To see the other types of publications on this topic, follow the link: Integrated maintenance.

Journal articles on the topic 'Integrated maintenance'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 journal articles for your research on the topic 'Integrated maintenance.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.

1

TÓTH, József. "AN INTEGRATED RESEARCH OF AIRCRAFT MAINTENANCE OFFICER COMPETENCIES." SCIENTIFIC RESEARCH AND EDUCATION IN THE AIR FORCE 18, no. 2 (2016): 775–82. http://dx.doi.org/10.19062/2247-3173.2016.18.2.40.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Seaman, Harry M. "Generic Integrated Maintenance Diagnostics." IEEE Aerospace and Electronic Systems Magazine 1, no. 6 (1986): 9–12. http://dx.doi.org/10.1109/maes.1986.5005132.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Raley, Glenn C., and Amy H. Lewellyn. "PHALANX Integrated Maintenance System." Naval Engineers Journal 108, no. 2 (1996): 65–67. http://dx.doi.org/10.1111/j.1559-3584.1996.tb00505.x.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Karningsih, Putu Dana, Winda Puspitasari, and Moses Laksono Singgih. "Cost-Integrated Lean Maintenance to Reduce Maintenance Cost." Jurnal Optimasi Sistem Industri 22, no. 1 (2023): 69–80. http://dx.doi.org/10.25077/josi.v22.n1.p69-80.2023.

Full text
Abstract:
The company has always prioritized cost reduction. In this study, the researchers aimed to decrease maintenance costs by actively eliminating expensive non-value-added processes. The study employed Process and Time Driven Activity Based Costing to integrate cost with the activities performed. By conducting maintenance value stream mapping, the researchers identified various forms of waste, such as centralized maintenance, ineffective data management, poor inventory management, inadequate maintenance, under-utilization of resources, and waiting time for maintenance resources. Several alternativ
APA, Harvard, Vancouver, ISO, and other styles
5

Zhao, Shixiong, Liya Wang, and Yu Zheng. "Integrating production planning and maintenance: an iterative method." Industrial Management & Data Systems 114, no. 2 (2014): 162–82. http://dx.doi.org/10.1108/imds-07-2013-0314.

Full text
Abstract:
Purpose – Making decisions on production and maintenance separately, as is often done in practice and research literature, may not result in overall optimization. This paper aims to propose a joint method that better integrates production planning and maintenance at the tactical level. The potential of improving the performance of the classic planning method is also explored. Design/methodology/approach – An integrated production planning and maintenance model is proposed. The production capacity losses resulted from both preventive and corrective maintenance activities are considered. Meanwhi
APA, Harvard, Vancouver, ISO, and other styles
6

BRANDOLESE, M., M. FRANCI, and A. POZZETTI*. "Production and maintenance integrated planning." International Journal of Production Research 34, no. 7 (1996): 2059–75. http://dx.doi.org/10.1080/00207549608905013.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Stevenson, Peter J. "Integrated Maintenance – The Logical Solution." Industrial Management & Data Systems 89, no. 6 (1989): 22–26. http://dx.doi.org/10.1108/eum0000000001412.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Liu, Qinming, and Wenyuan Lv. "Multi-component manufacturing system maintenance scheduling based on degradation information using genetic algorithm." Industrial Management & Data Systems 115, no. 8 (2015): 1412–34. http://dx.doi.org/10.1108/imds-04-2015-0150.

Full text
Abstract:
Purpose – The traditional maintenance scheduling strategies of multi-component systems may result in maintenance shortage or overage, while system degradation information is often ignored. The purpose of this paper is to propose a multi-phase model that better integrates degradation information, dependencies and maintenance at the tactical level. Design/methodology/approach – This paper proposes first a maintenance optimization model for multi-component systems with economic dependence and structural dependence. The cost of combining maintenance activities is lower than that of performing main
APA, Harvard, Vancouver, ISO, and other styles
9

Milana, Milana, M. Khurshid Khan, and J. Eduardo Munive-Hernandez. "Design and development of Knowledge Based System for Integrated Maintenance Strategy and Operations." Concurrent Engineering 25, no. 1 (2016): 5–18. http://dx.doi.org/10.1177/1063293x16665662.

Full text
Abstract:
The importance of maintenance has escalated significantly by the increase in automation in manufacturing processes. This condition changed the perspective of maintenance from being considered as an inevitable cost to being seen as a key business function to drive competitiveness. Consequently, maintenance decisions need to be aligned with the business competitive strategy as well as the requirements of manufacturing/quality functions in order to support manufacturing equipment performance. Therefore, it is required to synchronise the maintenance strategy and operations with business and manufa
APA, Harvard, Vancouver, ISO, and other styles
10

Wang, Lin, Zhiqiang Lu, and Xiaole Han. "Joint optimal production planning and proactive maintenance policy for a system subject to degradation." Journal of Quality in Maintenance Engineering 25, no. 2 (2019): 236–52. http://dx.doi.org/10.1108/jqme-11-2016-0068.

Full text
Abstract:
Purpose This paper integrates condition-based maintenance (CBM) with production planning in a single-stage production system that deteriorates with usage during a specified finite planning horizon. The purpose of this paper is to develop an integrated production and maintenance model to minimize the expected total cost over the horizon. Design/methodology/approach A joint production planning and CBM model is proposed. In the model, a set of products must be produced in lots. The system degradation is a stationary gamma process and the degradation level is detected by inspection between product
APA, Harvard, Vancouver, ISO, and other styles
11

Zilinsky, Adam, and Jozef Svetlik. "MODEL OF INTEGRATED COMPREHENSIVE MAINTENANCE SYSTEM." MM Science Journal 2016, no. 03 (2016): 981–84. http://dx.doi.org/10.17973/mmsj.2016_09_201650.

Full text
APA, Harvard, Vancouver, ISO, and other styles
12

MUKAI, Nobuyuki, Tomomi SAKATA, and Nobuyoshi YABUKI. "Integrated Contract System of Facility Maintenance." Journal of Construction Management, JSCE 12 (2005): 81–88. http://dx.doi.org/10.2208/procm.12.81.

Full text
APA, Harvard, Vancouver, ISO, and other styles
13

Ding, Xueying, Zhiqiang Xie, Wei Zhou, Zhenjiang Tan, and Ming Sun. "Flexible Integrated Scheduling Considering Periodic Maintenance." Electronics 13, no. 18 (2024): 3730. http://dx.doi.org/10.3390/electronics13183730.

Full text
Abstract:
Aiming at the problem of current flexible integrated scheduling, most of the current research shortens the total processing time of products and ignores the loss of the equipment in the processing, which affects the scheduling ability of the equipment; in this context, a flexible integrated scheduling algorithm considering periodic maintenance (FIS-PM) is proposed. The algorithm flexibly mobilizes the processing sequence of the selected processing equipment, and uniformly maintains all equipment at a certain time. First, the ISA-PM algorithm adopts the strategy combination of the layer priorit
APA, Harvard, Vancouver, ISO, and other styles
14

Mariano, Vittoria, Nuria Domínguez-Iturza, Lukas J. Neukomm, and Claudia Bagni. "Maintenance mechanisms of circuit-integrated axons." Current Opinion in Neurobiology 53 (December 2018): 162–73. http://dx.doi.org/10.1016/j.conb.2018.08.007.

Full text
APA, Harvard, Vancouver, ISO, and other styles
15

Rødseth, Harald, and Per Schjølberg. "Maintenance backlog for improving integrated planning." Journal of Quality in Maintenance Engineering 23, no. 2 (2017): 195–225. http://dx.doi.org/10.1108/jqme-01-2016-0002.

Full text
Abstract:
Purpose The purpose of this paper is to develop a novel model for maintenance backlog (MB) of physical assets and structure it in a framework for integrated planning (IPL). Design/methodology/approach Reliability theory principles for modelling MB are used. Furthermore, to structure a framework for IPL, literature study combined with earlier case studies is used. Findings The framework for IPL facilitates the model of MB. In addition to providing real-time diagnosis indicators, MB is regarded as valuable information for decision support in IPL. Originality/value Development of MB applied to IP
APA, Harvard, Vancouver, ISO, and other styles
16

Shohet, Igal M., Sarel Lavy-Leibovich, and Dany Bar-On. "Integrated maintenance monitoring of hospital buildings." Construction Management and Economics 21, no. 2 (2003): 219–28. http://dx.doi.org/10.1080/0144619032000079734.

Full text
APA, Harvard, Vancouver, ISO, and other styles
17

Yang, Ming-Feng, and Yi Lin. "Integrated inventory model with backorder and minimal repair in a supply chain." Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 232, no. 3 (2016): 546–60. http://dx.doi.org/10.1177/0954405416645997.

Full text
Abstract:
This study explores the feasibility of applying an integrated inventory model with the consideration of incorporating production programs and maintenance to an imperfect process involving a deteriorating production system. The main target of this research is to build an integrated inventory model with the issues of backorder and repair. Additionally, our proposed model tries to provide an optimal number of shipments m and lower cost. Furthermore, this article offers the detailed discussion of two preventive maintenances of the production run period which are named as perfect preventive mainten
APA, Harvard, Vancouver, ISO, and other styles
18

Li, Xue Jun, Peng Wang, and Xin Huang. "The Model of Equipment Integrated Maintenance Management Based on MES." Advanced Engineering Forum 2-3 (December 2011): 749–54. http://dx.doi.org/10.4028/www.scientific.net/aef.2-3.749.

Full text
Abstract:
With the development of information technology and use of intelligent sophisticated equipment. Factory automation has improved continuously, the situation of maintenance surplus and maintenance insufficient had often occurred. Through the application research of MES, in-depth understudied fault diagnosis and maintenance technology. In-depth analyzed the theory of equipment integrated maintenance in MES. Designed implementation program for equipment integrated maintenance management for MES by the thought of integrated. Used the idea of segmentation in time and space to establish the model of d
APA, Harvard, Vancouver, ISO, and other styles
19

EL-FERIK, SAMI, and MOHAMMED BEN-DAYA. "INTEGRATED PRODUCTION MAINTENANCE MODEL UNDER IMPERFECT AGE-BASED MAINTENANCE POLICY AND NON-NEGLIGIBLE MAINTENANCE TIMES." Asia-Pacific Journal of Operational Research 27, no. 04 (2010): 539–58. http://dx.doi.org/10.1142/s0217595910002843.

Full text
Abstract:
This paper deals with an integrated production maintenance model where preventive maintenance (PM) activities are carried out at the end of each production run or at failure, whichever of them occurs first. PM activities take a fixed amount of time. However, due to the random nature of failures, the stock built during the production period may deplete before the next production run starts, leading to some loss in demand. After N production runs, the process is replaced (or undergoes a major repair), which brings it to the "as-good-as-new" condition. A mathematical model is derived for this pro
APA, Harvard, Vancouver, ISO, and other styles
20

Lillerovde, Egil, Bill Sullivan, and Arvind Chetty. "Risk-based coating maintenance: an integrated program." APPEA Journal 51, no. 2 (2011): 728. http://dx.doi.org/10.1071/aj10108.

Full text
Abstract:
The integration of a cost-effective coating management plan into an asset integrity system is essential in ensuring asset longevity. The success of any corrosion management program relies on condition monitoring and quality auditing. Monitoring activities also contribute to maintenance plan feedback ensuring continuous improvement in corrosion management activities. It is recognised that there are many ways to organise and operate successful corrosion management programs, each of which is asset specific and depends on factors such as: Design. Stage in the life cycle. Process conditions. Operat
APA, Harvard, Vancouver, ISO, and other styles
21

Zhou, Binghai, and Zilong Liu. "Optimizing preventive maintenance: a deteriorating system with buffers." Industrial Management & Data Systems 116, no. 8 (2016): 1719–40. http://dx.doi.org/10.1108/imds-01-2016-0026.

Full text
Abstract:
Purpose Making decisions on preventive maintenance (PM) policy and buffer sizing, as is often studied, may not result in overall optimization. The purpose of this paper is to propose a joint model that integrates PM and buffer sizing with consideration of quality loss for a degenerating system, which aims to minimize the average operation cost for a finite horizon. The opportunistic maintenance (OM) policy which could increase the output and decrease the cost of the system is also explored. Design/methodology/approach A joint PM and buffer size model considering quality loss is proposed. In th
APA, Harvard, Vancouver, ISO, and other styles
22

Shum, Yu-Su, and Dah-Chuan Gong. "DESIGN OF AN INTEGRATED MAINTENANCE MANAGEMENT SYSTEM." Journal of the Chinese Institute of Industrial Engineers 20, no. 4 (2003): 337–54. http://dx.doi.org/10.1080/10170660309509242.

Full text
APA, Harvard, Vancouver, ISO, and other styles
23

Guan, Chongchong, Hui Lu, and Yaxian Liu. "Integrated scheduling methods of maintenance support resource." Journal of Physics: Conference Series 1325 (October 2019): 012077. http://dx.doi.org/10.1088/1742-6596/1325/1/012077.

Full text
APA, Harvard, Vancouver, ISO, and other styles
24

Park, Chulsoon, Dug Hee Moon, Hongsuk Sung, Junyeop Song, and Jongyun Jung. "An Integrated Maintenance in Injection Molding Processes." Journal of Society of Korea Industrial and Systems Engineering 38, no. 3 (2015): 100–107. http://dx.doi.org/10.11627/jkise.2015.38.3.100.

Full text
APA, Harvard, Vancouver, ISO, and other styles
25

Zivaljevic, Milenko, and Dragana Becejski-Vujaklija. "Integrated information system for combat aircraft maintenance." Vojnotehnicki glasnik 48, no. 4-5 (2000): 409–16. http://dx.doi.org/10.5937/vojtehg0005409z.

Full text
APA, Harvard, Vancouver, ISO, and other styles
26

Ip, W. H., K. C. Lee, K. L. Yung, and R. Yam. "SCADA in an integrated maintenance management system." Journal of Quality in Maintenance Engineering 6, no. 1 (2000): 6–19. http://dx.doi.org/10.1108/13552510010311309.

Full text
APA, Harvard, Vancouver, ISO, and other styles
27

FAHRENKRUG, THOMAS P. "Total Integrated Fleet Maintenance and Support Database." Naval Engineers Journal 105, no. 2 (1993): 53–58. http://dx.doi.org/10.1111/j.1559-3584.1993.tb02261.x.

Full text
APA, Harvard, Vancouver, ISO, and other styles
28

Jbili, S., A. Chelbi, M. Radhoui, and M. Kessentini. "Integrated strategy of Vehicle Routing and Maintenance." Reliability Engineering & System Safety 170 (February 2018): 202–14. http://dx.doi.org/10.1016/j.ress.2017.09.030.

Full text
APA, Harvard, Vancouver, ISO, and other styles
29

Prickett, P. W. "An integrated approach to autonomous maintenance management." Integrated Manufacturing Systems 10, no. 4 (1999): 233–43. http://dx.doi.org/10.1108/09576069910280611.

Full text
APA, Harvard, Vancouver, ISO, and other styles
30

Kunz, J. C., Yan Jin, R. E. Levitt, S. D. Lin, and P. M. Teicholz. "Support for integrated value-based maintenance planning." IEEE Expert 11, no. 4 (1996): 35–44. http://dx.doi.org/10.1109/64.511775.

Full text
APA, Harvard, Vancouver, ISO, and other styles
31

Kerzerho, J. P., F. Antues, J. P. Gerval, E. L. Cardoso, and J. Tisseau. "Prototyping an Integrated System for Predictive Maintenance." IFAC Proceedings Volumes 28, no. 10 (1995): 883–87. http://dx.doi.org/10.1016/s1474-6670(17)51632-8.

Full text
APA, Harvard, Vancouver, ISO, and other styles
32

Rawat, Manish, and Bhupesh Kumar Lad. "An integrated strategy for fleet maintenance planning." Journal of Quality in Maintenance Engineering 23, no. 4 (2017): 457–78. http://dx.doi.org/10.1108/jqme-03-2016-0013.

Full text
Abstract:
Purpose Conventionally, fleet maintenance decisions are made based on the level of repair (LOR) analysis. A general assumption made during LOR analysis is the consideration of the lifetime distribution with constant failure rate (CFR). However, industries do use preventive maintenance (PM) to extend the life of such components, which in turn may affect the LOR decisions such as repair/move/discard. The CFR assumption does not allow the consideration of effect of PM in LOR analysis. The purpose of this paper is to develop a more practical LOR analysis approach, considering the time-dependent fa
APA, Harvard, Vancouver, ISO, and other styles
33

Iijima, Hiroki, and Shozo Takata. "Condition based renewal and maintenance integrated planning." CIRP Annals 65, no. 1 (2016): 37–40. http://dx.doi.org/10.1016/j.cirp.2016.04.106.

Full text
APA, Harvard, Vancouver, ISO, and other styles
34

Gouiaa-Mtibaa, A., S. Dellagi, Z. Achour, and W. Erray. "Integrated Maintenance-Quality strategies with reworking activities." IFAC-PapersOnLine 49, no. 28 (2016): 61–66. http://dx.doi.org/10.1016/j.ifacol.2016.11.011.

Full text
APA, Harvard, Vancouver, ISO, and other styles
35

Yang, Ruifeng, Jianshe Kang, and Qiwei Hu. "Integrated maintenance policy optimization with finite spares." International Journal of System Assurance Engineering and Management 9, no. 5 (2018): 1014–21. http://dx.doi.org/10.1007/s13198-018-0718-9.

Full text
APA, Harvard, Vancouver, ISO, and other styles
36

Pattison, D., M. Segovia Garcia, W. Xie, et al. "Intelligent integrated maintenance for wind power generation." Wind Energy 19, no. 3 (2015): 547–62. http://dx.doi.org/10.1002/we.1850.

Full text
APA, Harvard, Vancouver, ISO, and other styles
37

Ismail, Zul-Atfi. "An Integrated Computerised Maintenance Management System (I-CMMS) for IBS building maintenance." International Journal of Building Pathology and Adaptation 37, no. 3 (2019): 326–43. http://dx.doi.org/10.1108/ijbpa-10-2017-0049.

Full text
Abstract:
Purpose The purpose of this paper is to focus on the development of an integrated computerised maintenance management system to improve the information storage of design and construction, diagnostic and defect risk assessments on IBS building through the integration of building information modelling (BIM). Design/methodology/approach The methodology used interviews with the IBS building client/maintenance contractor in Malaysia to gather information about maintenance management problems, approaches to address problems, information and communication technology implementation and use of emerging
APA, Harvard, Vancouver, ISO, and other styles
38

Gouiaa-Mtibaa, A., S. Dellagi, Z. Achour, and W. Erray. "Integrated Maintenance-Quality policy with rework process under improved imperfect preventive maintenance." Reliability Engineering & System Safety 173 (May 2018): 1–11. http://dx.doi.org/10.1016/j.ress.2017.12.020.

Full text
APA, Harvard, Vancouver, ISO, and other styles
39

Szpytko, Janusz, and Yorlandys Salgado Duarte. "Integrated maintenance platform for critical cranes under operation: Database for maintenance purposes." IFAC-PapersOnLine 53, no. 3 (2020): 167–72. http://dx.doi.org/10.1016/j.ifacol.2020.11.027.

Full text
APA, Harvard, Vancouver, ISO, and other styles
40

Li, Li Sheng, Jia Yu Cai, and Xiao Mei Hu. "Research on Integrated and Comprehensive Service System of Operation and Maintenance of Petrochemical Units." Applied Mechanics and Materials 433-435 (October 2013): 1639–42. http://dx.doi.org/10.4028/www.scientific.net/amm.433-435.1639.

Full text
Abstract:
In order to realize the goal of one-stop operation service in the petrochemical industry, according to the integrated device operation and maintenance mode of the domestic large and complex petrochemical industry units, integrated and comprehensive service system of operation and maintenance of petrochemical units is designed. Three subsystems of operation and maintenance management, preventive maintenance, maintenance emergency response are designed into an integrated and comprehensive service system. The system has the characteristics of being integrated, open, easy to extend and maintain. T
APA, Harvard, Vancouver, ISO, and other styles
41

Sa’ad, Aisha, Aimé C. Nyoungue, and Zied Hajej. "An Integrated Production/Maintenance Optimization Planning of a Stand-alone Wind Energy System for Rural Electrification." E3S Web of Conferences 433 (2023): 02002. http://dx.doi.org/10.1051/e3sconf/202343302002.

Full text
Abstract:
The renewable energy industry has gained so much attention due to the global importance attached to it. However, these sources are volatile in nature, hence, it is important to properly plan the production system to ensure continuity. This work focused on production and maintenance of wind energy system as a stand-alone system for rural electrification. The methodology for power production forecast in this work is optimization using machine learning technique; support vector regression (SVR) and estimation from theoretical technique. The production optimization is aimed to determine the optima
APA, Harvard, Vancouver, ISO, and other styles
42

Yoshimura, Shinobu, Kazuo Furuta, Yoshihiro Isobe, et al. "ICONE15-10083 AN INTEGRATED SIMULATOR FOR THE MAINTENANCE OPTIMIZATION OF LIGHT WATER REACTORS." Proceedings of the International Conference on Nuclear Engineering (ICONE) 2007.15 (2007): _ICONE1510. http://dx.doi.org/10.1299/jsmeicone.2007.15._icone1510_36.

Full text
APA, Harvard, Vancouver, ISO, and other styles
43

Isobe, Yoshihiro, Mitsuyuki Sagisaka, Junji Etoh, et al. "ICONE23-1644 APPLICATION OF DR. MAINTE, INTEGRATED SIMULATOR OF MAINTENANCE OPTIMIZATION, TO LWRS." Proceedings of the International Conference on Nuclear Engineering (ICONE) 2015.23 (2015): _ICONE23–1—_ICONE23–1. http://dx.doi.org/10.1299/jsmeicone.2015.23._icone23-1_316.

Full text
APA, Harvard, Vancouver, ISO, and other styles
44

Qu, Zhijian, Xinyu Liao, Rui Chi, Baoquan Wei, and Xinxing Hou. "Multi-objective maintenance optimization of contact networks considering integrated state parameters." PLOS One 20, no. 6 (2025): e0321384. https://doi.org/10.1371/journal.pone.0321384.

Full text
Abstract:
With the gradual expansion of China’s high-speed railroad operation scale and the accumulation of operation time, the pressure of operation and maintenance of contact networks is increasing, and the operation and maintenance strategy of railroad contact networks under the traditional cyclic maintenance mode has the double dilemma of low maintenance efficiency and high labor intensity of maintenance personnel. In order to protect the transportation quality and efficiency of high-speed railroads and reduce the labor intensity of maintenance personnel, this paper proposes a multi-objective optimi
APA, Harvard, Vancouver, ISO, and other styles
45

Chen, Xiaohui, Lei Xiao, Xinghui Zhang, Weixiao Xiao, and Junxing Li. "An integrated model of production scheduling and maintenance planning under imperfect preventive maintenance." Eksploatacja i Niezawodnosc - Maintenance and Reliability 17, no. 1 (2015): 70–79. http://dx.doi.org/10.17531/ein.2015.1.10.

Full text
APA, Harvard, Vancouver, ISO, and other styles
46

Ettaye, Ghita, Abdellah El Barkany, and Ahmed El Khalfi. "Modeling and Optimization a Production/Maintenance Integrated Planning." International Journal of Engineering Research in Africa 28 (January 2017): 169–81. http://dx.doi.org/10.4028/www.scientific.net/jera.28.169.

Full text
Abstract:
This study is on the integrated planning problem of maintenance and production within the frame work of a system subject to periodic preventive replacements with minimal repairs in case of unplanned failures. A model was developed using the overall cost by considering the interdependence between the maintenance plan and the production schedule. The overall cost contains two parts: the costs of launching a product, production, storage and breaking on the demand and the preventive and corrective maintenance costs for multi-periods and multi-products systems. The purpose of this integration is to
APA, Harvard, Vancouver, ISO, and other styles
47

Zheng, Hao, Yixiong Feng, Jianrong Tan, and Zixian Zhang. "An integrated modular design methodology based on maintenance performance consideration." Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 231, no. 2 (2016): 313–28. http://dx.doi.org/10.1177/0954405415573060.

Full text
Abstract:
Maintenance nowadays not only plays a crucial role in the usage phase, but is fast becoming the primary focus of the design stage—especially with general increased emphasis on product service. The modularization of maintenance has been explored rarely by previous researchers, despite its significant potential benefit. Existing modular design methods on life cycle do not sufficiently improve maintenance performance as a whole. In effort to remedy this, this article considers relevant maintenance issues at early stages of product development and presents a novel modular methodology based on the
APA, Harvard, Vancouver, ISO, and other styles
48

Lacković, Krešimir, Robert Šojo, and Marina Peko. "Integrated Marketing Communication in Project Activities." Tehnički glasnik 15, no. 2 (2021): 205–12. http://dx.doi.org/10.31803/tg-20200707161105.

Full text
Abstract:
The paper deals with integrated marketing applied in project activities. The reason for this is the fact that such activities should refine their offer with a supplement in the project documentation but in the means of a different approach to the market. The amendment addresses recommendations to investors for the future construction and maintenance of facilities, and Lean and BIM in the design, construction and maintenance of facilities. That is why, during market processing, investors are offered an offer that solves the project task, includes design with visualization, and construction supe
APA, Harvard, Vancouver, ISO, and other styles
49

Shao Zhifang, Sun Lu, and Li Fujuan. "Optimization Model Integrated Flight Schedule and Maintenance Plans." INTERNATIONAL JOURNAL ON Advances in Information Sciences and Service Sciences 5, no. 3 (2013): 784–90. http://dx.doi.org/10.4156/aiss.vol5.issue3.91.

Full text
APA, Harvard, Vancouver, ISO, and other styles
50

Horváth, Csaba. "Integrated maintenance management model in the printing industry." Journal of Graphic Engineering and Design 1, no. 1 (2010): 16–22. http://dx.doi.org/10.24867/jged-2010-1-016.

Full text
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!