Books on the topic 'Hydroelectric power plants. Electric power-plants'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 books for your research on the topic 'Hydroelectric power plants. Electric power-plants.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse books on a wide variety of disciplines and organise your bibliography correctly.

1

Koch, C. Peter. Small hydroelectric design manual. New Westminster, B.C. (512 Sharpe St., New Westminster V3M 4R2): C.P. Koch, 1990.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
2

Hydro, Ontario. Ontario Hydro's history and description of hydro-electric generating stations. [Toronto]: Ontario Hydro, 1991.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
3

Hydro-electric and pumped storage plants. New York: Wiley, 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
4

United States. Bureau of Reclamation. Denver Office. Engineering Division. Review of power operation and maintenance program: Review report : power operations, lower Colorado region. Denver, Colo: Engineering Division, Denver Office, Bureau of Reclamation, U.S. Dept. of the Interior, 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
5

United States. Bureau of Reclamation. Denver Office. Engineering Division. Review of power operation and maintenance program: Review report : communication and control, Central Snake Project, Grand Coulee Project, Columbia Basin Project, August 21-24, 1989, Pacific Northwest Region. Denver, Colo: Engineering Division, Denver Office, Bureau of Reclamation, U.S. Dept. of the Interior, 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
6

Energy, Ontario Ministry of. Small hydro international marketing study. [Toronto]: Ontario Ministry of Energy, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
7

Hydro, Manitoba. A History of hydro-electric power in Manitoba. [Winnipeg: Manitoba Hydro, 1986.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
8

MultiTech (Firm : Butte, Mont.). Small-scale hydroelectric potential of the Mill Diversion Channel in Lewistown, Montana. Helena, Mont. (1520 E. 6th Ave., Helena 59620): The Program, 1985.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
9

Varaschin, Denis. Le patrimoine industriel de l'électricité et de l'hydroélectricité: Actes du colloque international de Divonne-les-Bains et de Genève. Chambéry: Université de Savoie, UFR Lettres, langues, sciences humaines, Laboratoire Langages, littératures, sociétés, 2009.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
10

D, Boyce R., Bultsma M. L, and Montana Water Resources Division, eds. Effects of future irrigation development of hydroelectric generation in the Clark Fork River Basin: Final project report. Bozeman, Mont: Dept. of Civil and Agricultural Engineering, Montana State University, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
11

Converse, V. G. The electrical plant of the Ontario Power Company. Niagara Falls [Ont.]: Ontario Power, 1994.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
12

Kauppi, Olli. A model of imperfect dynamic competition in the Nordic power market. Helsinki: Helsinki School of Economics, 2009.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
13

Kauppi, Olli. A model of imperfect dynamic competition in the Nordic power market. Helsinki: Helsinki School of Economics, 2009.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
14

Hydropower development in West Africa: A study in resource development. New York: P. Lang, 1990.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
15

A, Soliman S., ed. Optimal long-term operation of electric power systems. New York: Plenum Press, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
16

Simpósio do Curso de Pós-graduação em Ciências da Engenharia Ambiental (7th 2001 São Carlos, São Paulo, Brazil). Recursos hidroenergéticos: Usos, impactos e planejamento integrado. São Carlos: RiMa, 2002.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
17

Seminário Nacional de Produção e Transmissão de Energia Elétrica (9th 1987 Belo Horizonte, Brazil). IX Seminário Nacional de Produção e Transmissão de Energia Elétrica: Belo Horizonte, 25 a 29 de outubro de 1987. [Belo Horizonte, Brazil?]: CEMIG, 1987.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
18

Miguel, Ramón Ojeda San. Aquellas viejas "Fábricas de luz": La explosión del mundo hidroeléctrico en la cuenca alta del Ebro. [Miranda de Ebro, Spain]: Instituto Municipal de Historia, 1998.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
19

United States. Office of Hydropower Licensing. Condit hydroelectric project: FERC no. 2342-005, Washington : final environmental impact statement. Washington, D.C. (888 First St., NE, Washington 20426): Office of Hydropower Licensing, Division of Licensing and Compliance, 1996.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
20

Hayeur, Gaétan. Summary of knowledge acquired in northern environments from 1970 to 2000. [Montréal]: Hydro-Québec, 2001.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
21

United States. Federal Energy Regulatory Commission. Hydroelectric project relicensing handbook. Washington, DC: Office of Hydropower Licensing, Federal Energy Regulatory Commission, 1990.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
22

Exchange, German Appropriate Technology, ed. Itaipú: Basic geopolitical and energy situation : socio-economic and ecological consequences of the Itaipú dam and reservoir on the Rio Paraná (Brazil/Paraguay). Braunschweig: F. Vieweg, 1987.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
23

Prinsenberg, S. J. Effects of hydro-electric projects on Hudson Bay's marine and ice environments. Ottawa: Hudson Bay Programme = Programme sur la Baie d'Hudson, 1994.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
24

Agência Nacional de Energia Elétrica (Brazil). Oportunidades de negócios em empreendimentos hidrelétricos. Brasília: ANEEL, Agência Nacional de Energia Elétrica, 2001.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
25

Administration, Bonneville Power. Record of decision, final environmental impact statement, initial Northwest Power Act power sales contracts. Portland, Or: U.S. Dept. of Energy, Bonneville Power Administration, 1992.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
26

Moreira, Ajax R. B. Regulação e o investimento em termo geração no Brasil. Rio de Janeiro: IPEA, 2001.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
27

United States. Congress. House. Committee on Resources. Subcommittee on Water and Power Resources. Maximizing power generation at federal facilities: Oversight hearing before the Subcommittee on Water and Power of the Committee on Resources, U.S. House of Representatives, One Hundred Seventh Congress, first session, April 26, 2001. Washington: U.S. G.P.O., 2002.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
28

As tensões do lugar: Hidrelétricas, sujeitos e licenciamento ambiental. Belo Horizonte: EDUFMG, 2011.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
29

Waldram, James B. The impact of hydro-electric development upon a northern Manitoba native community. Ann Arobr, Mich: University Microfilms International, 1998.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
30

Waldram, James B. The impact of hydro-electric development upon a northern Manitoba native community. Ann Arobr, Mich: University Microfilms International, 1998.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
31

Myllyntaus, Timo. Phases of a network: From a breakthrough to a national system. [Helsinki]: Fingrid Oyj, 1999.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
32

Hydro-electric license in Alaska: Report (to accompany S. 1843). [Washington, D.C: U.S. G.P.O., 2002.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
33

United States. Congress. Senate. Committee on Energy and Natural Resources. Hydro-electric license in Alaska: Report (to accompany S. 1843). [Washington, D.C: U.S. G.P.O., 2002.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
34

Teixeira, Maria Gracinda C. Energy policy in Latin America: Social and environmental dimensions of hydropower in Amazônia. Aldershot, Hants, England: Avebury, 1996.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
35

Company, British Columbia Electric Railway. A short account of the plant and operations of the British Columbia Electric Railway Company, Limited and the Vancouver Power Company and the Vancouver Island Power Company. Vancouver: [s.n.], 1995.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
36

British Columbia Electric Railway Company. A short account of the plant and operations of the British Columbia Electric Railway Company, Limited, the Vancouver Power Company, Limited and the Vancouver Island Power Company, Limited. [Vancouver?: s.n.], 1995.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
37

Goldsmith, K. Small hydro international market and Canadian suppliers and services. Ottawa: Hydraulic Energy, 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
38

Torres, Eugenio Latimer. Historia de la Autoridad de Energía Eléctrica: Implantación de los sistemas de luz y fuerza en Puerto Rico 1893-1993. [S.l: s.n.], 1997.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
39

Peat, Neville. Manapouri saved!: New Zealand's first great conservation success story : integrating nature conservation with hydro-electric development of Lakes Manapouri and Te Anau, Fiordland National Park. Dunedin: Longacre Press for the Guardians of Lakes Manapouri, Monowai, and Te Anau, 1994.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
40

Strauss, Hannah. For the good of society: Public participation in the siting of nuclear and hydro power projects in Finland. Oulu: University of Oulu, 2011.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
41

Administration, Bonneville Power. Tenaska Washington II generation project record of desision. Portland, Or: Dept. of Energy, Bonneville Power Administration, 1992.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
42

Providing for the consideration of H.R. 3986, to provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington: Report (to accompany H. Res. 581). [Washington, D.C: U.S. G.P.O., 2000.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
43

United States. Congress. House. Committee on Rules. Providing for the consideration of H.R. 3986, to provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington: Report (to accompany H. Res. 581). [Washington, D.C: U.S. G.P.O., 2000.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
44

US GOVERNMENT. An Act to Provide for a Study of the Engineering Feasibility of a Water Exchange in Lieu of Electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington. [Washington, D.C: U.S. G.P.O., 2000.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
45

Cremoux, Raúl. Relatos de luz. Edited by León Martha and Iturbide Graciela 1942-. [México]: CFE, 1995.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
46

Chandler Pumping Plant and powerplant operations at Prosser Diversion Dam, Washington: Report (to accompany H.R. 3986) (including cost estimate of the Congressional Budget Office). [Washington, D.C: U.S. G.P.O., 2000.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
47

National, Seminar Grid Operation and Management (2002 Madras India). National Seminar, Grid Operation and Management, 29-30 October, 2002, Chennai: Proceedings. New Delhi: Central Board of Irrigation and Power, 2002.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
48

The science of lighting a city: Electricity in action. Mankato, Minn: Capstone Press, 2010.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
49

Jim, Whiting. The science of lighting a city: Electricity in action. Mankato, Minn: Capstone Press, 2010.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
50

Möst, Dominik. Zur Wettbewerbsfähigkeit der Wasserkraft in liberalisierten Elektrizitätsmärkten: Eine modellgestützte Analyse dargestellt am Beispiel des schweizerischen Energieversorgungssystems. Frankfurt am Main: Lang, 2006.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!

To the bibliography