems in Engineering 2013 (2013): 1–12. http://dx.doi.org/10.1155/2013/182598.
Full textMansouri, Milad, Hacene Smadi, and Younes Bahmani. "Multi-objective optimization in an identical parallel flow shop scheduling problem with waiting time constraint." STUDIES IN ENGINEERING AND EXACT SCIENCES 5, no. 2 (2024): e12011. https://doi.org/10.54021/seesv5n2-752.
Full textHertrich, Christoph, Christian Weiß, Heiner Ackermann, Sandy Heydrich, and Sven O. Krumke. "Scheduling a proportionate flow shop of batching machines." Journal of Scheduling 23, no. 5 (2020): 575–93. http://dx.doi.org/10.1007/s10951-020-00667-2.
Full textBank, M., S. M. T. Fatemi Ghomi, F. Jolai, and J. Behnamian. "Two-machine flow shop total tardiness scheduling problem with deteriorating jobs." Applied Mathematical Modelling 36, no. 11 (2012): 5418–26. http://dx.doi.org/10.1016/j.apm.2011.12.010.
Full textXiao, Yiyong, Yingying Yuan, Ren-Qian Zhang, and Abdullah Konak. "Non-permutation flow shop scheduling with order acceptance and weighted tardiness." Applied Mathematics and Computation 270 (November 2015): 312–33. http://dx.doi.org/10.1016/j.amc.2015.08.011.
Full textBülbül, Kerem, Philip Kaminsky, and Candace Yano. "Flow shop scheduling with earliness, tardiness, and intermediate inventory holding costs." Naval Research Logistics (NRL) 51, no. 3 (2004): 407–45. http://dx.doi.org/10.1002/nav.20000.
Full textBrahma, Datta Shukla *. &. Pragya Singh Tomar. "OPTIMIZATION OF FLOW SHOP SCHEDULING USING MATLAB." INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY 7, no. 9 (2018): 323–29. https://doi.org/10.5281/zenodo.5150000.
Full textHuang, Rong Hwa, Tung Han Yu, and Chang Lin Yang. "Multiprocessor Flow Shop Scheduling Problem with Common due Window." Applied Mechanics and Materials 284-287 (January 2013): 3712–16. http://dx.doi.org/10.4028/www.scientific.net/amm.284-287.3712.
Full textPeng, Chen, Tao Peng, Yi Zhang, Renzhong Tang, and Luoke Hu. "Minimising Non-Processing Energy Consumption and Tardiness Fines in a Mixed-Flow Shop." Energies 11, no. 12 (2018): 3382. http://dx.doi.org/10.3390/en11123382.
Full textKurniawati, Dwi Agustina, and Yoga Isnaini Nugroho. "Computational Study of N-Job M-Machine Flow Shop Scheduling Problems: SPT, EDD, NEH, NEH-EDD, and Modified-NEH Algorithms." Journal of Advanced Manufacturing Systems 16, no. 04 (2017): 375–84. http://dx.doi.org/10.1142/s0219686717500226.
Full textLee, Wen-Chiung, and Chin-Chia Wu. "Minimizing the total flow time and the tardiness in a two-machine flow shop." International Journal of Systems Science 32, no. 3 (2001): 365–73. http://dx.doi.org/10.1080/002077201300029746.
Full textGopinath, S., C. Arumugam, Tom Page, and M. Chandrasekaran. "Solving Multi Objective Job Shop Scheduling Problems Using Artificial Immune System Shifting Bottleneck Approach." Applied Mechanics and Materials 766-767 (June 2015): 1209–13. http://dx.doi.org/10.4028/www.scientific.net/amm.766-767.1209.
Full textWitkowski, T., P. Antczak, and A. Antczak. "Multi-objective decision making and search space for the evaluation of production process scheduling." Bulletin of the Polish Academy of Sciences: Technical Sciences 57, no. 3 (2009): 195–208. http://dx.doi.org/10.2478/v10175-010-0121-4.
Full textSharma, Pankaj, and Ajai Jain. "Effect of routing flexibility and sequencing rules on performance of stochastic flexible job shop manufacturing system with setup times: Simulation approach." Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 231, no. 2 (2016): 329–45. http://dx.doi.org/10.1177/0954405415576060.
Full textSonata, Fifin, and Dede Prabowo Wiguna. "Analisis Perbandingan Aggregat Of Function (AOF) dengan Non-Dominated Sorting Genetic Algorithm (NSGA-II) dalam Menentukan Optimasi Multi-Objective pada Penjadwalan Mesin Produksi Flow Shop." Jurnal SAINTIKOM (Jurnal Sains Manajemen Informatika dan Komputer) 17, no. 2 (2018): 158. http://dx.doi.org/10.53513/jis.v17i2.39.
Full textPhanden, Rakesh Kumar, Ajai Jain, and Rajiv Verma. "A Genetic Algorithm-Based Approach for Flexible Job Shop Scheduling." Applied Mechanics and Materials 110-116 (October 2011): 3930–37. http://dx.doi.org/10.4028/www.scientific.net/amm.110-116.3930.
Full textPaprocka, Iwona, Wojciech M. Kempa, Krzysztof Kalinowski, and Cezary Grabowik. "On Pareto Optimal Solution for Production and Maintenance Jobs Scheduling Problem in a Job Shop and Flow Shop with an Immune Algorithm." Advanced Materials Research 1036 (October 2014): 875–80. http://dx.doi.org/10.4028/www.scientific.net/amr.1036.875.
Full textK.T., Vinod, S. Prabagaran, and O. A. Joseph. "Dynamic due date assignment method." Journal of Manufacturing Technology Management 30, no. 6 (2019): 987–1003. http://dx.doi.org/10.1108/jmtm-06-2017-0112.
Full textSchaller, Jeffrey. "Scheduling a permutation flow shop with family setups to minimise total tardiness." International Journal of Production Research 50, no. 8 (2012): 2204–17. http://dx.doi.org/10.1080/00207543.2011.575094.
Full textChen *, J. S., and J. C. H. Pan. "Minimising mean tardiness with alternative operations in two-machine flow-shop scheduling." International Journal of Systems Science 36, no. 12 (2005): 757–66. http://dx.doi.org/10.1080/00207720500219237.
Full textNagano, Marcelo Seido, Adriano Seiko Komesu, and Hugo Hissashi Miyata. "An evolutionary clustering search for the total tardiness blocking flow shop problem." Journal of Intelligent Manufacturing 30, no. 4 (2017): 1843–57. http://dx.doi.org/10.1007/s10845-017-1358-7.
Full textKharbeche, M., and M. Haouari. "MIP models for minimizing total tardiness in a two-machine flow shop." Journal of the Operational Research Society 64, no. 5 (2013): 690–707. http://dx.doi.org/10.1057/jors.2012.89.
Full textGhassemi Tari, Farhad, and Laya Olfat. "Heuristic rules for tardiness problem in flow shop with intermediate due dates." International Journal of Advanced Manufacturing Technology 71, no. 1-4 (2013): 381–93. http://dx.doi.org/10.1007/s00170-013-5478-8.
Full textLin, Zheng Ying, and Wei Zhang. "Study on Multi-Objective Optimization of Hybrid Flow Shop Scheduling Problem." Advanced Materials Research 1082 (December 2014): 529–34. http://dx.doi.org/10.4028/www.scientific.net/amr.1082.529.
Full textXu, Xiao Qiang, and De Ming Lei. "A Parallel Iterated Local Search for Two-Agent Flow Shop Scheduling." Advanced Materials Research 926-930 (May 2014): 3476–84. http://dx.doi.org/10.4028/www.scientific.net/amr.926-930.3476.
Full textEl Khoukhi, Fatima, Tarik Lamoudan, Jaouad Boukachour, and Ahmed El Hilali Alaoui. "Ant Colony Algorithm for Just-in-Time Job Shop Scheduling with Transportation Times and Multirobots." ISRN Applied Mathematics 2011 (June 22, 2011): 1–19. http://dx.doi.org/10.5402/2011/165620.
Full text