Academic literature on the topic 'Integrated building permit'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Integrated building permit.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Journal articles on the topic "Integrated building permit"

1

Meirini, Putri Amelia, Wayan Wesna Astara, and I. Nyoman Sutama. "Implementasi Perda Kabupaten Gianyar tentang Retribusi Izin Mendirikan Bangunan terhadap Bangunan Pariwisata di Kabupaten Gianyar." Jurnal Interpretasi Hukum 1, no. 2 (2020): 158–63. http://dx.doi.org/10.22225/juinhum.1.2.2455.158-163.

Full text
Abstract:
Every founder of a tourism building in Gianyar Regency is required to have a Building Permit (IMB) and pay the levies according to the regional government (Bupati) of Gianyar Regency. The government establishes a procedure for the construction of tourism buildings because they are one of the business fields of providing accommodation which is supervised by the Supervisor of the Investment Service and One Stop Integrated Service of the Gianyar Regency area who is appointed by the Regent and employees who are assigned certain tasks in the area of ​​regional retribution according to applicable le
APA, Harvard, Vancouver, ISO, and other styles
2

Nurrahmah, Dina, and Retnowati Wahyuning Dyas Tuti. "Analysis of the Quality of One Stop Services for Building Construction Permits (IMB) in Bogor Regency." Jurnal Ilmiah Ilmu Administrasi Publik 11, no. 1 (2021): 78. http://dx.doi.org/10.26858/jiap.v11i1.20377.

Full text
Abstract:
One of the bad services in Indonesia is the building permit or IMB and other related permits. In general, the One Stop Integrated Service Investment Service serves various permits, such as: IMB, Advertising Permit, Disturbance Permit, Construction Service Business Permit, and Trade Permit. In reality, there are still various criticisms and complaints from the public regarding public services provided by the One Stop Integrated Licensing Service Agency, which of course will greatly affect the image of the government in the eyes of the community. People always want to get fast, easy and cheap se
APA, Harvard, Vancouver, ISO, and other styles
3

Mukminati, Andan Hafsari, and Andina Elok Puri Maharani. "Effectiveness of Building Approval Services in the Department of Capital Investment and One-Door Integrated Services in Boyolali District Public Policy Law." International Journal of Sustainability in Research 2, no. 3 (2024): 251–60. http://dx.doi.org/10.59890/ijsr.v2i3.1836.

Full text
Abstract:
This research is intended to evaluate the effectiveness of building permit services at the Investment and Integrated One-Stop Service Office (DPMPTSP) of Boyolali Regency in order to improve public service to the community. The effectiveness of the Building Permit Service is a tool to measure the success of services at DPMPTSP in Boyolali, in accordance with applicable regulations. The building permit service at DPMPTSP of Boyolali Regency is carried out in accordance with the regulations stipulated in the Regent Regulation Number 4 of 2012 regarding Permit and Non-Permit Services. This resear
APA, Harvard, Vancouver, ISO, and other styles
4

Ciotta, Vittoria, Angelo Ciccone, Domenico Asprone, Gaetano Manfredi, and Edoardo Cosenza. "STRUCTURAL E-PERMITS: AN OPENBIM, MODEL-BASED PROCEDURE FOR PERMIT APPLICATIONS PERTAINING TO STRUCTURAL ENGINEERING." JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 27, no. 8 (2021): 651–70. http://dx.doi.org/10.3846/jcem.2021.15784.

Full text
Abstract:
This paper investigates the creation and use of integrated IFC models to modernise traditional processes for applications to building authorities for structural engineering approvals and permits. First, we provide a brief overview of e-permit systems in the AEC sector, with the focus on solutions that implement openBIM standards like IFC, MVD, and IDM. Second, we conduct a study on the information requirements of Italy’s seismic-authorisation processes relating specifically to the field of structural engineering. Third, we describe preliminary research on defining the structural engineering in
APA, Harvard, Vancouver, ISO, and other styles
5

Aufa, Muhammad Fikri, Noor Syahbania, and Fiko Agung Pradana. "Juridical Study in Implementing A System on Licensing for Establishing Buildings in Banjarmasin City." Jurnal Penegakan Hukum dan Keadilan 3, no. 1 (2022): 60–77. http://dx.doi.org/10.18196/jphk.v3i1.13411.

Full text
Abstract:
A building permit is a permit granted by a regional head to a building owner to construct a new structure, expand an existing structure, maintain existing facilities, and reduce the size of existing structures while adhering to all applicable technical and administrative standards. The requirements to apply a building permit had been governed in Article 7 of Banjarmasin City Regulation Number 15 of 2012 concerning Building Permits. The Investment and Integrated One-Stop Services Agency/DPMPTSP Banjarmasin City was the subject of this study. The research aimed to discover and examine the mechan
APA, Harvard, Vancouver, ISO, and other styles
6

Marthinus Mandagi, Thelma Wawointana, and Lendyane Tumewu. "Building Construction Permit Service at the Investment and One-Stop Integrated Service Office of Minahasa Regency." Technium Social Sciences Journal 49, no. 1 (2023): 202–6. http://dx.doi.org/10.47577/tssj.v49i1.9802.

Full text
Abstract:
The purpose of this study is to find out, analyze and describe how the Service Mechanism for Building Permits at the Investment Service and One-Stop Integrated Services in Minahasa Regency. The research method used is descriptive qualitative. with the results of research on the first indicator there are still many people who do not know the requirements that need to be input when registering. the second indicator is the location checking process is carried out to see whether the applicant's data matches the location or not and then there is a determination of retribution fees. third indicator
APA, Harvard, Vancouver, ISO, and other styles
7

Mayboroda, Victor A. "Digital Building Permit As a Complex Permitting Document." Theoretical and Applied Law, no. 2 (June 7, 2021): 35–41. https://doi.org/10.5281/zenodo.15520099.

Full text
Abstract:
The article puts forward a proposal for the formation of a digital building permit as a complex permitting document, the formation and issuance of which will include compliance with the requirements for landscaping both at the start of construction and at its completion. The digitalization of urban planning regulation, on the one hand, and the digitalization of the construction area of regulation should be harmonized through the improvement of the structure of the urban planning plan of the land plot, the implementation of which for the location of the capital construction facility will includ
APA, Harvard, Vancouver, ISO, and other styles
8

Mohammed Ali Berawi, Van Basten, Yusuf Latief, and Igor Crévits. "Development System on Integrated Regional Building Permit Policy to Enhance Green Building Life Cycle Achievement." Evergreen 7, no. 2 (2020): 240–45. http://dx.doi.org/10.5109/4055226.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Andan Hafsari Mukminati and Andina Elok Puri Maharani. "Online Service Policy Reform for Building Permits at the Department of Capital Investment and One-Door Integrated Services of Boyolali District." International Conference on Education, Social Sciences and Technology (ICESST) 3, no. 1 (2024): 01–12. https://doi.org/10.55606/icesst.v3i1.365.

Full text
Abstract:
Problem/Background (GAP): Building Construction Permit is a permit granted by the City/Regency Government to building owners to modify, build new, reduce and maintain buildings in accordance with administrative requirements and technical requirements. In its implementation, the aim of the IMB is to create an orderly layout and layout that is in accordance with the land use designation so that it will create harmony and balance between the environment and the building. To optimize public services to the community in the licensing sector which utilizes advances in information technology, the Boy
APA, Harvard, Vancouver, ISO, and other styles
10

Hobeika, N., J. van Liempt, F. Noardo, K. Arroyo Ohori, and J. Stoter. "GEOBIM INFORMATION TO CHECK DIGITAL BUILDING PERMIT REGULATIONS." International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences XLIII-B4-2022 (June 2, 2022): 529–35. http://dx.doi.org/10.5194/isprs-archives-xliii-b4-2022-529-2022.

Full text
Abstract:
Abstract. Municipalities invest a lot of time and person-hours into manual building permit checks. With the increase in computational power and the use of Building Information Models (BIM) in the building design life cycle, several municipalities are investing in automating these checks using BIM and geo-data sets. However, few examples exist of tools effectively using geo-information with BIM. In order to address this gap, a project was developed with the municipality of Rotterdam (NL). In a previous phase, a tool was implemented, able to analyse the BIM data to extract the needed information
APA, Harvard, Vancouver, ISO, and other styles
More sources

Book chapters on the topic "Integrated building permit"

1

Mastrolembo Ventura, Silvia, Sara Comai, Francesca Noardo, Kavita Raj, and Angelo Luigi Camillo CIRIBINI. "Integrated GeBIM Requirements Definition for Digital Building Permit." In CONVR 2023 - Proceedings of the 23rd International Conference on Construction Applications of Virtual Reality. Firenze University Press, 2023. http://dx.doi.org/10.36253/979-12-215-0289-3.51.

Full text
Abstract:
The development of methods for building permit issuing supported by digital tools could improve the current mostly manual procedures for processing regulatory information and related compliance processes. Several studies are currently addressing the challenge of building permit digitalisation, mostly considering building information models as the source data for automating the regulations checks. However, many of the main checks, that usually represent the major bottlenecks of the compliance checking process, need a joint representation of the new proposed construction and its context, which c
APA, Harvard, Vancouver, ISO, and other styles
2

Mastrolembo Ventura, Silvia, Sara Comai, Francesca Noardo, Kavita Raj, and Angelo Luigi Camillo CIRIBINI. "Integrated GeBIM Requirements Definition for Digital Building Permit." In CONVR 2023 - Proceedings of the 23rd International Conference on Construction Applications of Virtual Reality. Firenze University Press, 2023. http://dx.doi.org/10.36253/10.36253/979-12-215-0289-3.51.

Full text
Abstract:
The development of methods for building permit issuing supported by digital tools could improve the current mostly manual procedures for processing regulatory information and related compliance processes. Several studies are currently addressing the challenge of building permit digitalisation, mostly considering building information models as the source data for automating the regulations checks. However, many of the main checks, that usually represent the major bottlenecks of the compliance checking process, need a joint representation of the new proposed construction and its context, which c
APA, Harvard, Vancouver, ISO, and other styles
3

Bréant Claudine, Borst François, Campi Daniel, Griesser Vincent, and Le Huy Son. "Expanding DIOGENE with a Clinical Information System Based on a New Hospital-Wide Clinical Finding Dictionary." In Studies in Health Technology and Informatics. IOS Press, 1999. https://doi.org/10.3233/978-1-60750-912-7-7.

Full text
Abstract:
The aim of this project is to expand DIOGENE with a centralized and integrated patient clinical database system providing a standardized framework for the building of future clinical databases and for the integration of existing heterogeneous ones. The combined ‘across time view’ and ‘across departments view’ generated from the integrated clinical data will enable an evolutionary view of the patient state both across time and across medical specialties. For this purpose and to permit the communication and exchange of data, a new controlled vocabulary for
APA, Harvard, Vancouver, ISO, and other styles
4

Körner Christine, Hecker Dirk, Krause-Traudes Maike, et al. "Spatial Data Mining in Practice: Principles and Case Studies." In Frontiers in Artificial Intelligence and Applications. IOS Press, 2010. https://doi.org/10.3233/978-1-60750-633-1-164.

Full text
Abstract:
Almost any data can be referenced in geographic space. Such data permit advanced analyses that utilize the position and relationships of objects in space as well as geographic background information. Even though spatial data mining is still a young research discipline, in the past years research advances have shown that the particular challenges of spatial data can be mastered and that the technology is ready for practical application when spatial aspects are treated as an integrated part of data mining and model building. In this chapter in particular, we give a detailed description of severa
APA, Harvard, Vancouver, ISO, and other styles
5

Tedim, Fantina, André Samora-Arvela, Catarina Coimbra, Fernando Correia, Diogo Pinto, and José Aranha. "Bridging the gap in the knowledge on the role of spatial planning in the reduction of wildfire risk: insights from Portugal." In Advances in Forest Fire Research 2022. Imprensa da Universidade de Coimbra, 2022. http://dx.doi.org/10.14195/978-989-26-2298-9_129.

Full text
Abstract:
The 2017 wildfires marked a dramatic milestone in Portuguese society, which corresponded to an extreme intensity and the inherent loss of life, property, and thousands of forest hectares. This high impact led to a paradigm shift regarding prevention and firefighting, highlighting the need for an integrated fire management approach and assuming as imperative the integration of wildfire risk reduction on spatial planning at municipal level. This turning point was expressed in the prolific legislative production, namely in the guidelines for preventing and fighting wildfires, given by the Resolut
APA, Harvard, Vancouver, ISO, and other styles
6

Singh, Bhupinder, and Anjali Raghav. "Artificial Intelligence and Machine Learning in VLSI." In Advances in Computational Intelligence and Robotics. IGI Global, 2024. https://doi.org/10.4018/979-8-3693-7367-5.ch022.

Full text
Abstract:
The revolution of energy management in Very Large Scale Integration (VLSI) can be realized for lower power and sustainability with Artificial Intelligence (AI) and Machine Learning (ML) as an essential tool to maintain the smart city. Reduction of size is the origin of very-scale integrated (VLSI) technology that permits as usual more complex circuit building and also achieves higher densities in electronics systems. AI and ML machines optimize the performance of these systems resulting in a higher clean energy yield, solving for some or all supporting smart cities with equitable access is tou
APA, Harvard, Vancouver, ISO, and other styles
7

McAliney, Peter J., Guy J. Albertini, and Shannon D. Ramsaywak. "Incidence Response, Disaster Recovery, and Business Continuity Planning." In Handbook of Research on Current Trends in Cybersecurity and Educational Technology. IGI Global, 2023. http://dx.doi.org/10.4018/978-1-6684-6092-4.ch003.

Full text
Abstract:
Between advances in educational technology and learner expectations, higher education institutions are becoming increasingly dependent on third-party educational technologies such as learning management systems, metaverse-related technologies, open educational resources, and eportfolios to support learning. While this permits these institutions to deliver more engaging learner experiences, it also brings increased exposure to cyber-attacks. This chapter addresses the hierarchy that is implied by the threat of cyber-attack and the importance of developing the front-line incidence response (IR)
APA, Harvard, Vancouver, ISO, and other styles
8

Pomar, Luis, Juan Ignacio Baceta, and G. Mateu-Vicens. "The upper Miocene reef-rimmed platform of Mallorca (Spain): factory structure, growth dynamics and diagenesis." In Field guides to exceptionally exposed carbonate outcrops. International Association of Sedimentologists, 2021. http://dx.doi.org/10.54780/iasfg3/13.

Full text
Abstract:
The Llucmajor platform on southern Mallorca Island (Spain) is one of the best-exposed Miocene shallow-water carbonate platforms known in the world. Up to 90 m vertical sea cliffs provide a clean, continuous and detailed 3D view of the facies architecture and continuous cores from fifty-two water wells, affording information to interpret the 3D architecture of this 20 km-wide and only slightly deformed carbonate platform. Forty years of research on the Llucmajor platform provided insights into how the mutual interaction of biological and physical processes control the type of carbonate producti
APA, Harvard, Vancouver, ISO, and other styles

Conference papers on the topic "Integrated building permit"

1

Perkins, A. "Field Experience with a New Type of Scaling and Fouling Monitor." In CORROSION 1987. NACE International, 1987. https://doi.org/10.5006/c1987-87465.

Full text
Abstract:
Abstract A new scaling and fouling monitor is described which takes measurements on two heat transfer surfaces rather than one, as is the normal practice. One surface, called the 'test,' is heated. The other surface, called the 'reference,' normally remains unheated. At intervals, comparisons are made between the heat transfer characteristics of the two surfaces. Differential thermal measurements between the two surfaces permit increased sensitivity to heat induced deposition, since compensation for changes in fluid parameters is inherent. Conventional measurements on the unheated reference su
APA, Harvard, Vancouver, ISO, and other styles
2

Koperna, George, David Riestenberg, Jeremy Leierzapf, Richard Esposito, Kimberly Sams Gray, and Benjamin Roth. "Building the Permit for the First Carbon Storage Hub in the United States." In SPE Annual Technical Conference and Exhibition. SPE, 2022. http://dx.doi.org/10.2118/210198-ms.

Full text
Abstract:
Abstract To accelerate commercialization of Carbon Capture and Storage (CCS), the U.S. Department of Energy is building on decades of characterization efforts and pilot-scale projects through their CarbonSAFE program. Administered through their National Energy Laboratory, this program seeks to bring fully integrated projects to the sector that can store more than 50 million tonnes of CO2 over a 30 year period. The program, enacted prior to the enhancement of Internal Revenue Code Section 45Q, is in the capture assessment, characterization, and permitting phase. The objectives of this paper are
APA, Harvard, Vancouver, ISO, and other styles
3

Foley, Gearoid, and Richard Sweetser. "Emerging Role for Absorption Chillers in Integrated Energy Systems in America." In ASME 2002 International Mechanical Engineering Congress and Exposition. ASMEDC, 2002. http://dx.doi.org/10.1115/imece2002-33339.

Full text
Abstract:
President Bush’s National Energy Policy, Clear Skies and the Global Climate Change Initiatives form a comprehensive roadmap to a secure, clean, reliable, and affordable energy supply for the future. These far reaching policy proposals rely heavily on the development of distributed energy systems. The cornerstone of distributed energy systems is the emergence of Integrated Energy Systems (IES), which will permit consulting engineers to substantially improve energy efficiency. Thermally Activated Technologies, in general, and absorption chillers, in particular, are increasingly being viewed as a
APA, Harvard, Vancouver, ISO, and other styles
4

Marom, Aufarul. "Performance Analysis of IMB (Building Permit) Licensing Services in the Capital Investment Service and Integrated Service of One Door and Labor of Pekalongan Regency." In Proceedings of the 5th International Conference on Indonesian Social and Political Enquiries, ICISPE 2020, 9-10 October 2020, Semarang, Indonesia. EAI, 2021. http://dx.doi.org/10.4108/eai.9-10-2020.2304734.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Valdeolmillos, Nur Alah Abdelzayed, Almaha Ahmad E. R. Al-Malki, Shaligram Pokharel, and Mohamed Arselene Ayari. "Assessment of Aesthetic Control in Qatar’s Urban Design." In The 2nd International Conference on Civil Infrastructure and Construction. Qatar University Press, 2023. http://dx.doi.org/10.29117/cic.2023.0127.

Full text
Abstract:
Aesthetic control is concerned with the visual appearance of the built environment, specifically in the urban setting. The built environment aesthetics can directly influence place identity, property values and the business owners’ financial status in the area. People’s behavior in terms of choosing a place to live or do business is also affected by the locality’s aesthetics. Qatar has invested heavily in the built environment over the last two decades, which has shed light on the importance of government adopted aesthetic control measures to preserve the identity of Qatar’s built form. This p
APA, Harvard, Vancouver, ISO, and other styles
6

Abdullah, Moh, Nasir Mangngasing, Irwan waris, and I. Suyasa. "Quality of Service for Building Permits at the Office of Investment and One-Stop Integrated Services in Palu City." In Proceedings of the 6th Batusangkar International Conference, BIC 2021, 11 - 12 October, 2021, Batusangkar-West Sumatra, Indonesia. EAI, 2022. http://dx.doi.org/10.4108/eai.11-10-2021.2319634.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Zhou, Hui, Lucybel Montilla, M. D. Rincones, and Kunle Orogbemi. "Physics Inspired Machine Learning for Reliable Production Forecast in Unconventional Reservoirs." In SPE Permian Basin Energy Conference. SPE, 2024. http://dx.doi.org/10.2118/221501-ms.

Full text
Abstract:
Abstract Reliable production forecasting in unconventional reservoirs requires consideration of the underlying physics that govern subsurface flow dynamics. For unconventional shale reservoirs, the identification of flow regimes, including linear and boundary-dominated flow, provides important insights for production forecasts. Traditional rate transient analysis methods, however, often rely on manual processes, introducing a degree of subjectivity and potential bias into the results. We introduce an innovative machine learning-driven approach, rooted in the fundamental physics of flow within
APA, Harvard, Vancouver, ISO, and other styles
8

Urazov, Aibek, and Iliyas Zholshybekuly. "Integrated Production Schedule." In SPE Caspian Technical Conference and Exhibition. SPE, 2023. http://dx.doi.org/10.2118/217584-ms.

Full text
Abstract:
Abstract The focus of this comprehensive study is the mitigation and prevention of incidents that may lead to potential production loss (LPO) at the Tengiz and Korolev fields, two vital components of the oil and gas industry. These fields confront numerous challenges in production and ongoing operational activities. The primary objective of this research is the development and implementation of an integrated production schedule (IPS) in conjunction with a reservoir simulation model to foresee field production performances and proactively manage production operations. The core of this process r
APA, Harvard, Vancouver, ISO, and other styles
9

Läsche, Christoph, Jan Pinkowski, Sebastian Gerwinn, Rainer Droste, and Axel Hahn. "Model-Based Risk Assessment of Offshore Operations." In ASME 2014 33rd International Conference on Ocean, Offshore and Arctic Engineering. American Society of Mechanical Engineers, 2014. http://dx.doi.org/10.1115/omae2014-24018.

Full text
Abstract:
Safety and dependability are major design objectives for offshore operations such as the construction of wind farms or oil and gas exploration. Today processes and related risks are typically described informally and process specification are neither reusable nor suitable for risk assessment. Here, we propose to use a specification language for processes. We integrate this specification language in a generic modeling approach in combination with an analysis tool and a tool to construct health, safety and environment (HSE) plans — a mandatory document for granting a construction/operation permi
APA, Harvard, Vancouver, ISO, and other styles
10

Rilak, Vladimir, Milan Radojković, and Dejan Bošković. "INSTALLATION OF FUSED IPC CONNECTOR ON UTILITY POLE." In 14. Savetovanje o elektrodistributivnim mrežama Srbije, sa regionalnim učešćem,. CIRED Liaison Committee of Serbia, 2024. http://dx.doi.org/10.46793/cired24.r-2.04vr.

Full text
Abstract:
In Krusevac Branch of Elektrodistribucija Srbije , consumers of electricity face problems with power limiters that are installed in switch cabinets, both in the buildings and in pole mounted meter boxes. During frequent control done by linemen, it is found that inadequate power limiters are installed in meter boxes. They are often of higher amperage and often the lineman discovers that the power limiter is fake. In order to solve this problem, the method of limiting the power is applied, by installing an insulated waterproof connector with an integrated power limiter. Installation of such a co
APA, Harvard, Vancouver, ISO, and other styles

Reports on the topic "Integrated building permit"

1

Ortiz-Vargas, Andrea, Dominic Sett, Jonas Hansohm, et al. Opportunities for improved flood risk management and adaptation in Hue, Central Viet Nam: Addressing current and future flood risks. United Nations University Institute for Environment and Human Security, 2025. https://doi.org/10.53324/qcds7239.

Full text
Abstract:
Hue City in Central Viet Nam is increasingly vulnerable to recurrent flooding, driven by climate change, rapid urbanization, and environmental degradation. Building on the findings of the FloodAdaptVN Risk Report, which identified the root causes and drivers of flood risk, this report shifts the focus to actionable, evidence-based solutions for improving flood risk management and adaptation strategies in the region. Using a participatory approach complemented by literature-based assessments, the report identifies and evaluates a diverse set of structural, social, institutional, and ecosystem-b
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!