Academic literature on the topic 'Installation process'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Installation process.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Journal articles on the topic "Installation process"
Di Maro, Daniela, Andrea Bene, Diego Bernini, Simone Bonetti, Giorgio De Michelis, Francesco Tisato, and Gianluca Colombo. "Anastatica Sensibile - Grounding Interactivity on a Natural Process." Leonardo 47, no. 5 (October 2014): 502–3. http://dx.doi.org/10.1162/leon_a_00823.
Full textRathore, Neeraj. "GridSim Installation and Implementation Process." i-manager's Journal on Cloud Computing 2, no. 4 (October 15, 2015): 23–34. http://dx.doi.org/10.26634/jcc.2.4.4906.
Full textYang, Dong, Yongbin Li, Tiejun Li, Tian Zhang, Ming Han, and Han Yan. "The system design of external cladding installation robot." International Journal of Advanced Robotic Systems 17, no. 6 (November 1, 2020): 172988142096906. http://dx.doi.org/10.1177/1729881420969062.
Full textГонтарев, С., S. Gontarev, Сергей Мошаров, Sergey Mosharov, М. Корсак, and M. Korsak. "Novel Way for Continuous Filtration of Large Volumes of Water in Environmental Monitoring System." Safety in Technosphere 6, no. 3 (October 17, 2017): 13–17. http://dx.doi.org/10.12737/article_59d3a1993a6f61.46420059.
Full textLutsenko, Mariia, Oksana Halai, Victor Legkoduh, Iryna Lastovska, Oleksandr Borshch, and Valentyna Nadtochii. "Milk production process, quality and technological properties of milk for the use of various types of milking machines." Acta Scientiarum. Animal Sciences 43 (May 14, 2021): e51336. http://dx.doi.org/10.4025/actascianimsci.v43i1.51336.
Full textBaha II, Samuel, and Olaf Hesebeck. "Simulation of the Solid Rivet Installation Process." SAE International Journal of Aerospace 3, no. 1 (September 28, 2010): 187–97. http://dx.doi.org/10.4271/2010-01-1843.
Full textYAMAMOTO, Yukiko, and Shinji IKARUGA. "LANDSCAPE CHARACTERISTICS OF INSTALLATION SPACE FROM THE OPEN-AIR SCULPTURE INSTALLATION PROJECT PROCESS." Journal of Architecture and Planning (Transactions of AIJ) 75, no. 653 (2010): 1697–706. http://dx.doi.org/10.3130/aija.75.1697.
Full textZhang, Jing. "Method of the Safety Early Warning on Hazard Installations." Applied Mechanics and Materials 34-35 (October 2010): 806–10. http://dx.doi.org/10.4028/www.scientific.net/amm.34-35.806.
Full textBorisenko, A. B., V. V. Khramtsov, V. A. Nemtinov, A. V. Krylov, and M. A. Matrokhin. "Designing a Chemical Nickel Plating Unit Operating as Part of a Galvanic Line." Vestnik Tambovskogo gosudarstvennogo tehnicheskogo universiteta 27, no. 2 (2021): 275–84. http://dx.doi.org/10.17277/vestnik.2021.02.pp.275-284.
Full textCamacho, Javier, Fernando Veiga, Mari Luz Penalva, Alberto Diez-Olivan, Lutz Deitert, and Norberto López de Lacalle. "On-Line Monitoring of Blind Fastener Installation Process." Materials 12, no. 7 (April 10, 2019): 1157. http://dx.doi.org/10.3390/ma12071157.
Full textDissertations / Theses on the topic "Installation process"
OWAIS, MUHAMMAD. "Management of risks in Engine Installation Process." Thesis, KTH, Tillämpad maskinteknik (KTH Södertälje), 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-204887.
Full textWalker, Richard Thomas. "Installation optimisation for marine energy converters to inform the designation process." Thesis, University of Exeter, 2013. http://hdl.handle.net/10871/14730.
Full textO, Donnell Sarah. "Tracing a Process." The Ohio State University, 2012. http://rave.ohiolink.edu/etdc/view?acc_num=osu1339194276.
Full textTurner, Blake C. "Determining Process: An Analysis of Corridor #1." The Ohio State University, 2016. http://rave.ohiolink.edu/etdc/view?acc_num=osu1460630059.
Full textPoudyal, Bidusha. "Predictive analysis of installation and operational qualification issues vs. process severity events." Thesis, Massachusetts Institute of Technology, 2020. https://hdl.handle.net/1721.1/126913.
Full textThesis: S.M., Massachusetts Institute of Technology, Department of Electrical Engineering and Computer Science, in conjunction with the Leaders for Global Operations Program at MIT, 2020
Cataloged from the official PDF of thesis.
Includes bibliographical references (pages 81-82).
As the retail industry grows more popular, ABCD, a world-class electronic commerce (e-commerce) business, is increasingly building new Fulfillment Centers (FCs) to support this rapid demand growth. It is integral for ABCD to validate the installation quality and functionality of Material Handling Equipment (MHE) in these newly built FCs so operations can avoid errors. To achieve this objective, ABCD introduced the Installation and Operational Qualification (IOQ) process in late 2014. While the IOQ process reduces early operational failures, it does not completely eliminate them. Inadequate IOQ and tighter installation timelines are leading to degraded installation quality, resulting in operational issues and costs for ABCD. As the FC network continues to grow, there is a need to improve installation quality to reduce early operational issues and enhance the FC start-up experience.
This project is a part of the ABCD Operation Engineering teams' effort to improve the existing IOQ process and the FC start-up experience. This initiative consists of three main phases. The first phase - the research phase - is dedicated to understanding the current processes and problem statement. It also includes a study of available data sources to discover failure patterns across different FCs. The second phase involves developing analytical frameworks and machine-learning models to uncover the most problematic equipment in the FC. The third phase focuses on evaluating the effectiveness of the current IOQ process based on Phase 1 and 2 findings, and identifying opportunities to better the process. The thesis summarizes the outcomes from all of these phases. The project focuses on improving IOQ coverage, efficiently reprioritizing the testing schedule, introducing threshold metric for installation quality, and exploring predictive and preventative maintenance opportunities.
This thesis also includes recommendations for refining the data-gathering process to improve future model outcomes. The ultimate goal is to improve FC installation quality and enhance the IOQ process to eliminate start-up issues. The approach taken and the recommendations proposed seek to approximate the ideal state as closely as possible. Incremental adoption of these recommendations will help deliver better-installed FCs, reduce early operational issues, improve start-up experiences, and strengthen ABCD's infrastructure.
by Bidusha Poudyal.
M.B.A.
S.M.
M.B.A. Massachusetts Institute of Technology, Sloan School of Management
S.M. Massachusetts Institute of Technology, Department of Electrical Engineering and Computer Science
Toth, Ibojka Maria. "Borderland American - Hungarian video installation /." [Kent, Ohio] : Kent State University, 2006. http://rave.ohiolink.edu/etdc/view?acc%5Fnum=kent1165764619.
Full textTitle from PDF t.p. (viewed March 27, 2008). Advisor: Martin Ball. Keywords: American - Hungarian Video Installation, 1956 Hungarian Revolution, Budapest, Hungary, Documentary - Style Production Process, Fragmented Memories of Time and Place, American - Hungarian Struggles with Personal and Cultural Identities, Discourse about Mul.
Vásquez, Chicata Luis Fernando Gonzalo. "Computational procedure for the estimation of pile capacity including simulation of the installation process /." Full text (PDF) from UMI/Dissertation Abstracts International, 2000. http://wwwlib.umi.com/cr/utexas/fullcit?p3004390.
Full textWylde, Nanette. "A brief history... interactive multimedia art installation: discussion of process, media, content, and response." The Ohio State University, 1996. http://rave.ohiolink.edu/etdc/view?acc_num=osu1384359452.
Full textAcharjee, Tapas. "Investigating Accumulation of Tolerances and its Impact on Reliability of Job Site Installation." University of Cincinnati / OhioLINK, 2007. http://rave.ohiolink.edu/etdc/view?acc_num=ucin1172857125.
Full textCanovas, Samantha Sobreira. "Frangalhos." Universidade de São Paulo, 2017. http://www.teses.usp.br/teses/disponiveis/27/27159/tde-02102017-154504/.
Full textSeeking to combine diverse styles of writing including fictional narratives, personal reports and articles, the present dissertation reflects on my artistic practice in the scope of painting, installation and the textile. The text raises poetic reflections about concepts such as: materiality, obsession, idleness, method and drift. Through a series of short texts the dissertation intends to discuss my poetic production, becoming another dimension of practical work.
Books on the topic "Installation process"
Bacon, John M. Instrumentation installation: Project management system. Research Triangle Park, N.C: Instrument Society of America, 1989.
Find full textChrystall, Christopher Neil. The evaluation and installation of a computer based process simulation tool. Portsmouth: Portsmouth Polytechnic, School of Management Studies, 1988.
Find full textMcMillan, Gregory K. Essentials of modern measurements and final elements in the process industry: A guide to design, configuration, installation, and maintenance. Research Triangle Park, NC: ISA, 2010.
Find full textAmerica, Instrument Society of, ed. Essentials of modern measurements and final elements in the process industry: A guide to design, configuration, installation, and maintenance. Research Triangle Park, NC: ISA, 2009.
Find full textMcMillan, Gregory K. Essentials of modern measurements and final elements in the process industry: A guide to design, configuration, installation, and maintenance. Research Triangle Park, NC: ISA, 2010.
Find full textKillcross, Martin. Chemical and process plant commissioning handbook: A practical guide to plant system and equipment installation and commissioning. Amsterdam: Elsevier/Butterworth-Heinemann, 2012.
Find full textGross, Carmela, and Aracy A. Amaral. De Brasil: Alquimias y procesos. Santafé de Bogotá, D.C: Biblioteca Luis Ángel Arango, 1999.
Find full textAmerican Water Works Association. Organic Contaminants Control Committee. Committee report: Existing VOC treatment installations : design, operation, and cost. Denver, CO: American Water Works Association, 1991.
Find full textKsenz, Nikolay, Boris Cheba, and Igor' Yudaev. Electroactivation of media in agricultural technologies as a way to intensify production processes. ru: INFRA-M Academic Publishing LLC., 2021. http://dx.doi.org/10.12737/1154383.
Full textNee, Michael J. Heat exchanger engineering techniques: Process, air conditioning, and electronic systems : a treatise on heat exchanger installations that did not meet performance. New York: ASME Press, 2003.
Find full textBook chapters on the topic "Installation process"
Hammon, Gary L. "Understanding the Purchasing and Installation Process." In Healthcare Information Management Systems, 236–43. New York, NY: Springer New York, 1995. http://dx.doi.org/10.1007/978-1-4757-2402-8_19.
Full textHammon, Gary L. "Understanding the Purchasing and Installation Process." In Healthcare Information Management Systems, 337–44. New York, NY: Springer New York, 1991. http://dx.doi.org/10.1007/978-1-4757-4043-1_35.
Full textKugler, Stefan, Cordula Czwick, Hoang Phuong Linh Nguyen, and Reiner Anderl. "Method for the Targeted Selection and Installation of an IoT - Platform." In Advances in Manufacturing, Production Management and Process Control, 116–23. Cham: Springer International Publishing, 2021. http://dx.doi.org/10.1007/978-3-030-80462-6_15.
Full textMuniak, Damian Piotr. "Aim of the Process of a Hydronic Heating Installation Control and Regulation." In Regulation Fixtures in Hydronic Heating Installations, 1–3. Cham: Springer International Publishing, 2018. http://dx.doi.org/10.1007/978-3-030-03128-2_1.
Full textKer, Jun-Ing, and Yichuan Wang. "Applying the Principles of Lean Manufacturing to Optimize Conduit Installation Process." In Intelligent Technologies and Engineering Systems, 923–29. New York, NY: Springer New York, 2013. http://dx.doi.org/10.1007/978-1-4614-6747-2_107.
Full textBlázquez, Cristina Sáez, Ignacio Martín Nieto, Arturo Farfán Martín, and Diego González-Aguilera. "Optimization of the Dimensioning Process of a Very Low Enthalpy Geothermal Installation." In Smart Cities, 179–91. Cham: Springer International Publishing, 2019. http://dx.doi.org/10.1007/978-3-030-12804-3_14.
Full textBeinke, Thies, Abderrahim Ait Alla, and Michael Freitag. "Resource and Information Sharing for the Installation Process of the Offshore Wind Energy." In Advances in Production Management Systems. The Path to Intelligent, Collaborative and Sustainable Manufacturing, 268–75. Cham: Springer International Publishing, 2017. http://dx.doi.org/10.1007/978-3-319-66926-7_31.
Full textBurghardt, M., G. J. Mulder, and R. Kabos. "Quality Assurance and Quality Control During the Installation Process of a Vertical Slurry Wall of Plastic Concrete." In Soil & Environment, 723–24. Dordrecht: Springer Netherlands, 1995. http://dx.doi.org/10.1007/978-94-011-0415-9_193.
Full textFoissac, Charly, Alain Daidie, Stephane Segonds, and Clément Chirol. "Smart Tightening Development for Aeronautical Bolted Assemblies in an Industry 4.0." In Lecture Notes in Mechanical Engineering, 419–25. Cham: Springer International Publishing, 2021. http://dx.doi.org/10.1007/978-3-030-70566-4_66.
Full textPeppel, Claudia. "Enduring Rain." In Cultural Inquiry, 277–87. Berlin: ICI Berlin Press, 2020. http://dx.doi.org/10.37050/ci-17_13.
Full textConference papers on the topic "Installation process"
"Smart Manufacturing Concept in Shipbuilding Process with Related Optimization Issues and Strategies." In Proceeding of Marine Safety and Maritime Installation. Clausius Scientific Press, 2018. http://dx.doi.org/10.23977/msmi.2018.82621.
Full text"A Study of Decision Making Process for the Most Efficient Steaming Speed of Ship." In Proceeding of Marine Safety and Maritime Installation. Clausius Scientific Press, 2018. http://dx.doi.org/10.23977/msmi.2018.82618.
Full textMayfield, David, Edgar M. Rodriguez, Erik Nordenstam, and Jerry Buster. "Whipstock Casing Installation Advances Well Construction Process." In IADC/SPE Drilling Conference. Society of Petroleum Engineers, 2002. http://dx.doi.org/10.2118/74563-ms.
Full textNogueira, E. F., A. T. Borges, C. J. M. Junior, and R. D. Machado. "Torpedo Base - A New Conductor Installation Process." In Offshore Technology Conference. Offshore Technology Conference, 2005. http://dx.doi.org/10.4043/17197-ms.
Full textPrudij, A. V., P. V. Solomykin, I. A. Bondarenko, and A. O. Prohorov. "Concept of digital process twin, trenchless installation communications." In Scientific trends: Questions of exact and technical sciences. ЦНК МОАН, 2020. http://dx.doi.org/10.18411/sciencepublic-12-06-2020-05.
Full textHatas, Veysel, Sevil Sen, and John A. Clark. "Efficient Evolutionary Fuzzing for Android Application Installation Process." In 2019 IEEE 19th International Conference on Software Quality, Reliability and Security (QRS). IEEE, 2019. http://dx.doi.org/10.1109/qrs.2019.00021.
Full textGlatzmaier, Greg C., and Koenraad F. Beckers. "Hydrogen mitigation process installation at Nevada Solar One." In SOLARPACES 2019: International Conference on Concentrating Solar Power and Chemical Energy Systems. AIP Publishing, 2020. http://dx.doi.org/10.1063/5.0031968.
Full text"The Selection of Ship Type to Use Dual Fuelled or Gas Fuelled using Analytical Hierarchy Process: A Case Study of Indonesia Government." In Proceeding of Marine Safety and Maritime Installation. Clausius Scientific Press, 2018. http://dx.doi.org/10.23977/msmi.2018.82607.
Full textLi, Shaohua, Deyong Che, Weihong Zhang, Jiewen Deng, Hu Wang, and Qingzhe Zhang. "Visual Dynamic Simulation on Installation Process of Power Plant." In 2010 Asia-Pacific Power and Energy Engineering Conference. IEEE, 2010. http://dx.doi.org/10.1109/appeec.2010.5448595.
Full textThakur, Barun Kumar, Prosun Bhattacharya, and Md Jakariya. "SEDIMENT COLOUR BASED TUBEWELL INSTALLATION PROCESS IN BIHAR, INDIA." In GSA Annual Meeting in Phoenix, Arizona, USA - 2019. Geological Society of America, 2019. http://dx.doi.org/10.1130/abs/2019am-335557.
Full textReports on the topic "Installation process"
Lee, Michael H. Entity Resolution Workflow Installation Process and User Guide. Fort Belvoir, VA: Defense Technical Information Center, July 2013. http://dx.doi.org/10.21236/ada586761.
Full textKristi M Christensen. Installation and Testing of a Jorin Visual Process Analyzer. Office of Scientific and Technical Information (OSTI), September 2010. http://dx.doi.org/10.2172/1004258.
Full textJohnston, Derek. Installation and Implementation of an In-Process Coordinate Measuring Machine (CMM). Office of Scientific and Technical Information (OSTI), June 2008. http://dx.doi.org/10.2172/952956.
Full textQuintana, Sarah V. Development of an Improved Process for Installation Projects of High Technology Manufacturing Equipment. Office of Scientific and Technical Information (OSTI), April 2014. http://dx.doi.org/10.2172/1130511.
Full textBurns, Dominic, and John Hopkinson. Leapfrog Technology to Standardize Equipment and System Installation, Section 9 and 10 - Review and Approval Process. Fort Belvoir, VA: Defense Technical Information Center, September 1999. http://dx.doi.org/10.21236/ada452848.
Full textCronk, T. A., D. R. Smuin, and R. M. Schlosser. Development of remedial process options: Phase II, Feasibility study: Installation Restoration Program, Naval Air Station Fallon, Fallon, Nevada. Office of Scientific and Technical Information (OSTI), November 1991. http://dx.doi.org/10.2172/5792514.
Full textCronk, T. A., D. R. Smuin, and R. M. Schlosser. Development of remedial process options: Phase II, Feasibility study: Installation Restoration Program, Naval Air Station Fallon, Fallon, Nevada. Office of Scientific and Technical Information (OSTI), November 1991. http://dx.doi.org/10.2172/10120118.
Full textNazarenko, Ivan, and Oleksandr Diachenko. Experimental research of the working process of the vibration installation for compaction of concrete mixes with variable mode of oscilla-tions. Gіrnichі, budіvelnі, dorozhnі ta melіorativnі mashini, April 2019. http://dx.doi.org/10.31493/gbdmm1892.0301.
Full textRusk, Todd, Ryan Siegel, Linda Larsen, Tim Lindsey, and Brian Deal. Technical and Financial Feasibility Study for Installation of Solar Panels at IDOT-owned Facilities. Illinois Center for Transportation, August 2021. http://dx.doi.org/10.36501/0197-9191/21-024.
Full textDessouky, M. I., R. E. DeVor, and S. S. Kapoor. Statistical Process Control for Evaluating Contract Service at Army Installations. Fort Belvoir, VA: Defense Technical Information Center, September 1990. http://dx.doi.org/10.21236/ada228405.
Full text